Information processing device, information processing method, information processing program, and distributed control system

JP2024132666AActive Publication Date: 2024-10-01YOKOGAWA ELECTRIC CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023043524
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-17
Publication Date
2024-10-01
Estimated Expiration
2043-03-17

AI Technical Summary

Benefits of technology

【0012】 一実施形態によれば、DCSの制御ノードが過負荷になることを抑止することができる。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024132666000001_ABST
    Figure 2024132666000001_ABST
Patent Text Reader

Abstract

To suppress that a control node of a DCS becomes an overload.SOLUTION: A management server 30 of an embodiment includes: a calculation part 332; and a notification part 333. The calculation part 332 calculates loads of a plurality of control nodes 10 on the basis of information indicating a situation of data access to each of the plurality of control nodes 10. The notification part 333 performs a notification in the case where the load of any one of the plurality of control nodes 10 exceeds a threshold value.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an information processing device, an information processing method, an information processing program, and a distributed control system. [Background technology]

[0002] 2. Description of the Related Art Conventionally, a distributed control system (DCS) has been known in which a plurality of control nodes connected to one another via a network controls a plant (see, for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Special Publication No. 2017-511024 Summary of the Invention [Problem to be solved by the invention]

[0004] However, conventional DCSs have a problem in that they may not be able to prevent the control node from becoming overloaded.

[0005] When OPC-UA is used for communication between control nodes, queries are made to a Global Discovery Server (GDS). For example, queries to a GDS are made for the purpose of authentication between control nodes and for the purpose of finding out which control nodes have data that an HMI (Human Machine Interface) server wants to access.

[0006] While a query to the GDS is made only once, due to the nature of process control, control nodes constantly access data, placing the same load on them. Data access includes obtaining monitoring data by the HMI server, obtaining process node data by the control node, and communication between control nodes.

[0007] One aspect aims to prevent the DCS control node from becoming overloaded. [Means for solving the problem]

[0008] An information processing device according to one aspect is characterized in having a calculation unit that calculates the load of each of a plurality of control nodes based on information indicating the status of data access to each of the plurality of control nodes, and a notification unit that issues a notification when the load of any of the plurality of control nodes exceeds a threshold value.

[0009] An information processing method according to one aspect is characterized in that a computer calculates the load on each of a plurality of control nodes based on information indicating the status of data access to each of the plurality of control nodes, and executes a process of sending a notification when the load on any of the plurality of control nodes exceeds a threshold value.

[0010] An information processing program according to one aspect is characterized in that it calculates the load on each of a plurality of control nodes based on information indicating the data access status for each of the plurality of control nodes, and causes a computer to execute a process of sending a notification when the load on any of the plurality of control nodes exceeds a threshold value.

[0011] One aspect of the distributed control system is a distributed control system having a management server that notifies the data access destination in response to an inquiry, a plurality of control nodes, and a monitoring server, wherein the plurality of control nodes make inquiries to the management server and access data with each other in response to the notification from the management server, the monitoring server makes inquiries to the management server and accesses data with any of the plurality of control nodes in response to the notification from the management server, and the management server has a calculation unit that calculates the load on each of the plurality of control nodes based on information indicating the data access status for each of the plurality of control nodes, and a notification unit that issues a notification when the load on any of the plurality of control nodes exceeds a threshold value. Effect of the Invention

[0012] According to one embodiment, it is possible to prevent the control node of the DCS from becoming overloaded. [Brief description of the drawings]

[0013] [Figure 1] 1 is a diagram illustrating an example of a configuration of a distributed control system according to a first embodiment. [Diagram 2] FIG. 2 is a diagram illustrating an example of the configuration of a management server according to the first embodiment. [Diagram 3] FIG. 11 is a diagram illustrating an example of task information. [Figure 4] FIG. 13 illustrates an example of data access. [Diagram 5] FIG. 13 illustrates an example of data access. [Figure 6] 13 is a flowchart showing a processing flow of a management server. [Figure 7] FIG. 2 is a diagram illustrating an example of a hardware configuration. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Hereinafter, embodiments of the information processing device, information processing method, information processing program, and distributed control system disclosed in the present application will be described in detail with reference to the drawings. Note that the present invention is not limited to the embodiments described here. Also, the same elements are given the same reference numerals, and duplicated descriptions are omitted as appropriate. Also, each embodiment can be appropriately combined within a range that does not cause contradictions. Also, the management server is an example of an information processing device.

