Supervision with anticipation of the electrical power supply unit of a vehicle

EP4429908A1Pending Publication Date: 2024-09-18STELLANTIS AUTO SAS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
EP2022797420
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-11-10
Filing Date
2022-10-03
Publication Date
2024-09-18

AI Technical Summary

Technical Problem

Current vehicle power supply systems face challenges in anticipating and managing electrical energy shortages, which can lead to voltage drops or surges impacting safety equipment performance, especially during energy-intensive situations like emergency maneuvers, due to the insufficient power supply capacity and aging service batteries.

Method used

A supervision method and device that assess the power supply group's energy production capacity and next energy requirements, determining a state of energy shortage to manage electrical energy distribution in real-time, prioritizing supply to critical equipment and potentially shedding non-priority loads to prevent network collapse.

Benefits of technology

Enables advanced decision-making for power management, ensuring the reliability and performance of safety equipment by anticipating and mitigating energy shortages, thereby enhancing vehicle safety during energy-intensive operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 1.1
    Figure 1.1
Patent Text Reader

Abstract

A supervision method is implemented in a vehicle comprising an on-board power system supplied with electrical energy by a power supply unit comprising an electrical energy generator and a service battery. This method comprises a step (10-30) of determining whether the power supply unit has at least one problem, whether the on-board power system will have an upcoming energy-consuming need, and information representative of an electrical energy production capacity of the electrical energy generator, and then determining a state representative of a level of energy shortage of the power supply unit based on this determined information, a determined potential problem and a determined potential upcoming energy-consuming need.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] DESCRIPTION

[0002] TITLE: ANTICIPATED SUPERVISION OF A VEHICLE'S ELECTRICAL POWER SUPPLY UNIT

[0003] The present invention claims priority from the French application

[0004] 5 No. 2111915 filed on 10.11.2021, the content of which (text, drawings and claims) is incorporated here by reference.

[0005] Technical field of the invention

[0006] The invention relates to vehicles comprising an on-board network supplied with electrical energy by a power supply unit comprising an electrical energy generator and a service battery, and more specifically to the supervision of the power supply unit of such vehicles.

[0007] State of the art

[0008] Some vehicles include an on-board network supplied with electrical energy by a power supply unit comprising an electrical energy generator and a service battery (generally rechargeable, possibly via the electrical energy generator). The electrical energy generator may, for example, be an alternator or an alternator-starter when the vehicle includes a powertrain (or GMP) comprising at least one thermal prime mover, or a converter associated with a main (or "traction") battery of low, medium or high voltage type, when the GMP includes at least one electric prime mover. In the following and the preceding, "on-board network" means an electrical power supply network to which electrical (or electronic) equipment (or components) consuming electrical energy and being "non-priority" or "safety" (and therefore priority) are coupled.

[0009] Furthermore, in the following and the above, the term "service battery" means a very low voltage battery (typically 12 V, 24 V or 48 V) and possibly rechargeable by at least one electrical energy generator.

[0010] Furthermore, in the following and the preceding, the term "safety equipment (or component)" means equipment (or component) providing at least one so-called "safety" function because it concerns the safety of the passengers of a vehicle, and therefore must be supplied with electrical energy as a priority. This is the case, for example, of electric power steering or a

[0011] 5 electric braking device (service brake, emergency brake, brake assist system or anti-skid system, for example), or a trajectory control device.

[0012] In many vehicles, the on-board network is mainly supplied with electrical energy by the electric power generator, particularly when the powertrain is in operation, and the service battery is present to supply the on-board network when the powertrain electric power generator cannot do so or in addition to what the electric power generator provides, particularly when it is necessary to guarantee a minimum voltage level for the safety components. 5 When the service battery supplies the on-board network, it discharges, which can cause a voltage drop at the terminals of the on-board network (a phenomenon known as "collapse"), and when it is subject to an operating problem, possibly due to its aging, the voltage at its terminals may prove unsuitable for the on-board network.In both cases, the nominal operation of electrical equipment coupled to the on-board network, and in particular those which are safety-related, may be impacted.

[0013] Similarly, when the electrical energy generator experiences an operating problem resulting from a failure of an internal component and / or from the fact that it is not correctly supplied with electrical energy by the main battery5, this can cause an overvoltage or undervoltage in the on-board network, which can impact the nominal operation of the electrical equipment which is coupled to the latter, or even damage this electrical equipment.

