Inventory management apparatus, inventory management method, and inventory management program

The inventory management system addresses the challenge of determining valid inventory by calculating and allocating products based on handling deadlines, ensuring accurate inventory tracking and timely decision-making.

JP2024133888AActive Publication Date: 2024-10-03OBIC CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023043890
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-20
Publication Date
2024-10-03
Estimated Expiration
2043-03-20

AI Technical Summary

Technical Problem

Conventional inventory management systems fail to accurately determine valid inventory within handling deadlines, such as shipping and expiration dates, making it difficult for sales and business personnel to grasp the accurate inventory of products.

Method used

An inventory management system that calculates and allocates products based on handling deadlines, detecting the number of products in stock for each deadline, and generating allocation results to ensure accurate inventory management.

Benefits of technology

Enables accurate inventory tracking within handling periods, allowing for timely shipping and manufacturing decisions while ensuring product quality and reducing waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024133888000001_ABST
    Figure 2024133888000001_ABST
Patent Text Reader

Abstract

To make it possible to grasp the accurate stocks of commodities within handling time limits.SOLUTION: A detection part refers to the inventory data on the basis of handling time limits added to a commodity to detect the stock quantity of the commodity for each handling time limit. A calculation part subtracts the number of commodity pieces already allocated or to be allocated from the number of stocked commodity pieces of each handling time limit to calculate the number of unallocated pieces of the commodity for each handling time limit. An allocation processing part performs allocation processing of the number of allocated commodity pieces from the number of unallocated commodity pieces of the minimum handling time limit among the handling time limits on and after the reference date which is a designated date. A data generation part generates allocation result data including at least a handling time limit, an allocated number, and a carried-forward number, which is a number obtained by subtracting the allocated number from an unallocated number, of the commodity of which the stocked number is detected. An output control unit outputs the generated allocation result data for display, printing, or the like.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an inventory management device, an inventory management method, and an inventory management program. [Background technology]

[0002] Nowadays, in many cases, when an order is received, the number of items available for shipment is checked and shipping and manufacturing decisions are made based on that information.

[0003] As background technology relating to inventory management, Patent Document 1 (JP 2023-018105 A) discloses a system for optimizing product inventory through intelligent adjustment of inbound purchase orders.

[0004] The system includes a process for receiving a demand forecast amount including a forecasted demand amount for each product over each unit of time, and a process for receiving source statistical data for a supplier associated with a portion of the product corresponding to one or more product identifiers. The system also includes a process for receiving a current product inventory level and a current product order quantity for the product, and a process for determining a reserve order quantity for the product. The system also includes a process for constraining the reserve order quantity to obtain a recommended order quantity based on at least the source statistical data, the current product inventory level, and the current order quantity, and a process for generating a purchase order to a supplier of the product based on the recommended order quantity. The system performs these processes to optimize product inventory through intelligent adjustment of inbound purchase orders. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent Publication No. 2023-018105 Summary of the Invention [Problem to be solved by the invention]

[0006] Conventionally, shipping and manufacturing decisions were made based on the transition of the total inventory (including shipping and production plans). In this way, when shipping and manufacturing decisions are made based on the transition of the total inventory, it is not possible to determine whether the current inventory is valid inventory within the handling period (shipping period or expiration date, etc.), which creates a problem that it is difficult for sales personnel or business personnel to grasp the accurate inventory of products.

[0007] The present invention has been made in consideration of the above-mentioned problems, and aims to provide an inventory management device, an inventory management method, and an inventory management program that make it possible to grasp the accurate inventory of products within their handling expiration dates. [Means for solving the problem]

[0008] In order to solve the above-mentioned problems and achieve the object, the inventory management device of the present invention has a detection unit that detects the inventory number of products for each handling deadline by referring to inventory data based on the handling deadline attached to the product, a calculation unit that calculates the unallocated number for each product for each handling deadline by subtracting the number of products that have been allocated or are to be allocated from the inventory number of products for each handling deadline, an allocation processing unit that allocates the allocated number of products from the unallocated number of products with the shortest handling deadline among those with handling deadlines after a specified date, a reference date, a data generation unit that generates allocation result data including at least the handling deadline, the allocated number, and the carryover number, which is the number obtained by subtracting the allocated number from the unallocated number, for each product for which inventory number has been detected, and an output control unit that controls the output of the generated allocation result data.

[0009] In addition, in order to solve the above-mentioned problems and achieve the object, the inventory management method of the present invention includes a detection step in which a detection unit detects the inventory number of products for each handling deadline by referring to inventory data based on the handling deadline attached to the product; a calculation step in which a calculation unit calculates the unallocated number for each product for each handling deadline by subtracting the number of products that have been allocated or are to be allocated from the inventory number of products for each handling deadline; an allocation processing step in which an allocation processing unit allocates the allocated number of products from the unallocated number of products with the shortest handling deadline among the handling deadlines on or after a specified date, a reference date; a data generation step in which a data generation unit generates allocation result data including at least the handling deadline, the allocated number, and the carryover number, which is the number obtained by subtracting the allocated number from the unallocated number, for each product for which the inventory number has been detected; and an output control step in which an output control unit controls the output of the generated allocation result data.