[0015] The configuration of a distributed control system according to the first embodiment will be described with reference to Fig. 1. Fig. 1 is a diagram showing an example of the configuration of a distributed control system according to the first embodiment.

[0016] As shown in FIG. 1, the distributed control system 1 includes a control node 10a, a control node 10b, a control node 10, a field device 21a, a field device 22a, a management server 30, an HMI client 40, and an HMI server 50.

[0017] In the following description, each control node may be referred to without distinction as a control node 10. Also, in the following description, each field device may be referred to without distinction as a field device 20.

[0018] The number of control nodes 10 and field devices 20 included in the distributed control system 1 is not limited to those shown in Fig. 1. Furthermore, each control node 10 may be connected to one or more field devices 20, or may not be connected to any field device 20.

[0019] The field device 20 is provided in a plant. The plant is, for example, an oil plant, a petrochemical plant, a chemical plant, or a gas plant. When the plant is operated, products such as LNG (liquefied natural gas), resins (plastic, nylon, etc.), and chemical products are obtained.

[0020] The plant also includes factory facilities, machine facilities, production facilities, power generation facilities, storage facilities, wellhead facilities for extracting oil, natural gas, etc. The plant also includes equipment for producing products.

[0021] The field device 20 acquires information about the state of the plant. For example, the field device 20 is a temperature sensor, a pH sensor, a speed sensor, an acceleration sensor, an air pressure sensor, a gas concentration sensor, a device that detects the opening degree of a valve, a device that detects the state (on or off) of a switch, etc.

[0022] The field device 20 transmits data indicating a sensor value or a detection result to the control node 10 using a predetermined communication protocol.

[0023] The control node 10 executes the assigned task. A task is a part or all of a calculation that occurs with the execution of an application. For example, a task is a function, a function block (FB), a functional module, etc., included in an application. Note that a task may use data received from a field device 20.

[0024] It should be noted that a control APP (control application) shown in FIG. 1 is an application for executing a task.

[0025] Furthermore, the control node 10a, the control node 10b, and the control node 10c store data 110a, data 110b, and data 110c, respectively. The data 110a, data 110b, and data 110c may be data obtained from the field device 20, or may be data obtained by executing a task.

[0026] The management server 30 is connected to the control node 10 via a network. The management server 30 functions as a GDS (reference URL: https: / / jp.opcfoundation.org / wp-content / uploads / sites / 2 / 2018 / 12 / 4_Endo_OPCUA_GDS.pdf). The GDS manages a list of OPC-UA applications and certificates used by the applications.

[0027] The management server 30 also functions as an Alias, which corresponds to the name resolution function of a Domain Name System (DNS) in an IP network, and manages the correspondence between node names or tag names and IP addresses.

[0028] The HMI client 40 is connected to the HMI server 50. In addition, the HMI server 50 acquires information for monitoring the field device 20, and provides the acquired information to the HMI client 40.

[0029] Here, the distributed control system 1 is an example of a process control system. In the process control system, real-time processing and non-real-time processing are executed. Furthermore, the tasks executed by the control node 10 include real-time processing and non-real-time processing.

[0030] The real-time processing is the execution of a control application, data transmission and reception between control nodes, etc. For example, the real-time processing is processing in which the control node 10 controls the field device 20 based on information acquired from the field device 20 (e.g., PID control).

[0031] Non-real-time processing is processing related to system monitoring, field device management, quality control, advanced control, etc. For example, non-real-time processing is processing performed using data collected over a certain period of time from multiple control nodes 10. In this case, the control node 10 outputs the data acquired from the field devices 20 after converting the format of the data to suit subsequent processing.

[0032] Non-real-time processing also includes processing that requires a certain level of computing power and processing that requires a special device such as a Graphics Processing Unit (GPU).

[0033] In a conventional DCS, real-time processing is executed by a controller (e.g., corresponding to the control node 10). Also, in a conventional DCS, non-real-time processing is executed by a device other than the controller, such as a PC or a server.

