Technical Problem

[0002]在铝钢焊作用中,焊接导杆需要利用吊链进行运输到工位上,现有的方式是将吊链穿过导杆上的穿孔,然后打结固定,由于导杆落位时需要保持竖直放置,因此在解锁时需要工人借用梯子将吊链解开,不仅影响工作效率,同时具有较大的安全隐患

Benefits of technology

[0011]与现有技术相比,本实用新型的有益效果是:本导杆吊运用吊具设计合理,构思巧妙,通过设置上支撑板、下支撑板和连接杆组成一个U型结构,将下支撑板穿过导杆上的穿孔,然后通过吊链穿过上支撑板上的吊耳,可以快速的对导杆进行固定;需要解锁时,通过长杆拨动整个吊具移动,使得下支撑板脱离导杆,避免了工人上下摘卸导杆的反复作业,提升了工作效率,同时降低了工作中的安全隐患。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224812086U_ABST
    Figure CN224812086U_ABST
Patent Text Reader

Abstract

The utility model discloses a guide rod hoist use hoist, including upper support board, lower support board, connecting rod, fixed shaft and lifting lug, upper support board and lower support board are in parallel arrangement, the connecting rod is fixed between upper support board and lower support board, upper support board is located the right above of lower support board, the size of lower support board is less than the size of the perforation of guide rod end, the fixed shaft is penetrated in upper support board, the both ends of lifting lug are rotatoryly connected respectively in the outside of fixed shaft, and this guide rod hoist use hoist can fix and unlock guide rod fast, improves work efficiency, reduces the potential safety hazard in work, and greatly improves the use convenience.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of overhead crane transportation technology, specifically to a lifting device for a guide rod crane. Background Technology

[0002] In aluminum-steel welding, the welding guide rod needs to be transported to the work station using a lifting chain. The existing method is to pass the lifting chain through the hole on the guide rod and then tie it in place. Since the guide rod needs to be placed vertically when it is lowered, workers need to use a ladder to untie the lifting chain when unlocking it, which not only affects work efficiency but also poses a significant safety hazard. Summary of the Invention

[0003] The technical problem to be solved by this utility model is to overcome the existing defects and provide a lifting tool for guide rod hoisting, which can quickly fix and unlock the guide rod, improve work efficiency, reduce safety hazards in the work, and effectively solve the problems in the background art.

[0004] To achieve the above objectives, this utility model provides the following technical solution: a guide rod lifting device, comprising an upper support plate, a lower support plate, a connecting rod, a fixed shaft, and lifting lugs;

[0005] The upper support plate and the lower support plate are arranged in parallel. The connecting rod is fixed between the upper support plate and the lower support plate. The upper support plate is located directly above the lower support plate. The size of the lower support plate is smaller than the through hole size at the end of the guide rod. A fixed shaft passes through the upper support plate. The two ends of the lifting lug are respectively rotatably connected to the outer side of the fixed shaft.

[0006] As a preferred technical solution of this utility model, it also includes an anti-drop component, which includes a positioning steel pipe, an opening groove, a locking rod, a stop rod, and a fixing nut;

[0007] The positioning steel pipe is vertically fixed to one end of the upper support plate, and the fixing nut is fixed to one end of the lower support plate. The positioning steel pipe is located directly above the fixing nut, and the central axis of the positioning steel pipe coincides with the central axis of the fixing nut. The locking rod is located inside the positioning steel pipe. An opening groove is formed on the outer side of the positioning steel pipe along its length. The opening of the opening groove is located at the upper end of the positioning steel pipe. A stop rod is fixed on the outer side of the locking rod. The outer diameter of the stop rod is smaller than the width of the opening groove.

[0008] In a preferred embodiment of this utility model, the positioning steel pipe is connected to the upper support plate, and the fixing nut is connected to the lower support plate by welding.

[0009] As a preferred embodiment of this utility model, the upper support plate, the lower support plate, and the connecting rod are an integral structure.

[0010] As a preferred embodiment of this utility model, an auxiliary frame is welded to one side of the connecting rod.

[0011] Compared with the prior art, the beneficial effects of this utility model are as follows: This guide rod hoist uses a reasonable and ingeniously designed lifting device. By setting up an upper support plate, a lower support plate, and a connecting rod to form a U-shaped structure, the lower support plate is passed through the perforation on the guide rod, and then the lifting chain passes through the lifting lug on the upper support plate, which can quickly fix the guide rod. When unlocking is required, the entire lifting device is moved by using a long rod to make the lower support plate detach from the guide rod, avoiding the repeated work of workers to remove and unload the guide rod, improving work efficiency, and reducing safety hazards during work. Attached Figure Description

[0012] Figure 1 This is a schematic diagram of the structure of this utility model;

[0013] Figure 2 This is the front view of the present utility model;

[0014] Figure 3 This is a schematic diagram of the working state of this utility model.

[0015] In the diagram: 1 Upper support plate, 2 Lower support plate, 3 Connecting rod, 4 Fixed shaft, 5 Lifting lug, 6 Auxiliary frame, 7 Anti-fall component, 71 Positioning steel pipe, 72 Opening slot, 73 Locking rod, 74 Stop rod, 75 Fixing nut. Detailed Implementation

[0016] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments (for ease of description and understanding, hereinafter referred to as...). Figure 2 The top of is the top. Figure 2 (The preceding part is described as the foreground). Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this utility model.