[0014] Furthermore, certain situations in the life of a vehicle, such as for example0 certain so-called emergency maneuvers (such as emergency braking or avoidance), are (very) energy-intensive (i.e. consume a (very) significant amount of electrical energy), and therefore the electrical energy supply capacity of the power supply unit may prove insufficient to fully meet the electrical energy needs of the on-board network. In this type of situation there is a risk of collapse of the on-board network and / or an impossibility of guaranteeing the operation of certain safety equipment (or components) with the expected level of performance, which may

[0015] 5 may prove dangerous.

[0016] Currently, there is no monitoring system that can predict the risk of a shortage of electrical energy for the on-board network, which limits, or even prevents, advance decisions to cut power to certain non-priority electrical equipment. The invention is therefore intended in particular to improve the situation.

[0017] Presentation of the invention

[0018] For this purpose, it proposes in particular a supervision method intended to be implemented in a vehicle comprising an on-board network supplied with electrical energy by a power supply unit comprising an electrical energy generator and a service battery.

[0019] This supervision process is characterized by the fact that it includes a step in which:

[0020] - we determine whether the power supply unit has at least one problem, whether the on-board network will have a future energy-intensive need, and information representative of the electrical energy production capacity of the electrical energy generator, then

[0021] - a representative state of a level of energy shortage of the power supply group is determined based on this determined information, a possible determined problem and a possible future determined energy requirement.

[0022] Thanks to the knowledge of this state representative of the anticipated level of energy shortage of the power supply group, it is now possible to manage in advance, in real time, the electrical energy which can be supplied to the on-board network.

[0023] The supervision method according to the invention may include other characteristics which may be taken separately or in combination, and in particular: - in its step I state may be chosen from N predefined states, with N > 2;

[0024] - in the presence of the first option, in its step the N predefined states can be chosen from a group comprising, on the one hand, a non-critical state representative of a capacity of the electrical energy generator to

[0025] 5 meet alone the current need of the on-board network in the absence of a next energy-consuming need, on the one hand, a partially critical state representative of a capacity of the electrical energy generator to partially meet the current need of the on-board network in the absence of a next energy-consuming need, an additional part being supplied by the service battery, the latter having a current state of charge greater than a first threshold, on the other hand, a very critical state representative of an inability of the power supply group to meet the current need of the on-board network in the absence of a next energy-consuming need, when the current state of charge of the service battery is less than or equal to the first threshold, on the other hand,a so-called stabilized state representative of a situation in which the current need of the on-board network has been reduced so that the electrical energy generator is able to meet a new reduced need alone in the absence of a future energy-intensive need, and fifthly, a so-called safe state representative of a future energy-intensive need of the on-board network;

[0026] - in its step the information can be chosen from M predefined information, with M > 3;

[0027] - in the presence of the last option, in its step the M information can be chosen from a group comprising, on the one hand, a first predefined information representative of a first interval of remaining capacities for producing electrical energy of the electrical energy generator, on the other hand, a second predefined information representative of a second interval of remaining capacities for producing electrical energy of the electrical energy generator less than the first interval, on the other hand, a third predefined information representative of a third interval of remaining capacities for producing electrical energy of the electrical energy generator less than the second interval, on the other hand, a fourth predefined information representative of a fourth interval of remaining capacities for producing electrical energy of the electrical energy generator less than the third interval, and,on the fifth hand, a fifth piece of information representing an inability to supply electrical energy from the energy generator,

[0028] 5 electric and / or service battery;

[0029] - in its step the problem of the power supply group can be chosen from a group comprising a problem of operation of the electric power generator, a problem of operation of the service battery, a problem of overvoltage at the terminals of the service battery with respect to a second threshold, and a problem of undervoltage at the terminals of the service battery with respect to a third threshold;

[0030] - in the presence of the last option, in its step the overvoltage problem can correspond to a voltage higher than the second threshold for a duration greater than a first predefined duration, and the undervoltage problem can correspond to a voltage lower than or equal to the third threshold for a duration greater than a second predefined duration.

[0031] The invention also proposes a computer program product comprising a set of instructions which, when executed by processing means, is capable of implementing a supervision method of the type presented above for supervising a power supply unit comprising an electrical energy generator and a service battery and supplying electrical energy to an on-board network of a vehicle.

