Learning device and steam generation device control system
The learning device and steam generator control system address the reliance on user experience for BIR by using a machine learning model to generate a pre-acceleration command value, enhancing the tracking characteristic of power generation quantity.
Patent Information
- Application Number
- DE112020000784
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2019-02-08
- Filing Date
- 2020-02-07
- Publication Date
- 2024-11-07
- Estimated Expiration
- 2040-02-07
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present disclosure relates to a learning device and a steam generator control system. Priority is claimed to Japanese patent application No. JP 2019-021712, filed on February 8, 2019, the contents of which are incorporated herein by reference. TECHNICAL BACKGROUND
[0002] The following Patent Document 1 describes a steam generator control device used for a thermal power generation plant. The steam generator control device controls a steam generator such that a power generation amount E of the thermal power generation plant (a steam turbine) follows a power generation command value MWD.
[0003] It is known that a response delay of a steam generator is caused when a load on the steam generator changes. Therefore, the steam generator control device may, for example, pre-increase fuel of the steam generator in addition to a power generation command value MWD based on a pre-acceleration command value, referred to as steam generator input speed (BIR), when a load on the steam generator changes, so as to compensate for the response delay. Related art publications
[0004] Patent Document 1 Japanese Unexamined Patent Application JP 2012- 41889 A
[0005] JP H05-53605 A discloses a process control device comprising a basic program circuit that generates a basic setpoint command Frdo of a process manipulated variable from a load command Ld, a correction circuit that generates a correction signal from the deviation ET secured between a sensed process-controlled variable and a set control variable, and an acceleration circuit that corrects the command Fedo. A circuit inputs the command Ld and then the deviation ET and generates an acceleration signal AFrd to minimize the deviation ET. The circuit is formed in a neural network or using fuzzy inference.
[0006] US 2009 / 0 132 095 A1 discloses a control device for a plant, comprising a section for generating a manipulation signal for the plant, a model adapted to simulate a property of the plant, a learning section for generating an input signal of the model such that an output signal obtained from the model simulating the property of the plant meets a predetermined target, a learning signal generation section for calculating a learning signal according to a learning result in the learning section, a manipulation result evaluation section for calculating a first deviation as a deviation between a first measurement signal of the plant, which is obtained as a result of applying a specific manipulation signal to the plant, and a target value of the measurement signal, and a second deviation as a deviation between a second measurement signal of the plant,which is obtained as a result of applying an updated manipulation signal to the system and the setpoint, and comprises a section for generating a correction signal to be generated when the second deviation calculated by the manipulation result evaluation section is greater than the first deviation. SUMMARYTechnical task
[0007] However, the BIR must be adjusted by the user based on the user's previous experience. Therefore, the accuracy of the BIR may be significantly affected by user experience, and there is a likelihood that the response delay described above will not be compensated. As a result, the follow-up characteristic of the power generation quantity E with respect to the power generation command value MWD may be poor.
[0008] The present disclosure has been made in view of the above-described circumstances, and an object of the present disclosure is to improve a follow-up characteristic of a power generation amount with respect to a power generation command value. Solution to the task
[0009] According to the invention, there is provided a learning device and a steam generator control system as specified in the appended claims. Effects of the invention
[0010] As described above, according to the present disclosure, it is possible to improve a following characteristic of a power generation amount with respect to a power generation command value. BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a diagram showing an example of a schematic configuration of a heat energy generation system according to a first embodiment. Fig. 2 shows a diagram for describing a pre-acceleration command value BIR. Fig. 3 shows a functional block diagram of a learning device according to the first embodiment. Fig. 4 shows a functional block diagram of a steam generator control device according to the first embodiment. Fig. 5 is a flowchart showing an example of an operation of the learning apparatus according to the first embodiment. Fig. 6 is a diagram showing an example of a schematic configuration of a heat energy generation system according to a second embodiment. Fig. 7 shows a functional block diagram of a learning device according to the second embodiment. Fig. 8 shows a functional block diagram of a steam generator control device according to the second embodiment. Fig. 9A is a flowchart showing an example of an operation of the learning apparatus according to the second embodiment. Fig. 9B is a flowchart showing an example of an operation of a BIR generating device according to the second embodiment. DETAILED DESCRIPTION
[0011] Hereinafter, a learning apparatus and a steam generator control system according to a first embodiment will be described with reference to the drawings. (First embodiment)
[0012] Fig. 1 shows a diagram of an example of a schematic structure of a heat energy generation system A according to the first embodiment. As in Fig. 1, the thermal energy generation system A comprises a thermal energy generation plant 1 and a plant control system 2.
[0013] The thermal energy generation plant 1 causes steam to be generated by the steam generation device 3 using the heat of combustion gas generated by burning fuel. The thermal energy generation plant 1 drives a steam turbine 4 with the steam, and a power generator 5 directly connected to the steam turbine 4 obtains a desired power generation quantity E.
[0014] The plant control system 2 controls the steam generator 3 and therefore controls the power generation quantity E generated by the power generator 5. Controlling the steam generator 3 here means controlling a parameter (hereinafter referred to as a "control target object") required for the operation of the steam generator 3. The control target object is, for example, a flow rate of fuel supplied to the steam generator 3 (hereinafter referred to as a "fuel flow rate"), a flow rate of water supplied to the steam generator 3 (hereinafter referred to as a "water supply flow rate"), and / or a volume flow rate of air supplied to the steam generator 3 (hereinafter referred to as an "air flow rate"), and / or the steam pressure.supplied to the steam turbine 4 from the steam generating device 3 (hereinafter referred to as "main steam pressure"), and / or a temperature of the steam supplied to the steam turbine 4 from the steam generating device 3 (hereinafter referred to as "main steam temperature"), and / or a flow rate of ammonia for denitrification and / or a flow rate of spray water for controlling a reheated steam temperature (hereinafter referred to as "spray water flow rate for controlling a reheated steam temperature").
