Method for operating a domestic refrigeration appliance having a specific operating process coordination depending on an idle time interval, and domestic refrigeration appliance

The method allows users to control ice maker noise emissions by deactivating the ice production mode during specified intervals, reducing noise disturbances and maintaining efficiency, addressing the issue of disruptive noise from ice maker operations in household refrigeration appliances.

EP4435352A1Pending Publication Date: 2024-09-25BOSCH SIEMENS HAUSGERATE GMBH
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
EP2024158038
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-21
Filing Date
2024-02-16
Publication Date
2024-09-25

AI Technical Summary

Technical Problem

Household refrigeration appliances with ice makers often produce noise during ice production, which can be disruptive, especially during quiet activities or conversations.

Method used

A method that allows users to deactivate the ice production mode temporarily based on user-defined criteria, reducing noise emissions by coordinating quieter operating processes during specified rest time intervals, and intelligently managing operating processes to minimize noise disturbance.

Benefits of technology

Enables flexible and efficient operation of the ice maker, reducing noise disturbances and maintaining ice production efficiency, while allowing for user-defined control over noise levels and energy management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGAF001_ABST
    Figure IMGAF001_ABST
Patent Text Reader

Abstract

One aspect of the invention relates to a method for operating a household refrigeration appliance (1) comprising an ice maker (12) which produces and / or dispenses ice in an ice production mode (EP), comprising the following steps: - providing the household refrigeration appliance (1) with the possibility of at least partially deactivating at least one subprocess (TEP) of the ice production mode (EP) depending on a user-defined deactivation criterion; - providing at least one first operating process (P1, P1') of the household refrigeration appliance (1) which, when carried out, generates a first noise emission that is lower than that of the subprocess; - specifying a user-defined rest period (R) of the ice maker (12) as a deactivation criterion, wherein at least one subprocess (TEP) of the ice production mode (EP) is at least partially deactivated during the rest period (R);- Coordinating the operation of the household refrigeration appliance (1) such that the first operating process (P1, P1') is carried out at least temporarily during the rest period interval (R).
Need to check novelty before this filing date? Find Prior Art

Description

[0001] One aspect of the invention relates to a method for operating a household refrigeration appliance having an ice maker. Another aspect of the invention relates to a household refrigeration appliance.

[0002] Household refrigeration appliances that have an ice maker are known. Ice makers usually have an ice tray into which liquid, especially water, is introduced, which is then frozen in this ice tray to form ice cubes, such as ice cubes. An ice maker usually also has a storage container separate from the ice tray. The ice cubes are temporarily stored frozen in this storage container in the ice maker after they are ejected from the ice tray. Such ejection of the ice cubes from the ice tray into the storage container can, in particular, also take place automatically. This allows the production of ice cubes to be carried out automatically and, since the storage container usually has a larger volume than the ice tray, a larger number of ice cubes can be produced in several runs, all of which can then be temporarily stored in the storage container.Only when a user requests the dispensing of ice cubes temporarily stored in the storage container are they removed from the storage container and ejected via a dispensing unit in the household refrigeration appliance. This automatic process ensures that there are always sufficient ice cubes in stock in the storage container.

[0003] When the ice maker is in operation, noises may occur during specific steps of ice production that can be perceived externally. However, such noises can be disturbing for users of the household refrigeration appliance. This can be particularly disturbing if, for example, a user is having a conversation in the area where the household refrigeration appliance is installed, for example during a telephone call, a video conference, or another personal conversation with another person. It can also be disturbing if the user wants to take in other acoustic information, such as listening to music and / or watching television. Last but not least, such noises can also be disturbing for a user or person when they generally need peace and quiet.

[0004] It is an object of the present invention to provide a method and a household refrigeration appliance with which the operation of an ice maker is improved with regard to noise emissions.

[0005] This object is achieved by a method and a household refrigeration appliance according to the independent claims.

[0006] One aspect of the invention relates to a method for operating a household refrigeration appliance having an ice maker. The ice maker is designed to produce and / or dispense ice in an ice production mode. The method comprises, in particular, the following steps: Providing the household refrigeration appliance with the option of at least partially deactivating at least one sub-process of the ice production mode depending on a user-defined deactivation criterion; providing at least one first operating process of the household refrigeration appliance which, when carried out, generates a first noise emission that is lower than that of the sub-process; specifying a user-specific rest time interval of the ice maker as a deactivation criterion, in particular at least reducing the external noise emission compared to a basic operation of the household refrigeration appliance, wherein at least one sub-process of the ice production mode is at least temporarily deactivated during the rest time interval; coordinating the operation of the household refrigeration appliance such that the first operating process is carried out at least temporarily during the rest time interval.

[0007] This method now makes it possible to control and configure ice production more individually, particularly with regard to the production itself and / or dispensing. It is particularly advantageous in this context that a household refrigeration appliance is designed in such a way that it provides the option of deactivating this ice production mode on a user-specific basis. This means, in particular, that this deactivation of the ice production mode is possible independently of the other operating modes of the household refrigeration appliance when it is operated in the switched-on state.Thus, such an option for deactivating the ice production mode should not be understood as meaning that the entire household refrigeration appliance is switched off, and in particular, that it is then without power. Rather, the option mentioned in this regard should only be understood in the sense that the household refrigeration appliance remains switched on and, specifically, that the ice production mode can be deactivated by the user. Such an option alone creates a high degree of flexibility, allowing the ice production mode to be operated not only automatically and invariably via a predefined control program, but also to take user-specific interests and situations into account.

