Kit for insulating formwork of a building wall and method for constructing a wall of a building with insulating formwork
The prefabricated insulating formwork construction element with dovetail grooves and temporary fixing assemblies addresses complex reinforcement installation and thermal bridges, enabling efficient assembly, reinforcement placement, and vibration, while allowing direct cladding application for faster construction with improved insulation and soundproofing.
Patent Information
- Application Number
- EP2023206733
- Authority / Receiving Office
- EP · EP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2022-11-16
- Filing Date
- 2023-10-30
- Publication Date
- 2025-10-15
- Estimated Expiration
- 2043-10-30
AI Technical Summary
Existing insulating formwork building blocks face challenges such as complex reinforcement installation, need for additional cladding, inability to vibrate, thermal bridges due to spacer remnants, and difficulty in forming corners, while also requiring specific blocks for corners.
A prefabricated insulating formwork construction element with a dovetail groove for concrete retention and a cladding panel, along with a temporary fixing assembly using metal fixing plates, screws, and tubular spacers for easy assembly, reinforcement placement, and vibration, which can be reused after concrete drying.
Facilitates easy assembly, reinforcement placement, and vibration, reduces thermal bridges, and allows for direct cladding application, resulting in faster construction with improved insulation and soundproofing.
Smart Images

Figure IMGF0001 
Figure IMGF0002 
Figure IMGF0003
Abstract
Description
[0001] The present invention relates to the technical field of the construction of an insulating formwork building wall and more particularly relates to an insulating formwork building element for a building wall, a kit for insulating formwork for a building wall and a method of constructing an insulating formwork building wall.
[0002] There are already blocks configured to be stacked to form so-called insulating formwork, that is, formwork capable of serving as formwork to allow the pouring of concrete so as to enable the manufacture of a building wall and intended to remain in place after the concrete has dried to ensure thermal insulation of the resulting wall. The existing blocks each comprise two opposing insulating portions secured to each other and spaced by spacers put in place when the block is manufactured. On a construction site, the blocks are then stacked to simultaneously assemble two opposing walls of the formwork, metal reinforcements are generally placed between the two walls, then concrete is poured between the two walls.
[0003] These blocks have the advantage of allowing faster fabrication of a wall. However, they also have several disadvantages, such as the fact that the installation of reinforcements between the walls of the formwork is complex, the fact that specific blocks are necessary to make the corners of the formwork, the fact that vibration of the insulating formwork obtained is not possible, the fact that additional cladding must be installed on the blocks, for example to be able to apply a coating or paint to the wall, or the fact that the spacers connecting the walls of the insulating formwork remain in place in the concrete after it has dried and form thermal bridges. Document WO 85 / 00396 A1 discloses the characteristics of the preamble of claim 1.
[0004] The present invention aims in particular to solve the problems indicated above by proposing a kit for insulating formwork for a building wall according to claim 1 and a method of constructing a building wall with insulating formwork according to claim 8.
[0005] The kit of the present invention comprises a building wall insulating formwork construction element configured for stacking, which is prefabricated and consists of a parallelepiped insulating portion comprising a first face in which at least one recess is formed configured to allow concrete to be attached and a second face opposite the first face; and at least one cladding panel glued to the second face of the insulating portion.
[0006] Construction elements as described above are preferably intended to be used for constructing insulating formwork walls by stacking several rows of construction elements. Compared with existing blocks, the construction elements according to the invention have the particular advantage of allowing successive assembly of the formwork walls, which facilitates, for example, the placement of reinforcements in the formwork. In addition, the construction elements according to the invention can be easily pre-cut during manufacture or re-cut on site to form corners of the insulating formwork. Furthermore, the construction elements according to the invention directly provide a cladding capable of receiving coating or paint.
[0007] Advantageously, the at least one recess is in the form of a groove having a dovetail profile.
[0008] The use of grooves having a dovetail cross-sectional profile allows concrete to penetrate into the recess during pouring and to retain the construction element once the concrete has dried. Thus, after the concrete has dried, the insulating portion is secured to the concrete mass by interlocking concrete in the recesses. It will be understood that the profile could have another shape, for example a "T" or an oval or any shape allowing the concrete to be retained therein once the concrete has dried. Preferably, the grooves are formed in a longitudinal direction of the insulating portion, which in particular reduces the manufacturing time. It will be understood, however, that the grooves could be formed in a transverse direction of the insulating portion. It will also be understood that the recesses could have other shapes, for example cylindrical holes in the insulating portion.
[0009] According to one embodiment, the insulating portion is made of a material having both thermal insulation and sound insulation properties.
[0010] It will be understood that this method of production allows the manufacture of a wall with good thermal and sound insulation.
[0011] According to another embodiment, the insulating portion comprises expanded polystyrene.
[0012] The use of expanded polystyrene makes it possible to obtain lightweight construction elements with good thermal insulation.
[0013] Advantageously, the at least one cladding panel comprises a mixture of cement and wood particles.
[0014] The use of a material comprising a mixture of cement and wood particles makes it possible to obtain resistant cladding panels which can be left bare but are preferably subsequently covered with paint or plaster to give a final appearance to the wall. The cladding panels are for example, but without the invention being limited thereto, made of betonyp ®< .