[0015] The schematic structure of the heat energy generation plant 1 according to the first embodiment will be described below with reference to Fig. 1 described.
[0016] The thermal energy generation plant 1 comprises the steam generation device 3, the steam turbine 4, the power generator 5, a condenser 6, a fuel flow rate adjusting device 7, an air flow rate adjusting device 8, a steam flow rate adjusting device 9, a water supply pump 10, a fuel flow rate sensor 11, an air flow rate sensor 12, a pressure sensor 13, a temperature sensor 14, a water supply flow rate sensor 15 and an electrical power sensor 16.
[0017] The steam generator 3 generates combustion gas by taking in outside air and fuel, such as pulverized coal, and burning the fuel. The steam generator 3 heats water using the heat of the combustion gas to generate steam and supplies the steam to the steam turbine 4. Here, pulverized coal is a fuel obtained by grinding coal.
[0018] Although the first embodiment describes a case where the fuel is coal (e.g., pulverized coal), the fuel is not limited to this. The fuel may be, for example, petroleum such as heavy oil or light oil, liquefied natural gas (LNG), liquefied petroleum gas (LPG), natural gas such as methane hydrate or shale gas, or biomass.
[0019] The steam turbine 4 is directly connected to the power generator 5. That is, an output shaft of the steam turbine 4 is connected to a rotating shaft of the power generator 5. The steam turbine 4 is rotated by the steam generated in the steam generator 3 and causes the power generator 5 to rotate.
[0020] The power generator 5 is driven by the rotation of the steam turbine 4 and generates electricity.
[0021] The condenser 6 cools the steam to restore the water after the steam turbine 4 is rotated.
[0022] The fuel flow rate adjusting device 7 is controlled by the plant control system 2 and adjusts the flow rate of the fuel supplied to the steam generating device 3. The fuel flow rate adjusting device 7 is, for example, a flow rate adjusting valve and adjusts the flow rate of fuel supplied to the steam generating device 3 when its opening degree is controlled by the plant control system 2.
[0023] The air flow rate adjustment device 8 is controlled by the system control system 2 and adjusts the air flow rate supplied to the steam generating device 3. The air flow rate adjustment device 8 is, for example, a flow rate adjustment valve or an air damper and adjusts the air flow rate supplied to the steam generating device 3 when its opening degree is controlled by the system control system 2. The air can be primary air, secondary air, or both.
[0024] The steam flow rate adjustment device 9 is controlled by the plant control system 2 and adjusts the steam flow rate supplied to the steam turbine 4 from the steam generating device 3. The steam flow rate adjustment device 9 is, for example, a flow rate adjustment valve and adjusts the steam flow rate supplied to the steam turbine 4 from the steam generating device 3 when its opening degree is controlled by the plant control system 2.
[0025] The water supply pump 10 supplies the water recovered by the condenser 6 to the steam generator 3. The drive of the water supply pump 10 is controlled by the plant control system. Therefore, the flow rate of water supplied to the steam generator 3 by the water supply pump 10 is controlled by the plant control system 2.
[0026] The fuel flow sensor 11 measures the flow rate of fuel supplied to the steam generating device 3 and outputs the measured fuel flow rate to the plant control system 2.
[0027] The air volume flow sensor 12 measures the volume flow of air supplied to the steam generating device 3 and outputs the measured air volume flow to the system control system 2.
[0028] The pressure sensor 13 measures the pressure of steam supplied to the steam turbine 4 from the steam generating device 3 and outputs the measured steam pressure to the plant control system 2.
[0029] The temperature sensor 14 measures the main steam temperature, which is the temperature of the steam supplied to the steam turbine 4 from the steam generating device 3, and outputs the measured main steam temperature to the plant control system 2.
[0030] The water supply flow rate sensor 15 measures the flow rate of water supplied to the steam generating device 3 and outputs the measured water supply flow rate to the facility control system 2.
[0031] The electric power sensor 16 measures the power generation amount E generated by the power generator 5 and outputs the measured power generation amount E to the plant control system 2.
[0032] Next, a schematic structure of the plant control system 2 according to the first embodiment will be described.
[0033] The plant control system 2 includes a steam generator control device 17 and a learning device 18. Although the first embodiment describes that the steam generator control device 17 and the learning device 18 are configured separately, the present disclosure is not limited to this. The steam generator control device 17 and the learning device 18 may be integrally constructed with each other. For example, an information processing device may have a function of the steam generator control device 17 and a function of the learning device 18. The information processing device is, for example, a computer.
[0034] The steam generator control device 17 and the learning device 18 may each also include a microprocessor such as a central processing unit (CPU) or microprocessing unit (MPU), a microcontroller such as a microcontroller unit (MCU), or the like.
[0035] The information processing device having the function of the steam generator control device 17 and the function of the learning device 18 may include a CPU, a memory such as a random access memory (RAM) or a read-only memory (ROM), a storage device such as a solid state drive (SSD) or hard disk drive (HDD), and an input / output device that exchanges signals with an external device such as a sensor.
