A layered ecological restoration and slope stabilization device for open-pit mine spoil heaps

By employing a layered ecological restoration and slope stabilization device at open-pit mine spoil heaps, utilizing local materials such as gangue, fly ash, and arsenic sandstone, a layered structure is formed that resists settlement, blocks water, solidifies heavy metals, and is suitable for plant growth. This solves the problem of high restoration costs and achieves low-cost, high-efficiency ecological restoration.

CN224982212UActive Publication Date: 2026-11-17ORDOS DAYUAN COAL CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522581864.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-04
Publication Date
2026-11-17
Estimated Expiration
2035-12-04

AI Technical Summary

Technical Problem

Existing ecological restoration and slope stabilization devices are costly to repair and require materials to be transported from other locations, leading to increased transportation costs and energy consumption, making them difficult to promote and apply in the treatment of large-scale open-pit mine spoil heaps.

Method used

The project utilizes a gangue base layer to enhance its resistance to settlement, a fly ash and arsenic sandstone water-blocking layer to prevent water damage and solidify heavy metals, and an improved planting layer to adapt to plant growth. By using mining solid waste such as gangue, fly ash, and arsenic sandstone, as well as local materials, combined with anchor rods and slope protection nets, a layered structure is formed, reducing material procurement and transportation costs. The slope stability is ensured through a water retaining wall and a drainage system with a water channel.

Benefits of technology

It achieves low repair costs, high slope stability, is suitable for large-scale application, and facilitates the replacement of slope protection nets, thereby improving work efficiency and alleviating the constraints of drought on ecological restoration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982212U_ABST
    Figure CN224982212U_ABST
Patent Text Reader

Abstract

This utility model discloses a layered ecological restoration slope stabilization device for open-pit mine spoil heaps. Applied to the field of ecological restoration of open-pit mine spoil heaps, this utility model enhances the anti-settlement capacity by using a gangue base layer, a fly ash and arsenic sandstone water-blocking layer to achieve water resistance and heavy metal solidification, and an improved planting layer adapted to plant growth. Each layer works synergistically to ensure the foundation for restoration. Using mining solid waste such as gangue, fly ash, and arsenic sandstone, as well as local materials, significantly reduces material procurement and transportation costs, achieving the goal of "treating waste with waste," thus achieving low restoration costs and facilitating widespread application. By setting up a water-retaining wall to prevent water from flowing onto the planting layer, water is discharged into a collection pool through a drainage channel, ensuring slope stability. The collected rainwater can be used to irrigate plants, alleviating the constraints of drought on ecological restoration. Anchoring rods to anchor the slope and slope protection netting to protect the slope improve its anti-slip capacity and ensure slope stability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of ecological restoration of open-pit mine spoil heaps, and in particular to a layered ecological restoration and slope stabilization device for open-pit mine spoil heaps. Background Technology

[0002] During open-pit mining, large amounts of surface soil and surrounding rock are stripped away to form mining overburden, which is typically piled up around the mining area to form spoil heaps. As artificially constructed loose slopes, spoil heaps not only damage the original landform and ecosystem but also, due to their structural characteristics and environmental conditions, face a series of severe ecological and safety problems, becoming one of the key bottlenecks restricting the green and sustainable development of open-pit mines. A search of Chinese patent CN217267546U, publication number: "An Ecological Restoration and Soil Stabilization Device for Steep Rock Slopes," reveals that the device comprises several galvanized wire meshes and several soil stabilization components. Each soil stabilization component is rectangular, with retaining steel plates installed on its upper surface, lower surface, and interior. The components contain internal voids. These components are installed on the slope surface, adhering to it, and the voids within them connect to the upper surface of the slope. The galvanized wire meshes are connected to the periphery of the soil stabilization components. This invention utilizes soil stabilization components to form a three-dimensional structure with internal voids, allowing for soil filling and facilitating vegetation rooting. The anchor rods used to anchor the device are part of the soil stabilization components, comprising four in total, effectively increasing anchoring strength. The galvanized wire meshes are directly bound and fixed to the soil stabilization components, significantly reducing the number of anchor bolts required for anchoring the galvanized wire meshes.