[0010] In addition, in order to solve the above-mentioned problems and achieve the object, the inventory management program of the present invention causes a computer to function as a detection unit that detects the inventory quantity of products for each handling deadline by referring to inventory data based on the handling deadline attached to the product, a calculation unit that calculates the unallocated quantity for each product for each handling deadline by subtracting the number of products that have been allocated or are to be allocated from the inventory quantity of products for each handling deadline, an allocation processing unit that allocates the allocated number of products from the unallocated number of products with the shortest handling deadline among the handling deadlines after the specified date, a reference date, a data generation unit that generates allocation result data including at least the handling deadline, the allocated number, and the carryover number, which is the number obtained by subtracting the allocated number from the unallocated number, for each product for which the inventory quantity has been detected, and an output control unit that controls the output of the generated allocation result data. Effect of the Invention

[0011] The present invention makes it possible to grasp the accurate inventory of products that have not yet reached their expiration date. [Brief description of the drawings]

[0012] [Figure 1] FIG. 1 is a block diagram showing a hardware configuration of an inventory management device according to an embodiment. [Diagram 2] FIG. 2 is a diagram illustrating an example of inventory data. [Diagram 3] FIG. 3 is a diagram illustrating an example of the order data. [Figure 4] FIG. 4 is a diagram illustrating an example of the production acceptance schedule data. [Diagram 5] FIG. 5 is a diagram showing an example of the production delivery schedule data. [Figure 6] FIG. 6 is a diagram showing an example of a product inventory plan inquiry screen. [Figure 7] FIG. 7 is a diagram showing an outline of the initial processing of the allocation result screen work. [Figure 8] FIG. 8 is a diagram illustrating an example of the allocation inventory work. [Figure 9] FIG. 9 is a diagram showing an example of the first work (order data) and the second work (order data). [Figure 10] FIG. 10 is a diagram showing an example of the first work (production and delivery schedule data) and the second work (production and delivery schedule data). [Figure 11] FIG. 11 is a diagram illustrating an example of the allocated inventory work in which the unallocated quantity has been updated. [Figure 12] FIG. 12 is a diagram showing an example of result display screen data of the result display screen work (initial stage) displayed on the product inventory plan inquiry screen. [Figure 13] FIG. 13 is a diagram showing an outline of the loop process in the period from the reference date inputted on the manufacturing inventory plan inquiry screen. [Figure 14] FIG. 14 is a diagram showing an example of result display screen data for October 1st, which is generated by the loop processing. [Figure 15] FIG. 15 is a diagram illustrating an example of the order data work. [Figure 16] FIG. 16 is a diagram illustrating an example of the SIM order data. [Figure 17] FIG. 17 is a diagram for explaining the operation of detecting an allocation target from the result display screen data for October 1st. [Figure 18]FIG. 18 is a diagram showing an example of the result display screen work for October 1st, including the result display screen data after the allocation process. [Figure 19] FIG. 19 is a diagram showing an example of the order data work after the allocation process. [Figure 20] FIG. 20 is a diagram showing an example of the display contents in the result display area of ​​the manufacturing inventory plan inquiry screen for October 1st. [Figure 21] FIG. 21 is a diagram showing an example of result display screen data for October 2nd, generated by the loop processing. [Figure 22] FIG. 22 is a diagram showing an example of the manufacturing and dispensing schedule database and the SIM manufacturing and dispensing schedule data. [Diagram 23] FIG. 23 is a diagram for explaining the operation of detecting an allocation target from the result display screen data for October 2nd. [Figure 24] FIG. 24 is a diagram showing an example of the result display screen work for October 2, including the result display screen data that has been allocated. [Diagram 25] FIG. 25 is a diagram for explaining an example of a production take-out schedule data work and an example of a production take-out schedule data work in which reprocessing for unallocated items has been performed. [Figure 26] FIG. 26 is a diagram for explaining the operation of detecting an allocation target from the result display screen data for October 2nd. [Figure 27] FIG. 27 is a diagram showing an example of the production and delivery schedule data of the production and delivery schedule data work for October 2nd. [Figure 28] FIG. 28 is a diagram showing an example of the first work (production and delivery schedule data). [Figure 29] FIG. 29 is a diagram showing an example of the display contents in the result display area of ​​the manufacturing inventory plan inquiry screen for October 2nd. [Diagram 30] FIG. 30 is a diagram showing an example of the result display screen work for October 2, including the result display screen data that has been allocated. [Diagram 31] FIG. 31 is a diagram showing an example of result display screen data for October 3rd, generated by the loop processing. [Diagram 32] FIG. 32 is a diagram showing an example of the manufacturing acceptance schedule data and the SIM manufacturing acceptance schedule data. [Diagram 33] FIG. 33 is a diagram showing a result display screen work showing a state in which the extracted production acceptance schedule data has been added as the result display screen data for October 3rd. [Diagram 34] FIG. 34 is a diagram showing a result display screen work configured from result display screen data for October 1st to October 3rd by loop processing. [Diagram 35] FIG. 35 is a diagram showing the result display screen data for October 1st to October 3rd displayed in the result display area of ​​the manufacturing inventory plan inquiry screen. [Diagram 36] FIG. 36 is a diagram showing an example of a product