WATER TURBINE POWER GENERATION SYSTEM AND CONTROL METHOD FOR PROVIDING IMPROVED DYNAMIC RESPONSE TO STRONG FLUCTUATIONS IN THE POWER SETPOINT

DE602022008188T2Active Publication Date: 2024-11-27SUPERGRID INSTITUTE SAS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DE602022008188
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Priority Date
2022-01-25
Filing Date
2022-01-31
Publication Date
2024-11-27
Estimated Expiration
2042-01-31

AI Technical Summary

Technical Problem

Hydraulic turbine systems face limitations in responding quickly to significant variations in electrical power set points due to physical constraints, leading to instability and increased maintenance costs, while energy storage systems are costly and have limited capacity, making it difficult to meet rapid power adjustments requested by AC grids.

Method used

A control system that coordinates the turbine system with an energy storage system to manage power variations by selectively charging or discharging the storage system, allowing the turbine to respond more aggressively and reducing the need for high energy storage capacity, thereby achieving quicker power adjustments within tolerated deviations.

Benefits of technology

This approach enables the turbine system to rapidly adjust electrical power output to meet AC grid demands, reducing downtime and maintenance costs while using a more cost-effective energy storage system, particularly effective for significant power variations exceeding 30% of nominal output.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art

Description

[0001] [The invention relates to a monitoring strategy for optimizing the operation of a hybrid power generation system using a turbine system producing electrical energy to an alternating current grid (AC grid), as a primary energy source, and an energy storage system, as a secondary source. The invention relates in particular to the management of significant variations in the electrical power set point. The description also relates to the management of sudden variations in the electrical power set point.

[0002] Many power plants, especially hydroelectric dams, include a turbine system to produce electrical power that is transferred to an AC grid through a connecting link. Significant variations in electrical power may be requested by the AC grid operator from the power generation system. Due to its physical limitations, the turbine system cannot instantly provide a significant variation in its output electrical power. For example, the responsiveness of a hydroelectric system to a significant variation in the power setpoint is typically greater than 30 seconds, particularly given the inertia of the water column in the upstream conduits connected to the turbine.

[0003] A hydraulic turbine system is configured to operate over a specific output power range. Outside this output power range, several undesirable phenomena can be expected. For example, with a Francis turbine, a system instability called an "S-shape" appears at output power between 0% and 20% of the rated output power, an unstable vortex appears between the turbine blades at output power between 20% and 40% of the rated output power, a helical vortex can appear downstream of the turbine at output power between 40% and 60% of the rated output power, and a straight vortex downstream of the turbine can appear at output power between 90% and 110% of the rated output power.These unwanted phenomena are known to damage parts of the turbine system and prolonged use of the system under these conditions requires operators to repair damaged parts, resulting in increased system downtime for maintenance and, consequently, increased maintenance costs.

[0004] The hydraulic system may be associated with an energy storage system connected to the connection link to increase the responsiveness of the turbine system to a new electrical power setpoint transmitted by an AC grid operator. A control circuit receives an electrical power setpoint sent by the AC grid operator and, based on this setpoint, controls a transient power transfer between the connection link and the energy storage system by selectively controlling the charging or discharging of the energy storage system. When a new setpoint is received, the energy storage system contributes to this variation by immediately participating in the power variation with the turbine.

[0005] However, given its cost, the energy storage system has a limited capacity. Therefore, it can only contribute to a limited variation of electrical energy after a new electrical power setpoint has been transmitted by the AC grid operator. Thus, the actual electrical power supplied to the AC grid does not reach the setpoint requested by the AC grid operator quickly enough. Indeed, the responsiveness to a power setpoint variation has an increasing market value in the context of the integration of more renewable energies into the electricity grids. This market value increases the profitability of the turbine system, if this responsiveness can be improved.

[0006] It is therefore necessary to improve the responsiveness of a power generation system using a turbine system in order to respond to a new electrical power set point involving a significant power variation.

[0007] Furthermore, electricity suppliers can generate revenue from system operator requirements. These requirements are defined as requests to supply energy to a network, requests that sometimes impose very short activation times, typically less than 1 s. Such power requests can be requested to compensate for the difference between production and consumption at the electricity network level. Such services can provide significant revenue to electricity suppliers if these output power adjustment deadlines are respected.

[0008] The hydraulic system may be combined with an energy storage system to increase the responsiveness of the turbine system when a new electrical power setpoint is applied. A control circuit receives an electrical power setpoint transmitted by the AC network operator or calculated from the frequency deviation observed at the electrical delivery connection, and, depending on this setpoint value, controls a transient power transfer between the connection link and the energy storage system by selectively controlling the charging or discharging of the energy storage system. When such a sudden new setpoint is received, the energy storage system contributes to this variation by immediately contributing to the power variation with the turbine.

[0009] However, such a system currently relies on a large-capacity energy storage system, which increases its cost and size. To improve the diffusion of energy production systems that include an energy storage system, it is important to keep their cost as low as possible.