[0036] The steam generator control device 17 controls each control target object based on a power generation command value MWD (megawatt demand), which is a command value of an output of the thermal energy generation (of the power generator 5), so that the power generation amount E is allowed to follow the power generation command value MWD. The power generation command value MWD is a target value of the power generation amount E generated by the power generator 5. The steam generator control device 17 may acquire the power generation command value MWD from an external device or may calculate the power generation command value MWD using the known technique.
[0037] Here, it is known that a response delay of the steam generator 3 is caused when the load on the steam generator 3 changes. Therefore, the steam generator control device 17 performs, for example, pre-control for increasing the fuel of the steam generator 3 ahead of time when the load on the steam generator 3 changes, in addition to the power generation command value MWD based on a pre-acceleration command value called the steam generator input speed (BIR) (hereinafter referred to as pre-acceleration command "BIR") so as to compensate for the above-described response delay.
[0038] As in Fig. For example, as shown in Figure 2, assume a case where the thermal power generation plant 1 according to the first embodiment is a 700 MW coal-fired power generation plant, and the power generation amount E of the power generator 5 is increased from 350 MW to 700 MW as a load change. Assume that the static characteristic of the steam generator 3 requires a fuel consumption of 110 t / h to 220 t / h (fuel flow rate) to increase the power generation amount E from 350 MW to 700 MW.
[0039] In this case, if the steam generator control device 17 controls the fuel flow rate from 110 t / h to 220 t / h at once to increase the power generation amount E from 350 MW to 700 MW, the control of a plurality of devices (for example, a coal grinding device) may not be able to follow the increase in the power generation amount E. Therefore, the steam generator control device 17 does not increase the power generation amount E from 350 MW to 700 MW at once, but increases the power generation amount E at a certain rate of change.That is, when a load change occurs from a first power generation amount to a second power generation amount, the power generation command value MWD becomes a power generation command value indicating that the power generation amount is increased from the first power generation amount to the second power generation amount at a certain change rate (. Fig. 2(a)). On the other hand, there is a user request to accelerate this load change. Therefore, the steam generator control device 17 executes as shown in Fig. 2(c), at the time of static determination, the steam generator control device 17 performs a pre-control to increase a control target object when the load on the steam generator 3 changes. More specifically, the steam generator control device 17 increases the control target object in advance based on the Fig. 2(b) shown pre-acceleration command value BIR.
[0040] Fig. 2(a) is a diagram showing a relationship between time and power generation amount when the power generation amount is increased at a certain rate of change, Fig. 2(b) is a diagram showing a relationship between time and fuel flow rate when only the pre-acceleration command value BIR is applied, and Fig. 2(c) shows a relationship between time and fuel flow rate when a fuel flow rate based on BIR is compared to the fuel flow rate at the time of static determination (the fuel flow rate when the power generation quantity is compared with the fuel flow rate calculated in Fig. 2(a) is increased).
[0041] In the first embodiment, an example of precontrol is described in which the fuel flow rate is increased in advance as precontrol of the main steam temperature in the steam generator control device 17. However, the precontrol of the steam generator control device 17 is not limited to the above example, and the water supply flow rate may be precontrolled as the precontrol of the main steam pressure. Furthermore, the steam generator control device 17 may precontrol the air flow rate. For example, the steam generator control device 17 may perform precontrol on at least one of the control targets described above.
[0042] One of the features of the present embodiment is that the steam generator control device 17 uses the pre-acceleration command value BIR generated by the learning device 18 using a learning model (a learned model) constructed according to machine learning for feedforward control. In the following description, a process of constructing the learning model may also be referred to as a learning process, and a process of generating the pre-acceleration command value BIR using the learned model may be referred to as a control process.
[0043] The learning device 18 forms a learning model for generating the pre-acceleration command value BIR used for the feedforward control.
[0044] First, functional blocks of the learning device 18 according to the first embodiment will be described with reference to Fig. 3 described. Fig. 3 shows a functional block diagram of the learning device 18 according to the first embodiment.
[0045] As in Fig. 3, the learning device 18 comprises a learning data acquisition device 19, a learning device 20 and a learning model memory 21.
[0046] The learning data acquisition unit 19 acquires previous operating data of the steam generating device 3 as learning data. The operating data includes data required for the operation of the steam generating device 3 and / or data indicating a state of the steam generating device during operation, or may include both. For example, this operating data is the power generation command value MWD, the pre-acceleration command value BIR, the power generation quantity E, and the process value of the control target object. The process value of the control target object is, for example, the fuel flow rate, the water supply flow rate, the air flow rate, the main steam pressure, the ammonia flow rate for denitrification, the spray water flow rate for controlling the reheated steam temperature, and / or the main steam temperature.
[0047] Specifically, the learning data acquisition means 19 acquires a data set including the power generation command value MWD and the pre-acceleration command value BIR used in the previous operation of the steam generating device 3 as learning data. The learning data acquisition means 19 may also include the power generation quantity E or the process value of the control target object obtained in the previous operation of the steam generating device 3 in the above-described data set.
[0048] The learning data acquisition unit 19 may further extract, as learning data, a set of data when a deviation between the power generation command value MWD used in a previous operation of the steam generator 3 and the power generation quantity E obtained from the previous operation of the steam generator in the previous operation data of the steam generator 3 (hereinafter referred to as "power generation deviation quantity") is less than or equal to a threshold value. The set of data when the power generation deviation quantity is less than or equal to the threshold value is a set of data when a subsequent characteristic of the power generation quantity E with respect to the power generation command value MWD exceeds a given standard.The threshold value described above may also be set according to a value allowed as a power generation deviation amount during actual operation of the steam generating device 3.
