A battery testing device

By combining a bidirectional inverter and a relay, the problems of single power supply and insufficient battery life of battery testing equipment are solved, and efficient energy utilization and charging/discharging functions are realized under different power conditions.

CN224985568UActive Publication Date: 2026-11-17REPOWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522642214.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-12
Publication Date
2026-11-17
Estimated Expiration
2035-12-12

AI Technical Summary

Technical Problem

Existing battery testing equipment uses a single power supply method, resulting in high power consumption and energy loss under AC380V DC power supply, and insufficient battery life without external power supply.

Method used

By employing a combination of bidirectional inverters and relays, the energy storage battery pack can switch to a discharge state when there is no AC power. Through inverter and rectification functions, DC power is converted into AC power to charge the battery pack under test, and during discharge, it is fed back to the grid or used by the internal power modules of the equipment.

Benefits of technology

It improves energy efficiency, extends the device's battery life without external power, and enables normal charging and discharging under different power conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224985568U_ABST
    Figure CN224985568U_ABST
Patent Text Reader

Abstract

This utility model provides a battery testing device, comprising: a three-phase five-wire interface connected to a first AC power source; a first bidirectional inverter connected to the three-phase five-wire interface and receiving three-phase AC power, wherein the first bidirectional inverter is also connected to a battery pack under test; a second bidirectional inverter connected to the three-phase five-wire interface and receiving three-phase AC power; a first energy storage battery pack connected to the second bidirectional inverter; an AC power interface connected to a second AC power source; and an AC-DC converter connected to the AC power interface and receiving single-phase AC power, wherein the AC-DC converter is also connected to the first energy storage battery pack. This utility model provides a battery testing device that can meet the power supply requirements of various power sources, enabling charge and discharge testing of the battery pack under test.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of battery testing technology, and in particular to a battery testing device. Background Technology

[0002] Lithium battery pack analysis equipment is a testing device integrating various modules or instruments, primarily used for quality analysis and testing during the research and development and production of lithium battery modules or packs. The internal modules or instruments are powered by both AC380V and AC220V. A typical power supply topology diagram for this equipment is shown below. Figure 1 .

[0003] The equipment uses a three-phase five-wire AC380V system (L1, L2, L3, N, PE) as its overall power supply. In practical applications, the AC380V three-phase five-wire power supply can be wired from the factory's distribution cabinet. Then, through internal electrical wiring, one of the L1 terminals, the neutral point N, and the grounding point PE are connected to modules or instruments that require AC220V power. This satisfies the equipment's internal power supply requirements for both AC380V and AC220V.

[0004] Existing power supply technology can only select AC380V three-phase five-wire system (L1, L2, L3, N, PE), which is a single choice; AC380V DC power supply to charge the battery pack under test consumes the power grid's energy. When the battery pack under test is discharging, the energy will be dissipated as heat after passing through the AC380V DC power supply, resulting in energy loss. Summary of the Invention

[0005] To solve the above-mentioned technical problems, this utility model provides a battery testing device that enables a first energy storage battery pack to switch to a discharge state when there is no first AC power supply. The DC power output from the first energy storage battery pack is converted into AC power by a first bidirectional inverter and a second bidirectional inverter to charge the battery pack under test.

[0006] In a first aspect, this utility model provides a battery testing device, comprising: A three-phase five-wire interface connected to the first AC power supply; a first bidirectional inverter connected to the three-phase five-wire interface and receiving three-phase AC power; wherein the first bidirectional inverter is also connected to the battery pack under test. A second bidirectional inverter connected to a three-phase five-wire interface and receiving three-phase AC power, and a first energy storage battery pack connected to the second bidirectional inverter. An AC power interface connected to a second AC power source, and an AC-DC converter connected to the AC power interface and receiving single-phase AC power, wherein the AC-DC converter is also connected to a first energy storage battery pack.

[0007] In conjunction with the first aspect, in one alternative implementation, Also includes: A first relay including a first contact position and a second contact position, a second relay including a third contact position and a fourth contact position, and a second energy storage battery pack; wherein the first contact position and the second contact position are different contact positions, and the third contact position and the fourth contact position are different contact positions; The AC-DC converter is also connected to the second energy storage battery pack via a first relay located at the first contact position to charge the second energy storage battery pack. Furthermore, the first energy storage battery pack is connected to the battery pack under test via a second relay located at the third contact position, a second bidirectional inverter, and a first bidirectional inverter to charge the battery pack under test; or... The AC-DC converter is also connected to the first energy storage battery pack via the second relay located at the second contact position to charge the first energy storage battery pack. The second energy storage battery pack is also connected to the battery pack under test via the second relay located at the fourth contact position, the second bidirectional inverter, and the first bidirectional inverter to charge the battery pack under test.