[0034] In response to this, open process control systems such as the OPA (Open Process Automation) system advocated by the OPAF (Open Process Automation Forum) (Reference: https: / / www.yokogawa.com / us / solutions / featured-topics / open-process-automation / ) have been proposed in recent years. In an OPA system, the processing hierarchy is flattened, and real-time processing is required even for devices other than controllers such as servers. On the other hand, there are also cases where non-real-time processing is executed on the control node.

[0035] The control node in the OPA system may be called a Distributed Control Node (DCN). The control node in this embodiment is, for example, a Distributed Control Node (DCN) in the OPA system.

[0036] The control node 10 receives constant data access while executing the tasks described above. As a result, the control node 10 may become overloaded. In response to this, the management function of this embodiment can prevent the control node 10 from becoming overloaded.

[0037] The configuration of the management server 30 will be described with reference to Fig. 2. Fig. 2 is a diagram showing an example of the configuration of the management server according to the first embodiment. As shown in Fig. 2, the management server 30 includes a communication unit 31, a storage unit 32, and a control unit 33.

[0038] The communication unit 31 communicates data with other devices. For example, the communication unit 31 is a communication interface. The communication unit 31 communicates with the control node 10 and the HMI server 50.

[0039] The storage unit 32 stores various data and various programs executed by the control unit 33. For example, the storage unit 32 is a storage device such as a memory or a hard disk. The storage unit 32 stores various data generated in the processing executed by the management server 30, such as data obtained in the process of executing various processes by the control unit 33 and processing results obtained by executing various processes.

[0040] The storage unit 32 stores a management table 321 .

[0041] The management table 321 is a table for managing the number of connections to each control node 10. The number of connections is the number of devices performing data access to the control node 10.

[0042] Here, the node IDs of the control node 10a, the control node 10b, and the control node 10c are “N101,” “N102,” and “N103,” respectively. For example, FIG. 3 shows that the number of connections of the control node 10a, whose node ID is “N101,” is 0.

[0043] The control unit 33 is a processing unit that controls the entire management server 30. The control unit 33 is realized by, for example, a processor, etc. The control unit 33 includes an updating unit 331, a calculating unit 332, and a notifying unit 333.

[0044] When the number of connections of the control node 10 changes, the update unit 331 updates the management table 321. Below, a case where the update unit 331 updates the management table 321 will be described.

[0045] [Case 1: System monitoring] The update unit 331 updates the management table 321 when the HMI server 50 starts acquiring data from the control node 10 for system monitoring.

[0046] For example, as shown in Fig. 4, the HMI server 50 makes an inquiry (access inquiry) to the management server 30 in order to acquire data 110b and data 110c. Fig. 4 is a diagram showing an example of data access.

[0047] The multiple control nodes 10 make inquiries to the management server 30 and access data from one another in response to notifications from the management server 30. Also, the HMI server 50 makes inquiries to the management server 30 and accesses data from any one of the multiple control nodes 10 in response to notifications from the management server 30. The HMI server 50 is an example of a monitoring server.

[0048] Management server 30 functions as a GDS and notifies HMI server 50 that data 110b is in control node 10b (node ​​ID "N102") and data 110c is in control node 10c (node ​​ID "N103").

[0049] After receiving the notification, the HMI server 50 periodically obtains the data 110b from the control node 10b and obtains the data 110c from the control node 10c.

[0050] In this case, the update unit 331 increments the number of connections in the management table 321 of the control node 10b (node ​​ID "N102") and the control node 10c (node ​​ID "N103") by one each.

[0051] [Case 2: Communication between control nodes for control calculations] The update unit 331 updates the management table 321 when communication between control nodes is started for control calculation.

[0052] For example, as shown in Fig. 5, the control node 10b makes an inquiry (access inquiry) to the management server 30 in order to acquire data 110a and data 110c. Fig. 5 is a diagram showing an example of data access.

[0053] The management server 30 functions as a GDS and notifies the control node 10b that the data 110a is in the control node 10a (node ​​ID "N101") and the data 110c is in the control node 10c (node ​​ID "N103").

[0054] After receiving the notification, the control node 10b periodically obtains the data 110a from the control node 10a and obtains the data 110c from the control node 10c.

[0055] In this case, the update unit 331 increments the number of connections in the management table 321 of the control node 10a (node ​​ID "N101") and the control node 10c (node ​​ID "N103") by one each.

[0056] The management server 30 updates the management table 321 for the control node 10 that received the access inquiry, and starts packet capture. This allows the management server 30 to obtain the size of data acquired from the control node 10 by data access and the period during which the data is acquired.