inventory plan inquiry screen displaying a result display screen for October 1st to October 3rd. [Figure 37] FIG. 37 is a diagram showing an example of a result display screen for October 1st to October 3rd displayed in the result display area of ​​the product inventory plan inquiry screen. [Figure 38] FIG. 38 is a diagram showing an example of the product inventory plan inquiry schedule adjustment screen. [Figure 39] FIG. 39 is a diagram showing an example of SIM order data, SIM production and delivery schedule data, and SIM production and acceptance schedule data. [Diagram 40] FIG. 40 is a diagram for explaining an example of performing a simulation for changing the manufacturing delivery date. [Diagram 41] FIG. 41 is a diagram showing SIM manufacturing acceptance schedule data in which a change in the manufacturing delivery date has been reflected. [Diagram 42] FIG. 42 is a diagram showing how the inquiry execution button on the manufacturing inventory plan inquiry screen is operated in order to obtain simulation results with a changed manufacturing delivery date. [Diagram 43] FIG. 43 is a diagram showing an example of a result display screen in which a change in the manufacturing delivery date is reflected. [Diagram 44] FIG. 44 is a diagram showing an example of a drawing delivery schedule data work in which a change in the manufacturing delivery date is reflected. [Diagram 45]FIG. 45 is a diagram showing an example of SIM manufacturing acceptance schedule data that has been updated based on a change in the manufacturing delivery date. [Figure 46] FIG. 46 is a diagram showing a state in which stockouts do not occur by changing the manufacturing delivery date. [Figure 47] FIG. 47 is a diagram showing an example of a manufacturing inventory plan inquiry screen for explaining an example of performing a change simulation of a scheduled shipping date. [Figure 48] FIG. 48 is a diagram showing the display contents displayed in the result display area of ​​the manufacturing inventory plan inquiry screen. [Figure 49] FIG. 49 shows the manufacturing inventory plan inquiry schedule adjustment screen before the scheduled shipping date is changed. [Figure 50] FIG. 50 is a diagram showing SIM order data before the scheduled shipping date is changed. [Figure 51] FIG. 51 shows the manufacturing inventory plan inquiry schedule adjustment screen in which the scheduled shipping date of the simulation order data has been changed. [Figure 52] FIG. 52 is a diagram showing SIM order data in which the scheduled shipping date has been changed. [Figure 53] FIG. 53 is a diagram showing how the inquiry execution button is operated when performing a simulation of a change in the scheduled shipping date. [Figure 54] FIG. 54 is a diagram showing an example of result display screen data showing a state in which allocation has been changed due to a change in the scheduled shipping date. [Figure 55] FIG. 55 shows the order data work in which the scheduled shipping date has been changed. [Figure 56] FIG. 56 is a diagram showing SIM order data in which the change in the scheduled shipping date has been reflected. [Figure 57] FIG. 57 is a diagram showing an example of result display screen data indicating that the earliest shipping date is now October 3rd as a result of changing the scheduled shipping date. [Figure 58] FIG. 58 is a diagram showing how the allocation confirmation button 52 is operated when updating the actual manufacturing acceptance schedule data with the simulated SIM manufacturing acceptance schedule data. [Figure 59] FIG. 59 is a diagram showing an outline of the update process of the actual data based on the simulation result. [Figure 60] FIG. 60 is a diagram showing an example of SIM manufacturing acceptance schedule data that is a result of the simulation. [Figure 61] FIG. 61 is a diagram showing how actual manufacturing acceptance schedule data is updated with SIM manufacturing acceptance schedule data that is a simulation result. [Figure 62] FIG. 62 is a diagram for explaining that when the SIM update flag is "0", the order data is not updated. [Figure 63] FIG. 63 is a diagram showing how actual data is updated in various data works. [Figure 64] FIG. 64 is a diagram for explaining the update process of the order data, which is actual data based on the order data work. [Figure 65] FIG. 65 is a diagram for explaining the update process of the production and delivery schedule data, which is actual data based on the production and delivery schedule database. [Figure 66] FIG. 66 is a diagram for explaining the "data addition auxiliary function" which enables a simulation in which data outside the initially specified date range is called up and the date is changed. [Figure 67] FIG. 67 is a diagram showing how production acceptance schedule data that meets predetermined extraction conditions is extracted. [Figure 68] FIG. 68 is a diagram showing the Add Receiving Schedule button which is operated when extracting manufacturing receiving schedule data that meets the extraction conditions. [Figure 69] FIG. 69 is a diagram showing the Add Order button which is operated when extracting order data that meets the extraction conditions. [Figure 70] FIG. 70 is a diagram showing the take-off schedule addition button that is operated when extracting production take-off schedule data that meets the extraction conditions. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An inventory management device according to an embodiment of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that the present invention is not limited to the following embodiment.

[0014] (Hardware configuration) As shown in FIG. 1, the inventory management device 1 of the embodiment includes a storage unit 2, a control unit 3, a communication interface unit 4, and an input / output interface unit 5. An input device 6 and an output device 7 are connected to the input / output interface unit 5. The output device 7 corresponds to a display unit such as a monitor device (including a home television), a printing device, or a speaker device. The input device 6 may be a keyboard device, a mouse device, a microphone device, or a monitor device that cooperates with a mouse device to realize a pointing device function. The communication interface unit 4 is connected to a network such as a wide area network such as the Internet or a private network such as a LAN (Local Area Network).