[0008] In the case of the operating processes of the household refrigeration appliance which generate noise emissions, this is to be understood in particular to mean that the noise emissions occur outwards and can therefore also be perceived by a person in the vicinity of the household refrigeration appliance. A particularly advantageous feature of the method is that a person or user can now individually specify at least one time phase, namely this rest period interval. This therefore represents a user-defined deactivation criterion which can in particular also be processed by a control unit of the household refrigeration appliance. In particular, with such a specification, in particular input of at least one such rest period interval, the control unit can then automatically deactivate the ice production mode. In particular, this deactivation is controlled automatically by the control unit of the household refrigeration appliance.

[0009] What is particularly advantageous about the method is that it not only involves this user-specific specification of the rest period and the associated deactivation of at least one sub-process of the ice production mode, but also that operating process management is also carried out intelligently by the household refrigeration appliance itself. This user-specifically specified rest period or rest period is then intelligently used to sort operating processes of the household refrigeration appliance in such a way that this rest period is also used to carry out operating processes, but at least a reduced noise emission from the household refrigeration appliance into the environment occurs compared to operation of the household refrigeration appliance in which no such rest period is specified.In one embodiment, this also prevents any operating processes from being carried out at all during the rest period, in particular those which also produce a certain, albeit low, noise emission to the outside, but rather the rest period is also used in an intelligent manner to carry out operating processes which, however, have a significantly lower noise emission and thus a significantly lower or even no noise disturbance potential for a person in the vicinity of the household refrigeration appliance.

[0010] This enables the entire operation of the household refrigeration appliance to be carried out in a very intelligent and efficient manner, and the household refrigeration appliance itself can react intelligently to the very individually specified at least one rest period in order to, for example, avoid any undesired delay in operating processes and / or at least a partial failure of an operating process.

[0011] In one embodiment, during the coordination, the quieter first operating process is carried out at least temporarily during the rest period. This enables a quieter operation of the household refrigeration appliance at least in some situations, compared to an operating mode of the household refrigeration appliance in which the rest period is specified and desired. This is especially true if a louder operating process would otherwise be carried out during the rest period.

[0012] In one embodiment, during coordination, a check is made as to the order specified as the basic setting and / or the time intervals specified as the basic setting in which the first operating process and / or the at least one sub-process are carried out or are scheduled to be carried out in a basic operation of the household refrigeration appliance in which no rest period is specified. This is a further very advantageous embodiment, since it fundamentally checks the time of day and / or the length of the rest period, and then checks which of the operating processes are scheduled at this time of day and / or over this period in this basic setting or in this basic operation of the household refrigeration appliance.For example, if an individual specification stipulates that a very quiet operating process, in particular the quieter first operating process, would be carried out anyway during this user-specifically specified rest time interval, reordering the operating processes, which would be carried out with coordination in one exemplary embodiment, is not necessary. However, if it is the case that a louder operating process, in particular also a second operating process, would be carried out at least in phases during this at least one intended rest time interval and thus in the individually specified time period and / or time of day - in accordance with the specified basic operation of the household refrigeration appliance - this second operating process is then prevented during the rest time interval.It is precisely in such a case that it is intelligently provided that the order and / or the time intervals of this basic setting of the operating processes are changed. For example, in this context, it can be provided that the operating processes are swapped in order and / or the duration or time intervals of at least one operating process are changed, for example, extended or shortened. This also provides highly dynamic operating process management. In particular, a diverse dynamic change to these operating processes can thus take place, particularly depending on at least one user-specific rest period.

[0013] In one embodiment, depending on the information from the baseline operation and the rest period, a check is made to determine whether the sequence and / or the time intervals should be changed in such a way that at least the louder operating process is prevented from being carried out during the rest period. This minimizes the potential for noise disturbance to a person, especially the person who specified the rest period.

[0014] In one embodiment, after the end of the rest period, a sequence that may have been changed during coordination and / or a duration that may have been changed during coordination of at least one operating process is changed back to the sequence specified during basic operation and / or to the duration of the operating processes specified during basic operation. In particular, this also occurs automatically. In particular, this is performed by the control unit of the household refrigeration appliance. In one advantageous embodiment, a quasi-fully automatic coordination operation of the operating processes is then carried out by the control unit. This also prevents the actual basic setting of the household refrigeration appliance with regard to the operating processes from becoming disrupted after the end of a rest period.In one embodiment, the first operating process is defrosting the evaporator of a freezer compartment of the household refrigeration appliance. Such a defrosting process is generally a relatively quiet operating process, particularly compared to other operating processes of the household refrigeration appliance. Such an evaporator is part of a refrigeration circuit of the household refrigeration appliance. In particular, the household refrigeration appliance can have at least one freezer compartment and / or at least one refrigerator compartment. Due to thermodynamic processes, ice can accumulate over the course of operation in the evaporator, which is provided for cooling the freezer compartment, which is known to reduce efficiency. In a clever way, it is now possible for such a defrosting process to be carried out at least temporarily during the rest time interval specified by the user.This allows for a very quiet operating process during the idle time interval. This minimizes the potential for noise disturbance and, at the same time, provides a significant benefit in that the evaporator is returned to a defrosted or more defrosted state.