[0057] When data access to the control node 10 is released, the management server 30 decrements the number of connections in the management table 321 of the control node 10 and ends packet capture.

[0058] The calculation unit 332 calculates the load on each of the control nodes 10 based on information indicating the state of data access to each of the control nodes 10 (for example, the management table 321).

[0059] The calculation unit 332 can calculate the load based on the number of data accesses to each of the multiple control nodes 10. For example, the calculation unit 332 calculates the load to be greater as the number of connections recorded in the management table 321 increases.

[0060] The algorithm by which the calculation unit 332 calculates the load is written in a language such as Jscript, python (registered trademark), or C language, and is realized by a pre-installed program.

[0061] Furthermore, the calculation unit 332 may calculate the load taking into consideration the size of data acquired in the data access and the period in which the data is acquired. In this case, the management table 321 stores the size of data to be acquired and the period in which the data is acquired for each access source of the data access (for example, the control node 10 or the HMI server 50).

[0062] Furthermore, the calculation unit 332 may correct the calculated load based on the loads of each of the multiple control nodes 10 indicated by a known management function (such as Redfish).

[0063] For example, the calculation unit 332 calculates an average value α of the difference between the load indicated by the management function and the load calculated by the calculation unit 332. Then, the calculation unit 332 calculates a value obtained by adding α to the load calculated by the calculation unit 332 as a load correction value. Note that α may be positive or negative.

[0064] In this way, the calculation unit 332 can correct the calculated load based on the difference between the calculated load and the load indicated by the management function.

[0065] Also, for example, the calculation unit 332 calculates a ratio β of the load indicated by the management function to the load calculated by the calculation unit 332. Then, the calculation unit 332 calculates a value obtained by multiplying the load calculated by the calculation unit 332 by β as a correction value of the load. Note that β may be 1 or more or may be less than 1.

[0066] In this way, the calculation unit 332 can correct the calculated load based on the ratio of the load indicated by the management function to the calculated load.

[0067] The calculation unit 332 may calculate α and β for each control node, or may calculate them for all control nodes.

[0068] The notification unit 333 issues a notification when the load of any of the plurality of control nodes 10 exceeds a threshold. Note that different thresholds may be set for each of the plurality of control nodes 10 according to performance.

[0069] For example, when the load (or the corrected value) calculated by the calculation unit 332 exceeds a threshold value, the notification unit 333 outputs an alert to the operator via the HMI server 50 or the HMI client 40.

[0070] The flow of processing in the management server 30 will be described with reference to Fig. 6. Fig. 6 is a flowchart showing the flow of processing in the management server.

[0071] 6, first, the management server 30 receives an inquiry regarding a control node from which data can be acquired (step S101). The inquiry is made by the control node 10 or the HMI server 50.

[0072] In response to the inquiry, the management server 30 notifies the control node from which the data can be acquired (step S102). After that, data access is started to the control node from which it has been notified that the data can be acquired.

[0073] For example, the management server 30 converts the data name specified by the query into an IP address using a name resolution function. For example, when the data 110b is specified, the management server 30 notifies the source of the query of the IP address of the control node 10b.

[0074] The management server 30 updates the management table 321 for the control node that has notified that data can be acquired (step S103). For example, the management server 30 increases the number of connections of the control node in the management table 321.

[0075] Then, the management server 30 calculates the load of each control node based on the management table 321, and determines whether the load is normal or not (step S104). For example, the management server 30 determines whether the calculated load exceeds a threshold value.

[0076] If the load on any of the control nodes is not normal (for example, if the load exceeds a threshold) (step S104, No), the management server 30 outputs an alert (step S105).

[0077] If the load on the control node is normal (for example, the load does not exceed the threshold) (Yes at step S104), the management server 30 ends the process without outputting an alert.

[0078] In response to the notification from the management server 30, the operator can manually make adjustments according to the load situation.

[0079] Furthermore, the management server 30 may execute a function of automatically distributing the load of the control nodes 10. For example, when the load of a control node 10 exceeds a threshold, the management server 30 assigns the task of the control node 10 to another control node 10 or a server, etc.