[0008] In conjunction with the first aspect, in one alternative implementation, Also includes: The first power module and the second power module are respectively connected to the three-phase five-wire interface and the input AC power type is single-phase power, where the voltage of single-phase power is 220V.

[0009] In conjunction with the first aspect, in one alternative implementation, The first AC power source includes a three-phase AC power source with a voltage of 380V, and the second AC power source includes an AC power source with a voltage of 220V.

[0010] Secondly, this utility model provides a battery testing device, comprising: The system comprises a first energy storage battery pack, a second energy storage battery pack, an AC power interface connected to a second AC power source, an AC-DC converter connected to the AC power interface and receiving single-phase AC power, a first relay with first and second contact positions, a second relay with third and fourth contact positions, a first bidirectional inverter, and a second bidirectional inverter; wherein... The AC-DC converter is also connected to the second energy storage battery pack via a first relay located at the first contact position, and the first energy storage battery pack is also connected to the battery pack under test via a second relay located at the third contact position, a second bidirectional inverter, and a first bidirectional inverter; or, The AC-DC converter is also connected to the first energy storage battery pack via the second relay located at the second contact position to charge the first energy storage battery pack. The second energy storage battery pack is also connected to the battery pack under test via the second relay located at the fourth contact position, the second bidirectional inverter, and the first bidirectional inverter to charge the battery pack under test.

[0011] In conjunction with the second aspect, in one alternative implementation, Also includes: A first power module and a second power module are respectively connected to the second bidirectional inverter and the input AC power type is single-phase power, wherein the voltage of the single-phase power is 220V.

[0012] In conjunction with the second aspect, in one alternative implementation, Also includes: The second AC power source includes: an AC power source with a voltage of 120V, 240V, or 230V.

[0013] This invention provides a battery testing device, comprising: a three-phase five-wire interface connected to a first AC power source; a first bidirectional inverter connected to the three-phase five-wire interface and receiving three-phase AC power, wherein the first bidirectional inverter is also connected to a battery pack under test; a second bidirectional inverter connected to the three-phase five-wire interface and receiving three-phase AC power; a first energy storage battery pack connected to the second bidirectional inverter; an AC power interface connected to a second AC power source; and an AC-DC converter connected to the AC power interface and receiving single-phase AC power, wherein the AC-DC converter is also connected to the first energy storage battery pack. Using this invention, in a first aspect, it is possible to switch the first energy storage battery pack to a discharge state when the first AC power source is unavailable, and convert the DC power output from the first energy storage battery pack into AC power to charge the battery pack under test via the first and second bidirectional inverters.

[0014] Secondly, when the first energy storage battery pack has low or no power, and the usage scenario cannot provide a first AC power source (e.g., main AC 380V), a second AC power source (AC 220V connected to the AC power interface, via an AC-DC converter) can be used to charge the first energy storage battery pack. When the first energy storage battery pack is fully charged or has a certain amount of power, the battery testing equipment can normally charge and discharge the battery pack under test.

[0015] Thirdly, the device enables the battery pack under test to automatically switch between inverter and rectification functions via the first bidirectional converter (AC380V bidirectional DC power supply) during charging and discharging. When the battery pack under test is charging, the electrical energy can come from the first AC power supply (equipment main power supply, three-phase five-wire interface) or from the electrical energy of the first energy storage battery pack after being inverted by the first bidirectional inverter and the second bidirectional inverter. When the battery pack under test is discharging, the released electrical energy can be used by one or more power modules (other loads) inside the battery testing equipment. At the same time, after being converted by the first bidirectional inverter and the second bidirectional inverter, it charges the first energy storage battery pack. Excess electrical energy is fed back to the grid through the three-phase five-wire interface, improving energy utilization and achieving energy saving.

