By designing a testing tool that uses a power module and current detection circuit to calculate the grounding resistance value of the inverter, the problem of functional testing of truck inverters before they leave the factory is solved, ensuring their safety and avoiding potential safety hazards.

CN224985526UActive Publication Date: 2026-11-17BEIJING FOTONDAIMLER AUTOMOTIVE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522329389.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-03
Publication Date
2026-11-17
Estimated Expiration
2035-11-03

AI Technical Summary

Technical Problem

Existing technologies do not propose testing the various functions of truck inverters using testing tools before the truck leaves the factory, which means that the safety functions of the inverters cannot be guaranteed and may cause safety hazards.

Method used

A testing tool is provided, including a power module, a voltage clamp, a current clamp, a current detection circuit, and a control module. By outputting a preset voltage to the inverter and detecting the current flowing through a grounding resistor, the resistance value of the grounding resistor is calculated to determine whether the leakage protection function of the inverter is normal.

Benefits of technology

The inverter is tested before the truck leaves the factory to ensure its safety functions are normal and to avoid safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224985526U_ABST
    Figure CN224985526U_ABST
Patent Text Reader

Abstract

This utility model discloses a testing tool for testing truck inverters. The testing tool includes: a housing, a power module, a first voltage clamp, a second voltage clamp, a current clamp, a current detection circuit, and a control module. The power module outputs a preset voltage; the first voltage clamp is connected to a first terminal of the power module and is also adapted to connect to the inverter's housing; the second voltage clamp is connected to a second terminal of the power module and is adapted to connect to the inverter's grounding terminal, which is connected to a grounding resistor inside the inverter; the current clamp is adapted to connect to the inverter's grounding terminal; the current detection circuit is connected to the current clamp and is used to detect the current flowing through the grounding resistor; the control module is connected to the current detection circuit and the power module and is used to obtain the resistance value of the grounding resistor during leakage current testing. This testing tool can test the truck inverter's functionality before the truck leaves the factory, ensuring the normal operation of the truck inverter's safety functions and preventing safety accidents.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of vehicles, and in particular to a testing tool. Background Technology

[0002] In related technologies, truck inverters are key components of trucks, supplying power to the cab. Existing technologies do not propose a testing tool to test the various functions of truck inverters before the truck leaves the factory, so the safety functions of truck inverters cannot be guaranteed. In the event of a truck inverter leakage, it may cause safety hazards. Utility Model Content

[0003] The present invention aims to at least solve one of the technical problems existing in the prior art. Therefore, one objective of the present invention is to provide a testing tool that can test the various functions of a truck inverter before the truck leaves the factory, ensuring the normal operation of the truck inverter's safety functions and preventing safety accidents.

[0004] To address the aforementioned problems, a first aspect of this utility model provides a testing tool, comprising: a housing; a power module located within the housing for outputting a preset voltage; a first voltage clamp mounted on the housing and connected to a first terminal of the power module, the first voltage clamp also adapted to connect to the outer casing of an inverter; a second voltage clamp mounted on the housing and connected to a second terminal of the power module, the second voltage clamp adapted to connect to the grounding terminal of the inverter, the grounding terminal being connected to a grounding resistor within the inverter; a current clamp mounted on the housing and adapted to connect to the grounding terminal of the inverter; a current detection circuit located within the housing and connected to the current clamp, for detecting the current flowing through the grounding resistor; and a control module connected to the current detection circuit and the power module.

[0005] According to the test tool of this utility model embodiment, the power module outputs a preset voltage to the inverter, and the current flowing through the grounding resistor is detected by the current detection circuit. The control module can obtain the resistance value of the grounding resistor based on the output preset voltage and the current flowing through the grounding resistor, thereby determining whether the leakage protection function of the inverter is normal during leakage test. The truck inverter function is tested before the truck leaves the factory to ensure that the safety function of the truck inverter is normal and to avoid safety accidents.

