Hoisting system and method
The hoisting system addresses inefficiencies in load and speed management by using a remotely connectable sheave assembly to adjust line configurations, enhancing operational flexibility and efficiency in drilling and production systems.
Patent Information
- Application Number
- EP2018781882
- Authority / Receiving Office
- EP · EP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2017-04-05
- Filing Date
- 2018-04-03
- Publication Date
- 2025-01-15
- Estimated Expiration
- 2038-04-03
AI Technical Summary
Existing hoisting systems in drilling and production systems face challenges in efficiently managing load capacity and speed, requiring re-reeving of cable assemblies to adjust between low load/high speed and high load/low speed operations, which is inefficient and limits operational flexibility.
A hoisting system with a sheave assembly that can be remotely connected to either the crown block or traveling block, allowing for increased load capacity without re-reeving the cable assembly, by altering the number of lines from 12 to 16 or 10 to 18, without increasing drawworks horsepower or cable size.
Enables flexible load capacity adjustment without re-reeving, maintaining high speed at low loads and high load capacity at low speeds, improving operational efficiency and reducing the need for frequent system adjustments.
Smart Images

Figure IMGF0001 
Figure IMGF0002 
Figure IMGF0003
Abstract
Description
BACKGROUND
[0001] This section is intended to introduce the reader to various aspects of art that may be related to various aspects of the present disclosure, which are described and / or claimed below. This discussion is believed to be helpful in providing the reader with background information to facilitate a better understanding of the various aspects of the present invention. Accordingly, it should be understood that these statements are to be read in this light, and not as admissions of prior art.
[0002] Natural resources, such as oil and gas, are used as fuel to power vehicles, heat homes, and generate electricity, in addition to various other uses. Once a desired resource is discovered below the surface of the earth, drilling and production systems are often employed to access and extract the resource. These systems may be located onshore or offshore depending on the location of the desired resource. Further, such systems may include a wide variety of components, such as various casings, fluid conduits, tools, and the like, that facilitate extraction of the resource from a well during drilling or extraction operations.
[0003] Whether onshore or offshore, a drilling rig can be provided to drill a well to access the desired resource. A drill string can be suspended from the drilling rig and rotated to drill the well. While the drill string can be suspended from a kelly and driven by a rotary table on the drill floor of the drilling rig, in some instances the drill string is instead suspended from and driven by a top drive of the drilling rig. Such a top drive generally includes a drive stem (also referred to as a main shaft) that can be connected to the drill string. A motor in the top drive is connected to the drive stem to drive rotation of the drill string via the drive stem. The top drive can be raised and lowered via a mast and a hoisting system to raise and lower the drill string within the well.
[0004] The drilling rig also includes a hoisting system configured to raise and to lower drilling equipment relative to the drill floor. The hoisting system typically includes a crown block, a traveling block, a drawworks system, and a cable assembly (e.g., wire) that extends from the drawworks system and couples the crown block to the traveling block. As the number of reeves or lines of the hoisting system increase, the speed of the system decreases, and can decrease to a point where the speed is too low. Therefore, the cable assembly of hoisting system must be re-reeved so that it has fewer lines (e.g. 18 lines to 12 lines). The opposite is also true when a higher load capacity is needed.
[0005] WO 01 / 29366 describes a hoisting mechanism for use on a vessel comprising a mast with cable blocks on the top side thereof, a trolley displaceably attached to the mast, with cable blocks on the top side thereof and means for picking up a load on the underside thereof and hoisting means including a hoisting cable guided over the cable blocks of both the mast and the trolley and allowing movement of the trolley with respect to the mast. A compensator in the form of a pneumatic or hydraulic cylinder is provided for damping movements of the vessel, the hoisting cable being guided over cable pulleys connected to the end of the compensator to exert force on the hoisting cable.
[0006] US 6926108 describes a hoist system for a derrick including a splittable block connected to the derrick top side, a hoisting cable guided through the splittable block a moveable trolley connected to the splittable block and removably secured on the derrick and a hoist winch adapted to pull the hoisting cable over the derrick top side and through the splittable block to move the moveable trolley relative to the derrick.
