Flat roof drainage method

The flat roof drainage method addresses leakage and maintenance issues by using grooves and conducting elements to manage water flow, eliminating the need for a slope making layer and reducing costs, thus enhancing the service life and reducing maintenance for flat roofs.

GB2603986BInactive Publication Date: 2024-11-20HAINAN SEQUOIA CREATION
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
GB2021012841
Authority / Receiving Office
GB · GB
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-08-27
Filing Date
2021-03-08
Publication Date
2024-11-20
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Flat roofs experience leakage and high maintenance costs due to poor drainage, especially with lightweight aggregate concrete slopes that are prone to water accumulation and damage, and integrated roof systems where dust and dirt affect the heat insulation and waterproof coatings.

Method used

A flat roof drainage method involving the creation of grooves in water accumulation areas communicating with drainage ports and the use of conducting elements like U-shaped groove pipes or PVC pipes, which are easily adjustable and easy to clean, to facilitate smooth water flow and reduce the need for a slope making layer.

Benefits of technology

This method effectively reduces roof leakage risk, prolongs the service life of the roof, and significantly decreases maintenance and construction costs by allowing for direct installation on a plastering and leveling layer or cast-in-place concrete, while maintaining the integrity of exposed, waterproof, and heat insulation integrated systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000001_0000
    Figure 00000001_0000
  • Figure 00000002_0000
    Figure 00000002_0000
Patent Text Reader

Abstract

A flat roof water drainage method comprising: step S1, providing, in a water accumulation region of a roof, at least one recess communicating with a water drainage port; step S2, providing, in the recess, a drainage member for draining accumulated water; and step S3, adjusting a water drainage slope of the drainage member. If this method is applied to a new roof system, then a slope making layer of the new roof system can be eliminated, and smooth water drainage can be achieved by means of providing a drainage member and adjusting a water drainage slope of the drainage member. In addition, eliminating the slope making layer greatly reduces construction costs of a roofing project. If this method is applied to an existing roof system, then the issue in which water drainage of a roof region having accumulated water is not smooth can be resolved, maintenance difficulty and maintenance costs of the roof system can be greatly reduced, and the risk of roof leakage can be reduced. If this method is applied to an exposed waterproof and heat insulation integrated lightweight roof system, then the service life of the lightweight roof system can be extended, and maintenance costs can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application claims priority of Chinese Patent Application No. 202010878605.6, titled "FLAT ROOF DRAINAGE METHOD”, filed with the China National Intellectual Property Administration on August 27, 2020, which is incorporated herein by reference in its entirety. TECHNICAL FIELD

[0002] Tlie present application relates to the technical field of drainage of flat roofs, and in particular to a flat roof drainage method. BACKGROUND

[0003] At present, leakage is a serious problem in a building roof, and a key link in roof waterproofing treatment is to ensure smooth drainage. Referring to Figure 1, a slope making layer 01 of a flat roof refers to a certain gentle slope built according to a designed drainage direction, which collects water into a roof drainage ditch commonly known as "gutter" or "eave gutter", and the water is finally discharged through the drainage port, to dredge rainwater from the roof to a rainwater drainage system of a building and city.

[0004] According to requirement of the building code, a slope of the slope making layer 01 of a roof building ranges from 1.5 to 5 degrees, and a thickness of the thinnest part of the slope making layer 01 is 50mm. The slope making layer 01 should be made of lightweight aggregate concrete with a strength grade of not less than LC15, or fine stone concrete with a strength grade not less than C20, or cement mortar with a strength grade not less than Ml5. The slope making layer 01 generally adopts light construction materials, such as ceramsite and foamed concrete block to perform setting, to reduce a roof load. However, light construction materials all have strong hydrophilicity. Once a roof waterproof layer is damaged, the entire slope making layer 01 may be fill ed with water, a roof aquifer is formed, which may cause continuous leakage of the roof. In addition, an average thickness of the slope making layer ranges from 60mm to 120mm, the roof load is relatively large, and the construction cost is relatively high, therefore, cancellation of the slope making layer may not only save the construction cost, but also reduce the hidden danger of roof leakage.