[0032] The invention also proposes a supervision device intended to equip a vehicle comprising an on-board network supplied with electrical energy by a power supply group comprising an electrical energy generator and a service battery.

[0033] This supervision device is characterized by the fact that it comprises at least one processor and at least one memory arranged to carry out the operations consisting of: 0 - determining whether the power supply unit has at least one problem, whether the on-board network will have a future energy-intensive need, and information representative of an electrical energy production capacity of the electrical energy generator, then - determining a state representative of an energy loss level of the power supply unit as a function of this determined information, of a possible determined problem and of a possible future determined energy-intensive need.

[0034] 5 The invention also proposes a vehicle, possibly of the automobile type, and comprising an on-board network supplied with electrical energy by a power supply unit comprising an electrical energy generator and a service battery, as well as a supervision device of the type presented above.

[0035] Brief description of the figures

[0036] Other characteristics and advantages of the invention will appear on examining the detailed description below, and the appended drawings, in which:

[0037] [Fig. 1] schematically and functionally illustrates an exemplary embodiment of a vehicle comprising a distribution box comprising a supervision device according to the invention,

[0038] [Fig. 2] schematically and functionally illustrates an exemplary embodiment of a computer for supervising the distribution of electrical energy comprising an exemplary embodiment of a supervision device0 according to the invention, and

[0039] [Fig. 3] schematically illustrates an example of an algorithm implementing a supervision method according to the invention.

[0040] Detailed description of the invention 5 The invention aims in particular to propose a supervision method, and an associated supervision device DS, intended to allow the early supervision in a vehicle V of a power supply group comprising an electrical energy generator GE and a service battery BS and responsible for supplying electrical energy to an on-board network RB to which electrical equipment is coupled.

[0041] In the following, it is considered, by way of non-limiting example, that the vehicle V is of the automobile type. It is for example a car, as illustrated in figure 1. But the invention is not limited to this type of vehicle. It relates in fact to any type of vehicle comprising an on-board network supplied with electrical energy by a power supply unit comprising an electrical energy generator and a service battery. Thus, it relates, by

[0042] 5 example, land vehicles (utility vehicles, camper vans, minibuses, coaches, trucks, motorcycles, road machinery, construction machinery, agricultural machinery, leisure machinery (snowmobiles, karts), and tracked vehicles, for example), boats and aircraft.

[0043] Furthermore, it is considered in the following, by way of non-limiting example, that the vehicle V comprises a powertrain (or GMP) of the all-electric type (and therefore whose drive is provided exclusively by at least one electric motor). But the GMP could be of the hybrid type (thermal and electric) or of the purely thermal type.

[0044] Figure 1 schematically shows a vehicle V comprising an electric GMP transmission chain, an on-board network RB, a power supply unit comprising a service battery BS and an electric power generator GE, and a supervision device DS according to the invention.

[0045] The on-board network RB is an electrical power supply network to which electrical (or electronic) equipment (or components) are coupled (or connected) which consume electrical energy and some of which are "non-priority" and some of which are "safety" (and therefore priority). For example, safety equipment (or components) may be electric power steering, or an electric braking device5 (service brake, emergency brake, brake assist system or anti-skid, for example), or a trajectory control device. Also, for example, non-priority equipment (or components) may be a heating / air conditioning system or a seat heating device or a seat massage device.0 The service battery BS is responsible for supplying electrical energy to the on-board network RB, in addition to that supplied by the electrical energy generator GE and sometimes instead of the latter (GE). For example, this service battery BS may be arranged in the form of a very low voltage battery (typically 12 V, 24 V or 48 V). It is for example rechargeable by at least the electrical energy generator GE. In the following, as a non-limiting example, it is considered that the service battery BS is of the 12 V Lithium-ion type.

[0046] 5 Furthermore, the service battery BS is associated with a first battery box BB1 responsible for determining, estimating or measuring voltages / currents, state of charge and temperature, and coupled to the distribution box BD.

[0047] The transmission chain has a GMP which is, here, purely electric, and therefore which includes, in particular, an electric driving machine MM1, a motor shaft AM, and a transmission shaft AT. Here, the term “electric driving machine” means an electric machine arranged so as to provide or recover torque to move the vehicle V.