[0015] The invention therefore relates to a kit for insulating formwork for a building wall, which comprises construction elements as described above, intended to be stacked to form walls of an insulating formwork for a building wall with the insulating portions oriented towards a core thereof, the construction elements having the same height in a so-called stacking direction; and at least one temporary fixing assembly, each temporary fixing assembly being configured to temporarily connect a first wall of the formwork to a second wall of the formwork opposite in order to allow pouring and drying of concrete in the insulating formwork, and comprising two fixing plates, each fixing plate being configured to be brought into contact, at a contact face, with at least one cladding panel and to be secured to the at least one cladding panel,each fixing plate comprising at least one spacer lug projecting from the contact face, all the spacer lugs being aligned and configured to be arranged, during assembly, in contact with an upper face of a construction element, and a through hole formed in alignment with the at least one spacer lug, a first fixing plate being configured to be fixed, during assembly, to the first wall of the formwork and a second fixing plate being configured to be fixed, during assembly, to the second wall of the formwork such that the through holes of the first and second fixing plates are aligned in a transverse direction of the formwork; a fixing rod, configured to be threaded into the through holes of the two fixing plates, after fixing thereof, and to extend beyond each fixing plate,and comprising at least one hole at each end in a portion extending, after assembly, beyond the respective fixing plate; and two wedges, each wedge being configured to be inserted into a hole in the fixing rod once the fixing rod has been threaded into the through holes and to come into contact with an adjacent fixing plate so as to lock the fixing rod in position.,
[0016] It will be understood that, when the fixing plate is metallic, the spacer lugs and the through hole can be formed by a single operation, for example a punching operation of the fixing plate. It will be understood, however, that the spacer lugs could also be formed by molding or even by 3D printing when the fixing plate is made of another material (plastic or composite material for example).
[0017] A kit as described above allows the manufacture of an insulating formwork comprising first and second walls connected together during pouring of concrete into the formwork, and whose temporary fixing assemblies can be removed after the concrete has dried in order to eliminate any thermal bridge between the walls of the insulating formwork. Preferably, reinforcements, for example made of steel, will be provided in the formwork in order to reinforce the wall obtained after pouring and drying of the concrete.
[0018] Advantageously, at least one temporary fixing assembly further comprises a tubular spacer configured to be threaded onto the fixing rod and to bear against first faces of insulating portions facing each other, so as to ensure a constant distance between walls of the insulating formwork facing each other, the at least one tubular spacer being made of a material having low thermal conductivity, preferably a plastic material, more preferably polyvinyl chloride (PVC). The tubular spacer also allows easier removal of the fixing rod once the concrete has dried, by limiting the contact areas between the fixing rod and the dried concrete.
[0019] According to a preferred embodiment, at least one temporary fastening assembly further comprises at least one fastening screw for each fastening plate, each fastening screw being configured to temporarily connect the respective fastening plate to a trim panel.
[0020] It will be understood that screwing is a technical solution that allows the fixing plates to be securely fixed to the cladding panels while allowing easy removal of the fixing plates after the concrete has dried. However, it will be understood that any technical solution that allows the fixing plates to be temporarily fixed to the cladding panels can be used, for example, gluing with an adhesive that can be separated by heating.
[0021] Advantageously, the fixing plates, the fixing rod and the wedges of the at least one temporary fixing assembly are made of metal, such that the at least one temporary fixing assembly is configured to have sufficient mechanical strength to allow, after assembly, vibration of the insulating formwork by stressing the at least one temporary fixing assembly.
[0022] It will be understood that vibration of the formwork makes it possible in particular to homogenize the concrete in the formwork and to promote the entry of concrete into all the recesses formed in the insulating portions. It will also be understood that any device capable of transmitting vibrations can be used as a stressing device to carry out the vibration.
[0023] It will also be understood that another advantage of the kit according to the invention is that it is reusable, since each of its elements is intended to be removed once the concrete has dried and the wall has been built.
[0024] The invention also relates to a method for constructing a building wall with insulating formwork using a kit according to the invention, comprising the steps of: a) placing a row of building elements on a concrete slab along a first contour of the wall, the insulating portions being oriented towards one side, called the core, of the first contour and the cladding panels being oriented towards an opposite side, called the outer side, of the first contour; b) temporarily fixing fixing plates on cladding panels of the highest row of building elements arranged along the first contour, with for each fixing plate the at least one spacing lug placed in contact with an upper face of each respective building element;c) stacking additional building elements on the highest row of building elements of the building elements arranged along the first contour to form an additional row of building elements, said additional building elements being supported on spacing lugs of the fixing plates fixed in the previous step, and the insulating portions being oriented towards the core side of the first contour and the cladding panels being oriented towards the outer side of the first contour; d) repeating steps b) and c) to obtain a first wall of a number of rows of building elements corresponding to a desired wall height; e) placing horizontal and vertical reinforcements opposite the insulating portions and fixing said reinforcements to foundation reinforcements protruding from the concrete slab;f) placing another row of building elements on the concrete slab along a second contour of the wall spaced from the first contour by a desired distance for the thickness of the wall, the insulating portions being oriented towards one side, called the core, of the second contour and the cladding panels being oriented towards an opposite side, called the exterior, of the second contour, such that the insulating portions of the building elements arranged along the second contour face the insulating portions of the building elements arranged along the first contour;g) temporarily fixing fixing plates to cladding panels of the uppermost row of building elements arranged along the second contour opposite each fixing plate fixed to the row of building elements arranged along the first contour opposite, with for each fixing plate the at least one spacer lug brought into contact with an upper face of each respective building element and the through hole aligned with the through hole of the fixing plate fixed opposite; h) threading a fixing rod into the aligned through holes of each pair of fixing plates opposite each other; i) inserting a wedge, at each end of each fixing rod, into a respective hole so as to bring the wedge into contact with the adjacent fixing plate to lock the fixing rods in position;j) stacking additional building elements on the highest row of building elements of the building elements arranged along the second contour to form an additional row of building elements, said additional building elements being supported on spacer lugs of the fixing plates fixed in the previous step, and the insulating portions being oriented towards the core side of the second contour and the cladding panels being oriented towards the outer side of the second contour; k) repeating steps g) to j) to obtain a second wall of a number of rows of building elements corresponding to the desired wall height, connected to the first wall; l) pouring concrete between the first and second walls of the insulating formwork created by the previous steps; m) waiting for the concrete to dry; and n) removing all shims and fixing plates.