[0005] In an existing building roof maintenance project, since water is accumulated in local areas of the roof, the following process is generally adopted, in which the slope making layer is reset, and a leveling layer, a waterproof layer and a protective layer are respectively set, which may not only increase load of a roof mechanism and bring hidden safety danger to the building structure, but also greatly increase the construction cost.

[0006] In an exposed, waterproof and heat insulation integrated light roof system that adopts waterproof coating and heat insulation coating as the main materials, a roof drainage ditch is a first part to be damaged. Due to the dust and dirt deposited in the drainage ditch, which may harden and crack after being dried out, the heat insulation coating may delaminate. After the heat insulation coating is damaged, the waterproof coating may be easily aged, which may affect the service life of the exposed, waterproof and heat insulation integrated roof system.

[0007] In summary, a technical issue to be addressed presently by those skilled in the art is to provide a flat roof drainage method for effectively reducing roof leakage risk and roof maintenance cost, and prolonging roof service life. SUMMARY

[0008] In view of this, an object of the present application is to provide a flat roof drainage method, so as to effectively solve the problem of poor drainage of a roof system, to reduce roof maintenance cost and to prolong the service life of the roof.

[0009] In order to achieve the above objects, the following technical solutions are provided according to the present application.

[0010] A flat roof drainage method includes: step SI, providing at least one groove in a water accumulation area of a roof for communicating with a drainage port, step S2, providing a conducting element in the groove for dredging accumulated water; step S3, adjusting a drainage slope of the conducting el ement.

[0011] Preferably, the number of the groove is greater than or equal to one; if multiple grooves are provided, the multiple grooves are in grid communication, and an accumulation water outlet of each of the multiple grooves is communicated with a drainage port.

[0012] Preferably, the conducting element is a U-shaped groove pipe or a PVC pipe that has been cut open, which matches a size of the grooves, a port of the conducting element is flush with a horizontal plane of the roof.

[0013] Preferably, the U-shaped groove pipe is a metal piece, a plastic piece or a ceramic piece, and the PVC pipe is a conventional construction PVC drainage pipe.

[0014] Preferably, the bottom of an arc groove of the PVC pipe and the bottom of a U-shaped groove of the U-shaped groove pipe are both higher than an outfall port of the roof.

[0015] Preferably, that adjusting a drainage slope of the conducting element includes adjusting the drainage slope of the conducting element by a mortar uplift-paving process.

[0016] Preferably, a mortar used in the mortar uplift-paving process is a cement mortar or a waterproof mortar.

[0017] Compared with the conventional art, in case that the flat roof drainage method provided by the present application is adopted in a newly built roof system, the slope making layer of the newly built roof sy stem may be directly removed. The conducting element may be provided on a plastering and leveling layer or a groove may be prefabricated in a cast-in-place concrete floor slab. In addition, a smooth drainage may be realized by adjusting the drainage slope of the conducting element, thereby effectively prolonging the service life of the roof. In addition, cancellation of the slope making layer may greatly reduce the construction cost of a roofing project.

[0018] In case that the method is adopted in an existing roof system for solving poor drainage problem, there is no need to reset the roof slope making layer. The groove for communicating with a drainage port is provided in the water accumulation area of the roof, and the conducting element is then provided inside the groove. In addition, the drainage slope of the conducting element is adjusted according to actual drainage requirement, so that poor drainage problem of the roof system is effectively solved, service life of the roof is further effectively prolonged, which may effectively reduce maintenance difficulty and maintenance cost of the roof.

[0019] In case that the method is adopted in an exposed, waterproof and heat insulation integrated light roof system, dust and dirt on a surface of the light roof system may accumulated, with rainwater, in a U-shaped groove pipe or a cut-open PVC pipe provided inside the groove, which is easy to clean and may not leak, so that service life of the light roof system may be prolonged, and maintenance cost may be reduced.

[0020] In summary, by adopting the flat roof drainage method provided by the present application, problem of poor drainage of the roof system may be effectively solved, the roof maintenance cost may be reduced, and the roof service life may be prolonged. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] For more clearly illustrating embodiments of the present disclosure or the technical 10 solutions in the conventional technology, drawings referred to for describing the embodiments or the conventional technology will be briefly described hereinafter. Apparently, drawings in the following description are only examples of the present disclosure, and for the person skilled in the art, other drawings may be obtained based on the provided drawings without any creative efforts. 15

[0022] Figure 1 is a schematic structural view of a traditional roof system in the conventional art;

[0023] Figure 2 is a schematic flow chart of a flat roof drainage method provided according to the present application.