[0016] Fourthly, when the device is not connected to the first AC power source (the device's main power supply and three-phase five-wire interface), the electrical energy during the charging of the battery pack under test comes from the first energy storage battery pack after being inverted by the second bidirectional inverter and rectified by the first bidirectional inverter. When the battery pack under test discharges, the released electrical energy can be used for other loads inside the battery testing equipment, and at the same time, after being rectified by the second bidirectional inverter, it charges the energy storage battery pack, which can greatly extend the battery testing equipment's endurance when there is no external power source. Attached Figure Description

[0017] To more clearly illustrate the technical solutions of the embodiments of this utility model, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0018] Figure 1 This is a schematic diagram of a battery testing device in the prior art provided by this utility model; Figure 2 This is a schematic diagram of a battery testing device provided by this utility model; Figure 3 This is a schematic diagram of another battery device provided by this utility model; Among them, 101-three-phase five-wire interface, 102-first bidirectional inverter, 103-second bidirectional inverter, 104-AC-DC converter, 105-AC power interface, 106-first power consumption module, 107-second power consumption module, 108-first energy storage battery pack, 109-battery pack under test, 110-second energy storage battery pack, 111-first relay, and 112-second relay. Detailed Implementation

[0019] The technical solutions of this utility model will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this utility model. All other embodiments obtained by those skilled in the art based on the embodiments of this utility model without creative effort are within the scope of protection of this utility model.

[0020] It should be noted that the terms "first" and "second" in this utility model are only used to distinguish different AC power supplies, dual-mode inverters, relays, energy storage battery packs, etc., and have no other meaning. They should not be used to limit the scope of protection of this utility model.

[0021] See Figure 2 This is a schematic diagram of a battery testing device provided by this utility model, as shown below. Figure 2 As shown, specifically, battery testing equipment may include, but is not limited to: A three-phase five-wire interface 101 is connected to the first AC power supply, and a first bidirectional inverter 102 is connected to the three-phase five-wire interface 101 and the input AC power type is three-phase power. The first bidirectional inverter 102 is also connected to the battery pack 109 under test. A second bidirectional inverter 103 connected to a three-phase five-wire interface 101 and receiving three-phase AC power, and a first energy storage battery pack 108 connected to the second bidirectional inverter 103. An AC power interface 105 is connected to a second AC power source, and an AC-DC converter 104 is connected to the AC power interface 105 and receives single-phase AC power. The AC-DC converter 104 is also connected to a first energy storage battery pack 108.

[0022] Optionally, the battery testing equipment may include, in addition to: a three-phase five-wire interface 101, a first bidirectional inverter 102, a second bidirectional inverter 103, an AC-DC converter 104, an AC power interface 105, and a first energy storage battery pack 108, the following: A first relay 111 including a first contact position and a second contact position, a second relay 112 including a third contact position and a fourth contact position, and a second energy storage battery pack 110; wherein the first contact position and the second contact position are different contact positions, and the third contact position and the fourth contact position are different contact positions. The AC-DC converter 104 is also connected to the second energy storage battery pack 110 via a first relay 111 located at the first contact position, charging the second energy storage battery pack 110. The first energy storage battery pack 108 is also connected to the battery pack under test 109 via a second relay 112 located at the third contact position, a second bidirectional inverter 103, and a first bidirectional inverter 102, charging the battery pack under test 109. Alternatively, The AC-DC converter 104 is also connected to the first energy storage battery pack 108 via the second relay 112 located at the second contact position to charge the first energy storage battery pack 108. The second energy storage battery pack 110 is also connected to the battery pack under test 109 via the second relay 112 located at the fourth contact position, the second bidirectional inverter 103, and the first bidirectional inverter 102 to charge the battery pack under test 109.

[0023] Optionally, the battery testing equipment includes, in addition to: a three-phase five-wire interface 101, a first bidirectional inverter 102, a second bidirectional inverter 103, an AC-DC converter 104, an AC power interface 105, and a first energy storage battery pack 108, one or more power modules (such as a first power module 106 and a second power module 107) connected to the three-phase five-wire interface and inputting single-phase AC power, wherein the voltage of the single-phase power is 220V.

[0024] It should be noted that the first AC power source may include, but is not limited to, a three-phase AC power source with a voltage of 208V, 480V, 380V or 480V, and the second AC power source may include, but is not limited to, a single-phase AC power source with a voltage of 220V, 120V, 240V, 230V or 110V.

[0025] It should be noted that when the first energy storage battery pack 108 has low or no power, and the usage scenario cannot provide a first AC power source (e.g., main AC 380V), a second AC power source (e.g., AC 220V connected to AC power interface 105) can be used to charge the first energy storage battery pack 108 through the AC-DC converter 104. When the first energy storage battery pack 108 is fully charged or has a certain amount of power, the battery testing equipment can normally perform charge and discharge testing on the battery pack 109 under test.