[0015] A storage device such as a ROM (Read Only Memory), a RAM (Random Access Memory), a HDD (Hard Disk Drive), or an SSD (Solid State Drive) can be used as the storage unit 2. The storage unit 2 stores an inventory management program for managing inventory based on the handling period (shipping period or expiration date, etc.) of the product.

[0016] Furthermore, as will be described in more detail later, this memory unit 2 stores or forms inventory data, order data, scheduled manufacturing acceptance data, scheduled manufacturing delivery data, SIM order data, SIM scheduled manufacturing delivery data, SIM scheduled manufacturing acceptance data, simulated order data, simulated delivery schedule data, simulated scheduled acceptance data, allocation inventory work, order data work, scheduled manufacturing delivery data work, result display screen work (initial), result display screen work, etc.

[0017] FIG. 2 is a diagram showing an example of inventory data. The inventory data includes the product code, lot number (Lot No.), current stock quantity, shipping deadline, expiration date, and inventory rank of each product. The shipping deadline and expiration date are examples of handling deadlines. This example is an example in which each product is handled in so-called "lot units," with multiple products as one handling unit. Note that each product may also be handled in so-called "individual" quantities.

[0018] The shipping deadline is information that indicates the date on which the product can be shipped. The expiration date is information that indicates the date (date) on which the product will be effective (functional). Furthermore, the stock rank corresponds to the "quality" of the product. In this example, a product with a stock rank of "A" is of higher quality than a product with a stock rank of "B".

[0019] Fig. 3 is a diagram showing an example of order data. As shown in Fig. 3, the order data includes an order slip number, a line number, a scheduled shipping date, a product code, an order quantity, a lot number, an inventory rank, and a branch number.

[0020] 4 is a diagram showing an example of production acceptance schedule data. As shown in Fig. 4, the production acceptance data includes a production instruction slip number, a production delivery date, a product code, an acceptance instruction quantity, a lot number, an inventory rank, a shipping deadline, and an expiration date.

[0021] Fig. 5 is a diagram showing an example of production and delivery schedule data. As shown in Fig. 5, the production and delivery schedule data includes a production instruction slip number, a line number, a scheduled production date, a product code, a scheduled delivery quantity, a lot number, an inventory rank, and a branch number.

[0022] (Functional configuration of business support device) Next, the control unit 3 executes the inventory management program stored in the memory unit 2, and thereby functions as a display control unit 21, an extraction unit 22, a calculation unit 23, a data generation unit 24, and a memory control unit 25, as shown in FIG. 1.

[0023] The display control unit 21 is an example of an output control unit, and displays a product inventory plan inquiry screen, a product inventory plan inquiry schedule adjustment screen, allocation result data, etc., which will be described later, via the output device 7, which is an example of a display unit. Note that, although the following description will be given assuming that the output control unit is the display control unit 21, a print control unit may be provided as the output control unit, and the allocation result data, etc., may be printed and output on a predetermined sheet of paper.

[0024] The extraction unit 22 is an example of a detection unit, and detects the number of products in stock for each handling period by referring to inventory data based on handling periods (for example, shipping period and expiration period) attached to the products.

[0025] The calculation unit 23 subtracts the number of products that have been allocated or are to be allocated from the inventory number of products with each deadline to calculate the unallocated number for each product with each deadline.

[0026] The memory control unit 25 is an example of an allocation processing unit, and allocates the number of products to be allocated from the unallocated number of products with the shortest handling deadline among those with deadlines on or after the reference date, which is the date specified by the operator.

[0027] The data generating unit 24 generates allocation result data including at least the handling period, the allocated number, and the carried-over number obtained by subtracting the allocated number from the unallocated number for each product whose inventory number has been detected. This allocation result data is displayed by the display control unit 21 via the output device 7.

[0028] Furthermore, when a period of a predetermined number of days from the reference date is specified together with a base date, the memory control unit 25, which is an example of an allocation processing unit, performs daily allocation processing corresponding to the number of days in the period from the base date. The data generation unit 24 generates allocation result data of the daily allocation processing. As a result, the daily allocation result data, which is the result of the daily allocation processing corresponding to the number of days in the period from the base date, is displayed by the display control unit 21.

[0029] In the following description of the embodiment, the allocation quantity of goods is assumed to be an order allocation quantity equivalent to the number of orders for goods, or a production and delivery allocation quantity equivalent to the number of goods to be produced and delivered. Also, a "goods" is a set of a predetermined number of goods, which are handled in lots to which a handling deadline and lot number are attached. Therefore, the memory control unit 25, which is an example of an allocation processing unit, performs allocation processing based on the lot numbers of goods having the same lot number.

[0030] Furthermore, the extraction unit 22, which is an example of a detection unit, detects the number of manufactured and accepted products within a period including a reference date by referring to the production acceptance schedule data including the acceptance instruction number, which is the delivery number of products to be delivered by the specified production delivery date. The memory control unit 25, which is an example of an allocation processing unit, allocates the allocated number of products based on the production acceptance number. Furthermore, the data generation unit 24 generates allocation result data including the production acceptance number on the date of production acceptance as allocation result data for the date of production acceptance within the above-mentioned specified period.

