A composite beam assembly installation structure for construction
By using column embedded parts in conjunction with the limiting plate and steel relief groove of H-beams, the problem of bolt connection of precast composite beams on the construction site is solved, and the accurate positioning and installation of composite beams are achieved, which is suitable for construction environments with limited space.
Patent Information
- Application Number
- CN202522328847.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-03
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-11-03
AI Technical Summary
In existing technologies, when precast composite beams are installed on the construction site, it is difficult to accurately align the bolts between the H-beams and the embedded parts. Furthermore, the precast beam components are heavy, making installation difficult when space is limited.
The column embedded parts are used in conjunction with the limiting plates and steel relief grooves of the H-beams to ensure that the bolt holes are installed in a corresponding manner. The composite beams are directly installed by connecting the first and second column embedded parts with the external beams and columns.
The problem of bolt connection accuracy was solved, enabling accurate positioning and installation of composite beams under limited site conditions, thus simplifying the construction process.
Smart Images

Figure CN224955331U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of composite beams, and in particular relates to an installation structure for a composite beam assembly used in construction. Background Technology
[0002] Composite beams are rectangular beam components assembled from different materials such as concrete and steel, and then installed on the construction site. Current technology typically employs precast composite beams, which are manufactured in a factory and then transported to the construction site for installation. This combines the advantages of factory prefabrication with material combination, improving construction efficiency and optimizing structural stress through complementary material properties. However, current technology presents the following construction challenges: H-beams embedded in the structural beams and embedded parts in the structural columns cannot be accurately bolted together, requiring high precision; beam components need to be prefabricated off-site, but off-site prefabricated beam components are relatively heavy, making installation difficult in situations with limited space. Utility Model Content
[0003] In view of this, the present invention aims to provide a construction composite beam assembly installation structure to solve at least one of the problems existing in the prior art.
[0004] To achieve the above objectives, the technical solution of this utility model is implemented as follows: A construction composite beam assembly installation structure includes column embedded parts, the column embedded parts including a first column embedded part and a second column embedded part, the first column embedded part and / or the second column embedded part being installed to an external beam column, a composite beam being installed between the two beam columns, and the two ends of the composite beam being connected to the external beam column through the first column embedded part and / or the second column embedded part.
[0005] Furthermore, the first column embedded part includes a first plate, a first stiffening plate, two first column limiting plates, a number of first embedded rods and a number of first column bolts. A number of first embedded rods are arranged in an array on one side of the first plate, and a first column limiting plate is installed at the upper and lower ends of the other side of the first plate. The first column limiting plate is used in conjunction with the composite beam. A first stiffening plate is also installed in the middle of the other side of the first plate, and a number of first column bolts for the installation of the composite beam are arranged in an array on the first stiffening plate.
[0006] Furthermore, the first embedded rod has an L-shaped structure.
[0007] Furthermore, the second column embedded part includes a second plate, a third plate, a second stiffening plate, two second column limiting plates, several second embedded rods, and several second column bolts. The second plate and the third plate are symmetrically arranged, and several second embedded rods are arranged in an array between the second plate and the third plate. A second column limiting plate is installed at both the upper and lower ends of the side of the second plate and the third plate away from each other. A second stiffening plate is installed in the middle of the side of the second plate and the third plate away from each other. Several second column bolts for the installation of the composite beam are arranged in an array on the second stiffening plate.
[0008] Furthermore, the composite beam includes H-beams, one side of which has several steel mounting holes for connecting with the first stiffening plate and / or the second stiffening plate. At least one steel clearance groove is provided at each end of one side of the H-beam, which is used to limit the connection with the first column limiting plate and / or the second column limiting plate. Several shear studs are also installed on the surface of the H-beam, and several steel stiffening plates are also installed on the other side of the H-beam. The H-beams and steel stiffening plates are connected to the beam reinforcement. The beam reinforcement includes several longitudinal bars and several stirrups, which together form the beam frame.
[0009] Compared with existing technologies, the construction composite beam assembly installation structure described in this utility model has the following advantages: This utility model discloses a construction composite beam assembly installation structure. This installation structure is suitable for composite beam installation in situations with limited space. It eliminates the need for prefabrication of composite beams, allowing them to be directly installed at designated locations. Through the cooperation of the column limiting plates at both ends of the first or second column embedded part and the steel relief grooves at both ends of the H-beam, the installation positions of the steel mounting holes on the H-beam correspond one-to-one with the installation positions of the plate mounting holes in the first or second column embedded part. This solves the problem of inaccurate bolt connections and the requirement for high precision in existing technologies. Attached Figure Description
[0010] The accompanying drawings, which form part of this utility model, are used to provide a further understanding of the utility model. The illustrative embodiments of the utility model and their descriptions are used to explain the utility model and do not constitute an undue limitation of the utility model. In the drawings: Figure 1 This is a front view of the first column embedded part according to an embodiment of the present utility model; Figure 2 This is a partial side view of the first column embedded part according to an embodiment of the present utility model; Figure 3 This is a front view of the second column embedded part according to an embodiment of the present utility model; Figure 4 This is a partial side view of the second column embedded part according to an embodiment of the present utility model; Figure 5 This is a schematic diagram of the installation plan of the first column embedded part and the H-beam according to an embodiment of the present utility model; Figure 6 This is a partial side sectional view of the installation of the first column embedded part and the H-beam according to an embodiment of the present utility model; Figure 7 This is a schematic diagram of the installation plan of the first column embedded part and the composite beam according to an embodiment of the present utility model; Figure 8 This is a partial side sectional view of the installation of the first column embedded part and the composite beam according to an embodiment of the present utility model.