[0010] The invention aims to solve one or more of these drawbacks. The invention therefore relates to a method for controlling an energy production system, as defined in the appended claims.

[0011] The invention also relates to variants of the dependent claims. Those skilled in the art will understand that each of the features of the dependent claims or the description can be combined independently with the features of an independent claim, but without constituting an intermediate generalization.

[0012] The invention is defined by independent claims 1 and 9. Preferred embodiments are defined by the dependent claims.

[0013] Furthermore, there is identified herein the document EP3703213 A1 of the Art closest to independent claims 1 and 9, which relates in particular to the control of a hydraulic turbine system as claimed in the respective preambles.

[0014] In addition, we identify the document CN111900721 ​​A.

[0015] Other characteristics and advantages of the invention will become clearer from the description given below, for information purposes only and in a non-limiting manner, with reference to the appended drawings, in which: [ Fig. 1 ] is a schematic representation of an energy production system according to one embodiment of the invention; [ Fig.2 ] is a diagram illustrating the evolution of electrical power at different locations of an energy production system according to a first variant of the invention; [ Fig.3 ] is a diagram illustrating the evolution of electrical power at different locations of an energy production system according to a second variant of the invention; [ Fig.4 ] is a schematic representation of an energy production system according to another exemplary embodiment of the invention; [ Fig.5 ] is a schematic representation of an energy production system according to an example of an unclaimed aspect. ; [ Fig.6 ] illustrates the electrical power supplied to the connection interface with power management according to an example of an unclaimed aspect. ; [ Fig.7 ] illustrates the energy supplied by the energy storage device during power management of the figure 6 ; [ Fig.8 ] illustrates the electrical powers supplied on the connection interface according to a reference power management; [ Fig.9 ] illustrates the energy supplied by the energy storage device during power management of the figure 8 .

[0016] There Figure 1 is a schematic representation of a power generation system 1 according to a first embodiment of the invention. The power generation system 1 comprises a turbine system 3, an energy storage system 14 and a connection link 6. The invention will be disclosed in the specific example of a hydraulic turbine system, but can also be applied to other turbine systems, such as gas turbines.

[0017] The turbine system 3 comprises an electrical machine 31 (generally a synchronous machine) and a turbine 32 coupled to the electrical machine 31. The turbine system 3 is essentially designed to provide electrical power to the connecting link 6. The turbine system 3 may also be reversible and be designed to operate as a pump-turbine.

[0018] The connection link 6 comprises a connection interface 62 for an AC network 2. The electrical machine 31 and the energy storage system 14 are electrically connected to the connection link 6. The electrical machine 31 is configured to generate electrical energy and transfer it to the AC network 2 via the connection interface 62.

[0019] The energy storage system 14 is configured to provide or absorb electrical power to / from the connection interface 62. In this embodiment of the invention, the energy storage system 14 comprises an AC / DC electrical transducer 12 and a DC converter 13. The AC interface of the AC / DC converter 12 is connected to the connection link 6 and the DC interface of the AC / DC converter 12 is connected to the DC electrical transducer 13 which allows the transfer of power between the connection link 6 and the DC transducer 13.

[0020] The connection interface 6 is connected to an AC network 2, typically a three-phase AC network. The AC network 2 can request electrical power by providing corresponding power setpoints to the power generation system 1.

[0021] The operation of the energy production system 1 is controlled by a control system. The control system of the illustrated example comprises a main supervisor 7, a controller 8 for the electric machine 31, a controller 141 of the energy storage system and a controller 9 for the turbine 32.

[0022] According to the invention, the energy production system 1 is controlled as follows. The following parameters will be used in the remainder of the description.

[0023] Pnom is the nominal electrical power of the turbine system 3; Ps0 is an initial set point of the electrical power received from the AC network 2; Ps1 is a subsequent electrical power set point received from the AC network 2; Δps = Ps1 - Ps0 corresponds to the variation of electrical power requested by the AC network 2; Pt0 is the initial electrical power supplied by the turbine system 3 to the connection interface 62; Pti is the instantaneous electrical power supplied by the turbine system 3; Pea is the electrical power that the energy storage system can supply to the connection interface 62; Peamax is the maximum electrical power exchanged at the connection interface 62 by the energy storage system 14, as permitted by the design of the energy storage system 14; Pe1 is the instantaneous electrical power exchanged between the connection interface 62 and the energy storage system 14;ε1 and ε2 are respectively the lower and higher power deviations tolerated by the AC network 2; ;

[0024] The following steps are performed. First, before a reference time t=0, the AC network 2 operates with an electrical power setpoint Ps0 sent by the supervisor 7 to the turbine system 3. At this point, the power Ps0 delivered by the turbine system 3 to the connection interface 62 is equal to the electrical power setpoint Ps0, say Pt0 = Ps0.