[0048] The operation of the GMP is supervised by a first supervision computer CS1. 5 The prime mover MM1 (here an electric motor) is coupled to a main (or traction) battery BP, in order to be supplied with electrical energy, as well as possibly to supply this main battery BP with electrical energy during a regenerative braking phase. It is coupled to the motor shaft AM, to provide it with torque by rotational drive. This motor shaft AM is here coupled to a reducer RD which is also coupled to the transmission shaft AT, itself coupled to a first train T1 (here of wheels), preferably via a differential D1.

[0049] This first train T1 is here located in the front part PW of the vehicle V. But in a variant this first train T 1 could be the one which is here referenced T25 and which is located in the rear part PRV of the vehicle V.

[0050] The prime mover MM1 is, here, also coupled to the electric power generator GE which is also indirectly coupled to the service battery BS, in particular to recharge it with electrical energy from the main battery BP and converted. 0 This electric power generator GE is a current converter, for example. It is here responsible during the driving phases of the vehicle V for converting part of the electric current stored in the main battery BP to supply with converted electric current, on the one hand, the on-board network RB, and, on the other hand, the service battery BS (when it needs to be recharged).

[0051] When the main BP battery is suitable for mode 2 or 3 charging, it can be recharged with direct current by the power generator

[0052] 5 GE electric vehicle when the latter (GE) has been temporarily coupled to an external power source, via a charging cable previously connected to a charging connector of the vehicle V.

[0053] For example, the main BP battery may include electrochemical electrical energy storage cells, possibly of the lithium-ion (or Li-ion) or Ni-Mh or Ni-Cd type.

[0054] Also for example, the main BP battery can be of low voltage type (typically 450 V for illustration). But it could be of medium voltage or high voltage type.

[0055] Furthermore, the main battery BP is associated with a second battery box BB2 which comprises, for example, an isolation device, voltage / current / temperature measuring means and a battery calculator. The isolation device is arranged so as to isolate the main battery BP from the electrical energy generator GE and / or from the charging connector and / or from the prime mover MM 1 , when the battery calculator of the second battery box BB2 requests it. The battery calculator of the second battery box BB2 centralizes the voltage, current and temperature measurements, and determines parameters of the main battery BP according to these measurements, and in particular its internal resistance, its minimum voltage and its state of charge (or SOC (“State Of Charge”)).Furthermore, the battery calculator of the second BB2 battery box exchanges information in particular with the first CS1 supervision calculator of the GMP and the second CS2 supervision calculator.

[0056] It will be noted that in the example illustrated non-limitingly in Figure 1, the vehicle V also comprises a distribution box BD to which the service battery BS, the electrical energy generator GE and the on-board network RB are coupled. This distribution box BD is responsible for distributing in the on-board network RB the electrical energy produced by the electrical energy generator GE or stored in the service battery BS, for the power supply of the electrical components (or equipment) coupled to the on-board network RB, according to power supply requests received (in particular from the first supervision computer CS1 of the GMP).

[0057] The supervision of the distribution of this electrical energy can be ensured

[0058] 5 by a second supervision computer CS2. In the example illustrated non-limitingly in Figure 1, the second supervision computer CS2 is part of the distribution box BD. But in an alternative embodiment (not illustrated) the second supervision computer CS2 could not be part of the distribution box BD.

[0059] As mentioned above, the invention notably proposes a supervision method intended to enable the supervision of the power supply unit of the vehicle V in advance.

[0060] This (supervision) method can be implemented at least in part by a supervision device DS of the type illustrated in Figure 2 and 5 comprising at least one processor PR1 and at least one memory MD which are arranged to carry out operations when it has been woken up, for example by the first supervision computer CS1 when the latter (CS1) wants to obtain a state eg of the power supply group, or possibly as soon as the on-board electronics are woken up by a master computer of the vehicle V. 0 It will be noted that in the example illustrated non-limitingly in Figure 1, the supervision device DS is part of the second supervision computer CS2. But it could be equipment coupled to the second supervision computer CS2. Generally speaking, the supervision device DS is produced in the form of a combination of electrical5 or electronic circuits or components (or "hardware") and software modules (or "software").

[0061] The PR1 processor may, for example, be a digital signal processor (or DSP). This PR1 processor may include integrated (or printed) circuits, or several integrated (or printed) circuits connected by wired or wireless connections. An integrated (or printed) circuit is any type of device capable of performing at least one electrical or electronic operation. Thus, it may, for example, be a microcontroller.