[0049] As described above, the learning data acquisition means 19 may have an evaluation function of evaluating the following characteristic of the power generation quantity E with respect to the power generation command value MWD, and may extract operation data as the learning data when the evaluation of the following characteristic exceeds a given standard. However, it is not essential for the learning data acquisition means 19 to use the operation data as the learning data when the evaluation of the following characteristic exceeds the given standard, and operation data may be extracted as the learning data when the evaluation of the following characteristic does not exceed the given standard. That is, the learning data acquisition means 19 may use all operation data as the learning data regardless of the following characteristic of the power generation quantity E with respect to the power generation command value MWD.For example, the learning data acquisition device 19 may use a set of operating data when the evaluation of the subsequent characteristic of the operating data exceeds the given standard and a correct answer flag indicating that the subsequent characteristic of the operating data is good as the learning data. The learning data acquisition device 19 may also use a set of operating data when the evaluation of the subsequent characteristic of the operating data does not exceed the given standard and a correct answer flag indicating that the subsequent characteristic of the operating data is poor as the learning data.
[0050] The above-described previous operation may also be a test operation of the steam generating device that was previously performed, an actual operation of the steam generating device that was previously performed, or both. The learning data acquisition device 19 may also acquire the power generation quantity E from the electric power sensor 16.
[0051] The learning data acquisition device 19 may also acquire the above-described operating data as learning data from the steam generator control device 17, or may directly acquire the above-described operating data from the above-described various types of sensors (the fuel flow sensor 11, the air volume sensor 12, the pressure sensor 13, the temperature sensor 14, the water supply flow sensor 15, and the like). The learning data acquisition device 19 may further acquire the operating data by reading the operating data stored in a memory (not shown) provided outside or inside the learning device 18 as learning data.
[0052] As described above, the learning data acquiring means 19 acquires, as learning data, a data set including the power generation command value MWD and the pre-acceleration command value BIR from the operation data.
[0053] The learning unit 20 constructs a learning model for generating the pre-acceleration command value BIR by performing machine learning based on the learning data acquired by the learning data acquisition unit 19. The learning model is only required to output the pre-acceleration command value BIR at which the follow-up characteristic of the power generation quantity E with respect to the power generation command value MWD exceeds a given standard, based on at least the input of the power generation command value MWD. The present disclosure is not particularly limited to any one type of machine learning. The machine learning may be, for example, supervised learning such as a support vector machine (SVM) or reinforcement learning. The machine learning may also be machine learning using a neural network or, for example, deep learning.
[0054] The learning device 20 uses, within the learning data (data set), for example, the power generation command value MWD serving as input data and the pre-acceleration command value BIR serving as the correct response data of the input value. The learning device 20 learns a parameter (a weight) of the learning model such that the deviation between the output value output from the learning model and the correct response data is minimized by inputting the input value to the learning model. The process value of the control target object can also be used as the input value. The process value is, for example, the fuel flow rate, the water supply flow rate, the air flow rate, the main steam pressure, the ammonia flow rate for denitrification, the spray water flow rate for controlling the reheated steam temperature, and / or the main steam temperature.
[0055] As described above, the learning device 20 determines a weight for generating or predicting the pre-acceleration command value BIR at which the follow-up characteristic of the power generation quantity E with respect to the power generation command value MWD exceeds the given standard. For example, the learning device 20 determines a weight ω indicating an influence of a predetermined description variable on a target variable. In this case, the description variable is the power generation command value MWD or the process value of the control target object. The target variable is the pre-acceleration command value BIR.
[0056] The learning model memory 21 stores the learning model constructed by the learning device 20.
[0057] The learning model memory 21 includes, for example, a hard disk drive (HDD), a non-volatile memory, or the like.
[0058] Next, the functional blocks of the steam generating device control device 17 will be explained with reference to Fig. 4 when the load on the steam generating device 3 according to the first embodiment changes. Fig. 4 shows a block diagram of the steam generator control device 17 according to the first embodiment.
[0059] As in Fig. 4, the steam generator control device 17 includes a pilot control device 22 and a feedback control device 23. Although an example in which the steam generator control device 17 controls the fuel flow rate in advance is described in the first embodiment, the example can be equally applied to a case in which other control target objects such as the main steam temperature, the water supply flow rate, the main steam pressure, and the air flow rate are controlled in advance.Also, functions of all or part of the above-described steam generating device control device 17 can be implemented by recording a program for implementing the functions in a computer in the above-described computer-readable recording medium and causing the above-described processor to read out and execute the above-described program recorded in the recording medium.
[0060] The pilot control device 22 comprises a function generating device 221, a BIR generating device 222 and an adder 223.
[0061] The function generator 221 acquires the power generation command value MWD. Then, the function generator 221 converts the power generation command value MWD into a fuel flow rate command value (hereinafter referred to as a "fuel flow rate command value") according to a preset function. The function generator 221 outputs the converted fuel flow rate command value to the adder 223.
[0062] The BIR generation means 222 acquires a learning model constructed by the learning device 18 (a learned model) from the learning device 18. For example, the BIR generation means 222 reads the learned model stored in the learning model memory 21. The BIR generation means 222 obtains the pre-acceleration command value BIR from the learned model by inputting the power generation command value MWD into the read learned model. The BIR generation means 222 acquires the pre-acceleration command value BIR from the learning model, for example, before the load on the steam generator 3 actually changes. The BIR generation means 222 outputs the pre-acceleration command value BIR obtained from the learned model to the adder 223.