[0031] Furthermore, the extraction unit 22, which is an example of a detection unit, generates data indicating the inventory quantity of products for each handling deadline detected by referring to the inventory data, and "lot undetermined" data indicating that the inventory quantity is "0" and the handling deadline is blank and the lot number for which the allocation process is to be performed has not been determined. The memory control unit 25, which is an example of an allocation processing unit, performs allocation processing from the "lot undetermined" inventory quantity when the inventory quantity of products is less than the allocation quantity. Then, the data generation unit 24 generates allocation result data indicating that the allocation process has been performed from the "lot undetermined" inventory quantity.

[0032] In addition, the data generation unit 24 generates SIM order data, which is order data for simulation and includes a scheduled shipping date, an order quantity, and an update flag; SIM manufacturing and dispensing schedule data, which is manufacturing and dispensing schedule data for simulation and includes a scheduled manufacturing date, a scheduled dispensing quantity, and an update flag; and SIM manufacturing and accepting schedule data, which is manufacturing and accepting schedule data for simulation and includes a manufacturing delivery date, an acceptance instruction quantity, a handling deadline, and an update flag.

[0033] When an adjustment for simulation is instructed, the display control unit 21, which is an example of an output control unit, displays, via the output device 7, simulated order data equivalent to the SIM order data, simulated delivery schedule data equivalent to the SIM manufacturing delivery schedule data, and simulated acceptance schedule data equivalent to the SIM manufacturing acceptance schedule data. At least the scheduled shipping date, scheduled manufacturing date, or manufacturing delivery date of the simulated order data, simulated delivery schedule data, and simulated acceptance schedule data can be changed to desired values.

[0034] When the scheduled shipping date is changed, the data generating unit 24 changes the scheduled shipping date in the SIM order data and changes the update flag to a value indicating that the scheduled shipping date has been changed. When the scheduled manufacturing date is changed, the data generating unit 24 changes the scheduled manufacturing date in the SIM manufacturing and dispensing schedule data and changes the update flag to a value indicating that the scheduled manufacturing date has been changed. When the manufacturing delivery date is changed, the data generating unit 24 changes the manufacturing delivery date in the SIM manufacturing and receiving schedule data and changes the update flag to a value indicating that the manufacturing delivery date has been changed.

[0035] When the scheduled shipping date of the SIM order data is changed and an instruction to execute a simulation is given, the memory control unit 25, which is an example of an allocation processing unit, cancels the allocation result of the number of orders received before the change of the scheduled shipping date, and performs allocation processing on the number of orders of the products as the allocation number from the unallocated number of products with the shortest handling deadline among the handling deadlines after the changed scheduled shipping date of the SIM order data. In addition, when the scheduled manufacturing date of the SIM manufacturing and dispensing scheduled data is changed and an instruction to execute a simulation is given, the memory control unit 25 cancels the allocation result of the scheduled dispensing number before the change of the scheduled manufacturing date, and performs allocation processing on the number of products scheduled to be dispensed as the allocation number from the unallocated number of products with the shortest handling deadline among the handling deadlines after the changed scheduled manufacturing date of the SIM manufacturing and dispensing scheduled data. In addition, when the manufacturing delivery date of the SIM manufacturing acceptance scheduled data is changed and an instruction to execute a simulation is given, the memory control unit 25 cancels the allocation result before the change of the manufacturing delivery date, and performs allocation processing based on the number of manufacturing acceptances to be received during the manufacturing delivery date. The display control unit 21 displays the results of such a simulation as the above-mentioned allocation result data via the output device 7.

[0036] Furthermore, when execution of an allocation determination process for updating actual data based on the results of the simulation is specified, the storage control unit 25 detects data including the above-mentioned update flag indicating that a value has been changed among the SIM order data, SIM manufacturing and dispensing schedule data, and SIM manufacturing and acceptance schedule data.The storage control unit 25 then updates the order data, manufacturing and dispensing schedule data, or manufacturing and acceptance schedule data, which are actual data stored in the storage unit 2, based on the detected SIM order data, SIM manufacturing and dispensing schedule data, or SIM manufacturing and acceptance schedule data.

[0037] In addition, when another scheduled shipping date, scheduled manufacturing date, or scheduled manufacturing delivery date is additionally specified as the scheduled shipping date, scheduled manufacturing date, or scheduled manufacturing delivery date, the extraction unit 22, which is an example of a detection unit, detects order data corresponding to the additionally specified other scheduled shipping date, detects scheduled manufacturing dispensing data corresponding to the additionally specified other scheduled manufacturing date, or detects scheduled manufacturing acceptance data corresponding to the additionally specified other scheduled manufacturing delivery date.

[0038] The display control unit 21 controls the output of a record of the order data corresponding to the other detected scheduled shipping date as an additional record of the simulated order data. Alternatively, the display control unit 21 controls the output of a record of the production outgoing schedule data corresponding to the other detected scheduled production date as an additional record of the simulated outgoing schedule data. Alternatively, the storage control unit 25 controls the output of a record of the production acceptance schedule data corresponding to the other detected production delivery date as an additional record of the simulated acceptance schedule data.