[0006] In some embodiments, the testing tool further includes: a first load module located inside the housing; a functional test connection terminal located outside the housing, wherein during functional testing, a first end of the functional test connection terminal is connected to the first load module via a wiring harness, and a second end of the functional test connection terminal is adapted to connect to the output terminal of the inverter; and a voltage detection module located inside the housing and connected to the first load module for detecting the output voltage of the inverter.

[0007] In some embodiments, the testing tool further includes a display screen located on the housing for displaying the output voltage of the inverter.

[0008] In some embodiments, the test tool further includes: a second load module located inside the housing, wherein during a short-circuit test, the second load module is connected to the first end of the functional test connection terminal via a wiring harness; the control module is also connected to the voltage detection module.

[0009] In some embodiments, the resistance of the second load module is a short-circuit test resistance threshold, and the resistance of the first load module is greater than the resistance of the second load module.

[0010] In some embodiments, the testing tool further includes a switch located inside the housing, the switch being connected to the control module, and the switch being used to switch the connection status of the first load module and the second load module with the functional test connection terminal.

[0011] In some embodiments, the testing tool further includes a printing module located within the housing, the printing module being connected to the control module for printing and outputting test results.

[0012] In some embodiments, the testing tool further includes a prompting module connected to the control module, used to prompt the test status of at least one of the leakage current test, the functional test, and the short circuit test.

[0013] In some embodiments, the testing tool further includes a handle, which is disposed on the housing and located outside the housing.

[0014] In some embodiments, the first voltage clamp and the second voltage clamp are located on opposite sides of the housing in the width direction, the current clamp is located on either side of the housing in the width direction, and the functional test connection terminal is connected to one end of the housing in the length direction.

[0015] Additional aspects and advantages of this invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description

[0016] The above and / or additional aspects and advantages of this utility model will become apparent and readily understood from the description of the embodiments taken in conjunction with the following drawings, in which: Figure 1 This is a schematic diagram of a testing tool according to an embodiment of the present invention; Figure 2 This is a structural block diagram of a testing tool according to an embodiment of the present invention; Figure 3 This is a schematic diagram of a truck inverter according to an embodiment of the present invention; Figure 4 This is a structural block diagram of a prompting module according to an embodiment of the present utility model.

[0017] Figure label: Test tool 100; Housing 1; Power module 101; First voltage clamp 2; Second voltage clamp 3; Current clamp 4; Current detection circuit 102; Control module 103; First load module 104; Functional test connection terminal 5; Voltage detection module 105; Display screen 6; Second load module 106; Switch 107; Printing module 108; Prompt module 7; Handle 8; First prompt unit 01; Second prompt unit 02; Third prompt unit 03; Fourth prompt unit 04. Detailed Implementation

[0018] The embodiments of the present invention are described in detail below. The embodiments described with reference to the accompanying drawings are exemplary. The embodiments of the present invention are described in detail below.

[0019] In the existing technology, a truck inverter is a power electronic device installed on a truck that converts the direct current (DC) power supplied by the vehicle's battery or generator into alternating current (AC). It is mainly used to power AC electrical appliances when the vehicle is driving or parked. It is an important auxiliary power source for long-haul truck drivers, mobile work vehicles, and RV-type trucks. Truck electrical systems are usually 24V DC systems (heavy truck / commercial vehicle standard), while many everyday electrical appliances (such as air conditioners, refrigerators, rice cookers, laptops, and microwave ovens) use 220V AC power. Therefore, an inverter is needed to convert the voltage and current forms.

[0020] Existing technologies do not propose a testing tool to test the various functions of truck inverters before the truck leaves the factory, so the safety functions of truck inverters cannot be guaranteed, which may cause safety hazards when truck inverters leak electricity.

[0021] To address the above problems, the first aspect of this utility model provides a testing tool for testing truck inverters. This testing tool can test the functionality of truck inverters before the truck leaves the factory, ensuring that the safety functions of the truck inverters are normal and preventing safety accidents.

[0022] The following is for reference. Figure 1 A testing tool according to a first aspect embodiment of the present invention is described, such as... Figure 1 and Figure 2 As shown, the test tool 100 includes: a housing 1, a power module 101, a first voltage clamp 2, a second voltage clamp 3, a current clamp 4, a current detection circuit 102, and a control module 103.