[0062] The MD memory is live in order to store instructions for the implementation by the PR1 processor of at least part of the supervision process described below (and therefore of its functionalities).

[0063] As illustrated non-limitingly in Figure 3, the (supervision) method, according to the invention, comprises a step 10-30.

[0064] 5 This step 10-30 firstly comprises a sub-step 10 in which one (the supervision device DS) determines whether the power supply group has at least one problem, whether the on-board network RB will have a future energy-intensive need, and information ic representative of the electrical energy production (or supply) capacity of the electrical energy generator GE.

[0065] Determining a problem at the power group level can be done, for example, at the first BB1 and second BB2 battery boxes and the GE electric power generator.

[0066] For example and without limitation, a problem of the power group can be a problem of operation of the electric power generator GE, a5 problem of operation of the service battery BS, a problem of overvoltage at the terminals of the service battery BS with respect to a (second) threshold s2, or a problem of undervoltage at the terminals of the service battery BS with respect to a (third) threshold s3. It will be noted that in the presence of a main battery BP supplying the electric power generator GE,0 another problem of the power group can be a problem of operation of the main battery BP.

[0067] The value of the second threshold s2 can be chosen during the development phase of the vehicle V. This value depends mainly on the nominal average value of the voltage of the on-board network RB and the electrical architecture of the vehicle V. For example, when the nominal average value of the voltage of the on-board network RB is equal to 12 V, the value of the second threshold s2 can be between 15 V and 17 V. As an illustrative example, the value of the second threshold s2 can be equal to 16 V. But other values ​​of the second threshold s2 can be used. Similarly, the value of the third threshold s3 can be chosen during the development phase of the vehicle V. This value depends mainly on the nominal average value of the voltage of the on-board network RB and the electrical architecture of the vehicle V. For example, when the nominal average value of the voltage of the on-board network RB is equal to 12 V, the value of the third threshold s3 can be between 10 V and 12 V.As an illustrative example, the value of the third threshold s3 can be equal to 12 V. But other values ​​of the third threshold s3 can be used.

[0068] 5 Preferably, in sub-step 10 of step 10-30, a notion of duration is taken into account during which the overvoltage or undervoltage must be present without interruption to be considered as such. In this case, the overvoltage problem corresponds to a voltage which is greater than the second threshold s2 for a duration greater than a first predefined duration d1, and the undervoltage problem corresponds to a voltage which is less than or equal to the third threshold s3 for a duration greater than a second predefined duration d2.

[0069] The value of the first duration d1 can be chosen during the vehicle V tuning phase. For example, when the nominal average value of the on-board network voltage RB is equal to 12 V, the value of the first duration d1 can be between 20 s and 40 s. As an illustrative example, the value of the first duration d1 can be equal to 30 s. But other values ​​of the first duration d1 can be used.

[0070] Similarly, the value of the second duration d2 can be chosen during the development phase of the vehicle V. For example, when the nominal average value of the voltage of the on-board network RB is equal to 12 V, the value of the second duration d2 can be between 20 s and 40 s. As an illustrative example, the value of the second duration d2 can be equal to 30 s. But other values ​​of the second duration d2 can be used. 5 The determination of a next energy-consuming requirement of the on-board network RB can be done, for example, with the first supervision computer CS1 or another on-board computer responsible for controlling the safety functions within the vehicle V. Here, the term "next energy-consuming requirement" means a need for a (very) large quantity of electrical energy0 that will occur very soon because at least one energy-consuming safety function has just been required in the vehicle V.For example, such an energy-consuming safety function may concern an emergency maneuver (it may thus be an emergency braking or an avoidance). The determination of I information ic (representative of the electrical energy supply capacity of the electrical energy generator GE) may be done, for example, at the electrical energy generator GE. For example, it may be determined according to the electrical power which is being.

[0071] 5 production by the GE electric power generator and the maximum electrical power that the GE electric power generator could produce at the time in question.

[0072] Step 10-30 also includes a sub-step 20 in which one (the supervision device DS) determines a state eg which is representative of the level of energy shortage of the power supply group as a function of the determined information ic, of a possible problem of the determined power supply group and of a possible next determined energy-consuming need.

[0073] It will be understood that this state eg represents the anticipated level of energy shortage of the power supply group since it takes into account not only5 a possible problem of the power supply group likely to prevent the supply to the on-board network RB (including in the absence of a future energy-intensive need) of a sufficient quantity of electrical energy, but also a possible future energy-intensive need that may be impossible to satisfy.