[0025] Alternatively, it is possible to place a layer of cement between two fixing plates, to increase the adhesion of two consecutive rows to each other, the absence of cement at the level of the fixing plates allowing the introduction of the fixing rod.
[0026] The process described above makes it easy to place reinforcements in the insulating formwork before erecting the second formwork wall, which reduces the construction time of an insulating formwork wall. This process also makes it possible to manufacture a wall directly comprising a cladding that can be left bare but can be painted or coated.
[0027] According to one embodiment, the method further comprises repeating step b) after step d) and repeating steps g) to i) after step k).
[0028] The fixing plates then make it possible to connect two construction elements stacked on top of each other, in particular in order to improve the mechanical strength of the formwork during assembly, pouring of concrete and possible vibration of the formwork.
[0029] Advantageously, the method further comprises at least one additional step from: before step a), a step consisting of putting in place props configured to receive in lateral support the construction elements arranged during steps a) to d); and before step f), a step consisting of putting in place props configured to receive in lateral support the construction elements arranged during steps f) to k).
[0030] The use of props makes it possible in particular to guarantee the verticality of the stacking of construction elements as well as their stability during assembly.
[0031] According to a preferred embodiment, the method comprises, respectively after step c) and after step j), additional steps consisting of temporarily fixing the fixing plates to the additional stacked construction elements.
[0032] It will be understood that these additional steps make it possible to connect the two walls at the top of the formwork, in order to improve the mechanical strength during the pouring of the concrete and the possible vibration of the formwork.
[0033] Advantageously, the fixing plates are fixed to the cladding panels using screws.
[0034] As stated above, it will be understood that screwing is a technical solution that allows the fixing plates to be securely fixed to the cladding panels while allowing easy removal of the fixing plates after the concrete has dried. However, it will be understood that any technical solution that allows the fixing plates to be temporarily fixed to the cladding panels can be used, for example, gluing with an adhesive that can be separated by heating.
[0035] According to a preferred embodiment, the method further comprises, between steps l) and m), an additional step consisting of coupling at least one stressing device to at least one temporary fixing assembly, so as to vibrate the insulating formwork.
[0036] As indicated above, it will be understood that vibration of the formwork makes it possible in particular to homogenize the concrete in the formwork and to promote entry of concrete into all the recesses formed in the insulating portions. It will also be understood that any device capable of transmitting vibrations can be used as a stressing device to carry out the vibration.
[0037] According to one embodiment, step h) further consists of threading, onto at least one fixing rod, a tubular spacer configured to come into contact with first faces of insulating portions facing each other.
[0038] It will be understood that the use of tubular spacers makes it possible to guarantee a constant distance between the walls of the insulating formwork facing each other. In order to limit thermal bridges, the at least one tubular spacer is made of a material having low thermal conductivity, preferably a plastic material, more preferably polyvinyl chloride (PVC).
[0039] Advantageously, step n) further consists of removing at least one fixing rod.
[0040] Preferably, all fixing rods are removed during step n) in order to eliminate any thermal bridges due to the fixing rods.
[0041] Particular embodiments of the present invention will now be described, by way of non-limiting examples, with reference to the accompanying drawings.
[0042] On these drawings: [ Fig. 1 ] is a perspective view of a building wall insulating formwork construction element for a kit according to one embodiment of the invention. [ Fig. 2 ] is an exploded perspective view of a temporary fixing assembly of a kit for insulating formwork for a building wall according to one embodiment of the invention. Fig. 3a ] is a partial perspective view of an insulating formwork for a building wall, before pouring the concrete, the reinforcements not being shown for clarity. Fig. 3b ] is an enlarged partial side view of an insulating formwork for a building wall, before pouring the concrete. Fig. 4a ] is a perspective view of a first phase of a method of constructing an insulating formwork building wall according to one embodiment of the invention. [ Fig. 4b ] is a perspective view of a second phase of the process of the Figure 4a with a detail of the installation of the irons. [ Fig. 4c ] is a perspective view of a third phase of the process of Figures 4a And 4b .
[0043] If we first refer to the Figure 1 , it can be seen that there is shown a construction element 1 of insulating formwork for a building wall according to an embodiment of the invention, comprising an insulating portion 11 and a cladding panel 12. The construction element 1 is prefabricated in the factory and is configured for stacking on a construction site with other construction elements 1 preferably having an identical height in a so-called stacking direction, in order to form a wall of insulating formwork.
[0044] In the embodiment shown in Figure 1 , the insulating portion 11 is in the form of a straight block of expanded polystyrene comprising a first face 11a in which three recesses 11b are formed, in the form of grooves having a dovetail profile extending in a longitudinal direction perpendicular to the stacking direction. The insulating portion 11 also comprises a second face 11c, opposite the first face 11a, on which the cladding panel 12 is glued, composed, by way of non-limiting example to which the invention is not limited, of a mixture of cement and wood particles, for example betonyp ®<.
[0045] In order to allow optimal insulation, the insulating portion 11 is preferably continuous from one side to another side of the construction element 1. Furthermore, the construction element 1 is configured so that concrete is able to enter the recesses 11b during pouring. Thus, after the concrete has dried, the construction element 1 is secured to the concrete mass by imbrication of concrete in the recesses 11b. The construction element 1 further comprises an upper face 11d in the stacking direction, the role of which during construction will be described in more detail below.
[0046] It will be understood that as a variant, the insulating portion 11 could have another shape, preferably parallelepiped, capable of allowing a stacking of construction elements 1, for example a cube shape or a prism shape whose base is a trapezoid or a rhombus.
[0047] It will also be understood that the expanded polystyrene makes it possible to obtain a lightweight construction element 1 having good thermal insulation, but that as a variant the material of the insulating portion 11 can be chosen to provide both good thermal insulation and good sound insulation, for example by adding particles, for example cork, in the material of the insulating portion 11 in order to obtain a composite material. As a variant still, the insulating portion 11 could be composed of several stacked layers, each layer possibly being composed of a material different from the other layers.