[0003] Existing ecological restoration and slope stabilization devices are costly. Most of these devices require the purchase of topsoil, concrete, and specialized protective materials, which must be transported from other locations to the mining area. This not only increases transportation costs and energy consumption but also significantly raises the overall cost of the restoration project due to the scarcity of topsoil resources. Consequently, they are difficult to promote and apply in the large-scale management of open-pit mine spoil heaps. To address these issues, we propose a layered ecological restoration and slope stabilization device for open-pit mine spoil heaps. Utility Model Content

[0004] The purpose of this invention is to provide a layered ecological restoration and slope stabilization device for open-pit mine spoil heaps, which has the advantage of low restoration cost.

[0005] The above-mentioned technical objective of this utility model is achieved through the following technical solution: a layered ecological restoration and slope stabilization device for open-pit mine spoil heaps, comprising a slope, a base layer laid on the surface of the slope, a water-proof layer laid on the surface of the base layer, a planting layer laid on the surface of the water-proof layer, a water-retaining wall set on the surface of the slope, a water-guiding channel opened on the surface of the planting layer, a water collection pool set on one side of the slope, a plurality of anchor rods set on the inner wall of the slope, a slope protection net sleeved between the surfaces of the anchor rods, a fixing rod slidably sleeved on the inner wall of the anchor rod, a pressing rod slidably sleeved on the inner wall of the fixing rod, a trapezoidal groove opened on the surface of the pressing rod, a steel ball set on the inner wall of the fixing rod, the steel ball being adapted to the trapezoidal groove, a fixing groove opened on the inner wall of the anchor rod, the fixing groove being engaged with the steel ball, a spring set between the inner walls of the pressing rod and the fixing rod, and a pressure plate fixedly sleeved on the surface of the fixing rod.

[0006] The above technical solution utilizes a gangue base layer to enhance anti-settlement capacity, a fly ash and arsenic sandstone water-resistant layer to block water and solidify heavy metals, and an improved planting layer to adapt to plant growth. These layers work together to ensure a solid foundation for restoration. By using mining solid waste such as gangue, fly ash, and arsenic sandstone, along with local materials, material procurement and transportation costs are significantly reduced, achieving the goal of "treating waste with waste." This results in low restoration costs and facilitates widespread application. A water-retaining wall prevents water from flowing onto the planting layer, and water is diverted through a drainage system. The trough drains into the collection pool, ensuring the stability of the slope. The collected rainwater can be used to irrigate plants, alleviating the constraints of drought on ecological restoration. Anchoring rods secure the slope, and the slope protection net protects it, improving the slope's resistance to sliding and ensuring its stability. By pressing the pressing rod, the trapezoidal groove is aligned with the steel ball, and the fixing rod is pulled out, causing the steel ball to disengage from the fixing groove, facilitating the installation and removal of the slope protection net. This makes it easy to replace the slope protection net, reducing workload and improving work efficiency.

[0007] The present invention is further configured such that a nut is threaded onto the surface of the pressing rod.

[0008] By adopting the above technical solution, the pressing rod is fixed by setting a nut to prevent accidental contact that could cause the fixing rod to loosen, thus ensuring the stability of the slope protection net.

[0009] The present invention is further configured such that an anti-detachment rod is hinged to the inner wall of the anchor rod.

[0010] The above technical solution is adopted to prevent the anchor rod from slipping by setting an anti-slip rod.

[0011] The present invention is further configured such that the base layer is made of gangue.

[0012] By adopting the above technical solution, the base layer is made of gangue, which has good anti-settlement performance.

[0013] The present invention is further configured such that the material of the waterproof layer is fly ash arsenic sandstone.

[0014] The above technical solution uses a fly ash and arsenic sandstone material to create a waterproof layer, which blocks water and solidifies heavy metals.

[0015] The present invention is further configured such that the planting layer is composed of gangue particles and topsoil mixed in a volume ratio of 1:3.