[0015] In a further embodiment, defrosting of the ice maker can be carried out in addition to or instead of the ice maker as the first operating process. This means, in particular, that an evaporator of the ice maker is defrosted. This is particularly advantageous in embodiments of an ice maker that have their own evaporator, by means of which an ice tray of the ice maker is cooled. Such embodiments of ice makers that have their own internal evaporator can freeze the water present in the ice tray independently of other compartments and operating modes of the household refrigeration appliance. For this purpose, it is provided that such an evaporator belonging to the ice maker is arranged directly below the ice tray and / or directly to the side of the ice tray. This allows a particularly strong cooling effect on the ice tray and allows water introduced into it to be frozen particularly quickly and efficiently.However, since this evaporator can also accumulate ice over the course of its operation, it is particularly beneficial to defrost it regularly. Therefore, it is particularly advantageous if this ice production mode is deactivated during the idle time interval and the ice maker-side evaporator is defrosted. This ensures that the ice maker-side evaporator is at least in a more ice-free state when the ice production mode is reactivated, allowing ice production to be carried out more efficiently in many ways.

[0016] In a further embodiment, a further sub-process of the ice production mode can be performed in addition to or instead of the first operating process. For example, such a further sub-process can be the freezing of water in the ice tray of the ice maker.

[0017] In one embodiment, a subprocess of the ice production mode involves supplying water to the ice maker. In one embodiment, this may result in an undesirably loud splashing noise being emitted, which may be perceived as annoying by some users.

[0018] In a further embodiment, a sub-process of the ice production mode can involve the internal relocation of ice-forming elements produced in the ice tray within the ice maker. This is, in particular, a procedure in which ice-forming elements produced in the ice tray are introduced into a storage container of the ice maker. Compared to other operating processes of the ice maker of the household refrigeration appliance, this process is considered to be a very noisy sub-process, resulting in significantly higher external noise emissions compared to other operating processes. This is because the ice-forming elements ejected from the ice tray then fall into the ice maker's storage container, generating corresponding noise.

[0019] This removal of the ice-forming elements from the ice tray into the storage container, which is usually carried out automatically by the ice maker, is therefore unpredictable for a person in the vicinity of the household refrigeration appliance. Therefore, it may be particularly desirable for the user to avoid or definitively rule out such a second operating process during the rest period. Therefore, a person will not be disturbed by such an unpredictable second operating process during the rest period they desire.

[0020] In one embodiment, the household refrigeration appliance can have at least a second operating process. In one embodiment, this second operating process can have a noise emission that is higher than the first operating process. It is possible for this second operating process to be coordinated by the control unit such that it is not carried out during a rest period, in particular, it is deactivated. The second operating process can be a different process from the sub-process of the ice production mode.

[0021] In one embodiment, a temperature value is set in a freezer compartment of the household refrigeration appliance during the rest period that is lower than a target temperature value during basic operation of the household refrigeration appliance, in which no rest period is set. This is another very advantageous embodiment because cooling the freezer compartment in this way to a value below the target temperature value essentially creates a cold buffer in the freezer compartment. This rest period is therefore used to cool the freezer compartment further than would be necessary according to the target temperature value. This results in a temperature buffer for subsequent operation of the freezer compartment, so that during further operation of the household refrigeration appliance, the freezer compartment can be at least partially cooled with an energy expenditure that is lower than that required to maintain the target temperature value.This makes it particularly advantageous to dynamize and increase the flexibility of the household refrigeration appliance's energy management. Any energy not required for cooling the freezer compartment during subsequent operation can then be made available for other operating processes of the household refrigeration appliance.

[0022] In one embodiment, the temperature value is set at least 2 °C lower than the target temperature value. For example, if the target temperature in a freezer compartment is minus 18 °C, the freezer compartment can be set to a temperature value of, for example, minus 20 °C or lower during the rest period. It is also possible for the temperature value in the freezer compartment to be set to, for example, minus 21 °C or minus 22 °C, etc. during the rest period. This allows the size of this temperature buffer in the freezer compartment to be varied very individually.

[0023] In one embodiment, after the end of a rest period, an ice production mode is started with a turbo production level, which differs from the operating production level and in which the production rate is increased compared to the base production level. The ice production mode can be started or activated immediately after the end of the rest period. However, it is also possible for a grace period to exist between the end of the rest period and the start of the ice production mode. This grace period can last several seconds or even several minutes. It is also possible for this grace period to last an hour or longer.

[0024] The advantageous embodiment described above then makes it possible for the turbo production stage to at least partially compensate for the loss of ice production that may have occurred due to the deactivation of the ice production mode during the idle time interval. The turbo production stage can be automatically set or activated by a control unit. However, it is also possible for the turbo production stage to be started individually by the user. This also allows the ice production mode to be carried out after the idle time interval in a very demand-oriented and energy-efficient manner.