[0063] The BIR generation unit 222 can also obtain the pre-acceleration command value BIR from the learning model by inputting the power generation command value MWD and a current process value (e.g., a current fuel flow rate, main steam temperature, or both) into the read learned model. For example, if the read learned model was learned using the process value, the BIR generation unit 222 can obtain the pre-acceleration command value BIR from the learning model by inputting the current value of the process value into the above-described learned model in addition to the power generation command value MWD.
[0064] The adder 223 generates a first command value by adding the fuel flow rate command value output from the function generator 221 to the pre-acceleration command value BIR output from the BIR generator 222. The adder 223 outputs the generated first command value to the feedback controller 23.
[0065] The feedback control device 23 includes a subtractor 231 and a multiplier 232, a PI controller 233 and an adder 234.
[0066] The subtractor 231 obtains, for example, a deviation ΔH between the main steam pressure measured by the pressure sensor 13 as the process value of the control target object and a preset setting value of the process value.
[0067] The multiplier multiplies the deviation ΔH obtained by the subtractor 231 by a coefficient K set by the power generation command value MWD or the like. The multiplier 232 outputs a value (ΔH×K) obtained by multiplying the deviation ΔH by the coefficient K to the PI controller 233.
[0068] The PI controller 233 generates a control command to eliminate the value (ΔH×K) by applying PI control to the value (ΔH×K) output from the multiplier 232. The PI controller 233 outputs the generated control command to the adder 234.
[0069] The adder 234 generates a second command value by adding the control command output from the PI controller 233 to the first command value output from the adder 223. This second command value is a manipulation command for controlling the control target. The adder 234 outputs the second command value to a device for controlling the control target, for example, the fuel flow rate adjusting device 7.
[0070] Next, an example of a flow of operation of the learning device 18 according to the first embodiment will be described with reference to Fig. 5 described. Fig. 5 shows a flowchart of an example of the operation of the learning device 18 according to the first embodiment.
[0071] First, the learning data acquisition means 19 acquires previous operation data of the steam generator 3 as learning data (step S101). Here, as the learning data, the learning data acquisition means 19 may extract, from the previous operation data of the steam generator 3, operation data in which the follow-up characteristic of the power generation amount E with respect to the power generation command value MWD exceeds a standard. For example, the learning data acquisition means 19 extracts, as learning data, from the previous operation data obtained for each control cycle of the steam generator control device 17, operation data when a power generation deviation amount is less than or equal to a threshold value. Thus, the learning data acquisition means 19 may extract, as learning data, operation data in which the follow-up characteristic exceeds the standard.The operating data also includes, for example, the power generation command value MWD, the pre-acceleration command value BIR and the process value (for example, the process value includes the fuel flow rate and / or the water feed flow rate and / or the air volume flow rate and / or the main steam pressure and / or the ammonia flow rate for denitrification and / or the spray water flow rate for controlling the reheated steam temperature and / or the main steam temperature).
[0072] However, the learning data acquisition means 19 may also extract, as the learning data, from the previous operation data of the steam generating means 3, operation data in which the follow-up characteristic of the power generation amount E with respect to the power generation command value MWD does not exceed the standard.
[0073] Next, the learning device 20 obtains an output value from the learning model by inputting the power generation command value MWD and the process value as input values to the learning model. The learning device 20 learns a parameter (a weight) of the learning model using, for example, an error backpropagation method so that the deviation between the output value from the learning model and the pre-acceleration command value BIR of the learning data is minimized (step S102).
[0074] The learning device 20 stores the constructed learning model (learned model) in the learning model memory 21 (step S103).
[0075] As described above, the learning device 18 of the above-described embodiment includes the learning device 20 for forming the learning model for generating a pre-acceleration command value BIR for controlling a control target before the time when the load on the steam generator 3 used for thermal power generation changes. The learning device 20 generates the above-described learning model by mechanically learning the data set including the power generation command value MWD of thermal power generation and the pre-acceleration command value BIR used in the previous operation of the steam generator 3 as learning data.
[0076] According to the above-described configuration, it is possible to generate a pre-acceleration command value BIR in which the above-described following characteristic exceeds a given standard in a state where the user does not adjust the pre-acceleration command value BIR based on previous experience. Therefore, it is possible to improve the following characteristic of the power generation quantity E with respect to the power generation command value MWD.
[0077] Furthermore, the operating data is used in the actual operation using the pre-acceleration command value BIR obtained from the learning model of the above-described first embodiment as the learning data. As a result, the learning device 18 can accurately generate the pre-acceleration command value BIR in which the above-described following characteristic exceeds the given standard when the actual operation is performed. (Second embodiment)
[0078] A thermal power generation system B according to a second embodiment will be described below. The thermal power generation system B according to the second embodiment differs from the thermal power generation system A according to the first embodiment in that a method for generating the pre-acceleration command value BIR is different. The same or similar portions may be denoted by the same reference numerals in the figures, and redundant descriptions of these parts are omitted.
[0079] Fig. 6 shows a diagram of an example of a schematic structure of the heat energy generation system B according to the second embodiment. As in Fig. As shown in Figure 6, the thermal energy generation system B comprises a thermal energy generation plant 1 and a plant control system 2b.
[0080] The plant control system 2b controls a steam generating device 3 and therefore controls a power generation quantity E generated by a power generator 5. Here, controlling the steam generating device 3 means controlling a control target object, which is a parameter required to operate the steam generating device 3. This control target object is similar to that of the first embodiment.