[0011] Explanation of reference numerals in the attached figures: 1. First column embedded part; 11. First plate; 12. First embedded rod; 13. First stiffening plate; 14. First column bolt; 15. First column limiting plate; 2. Second column embedded part; 21. Second plate; 22. Third plate; 23. Second embedded rod; 24. Second column limiting plate; 3. Composite beam; 31. H-beam; 32. Steel stiffening plate; 33. Shear stud; 34. Beam reinforcement; 341. Longitudinal reinforcement; 342. Stirrups. Detailed Implementation
[0012] It should be noted that, unless otherwise specified, the embodiments and features described in these embodiments of the present invention can be combined with each other.
[0013] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the invention. Furthermore, the terms "first," "second," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined with "first," "second," etc., may explicitly or implicitly include one or more of that feature. In the description of this invention, unless otherwise stated, "a plurality of" means two or more.
[0014] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art will understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0015] The present invention will now be described in detail with reference to the accompanying drawings and embodiments.
[0016] like Figures 1 to 8 As shown, a construction composite beam assembly installation structure includes column embedded parts, the column embedded parts including a first column embedded part 1 and a second column embedded part 2, the first column embedded part 1 and / or the second column embedded part 2 are installed to external beams and columns, a composite beam 3 is installed between the two beams and columns, and the two ends of the composite beam 3 are connected to the external beams and columns through the first column embedded part 1 and / or the second column embedded part 2.
[0017] In a preferred embodiment of this utility model, the first column embedded part 1 includes a first plate 11, a first stiffening plate 13, two first column limiting plates 15, a plurality of first embedded rods 12, and a plurality of first column bolts 14. A plurality of first embedded rods 12 are arranged in an array on one side of the first plate 11, and a first column limiting plate 15 is installed at each of the upper and lower ends of the other side of the first plate 11. The first column limiting plates 15 are used in conjunction with the composite beam 3. A first stiffening plate 13 is also installed in the middle of the other side of the first plate 11, and a plurality of first column bolts 14 for installing the composite beam 3 are arranged in an array on the first stiffening plate 13. In this embodiment, the first column embedded part 1 is suitable for situations where column embedded parts need to be installed on one side of the beam and column. In actual construction, when the outer beam and column only need to be installed with the composite beam 3 on one side, only the first column embedded part 1 needs to be installed on one side of the beam and column.
[0018] In a preferred embodiment of this utility model, the first embedded rod 12 is an L-shaped structure. The purpose of setting it as an L-shaped structure is to increase the installation stability of the first embedded rod 12 and the beam and column.
[0019] In a preferred embodiment of this utility model, the second column embedded part 2 includes a second plate 21, a third plate 22, a second stiffening plate, two second column limiting plates 24, a plurality of second embedded rods 23, and a plurality of second column bolts. The second plate 21 and the third plate 22 are symmetrically arranged, and a plurality of second embedded rods 23 are arranged in an array between the second plate 21 and the third plate 22. A second column limiting plate 24 is installed at both the upper and lower ends of the side of the second plate 21 and the third plate 22 away from each other. A second stiffening plate is installed in the middle of the side of the second plate 21 and the third plate 22 away from each other. A plurality of second column bolts for the installation of the composite beam 3 are arranged in an array on the second stiffening plate. In this embodiment, the second column embedded part 2 is suitable for situations where column embedded parts need to be installed on both sides of the beam and column. In actual construction, when the beam and column in the middle are installed with the composite beam 3, it is necessary to install the second column embedded part 2 on both sides of the beam and column respectively.
[0020] In a preferred embodiment of this utility model, the composite beam 3 includes an H-beam 31. One side of the surface of the H-beam 31 has several steel mounting holes for connection with the first stiffening plate 13 and / or the second stiffening plate. At least one steel clearance groove 311 is provided at both ends of one side of the surface of the H-beam 31. The steel clearance groove 311 is used to limit the connection with the first column limiting plate 15 and / or the second column limiting plate 24. Several shear studs 33 are also installed on the surface of the H-beam 31. Several steel stiffening plates 32 are also installed on the other side of the surface of the H-beam 31. Both the H-beam 31 and the steel stiffening plates 32 are connected to the beam reinforcement. The beam reinforcement 34 includes several longitudinal bars 341 and several stirrups 342. The several longitudinal bars 341 and several stirrups 342 form a beam frame. The beam frame is used for pouring concrete layers. In this embodiment, taking the first column limiting plate 15 as an example, the first column limiting plate 15 at the upper end of the first plate 11 is located in the steel relief groove 311, and the first column limiting plate 15 at the lower end of the first plate 11 is located outside the steel relief groove 311. In this embodiment, shear studs 33 are provided on both sides of the surface of the H-beam 31, which can improve the connection stability between the H-beam 31 and the concrete layer of the composite beam 3.