[0048] The use of longitudinal grooves allows rapid manufacture of the insulating portion 11, however, as a variant, the grooves could be formed transversely, parallel to the stacking direction. This variant is however not preferred because it requires the production of a greater number of grooves to obtain the same total groove length, which lengthens the manufacturing time. Furthermore, a dovetail profile allows good adhesion of the concrete 6 on the first face 11a of the insulating portion 11, but other profiles are also possible according to variants not shown, such as for example a “T” profile or an oval profile. The recesses 11b could also have other shapes, for example cylindrical holes formed, for example perpendicularly or obliquely, in the first face 11a of the insulating portion 11.It will of course be understood that the number of recesses 11b may also vary, for example depending on the shape of the recesses 11b or the properties of the concrete with which the construction element 1 is intended to be used.
[0049] In the embodiment shown in the Figure 1 , the construction element 1 comprises a single covering panel 12 extending over the entire second face 11c of the insulating portion 11. It will however be understood that as a variant several covering panels 12 could be glued to the insulating portion 11 to cover the second face 11c, possibly with a gap between two adjacent covering panels 12, or else several covering panels 12 could be stacked on top of each other to form a layered structure.
[0050] It will also be understood that if each cladding panel 12 is preferably made of betonyp ®<, another cladding material, preferably capable of receiving a coating or paint, could be used as a variant, for example a mixture of wood and polymer binder.
[0051] Any method of fixing the insulating portion 11 with the cladding panel 12 is envisaged within the scope of the present invention, the preferred embodiment being gluing.
[0052] Compared with existing blocks, the construction elements 1 according to the invention have the advantages of allowing the walls of the insulating formwork to be mounted separately in order in particular to facilitate the installation of reinforcements, of being able to be easily pre-cut during manufacture or re-cut on site to form corners of the insulating formwork, and of directly providing a covering capable of receiving coating or paint.
[0053] The invention also relates to a kit for insulating formwork for a building wall comprising a plurality of construction elements 1 according to the invention and temporary fixing assemblies 2.
[0054] The construction elements 1 of a kit according to the invention are intended to be stacked to form walls P1, P2 of an insulating formwork for a building wall with the insulating portions 11 oriented towards a core of the insulating formwork. Preferably, provision will also be made to arrange reinforcements 5, for example made of steel, at the core of the formwork, that is to say between the walls of the insulating formwork.
[0055] Each temporary fixing assembly 2, described in connection with the Figures 2 , 3a And 3b , is configured to temporarily connect a first wall P1 of the formwork to a second wall P2 of the formwork opposite, in order to allow pouring and drying of concrete in the insulating formwork. The Figures 3a And 3brepresent the connections between the construction elements 1 forming the walls P1, P2 of an insulating formwork and the temporary fixing assemblies 2.
[0056] A temporary fixing assembly 2 according to the invention is shown in Figure 2 and comprises two fixing plates 21, a fixing rod 22 and two wedges 23.
[0057] Each fixing plate 21 is configured to be brought into contact, at a contact face 21a, with at least one covering panel 12 and to be secured to the at least one covering panel 12.
[0058] In the embodiment shown in Figure 2 , the fixing assembly 2 further comprises fixing screws 21b for each fixing plate 21, the screws 21b being configured to temporarily connect the respective fixing plate 21 to a cladding panel 12. It will be understood that each fixing plate can thus be easily separated from the cladding panel 12 on which it is fixed, by removing the screws 21b. It will also be understood that alternatively, the fixing plates 2 can be fixed to the construction elements 1 by any temporary fixing solution, for example by gluing.
[0059] In the embodiment shown in the Figure 2 , each fixing plate 21 comprises two spacing lugs 21c projecting perpendicularly from the contact face 21a. The two spacing lugs 21c are aligned in a transverse direction of the fixing plate 21 and are configured to be arranged, during assembly of a wall P1, P2 of the insulating formwork, in contact with an upper face 11d of a construction element 1. According to variants not shown, each fixing plate 21 could comprise a single spacing lug 21c or more than two spacing lugs 21c aligned in a transverse direction of the fixing plate 21, for example four spacing lugs 21c.
[0060] As can be seen on the Figure 2 , a through hole 21d is formed in alignment with the spacer pins 21c on each fixing plate 21. The spacer pins 21c and the through hole 21d can be formed by a single operation, for example a punching operation of the fixing plate 21 when the latter is made of metal. It will be understood, however, that the spacer pins 21c could also be formed by molding or even 3D printing.
[0061] When assembling the insulating formwork, a first fixing plate 21 is configured to be fixed to the first wall P1 of the formwork and a second fixing plate 21 is configured to be fixed to the second wall P2 of the formwork, such that the through holes 21d of the first and second fixing plates 21 are aligned in a transverse direction of the formwork.
[0062] In the embodiment shown in the Figure 2 , the contact face 21a of the fixing plates 21 extends on either side of an imaginary line formed by the alignment of the spacing lugs 21c and the through hole 21d, such that the contact face 21a is configured to be fixed to a first construction element 1, on the upper face 11d of which its spacing lugs 21c are brought into contact, then to be fixed to a second construction element 1 stacked on the spacing lugs 21c, such that the fixing plate 21 makes it possible to fix two construction elements 1 stacked on top of each other.However, according to a variant not shown, the contact face 21a of the fixing plates 21 could extend only on one side of the imaginary line formed by the alignment of the spacing lugs 21c and the through hole 21d, such that the contact face 21a is configured to be only fixed on a first construction element 1 on the upper face 11d of which its spacing lugs 21c are brought into contact.