[0081] Next, a schematic structure of the plant control system 2b according to the second embodiment will be described.
[0082] The facility control system 2b includes a steam generator control device 17b and a learning device 18b. Although the second embodiment describes an example in which the steam generator control device 17b and the learning device 18b are configured separately, the present disclosure is not limited thereto. The steam generator control device 17b and the learning device 18b may be configured integrally as in the first embodiment. For example, one information processing device may have the function of the steam generator control device 17b and the function of the learning device 18b.
[0083] Also, the steam generating device control device 17b and the learning device 18b may each include a microprocessor such as a CPU or an MPU, a microcontroller such as an MCU, or the like.
[0084] The steam generator control device 17b controls each control target object based on the power generation command value MWD, which is the command value of the heat energy generation output (of the power generator 5), and thereby causes the power generation amount E to follow the power generation command value MWD. This power generation command value MWD is a target value of the power generation amount E generated by the power generator 5. The steam generator control device 17b may acquire the power generation command value MWD from an external device or may calculate the power generation command value MWD using the known technique.
[0085] For example, when the load on the steam generator 3 changes, the steam generator control device 17b performs pre-control to increase the fuel of the steam generator based on the pre-acceleration command value BIR. An example of pre-control in which the fuel flow rate is increased in advance will also be described as pre-control of the main steam temperature in the steam generator control device 17b of the second embodiment, as in the first embodiment. However, the pre-control of the steam generator control device 17b is not limited to the above example, and the water supply flow rate may be pre-controlled as pre-control of the main steam pressure. Further, the steam generator control device 17b may pre-control the air flow rate.
[0086] The learning device 18b builds a learning model for generating a pre-acceleration command value BIR used for the feedforward control.
[0087] First, functional blocks of the learning device 18b according to the second embodiment will be described with reference to Fig. 7 described. Fig. 7 shows a functional block diagram of the learning device 18b according to the second embodiment.
[0088] As in Fig. 7, the learning device 18b includes a learning data acquisition device 19b, a learning device 20b, and a learning model memory 21b.
[0089] The learning data acquisition means 19b acquires, as learning data, the previous operation data of the steam generator 3 and the power generation amount E obtained through the previous operation when the previous operation data of the steam generator 3 is acquired. The learning data acquisition means 19b acquires the operation data and the power generation amount E for each control cycle of the steam generator control device 17b, for example. These operation data are similar to those of the first embodiment. Specifically, the learning data acquisition means 19b acquires, as the learning data, a set of operation data including the power generation command value MWD and the pre-acceleration command value BIR used in the previous operation of the steam generator 3, and the power generation amount E obtained through the previous operation.
[0090] The learning data acquisition means 19b may acquire the above-described learning data from the steam generator control device 17b at regular intervals, or may acquire the above-described learning data directly from the above-described various types of sensors (the fuel flow rate sensor 11, the air flow rate sensor 12, the pressure sensor 13, the temperature sensor 14, the water supply flow rate sensor 15, the electric power sensor 16, and the like) at regular intervals. The learning data acquisition means 19b may further read and acquire, as learning data, the operation data and the power generation amount E stored in a memory (not shown) provided outside or inside the learning device 18b, which are linked to each other.
[0091] The learning device 20b constructs a learning model for generating the pre-acceleration command value BIR by performing machine learning based on the learning data acquired by the learning data acquisition device 19b. The learning device 20b learns the characteristic curve of the steam generating device 3, for example, mechanically based on the learning data acquired by the learning data acquisition device 19b.
[0092] The learning device 20b causes, for example, a deep learning learning model, a neural network, or the like to learn relationships between the power generation command value MWD, the pre-acceleration command value BIR, and the power generation amount E based on the learning data acquired by the learning data acquisition device 19b. That is, the learning device 20b constructs a learning model in which the power generation amount E is output when the power generation command value MWD and the pre-acceleration command value BIR are input in the control process.As an example, the learning device 20b constructs the above-described learning model by learning a parameter (weight) of the learning model using, for example, an error backpropagation method such that a deviation between an output value and the power generation amount E is minimized, wherein the output value is output when the power generation command value MWD and the pre-acceleration command value BIR in the learning data are input to the learning model as input data, and the power generation amount E represents the learning data.
[0093] However, the learning device 20b according to the present embodiment is not limited to the above embodiment and may cause the learning model to mechanically learn relationships between the power generation command value MWD, the pre-acceleration command value BIR, the process value, and the power generation amount E based on the learning data acquired by the learning data acquisition device 19b. That is, the learning device 20b may construct a learning model by machine learning in which the power generation amount E is output when the power generation command value MWD, the pre-acceleration command value BIR, and the process value are input in the control process.As an example, the learning device 20b may construct the above-described learning model by mechanically learning a parameter (weight) of the learning model using, for example, an error backpropagation method such that a deviation between an output value and the power generation amount E is minimized, wherein the output value is output by inputting the power generation command value MWD, the pre-acceleration command value BIR, and the process value in the learning data as input data to the learning model, and the power generation amount E represents the learning data.
[0094] The learning model memory 21b stores the learning model constructed by the learning device 20b. The learning model memory 21b comprises, for example, an HDD, a non-volatile memory, or the like.
[0095] Next, functional blocks of the steam generating device control device 17b when the load on the steam generating device 3 changes according to the second embodiment will be explained with reference to Fig. 8 described. Fig. 8 shows a functional block diagram of the steam generator control device 17b according to the second embodiment.