[0016] By adopting the above technical solution, the planting layer is made of gangue particles and topsoil mixed in a volume ratio of 1:3, which is suitable for plant growth, reduces the amount of topsoil used, and lowers the remediation cost.

[0017] The present invention is further configured such that: a slider is bolted to the surface of the pressing rod, and a groove is slidably connected to the surface of the slider, and the groove is formed on the inner wall of the fixing rod.

[0018] By adopting the above technical solution, the sliding block and groove are set to prevent the pressing rod from slipping out and ensure stability.

[0019] The present invention is further configured such that a raised ring is integrally formed on the top of the fixing rod.

[0020] By adopting the above technical solution, a convex ring is integrally formed on the top of the fixing rod, which facilitates pressing the pressing rod.

[0021] In summary, this utility model has the following beneficial effects: 1. This utility model improves the anti-settlement capacity by using a gangue base layer, a fly ash and arsenic sandstone water-proof layer to achieve water blocking and heavy metal solidification, and an improved planting layer to adapt to plant growth. All layers work together to ensure the foundation for repair. By using mining solid waste such as gangue, fly ash, and arsenic sandstone, as well as local materials, the material procurement and transportation costs are greatly reduced, achieving the goal of "treating waste with waste". This results in low repair costs and facilitates promotion and application. 2. This utility model prevents water from flowing onto the planting layer by setting up a water retaining wall and drains the water into a collection pool through a water guide channel, thus ensuring the stability of the slope. The collected rainwater can be used to irrigate the plants, alleviating the constraints of drought on ecological restoration. By anchoring the slope with anchor rods and protecting the slope with slope protection nets, the slope's anti-slip ability is improved, ensuring the stability of the slope.

[0022] 3. This utility model allows the trapezoidal groove to align with the steel ball by pressing the pressing rod, and then pulling out the fixing rod to disengage the steel ball from the fixing groove, making it convenient to install and remove the slope protection net, thereby facilitating the replacement of the slope protection net, reducing workload and improving work efficiency. Attached Figure Description

[0023] Figure 1 This is a three-dimensional structural view of the present invention; Figure 2 This is a cross-sectional view of the structure of this utility model; Figure 3 This is a partial structural cross-sectional view of the present invention; Figure 4 This is a utility model Figure 3 Enlarged view of the structure at point A in the middle.

[0024] Reference numerals in the attached diagram: 1. Slope; 2. Base layer; 3. Water-resistant layer; 4. Planting layer; 5. Retaining wall; 6. Water channel; 7. Collection pool; 8. Anchor rod; 9. Slope protection net; 10. Fixing rod; 11. Pressing rod; 12. Trapezoidal groove; 13. Steel ball; 14. Fixing groove; 15. Spring; 16. Pressure plate; 17. Nut; 18. Anti-detachment rod; 19. Sliding block; 20. Slide groove; 21. Protruding ring. Detailed Implementation

[0025] The present invention will be further described in detail below with reference to the accompanying drawings. Example

[0026] refer to Figure 1 and Figure 2 A layered ecological restoration and slope stabilization device for open-pit mine spoil heaps includes a slope 1, a base layer 2 on the surface of the slope 1, a waterproof layer 3 on the surface of the base layer 2, a planting layer 4 on the surface of the waterproof layer 3, a retaining wall 5 on the surface of the slope 1, a water channel 6 on the surface of the planting layer 4, and a water collection pool 7 on one side of the slope 1. The device utilizes a gangue base layer 2 to enhance its anti-settlement capacity, a fly ash and arsenic sandstone waterproof layer 3 to prevent water blockage and solidify heavy metals, and a modified planting layer 4 to adapt to plant growth. Each layer works synergistically to ensure the foundation for restoration. By using mining solid waste such as gangue, fly ash, and arsenic sandstone, as well as local materials, the device significantly reduces material procurement and transportation costs, achieving the goal of "treating waste with waste," thus achieving low restoration costs and facilitating widespread application. The retaining wall 5 prevents water from flowing onto the planting layer 4, and the water is discharged into the water collection pool 7 through the water channel 6, ensuring the stability of the slope 1. The collected rainwater can be used to irrigate the plants, alleviating the constraints of drought on ecological restoration.