[0074] Thanks to the knowledge of this state eg, it is now possible to manage in an anticipated and possibly optimal way, in real time, the electrical energy which can be supplied to the on-board network RB (and therefore to the electrical equipment which is coupled to the latter). Thus, knowing this state eg the second supervision computer CS2 can in particular decide to carry out power supply cuts to certain non-priority electrical equipment in order to avoid in an anticipated manner any collapse of the on-board network RB.

[0075] It will be understood that it is the processor PR1 and memory MD which are arranged to carry out the operations consisting of determining whether the power supply group has at least one problem, whether the on-board network RB will have a future energy-consuming need, and the information ic, then determining the state eg.

[0076] For example, and as illustrated non-limitingly in Figure 3, step 10-30 may comprise a sub-step 30 in which at least one action can be carried out (the supervision device DS can trigger) in the vehicle V depending on the state eg determined.

[0077] For example, in sub-step 30 each action can be chosen from:

[0078] - prioritization of the supply of electrical energy to electrical equipment coupled to the RB on-board network, depending on the priority level

[0079] 5 associated (typically safety equipment that is in use will be served first if needed),

[0080] - signaling of a failure of the GE electric power generator and / or the BS service battery and / or the BP main battery, and

[0081] - a configuration of at least one electrical equipment coupled to the on-board network RB so that it consumes electrical energy which is compatible with the determined state eg.

[0082] It should be noted that the actions mentioned above are only non-limiting examples, and therefore other actions may be envisaged, and in particular the generation of at least one alert message intended for a user of the vehicle V, or the recording of at least one fault code in a memory of a computer of the vehicle V.

[0083] For example, an alert message may result in:

[0084] - activation of a light (or similar) dedicated to the power supply group, and / or

[0085] - the broadcasting by at least one loudspeaker (possibly of the vehicle V) and / or0 the display on at least one screen (possibly of the vehicle V, such as for example the central instrument panel or the dashboard) of a text message signaling a problem at the level of the power supply unit and possibly requiring a check (or verification) of the vehicle V (in an after-sales service) or an immediate stopping of the vehicle V. 5 Also for example, in sub-step 20 of step 10-30 one (the supervision device DS) can choose the state eg from among N predefined states, with N > 2. But in an alternative embodiment the state eg could be determined by calculation using at least one mathematical formula (or equation).

[0086] In the case of a choice, the N predefined states can, for example, be chosen from a group comprising:

[0087] - a non-critical state representative of the capacity of the electrical energy generator GE to satisfy alone the current need of the on-board network RB, in the absence of a next energy-consuming need, - a partially critical state representative of the capacity of the electrical energy generator GE to partially satisfy the current need of the on-board network RB in the absence of a next energy-consuming need. In this situation, the additional part of the electrical energy is supplied by the battery of

[0088] 5 BS easement, and this last BS must have a current charge state greater than a first threshold s1,

[0089] - a very critical state representative of an inability of the power supply group to meet the current need of the on-board network RB in the absence of a next energy-consuming need, when the current state of charge of the service battery BS is less than or equal to the first threshold s1,

[0090] - a so-called stabilized state representative of a situation in which the current need of the on-board network RB has been reduced so that the electrical energy generator GE is able to meet a new reduced need alone in the absence of a future energy-intensive need, and 5 - a so-called safe state representative of a future energy-intensive need of the on-board network RB.

[0091] It should be noted that in the stabilized state we are not in a nominal (non-critical) state, because we prohibit the consumption of electrical energy by at least one piece of electrical equipment coupled to the on-board network RB to define a new0 reduced need that the electrical energy generator GE can satisfy on its own.

[0092] It should be noted that the list of predefined states given above is not exhaustive and especially not limiting because it is given as an illustrative example. Furthermore, all of these predefined states can be used, or only some of them (at least two) can be used.

[0093] Also for example, in sub-step 10 of step 10-30 one (the supervision device DS) can choose the information ic from M predefined information, with M > 3. But in an alternative embodiment the information ic could be determined by calculation by means of at least one mathematical formula (or equation).