[0025] In one embodiment, the duration of the turbo production stage is determined as a function of the duration of the rest period and / or as a function of the time since the rest period ended, and / or as a function of the actual temperature value in the freezer compartment of the household refrigeration appliance at the end of the rest period and / or as a function of at least one actual temperature value in the freezer compartment of the household refrigeration appliance during the execution of the turbo production stage. This allows the turbo production stage to be determined in a highly dynamic and flexible manner. This also makes it possible to achieve a particularly coordinated behavior between energy consumption and the desired ice production. If, for example, it is not necessary or desired that ice be produced as quickly and / or as much as possible after the rest period, the turbo production stage can be omitted entirely or, for example, carried out for a reduced duration.This can be the case, for example, if the ice maker's storage bin is filled with ice above a specific threshold. If the storage bin contains a quantity of ice forming elements that is foreseeably sufficient for one or more future batches, the turbo production stage is not required. However, if, for example, the storage bin's fill level falls below a threshold, the turbo production stage can be started immediately by activating ice production mode after the rest period.

[0026] In one embodiment, the turbo production stage is performed until the current actual temperature of the household refrigeration appliance reaches the target temperature in the freezer compartment. In this embodiment, the coupling with the above-mentioned advantageous embodiment, in which a cold buffer is built up in the freezer compartment during the rest period, is particularly advantageous. This is because, by cooling the freezer compartment significantly further below the target temperature during the rest period, the freezer compartment can be operated with less energy for cooling, particularly in conjunction with the turbo production stage, thereby increasing the temperature in the freezer compartment. The energy released by the reduced cooling can be used for the turbo production stage.However, since in one embodiment the temperature in the freezer compartment should not exceed the target temperature, this energy used to cool the freezer compartment for the turbo production stage is only provided to the turbo production stage until the target temperature in the freezer compartment is reached. This also prevents the freezer compartment from becoming undesirably too warm, which would then require a high energy requirement to cool the freezer compartment from a higher temperature to the target temperature.

[0027] In one embodiment, it is provided that the status of the ice maker is checked whenever a rest period is specified. In one embodiment, it can be checked whether, for example, the ice mold tray is filled with already frozen ice mold elements at the start of the rest period. If this is the case, the frozen ice mold elements can be removed from the ice tray immediately before the start of the rest period, in particular automatically controlled by the control unit. This empties the ice mold tray immediately before the rest period. This means that after the rest period, when an ice production mode is activated again, the freezing of water in the ice mold tray can begin immediately. This also enables highly efficient ice production management. The ice mold elements are not kept in the ice tray for an unnecessarily long time.

[0028] This process is particularly advantageous when defrosting an ice maker-side evaporator can be performed or is to be performed as a second operating process during the idle time interval. In particular, it prevents the ice forming elements in the ice tray from being undesirably partially remelted. This also allows for highly efficient defrosting of the ice maker-side evaporator during the idle time interval without causing undesirable damage to the ice forming elements in the ice tray.

[0029] This also makes it possible for the defrosting process to be carried out for a longer and / or more intensive period without causing any undesirable damage to the ice forming elements in the ice tray.

[0030] In one embodiment, the ice maker can be a melt-out ice maker. In such an embodiment, the ice mold elements in the ice tray are slightly melted by a heater in the ice maker, so that they can be easily removed from the ice tray and placed in the storage container. It is also possible for the removal of finished ice mold elements from the ice tray to be carried out, at least temporarily, at the beginning of the rest period. This also means that if such a removal process of ice mold elements from the ice tray has not yet been completed by the time the rest period begins, in one embodiment this removal process from the ice tray and the placement into the storage container of the ice maker is still completed.It is also possible for such a process of dispensing any finished ice mold elements present in the ice tray to start at the beginning of the rest period. In such an embodiment, a short time interval at the beginning of the rest period is used to remove any finished and frozen ice mold elements from the ice tray and place them in the storage container.

[0031] A further aspect of the invention relates to a household refrigeration appliance with an ice maker. The household refrigeration appliance further comprises at least one control unit. The household refrigeration appliance is designed to carry out a method according to the above-mentioned aspect or an advantageous exemplary embodiment. The household refrigeration appliance has at least one receiving space for food. This can be a freezer compartment or a refrigerator compartment. In particular, the household refrigeration appliance has at least one freezer compartment and at least one refrigerator compartment. The ice maker of the household refrigeration appliance has, in particular, an ice tray into which water can be introduced, which water can be frozen to form ice elements. In one exemplary embodiment, the ice maker has, in addition to the ice tray, a separate storage container. The storage container is provided to receive the ice elements dispensed from the ice tray and to temporarily store them frozen in the ice maker.In one embodiment, the ice maker can have its own evaporator. This is arranged directly adjacent to the ice tray. If the ice maker is a melt-out ice maker, then in one embodiment it has a heater. This heater is arranged and designed such that the ice tray can be heated to simplify removal of the produced frozen ice mold elements from the ice tray. The slight heating causes the ice mold elements in the ice tray to melt slightly, so that they detach from the ice tray and can be easily removed. However, it is also possible for the ice maker to not be a melt-out ice maker in one embodiment. In such an embodiment, the ice tray can be rotated about its longitudinal axis, with a corresponding rotating device being provided for this purpose.By twisting in this way, the ice mold elements produced also detach from the ice tray and can then be easily removed from the ice tray.