[0024] Reference numerals in Figures 1 to 2 are listed as follows: 20   01 -slope making layer, 02-plastering and leveling layer. DETAILED DESCRIPTION OF THIS EMBODIMENTS

[0025] The technical solutions according to the embodiments of the present application will be described clearly and completely as follows in conjunction with the drawings in the 25 embodiments of the present application. It is apparent that the described embodiments are only a part of the embodiments according to the present application, rather than all of the embodiments. Based on the embodiments of the present application, all other embodiments obtained without creative efforts by those of ordinary skill in the art shall fall within the protection scope of the present application.

[0026] A core of the present application is to provide a flat roof drainage method, which may effectively solve problem of poor drainage of a roof system, reduce the roof maintenance cost and prolong the service life of a roof.

[0027] Reference is made to Figure 1 and Figure 2, and Figure 1 is a schematic structural 5 view of a traditional roof system in the conventional art, Figure 2 is a schematic flow chart of a flat roof drainage method provided according to the present application.

[0028] A flat roof drainage method is provided according to the specific embodiment, which includes: step SI, providing at least one groove in a water accumulation area of a roof for communicating with a drainage port; step S2, providing a conducting element in the groove 10 for dredging accumulated water; step S3, adjusting a drainage slope of the conducting element.

[0029] It should be noted that the flat roof drainage method provided by the present application is applicable to a newly built roof system and an existing roof system. In case that a drainage system is set up by using the method, there is no need to set the slope making layer 15   01 on the roof. Moreover, providing a groove herein means that more than one groove is provided in a water accumulation area of the roof according to a direction of the drainage port and a height of an the outfall port. Therefore, position, width and depth of the groove need to be set according to drainage requirement of the roof.

[0030] It should further be noted that, since the conducting element is arranged inside the 20 groove, size and shape of the conducting element need to be matched with a size and shape of the groove. That adjusting a drainage gradient of the conducting element may refer to lift the bottom of the conducting element to tilt the conducting element, thereby changing the drainage gradient of the conducting element, and a specific drainage gradient of the conducting element may be determined according to actual drainage requirement. 25

[0031] In an actual application process, shape, structure, position and sealing method for seam of the groove and conducting element may be determined according to actual situation and actual requirement.

[0032] Compared with the conventional art, in case that the flat roof drainage method provided by the present application is adopted in a newly built roof system, a slope making 30 layer 01 of the newly built roof system may be directly removed. A conducting element may be provided on a plastering and leveling layer 02 or a groove may be prefabricated in a cast-in-place concrete floor slab. In addition, a smooth drainage may be realized by adjusting the drainage slope of the conducting element, thereby effectively prolonging the sendee life of the roof. In addition, removing the slope making layer 01 may greatly reduce the construction cost of a roofing project.

[0033] In case that the method is adopted in an existing roof system for solving poor drainage problem, there is no need to reset the roof slope making layer 01. A groove for communicating with a drainage port is provided in a water accumulation area of a roof, and a conducting element is then provided inside the groove. In addition, the drainage slope of the conducting element is adjusted according to actual drainage requirement, so that poor drainage problem of the roof system is effectively solved, service life of the roof is further effectively prolonged, which may effectively reduce maintenance difficulty and maintenance cost of the roof.

[0034] In case that the method is adopted in an exposed, waterproof and heat insulation integrated light roof system, dust and dirt on a surface of the light roof system may accumulated, with rainwater, in a U-shaped groove pipe or a cut-open PVC pipe provided inside the groove, which is easy to clean and may not leak, so that service life of the light roof system may be prolonged, and maintenance cost may be reduced .

[0035] In summary, by adopting the flat roof drainage method provided by the present application, problem of poor drainage of the roof system may be effectively solved, the roof maintenance cost may be reduced, and the roof service life may be prolonged.