[0096] As in Fig. As shown in Fig. 8, the steam generator control device 17b includes a pilot control device 22b and a feedback control device 23. Although an example in which the steam generator control device 17b pre-controls the fuel flow rate is described in the second embodiment, the example can equally be applied to pilot control for the main steam temperature, the water supply flow rate, the air flow rate, or the like. Also, functions of all or part of the above-described steam generator control device 17b can be implemented by recording a program for implementing the functions in a computer in the above-described computer-readable recording medium and causing the above-described processor to read and execute the above-described program recorded in the recording medium.
[0097] The pilot control device 22b comprises a function generating device 221, a BIR generating device 222b and an adder 223.
[0098] The BIR generation unit 222b acquires a learning model (learned model) constructed by the learning unit 18b from the learning unit 18b. For example, the BIR generation unit 222b reads the learning model stored in the learning model memory 21b. The BIR generation unit 222b optimizes the pre-acceleration command value BIR using the read learning model in the control process. For example, in the control process, the BIR generation unit 222b inputs at least the power generation command value MWD obtained from an external device to the learning model as an input value and acquires the power generation amount E as an output value from the learning model. The BIR generation unit 222b obtains the pre-acceleration command value BIR at which a deviation between the power generation command value MWD (the input value) and the power generation amount E (the output value) is minimized.However, the BIR generating means 222b according to the present embodiment is not limited to the above embodiment, and it is only required to obtain the pre-acceleration command value BIR in which the deviation between the power generation command value MWD (the input value) and the power generation amount E (the output value) is less than or equal to a preset threshold value even if the deviation is not minimized.
[0099] It is also desirable that the above-described pre-acceleration command value BIR is obtained before changing the load on the steam generating device 3.
[0100] The BIR generating means 222b obtains the pre-acceleration command value BIR using the learning model constructed by the learning means 18b and outputs the pre-acceleration command value BIR to the adder 223.
[0101] The adder 223 generates a first command value by adding the fuel flow rate command value output from the function generator 221 to the pre-acceleration command value BIR output from the BIR generator 222b. The adder 223 outputs the generated first command value to the adder 234. The adder 234 generates a second command value by adding a control command output from the PI controller 233 to the first command value output from the adder 223. The adder 234 outputs the second command value to a device for controlling the control target, for example, the fuel flow rate adjusting device 7.
[0102] Hereinafter, an example of a flow of operation of the learning device 18b according to the second embodiment will be described with reference to Fig. 9A. Fig. 9A is a flowchart showing an example of the operation of the learning device 18b according to the second embodiment.
[0103] First, the learning data acquiring means 19b acquires, as learning data, a data set including the power generation command value MWD, the pre-acceleration command value BIR, and the power generation amount E used in the previous operation of the steam generating device 3 (step S201).
[0104] Next, the learning device 20b mechanically learns the characteristic of the steam generator 3 using the learning model based on the learning data acquired by the learning data acquisition device 19b. For example, the learning device 20b acquires an output value output from the learning model by inputting the power generation command value MWD and the pre-acceleration command value BIR in the learning data as input values to the learning model. The learning device 20b learns a parameter (weight) of the learning model using, for example, the error backpropagation method so that a deviation between the output value from the learning model and the power generation quantity E of the learning data is minimized (step S202).
[0105] The learning device 20b stores the constructed learning model (the learned model) in the learning model memory 21b (step S203).
[0106] Next, an example of a method of generating the pre-acceleration command value BIR of the BIR generating means 222b according to the second embodiment will be described with reference to Fig. 9B. Fig. 9B is a flowchart showing an example of an operation of the BIR generating means 222b according to the second embodiment.
[0107] The BIR generation device 222b reads a learned model from the learning model memory 21b, which is a learning model constructed by the learning device 18b (step S301). Next, the BIR generation device 222b inputs the power generation command value MWD obtained from the external device as an input value to the learning model (learned model) before the load on the steam generator 3 changes (step S302). The BIR generation device 222b obtains the pre-acceleration command value BIR at which a deviation between the output value output from the learning model and the power generation command value MWD, which is the input value, is minimized (step S303).
[0108] Here, in steps S302 and 303, the BIR generation means 222b may input the power generation command value MWD and the process value obtained from the external device as input values to the learning model, and obtain the pre-acceleration command value BIR in which the deviation between the output value output from the learning model and the power generation command value MWD of the input value is minimized.
[0109] As described above, the learning device 18b according to the second embodiment includes the learning device 20b for constructing the learning model for generating the pre-acceleration command value BIR for controlling the control target object ahead of time when the load on the steam generator 3 used for thermal power generation changes. The learning device 20b generates the above-described learning model by mechanically learning a set of data including the thermal power generation power generation command value MWD, the pre-acceleration command value BIR, and the power generation amount E used in the previous operation of the steam generator 3 as learning data.
[0110] More specifically, the learning means 20b according to the second embodiment mechanically learns the characteristic of the steam generating means 3 by mechanically learning relationships between the power generation command value MWD, the pre-acceleration command value BIR, and the power generation amount E based on the learning data acquired by the learning data acquiring means 19b.
[0111] According to the above-described configuration, it is possible to generate a pre-acceleration command value BIR in which the above-described following property exceeds a given standard in a state where the user does not set the pre-acceleration command value BIR based on previous experience. For example, the steam generator control device 17b can obtain the pre-acceleration command value BIR in which the deviation between the power generation command value MWD input to the learned model, which is the learning model constructed by the learning device 18b, and the power generation amount E output from the learned model is minimized. Therefore, it is possible to improve the following property of the power generation amount E with respect to the power generation command value MWD.