[0032] Another aspect of the invention relates to a method for operating a household refrigeration appliance having an ice maker. The ice maker is designed to produce and / or dispense ice in an ice production mode. The method comprises, in particular, the following steps: Providing the household refrigeration appliance with the option of deactivating the ice production mode depending on a user-defined deactivation criterion; Providing at least one first operating process of the household refrigeration appliance, which, when carried out, generates a first noise emission; Providing at least one second operating process of the household refrigeration appliance, which, when carried out, generates a second noise emission that is louder than the first noise emission; Specifying a user-specific idle time interval of the ice maker as a deactivation criterion, wherein the ice production mode is deactivated during the idle time interval; Coordinating the at least second operating process such that, during the idle time interval, the execution of at least the louder second operating process is prevented, in particular at least temporarily.

[0033] The advantages already mentioned above also apply here. Advantageous embodiments of the above-mentioned aspect are to be regarded as advantageous embodiments of the other aspect.

[0034] A second operating process can be an operating process of the ice maker itself. It can be the aforementioned subprocess of the ice production mode. However, it can also be another subprocess of the ice production mode. It is also possible for a second operating process to be an operating process of the household refrigeration appliance that is independent of the ice maker.

[0035] The terms "top", "bottom", "front", "back", "horizontal", "vertical", "depth direction", "width direction", "height direction" indicate the positions and orientations given when the device is used and arranged as intended.

[0036] Further features of the invention emerge from the claims, the figures and the description of the figures. The features and combinations of features mentioned above in the description, as well as the features and combinations of features mentioned below in the description of the figures and / or shown alone in the figures can be used not only in the respective combination specified, but also in other combinations or on their own, without departing from the scope of the invention. Thus, embodiments are to be regarded as encompassed and disclosed by the invention that are not explicitly shown and explained in the figures, but which emerge and can be produced by separate combinations of features from the explained embodiments. Embodiments and combinations of features are also to be regarded as disclosed that therefore do not have all the features of an originally formulated independent claim.

[0037] Embodiments of the invention are explained in more detail below with reference to schematic drawings. They show: Fig. 1 shows a schematic representation of an embodiment of a household refrigeration appliance according to the invention; and Fig. 2 shows a simplified diagram illustrating the timing of an embodiment of a method for operating a household refrigeration appliance.

[0038] In the figures, identical or functionally identical elements are provided with the same reference symbols.

[0039] In Fig. 11 shows a schematic representation of an exemplary embodiment of a household refrigeration appliance 1. The household refrigeration appliance 1 is designed for storing and preserving food. The household refrigeration appliance 1 can be a refrigerator or a freezer or a fridge-freezer combination appliance. The household refrigeration appliance 1 has a housing 2. The housing 2 has an outer housing 3. In addition, the housing 2 has an inner container 4 which is separate from the outer housing 3. The inner container 4 delimits with its walls a receiving space 5 for food in the household refrigeration appliance 1. The receiving space 5 can be a refrigerator compartment, for example. In one exemplary embodiment, the household refrigeration appliance 1 has a further receiving space 6 for food. In the exemplary embodiment, this is in particular a freezer compartment.

[0040] In particular, the household refrigeration appliance 1 has, shown only schematically, at least one refrigeration circuit 7. In one exemplary embodiment, this refrigeration circuit 7 has an evaporator 8 for cooling the freezer compartment 6. The household refrigeration appliance 1 furthermore has a control unit 9. With this control unit 9, at least some operating processes of the household refrigeration appliance 1, in particular all operating processes of the household refrigeration appliance 1, are controlled. The household refrigeration appliance 1 furthermore has a door 10. This is movably arranged on the housing 2. It is provided in particular for closing the receiving space 6. In one exemplary embodiment, the household refrigeration appliance 1 has a further door 11. This is separate and independent of the door 10. The further door 11 is provided for closing the receiving space 5. The household refrigeration appliance 1 furthermore has an ice maker 12.The position and design of the ice maker 12 is merely exemplary and should be understood schematically. The ice maker 12 can also be designed or arranged differently. The ice maker 12 has an ice production mode. With this ice production mode, ice can be produced and / or dispensed. In one embodiment, the ice maker 12 has an ice tray 13. This is intended to hold water. The ice maker 12 is designed to freeze the water introduced into the ice tray 13 so that ice-forming elements, such as ice cubes, are produced. In one embodiment, the ice maker 12 has its own evaporator 14. This is provided and arranged to cool the ice tray 13 so that the water introduced therein freezes into the aforementioned ice-forming elements.The ice maker-side evaporator 14 is arranged at least partially directly adjacent to the ice tray 13 and / or at least partially directly adjacent to the ice tray 13. Furthermore, in one exemplary embodiment, the ice maker 12 has a storage container 15. The frozen ice mold elements removed from the ice tray 13 are introduced into this storage container 15 and temporarily stored in the ice maker 12. The aforementioned components can be arranged in a housing 16 of the ice maker 12.

[0041] In one embodiment, it is also possible for the ice maker 12 to have a heater 17. This heater can be provided for heating the evaporator 14, for example, to defrost it. If the ice maker 12 is designed as a melt-out ice maker, it can have an additional heater, by means of which the ice tray 13 can be slightly heated to slightly melt the produced, frozen ice elements, allowing them to be easily removed from the ice tray 13 and deposited into the storage container 15.