[0026] It should be noted that the battery pack under test 109 can automatically switch between inverter and rectification functions through the first bidirectional converter 102 (e.g., AC380V bidirectional DC power supply) during charging and discharging. Specifically, when the battery pack under test 109 is charging, the electrical energy can come from the first AC power supply (e.g., the device's AC380V main power supply) input through the three-phase five-wire interface 101, or from the electrical energy after being inverted by the first bidirectional inverter 102 and the second bidirectional inverter 103 from the first energy storage battery pack 108. When the battery pack under test 109 is discharging, the released electrical energy can power one or more power modules inside the battery testing equipment (e.g., the first power module 106 and the second power module 107) to enable the battery testing equipment to work. At the same time, after being converted by the first bidirectional inverter 102 and the second bidirectional inverter 103, it charges the first energy storage battery pack 108. Excess electrical energy is fed back to the AC grid through the three-phase five-wire interface 101, improving energy utilization and achieving energy saving.

[0027] It should be noted that when the battery testing equipment is not connected to the first AC power source (e.g., the main power supply of the equipment), when the battery pack under test 109 is charging, the electrical energy comes from the first energy storage battery pack 108 after being inverted by the second bidirectional inverter 103 and rectified by the first bidirectional inverter 102. When the battery pack under test 109 is discharging, the released electrical energy can supply power to other loads inside the battery testing equipment (e.g., the first power module 106 and the second power module 107) to enable the battery testing equipment to work. At the same time, after being rectified by the second bidirectional inverter 103, it charges the first energy storage battery pack 108, which can greatly extend the battery testing equipment's endurance when there is no external power source.

[0028] In this scheme, if the battery testing equipment is not connected to the first AC power source (e.g., the main power supply of the equipment), and the first energy storage battery pack 108 is completely depleted, it must be charged through the AC-DC converter 104 via the second AC power source (e.g., a single-phase AC power source with a voltage of 220V, 120V, 240V, 230V, or 110V). When the first energy storage battery pack 108 is fully charged or has a certain amount of charge, the battery testing equipment can normally charge and discharge the battery pack 109 under test. This scheme requires charging the first energy storage battery pack 108 through the second AC power source first, and then discharging the first energy storage battery pack 108 to supply power to the first power module 106 and the second power module 107 of the battery testing equipment, so that the battery testing equipment can work normally.

[0029] Figure 3 Another battery testing device is illustrated, such as Figure 3 As shown, battery testing equipment may include, but is not limited to: A first energy storage battery pack 108, a second energy storage battery pack 110, an AC power interface 105 connected to a second AC power source, an AC-DC converter 104 connected to the AC power interface 105 and receiving single-phase AC power, a first relay 111 with first and second contact positions, a second relay 112 with third and fourth contact positions, a first bidirectional inverter 102, and a second bidirectional inverter 103; wherein... The AC-DC converter 104 is also connected to the second energy storage battery pack 110 via the first relay 111 located at the first contact position, and the first energy storage battery pack 108 is also connected to the battery pack under test 109 via the second relay 112 located at the third contact position, the second bidirectional inverter 103, and the first bidirectional inverter 102; or, The AC-DC converter 104 is also connected to the first energy storage battery pack 108 via the second relay 112 located at the second contact position to charge the first energy storage battery pack 108. The second energy storage battery pack 110 is also connected to the battery pack under test 109 via the second relay 112 located at the fourth contact position, the second bidirectional inverter 103, and the first bidirectional inverter 102 to charge the battery pack under test 109.

[0030] It should be noted that, Figure 3 The battery testing equipment shown consists of Figure 2 Improvements are made to the battery testing equipment shown; specifically, the three-phase five-wire interface 101, the first relay 111 containing the first and second contact positions, the second relay 112 containing the third and fourth contact positions, and the second energy storage battery pack 110 are removed to obtain the following: Figure 3 The battery testing equipment shown.

[0031] It should be noted that when the first relay 111 is in the first contact position and the second relay 112 is in the third contact position, the AC-DC converter 104 converts the electrical energy received through the AC power interface 105 into DC power to charge the first energy storage battery pack 108. At the same time, the second energy storage battery pack 110 is connected to the second bidirectional inverter 103 and the first bidirectional inverter 102 to provide power to the battery testing equipment, that is, to power the charging box of the battery pack under test 109 to the first power module 106 and the second power module 107. The power supply used to power the first power module 106 and the second power module 107 respectively is a 220V AC voltage.