[0025] At time t=0, AC network 2 provides a subsequent power setpoint Ps1. The corresponding power setpoint Ps1 is for example received by supervisor 7. Setpoint Ps1 implies a significant power variation, let's say it meets the following requirements ΔPs = Ps1 - Ps0 and |ΔPs| > Pnom * 0.3.

[0026] The power variation implied by the set point Ps1 is either an increase in power (Ps1 > Ps0) or a decrease in power (Ps0 > Ps1). In both cases, the reactivity of the power Pti is not immediate.

[0027] For an increase in power (Ps1 > Ps0): a) a hydraulic setpoint is applied to the turbine system 3, in order to increase its output power Pti at the connection interface 62. The supervisor 7 can for example send a hydraulic power setpoint to the controller 9. The controller 9 can control the operation of the turbine 32 accordingly, for example by adapting the angle of the movable blades of the director in a Francis turbine. The energy storage system 14 cannot supply electrical power simultaneously to the connection interface 62. Thus, the energy stored in the energy storage system 14 is retained for later use; b) the power Poa is determined. Poa is the maximum power that the energy storage system 14 can supply to the connection interface 62.The power Poa may in particular be supplied to the supervisor 7 by a state of charge controller of the energy storage system 14; c) the following requirement is verified: Pti + Pea ≥ Ps1 - ε1. The supervisor 7 may verify this requirement recurrently. When this requirement is satisfied, the energy storage system 14 is controlled to supply the electrical power Pe1 to the connection interface in order to satisfy the requirement Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2, with the power deviations ε1 and ε2 tolerated by the AC network 2. .

[0028] The power Pe1 may initially be equal to Pea or at least equal to Pea / 2, or preferably at least equal to Pea*0.75. The power Pe1 may initially be greater than 0.05 * Pnom or even initially greater than 0.1 * Pnom.

[0029] For a decrease in power (Ps0 > Ps1): n) a hydraulic setpoint is applied to the turbine system 3, in order to reduce its output power Pti at the connection interface 62. The supervisor 7 can for example send a hydraulic power setpoint to the controller 9. The energy storage system 14 cannot recover the electrical power simultaneously from the connection interface 62. Thus, the storage capacity of the energy storage system 14 is preserved for later use; o) the power Poa is determined. The power Poa is the maximum power that the energy storage system 14 can recover from the connection interface 62. The power Poa can in particular be provided to the supervisor 7 by the controller 141 of the energy storage system 14; p) the following requirement is verified: Pti + Pea ≤ Ps1 + ε2. The supervisor 7 can verify this requirement recurrently.When this requirement is satisfied, the energy storage system 14 is controlled to recover the electrical power Pe1 from the connection interface in order to satisfy the requirement Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2. .

[0030] According to the invention, the updated set point Ps1 can be reached more quickly without requiring increased energy capacity for the energy storage system 14. The invention makes it possible to reverse a prejudice of a person skilled in the art: it teaches to delay the power supply of the energy storage system 14 in order to reach the new power set point more quickly. The invention is particularly effective if ΔPs > Pnom*0.4, and even more so if ΔPs > Pnom*0.5. The invention is particularly interesting if ΔPs ≥ 2* Peamax.

[0031] According to the invention, the control of the turbine 32 can be more aggressive since the use of the energy storage system 14 allows a temporary overshoot of the electrical power generated by the electrical machine 31 once the updated setpoint PS1 is reached. Indeed, a rapid convergence of Pti with Ps1 as a limit is less necessary; oscillations of the power Pti around the setpoint Ps1 are tolerated. The turbine 32 can therefore be controlled only by taking into account its physical requirements alone. The turbine system 3 can thus provide a change in electrical power in less time.

[0032] Furthermore, controlling the turbine 32 to achieve overshoot also allows the state of charge of the energy storage system 14 to be addressed after its discharge, when the requirement Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2 is satisfied.

[0033] Such control of the turbine 32 can in particular be expressed as follows. When the requirement Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2 is satisfied, the turbine system 3 supplies the electrical power Pti transiently to the connection interface 62 with Pti > Ps1 if Ps1 > Ps0, or Pti < Ps1 if Ps0 > Ps1. The electrical power Pti can respond transiently to the following relationships: Pti > Ps1 if Ps1 > Ps0 or Pti < Ps1 if Ps0 > Ps1.

[0034] A significant overshoot can be accepted when the requirement Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2 is satisfied, for example if Ps1 > Ps0, Pti > Ps1 + 0.1* Pnom, or Pti > Ps1 + 0.15* Pnom, or Pti > Ps1 + 0.2* Pnom; if Ps0 > Ps1, Pti < Ps1 - 0.1* Pnom, or Pti > Ps1 - 0.15* Pnom, or even Pti > Ps1 - 0.2* Pnom.

[0035] Once the requirement Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2 is met, the AC network operator 2 can be informed that the power setpoint Ps1 is reached.