[0042] In one exemplary embodiment, the ice maker 12 is a component of an ice production and dispensing device 18 of the household refrigeration appliance 1. This ice production and dispensing device 18 has a dispensing unit 19. This is arranged, in particular, on the door 11. Thus, in one exemplary embodiment, it can be provided that ice mold elements temporarily stored in the storage container 15 are dispensed to the dispensing unit 19, for example, by means of a screw conveyor. An ejection unit can be formed on the outer side of the door 11 facing away from the receiving space 5, from which the ice mold elements are introduced into a container, such as a glass or the like, which may be provided, in particular when the door 11 is closed.

[0043] The household refrigeration appliance 1 is designed to carry out a method which is explained below using an exemplary embodiment. In particular, this method is carried out with the household refrigeration appliance 1. For this purpose, Fig. 2 a simplified diagram is shown in which the time t is plotted on the horizontal axis and various operating processes P of the household refrigeration appliance 1 are shown on the vertical axis.

[0044] In principle, the household refrigeration appliance 1 is provided or configured with the possibility of deactivating an ice production mode of the ice maker 12 depending on a user-defined deactivation criterion, which is defined individually for the user. Thus, in principle, the individual possibility is created for the household refrigeration appliance 1 for a user to deactivate the ice production mode depending on this deactivation criterion by specifying a deactivation criterion. If such a deactivation criterion is entered, this can be recognized by the control unit 9 in one embodiment, and the associated deactivation of the ice production mode is then controlled, in particular, automatically by the control unit 9. As shown in Fig. 2As can be seen, the representation of the operating processes P is shown on the vertical axis and the top line shows a sequence and / or a respective duration of modes M.

[0045] In one embodiment, the household refrigeration appliance 1 has at least one first operating process which, when carried out, generates a first noise emission to the outside of the household refrigeration appliance 1. In one embodiment, the household refrigeration appliance 1 can be provided with at least one different second operating process which, when carried out, generates a second noise emission to the outside of the household refrigeration appliance 1 that is louder than the first noise emission.

[0046] In particular, the household refrigeration appliance 1 has a basic operation M1. In this basic operation M1, a predetermined sequence of operating processes is carried out, in particular each in a basic setting. In particular, in this basic operation, operating processes are carried out in a predetermined sequence and / or over individually predetermined time intervals. As shown, in this basic operation M1, it is provided that an ice production mode EP is carried out during a time interval T1. The ice production mode EP has sub-processes. A first sub-process can be the supply of water to the ice maker 12. A second sub-process can be the freezing of the water in the ice tray 13. A third sub-process can be the removal of the frozen ice-forming elements from the ice tray 13. A fourth sub-process TEP can be the transfer of these ice-forming elements from the ice tray 13 to the storage container 15.The fourth sub-process, in particular, represents a process that is louder in terms of noise emissions than the others. Thus, the first, second, and third sub-processes can also be examples of first operating processes.

[0047] Furthermore, a first operating process P1 can be carried out in this basic operation M1. This can be carried out, for example, for a time interval T2. In the exemplary embodiment, it is also possible for a further first operating process P1' to be carried out, in particular, for example, for a time interval T3. The first operating process P1 can, for example, be a defrosting of the preferably present evaporator 14 of the ice maker 12. The further first operating process P1' can, for example, be a defrosting process of the evaporator 8. Both the number and the sequence as well as the respective durations of the operating processes presented for the basic operation M1 are to be understood merely as examples.In particular, the ice production mode EP, in particular the sub-process in which ice forming elements are repositioned in the ice maker 12 itself, can also be an exemplary embodiment of a second operating process, if such a process exists or can be carried out. However, other second operating processes P2 of the household refrigeration appliance 1 are also possible in addition to or instead of this. However, the second operating process P2 is louder than the first operating processes P1 and P1' in terms of noise emissions to the outside of the household refrigeration appliance 1.

[0048] In one embodiment, at least one user-specific predefined rest time interval R can be specified, in which the ice production mode EP of the ice maker 12 is controlled by the control unit 9, in particular at least temporarily deactivated. Fig. 2In this context, the rest period interval R is illustrated in an example. For example, starting from a starting time t0, at which an entire process scenario is considered, the rest period interval R can be started at a time t1. Thus, the user desires and specifies a rest period interval R that starts at time t1 and, in particular, ends at a time t2.

[0049] Depending on this rest period R, in one exemplary embodiment, the at least second operating process P2 is coordinated such that, in this rest period R, i.e., in the time interval between t1 and t2, the execution of at least one noisy second operating process is prevented. In particular, in the exemplary embodiment, the ice production mode EP is deactivated during the duration of the rest period R, controlled by the control unit 9.

[0050] In another exemplary embodiment, a user-specific idle time interval R of the ice maker 12 is specified as a deactivation criterion, wherein at least one sub-process TEP of the ice production mode EP is at least partially, in particular completely, deactivated during the idle time interval R. In the exemplary embodiment, the operation of the household refrigeration appliance 1 is coordinated such that the first operating process P1, P1' is carried out at least temporarily during the idle time interval R.

[0051] This results in a modified operation M2 compared to the basic operation M1. In this operation, the operating processes are rearranged compared to the basic operation M1.