[0032] It should be noted that when the first relay 111 is in the second contact position and the second relay 112 is in the fourth contact position, the states of the first energy storage battery pack 108 and the second energy storage battery pack 110 switch. Specifically, the first energy storage battery pack 108 is connected to the second bidirectional inverter 103, and the first bidirectional inverter 102 provides power to the battery testing equipment and supplies power to the charging box of the battery pack 109 under test, which in turn supplies power to the first power consumption module 106 and the second power consumption module 107. At the same time, the second energy storage battery pack 110 converts the electrical energy received from the AC power interface 105 into DC power for charging through the AC-DC converter 104. In this scheme, the second energy storage battery pack 110 can be charged while the first energy storage battery pack 108 supplies power to the first power consumption module 106 and the second power consumption module 107, so that the battery testing equipment can normally perform charging testing on the battery pack 109 under test without waiting, which is highly efficient.

[0033] Figure 2-3 This is merely used to explain the embodiments of this utility model and should not be construed as limiting the scope of protection of this utility model.

[0034] The above are merely optional embodiments of this utility model and do not limit the patent scope of this utility model. All equivalent structural transformations made based on the contents of this utility model specification and drawings under the application concept of this utility model, or direct / indirect applications in other related technical fields, are included within the patent protection scope of this utility model.

Claims

1. A battery testing device, characterized in that, include: A three-phase five-wire interface (101) is connected to the first AC power supply, and a first bidirectional inverter (102) is connected to the three-phase five-wire interface (101) and whose input AC power type is three-phase. The first bidirectional inverter (102) is also connected to the battery pack under test (109). A second bidirectional inverter (103) connected to a three-phase five-wire interface (101) and input AC power of three-phase type, and a first energy storage battery pack (108) connected to the second bidirectional inverter (103). An AC power interface (105) connected to a second AC power source, and an AC-DC converter (104) connected to the AC power interface (105) and inputting single-phase AC power, wherein the AC-DC converter (104) is also connected to a first energy storage battery pack (108).

2. The battery testing equipment as described in claim 1, characterized in that, Also includes: A first relay (111) including a first contact position and a second contact position, a second relay (112) including a third contact position and a fourth contact position, and a second energy storage battery pack (110); wherein the first contact position and the second contact position are different contact positions, and the third contact position and the fourth contact position are different contact positions; Among them, the AC-DC converter (104) is also connected to the second energy storage battery pack (110) through the first relay (111) located at the first contact position, to charge the second energy storage battery pack (110), and the first energy storage battery pack (108) is also connected to the battery pack under test (109) through the second relay (112) located at the third contact position, the second bidirectional inverter (103), and the first bidirectional inverter (102), to charge the battery pack under test (109); or, The AC-DC converter (104) is also connected to the first energy storage battery pack (108) through the second relay (112) located at the second contact position to charge the first energy storage battery pack (108), and the second energy storage battery pack (110) is also connected to the battery pack under test (109) through the second relay (112) located at the fourth contact position, the second bidirectional inverter (103), and the first bidirectional inverter (102) to charge the battery pack under test (109).

3. The battery testing equipment as described in claim 1, characterized in that, Also includes: A first power module (106) and a second power module (107) are respectively connected to a three-phase five-wire interface (101) and the input AC power type is single-phase power, wherein the voltage of single-phase power is 220V.

4. The battery testing equipment as described in claim 1, characterized in that, The first AC power source includes a three-phase AC power source with a voltage of 380V, and the second AC power source includes an AC power source with a voltage of 220V.

5. A battery testing device, characterized in that, include: A first energy storage battery pack (108), a second energy storage battery pack (110), an AC power interface (105) connected to a second AC power source, an AC-DC converter (104) connected to the AC power interface (105) and inputting single-phase AC power, a first relay (111) including a first contact position and a second contact position, a second relay (112) including a third contact position and a fourth contact position, a first bidirectional inverter (102), and a second bidirectional inverter (103); wherein, The AC-DC converter (104) is also connected to the second energy storage battery pack (110) via a first relay (111) located at the first contact position, and the first energy storage battery pack (108) is also connected to the battery pack under test (109) via a second relay (112) located at the third contact position, a second bidirectional inverter (103), and a first bidirectional inverter (102); or, The AC-DC converter (104) is also connected to the first energy storage battery pack (108) through the second relay (112) located at the second contact position to charge the first energy storage battery pack (108), and the second energy storage battery pack (110) is also connected to the battery pack under test (109) through the second relay (112) located at the fourth contact position, the second bidirectional inverter (103), and the first bidirectional inverter (102) to charge the battery pack under test (109).

6. The battery testing equipment as described in claim 5, characterized in that, Also includes: A first power module (106) and a second power module (107) are respectively connected to the second bidirectional inverter (103) and the input AC power type is single-phase power, wherein the voltage of the single-phase power is 220V.