[0080] Furthermore, when the load of the control node 10 can be actually measured, the actually measured load may be fed back to the management server 30. In this case, the management server 30 can optimize the algorithm for calculating the load based on the feedback. For example, the management server 30 holds constants similar to the above-mentioned α and β, independent of the management function, and corrects the constants in response to the feedback.

[0081] [effect] As described above, the management server 30 includes a calculation unit 332 and a notification unit 333. The calculation unit 332 calculates the load of each of the multiple control nodes 10 based on information indicating the state of data access to each of the multiple control nodes 10. The notification unit 333 issues a notification when the load of any of the multiple control nodes 10 exceeds a threshold value.

[0082] For example, the calculation unit 332 calculates the load based on the number of data accesses to each of the multiple control nodes 10.

[0083] The operator can take measures to reduce the load in response to the notification. In this way, the management server 30 can prevent the control node of the DCS (distributed control system 1) from becoming overloaded.

[0084] Furthermore, if the load on the control node 10 is below the allowable amount (e.g., about 90% of the allowable amount), the control node 10 can accurately report its own load to the outside. On the other hand, if the load on the control node 10 exceeds the allowable amount (e.g., about 120% of the allowable amount), it may become difficult for the control node 10 to accurately report its own load to the outside. Even in such a case, the management server 30 can calculate the load on the control node 10.

[0085] The management server 30 can calculate the load without acquiring any information from the control node 10 itself. Therefore, the management server 30 can calculate the load regardless of differences in the vendor and specifications of the control node 10.

[0086] Furthermore, the calculation unit 332 corrects the calculated load based on the load of each of the multiple control nodes 10 indicated by the management function. For example, the calculation unit 332 corrects the calculated load based on the difference between the calculated load and the load indicated by the management function. For example, the calculation unit 332 corrects the calculated load based on the ratio of the load indicated by the management function to the calculated load. The notification unit 333 issues a notification when the corrected load exceeds a threshold. This enables the management server 30 to improve the accuracy of load calculation.

[0087] [system] The information including the processing procedures, control procedures, specific names, various data and parameters shown in the above documents and drawings can be changed arbitrarily unless otherwise specified.

[0088] In addition, each component of each device shown in the figure is a functional concept, and does not necessarily have to be physically configured as shown in the figure. In other words, the specific form of distribution and integration of each device is not limited to that shown in the figure. In other words, all or part of them can be functionally or physically distributed and integrated in any unit depending on various loads, usage conditions, etc.

[0089] Furthermore, each processing function performed by each device may be realized, in whole or in part, by a CPU and a program analyzed and executed by the CPU, or may be realized as hardware using wired logic.

[0090] [Hardware] Next, a hardware configuration example of the management server 30 will be described. Fig. 7 is a diagram for explaining the hardware configuration example. As shown in Fig. 7, the management server 30 has a communication device 300a, a HDD (Hard Disk Drive) 300b, a memory 300c, and a processor 300d. Moreover, each unit shown in Fig. 7 is connected to each other by a bus or the like.

[0091] The communication device 300a is a network interface card or the like, and communicates with other devices. The HDD 300b stores programs and DBs that operate the functions shown in FIG.

[0092] The processor 300d reads out a program that executes the same processes as the respective processing units shown in FIG. 2 from the HDD 300b or the like and loads it in the memory 300c, thereby operating a process that executes each function described in FIG. 2 or the like. For example, this process executes a function similar to that of each processing unit of the management server 30. Specifically, the processor 300d reads out a program having functions similar to those of the update unit 331, the calculation unit 332, and the notification unit 333 from the HDD 300b or the like. Then, the processor 300d executes a process that executes the same processes as the update unit 331, the calculation unit 332, and the notification unit 333.

[0093] In this way, the management server 30 operates as an information processing device that executes an information processing method by reading and executing a program. The management server 30 can also realize functions similar to those of the above-mentioned embodiment by reading the program from a recording medium using a media reading device and executing the read program. Note that the program in this other embodiment is not limited to being executed by the management server 30. For example, the present invention can be similarly applied to cases where another computer or server executes a program, or where these cooperate to execute a program.

[0094] This program can be distributed via a network such as the Internet. This program can also be recorded on a computer-readable recording medium such as a hard disk, a flexible disk (FD), a CD-ROM, a magneto-optical disk (MO), or a digital versatile disk (DVD), and can be executed by being read out from the recording medium by a computer.