[0023] The power module 101 is located inside the housing 1 and is used to output a preset voltage. The first voltage clamp 2 is mounted on the housing 1 and is connected to the first end of the power module 101. The first voltage clamp 2 is also adapted to connect to the outer casing of the inverter. The second voltage clamp 3 is mounted on the housing 1 and is connected to the second end of the power module 101. The second voltage clamp 3 is adapted to connect to the grounding terminal of the inverter, and the grounding terminal is connected to the grounding resistor inside the inverter. The current clamp 4 is mounted on the housing 1 and is adapted to connect to the grounding terminal of the inverter. The current detection circuit 102 is located inside the housing 1 and is connected to the current clamp 4. It is used to detect the current flowing through the grounding resistor. The control module 103 is connected to the current detection circuit 102 and the power module 101.

[0024] Specifically, such as Figure 3 As shown, truck electrical systems are typically 24V DC (heavy-duty truck / commercial vehicle standard). Truck inverters convert this 24V DC to 220V AC. Cab sockets are located inside the truck cab, and electrical equipment is connected to these sockets, allowing the truck inverter to supply 220V AC power to appliances while the truck is in motion or parked. Because truck inverters have a metal casing, in the event of a leakage current, it is crucial to ensure that the current flows to the grounding terminal to prevent damage to the circuit and to avoid threatening personnel safety. Therefore, a leakage current test is performed on the truck inverter at the factory, and the resistance value of the grounding resistance flowing through the truck inverter is obtained using a testing tool 100.

[0025] like Figure 2 As shown, the test tool 100 internally includes a power supply module 101 that provides a preset voltage to the inverter's casing, a current detection circuit 102 that detects the current value of the grounding resistance, and a control module 103 connected to the current detection circuit 102 and the power supply module 101. Figure 1As shown, the test tool 100 has two voltage clamps and a current clamp 4 on its outer casing 1. The two voltage clamps are a first voltage clamp 2 and a second voltage clamp 3. During leakage current testing, the first voltage clamp 2 is connected to the inverter casing, the second voltage clamp 3 is connected to the inverter's grounding terminal, and the current clamp 4 is also connected to the grounding terminal. The internal control module 103 of the test tool 100 controls the power module 101 to apply a preset voltage, such as 10V, to the inverter casing. At this time, the inverter casing is conductive, and current flows through the grounding resistor, eventually flowing to the grounding terminal. Through the current clamp 4, the current flows to the current detection circuit 102, which obtains the current of the grounding resistor. The voltage value applied by the power module 101 is known, and the current detection circuit 102 obtains the current value of the grounding resistor. Using the formula R=U / I, the control module 103 can calculate the resistance value of the grounding resistor based on the preset voltage value and the grounding resistor current value.

[0026] By comparing the grounding resistance value with the resistance threshold, it is determined whether the inverter's leakage protection function is normal. When the grounding resistance value is less than the resistance threshold, the inverter's leakage protection function is normal. For example, the resistance threshold can be 100m ohms. When the calculated grounding resistance value is less than 100m ohms, it is determined that the leakage current of the inverter can flow to the grounding terminal, and the inverter's leakage protection function is normal.

[0027] According to the test tool of this utility model embodiment, the power module outputs a preset voltage to the inverter, and the current flowing through the grounding resistor is detected by the current detection circuit. The control module can obtain the resistance value of the grounding resistor based on the output preset voltage and the current flowing through the grounding resistor, thereby determining whether the leakage protection function of the inverter is normal during leakage test. The truck inverter function is tested before the truck leaves the factory to ensure that the safety function of the truck inverter is normal and to avoid safety accidents.

[0028] In some embodiments, such as Figure 1 and Figure 2 As shown, the test tool 100 also includes: a first load module 104, a functional test connection terminal 5, and a voltage detection module 105.