[0007] WO92 / 14028 describes a crown block / traveling block system for a well drilling derrick, the system being formed of elevationally stationary multi-sheave upper and lower crown blocks arranged in tandem and supported to the derrick support structure, an elevationally moveable multi-sheave traveling block adapted to support drilling equipment which is raised and lowered in the derrick, and a multi-sheave intermediate block. In one mode, the multi-sheave intermediate block is attached in tandem arrangement below the upper and lower crown blocks to form a part of a three-block crown block assembly and in a second mode, the intermediate block is attached to the traveling block to form a traveling block assembly, the modes being selected according to the weight of equipment to be supported during drilling operations.
[0008] Further, the document US6926103B1 discloses a hoisting system according to the preamble of claim 1.SUMMARY
[0009] The present invention resides in a hoisting system as defined in claim 1. Preferred embodiments are defined in claims 1 to 8 .
[0010] In another aspect, the invention resides in a a method to lift a load using a hoisting system as defined in claim 9. Preferred embodiments of the method are defined in claims 10 and 11.BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Various features, aspects, and advantages of the present disclosure will become better understood when the following detailed description is read with reference to the accompanying figures in which like characters represent like parts throughout the figures, wherein: FIG. 1 is a schematic diagram of a portion of a drilling and production system having a known hoisting system; FIG. 2 is a schematic representation of a hoisting system according to the present disclosure when in a low load / high speed mode. FIG. 3 is a schematic representation of a hoisting system according to the present disclosure when in a high load / low speed mode. FIG. 5 is an isometric view of a hoisting system according to the present disclosure when in a high load / low speed mode. The sheave assembly is connected to the crown block. FIG. 6 is an isometric view of a hoisting system according to the present disclosure when in a high load / low speed mode. The sheave assembly is connected to the traveling block. FIG. 7 is an isometric view of a hoisting system according to the present disclosure when in a low load / high speed mode. FIG. 8 is an isometric view of a hoisting system according to the present disclosure when in a high load / low speed mode. FIG. 9 is a schematic of a control system according to the present disclosure. DETAILED DESCRIPTION OF SPECIFIC EMBODIMENTS
[0012] One or more specific embodiments of the present disclosure will be described below. These described embodiments are only exemplary of the present disclosure.
[0013] The present embodiments are generally directed to drilling and production system comprising a hoisting system that may be utilized to support and lift a load (e.g., pipe section, drill pipe collar, casing section, or the like) within a drilling and production system.
[0014] To facilitate discussion, certain embodiments disclosed herein refer to pipe sections and drill strings; however, it should be understood that the disclosed embodiments may be adapted for use with any of a variety of tubular structures, including drill pipe collars, casing sections, or the like. Additionally, certain embodiments relate to a subsea (e.g., offshore) drilling and production system; however, it should be understood that the disclosed embodiments may be adapted for use within an onshore (e.g., land-based) drilling and production system.
[0015] With the foregoing in mind, FIG. 1 is a schematic diagram of a portion of a drilling and production system 10, in accordance with an embodiment of the present disclosure. As shown, the system 10 includes a derrick 12 supported by a platform 14 (e.g., floating platform or vessel). The system 10 includes a hoisting system 16 configured to raise and to lower drilling equipment relative to the drill floor 14. In the illustrated embodiment, the hoisting system 16 includes a crown block 18, a traveling block 20, a drawworks system 22, and a cable assembly 24 (e.g., wire) that extends from the drawworks system 22 and couples the crown block 18 to the traveling block 20. In the illustrated embodiment, a top drive 26 is coupled to the traveling block 20, and a drill string 28 supporting a drill bit (not shown) is suspended from the top drive 26 and extends through the platform 14 into a wellbore 30. The top drive 26 may be configured to rotate the drill string 28, and the hoisting system 16 may be configured to raise and to lower the top drive 26 and the drill string 28 relative to the platform 14 to facilitate drilling of the wellbore 30.