[0017] Please see Figure 1-3 This utility model provides a technical solution: a guide rod lifting device, including an upper support plate 1, a lower support plate 2, a connecting rod 3, a fixed shaft 4, and a lifting lug 5;

[0018] The upper support plate 1 and the lower support plate 2 are arranged in parallel. The connecting rod 3 is fixed between the upper support plate 1 and the lower support plate 2, and the connecting rod 3 is located at one end between the two. The upper support plate 1 is located directly above the lower support plate 2, so that the upper support plate 1, the lower support plate 2 and the connecting rod 3 form a U-shaped structure. The size of the lower support plate 2 is smaller than the through hole size at the end of the guide rod, so that the lower support plate 2 can pass through the through hole at the end of the guide rod. A fixed shaft 4 passes through the upper support plate 1, and the fixed shaft 4 passes through the upper support plate 1 vertically in the front-back direction. The two ends of the lifting lug 5 are rotatably connected to the outer side of the fixed shaft 4. When hoisting the guide rod, the lower support plate 2 passes through the through hole at one end of the guide rod, and then the lifting chain passes through the lifting lug 5. The guide rod is lifted by the overhead crane. When unlocking is required, the lower support plate 2 is disengaged from the guide rod by using a long rod, so as to quickly complete the removal and unloading of the guide rod and improve work efficiency.

[0019] Furthermore, in order to prevent the guide rod from detaching from the lifting device during the lifting process, the lifting device also includes an anti-detachment component 7, which includes a positioning steel pipe 71, an opening slot 72, a locking rod 73, a stop rod 74, and a fixing nut 75.

[0020] The positioning steel pipe 71 is vertically fixed to one end of the upper support plate 1, and the fixing nut 75 is fixed to one end of the lower support plate 2. The positioning steel pipe 71 is located directly above the fixing nut 75, and the central axis of the positioning steel pipe 71 coincides with the central axis of the fixing nut 75. The locking rod 73 is located inside the positioning steel pipe 71. An opening groove 72 is opened on the outer side of the positioning steel pipe 71 along its length. The opening position of the opening groove 72 is located at the upper end of the positioning steel pipe 71. A stop rod 74 is fixed on the outer side of the locking rod 73. The outer diameter of the stop rod 74 is smaller than the width of the opening groove 72. After the lower support plate 2 passes through the through hole at the end of the guide rod, the locking rod 73 falls through the central hole of the fixing nut 75. Under the limiting action of the opening groove 72, the guide rod is limited and fixed, preventing the guide rod from slipping during hoisting.

[0021] To improve the connection between the positioning steel pipe 71 and the fixing nut 75, the positioning steel pipe 71 is connected to the upper support plate 1 and the fixing nut 75 is connected to the lower support plate 2 by welding.

[0022] To improve the structural strength of the entire lifting device, the upper support plate 1, the lower support plate 2, and the connecting rod 3 are integrated into one structure, and all three are made of steel.

[0023] To facilitate workers using long rods to move the lifting device and detach the lower support plate 2 from the lifting rod, an auxiliary frame 6 is welded to one side of the connecting rod 3.

[0024] When in use: When it is necessary to hoist the guide rod, the lower support plate 2 passes through the through hole at the end of the guide rod, and then the locking rod 73 is moved so that the lower end of the locking rod 73 passes through the fixing nut 75, and the lifting chain passes through the lifting lug 5 on the upper support plate 1. The lifting chain is then lifted by the overhead crane to realize the transportation of the guide rod.

[0025] After the lifting rod is delivered to the position, the lifting chain is in a slack state. Then, the stop rod 74 is lifted by the long rod and rotated so that the stop rod 74 falls on the upper end of the positioning steel pipe 71. Then, the lower support plate 2 is moved so that the lower support plate 2 is disengaged from the guide rod, thereby unlocking the guide rod.

[0026] The parts of the utility model not described in detail are prior art. Although embodiments of the utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the utility model. The scope of the utility model is defined by the appended claims and their equivalents.

Claims

1. A lifting device for a guide rod hoist, characterized in that: It includes an upper support plate (1), a lower support plate (2), a connecting rod (3), a fixed shaft (4), and a lifting lug (5); The upper support plate (1) and the lower support plate (2) are arranged in parallel. The connecting rod (3) is fixed between the upper support plate (1) and the lower support plate (2). The upper support plate (1) is located directly above the lower support plate (2). The size of the lower support plate (2) is smaller than the through hole size at the end of the guide rod. A fixed shaft (4) passes through the upper support plate (1). The two ends of the lifting lug (5) are rotatably connected to the outer side of the fixed shaft (4).

2. The lifting device for a guide rod hoist according to claim 1, characterized in that: It also includes an anti-drop component (7), which includes a positioning steel pipe (71), an opening slot (72), a locking rod (73), a stop rod (74), and a fixing nut (75); The positioning steel pipe (71) is vertically fixed to one end of the upper support plate (1), and the fixing nut (75) is fixed to one end of the lower support plate (2). The positioning steel pipe (71) is located directly above the fixing nut (75), and the central axis of the positioning steel pipe (71) coincides with the central axis of the fixing nut (75). The locking rod (73) is located inside the positioning steel pipe (71). An opening groove (72) is provided on the outer side of the positioning steel pipe (71) along its length direction. The opening position of the opening groove (72) is located at the upper end of the positioning steel pipe (71). A stop rod (74) is fixed on the outer side of the locking rod (73). The outer diameter of the stop rod (74) is smaller than the width of the opening groove (72).

3. The lifting device for a guide rod hoist according to claim 2, characterized in that: The positioning steel pipe (71) is connected to the upper support plate (1), and the fixing nut (75) is connected to the lower support plate (2) by welding.

4. The lifting device for a guide rod hoist according to claim 1, characterized in that: The upper support plate (1), lower support plate (2) and connecting rod (3) are an integral structure.