[0036] The power deviations ε1 and ε2 are set by the network operator CA 2, in order to define the tolerance to power deviations at the connection interface 62. These deviations can for example satisfy the requirements ε1 ≤ 0.02 * Pnom and ε2 ≤ 0.02 * Pnom, preferably to the control method according to claim 1, where ε1 ≤ 0.015 * Pnom and if possible where ε2 ≤ 0.015 * Pnom, and ε1 ≤ 0.01 * Pnom and ε2 ≤ 0.01 * Pnom.

[0037] To reduce the cost of the energy storage system 14, it may, for example, be designed so that Peamax < 0.2 * Pnom, or be designed so that Peamax < 0,15 * Pnom .

[0038] In some cases, the energy stored in the energy storage system 14 is either insufficient or not high enough to satisfy the updated setpoint requirement for a long time. For example, for a power increase Ps1 > Ps0, if the energy stored in the energy storage system 14 is less than Pea * (t2 - t1) / 2, the requirement Ps1 - ε1 ≤ Pti ≤ Ps1 + ε2 may not be satisfied until time t2.

[0039] The supervisor 7 can integrate a digital clone of the turbine system 3 to anticipate its electrical power production. Based on parameters such as the power Pti, the water flow rate, the pressure inside the turbine or in its upstream conduits, the supervisor 7 can use the digital clone of the turbine system 3 and anticipate the evolution of the instantaneous transient electrical power Ptm supplied by the electrical machine 31 over a forecast horizon tp > t2 - t0. When it receives the set point Ps1, the supervisor 7 can anticipate the instantaneous power Pem = Ps1 - Pti which will be supplied by the energy storage system 14 over the forecast horizon tp > t2 - t0.

[0040] By integrating the Pem signal for a period corresponding to the forecast horizon tp > t2 - t0, the supervisor 7 can calculate the power that will be requested from the energy storage system 14 over the forecast horizon tp > t2 - t0. If the energy currently stored in the energy storage system 14 is less than the calculated energy, the energy storage system 14 will adjust its state of charge accordingly during the interval [t0 - t1].

[0041] If the energy storage system 14 does not have the capacity to store the calculated power, the supply of power by the energy storage system 14 may be postponed to let the Pti increase a little further, until the energy storage system 14 can supply the calculated power.

[0042] This can be applied in the same way for a decrease in the power setpoint.

[0043] In embodiments of the invention, the energy storage system 14 may include a storage device selected from the group consisting of a supercapacitor, a fuel cell, an electrochemical battery, an electric motor driving a flywheel, an air compressor, and electromagnetic storage.

[0044] There Figure 2 illustrates the operation of an energy production system 1 according to an embodiment of the invention. The solid line curve corresponds to the overall electrical power supplied to the connection interface 62. The dotted and dashed curve corresponds to the electrical power supplied by the electrical machine 31 to the connection interface 62. The dotted curve corresponds to the electrical power exchanged by the energy storage system 14 with the connection interface 62. The upper limit corresponds to Ps1 + ε2, the lower limit corresponds to Ps1 - ε2.

[0045] In this example, Pt0 = Ps0 = 0, let us say that the turbine system 3 does not supply power to the connection interface 62 before t = 0. At this point, the state of charge of the energy storage system 14 is sufficient for it to be able to supply electrical power Poa to the connection interface 62, in accordance with the invention. The energy storage system 14 may be fully or partially charged.

[0046] When t = 0, the AC grid 2 sends the power setpoint Ps1 to the supervisor 7, with Ps1 = 0.8 * Pnom. Therefore, a significant increase in power is requested by the AC grid 2. Until t = t1, the energy storage system 14 cannot supply electrical power to the connection interface 62. The energy storage system 14 cannot exchange electrical power with the connection interface 62 before t1. Thus, Pe1 = 0 between t = 0 and t1. Until t = t1, the turbine system 3 is controlled to increase the output electrical power Pti at the connection interface 62. Until t = t1, Pti + Pea < Ps1. Therefore, the power generation system 1 is unable to supply the electrical power corresponding to Ps1 before t1. Until t = t1, the electrical power of the connection interface 62 is only supplied by the turbine system 3.

[0047] When t = t1, the requirement Pti + Pea ≥ Ps1 is satisfied and the state of charge of the energy storage system is sufficient to ensure continued operation. The energy storage system 14 is then controlled to provide the electrical power Pe1 with Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2. Thanks to its power contribution, the energy storage system 14 makes it possible to quickly reach the power setpoint Ps1.

[0048] The energy storage system 14 is used to satisfy this requirement, even after it has been satisfied. As shown in Figure 2 , an aggressive control of the turbine 32 results in a power overshoot after t = t2: Pti > Ps1. Thus, after t2, the energy storage system 14 begins to recover electrical energy from the connection interface 42, in order to maintain Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2. The previous discharge of the energy storage system 14 allows it to store more electrical power after such an overshoot.