[0052] In the exemplary embodiment shown, this means that it is preferably checked in which order, predefined as the basic setting, and / or at which time intervals, predefined as the basic setting, the first operating process P1 and / or the further first operating process P1', and / or the second operating process P2 and / or the sub-process TEP are carried out or are intended to be carried out in the basic mode M1 of the household refrigeration appliance 1, in which no rest time interval R is predefined. In the exemplary embodiment shown, this would mean that the ice production process EP, in particular the sub-process TEP, would be carried out in the basic mode M1 at least temporarily during the rest time interval R. Due to this constellation, however, here the ice production mode EP, in particular the sub-process TEP, as shown by the time profile EP' in the diagram in Fig. 2shown, at least prevented. It is provided here that the sub-process TEP of the ice production mode EP is not activated or remains activated at time t1. If the ice production mode EP is activated at this time t1, as shown in Fig. 2 As shown by way of example, it is deactivated at time t1. This deactivation of at least the sub-process TEP of the ice production mode EP lasts until time t2, according to the temporal representation with the progression EP'.

[0053] In one exemplary embodiment, it is preferably provided that when coordinating the operating processes, the first operating processes P1 and P1' presented here as examples are re-sorted. This means that during this coordination, the first operating processes P1 and P1', which take place later in basic operation M1, are brought forward. This is indicated by the arrows. It is provided here that the first operating process P1 and also the further first operating process P1' are coordinated such that they are carried out at least temporarily during the rest time interval R. In one exemplary embodiment, the control unit 9 can check how long the first operating process P1 and / or how long the further first operating process P1' lasts. In one exemplary embodiment, this can be compared with the duration of the rest time interval R.Depending on this, a decision can then be made as to which of the first operating processes P1 and / or P1' is to be carried out, and / or in which order these first operating processes P1 and P1' are to be carried out, if applicable, and / or over which respective time duration the first operating processes P1 and P1' are to be carried out. In the present exemplary embodiment, which is by no means to be understood as exhaustive, the rest time interval R is longer than the summed time durations T2 and T3. Therefore, it can be provided, for example, that both first operating processes P1 and P1' are brought forward in the operating process coordination and thus shifted forward in time and both can be carried out completely within the rest time interval R. In particular, they can be carried out here in the order specified by the basic operation M1.

[0054] Thus, in one exemplary embodiment, the execution of the first operating processes P1 and P1' according to the specified basic operation M1, i.e., even later after the rest period R, can also be omitted if necessary, in particular at the times at which they would be specified according to the basic operation M1. However, it is also possible, which may depend on the duration of the rest period R and in particular also on the time t1 and / or the time t2, that the operating processes P1 and P1' are additionally started and executed even after the end of the rest period R at the times respectively provided by the basic operation M1.In such an embodiment, the first operating processes P1 and P1' are not deleted without replacement from the basic operation M1 or moved forward in time and then no longer carried out at the time specified in the basic operation M1, but in this embodiment they can then also be carried out at least temporarily during the rest time interval R. The execution of the operating processes P1 and P1' specified by the basic operation M1 at the respectively specified times in the basic operation M1 can then also take place additionally.

[0055] In particular, by coordinating at least a first operating process P1 and P1' is carried out at least temporarily during the rest time interval R.

[0056] Depending on the information of the basic operation M1 and the rest time interval R, in one embodiment it is checked, in particular by the control unit 9, whether the sequence and / or the time intervals of the operating processes, in particular of the first operating processes P1 and P1', are changed in such a way that the execution of at least one louder second operating process, here at least the ice production process EP, is prevented in the rest time interval R.

[0057] It is also possible in one embodiment that after the end of the rest time interval R, i.e. at time t2 or after time t2, a changed sequence of the operating processes or a changed duration of at least one operating process is changed back to the sequence and / or duration of the operating processes specified in the basic operation M1.

[0058] As can be seen from the illustration in Fig. 2According to one embodiment, during the rest period R in the freezer compartment formed by the receiving space 6, a temperature value is set which is lower than a target temperature value in the basic operation M1 of the household refrigeration appliance 1, in which no rest period R is set. For example, this temperature value can be set at least 2 °C lower than the target temperature value. For this purpose, in the embodiment according to Fig. 2For example, at a time t3, an additional cooling operation Z is started. If, for example, the target temperature value in the freezer compartment is reached before time t2, for example already at a time t4, this additional cooling operation Z is terminated again at time t4. In particular, however, it is provided that this target temperature value, which is set at least 2 °C lower than the setpoint temperature value, is maintained at least until time t2, at which the rest period R ends. If necessary, it can be provided that the additional cooling operation Z remains activated until time t2.

[0059] Due to this additional cooling operation Z, at the end of the rest time interval R at time t2, the temperature in the freezer compartment is lower than the target temperature.

[0060] In one embodiment, it is possible that an ice production mode EP is reactivated after the end of the rest period R. This can be the case immediately at time t2, at which the rest period R ends. However, it is also possible that the activation of the ice production mode EP is delayed to time t2. In the Fig. 2 In the exemplary embodiment shown, the ice production mode EP is reactivated according to the time profile EP' at time t2. In one exemplary embodiment, it can be provided that the ice production mode EP is not started and carried out with a basic production level, but with a different turbo production level T. In the turbo production level, the production rate of ice is increased compared to the basic production level. In order to achieve this turbo production level T, as shown in the diagram in Fig. 2is symbolized, this ice production rate is then increased compared to the base production stage, for example up to a time t5. This is particularly advantageous in that the energy requirement is increased in the time interval in which the turbo production stage T is carried out, i.e. here between the time t2 and t5. It can be provided that the cooling of this holding space 6 during the turbo production stage T is reduced by the cold buffer (temperature value lower than the target temperature value) that was built up in the holding space 6 during the rest time interval R, so that a temperature increase occurs in the holding space 6 from the set lower temperature value to the higher target temperature value. In particular, the turbo production stage T is carried out at most until a current actual temperature value in the holding space 6, i.e. the freezer compartment, has reached the target temperature value.In the exemplary embodiment, this can be at time t5. List of reference symbols

