Graphical User Interface for Monitoring and Displaying Functions of Electronic Devices
CN309422701SActive Publication Date: 2025-08-05CHINA CONSTR THIRD ENG BUREAU GRP CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430643011.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-12
- Publication Date
- 2025-08-05
- Estimated Expiration
- 2039-10-12
Smart Images

Figure 000001_ABST
Abstract
1. Name of the Design Product: Graphic User Interface for Monitoring and Display Functions of Electronic Devices. 2. Use of the Design Product: An electronic device. 3. Design Key Points of the Design Product: Lies in the interface content of the graphic user interface in the electronic device. 4. Picture or Photograph that Best Illustrates the Design Key Points: Front View. 5. Use of the Graphic User Interface: Used for monitoring and displaying the construction process of the reactor building. 6. Human-Computer Interaction Method of the Graphic User Interface: The front view interface is the main page. After clicking and checking the hanger option on the front view page, enter the interface change state diagram 1; after clicking and checking the protective net option in the interface change state diagram 1, enter the interface change state diagram 2; after clicking and checking the support system option in the interface change state diagram 2, enter the interface change state diagram 3; after clicking and checking the core tube option in the interface change state diagram 3, enter the interface change state diagram 4; after clicking and checking the foundation structure option in the interface change state diagram 4, enter the interface change state diagram 5; after clicking and checking the concrete placing boom option in the interface change state diagram 5, enter the interface change state diagram 6; after clicking and checking the telescopic boom crane option in the interface change state diagram 6, enter the interface change state diagram 7; after clicking and checking the hydraulic lifting flat bridge option in the interface change state diagram 7, enter the interface change state diagram 8.
Need to check novelty before this filing date? Find Prior Art