A material extraction structure for unloading liquefied products at a dock

By installing anti-detachment claws and tension adjustment structures on the flange, the problem of material leakage caused by unstable flange connections is solved, ensuring the safety and stability of the liquefied product unloading process, preventing corrosive material splashing, and protecting the safety of operators and the environment.

CN224454022UActive Publication Date: 2026-07-03ANQING CHEMICAL CONSTRUCTION INVESTMENT CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
ANQING CHEMICAL CONSTRUCTION INVESTMENT CO LTD
Filing Date
2025-07-07
Publication Date
2026-07-03

Smart Images

  • Figure CN224454022U_ABST
    Figure CN224454022U_ABST
Patent Text Reader

Abstract

This utility model discloses a material extraction structure for unloading liquefied materials at a dock. It includes an extraction pipe installed on the discharge pipe of a material tank, a first flange mounted on the extraction pipe, and a second flange detachably connected to the discharge pipe. The structure also includes an anti-detachment structure mounted on the first flange. The anti-detachment structure comprises several anti-detachment hooks that grip the bottom of the second flange. The gripping force of the anti-detachment hooks is adjusted by a tension adjustment structure. During the extraction process, when the flanges are connected, the locking action of the anti-detachment hooks locks the connected flange structure, preventing the flanges from loosening and causing serious safety accidents, especially for hazardous chemicals, due to leakage or splashing.
Need to check novelty before this filing date? Find Prior Art