[0063] The fixing rod 22 is configured to be threaded into the through holes 21d of the two fixing plates 21, after fixing them to the construction elements 1, and to extend beyond each fixing plate 21 in a transverse direction of the insulating formwork. It will be understood that according to variants not shown, each fixing plate 21 could comprise several through holes 21d aligned and configured to each receive a respective fixing rod 22 of the temporary fixing assembly 2.
[0064] Furthermore, the fixing rod 22 comprises an orifice 22a at each end in a portion extending, after assembly, beyond the respective fixing plate 21 towards the outside of the insulating formwork. It will be understood that the orifices 22a are placed on the fixing rod 22 according to the desired formwork width. Alternatively, each fixing rod 22 may comprise a series of orifices 22a at one of its ends, such that the fixing rod 22 is configured to allow several widths of insulating formwork.
[0065] Each wedge 23 is configured to be inserted into an orifice 22a of the fixing rod 22, and comprises a widened upper portion, intended for gripping it, and a tapered lower portion to allow forced insertion into the orifices 22a once the fixing rod 22 is threaded into the through holes 21d, and to come into contact with an adjacent fixing plate 21, so as to lock the fixing rod 22 in position. Preferably, the fixing plates 21 each comprise fins 21e projecting on a face opposite the contact face 21a, said fins 21e being configured to guide the wedges 23 during their insertion and then to hold the wedges 23 in position. It will be understood that the fins 21e can for example be formed by punching the fixing plate 21 or by molding or 3D printing. Lateral tabs 21f allow better gripping of the fixing plate 21, particularly when removing it.The 21f side tabs can be formed by bending, molding, or 3D printing.
[0066] In the embodiment shown in the Figures 2 , 3a And 3b , each temporary fixing assembly 2 is configured such that the shims 23 are introduced into the fixing rod 22 in a direction parallel to the stacking direction. It will be understood, however, that as a variant the fixing assembly could be configured such that the direction of introduction of the shims 23 is different, for example perpendicular to the stacking direction.
[0067] As shown on the Figures 2 , 3a And 3b, preferably, each temporary fixing assembly 2 further comprises a tubular spacer 24 configured to be threaded onto the fixing rod 22 and to come to bear against first faces 11a of insulating portions 11 facing each other, so as to guarantee a constant distance between the walls P1, P2 of the insulating formwork facing each other and to facilitate the removal of the fixing rod 22 after drying of the concrete 6.
[0068] Advantageously, the tubular spacers 24 are made of a material having low thermal conductivity, preferably a plastic material, more preferably polyvinyl chloride (PVC), so as to limit as much as possible the thermal bridges between the walls P1, P2 of the formwork.
[0069] In the embodiment shown in the Figure 2 , the fixing plates 21 and the fixing rod 22 are made of metal, for example steel, such that the temporary fixing assembly 2 is configured to have sufficient mechanical strength to allow, after assembly of the walls P1, P2 and pouring of concrete 6, vibration of the insulating formwork by stressing the temporary fixing assemblies 2. Other materials such as composite materials or plastics can also be envisaged. It will be understood that a stressing device is a device capable of transmitting vibrations to the formwork so as to allow vibration of the concrete 6, well known to those skilled in the art.
[0070] A method of constructing a building wall with insulating formwork using a kit according to the invention will now be described, also referring to: Figures 4a à 4c .
[0071] The method firstly comprises an optional but preferred step of putting in place props 3 configured to receive, in lateral support, construction elements 1 arranged to form a first wall P1 of an insulating formwork. As shown in the Figure 4a , the first wall P1 is preferably arranged on one side facing an interior of the building, but may optionally alternatively be arranged on one side facing an exterior of the building.
[0072] The method then comprises a step a) consisting of placing a row of construction elements 1 on a concrete slab 4 along a first contour of the wall, the insulating portions 11 being oriented towards one side, called the core, of the first contour and the cladding panels 12 being oriented towards an opposite side, called the exterior, of the first contour.
[0073] The method then comprises a step b) of temporarily fixing, preferably using screws 21b, fixing plates 21 to cladding panels 12 of the uppermost row of the building elements 1 arranged along the first contour. For each fixing plate 21, the spacer pins 21c are brought into contact with an upper face 11d of each respective building element 1. Preferably, at least one fixing plate 21 is fixed to each building element 1, more preferably, two fixing plates 21 are fixed to each building element 1.
[0074] The method subsequently comprises a step c) consisting of stacking additional building elements 1 on the highest row of building elements 1 of the building elements 1 arranged along the first contour to form an additional row of building elements 1. Said additional building elements 1 are arranged to rest on spacer lugs 21c of the fixing plates 21 fixed in the previous step b). The insulating portions 11 of said additional building elements 1 are oriented towards the core side of the first contour and the cladding panels 12 are oriented towards the outer side of the first contour.
[0075] The method may then comprise an optional but preferred step of temporarily fixing, preferably using screws 21b, the fixing plates 21 to said stacked additional building elements 1. It will be understood that this step requires the use of fixing plates 21 comprising a contact face 21a which extends on either side of an imaginary line formed by the alignment of the spacing lugs 21c and the through hole 21d of the fixing plates 21, such as for example a fixing plate 21 shown in Figure 2 .
[0076] The next step d) of the method consists of repeating the steps b) of fixing fixing plates 21 and c) of stacking additional building elements 1, to obtain a first wall P1 of a number of rows of building elements 1 corresponding to a desired wall height. This step may further optionally, but preferably, consist of repeating the optional step of fixing the fixing plates 21 to said stacked additional building elements 1.
[0077] The method may thereafter comprise an optional but preferred step of fixing fixing plates 21 to the top of the first wall P1 of the insulating formwork, i.e. temporarily fixing, preferably using screws 21b, fixing plates 21 to cladding panels 12 of the uppermost row of the construction elements 1 arranged along the first contour, with for each fixing plate 21 the spacing lugs 21c brought into contact with an upper face 11d of each respective construction element 1.
[0078] There Figure 4a represents the assembly of a first wall P1 of the formwork according to the steps indicated above.