[0021] This installation structure is suitable for composite beam installation in situations with limited space. It eliminates the need for prefabricated composite beams, allowing them to be directly installed in designated locations. The cooperation between the column limiting plates at both ends of the first column embedded part 1 or the second column embedded part 2 and the steel relief grooves 311 at both ends of the H-beam 31 ensures that the installation positions of the steel mounting holes on the H-beam 31 correspond one-to-one with the plate mounting holes in the first column embedded part 1 or the second column embedded part 2. This facilitates the installation of the first column bolt 14 and the second column bolt, solving the problem of inaccurate bolt connections and high precision requirements in existing technologies.
[0022] The working principle of a composite beam assembly installation structure for construction: It should be noted that composite beam 3 needs to be installed between two beams and columns. During the installation process, the beams and columns need to be installed first, and the column reinforcement bars need to be tied. Then, the first column embedded part 1 or the second column embedded part 2 is pre-embedded in the beams and columns. After the first column embedded part 1 or the second column embedded part 2 is pre-embedded, concrete can be poured into the beams and columns. Next, install the H-beam 31 in the composite beam 3. The H-beam 31 is connected to the first column bolt 14 on the first column embedded part 1 or the second column embedded part 2. After the H-beam 31 is installed with the first column embedded part 1 or the second column embedded part 2, tie the beam reinforcement 34 (longitudinal reinforcement 341 and stirrup 342) of the composite beam 3, and weld the beam reinforcement 34 to the H-beam 31. After installation, pour a concrete layer inside the composite beam 3.
[0023] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A composite beam assembly installation structure for construction, characterized in that: Includes column embedded parts, the column embedded parts include a first column embedded part (1) and a second column embedded part (2), the first column embedded part (1) and / or the second column embedded part (2) are installed to the external beams and columns, a composite beam (3) is installed between the two beams and columns, and the two ends of the composite beam (3) are connected to the external beams and columns through the first column embedded part (1) and / or the second column embedded part (2); The first column embedded part (1) includes a first plate (11) and a plurality of first embedded rods (12), and a plurality of first embedded rods (12) are arranged in an array on one side of the first plate (11); The second column embedded part (2) includes a second plate (21), a third plate (22) and a number of second embedded rods (23). The second plate (21) and the third plate (22) are symmetrically arranged, and a number of second embedded rods (23) are arranged in an array between the second plate (21) and the third plate (22).
2. The construction composite beam assembly installation structure according to claim 1, characterized in that: The first embedded rod (12) has an L-shaped structure.
3. The construction composite beam assembly installation structure according to claim 1, characterized in that: The first column embedded part (1) also includes two first column limiting plates (15). A first column limiting plate (15) is installed at the upper and lower ends of the other side of the first plate body (11). The first column limiting plate (15) is used in conjunction with the composite beam (3).
4. The construction composite beam assembly installation structure according to claim 1, characterized in that: The first column embedded part (1) also includes a first stiffening plate (13) and a number of first column bolts (14). The first stiffening plate (13) is also installed in the middle of the other side of the first plate (11). A number of first column bolts (14) for the installation of the composite beam (3) are arranged in an array on the first stiffening plate (13).
5. The installation structure of a composite beam assembly for construction according to claim 1, characterized in that: The second column embedded part (2) also includes two second column limiting plates (24). A second column limiting plate (24) is installed at the upper and lower ends of the side of the second plate (21) and the third plate (22) away from each other.
6. The installation structure of a composite beam assembly for construction according to claim 5, characterized in that: The second column embedded part (2) also includes a second stiffening plate and several second column bolts. The second stiffening plate is installed in the middle of the side of the second plate (21) and the third plate (22) away from each other. Several second column bolts for the installation of the composite beam (3) are arranged in an array on the second stiffening plate.
7. The construction composite beam assembly installation structure according to claim 1, characterized in that: The composite beam (3) includes an H-beam (31), on which several shear studs (33) are installed. On the other side of the surface of the H-beam (31), several steel stiffening plates (32) are also installed. The H-beam (31) and the steel stiffening plates (32) are both connected to the beam reinforcement (34).
8. The construction composite beam assembly installation structure according to claim 7, characterized in that: The H-beam (31) has several steel mounting holes on one side for connecting with the first stiffening plate (13) and / or the second stiffening plate.
9. The installation structure of a composite beam assembly for construction according to claim 7, characterized in that: At least one steel relief groove is provided at both ends on one side of the surface of the H-beam (31), and the steel relief groove is used to limit the first column limiting plate (15) and / or the second column limiting plate (24).
10. The installation structure of a composite beam assembly for construction according to claim 7, characterized in that: The beam reinforcement (34) includes several longitudinal bars (341) and several stirrups (342), and the several longitudinal bars (341) and several stirrups (342) form a beam frame.