[0029] The first load module 104 is located inside the housing 1; the functional test connection terminal 5 is located outside the housing 1. During functional testing, the first end of the functional test connection terminal 5 is connected to the first load module 104 via a wiring harness, and the second end of the functional test connection terminal 5 is adapted to connect to the output terminal of the inverter; the voltage detection module 105 is located inside the housing 1 and is connected to the first load module 104 to detect the output voltage of the inverter.

[0030] Specifically, such as Figure 2As shown, the test tool 100 includes a first load module 104 and a voltage detection module 105, such as... Figure 1 As shown, a functional test connection terminal 5 is provided at one end of the outer housing 1 of the test tool 100. During functional testing, the external functional test connection terminal 5 of the test tool 100 connects to... Figure 3 The cab socket connection is shown. At this time, the first load module 104 is connected to the output terminal of the inverter. The voltage detection module 105 detects the inverter's output voltage. When the inverter's output voltage matches the inverter's target output voltage, the functional test is considered successful. For example, if the inverter's target output voltage is 220V, and the voltage detection module 105 detects that the inverter's output voltage is also 220V, the functional test is considered successful. Figure 3 The indicator light on the top of the cab socket is green. If the voltage detection module 105 detects that the inverter's output voltage is not 220V, the function test fails. Figure 3 The indicator light at the top of the cab socket is lit up in red.

[0031] In some embodiments, such as Figure 1 As shown, the test tool 100 also includes a display screen 6.

[0032] The display screen 6 is located on the housing 1 and is used to display the output voltage of the inverter.

[0033] Specifically, the test tool 100 housing 1 is equipped with a display screen 6. The first load module 104 is connected to the output terminal of the inverter. The output voltage of the inverter is detected by the voltage detection module 105. At the same time, the control module 103 controls the output voltage detected by the voltage detection module 105 to be displayed on the display screen 6 for easy observation.

[0034] In some embodiments, such as Figure 2 As shown, the test tool 100 also includes a second load module 106.

[0035] The second load module 106 is located inside the housing 1. During the short circuit test, the second load module 106 is connected to the first end of the functional test connection terminal 5 through a wiring harness. The control module 103 is also connected to the voltage detection module 105.

[0036] Specifically, truck inverters are usually equipped with short-circuit protection, which means that when the truck inverter detects a short circuit, it will stop working and no longer supply power to the load. The short-circuit test is used to check whether the short-circuit protection function of the truck inverter is normal.

[0037] like Figure 2 As shown, the test tool 100 includes a second load module 106. During short-circuit testing, the second load module 106 is connected to the output terminal of the inverter through the functional test connection terminal 5, that is, to... Figure 3 The cab socket connection shown will cause the truck inverter to short-circuit due to the low resistance of the second load module 106. At this time, the current flowing through the second load module 106 is obtained by measuring the output voltage of the inverter and the resistance of the second load module 106. If the current is zero, it means that the inverter is disconnected and no longer supplies power to the load, and the short-circuit test is successful. If the current flowing through the second load module 106 is not zero, it means that the inverter was not disconnected during the short circuit, and the inverter's short-circuit protection function is ineffective.

[0038] In some embodiments, the resistance of the second load module is the short-circuit test resistance threshold, and the resistance of the first load module is greater than the resistance of the second load module.

[0039] Specifically, the resistance of the first load module 104 is greater than the resistance of the second load module 106. For example, the resistance of the second load module 106 can be 135 kΩ, and the resistance of the first load module 104 can be any value greater than 135 kΩ. Because the first load module 104 has a larger resistance, the inverter will not short-circuit, and the inverter's function can be tested normally. During short-circuit testing, the connection between the second load module 106 and the inverter's output terminal is tested through the second load module 106. Since the resistance of the second load module 106 is the short-circuit test resistance threshold, meaning that a short circuit will occur when the resistance value is less than or equal to the resistance value of the second load module 106, the short-circuit test is performed through the second load module 106.

[0040] In some embodiments, such as Figure 2 As shown, the test tool 100 also includes a toggle switch 107.