[0079] The method then comprises a step e) consisting of placing horizontal and vertical reinforcements 5, preferably made of steel, opposite the insulating portions 11 and fixing said reinforcements 5 to foundation reinforcements 4a protruding from the concrete slab 4. The use of a kit and construction elements 1 according to the invention makes it possible to successively assemble the walls P1, P2 of the formwork, which greatly facilitates installation of the reinforcements 5 at the heart of the formwork, between the two walls P1, P2, compared to the use of existing blocks for which the reinforcements must be laid once the blocks are stacked.
[0080] There Figure 4b represents the reinforcement installation step 5 described above.
[0081] The method may subsequently comprise an optional but preferred additional step of installing props 3 configured to receive, in lateral support, construction elements 1 arranged to form a second wall P2 of the insulating formwork. As shown in the Figure 4c , the second wall P2 is preferably arranged on the side facing the outside of the building, but may optionally alternatively be arranged on the side facing the inside of the building when the first wall P1 is arranged on the side facing the outside of the building.
[0082] The method then comprises a step f) of placing another row of construction elements 1 on the concrete slab 4 along a second contour of the wall spaced from the first contour by a desired distance for the thickness of the wall. The insulating portions 11 are oriented towards one side, called the core, of the second contour and the cladding panels 12 are oriented towards an opposite side, called the outer side, of the second contour, such that the insulating portions of the construction elements 1 arranged along the second contour face the insulating portions 11 of the construction elements 1 arranged along the first contour.
[0083] The method then comprises a step g) of temporarily fixing, preferably using screws 21b, fixing plates 21 to cladding panels 12 of the uppermost row of the building elements 1 arranged along the second contour opposite each fixing plate 21 fixed to the row of building elements 1 arranged along the first contour opposite. For each fixing plate 21 the spacer pins 21c are brought into contact with an upper face 11d of each respective building element 1 and the through hole 21d is aligned with the through hole 21d of the fixing plate 21 fixed opposite.
[0084] Then, the method comprises a step h) consisting of threading a fixing rod 22 into the aligned through holes 21d of each pair of fixing plates 21 facing each other. This step may further optionally but preferably consist of threading, onto at least one fixing rod 22, a tubular spacer 24 configured to bear against first faces 11a of insulating portions 11 facing each other.
[0085] The method then comprises a step i) consisting of introducing a wedge 23, at each end of each fixing rod 22, into a respective orifice 22a so as to bring the wedge 23 into contact with the adjacent fixing plate 21 to lock the fixing rods 22 in position.
[0086] The method subsequently comprises a step j) consisting of stacking additional construction elements 1 on the highest row of construction elements of the construction elements 1 arranged along the second contour to form an additional row of construction elements 1. Said additional construction elements 1 are arranged to rest on spacing lugs 21c of the fixing plates 21 fixed in the previous fixing step, and the insulating portions 11 are oriented towards the core side of the second contour and the cladding panels 12 are oriented towards the outer side of the second contour.
[0087] The method may then comprise an optional but preferred step of temporarily fixing, preferably using screws 21b, the fixing plates 21 to said stacked additional building elements 1. It will be understood that this step requires the use of fixing plates 21 comprising a contact face 21a which extends on either side of an imaginary line formed by the alignment of the spacing lugs 21c and the through hole 21d of the fixing plates 21, such as for example a fixing plate 21 shown in Figure 2 .
[0088] The next step k) of the method consists of repeating the steps g) of fixing fixing plates 21, h) of threading fixing rods 22, i) of inserting wedges 23 and j) of stacking additional building elements 1, to obtain a second wall P2 of a number of rows of building elements 1 corresponding to the desired wall height, connected to the first wall P1. This step may further optionally, but preferably, consist of repeating the optional step of fixing the fixing plates 21 to said stacked additional building elements 1.
[0089] This produces an insulating formwork formed from construction elements 1, in which the insulating portions 11 are oriented towards the core of the formwork and the cladding panels 12 are oriented towards the outer sides of the formwork.
[0090] After that, in the case where fixing plates 21 have been fixed to the top of the first wall P1 of the insulating formwork, the method may comprise an optional but preferred step of fixing fixing plates 21 to the top of the second wall P2 of the formwork, i.e. temporarily fixing, preferably using screws 21b, fixing plates 21 on cladding panels 12 of the uppermost row of the building elements 1 arranged along the second contour opposite each fixing plate 21 fixed on the row of building elements 1 arranged along the first contour. For each fixing plate 21 the spacing lugs 21c are brought into contact with an upper face 11d of each respective building element 1 and the through hole 21d is aligned with the through hole 21d of the fixing plate 21 fixed opposite.Then, the method may comprise a further optional but preferred step of threading a fixing rod 22 into the aligned through holes 21d of each pair of fixing plates 21 facing each other. This step may further optionally consist of threading, onto at least one fixing rod 22, a tubular spacer 24 configured to bear against first faces 11a of insulating portions 11 facing each other. Then, the method may comprise yet another optional but preferred step of introducing a shim 23, at each end of each fixing rod 22, into a respective orifice 22a so as to bring the shim 23 into contact with the adjacent fixing plate 21 to lock the fixing rods 22 in position.
[0091] After this the method comprises a step l) consisting of pouring concrete 6 between the first and second walls P1, P2 of the insulating formwork created by the previous steps.
[0092] Then, the method may comprise an optional, but preferred, step of coupling at least one stressing device to at least one temporary fixing assembly 2, so as to vibrate the insulating formwork. As indicated above, it will be understood that a stressing device is a device capable of transmitting vibrations to the formwork so as to allow vibration of the concrete 6. The fixing plates 21, the fixing rods 22 and the wedges 23 are preferably made of metal, for example steel, to guarantee their mechanical strength during vibration of the formwork. However, the possible tubular spacers 24 are preferably made of a material having low thermal conductivity, preferably a plastic material, more preferably polyvinyl chloride (PVC), so as to limit as much as possible the thermal bridges between the walls P1, P2 of the formwork.