[0027] refer to Figure 1 and Figure 2 The base layer 2 is made of gangue, which has good anti-settlement properties.

[0028] refer to Figure 1 and Figure 2 The material of the waterproof layer 3 is fly ash sandstone. By setting the material of the waterproof layer 3 to fly ash sandstone, water is blocked and heavy metals are solidified.

[0029] refer to Figure 1 and Figure 2 The planting layer 4 is made of gangue particles and topsoil mixed in a volume ratio of 1:3. By setting the planting layer 4 to be made of gangue particles and topsoil mixed in a volume ratio of 1:3, it is suitable for plant growth, reduces the amount of topsoil used, and lowers the cost of restoration. Example

[0030] refer to Figure 1 , Figure 2 , Figure 3 and Figure 4 The inner wall of slope 1 is provided with several anchor rods 8, and a slope protection net 9 is sleeved between the surfaces of the anchor rods 8. A fixing rod 10 is slidably sleeved on the inner wall of the anchor rod 8, and a pressing rod 11 is slidably sleeved on the inner wall of the fixing rod 10. A trapezoidal groove 12 is opened on the surface of the pressing rod 11. A steel ball 13 is provided on the inner wall of the fixing rod 10, and the steel ball 13 is adapted to the trapezoidal groove 12. A fixing groove 14 is opened on the inner wall of the anchor rod 8, and the fixing groove 14 is engaged with the steel ball 13. The inner walls of the pressing rod 11 and the fixing rod 10 are connected. A spring 15 is installed between the slopes, and a pressure plate 16 is fixedly sleeved on the surface of the fixing rod 10. The slope 1 is anchored by the anchor rod 8 and the slope protection net 9 protects the slope 1, which improves the slope 1's anti-slip ability and ensures the stability of the slope 1. By pressing the pressing rod 11, the trapezoidal groove 12 is aligned with the steel ball 13, and the fixing rod 10 is pulled out, so that the steel ball 13 is disengaged from the fixing groove 14, which facilitates the installation and removal of the slope protection net 9, thereby facilitating the replacement of the slope protection net 9, reducing the workload and improving the work efficiency.

[0031] refer to Figure 4 The surface of the pressing rod 11 is threaded with a nut 17. By setting the nut 17, the pressing rod 11 is fixed to prevent accidental contact that could cause the fixing rod 10 to loosen, thus ensuring the stability of the slope protection net 9.

[0032] refer to Figure 3 An anti-detachment rod 18 is hinged to the inner wall of the anchor rod 8 to prevent the anchor rod 8 from slipping.

[0033] refer to Figure 4 A slider 19 is bolted to the surface of the pressing rod 11. A groove 20 is slidably connected to the surface of the slider 19, and the groove 20 is opened on the inner wall of the fixed rod 10. By setting the slider 19 and the groove 20, the pressing rod 11 is prevented from slipping and stability is ensured.

[0034] refer to Figure 4 The top of the fixing rod 10 is integrally formed with a protruding ring 21, which facilitates pressing the pressing rod 11.

[0035] Brief description of the process: A gangue base layer 2 is used to enhance the anti-settlement capacity; a fly ash and arsenic sandstone water-proof layer 3 achieves water blocking and heavy metal solidification; and an improved planting layer 4 is adapted to plant growth. Each layer works together to ensure the foundation for restoration. Using mining solid waste such as gangue, fly ash, and arsenic sandstone, as well as local materials, significantly reduces material procurement and transportation costs, achieving the goal of "treating waste with waste." A water retaining wall 5 is installed to prevent water from flowing onto the planting layer 4, and the water is discharged into a collection pool 7 through a drainage channel 6, ensuring the stability of slope 1. The collected rainwater can be used to irrigate the plants, alleviating the constraints of drought on ecological restoration. Anchor rods 8 anchor slope 1, and slope protection netting 9 protect slope 1, improving its anti-slip capacity. Pressing the pressing rod 11 presses... The movement of rod 11 causes the trapezoidal groove 12 to move, aligning it with the steel ball 13. Then, the fixing rod 10 is pulled out. During this process, the steel ball 13 retracts into the trapezoidal groove 12 under the pressure of the inner wall of the fixing groove 14, disengaging from the fixing groove 14. The fixing rod 10 is then pulled out, and the slope protection net 9 is disassembled. During installation, the landslide net is mounted on the anchor rod 8, and the fixing rod 10 is inserted. The pressure plate 16 on the fixing rod 10 presses down on the slope protection net 9 to prevent it from falling off. The pressing rod 11 is released, and under the action of the spring 15, the pressing rod 11 drives the trapezoidal groove 12 to reset. The reset of the trapezoidal groove 12 causes the steel ball 13 to engage with the fixing groove 14, thus fixing it in place and completing the installation. This facilitates the installation and removal of the slope protection net 9.