[0049] As illustrated by the Figure 2 , after t1, the electrical power Pti can oscillate around the set point Ps1. The energy storage system 14 compensates for these oscillations in order to maintain the power delivered to the connection interface 62 within the limits set by the operator of the AC network 2. Consequently, the energy storage system 14 sequentially recovers / distributes energy from / to the AC network 2.

[0050] There Figure 3 illustrates the operation of an energy production system 1 according to another embodiment of the invention. The solid line curve corresponds to the overall electrical power supplied to the connection interface 62. The dotted and dashed curve corresponds to the electrical power supplied by the electrical machine 31 to the connection interface 62. The dotted curve corresponds to the electrical power exchanged by the energy storage system 14 with the connection interface 62. The upper limit corresponds to Ps1 + ε2, the lower limit corresponds to Ps1 - ε2.

[0051] In this example, Pt0 = Ps0 = 0, let's say that the turbine system 3 does not supply power to the connection interface 62 before t = 0. At this point, the energy storage system 14 may be fully or partially charged.

[0052] When t = 0, the AC network 2 sends the power setpoint Ps1 to the supervisor 7, with Ps1 = 0.8 * Pnom. Therefore, a significant increase in power is requested by the AC network 2. Until t = t1, the energy storage system 14 recovers the electrical power from the connection interface 62, in order to process its state of charge for the continuation of its operation.

[0053] Until t = t1, the turbine system 3 is controlled to increase the output electrical power Pti at the connection interface 62. Until t = t1, Pti + Pea < Ps1. Therefore, the power generation system 1 is not able to provide the electrical power corresponding to Ps1 before t1.

[0054] Until t = t3, the electrical power supplied by the turbine system 3 to the connection interface 62 is recovered by the energy storage system 14. Therefore, until t3, no electrical power is supplied to the connection interface 62; all the available electrical power Pti is transferred to the energy storage system 14. This does not cause any problem for the management of the AC network 2, since the available power is not sufficient to reach the set point Ps1.

[0055] When t = t3, the energy stored in the energy storage system 14 has reached a value adequate for continued operation. Between t3 and t1, there is no exchange of power between the energy storage system 14 and the connection interface 62. The electrical power supplied to the connection interface 62 therefore corresponds to the electrical power supplied by the turbine system 3 to this interface 62.

[0056] When t = t1, the requirement Pti + Pea ≥ Ps1 - ε1 is satisfied. The energy storage system 14 is then controlled to provide the electrical power Pe1 with Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2. Thanks to its power contribution, the energy storage system 14 makes it possible to quickly reach the power setpoint Ps1. The behavior of the electricity production system 1 is then identical to the behavior disclosed for the embodiment of the Figure 2 .

[0057] The following control parameters can be used. The supervisor 7 can receive active / reactive power setpoints from the AC network 2. The supervisor 7 will set the respective power inputs of the energy storage system 14 and the hydraulic system 3, by providing them with corresponding setpoints. The supervisor 7 can send the respective setpoints to the controllers 141, 8 and 9. The supervisor 7 can also transmit additional information, for example the voltage value of the AC network 2 to the controllers 141 and 8.

[0058] The controller 9 can receive the value of the instantaneous power Pti supplied by the electrical machine 31 at the connection interface 62, in order to correct the control of the hydraulic turbine 32.

[0059] The AC / DC converter 12 is configured to be current reversible. The AC / DC converter 12 is controlled by the controller 141.

[0060] There Figure 4 is a schematic representation of an energy production system 1 according to a second embodiment of the invention. This embodiment is identical to the second, except for the structure of its energy storage device 14. In this embodiment, the DC electrical transducer 13 of the energy storage system 14 comprises a DC / DC converter 131 and an electrical energy storage device 132. The DC / DC converter 131 electrically connects the energy storage system 14 to the DC interface of the AC / DC converter 12. The DC / DC converter 131 is configured to adapt the voltage level between the storage device 132 and the DC interface of the AC / DC converter 12. The operation of the electrical transducer 13 can be controlled by a control circuit 133.

[0061] There figure 5 is a schematic representation of a power generation system 1 according to another aspect not claimed and not forming part of the invention. The power generation system 1 comprises a turbine system 3, an energy storage system 14 and a connecting link 6. The aspect will be disclosed in the specific example of a hydraulic turbine system, but can also be applied to other turbine systems, such as gas turbines.

[0062] The turbine system 3 comprises an electrical machine 31 (generally a synchronous machine) and a turbine 32 coupled to the electrical machine 31. The turbine system 3 is essentially designed to provide electrical power to the connecting link 6. The turbine system 3 may also be reversible and be designed to operate as a pump-turbine.

[0063] The connection link 6 comprises a connection interface 62 for an AC network 2. The electrical machine 31 and the energy storage system 14 are electrically connected to the connection link 6. The electrical machine 31 is configured to generate electrical energy and transfer it to the AC network 2 via the connection interface 62.