[0039] The specific operation of the inventory management device 1 according to this embodiment will now be described.

[0040] (Display process of product inventory plan inquiry screen) The inventory management device 1 of the embodiment first checks the inventory quantity of products that can be shipped on the scheduled shipping date. In this case, an operator in the sales department or manufacturing department, for example, operates the input device 6 to specify the display of a product inventory plan inquiry screen. When this operation is performed, the control unit 3 functions as the display control unit 21 based on the inventory management program stored in the storage unit 2, and displays the product inventory plan inquiry screen illustrated in FIG. 6 via the output device 7.

[0041] This product inventory plan inquiry screen is an inquiry screen for confirming the inventory quantity of products that can be shipped on the desired scheduled shipping date. The operator inputs extraction conditions such as the product code, inventory rank, base date, and period of the product to be shipped on this product inventory plan inquiry screen, and operates the inquiry execution button 50. The example of FIG. 6 is an example in which the extraction conditions of the product code of "S001", the inventory rank of "A", the base date of "October 1, 2022", and the period of "3 days" are input. The display control unit 21 reads out the product name of "Product A" corresponding to the product code of "S001" from the product master (not shown), and displays it adjacent to the product code of "S001". In addition, when "A" is input for the inventory rank, the display control unit 21 displays the characters "A rank product" adjacent to the input field of this inventory rank.

[0042] The "reference date" is the date on which the inventory of the product will be confirmed and the inventory will be allocated. The "period" is the number of days from this reference date on which the inventory will be confirmed and the inventory will be allocated. In other words, if the reference date is "October 1, 2022" and the period is specified as "3 days," this means that the three days from "October 1, 2022" to "October 3, 2022" are the dates on which inventory will be confirmed and the inventory will be allocated.

[0043] The information input in the input fields such as the product code, stock rank, base date, and period is cleared by the display control unit 21 when the screen clear button 53 is operated. Also, during this stock confirmation stage, the adjustment button 51 and allocation confirmation button 52 are controlled by the display control unit 21 to be inoperable.

[0044] (Initial processing of the allocation result screen work (understanding the unallocated quantity of inventory information)) Next, when the extraction conditions are input and the inquiry execution button 50 is operated, the initial processing of the allocation result screen work, the outline of which is shown in FIG. 7, is carried out.

[0045] In the initial processing of the allocation result screen work, first, the current inventory information is extracted based on the extraction conditions entered on the product inventory plan inquiry screen. That is, when the above-mentioned extraction conditions are entered on the product inventory plan inquiry screen and the inquiry execution button 50 is operated, the control unit 3 functions as the extraction unit 22 based on the inventory management program, and extracts the inventory data of the product code "S001" and the inventory rank "A rank" from the inventory data shown in FIG. 2.

[0046] When inventory data corresponding to the extraction conditions is extracted, the control unit 3 functions as the memory control unit 25 based on the inventory management program, and controls the storage (inserts) of the extracted inventory data into an allocated inventory work, which is a storage area formed in the storage unit 2 and is illustrated in FIG. 8. This allocated inventory work stores the product code, lot number (Lot No.), current inventory quantity, shipping deadline, expiration date, and inventory rank of the extracted inventory data. The allocated inventory work also has an input field for the unallocated quantity. The memory control unit 25 inputs the current inventory quantity of the extracted inventory data into this input field for the unallocated quantity.

[0047] Next, products for which lot numbers have already been specified upon order receipt or production dispatch are extracted and subtracted from the current inventory quantity.

[0048] That is, the extraction unit 22 refers to the order data exemplified in FIG. 3 and extracts the order data to which a lot number has been added. In the example of FIG. 3, the lot number "L004" is added to the order data with the product code "S001", the inventory rank "A", and the order quantity "50 lots". This indicates that the product is a product whose lot has already been specified by the order. Therefore, the extraction unit 22 extracts the order data to which the lot number "L004" has been added. The memory control unit 25 controls the storage of the extracted order data in the first work (order data), which is the memory area of ​​the memory unit 2, as shown in FIG. 9(a).

[0049] The control unit 3 also functions as a data generation unit 24 based on the inventory management program, and generates order data by tallying the order quantity of the order data stored in the first work (order data) by product code and lot number as shown in Fig. 9(b). The storage control unit 25 controls the storage of this order data in the second work (order data).

[0050] Next, the extraction unit 22 refers to the production and dispensing schedule data illustrated in FIG. 5 and extracts the production and dispensing schedule data to which a lot number is added. In the example of FIG. 5, the production and dispensing schedule data with the product code "S001", the inventory rank "A", and the planned dispensing quantity "30 lots" is assigned the lot number "L002". This indicates that the product is a product for which a lot has already been designated by production and dispensing. Therefore, the extraction unit 22 extracts the production and dispensing schedule data to which the lot number "L002" is assigned. The storage control unit 25 controls the storage of the extracted production and dispensing schedule data in the first work (production and dispensing schedule data), which is the storage area of ​​the storage unit 2, as illustrated in FIG. 10(a).

[0051] In addition, the data generating unit 24 generates production and dispensing schedule data by tallying the planned dispensing quantity of the production and dispensing schedule data stored in the first work (production and dispensing schedule data) by product code and lot number as shown in Fig. 9 (10). The storage control unit 25 controls the storage of this production and dispensing schedule data in the second work (production and dispensing schedule data).