[0093] The method then comprises a step m) consisting of waiting for the concrete 6 to dry.
[0094] The method then comprises a step n) consisting of removing all the shims 23 and all the fixing plates 21. This step may further optionally, but preferably, consist of removing at least one fixing rod 22, preferably all the fixing rods 22. It will be understood that the removal of the fixing rods 22 makes it possible to eliminate the thermal bridges between the walls P1, P2 of the insulating formwork. It will also be understood that in the case of the use of tubular spacers 24, these protect the fixing rods 22 from the concrete 6, which facilitates the removal of the fixing rods 22 after the concrete 6 has dried. It will also be understood that an anti-adhesive agent may be placed on the fixing rods 22 to prevent the concrete 6 from adhering to the fixing rods 22, which facilitates the removal of the fixing rods 22, for example in the absence of a tubular spacer 24.
[0095] There Figure 4c represents a building wall obtained by the method described above. It will be understood that certain construction elements 1 and part of the reinforcements 5 and concrete 6 have not been shown for clarity.
[0096] It will obviously be understood that the building wall with insulating formwork may include openings 7, for example windows or a door as shown in the Figures 4a à 4c . In this case, the construction elements 1 are successively arranged so as to define the opening 7 and a concrete-tight frame 6, for example made of wood or metal, is arranged in the opening 7 so as to close the insulating formwork and allow the pouring of the concrete 6.
[0097] Referring to Figs 3a and 3b, it will also be understood that depending on the insulation requirements for the building wall, the thicknesses of the insulating portions 11 of the construction elements 1 used to mount the first wall P1 may be different from the thicknesses of the insulating portions 11 of the construction elements 1 used to mount the second wall P2.
[0098] According to a variant of the method described above, the second wall P2, or the first wall P1, could be assembled using construction elements comprising only a cladding panel, for example made from a mixture of wood and polymer binder, without an insulating portion.The method may then comprise an additional step, after step n) of removing the shims 23 and the fixing plates 21, consisting of removing the construction elements comprising only a cladding panel in order to obtain a so-called bare concrete finish for the respective wall P1, P2; or the construction elements comprising only a cladding panel may also comprise recesses, similar to the recesses 11b of the construction elements 1 comprising an insulating portion 11, such that the construction elements comprising only a cladding panel are integral with the concrete 6 after the latter has dried and are capable of receiving paint or a coating.It will be understood that, in the event that the building elements comprising only a cladding panel are removed, the cladding panels thereof may comprise a surface coating, for example a paint or a varnish, configured to limit adhesion of the concrete 6 to the building elements comprising only a cladding panel, in order to facilitate removal.
[0099] It is understood that the particular embodiments which have just been described have been given for informational and non-limiting purposes, and that modifications may be made without departing from the scope of the present invention defined by the appended claims.
Claims
1. - A kit for insulating formwork of a building wall, which comprises: - insulating formwork building elements (1) for walls of buildings configured for stacking, each building element (1) being prefabricated and consisting of: - a parallelepiped insulating portion (11) comprising a first face (11a) wherein at least one recess (11b) is formed, configured to allow concrete (6) to adhere, and a second face (11c) opposite the first face (11a); and - at least one facing panel (12) glued to the second face (11c) of the insulating portion (11); the building elements (1) being further intended to be stacked to form the walls (P1, P2) of an insulating formwork for building walls with the insulating portions (11) oriented toward a core thereof, and the building elements (1) having the same height in a so-called stacking direction; the kit being characterized by the fact that it also comprises: - at least one temporary fastening assembly (2), each temporary fastening assembly (2) being configured to temporarily connect a first wall (P1) of the formwork to a second wall (P2) of the formwork opposite to allow pouring and drying of concrete (6) in the insulating formwork, and comprising: - two fastening plates (21), each fastening plate (21) being configured to be in contact, at a contact face (21a), with at least one facing panel (12) and to be secured to the at least one facing panel (12), each fastening plate (21) comprising at least one spacing lug (21c) protruding from the contact face (21a), all the spacing lugs (21c) being aligned and configured to be arranged, during assembly, in contact with an upper face (11d) of a building element (1), and a through hole (21d) formed in alignment with the at least one spacing lug (21c), a first fastening plate (21) being configured to be fixed, during assembly, to the first wall (P1) of the formwork and a second fastening plate (21) being configured to be fixed, during assembly, to the second wall (P2) of the formwork in such a way that the through holes (21d) of the first and second fastening plates (21) are aligned in a transverse direction of the formwork; - a fastening rod (22), configured to be inserted through the aligned through holes (21d) of the two fastening plates (21), after fixing thereof, and to extend beyond each fastening plate (21), and comprising at least one orifice (22a) at each end in a part extending, after assembly, beyond the respective fastening plate (21); and - two wedges (23), each wedge (23) being configured to be introduced into an orifice (22a) of the fastening rod (22) once the fastening rod (22) is inserted through the through holes (21d) and to come into contact with an adjacent fastening plate (21) so as to lock the fastening rod (22) in position.
2. - The kit according to claim 1, characterized by the fact that, for at least one of the building elements (1), the at least one recess (11b) has the shape of a groove with of a dovetail profile.
3. - The kit according to claim 1 or claim 2, characterized by the fact that, for at least one of the building elements (1), the insulating portion (11) comprises expanded polystyrene.
4. - The kit according to any one of claims 1 to 3, characterized by the fact that, for at least one of the building elements (1), the at least one facing panel (12) comprises a mixture of cement and wood particles.