[0016] Schematically represented on FIGS. 2-8 is an example of a hoisting system 16 of the disclosure, enabling to increase load capacity. In embodiments, the hoisting system 16 comprises a drawworks system 22 including a cable assembly 24, a crown block 18, a traveling block 20 and a deadline anchor 25. In some embodiments, the hoisting system 16 may include a compensator such as a top mounted compensator 19 of a kind known in the art to allow hook load variations to be addressed directly to the crown block 18
[0017] In embodiments, the hoisting system 16 comprises a sheave assembly 32 that is attached to the crown block 18 or top mounted compensator 19 in "Low Load / High Speed" mode, as schematically illustrated in Figure 2, and attached to the traveling block 20 in "High Load / Low Speed" mode, as schematically illustrated in FIG. 3. FIGS. 2 & 3 show a hoisting system 16 for 12 lines 24B-H, 24L-Q in Low Load / High Speed mode and 16 lines 24B-Q in High Load / Low Speed mode. (Fast line 24A and deadline 24R are not included in the line count when calculating load and speed for the hoisting system 16.) By alternately connecting the sheave assembly 32 to the crown or traveling blocks 18, 20, the hoisting system 16 is provided a different load and speed capability without the need to re-reeve the cable assembly 24.
[0018] In the embodiment presented on FIGS. 4-8, the hoisting system 16 of the disclosure comprises a sheave assembly 32 and, in the presented example, enables to increase the load capacity from a 14-lines hoisting system 16 in Low Load / High Speed mode to an 18-lines hoisting system 16 in High Load / Low Speed mode. As previously stated, fast line 24A and deadline 24R do not count when calculating the load and speed.
[0019] In embodiments, connection of the sheave assembly 32 to either the top mounted compensator 19 or crown block 18, or to the traveling block 20, is done remotely from a drilling control room, for example. A control module 56 is in electronic or network communication with failsafe locking means 52 for locking and unlocking the sheave assembly 32 to the crown and traveling blocks 18, 20. The control module 56 may include one or more PLCs or microprocessors with associated software for providing the desired control. Appropriate control logic is employed to ensure the sheave assembly 32 is connected to one but not both of the blocks 18, 20. Sensors 58A, 58B are used to provide positive verification that the locking means 52A, 52B is in a locked (connected) or unlocked (disconnected) state. In some embodiments, the failsafe locking means 52 may include a hydraulic driver or supply 54 or its equivalent. The supply 54 may be located in a top drive loop, with the lock / unlock signal and control coming from the derrick side of the hoisting system 16.
[0020] Sheave assembly 32 may include a yoke 36 having an upper end 38 releasably connectable to the crown block 18 or top mounted compensator 19 and a lower end 40 releasably connectable to the traveling block 20. Failsafe locking means, which can be hydraulically actuatable and controlled from the drilling control room, are provided for releasably connecting the sheave assembly to the crown and traveling blocks. For example, the upper end 38 may include arms 39 received by an arm receiver 17 of the crown block 18. In some embodiments the arm receiver 17 is a cross bar. The drawworks system 22 applies the necessary force to engage the arms 39 with the cross bar 17.
[0021] By way of another example, the lower end 40 may include a pin 41 received by a pin receiver 21 of the traveling block 20. Moving the traveling block 20 toward the crown block 18 permits the pin 41 to be received by the receiver 21. As the traveling block 20 then moves away from the crown block 18, the pin 41 remains engaged and sheave assembly 32 remains connected to the traveling block 20 and disengages from the crown block 18. The receiver 41 may be hydraulically actuatable and controlled from the drilling control room.
[0022] When connected, to the top mounted compensator 19, the sheave assembly 32 might be parallel to the sheaves in the traveling block 20. When connected to the traveling block 20, the sheave assembly 32 might be parallel to the sheaves in the traveling block and, therefore, to compensate for the angle between the top mounted compensator 19 (or crown block 18) and the traveling block 20.
[0023] The sheave assembly 32 of the disclosure may comprise any number of sheaves 42, from 1 sheave and upwards. In examples, the number of lines (wire or cable parts) in a hoisting system 16 of the disclosure might be increased from 12 lines to 16 lines as shown in FIGS. 2 & 3, with 2 sheaves 42 in the sheave assembly 32). In other examples, the lines might be increased from 10 and up, for example increasing from 10 lines to 18 lines (with 4 sheaves 42 in the sheave assembly 32).