[0052] Next, the control unit 3 functions as the calculation unit 23 based on the inventory management program, and detects the inventory data corresponding to the lot number "L004" shown in FIG. 9(b) from the inventory data in the allocation inventory work shown in FIG. 11. Then, the control unit 3 subtracts the number of orders of the order data with the lot number "L004" shown in FIG. 9(b) from the unallocated number of the inventory data corresponding to the lot number "L004". That is, in this example, the unallocated number of the inventory data with the lot number "L004" is "60 lots" (see FIG. 8), and the number of orders of the order data with the lot number "L004" shown in FIG. 9(b) is "50 lots". Therefore, the calculation unit 23 performs the calculation of "unallocated number of inventory data 60 lots - number of orders of order data 50 lots = 10 lots".

[0053] Similarly, the calculation unit 23 detects the inventory data corresponding to the lot number "L002" shown in FIG. 10(b) from the inventory data in the allocation inventory work shown in FIG. 11. Then, the calculation unit 23 subtracts the planned number of deliveries of the production delivery schedule data with the lot number "L002" shown in FIG. 10(b) from the unallocated number of the inventory data corresponding to the lot number "L002". That is, in this example, the unallocated number of the inventory data with the lot number "L002" is "40 lots" (see FIG. 8), and the planned number of deliveries of the production delivery schedule data with the lot number "L002" shown in FIG. 10(b) is "30 lots". Therefore, the calculation unit 23 performs the calculation of "unallocated number of inventory data 40 lots - planned number of deliveries of production delivery schedule data 30 lots = 10 lots".

[0054] The memory control unit 25 reflects the above calculation results in the unallocated quantities of the lot numbers "L004" and "L002" in the allocated inventory work, as shown in Fig. 11. As a result, the unallocated quantity of the lot number "L004" in the allocated inventory work becomes "10 lots", and the unallocated quantity of the lot number "L002" also becomes "10 lots".

[0055] Next, the data generating unit 24 generates the result display screen data (initial) shown in Fig. 12 based on the allocated inventory work in which the above-mentioned calculation result is reflected in the unallocated quantity. This result display screen data (initial) is configured including the date, lot number, inventory rank, shipping deadline, expiration date, unallocated quantity, fluctuation quantity, carryover quantity, order allocated quantity, order allocated quantity, production delivery allocation quantity, production delivery allocation quantity, production acceptance quantity, and product code.

[0056] The data generating unit 24 sorts the inventory data of the allocated inventory work shown in Fig. 11 in order of shipping deadline to generate the result display screen data (initial) shown in Fig. 12. As a result, the result display screen data (initial) is generated in which the inventory data is arranged in the column direction in order of shipping deadline as shown in Fig. 12, though it is merely an image. Note that the data generating unit 24 inputs (sets) the corresponding unallocated quantity for the carryover quantity.

[0057] The storage control unit 25 controls the storage of such result display screen data (initial) in a result display screen work (initial), which is a storage area formed in the storage unit 2. As a result, as shown in Fig. 12, result display screen data (initial) for "October 1, 2022" specified by the operator as the reference date is generated. The display control unit 21 displays this result display screen data (initial) in the result display area 55 of the manufacturing inventory plan inquiry screen shown in Fig. 6.

[0058] (Loop processing for a set period from the base date) Next, when the initial processing of the allocation result screen work is completed, the control unit 3 performs the following loop processing for the period from the reference date entered on the manufacturing inventory plan inquiry screen based on the inventory management program. Figure 13 shows an overview of such loop processing.

[0059] 1. First, prepare the data for the relevant day (however, for the reference day only, use the Result Display Screen Work (Initial) as the data extraction base). Extraction conditions: Result display screen work date = Maximum (Result display screen work date) and Lot No. <> Lot undecided. Insert the extracted records into itself with date = applicable date. The extraction unit 22 extracts data based on the extraction conditions, and the storage control unit 25 performs the insert process.

[0060] 2. Next, add inventory based on the planned manufacturing acceptance data (extracted from the SIM planned manufacturing acceptance data during simulation). The extraction unit 22 extracts the scheduled manufacturing acceptance data based on the extraction conditions that the manufacturing delivery date of the scheduled manufacturing acceptance data = the relevant date, the product code of the scheduled manufacturing acceptance data = the product code of the result display screen work, and the product rank of the scheduled manufacturing acceptance data = the product rank of the result display screen work. In addition, since the manufacturing acceptance schedule data cannot be accepted if it cannot be dispensed, it is assumed that the lot number of the dispenser is reserved. In addition, at the timing of extracting this manufacturing acceptance schedule data, the storage control unit 25 updates the SIM manufacturing acceptance schedule data for simulation, which will be described later.

[0061] 3. Next, allocation processing is performed based on the order data. In this case, first, the extraction unit 22 extracts the order data (in the case of simulation, extraction is performed from the SIM order data). The extraction conditions are: scheduled shipping date of the order data = relevant date, and lot number of the order data = null data, and product code of the order data = product code of the result display screen work, and product rank of the order data = product rank of the result display screen work (update to the SIM order data at this time for simulation purposes).