[0064] The energy storage system 14 is configured to provide or absorb electrical power to / from the connection interface 62. In this embodiment of this unclaimed aspect, the energy storage system 14 comprises an AC / DC electrical transducer 12 and a DC converter 13. The AC interface of the AC / DC converter 12 is connected to the connection link 6 and the DC interface of the AC / DC converter 12 is connected to the DC electrical transducer 13 which enables the transfer of power between the connection link 6 and the DC transducer 13.

[0065] The connection interface 6 is connected to an AC network 2, typically a three-phase AC network. The AC network 2 can request electrical power by providing corresponding power setpoints to the power generation system 1.

[0066] The operation of the energy production system 1 is controlled by a control system. The control system of the illustrated example comprises a main supervisor 7, a controller 8 for the electric machine 31, a controller 141 of the energy storage system and a controller 9 for the turbine 32.

[0067] According to this embodiment of this unclaimed aspect, the power generation system 1 is controlled as follows.

[0068] The controller 9 is configured to apply a fluid parameter setpoint to the turbine 32, this parameter influencing the electrical power supplied by the electrical machine 31. More precisely, for a hydraulic turbine 32, the fluid parameter setpoint may be a guide valve opening setpoint of the turbine 32. The electrical machine 31 thus supplies an instantaneous electrical power Ph to the connection link 6.

[0069] The controller 7 receives from the AC network 2 a setpoint P* to be delivered on the connection interface 62 (the setpoint P* can also be calculated locally by the controller 7, for example by taking into account frequency variations). Before the instant t=0, the value of the setpoint P* is Ps0. The turbine system 3 is therefore controlled to deliver a power Ph0 = Ps0 on the connection interface 62. The energy storage system 14 is therefore not used, or can be charged or used transiently.

[0070] At time t = 0, the value of the setpoint P* is Ps1. ΔPs=Ps1-Ps0, with Ps1 >Ps0. Thus, at time t=0, a sudden increase in the setpoint value P* is requested.

[0071] From a predictive control model of the electrical power generated by the turbine system 3, successive operating parameters of the turbine controller 9 are determined, so that the power Ph reaches the value Ps1 with a minimum amount of additional energy to be supplied by the energy storage system 14. Thus, the controller 7 successively sends hydraulic power setpoints Ph* to the turbine controller 9 until the system reaches equilibrium. The controller 7 also sends successive power setpoints Pb* to the energy storage system 14 until the system reaches equilibrium. The power setpoints are defined to follow the relationship Ph*+Pb*= Ps1.

[0072] Model predictive controllers (MPC) rely on dynamic models of a process, most often linear empirical models obtained by system identification. The models used in model predictive controllers are generally intended to represent the behavior of complex dynamic systems. Model predictive controllers are based on finite-horizon iterative optimization under the constraints of a system model. At time t, the current state of the system is sampled and a cost-minimizing control strategy is calculated (by a numerical minimization algorithm) for a relatively short time horizon in the future: [ t, t + T ], where t is the current time and T is the prediction time or prediction horizon.More precisely, an online or on-the-fly computation is used to explore the state trajectories that emanate from the current state and to find (via the solution of the Euler-Lagrange equations for example) a control strategy that minimizes the costs up to time t + T. Only the first step of the control strategy is implemented over time [t, t+Ts], Ts being the sampling time of the controller, then the system state is sampled again, and the computations are repeated starting from the new current state, giving a new control and a new predicted state path. The prediction horizon continues to be shifted into the future and for this reason, model-predictive controllers are also called vanishing horizon controllers.

[0073] Until the hydraulic system stabilizes at the target output power (Ph reaches Ps1), the energy storage system 14 applies an actual electrical power Pb to the connection link 6, with Pb + Ph = Ps1. Simultaneously, the successive operating parameters provided by the turbine controller 9 are applied to the turbine 32.

[0074] Typically, the successive operating parameters determined by the controller 7 are power setpoints of the turbine 32. These setpoints are determined by the predictive model control, by minimizing a cost function defined as the quantity of additional energy to be supplied during the prediction horizon to the turbine to meet the high-level requirements associated with the new power setpoint. As a secondary objective, the same method is used to ensure the control of the state of charge of the energy storage system 14.The calculation of the best set of operating parameters of the turbine controller 9 also includes the following constraints: i) the additional energy to be supplied must not be greater than what the energy storage system 14 can absorb (or supply) based on its actual state of charge, ii) the expected additional power must not be greater than what the energy storage system 14 can absorb (or supply) based on its actual state of health, iii) the stability margins of the turbine system 3 and its controller 9 must be respected.