5. - The kit according to any one of claims 1 to 4, characterized by the fact that at least one temporary fastening assembly (2) also comprises a tubular spacer (24) configured to be inserted on the fastening rod (22) and to come into abutment against the first faces (11a) of the insulating portions (11) facing each other, so as to ensure a constant distance between the walls (P1, P2) of the insulating formwork facing each other, the at least one tubular spacer (24) being made of a material with low thermal conductivity, preferably a plastic material, more preferably polyvinyl chloride (PVC).
6. - The kit according to any one of claims 1 to 5, characterized by the fact that at least one temporary fastening assembly (2) also comprises at least one fastening screw (21b) for each fastening plate (21), each fastening screw (21b) being configured to temporarily connect the respective fastening plate (21) to a facing panel (12).
7. - The kit according to any one of claims 1 to 6, characterized by the fact that the fastening plates (21), the fastening rod (22), and the wedges (23) of the at least one temporary fastening assembly (2) are made of metal, in such a way that the at least one temporary fastening assembly (2) is configured to have sufficient mechanical strength to allow, after assembly, vibration of the insulating formwork by solicitation of the at least one temporary fastening assembly (2).
8. - A method of constructing a building wall using insulating formwork with a kit according to any one of claims 1 to 7, comprising the steps of: a) placing a row of building elements (1) on a concrete slab (4) along a first contour of the wall, the insulating portions (11) being oriented toward a side, called the core, of the first contour and the facing panels (12) being oriented toward an opposite side, called the exterior, of the first contour; b) temporarily fixing fastening plates (21) on the facing panels (12) of the highest row of the building elements (1) arranged along the first contour, with for each fastening plate (21) the at least one spacing lug (21c) put in contact with an upper face (11d) of each respective building element (1); c) stacking additional building elements (1) on the highest row of building elements (1) of the building element (1) arranged along the first contour to form an additional row of building elements (1), said additional building elements (1) being in abutment on the spacing lugs (21c) of the fastening plates (21) fixed in the previous step, and the insulating portions (11) being oriented toward the core side of the first contour and the facing panels (12) being oriented toward the exterior side of the first contour; d) repeating the steps b) and c) to obtain a first wall (P1) of a number of rows of building elements (1) corresponding to a desired wall height; e) placing horizontal and vertical reinforcements (5) facing the insulating portions (11) and fixing said reinforcements (5) to foundation reinforcements (4a) protruding from the concrete slab (4); f) placing another row of building elements (1) on the concrete slab (4) along a second contour of the wall spaced from the first contour by a desired distance for the wall thickness, the insulating portions (11) being oriented toward a side, called the core, of the second contour and the facing panels (12) being oriented toward an opposite side, called the exterior, of the second contour, in such a way that the insulating portions (11) of the building elements (1) arranged along the second contour face the insulating portions (11) of the building elements (1) arranged along the first contour; g) temporarily fixing the fastening plates (21) on the facing panels (12) of the highest row of the building elements (1) arranged along the second contour facing each fastening plate (21) fixed on the row of building elements (1) arranged along the opposite first contour, with for each fastening plate (21) the at least one spacing lug (21c) put in contact with an upper face (11d) of each respective building element (1) and the through hole (21d) aligned with the through hole (21d) of the fastening plate (21) fixed opposite; h) inserting a fastening rod (22) through the aligned through holes (21d) of each pair of the fastening plates (21) opposite each other; i) inserting a wedge (23) at each end of each fastening rod (22) into a respective orifice (22a) so as to bring the wedge (23) into contact with the adjacent fastening plate (21) to lock the fastening rods (22) in position; j) stacking additional building elements (1) on the highest row of building elements (1) of the building elements (1) arranged along the second contour to form an additional row of building elements (1), said additional building elements (1) being in abutment on spacing lugs (21c) of the fastening plates (21) fixed in the previous step, and the insulating portions (11) being oriented toward the core side of the second contour and the facing panels (12) being oriented toward the exterior side of the second contour; k) repeating the steps g) to j) to obtain a second wall (P2) of a number of rows of building elements (1) corresponding to the desired wall height, connected to the first wall (P1); l) pouring concrete (6) between the first and second walls (P1, P2) of the insulating formwork created by the previous steps; m) waiting for the concrete (6) to dry; and n) removing all wedges (23) and all fastening plates (21).
9. - The method of constructing a building wall using insulating formwork according to claim 8, characterized by the fact that the method further consists of repeating step b) after step d) and repeating steps g) to i) after step k).
10. - The method of constructing a building wall using insulating formwork according to claim 8 or claim 9, characterized by the fact that the method further comprises at least one additional step from among: - before step a), a step consisting of arranging props (3) configured to provide lateral support for the building elements (1) arranged during steps a) to d); and - before step f), a step consisting of arranging props (3) configured to provide lateral support for the building elements (1) arranged during steps f) to k).
11. - The method of constructing a building wall using insulating form work according to any one of claims 8 to 10, characterized by the fact that the method comprises, respectively after step c) and after step j), additional steps consisting of temporarily fixing the fastening plates (21) to the additional stacked building elements (1).
12. - The method of constructing a building wall using insulating form work according to any one of claims 8 to 11 when using a kit according to claim 7, characterized by the fact that the method further comprises, between steps I) and m), an additional step consisting of coupling at least one solicitation device to at least one temporary fastening assembly (2), so as to perform vibration of the insulating formwork.
13. - The method of constructing a building wall using insulating form work according to any one of claims 8 to 12, characterized by the fact that step h) further consists of inserting, on at least one fastening rod (22), a tubular spacer (24) configured to bear against the first faces (11a) of the insulating portions (11) facing each other.
14. - The method of constructing a building wall using insulating form work according to any one of claims 8 to 13, characterized by the fact that step n) further consists of removing at least one fastening rod (22).
Citation Information
Patent Citations
Prefabricated formwork elements intended to the building of walls, method and device related thereto
WO1985000396A1
Expanded-polystyrene-based composite interjoist element
FR2595393A1
Concrete form having the fixing means for panel