[0036] It should be noted that parts have a lifespan and can be replaced during regular maintenance when they no longer meet performance requirements. Deterioration in performance due to prolonged use of parts is not a design defect of this application.

[0037] This specific embodiment is merely an explanation of the present utility model and is not intended to limit the present utility model. After reading this specification, those skilled in the art can make modifications to this embodiment without contributing any inventive step, but as long as they are within the scope of the claims of the present utility model, they are protected by patent law.

Claims

1. A layered ecological restoration and slope stabilizing device for an open-pit mine dump, comprising a slope (1), characterized in that, The slope (1) is covered with a base layer (2), the base layer (2) is covered with a waterproof layer (3), the waterproof layer (3) is covered with a planting layer (4), the slope (1) is provided with a retaining wall (5), the planting layer (4) is provided with a water channel (6), a water collection pool (7) is provided on one side of the slope (1), the inner wall of the slope (1) is provided with a number of anchor rods (8), the surfaces of the anchor rods (8) are fitted with a slope protection net (9), and the inner wall of the anchor rods (8) is slidably fitted with a fixing rod (). 10), the inner wall of the fixing rod (10) is slidably sleeved with a pressing rod (11), the surface of the pressing rod (11) is provided with a trapezoidal groove (12), the inner wall of the fixing rod (10) is provided with a steel ball (13), and the steel ball (13) is adapted to the trapezoidal groove (12), the inner wall of the anchor rod (8) is provided with a fixing groove (14), and the fixing groove (14) is engaged with the steel ball (13), a spring (15) is provided between the inner wall of the pressing rod (11) and the fixing rod (10), and a pressure plate (16) is fixedly sleeved on the surface of the fixing rod (10).

2. The layered ecological restoration and slope stabilization device for open-pit mine spoil heaps according to claim 1, characterized in that, The surface of the pressing rod (11) is threaded with a nut (17).

3. The layered ecological restoration and slope stabilization device for open-pit mine spoil heaps according to claim 1, characterized in that, The inner wall of the anchor rod (8) is hinged with an anti-detachment rod (18).

4. The layered ecological restoration and slope stabilization device for open-pit mine spoil heaps according to claim 1, characterized in that, The base layer (2) is made of gangue.

5. The layered ecological restoration and slope stabilization device for open-pit mine spoil heaps according to claim 1, characterized in that, The waterproof layer (3) is made of fly ash sandstone.

6. The layered ecological restoration and slope stabilization device for open-pit mine spoil heaps according to claim 1, characterized in that, The planting layer (4) is made by mixing gangue particles and topsoil in a volume ratio of 1:

3.

7. The layered ecological restoration and slope stabilization device for open-pit mine spoil heaps according to claim 1, characterized in that, The surface of the pressing rod (11) is bolted to a slider (19), and the surface of the slider (19) is slidably connected to a groove (20), which is formed on the inner wall of the fixed rod (10).

8. The layered ecological restoration and slope stabilization device for open-pit mine spoil heaps according to claim 1, characterized in that, The top of the fixing rod (10) is integrally formed with a protruding ring (21).

Citation Information

Patent Citations

  • Ecological restoration and soil fixation device for high and steep rock slope

    CN217267546U