Monitoring Construction Machinery Operation Graphic User Interface of Electronic Device
CN309391613SActive Publication Date: 2025-07-18SHANGHAI HUAXING DIGITAL TECH
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430605764.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2025-07-18
- Estimated Expiration
- 2039-09-23
Smart Images

Figure 000001_ABST
Abstract
1. Name of the Design Product: Graphic User Interface for Monitoring Construction Machinery Operations on an Electronic Device. 2. Use of the Design Product: For an electronic device. 3. Design Key Points of the Design Product: Lies in the graphic user interface. 4. Picture or Photo Best Showing the Design Key Points: Front View of Design 1. 5. The electronic device has a conventional design, and other views of the electronic device are omitted. 6. Design 1 is designated as the basic design. 7. Use of the Graphic User Interface: For monitoring construction machinery operations. 8. Human - Machine Interaction Method of the Graphic User Interface: In the front view of Design 1, click the first rounded - corner button below "N01" on the right side of the interface, and the interface jumps to the interface for drawing a curve of parameter changes as shown in the interface change state diagram of Design 1; in the front view of Design 2, click the second rounded - corner button below "N01" on the right side of the interface, and the interface jumps to the interface for setting construction information parameters as shown in the interface change state diagram of Design 2; in the front view of Design 3, click the third rounded - corner button below "N01" on the right side of the interface, and the interface jumps to the interface for setting annotation parameters as shown in the interface change state diagram of Design 3; in the front view of Design 4, click the first rounded - corner button below the "Interface Auto - Jump" option card on the right side of the interface, and the interface jumps to the interface for setting drilling parameters as shown in the interface change state diagram of Design 4; in the front view of Design 5, click the second rounded - corner button below the "Interface Auto - Jump" option card on the right side of the interface, and the interface jumps to the interface presenting a confirmation grouting reminder as shown in the interface change state diagram of Design 5; "XXX" in the above interfaces represents replaceable content screens.
Need to check novelty before this filing date? Find Prior Art