[0041] The switch 107 is located inside the housing 1 and is connected to the control module 103. The switch 107 is used to switch the connection status of the first load module 104 and the second load module 106 with the functional test connection terminal 5.

[0042] Specifically, the test tool 100 includes a switch 107, which is used to switch the connection status of the first load module 104 and the second load module 106 with the inverter's output terminal. During functional testing, the control module 103 controls the switch 107 to connect the first load module 104 to the inverter's output terminal. At this time, the resistance of the first load module 104 is relatively large, and the inverter will not short-circuit, allowing for normal testing of the inverter's function. During short-circuit testing, the control module 103 controls the switch 107 to connect the second load module 106 to the inverter's output terminal. Since the resistance of the second load module 106 is the short-circuit test resistance threshold, meaning that a short circuit will occur when the resistance value is less than or equal to the resistance value of the second load module 106, the short-circuit test is performed through the second load module 106.

[0043] In some embodiments, such as Figure 2 As shown, the test tool 100 also includes a printing module 108.

[0044] The printing module 108 is located inside the housing 1 and is connected to the control module 103. It is used to print and output the test results.

[0045] Specifically, after the inverter test is completed, the control module 103 controls the printing module 108 to print the test results. The printing module 108 prints the inverter's test report, which includes at least one of the following: leakage current test results, functional test results, and short circuit test results. The printed test report is then transmitted via... Figure 1 The paper is fed out from the output port of the printing module 108.

[0046] In some embodiments, such as Figure 1 As shown, the test tool 100 also includes: a prompt module 7.

[0047] The prompting module 7 is connected to the control module 103 and is used to prompt the test status of at least one of the leakage current test, functional test and short circuit test.

[0048] Specifically, after the test tool 100 completes the test, the control module 103 controls the prompting module 7 to provide a prompt. After any of the tests, including leakage current test, functional test and short circuit test, are completed, the control module 103 controls the prompting module 7 to provide a prompt, so that the test completion information can be obtained intuitively.

[0049] like Figure 4 As shown, the prompting module 7 includes a first prompting unit 01, a second prompting unit 02, a third prompting unit 03, and a fourth prompting unit 04.

[0050] The first prompt unit 01 is used to indicate whether the leakage test is successful. If the leakage test is successful, the control module 103 controls the first prompt unit 01 of the test tool 100 to light up a green indicator light; if the leakage test fails, the control module 103 controls the first prompt unit 01 to light up a red indicator light.

[0051] The second prompt unit 02 is used to indicate whether the function test is successful. If the function test is successful, the control module 103 controls the second prompt unit 02 of the test tool 100 to light up a green indicator light; if the function test fails, the control module 103 controls the second prompt unit 02 of the test tool 100 to light up a red indicator light.

[0052] The third prompt unit 03 is used to indicate whether the short circuit test was successful. If the short circuit test is successful, the control module 103 controls the third prompt unit 03 of the test tool 100 to light up a green indicator light; if the short circuit test fails, the control module 103 controls the third prompt unit 03 of the test tool 100 to light up a red indicator light.

[0053] The fourth prompt unit 04 is used to indicate whether the leakage test, functional test and short circuit test are all successful. If the leakage test, functional test and short circuit test are all successful, the control module 103 controls the fourth prompt unit 04 of the test tool 100 to light up a green indicator light; if any of the leakage test, functional test and short circuit test fails, the control module 103 controls the fourth prompt unit 04 of the test tool 100 to light up a red indicator light.

[0054] In some embodiments, such as Figure 1 As shown, the test tool 100 also includes a handle 8.

[0055] The handle 8 is provided on the housing 1 and is located outside the housing 1. The handle 8 can facilitate the user to take out the test tool 100. When testing multiple inverters, the test tool 100 can be moved by the handle 8, which facilitates the movement of the test tool 100.

[0056] In some embodiments, such as Figure 1 As shown, the first voltage clamp 2 and the second voltage clamp 3 are located on both sides of the width direction of the housing 1, the current clamp 4 is located on either side of the width direction of the housing 1, and the functional test connection terminal 5 is connected to one end of the length direction of the housing 1.