[0024] In examples of the hoisting system 16 of the disclosure, the top mounted compensator 19, crown block 18, or traveling block 20 (or some combination thereof) might be designed to accommodate the sheave assembly 32. Therefore, the travelling block's sheave cluster might include a gap 23. To each side of the gap 23, the cable assembly 24 runs from the crown block 18 to the travelling block 20. Within the gap 23, the cable assembly 24 runs from the crown block 18 to the sheave assembly 32. The gap 23 can be the distance represented by the sheaves 42 of the sheave assembly 32. In other words, the sheaves 42, rather than being located on the traveling block 20, are moved to the sheave assembly 32, thereby leaving gap 23 in the traveling block's sheave cluster.
[0025] In embodiments, the sheave assembly 32 might be connected to the top mounted compensator 19 or crown block 18 as well as to the traveling block 20 in a way that enables the assembly 32 to accommodate the difference in angle between the compensator 19 and traveling block 20 or between the crown and traveling blocks 18, 20..
[0026] The disclosed hoisting system 16 thus enables to increase the system load capacity compared to known hoisting systems without the need for increasing any horsepower on the drawworks system 22, for example, or increasing the cable size. Further, the cable might not have to be re-reeved.
[0027] While the disclosure may be susceptible to various modifications and alternative forms, specific embodiments have been shown by way of example in the drawings and have been described in detail herein. However, it should be understood that the disclosure is not intended to be limited to the particular forms disclosed. Rather, the disclosure is to cover all modifications, equivalents, and alternatives falling within the scope of the disclosure as defined by the following appended claims.
Claims
1. A hoisting system (16) comprising: a crown block (18); a traveling block (20); and at least one sheave assembly (32) moveable between and alternatively connectable to the crown (18) and traveling (20) blocks; the hoisting system (16) having a first load capacity when the at least one sheave assembly (32) is connected to the crown block; and a second higher load capacity when the at least one sheave assembly (32) is connected to the traveling block (20); characterized by a failsafe locking means (52A, 52B) for releasably connecting the at least one sheave assembly (32) to the crown and traveling blocks (18, 20), the failsafe locking means including sensors (58A, 58B) to provide positive verification that the locking means (52A, 52B) is in a locked or unlocked state; and a control module (56) in electronic or network communication with the failsafe locking means (52A, 52B) for locking and unlocking the at least one sheave assembly (32) to the crown (18) and traveling (20) blocks, the control module (56) configured to ensure that the at least one sheave assembly (32) is connected to one of the crown block (18) or traveling block (20), but not to both the crown block (18) and the traveling block (20).
2. A hoisting system according to claim 1, the hoisting system (16) having: a first travel speed when the at least one sheave assembly (32) is connected to the crown block (18); and a second lower travel speed when the at least one sheave assembly (32) is connected to the traveling block (20).
3. A hoisting system according to claim 1, the at least one sheave assembly (32) including one or more sheaves (42).
4. A hoisting system according to claim 3, the traveling block (20) further comprising a sheave cluster including a gap (23) sized to accommodate the one or more sheaves (42) of the at least one sheave assembly (32).
5. A hoisting system according to claim 1, further comprising: the at least one sheave assembly including a pin (41) at a lower end (40); and the traveling block (20) including a pin receiver (21) configured to engage the pin (41).
6. A hoisting system according to claim 1, further comprising: the at least one sheave assembly including a pair of arms (39) at an upper end (38); and the crown block (18) including an arm receiver (17) configured to engage the pair of arms (39).
7. A hoisting system according to claim 1, further comprising a compensator (19) in communication with the crown block (18).
8. A hoisting system according to claim 1, further comprising a drawworks (22).
9. A method to lift a load using the hoisting system (16) of claim 1 the method comprising: using the control module (56) to lock the sheave assembly (32) to the crown block (18) so as to provide a first load capacity or to the traveling block (20) so as to provide a second higher load capacity via the failsafe locking means (52); and verifying that the sheave assembly (32) is connected to one of the control block (18) or traveling block (20), but not to both the control block (18) and the traveling block (20).
10. A method according to claim 9, further comprising: providing a first travel speed when the at least one sheave assembly (32) is connected to the crown block (18); and providing a second lower travel speed when the at least one sheave assembly (32) is connected to the traveling block (20).
11. A hoisting system according to claim 10, wherein the hoisting system includes a top mounted compensator (19) in communication with the crown block (18).
Citation Information
Patent Citations
Hoisting mechanism, with compensator installed in a hoisting cable system
WO2001029366A1