Trestle equipment capable of being used for distributing materials
By employing a laterally movable mounting frame and concrete conveying mechanism in tunnel engineering machinery, the problems of worker health threats and low efficiency in the construction of tunnel inverts and filling layers have been solved, achieving low-cost, high-efficiency tunnel concrete pouring and construction continuity.
Patent Information
- Application Number
- CN202522022552.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-19
- Publication Date
- 2026-07-14
- Estimated Expiration
- 2035-09-19
AI Technical Summary
The existing construction of tunnel invert arch and filling layer concrete pouring presents problems such as worker health threats, low efficiency and high cost. In addition, the existing trestle equipment has a complex structure and occupies a large amount of tunnel space.
By employing a horizontally movable mounting frame and concrete conveying mechanism, combined with a transverse track and a longitudinally moving full-arc trolley, continuous pouring of both sides can be achieved. Only one set of equipment is required, reducing space occupation and maintaining construction continuity.
It enables low-cost and efficient tunnel concrete pouring, reduces equipment space requirements, and improves construction continuity and traffic capacity.