[0036] On the basis of the above embodiment, preferably, the number of the groove is greater than or equal to one; multiple grooves are in grid communication, and an accumulation water outlet of each of the grooves is communicated with a drainage port.

[0037] It should be noted that providing grooves in the water accumulation area of the roof may refer to remove the slope making layer 01 that has suffered serious leakage, and reset grooves for communicating with the drainage port on the roof. The number of grooves is greater than or equal to two, the grooves are in grid communication to facilitate rainwater to flow. Finally, the rainwater conducted by the conducting elements in the grooves may be circulated and collected, and flow from the accumulation water outlet to the drainage port, and the accumulated water is finally effectively drained.

[0038] Preferably, the conducting element is a U-shaped groove pipe or a PVC pipe that has been cut open, which matches a size of the groove; a port of the conducting element is flush with a horizontal plane of the roof. Therefore, these U-shaped groove pipes or cut-open PVC pipes may form a roof drainage gutter for performing organized drainage operation. 5

[0039] In this embodiment, U-shaped groove pipes or cut-open PVC pipes, whose slopes are adjustable, are installed in grooves in grid communication on the roof, and these U-shaped groove pipes or cut-open PVC pipes that are connected to each other are configured to perform organized drainage, which may finally effectively solve the problem of poor drainage of the roof. 10

[0040] In an actual application process, shape, size, quantity and position of the U-shaped groove pipes or cut-open PVC pipes may be determined according to actual situation and actual requirement.

[0041] Preferably, each of the U-shaped groove pipes is a metal piece, a plastic piece or a ceramic piece, and the PVC pipe is a conventional construction PVC drainage pipe. 15

[0042] It should be noted that the U-shaped groove pipe may be processed from stainless steel pipe, plastic, ceramic or other metal materials. Each of the PVC pipes is a conventional construction PVC drainage pipe, since these pipes are low in cost, easy to make from materials, and have good weather resistance and simple splicing process, the surface is easy to clean, and leakage is not easy to occur, which may effectively reduce the maintenance cost of 20 the roof system and increase the service life of the roof system.

[0043] Preferably, the bottom of an arc groove of the PVC pipe and the bottom of a U-shaped groove of the U-shaped groove pipe are both higher than the outfall port of the roof, which ensures that water flow conducted by the PVC pipes and the U-shaped groove pipes may smoothly flow to the top of the outfall port and be discharged from the outfall port 25 smoothly.

[0044] On the basis of the above embodiment, preferably, adjusting a drainage slope of the conducting element includes adjusting the drainage slope of the conducting element by a mortar uplift-paving process.

[0045] In this embodiment, the U-shaped groove pipe or cut-open PVC pipe may be 30 installed in the groove by adopting the mortar uplift-paving process, and the drainage slope of the PVC pipe or U-shaped groove pipe may be adjusted by the mortar uplift-paving process, so that water flow inside the PVC pipe or U-shaped groove pipe may be gathered to the drainage port of the roof.

[0046] Preferably, a mortar used in the mortar uplift-paving process is a cement mortar or a 5 waterproof mortar.

[0047] It should be noted that, in order to improve the waterproof effect of the roof system, waterproof mortar may be preferably chosen to perform the mortar uplift-paving operation on the conducting element.

[0048] In order to further illustrate the flat roof drainage method provided by the present 10 application, examples are given as follows.

[0049] In case that the method is adopted in an existing roof system for solving poor drainage problem, more than one groove may be provided in a water accumulation area of the roof according to a direction of the drainage port and a height of the outfall port, in which the position, width and depth of the grooves are determined according to drainage requirement of 15 the roof. U-shaped groove pipes or cut-open PVC pipes may installed inside the grooves, and ports of these U-shaped groove pipes or cut-open PVC pipes may be ensured to be flush with a horizontal surface of the roof to form a new roof drainage gutter for performing organized drainage operation, and the installation of the U-shaped groove pipes or cut-open PVC pipes may be performed by adopting the mortar uplift-paving process. Finally, the drainage slope of 20 the PVC pipes or U-shaped groove pipes may be adjusted by the mortar uplift-paving process, so that water flow7 inside the PVC pipes or U-shaped groove pipes may be gathered to the drainage port of the roof. With the above arrangement, a drainage setting of the roof system is finished. By adopting the method, poor drainage problem of the roof system is effectively solved, service life of the roof is effectively prolonged, which may effectively reduce 25 maintenance difficulty and maintenance cost of the roof.