[0094] In the case of a choice, the M predefined information can, for example, be chosen from a group comprising:

[0095] - a first predefined information representative of a first interval of remaining electrical energy production capacities of the electrical energy generator GE,

[0096] - a second predefined information representative of a second interval

[0097] 12 of remaining electrical power generation capacity of the generator

[0098] 5 of GE electrical energy lower than the first interval it,

[0099] - a third predefined information representative of a third interval

[0100] 13 of remaining electrical power generation capacity of the GE electrical power generator less than the second interval i2,

[0101] - a fourth predefined information representative of a fourth interval

[0102] 14 of remaining electrical power generation capacity of the GE electrical power generator less than the third interval i3, and

[0103] - a fifth piece of information representing an inability to supply electrical energy from the electrical energy generator GE and / or the service battery BS. 5 It should be noted that the list of predefined information given above is not exhaustive and especially not limiting because it is given as an illustrative example. Furthermore, all of this predefined information can be used, or only some of it (at least three) can be used. 0 For example:

[0104] - the first interval can be between 60% and 100% of the maximum instantaneous capacity that the GE electric power generator can provide at the time in question, which corresponds to a low capacity provided,

[0105] - the second interval i2 can be between 30% and 59% of the maximum instantaneous capacity5 that the GE electric power generator can provide at the time considered, which corresponds to a moderate capacity provided,

[0106] - the third interval i3 can be between 1% and 29% of the maximum instantaneous capacity that the GE electrical energy generator can provide at the instant in question, which corresponds to a high provided capacity, and 0 - the fourth interval i4 can be equal to 0% of the maximum instantaneous capacity that the GE electrical energy generator can provide at the instant in question, which corresponds to a totally saturated provided capacity. Non-limiting examples of implementation of the method are given below.

[0107] For example, if the information ic is the first or second predefined information (the GE electric power generator is therefore able to satisfy

[0108] 5 alone to the needs of the on-board network RB), that there is no problem in the power supply group and that there is no next energy-consuming need, then the state eg is the non-critical state.

[0109] Also for example, if the information ic is the third or fourth predefined information (the service battery BS therefore has a state of charge higher than the first threshold s1 which allows it, if necessary, to supplement the electric energy generator GE to meet the needs of the on-board network RB together), that there is no problem in the power supply group and that there is no next energy-consuming need, then the state eg is the partially critical state. 5 Also for example, if there is at least one problem in the power supply group (for example the service battery BS has a state of charge lower than or equal to the first threshold s1 which does not allow it, if necessary, to supplement the electric energy generator GE to meet the needs of the on-board network RB together), but that there is no next energy-consuming need, then the state eg is the very critical state, whatever the information ic.

[0110] Also for example, if there is a next energy requirement, then the state eg is the safe state, regardless of the information ic and whether or not there is at least one problem in the power supply group.

[0111] Also for example, if the current need of the on-board network RB has been reduced so that the electrical energy generator GE is able to meet a new reduced need alone in the absence of a future energy-consuming need, then the state eg is the stabilized state.

[0112] It will also be noted, as illustrated non-limitingly in Figure 2, that the second supervision computer CS2 (or the possible computer of the supervision device DS) can also comprise, in addition to the RAM MD and processor PR1, a mass memory MM2, in particular for the storage of the electrical power currently being produced by the electrical energy generator GE and the maximum electrical power that the electrical energy generator GE could produce at the time considered, and intermediate data involved in all its calculations and processing. Furthermore, this second supervision computer CS2 (or the possible

[0113] 5 calculator of the supervision device DS) may also comprise an input interface IE for receiving the electrical power currently being produced by the electrical energy generator GE, the maximum electrical power that the electrical energy generator GE could produce at the time in question, information representative of a problem in the power supply group, information representative of a future energy-consuming need, and a possible request to obtain the status eg, possibly after having formatted and / or demodulated and / or amplified them, in a manner known per se, by means of a digital signal processor PR2.In addition, this second supervision computer CS2 (or the possible computer of the supervision device DS) can also comprise an output interface IS, in particular to deliver at least the messages containing the determined state eg (as well as each possible determined action) and the requests to obtain the electrical power currently being produced by the electrical energy generator GE, the maximum electrical power0 that the electrical energy generator GE could produce at the time in question, information representative of a possible problem in the power supply group, and information representative of a possible next energy-consuming need.

