Graphical user interface for power grid equipment model configuration tool for PC

CN309479563SActive Publication Date: 2025-09-05BEIJING ELECTRIC CHAIN TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430656959.5
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2025-09-05
Estimated Expiration
2039-10-18

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. The name of this design product: Graphical user interface for a computer-based configuration tool for power grid equipment. 2. Purpose of this design product: used to run programs and display information. 3. The key design points of this appearance design product are the interface content and interactive design of the user interface. 4. The picture or photo that best illustrates the key points of the design: main view. 5. Since the rear view, left view, right view, top view and bottom view are conventional designs, the rear view, left view, right view, top view and bottom view are omitted. 6. Purpose of the graphical user interface: This design product is used to support the configuration and maintenance of graphic information and model information in power grid equipment specifications. 7. Human-computer interaction mode of the graphical user interface: the main view is the main interface of the graphical user interface of the power grid equipment model configuration tool for computers in this application; enter the user name and password in the main view and press the Enter key to enter the interface change state diagram 1; click "Add" in the interface change state diagram 1 to enter the interface change state diagram 2; enter the basic information of the substation, click "OK" in the interface change state diagram 2, and enter the interface change state diagram 3; click "Yes" in the interface change state diagram 3 to enter the interface change state diagram 4; after selecting a template in the interface change state diagram 4, click "Next" in the interface change state diagram 4 to enter the interface change state diagram 5; configure the primary wiring diagram interval data in the interface change state diagram 5, click "OK" in the interface change state diagram 5 to enter the interface change state diagram 6; 'Double-click' the equipment icon in the interface change state diagram 6 to enter the interface change state diagram 7; click "Equipment Panorama" in the interface change state diagram 7 to enter the interface change state diagram 8.
Need to check novelty before this filing date? Find Prior Art