[0075] There figure 6 illustrates corresponding powers applied to the connection interface 62 according to the unclaimed aspect. The figure 6 illustrates in dotted lines the overall electrical power supplied on the connection interface 62. The hydraulic power Ph supplied on the connection interface 62 is illustrated in solid lines. The figure 7 illustrates the amount of energy to be delivered by the energy storage device 14 during the same period (corresponding to the area between the solid and dotted lines of the figure 6 ). As can be seen, the energy supplied by the energy storage device 14 until Ph reaches Ps1 is for example approximately 1 kW.h.

[0076] There figure 8 illustrates the overall electrical power supplied on the connection interface 62 in dotted lines, for reference power management. According to this power management according to the state of the art, the turbine 32 is controlled to provide a hydraulic power Ph which remains lower than Ps1. The hydraulic power Ph supplied on the connection interface 62 is illustrated in solid lines. The figure 9illustrates the amount of energy to be delivered by the energy storage device 14 during the same energy management period. As can be seen, the energy supplied by the energy storage device 14 until Ph reaches Ps1 is approximately 1.5 kW.h.

[0077] Therefore, according to the aspect, the required energy of the energy storage device 14 is reduced. Thus, an energy storage device 14 with reduced capacity (and therefore lower cost and size) can be used.

[0078] To ensure that the energy storage device 14 is able to supply the required energy to the connection link 6, the controller 7 also determines the amount of additional energy Emin that the energy storage system 14 must supply to the connection link 6. to meet the requirement Ps1 = Pb + Ph up to Ph = Ps1. The electrical power satisfying the requirement Pb + Ph = Ps1 and the application of the determined successive operating parameters of the turbine 32 are triggered only when the instantaneous available energy of the energy storage system 14 satisfies Eess > Emin.

[0079] Depending on the requirements set by the network managers, the electrical power meeting the requirement Pb+Ph= PS1 and the application of the successive operating parameters determined by the turbine 32 are triggered less than 5s after receiving the electrical power setpoint Ps1, preferably less than 2s, preferably less than 1s, preferably less than 500ms, and preferably less than 300ms.

[0080] According to another variant of this unclaimed aspect, the power generation system 1 is controlled in the following manner. In this embodiment, the turbine controller 9 is a PID controller, having at least one variable gain (either one or more of a proportional gain, an integration gain and a derivation gain).

[0081] As for the previous variant, the turbine controller 9 is configured to apply a fluid parameter setpoint to the turbine 32 influencing the electrical power delivered by the electrical machine 31. The electrical machine 31 thus delivers an instantaneous electrical power Ph to the connection link 6.

[0082] The controller 7 receives from the AC network 2 a setpoint P* to be delivered on the connection interface 62. Before the instant t=0, the value of the setpoint P* is Ps0. The turbine system 3 is therefore controlled to deliver a power Ph0 = Ps0 on the connection interface 62. The energy storage system 14 is therefore not used, or can be charged or used transiently.

[0083] At time t = 0, the value of the setpoint P* is Ps1. ΔPs=Ps1-Ps0, with Ps1 >Ps0. Thus, at time t=0, a sudden increase in the setpoint value P* is requested.

[0084] From a predictive model control of the electrical power generated by the turbine system 3, successive values ​​of a variable gain of the turbine controller 9 are determined, so that the power Ph reaches the value Ps1 with a minimum amount of additional energy supplied by the energy storage system 14. Successive values ​​can be determined for several different gains of the turbine controller 9.

Claims

1. A method of controlling an electricity generation system (1) comprising: - a feeder link (6) comprising a connection interface (62) for connection to an AC grid 2; - a turbine system (3) comprising an electrical machine (31) and configured to deliver a nominal electrical power Pnom to the feeder link (6); - an energy storage system (14) connected to the feeder link (6), wherein the control method comprises the following steps: - receiving from the AC grid (2) a first electrical power setpoint Ps0 to be delivered to the connection interface (62) and controlling the turbine system (3) so as to deliver an electrical power Pt0 = Ps0 to the connection interface; - the controlling method being characterized in that the steps also comprise the following steps: - receiving another electrical power setpoint Ps1 from the AC grid (2), where ΔPs = Ps1 - Ps0 and |ΔPs| > Pnom * 0.3 ; I f Ps1 > Ps0: a) applying a hydraulic setpoint to the turbine system (3) to increase its electrical power output Pti and prevent the energy storage system (14) from supplying electrical power to the connection interface (62); b) determining the power Poa that the energy storage system 14 can supply to the connection interface; c) when Pti + Pea ≥ Ps1 - ε1, control of the energy storage system (14) in order to supply an electrical power Pe1 to the connection interface with a view to fulfilling the requirement Ps1 - ε1 ≤ Pe1 +Pti ≤ Ps1 + ε2, with the power deviations ε1 and ε2 tolerated by the AC grid (2) at the connection interface (62); or I f Ps0 > Ps1: n) applying a hydraulic setpoint to the turbine system in order to decrease its electrical power output Pti and prevent the energy storage system (14) from retrieving electrical power from the connection interface; o) determining the power Pea that the energy storage system (14) can retrieve from the connection interface (62); p) when Pti + Pea ≤ Ps1 + ε2, controlling the energy storage system (14) to retrieve electrical power Pe1 from the connection interface with a view to fulfilling the requirement Ps1 − ε 1 ≤ Pe1 + Pti ≤ Ps1 + ε 2 .