[0050] In case that the flat roof drainage method provided by the present application is adopted in a newly built roof system, the slope making layer 01 of the newly built roof system may be directly removed. A conducting element may be provided on the plastering and leveling layer 02 or a groove may be prefabricated in a cast-in-place concrete floor slab. In 30 addition, a smooth drainage may be realized by adjusting the drainage slope of the conducting element, thereby effectively prolonging the service life of the roof. In addition, removing the - 8 - slope making layer 01 may greatly reduce the construction cost of a roofing project .

[0051] Therefore, the flat roof drainage method provided by the present application can solve problems of easy aging and easy leakage of a roof gutter, and problem of easy pollution and failure of an exposed, waterproof and heat insulation integrated light roof system. For a 5 newly built roof system, the slope making layer 01 structure is removed, thereby greatly reducing the construction cost of a roof project. As for an existing roof system, the method can effectively solve the problem of poor roof drainage, reduce the maintenance difficulty and maintenance cost of the roof, and reduce the risk of roof leakage. Moreover, in case that the method is adopted in the exposed, waterproof and heat insulation integrated light roof system, 10 service life of the light roof system may be prolonged, and maintenance cost may be reduced. In addition, it should be noted that the "bottom" and other terms that instruct orientation or positional relationship in the present application, is based on the orientation or positional relationship shown in the figures, which is only for simplifying the description and ease of understanding, rather than indicating or implying that the specified device or element must 15 have a specific orientation and be constructed and operated in a specific orientation, therefore cannot be understood as a limitation of the present application.

[0052] The embodiments in the description are described in a progressive manner. Each of the embodiments mainly focuses on its differences from other embodiments, and reference may be made among these embodiments with respect to the same or similar parts. Any 20 combination of all embodiments provided according to the present application is within the protection scope of the present appl ication, and will not be repeated here.

[0053] The principle and the embodiments of the present application are illustrated herein by specific examples. The above description of examples is only intended to facilitate the understanding of the method and spirit of the present application. It should be noted that for 25 those of ordinary skill in the art, various improvements and modifications may be made to the present application without departing from the spirit or scope of the present application, and these improvements and modifications fall within the protection scope of claims of the present application.

Claims

1. Aflat roof drainage method, comprising:step SI, providing at least one groove in a water accumulation area of a roof for communicating with a drainage port;step S2, providing a conducting element for dredging accumulated water in the groove;step S3, adjusting a drainage slope of the conducting element.

2. The flat roof drainage method according to claim 1, wherein a number of the groove is greater than or equal to one; if a plurality of grooves is provided, the plurality of grooves is in grid communication, and an accumulation water outlet of each of the plurality of grooves is communicated with a drainage port.

3. The flat roof drainage method according to claim 1, wherein the conducting element is a U-shaped groove pipe or a PVC pipe that has been cut open, which matches a size of the groove; a port of the conducting element is flush with a horizontal plane of the roof.

4. The flat roof drainage method according to claim 3, wherein the U-shaped groove pipe is a metal piece, a plastic piece or a ceramic piece, and the PVC pipe is a conventional construction PVC drainage pipe.

5. The flat roof drainage method according to claim 3, wherein a bottom of an arc groove of the PVC pipe and a bottom of a U-shaped groove of the U-shaped groove pipe are both higher than an outfall port of the roof.

6. The flat roof drainage method according to any one of claims 1 to 5, wherein that adjusting a drainage slope of the conducting element comprises adjusting the drainage slope of the conducting element by a mortar uplift-paving process.

7. The flat roof drainage method according to claim 6, wherein a mortar used in the mortar uplift-paving process is a cement mortar or a waterproof mortar.

Citation Information

Patent Citations

  • Method for reducing roof leakage

    CN104164936A

  • Flat roof water draining method

    CN111851877A

  • Frame girder drainage structure

    CN202248581U

  • Slope escape canal system for roof drainage

    CN205134781U

  • Roof drainage structure