[0114] It will also be noted that the invention also proposes a computer program product (or computer program) comprising a set of instructions which, when executed by processing means of the electronic circuit (or hardware) type, such as for example the processor PR1, is capable of implementing the supervision method described above to supervise in advance the power supply unit of the vehicle V. 0

Claims

DEMANDS 1. A method for monitoring a vehicle (V) comprising an on-board network (RB) supplied with electrical energy by a power unit comprising an electric power generator (GE) and a battery 5 servitude (BS), characterized in that it includes a step (10-30) in which it is determined whether said power group has at least one problem, whether said on-board network (RB) will have an upcoming energy-intensive need, and information representative of an electrical power generation capacity of said electrical power generator (GE), then a state representative of an energy shortage level of said power group is determined as a function of said information determined, said possible problem determined and said possible upcoming energy-intensive need determined.

2. A method according to claim 1, characterized in that in said step (10-30) said state is chosen from N predefined states, with N > 2.

5.

3. A method according to claim 2, characterized in that in said step (10-30) said N predefined states are chosen from a group comprising i) a non-critical state representing the capacity of said electrical power generator (EG) to meet the current demand of said on-board network (RB) alone in the absence of any future energy demand, ii) a partially critical state representing the capacity of said electrical power generator (EG) to partially meet the current demand of said on-board network (RB) in the absence of any future energy demand, a complementary part being supplied by said service battery (SB), the latter (SB) having a current state of charge greater than a first threshold.iii) a very critical state5 representing an inability of said power supply group to meet the current demand of said on-board network (RB) in the absence of any future energy demand, when said current state of charge of said service battery (BS) is less than or equal to said first threshold, iv) a so-called stabilized state representing a situation in which the current demand of said on-board network (RB) has been reduced so that said electrical power generator (GE) is able to meet a new reduced demand on its own in the absence of any future energy demand, and v) a so-called safe state representing a, next energy-intensive need of said on-board network (RB).

4. A method according to any one of claims 1 to 3, characterized in that in said step (10-30) said information is chosen from M predefined information, with M > 3.

5. A method according to claim 4, characterized in that in said step (10-30) said information M is selected from a group comprising i) a first predefined piece of information representing a first range of remaining electrical power generation capacities of said electrical power generator (EG), ii) a second predefined piece of information representing a second range of remaining electrical power generation capacities of said electrical power generator (EG) lower than said first range, iii) a third predefined piece of information representing a third range of remaining electrical power generation capacities of said electrical power generator (EG) lower than said second range, iv) a fourth predefined piece of information representing a fourth range of remaining electrical power generation capacities of said electrical power generator (EG) lower than said third range,and (v) a fifth piece of information indicating an inability to supply electrical energy to said electrical power generator (EG) and / or said service battery (SB).

6. A method according to any one of claims 1 to 5, characterized in that in said step (10-30) said power group problem is selected from a group comprising an operating problem of said electric power generator (EG), an operating problem of said service battery (SB), an overvoltage problem across said service battery (SB) relative to a second threshold, and an undervoltage problem across said service battery (SB) relative to a third threshold.

7. Method according to claim 6, characterized in that in said step (10-30) said overvoltage problem corresponds to a voltage0 greater than said second threshold for a duration greater than a first predefined duration, and said undervoltage problem corresponds to a voltage less than or equal to said third threshold for a duration greater than a second predefined duration.

8. Product: A computer program comprising a set of instructions which, when executed by processing means, is suitable for implementing the monitoring method according to any one of claims 1 to 7 for monitoring a power supply unit comprising a power generator 5 electric (GE) and a service battery (BS) and supplying electrical power to an on-board network (RB) of a vehicle (V).

9. Supervisory device (SD) for a vehicle (V) comprising an on-board network (RB) supplied with electrical energy by a power unit comprising an electric power generator (GE) and a service battery (BS), characterized in that it comprises at least one processor (PR1) and at least one memory (MD) arranged to perform the operations of i) determining whether said power unit has at least one problem, whether said on-board network (RB) will have an upcoming energy demand, and information representative of an electrical energy production capacity of said electric power generator (GE), and then ii) determining a state representative of an energy shortage level of said power unit as a function of said determined information, said possible problem determined, and said possible upcoming energy demand determined. 10.Vehicle (V) comprising an on-board network (RB) supplied with electrical energy by a power group comprising an electrical power generator (GE) and a service battery (BS), characterized in that it further comprises a supervision device (DS) according to claim 9.