[0095] Some examples of combinations of the disclosed technical features are set out below.

[0096] (1) a calculation unit that calculates a load on each of a plurality of control nodes based on information indicating a state of data access to each of the plurality of control nodes; a notification unit that issues a notification when a load on any of the plurality of control nodes exceeds a threshold; 13. An information processing device comprising: (2) The information processing device according to (1), wherein the calculation unit calculates a load based on the number of data accesses to each of the plurality of control nodes. (3) The information processing device described in (1) or (2), characterized in that the calculation unit corrects the calculated load based on the load of each of the multiple control nodes indicated by the management function, and the notification unit issues a notification when the corrected load exceeds the threshold. (4) The information processing device described in any one of (1) to (3), characterized in that the calculation unit corrects the calculated load based on the difference between the calculated load and the load indicated by the management function, and the notification unit issues a notification when the corrected load exceeds the threshold value. (5) The information processing device described in any one of (1) to (3), characterized in that the calculation unit corrects the calculated load based on the ratio of the load indicated by the management function to the calculated load, and the notification unit issues a notification when the corrected load exceeds the threshold value. (6) A management server that notifies a data access destination in response to an inquiry, a plurality of control nodes, and a monitoring server; A distributed control system having: The plurality of control nodes include Making an inquiry to the management server, and mutually accessing data in response to a notification from the management server; The monitoring server includes: A distributed control system that performs processing equivalent to that of the information processing device described in any one of (1) to (5). [Explanation of symbols]

[0097] 1 Distributed Control System 10, 10a, 10b, 10c Control Node 20, 21a, 22a Field devices 30 Management Server 31 Communications Department 32 Storage section 33 Control Unit 40 HMI clients 50 HMI Servers 110a, 110b, 110c Data 321 Management Table 331 Update Department 332 Calculation Department 333 Notification Department

Claims

1. a calculation unit that calculates a load on each of a plurality of control nodes based on information indicating a state of data access to each of the plurality of control nodes; a notification unit that issues a notification when a load on any of the plurality of control nodes exceeds a threshold; 13. An information processing device comprising:

2. The information processing apparatus according to claim 1 , wherein the calculation unit calculates the load based on the number of data accesses to each of the plurality of control nodes.

3. The calculation unit corrects the calculated load based on the load of each of the plurality of control nodes indicated by a management function; The information processing apparatus according to claim 1 , wherein the notification unit issues a notification when the corrected load exceeds the threshold value.

4. The calculation unit corrects the calculated load based on a difference between the calculated load and a load indicated by the management function; The information processing apparatus according to claim 3 , wherein the notification unit issues a notification when the corrected load exceeds the threshold value.

5. The calculation unit corrects the calculated load based on a ratio of a load indicated by the management function to the calculated load; The information processing apparatus according to claim 3 , wherein the notification unit issues a notification when the corrected load exceeds the threshold value.

6. Calculating a load on each of a plurality of control nodes based on information indicating a status of data access to each of the plurality of control nodes; When the load of any of the plurality of control nodes exceeds a threshold, a notification is issued. An information processing method characterized in that the processing is executed by a computer.

7. Calculating a load on each of a plurality of control nodes based on information indicating a status of data access to each of the plurality of control nodes; When the load of any of the plurality of control nodes exceeds a threshold, a notification is issued. An information processing program that causes a computer to execute a process.

8. A management server that notifies a data access destination in response to an inquiry, a plurality of control nodes, and a monitoring server; A distributed control system having: The plurality of control nodes include Making an inquiry to the management server, and mutually accessing data in response to a notification from the management server; The monitoring server includes: making an inquiry to the management server, and performing data access to any one of the plurality of control nodes in response to a notification from the management server; The management server includes: a calculation unit that calculates a load on each of a plurality of control nodes based on information indicating a state of data access to each of the plurality of control nodes; a notification unit that issues a notification when a load on any of the plurality of control nodes exceeds a threshold; A distributed control system comprising:

Citation Information

Patent Citations

  • Building information management system

    JP2006202182A

  • Power system monitoring device

    JP2013208043A

  • Appliance state determination device and program

    JP2014235624A

  • Management system, management server, display device, and method thereof

    JP2015135559A

  • Distributed processing system, distributed data management device, and distributed data management method

    JP2015207256A