[0057] Specifically, the first voltage clamp 2 and the second voltage clamp 3 are located on opposite sides of the housing 1 in the width direction, facilitating the connection of the first voltage clamp 2 to the inverter's casing. The second voltage clamp 3 connects to the inverter's grounding terminal. Both the first voltage clamp 2 and the second voltage clamp 3 have relatively long wiring harnesses. When not under test, the first voltage clamp 2 and the second voltage clamp 3 are located on opposite sides of the housing 1. During testing, the first voltage clamp 2 and the second voltage clamp 3 can be connected to the inverter within the length range of the wiring harness. The current clamp 4 is located in the width direction of the housing 1, facilitating the connection to the inverter's grounding terminal. The current clamp 4 has a relatively long wiring harness. When not under test, the current clamp 4 is located on one side of the housing 1. During testing, the current clamp 4 can be connected to the inverter within the length range of the wiring harness. The functional test connection terminal 5 is connected to one end of the housing 1 in the length direction. During testing, the functional test connection terminal 5 is connected to the inverter's output terminal.

[0058] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "illustrative embodiment," "example," "specific example," or "some examples," etc., refer to specific features, substrates, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example.

[0059] Although embodiments of the present invention have been shown and described, those skilled in the art will understand that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the claims and their equivalents.

Claims

1. A test tool, characterized by, The testing equipment, used for testing truck inverters, includes: case; A power module, located inside the housing, is used to output a preset voltage; A first voltage clamp is mounted on the housing and connected to a first end of the power module. The first voltage clamp is also adapted to connect to the housing of the inverter. A second voltage clamp is mounted on the housing and connected to a second terminal of the power module. The second voltage clamp is adapted to connect to the grounding terminal of the inverter, which is connected to a grounding resistor inside the inverter. A current clamp is mounted on the housing and is adapted to be connected to the grounding terminal of the inverter; A current detection circuit is located inside the housing and is connected to the current clamp for detecting the current flowing through the grounding resistor. A control module is provided, which is connected to the current detection circuit and the power supply module.

2. The test tool of claim 1, wherein, The testing tools also include: A first load module, the first load module being located within the housing; The functional test connection terminal is located on the outside of the housing. During functional testing, the first end of the functional test connection terminal is connected to the first load module through a wiring harness, and the second end of the functional test connection terminal is adapted to connect to the output terminal of the inverter. A voltage detection module is located inside the housing and is connected to the first load module for detecting the output voltage of the inverter.

3. The testing tool according to claim 2, characterized in that, The testing tools also include: A display screen, located on the housing, is used to display the output voltage of the inverter.

4. The testing tool according to claim 2, characterized in that, The testing tools also include: The second load module is located inside the housing. During short-circuit testing, the second load module is connected to the first end of the functional test connection terminal via a wiring harness. The control module is also connected to the voltage detection module.

5. The testing tool according to claim 4, characterized in that, The resistance of the second load module is the short-circuit test resistance threshold, and the resistance of the first load module is greater than the resistance of the second load module.

6. The testing tool according to claim 4, characterized in that, The testing tools also include: A switching switch is located inside the housing and is connected to the control module. The switching switch is used to switch the connection status of the first load module and the second load module with the functional test connection terminal.

7. The testing tool according to claim 4, characterized in that, The testing tools also include: A printing module is located inside the housing and is connected to the control module. It is used to print and output the test results.

8. The testing tool according to claim 4, characterized in that, The testing tools also include: A prompting module, connected to the control module, is used to provide prompts regarding the test status of at least one of the leakage current test, the functional test, and the short circuit test.

9. The testing tool according to any one of claims 1-8, characterized in that, The testing tool further includes a handle, which is disposed on the housing and located outside the housing.

10. The testing tool according to claim 1, characterized in that, The first voltage clamp and the second voltage clamp are located on opposite sides of the housing in the width direction, the current clamp is located on either side of the housing in the width direction, and the functional test connection terminal is connected to one end of the housing in the length direction.