2. The control method according to claim 1, wherein ε1 ≤ 0.02 * Pnom and ε2 ≤ 0.02 * Pnom.

3. The control method according to claim 1 or 2, wherein a completion signal is sent to a system for managing an AC grid (2) when the requirement Ps1 − ε 1 ≤ Pe1 + Pti ≤ Ps1 + ε 2 is fulfilled.

4. The control method according to any of the preceding claims, wherein a hydraulic setpoint is applied to the turbine system to cause it to deliver electrical power Pti transiently to the connection interface when the requirement Ps1 − ε 1 ≤ Pe1 + Pti ≤ Ps1 + ε 2 is fulfilled, where: Pti > Ps1 if Ps1 > Ps0; or Pti < Ps1 if Ps0 > Ps1 .

5. The control method according to claim 4, wherein, when the requirement Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2 is fulfilled, the electrical power Pti transiently satisfies the relationship: Pti > Ps1 + 0.1 * Pnom if Ps1 > Ps0; or Pti < Ps1 − 0.1 * Pnom if Ps0 > Ps1 .

6. The control method according to claim 4 or 5, wherein the energy storage system (14) is controlled to sequentially absorb and supply electrical power to the connection interface when the requirement Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2 is fulfilled.

7. The control method according to any of the preceding claims, wherein: Pe1 = 0 between the time at which the setpoint Ps1 is received and the time at which Pti + Pea - ε1 ≥ Ps1 or between the time at which the setpoint Ps1 is received and the time at which Pti + Pea + ε2 ≤ Ps1.

8. The control method according to any of claims 1 to 6, wherein, between the moment at which the setpoint Ps1 is received and the moment at which Pti + Pea − ε 1 ≥ Ps1: Pel < 0 if Ps1 > Ps0 ; or Pel > 0 if Ps0 > Ps1 .

9. A power generation system (1), characterised in that it comprises: - a feeder link (6) comprising a connection interface (62) for connection to an AC grid (2); - a turbine system (3) comprising an electrical machine (31) and configured to deliver a nominal electrical power Pnom to the feeder link (6); - an energy storage system (14) connected to the feeder link (6); - a control system (7) configured to control the operation of the power generation system (1), wherein the control system (7) is configured for: - receiving from the AC grid (2) a first electrical power setpoint Ps0 to be delivered to the connection interface (62) and controlling the turbine system (3) to deliver an electrical power Pt0 = Ps0 to the connection interface; - the power generation system being characterized in that it is also configured for: - receiving another electrical power setpoint Ps1 from the AC grid (2), where ΔPs = Ps1 - Ps0 and |ΔPs| > Pnom * 0.3; If Ps1 > Ps0: a) applying a hydraulic setpoint to the turbine system (3) to increase its electrical power output Pti and prevent the energy storage system (14) from supplying electrical power to the connection interface (62); b) determining the power Pea that the energy storage system 14 can supply to the connection interface; c) when Pti + Pea ≥ Ps1-ε1, controlling the energy storage system (14) to deliver electrical power Pe1 to the connection interface to fulfil the requirement Ps1 - ε1 ≤ Pe1 + Pti ≤ Ps1 + ε2, with the power deviations ε1 and ε2 tolerated by the AC grid (2) at the connection interface (62); or If Ps0 > Ps1: n) applying a hydraulic setpoint to the turbine system in order to decrease its electrical power output Pti and prevent the energy storage system (14) from retrieving electrical power from the connection interface; o) determining the power Pea that the energy storage system (14) can retrieve from the connection interface (62); p) when Pti + Pea ≤ Ps1 + ε2, controlling the energy storage system (14) to retrieve electrical power Pe1 from the connection interface with a view to fulfilling the requirement Ps1 − ε 1 ≤ Pe1 + Pti ≤ Ps1 + ε 2 .

10. The power generation system (1) according to claim 9, wherein the energy storage system (14) comprises a direct current electrical transducer (13), an AC / DC converter (12) having an AC interface connected to the feeder link (6) and a DC interface connected to the direct current electrical transducer (13).

11. The power generation system (1) according to claim 10, wherein the energy storage system (14) comprises a DC / DC converter (131) configured to change the voltage level between the DC electrical transducer (132) and the AC / DC converter (12).

12. The power generation system (1) according to claim 11, wherein the DC electrical transducer (13) is selected from the group comprising a supercapacitor, a fuel cell, an electrochemical battery, an electric motor driving a flywheel, an air compressor and an electromagnetic storage.

13. The power generation system (1) according to any of claims 9 to 12, wherein Pe1 > Pea / 2.