[0061] 1 Household refrigeration appliance 2 Housing 3 Outer casing 4 Inner container 5 Storage compartment 6 Freezer compartment 7 Refrigeration circuit 8 Evaporator 9 Control unit 10 Door 11 Door 12 Ice maker 13 Ice tray 14 Evaporator 15 Storage container 16 Housing 17 Heater 18 Ice production and dispensing device 19 Dispensing unit

Claims

1. A method for operating a household refrigeration appliance (1) having an ice maker (12) which produces and / or dispenses ice in an ice production mode (EP), comprising the following steps: - providing the household refrigeration appliance (1) with the option of at least partially deactivating at least one sub-process (TEP) of the ice production mode (EP) depending on a user-defined deactivation criterion; - providing at least one first operating process (P1, P1') of the household refrigeration appliance (1) which, when carried out, generates a first noise emission which is lower than that of the sub-process; - specifying a user-specific idle time interval (R) of the ice maker (12) as a deactivation criterion, wherein at least one sub-process (TEP) of the ice production mode (EP) is at least partially deactivated during the idle time interval (R);- coordinating the operation of the household refrigeration appliance (1) such that the first operating process (P1, P1') is carried out at least temporarily during the rest time interval (R); 2. The method according to claim 1, wherein the sub-process (TEP) is completely deactivated during the rest time interval (R).

3. Method according to claim 1 or 2, wherein during the coordination it is checked in which order predefined as a basic setting and / or at which time intervals predefined as a basic setting the first operating process (P1, P1') and / or the sub-process (TEP) are carried out or are intended to be carried out in a basic operation (M1) of the household refrigeration appliance (1), in which no rest time interval (R) is predefined.

4. The method according to claim 3, wherein, depending on the information of the basic operation (M1) and the rest time interval (R), it is checked whether the sequence and / or the time intervals are changed in such a way that the execution of at least this noisier sub-process (TEP) is prevented in the rest time interval (R).

5. Method according to claim 3 or 4, wherein after the end of the rest time interval (R), a sequence and / or a changed duration of at least one operating process (P1, P1', TEP) which may have been changed during coordination is changed back to the sequence and / or duration of the operating process (P1, P1', TEP) specified during a basic operation (M1).

6. Method according to one of the preceding claims, wherein defrosting of the evaporator (8) of a freezer compartment (6) of the household refrigeration appliance (1) is carried out as the first operating process (P1') and / or defrosting of the ice maker (12), in particular an ice maker-side evaporator (14), is carried out as the first operating process (P1).

7. Method according to one of the preceding claims, wherein a supply of water to the ice maker (12) and / or an internal relocation of produced ice forming elements in the ice maker (12) is carried out as a sub-process (TEP).

8. Method according to one of the preceding claims, wherein in the rest time interval (R) in a freezer compartment (6) of the household refrigeration appliance (1) a temperature value is set which is lower than a target temperature value in a basic operation (M1) of the household refrigeration appliance (1), in which no rest time interval (R) is set.

9. The method according to claim 8, wherein the temperature value is set at least 2°C lower than the target temperature value.

10. Method according to one of the preceding claims, wherein after the end of a rest time interval (R) an ice production mode (EP) is started with a turbo production stage (T) which is different from a basic production stage and in which the production rate of ice is increased compared to the basic production stage.

11. The method according to claim 10, wherein the duration of the turbo production stage (T) is determined as a function of the duration of the rest time interval (R) and / or as a function of the time since the rest time interval (R) has ended, and / or as a function of the actual temperature value in the freezer compartment (6) of the household refrigeration appliance (1) at the end of the rest time interval (R) and / or as a function of at least one actual temperature value in the freezer compartment (6) of the household refrigeration appliance (1) during the execution of the turbo production stage (T).

12. Method according to claim 10 or 11, wherein the turbo production stage (T) is carried out at most until a current actual temperature value in the freezer compartment (6) of the household refrigeration appliance (1) has reached the target temperature value in the freezer compartment (6).

13. Method according to one of the preceding claims, wherein immediately before the start of the rest time interval (R) and / or immediately with the start of the rest time interval (R), ice forming elements are introduced from an ice tray (13), if present therein, of the ice maker (12), into a storage container (15) of the ice maker (12).

14. Household refrigeration appliance (1) with an ice maker (12) and with a control unit (9), wherein the household refrigeration appliance (1) is designed to carry out a method according to one of the preceding claims.

15. Household refrigeration appliance (1) according to claim 13, wherein the ice maker (12) has an evaporator (14) which is arranged immediately adjacent to an ice tray (13) of the ice maker (12) and is provided for directly cooling the ice tray (12).

Citation Information

Patent Citations

  • Refrigerator and / or freezer

    DE102011121226A1

  • Controlling method and device for electric refrigerator

    JP1999030468A

  • Refrigerator

    JP2003322451A

  • Refrigerator and control method thereof

    US20100114378A1