[0112] Furthermore, the operating data in the actual operation is used by using the pre-acceleration command value BIR obtained from the learning model of the second embodiment as the learning data. That is, the learning model is updated by the learning device 20b based on the recent operating data and the power generation amount E. As a result, the learning device 18b can accurately generate the pre-acceleration command value BIR at which the above-described following characteristic exceeds a given standard when the actual operation is performed.
[0113] Although embodiments of the present disclosure have been described above with reference to the drawings, specific configurations are not limited to the embodiments, and other designs and the like may be included without departing from the scope of the present disclosure.
[0114] (Modified Example 1) Although the above-described first and second embodiments described an example in which the steam generating device 3 is a pulverized coal-fired steam generating device configured to burn pulverized coal as fuel, the present disclosure is not limited thereto. For example, the steam generating device 3 may be a mixed-combustion steam generating device that uses ammonia fuel in addition to fossil fuel as fuel and performs mixed combustion of the fossil fuel and the ammonia fuel.
[0115] (Modified Example 2) In the first and second embodiments described above, the pre-acceleration command value BIR may be, for example, any of the following. • Command value of a main steam pressure • Command value of a fuel flow rate • Exhaust O2 command value • Command value of a degree of opening of a gas damper for controlling a reheated steam temperature • Command value of an intermediate degree of a spray water opening • Command value of an air volume flow for a two-stage combustion • Command value of an ammonia control for denitrification
[0116] Also, all or part of the learning device of the above-described first or second embodiment may be implemented by a computer. In this case, the above-described computer may include a processor such as a CPU or a GPU and a computer-readable recording medium. Functions of all or part of the above-described learning device may be implemented by recording a program for implementing the functions in the computer in the above-described computer-readable recording medium and causing the above-described processor to read and execute the above-described program recorded in the recording medium.Here, the "computer-readable recording medium" refers to a storage device including a flexible floppy disk, a magneto-optical disk, a read-only memory (ROM), a portable medium such as a compact disc (CD-ROM), and a hard disk embedded in the computer system. Furthermore, the "computer-readable recording medium" may include a computer-readable recording medium for dynamically retaining a program for a short period of time, such as on a communication line when the program is transmitted over a network such as the Internet, or in a communication circuit such as a telephone circuit. The "computer-readable recording medium" may include a computer-readable recording medium for retaining the program for a given period of time, such as a volatile memory in the computer system including a server and a client when the program is transmitted.The program described above may also be a program for implementing some of the functions described above. Furthermore, the program described above may be a program that implements the functions described above in combination with a program already recorded on the computer system, or may be a program implemented using a programmable logic device such as an FPGA. Industrial applicability
[0117] The present disclosure can be applied to a learning device for constructing a learning model for generating a pre-acceleration command value for controlling a control target object before the time at which a load on a steam generator used for heat power generation changes, and can be applied to a steam generator control system including the learning device. List of reference symbols A, B heat energy generation system 1 thermal energy generation plant 2, 2b Plant control system 3 Steam generating device 17, 17b Steam generating device control device 18, 18b Learning device 20, 20b Learning facility
Claims
[1] A learning device (18, 18b) for forming a learning model for generating a pre-acceleration command value (BIR) for controlling a control target object before the time at which a load on a steam generating device (3) used for thermal energy generation changes, the learning device (18, 18b) comprising a learning device (20, 20b) configured to generate the learning model by mechanically learning a data set as learning data containing a power generation command value (MWD) for heat energy generation and the pre-acceleration command value (BIR) used in a previous operation of the steam generating device, characterized by , that the learning device (20, 20b) constructs the learning model based on the learning data, which outputs the pre-acceleration command value (BIR) at which a follow-up characteristic of a power generation quantity (E) with respect to the power generation command value (MWD) exceeds a given standard by inputting at least the power generation command value (MWD). [2] The learning device (18, 18b) according to claim 1, wherein the learning means (20, 20b) causes a process value of the control target object obtained in the previous operation of the steam generating device (3) to be included in the learning data. [3] The learning device (18, 18b) according to claim 2, wherein the process value of the control target object includes a flow rate of fuel supplied to the steam generating device (3), a flow rate of water supplied to the steam generating device (3), a volume flow rate of air supplied to the steam generating device (3), a flow rate of ammonia for denitrification, a flow rate of spray water for controlling a reheated steam temperature, and / or a steam pressure. [4] A learning device (18, 18b) according to any one of claims 1 to 3, wherein the learning means (20, 20b) uses as the learning data the data set obtained in the previous operation of the steam generating means (3). [5] Steam generating device control system with the learning device (18, 18b) according to claim 1 and a steam generator control device (17, 17b) configured to obtain the pre-acceleration command value (BIR) by inputting at least the power generation command value (MWD) into a learned model, which is the learning model constructed by the learning device (18, 18b), wherein, when the load on the steam generator (3) changes, the steam generator control device (17, 17b) causes the power generation amount (E) to follow the power generation command value (MWD) by controlling the control target object based on a value obtained by adding the pre-acceleration command value (BIR) to the power generation command value (MWD).
Citation Information
Patent Citations
Electrostatic chuck
JP2019021712A
Method and device for process control
JP1993053605A
Power generation system
JP2012041889A
Control device for plant, control device for thermal power plant, and gas concentration estimation device of coal-burning boiler
US20090132095A1
Intelligent building management systems
US20190377305A1