[0062] Next, the data generating unit 24 performs allocation processing on the extracted order data in the order slip number order sequence. The data generation unit 24 identifies the items to be allocated based on the condition that "the shipping deadline of the result display screen work >= the smallest shipping date among the relevant date, and the carryover number of the result display screen work > 0 (if multiple records with the same shipping deadline are obtained, the one with the smallest lot number)."

[0063] Next, the result display screen work is updated. This update process is performed by the memory control unit 25 by setting the unallocated order quantity to the allocated order quantity, with the unallocated order quantity in the result display screen work being set as the maximum. Moreover, this update process is performed by the memory control unit 25 by setting the variable number to "order allocation number x (-1)". Furthermore, this update process is performed by the memory control unit 25 by setting the carryover number to the unallocated number + the variable number.

[0064] Next, the order data work is updated. This update process is performed by the memory control unit 25 by setting the order allocation quantity of the result display screen work to the allocation quantity. In addition, this update process is performed by the calculation unit 23 subtracting the allocated amount from the unallocated amount, and the memory control unit 25 setting the value obtained by this subtraction process. Furthermore, the update process is performed by the memory control unit 25 by setting the lot number to the lot number.

[0065] Next, perform additional processing of the order data work. The condition is that the unallocated quantity is <> 0. If the record has an unallocated quantity <> 0, return to the process of "Perform allocation processing in the order slip number order using the extracted data" and perform processing for the unallocated quantity again.

[0066] 4. Perform allocation processing based on production delivery schedule data. In this case, first, the extraction unit 22 extracts the production and removal schedule data based on the extraction conditions of "the scheduled production date of the production and removal schedule data = the relevant date, and the lot number of the production and removal schedule data = null data, and the product code = the product of the result display screen work, and the inventory rank of the production and removal schedule data = the inventory rank of the result display screen work."

[0067] At the timing of extracting the manufacturing and dispensing schedule data, the SIM manufacturing and dispensing schedule data for a simulation, which will be described later, is updated. During the simulation, the extracting unit 22 extracts the manufacturing and dispensing schedule data based on the SIM manufacturing and dispensing schedule data.

[0068] Next, the data generating unit 24 performs allocation processing on the manufacturing instruction slip using the extracted manufacturing and dispatch schedule data. The condition for allocation is "shipping deadline of the result display screen work ≧ the smallest shipping date among the relevant dates, and the carryover number of the result display screen work > 0." If multiple records with the same shipping deadline are obtained, the record with the smallest lot number is used for allocation.

[0069] Next, the storage control unit 25 performs an update process for the result display screen work. In this case, the storage control unit 25 first sets the production dispatch unallocated quantity to the production dispatch allocated quantity. However, the unallocated quantity of the result display screen work is maximized. As an exception, when the lot number = lot undecided, the order unallocated quantity is set as it is. In addition, the memory control unit 25 sets the variable number to "manufacturing delivery allocation number x (-1)". In addition, the memory control unit 25 sets the carryover number to the "unassigned number + variable number".

[0070] Next, the storage control unit 25 performs an update process of the production and delivery schedule database. In this case, the storage control unit 25 sets the production delivery allocation quantity of the result display screen work to the allocation quantity. Furthermore, the calculation unit 23 subtracts the allocated amount from the unallocated amount, and the memory control unit 25 sets the value obtained by the subtraction. Moreover, the memory control unit 25 sets the lot number.

[0071] Next, the storage control unit 25 performs an addition process for the production and delivery schedule data work. The condition for this addition process is "unassigned quantity<>0".

[0072] If the record is "unassigned quantity <> 0", the process returns to "Perform allocation processing on the manufacturing instruction slip using the extracted manufacturing delivery schedule data" and the process for the unallocated quantity is executed again.

[0073] 5. Next, the storage control unit 25 performs a process of reflecting the allocated order data as of the reference date. In this case, the extraction unit 22 extracts the order data of the first work (order data) for the scheduled shipping date = corresponding date. The storage control unit 25 updates the order quantity of the first work (order data) to the order allocation quantity of the result display screen work based on the lot number of the first work (order data) and the product code of the first work (order data). This allows the extracted order data to be reflected in the result display screen work.

[0074] 6. Next, the storage control unit 25 performs a process of reflecting the production and delivery schedule data as of the reference date. In this case, the extraction unit 22 extracts the planned production date of the first work 1 (manufacturing and dispensing schedule data) = the production and dispensing schedule data of the relevant date. The storage control unit 25 updates the planned dispensing quantity of the first work (manufacturing and dispensing schedule data) to the production and dispensing allocated quantity of the result display screen work based on the lot number of the first work (manufacturing and dispensing schedule data) and the commodity code of the first work (manufacturing and dispensing schedule data).

[0075] 7. When this loop processing for the period from the reference date entered on the manufacturing inventory plan inquiry screen is completed, the display control unit 21 displays the result display screen for the specified period in the result display area 55 of the manufacturing inventory plan inquiry screen.

[0076] When displaying, the display control unit 21 does not display records that satisfy the following conditions: unallocated quantity = 0, change quantity = null data, carryover quantity = 0, and null data from order allocated quantity to production accepted quantity.

[0077] (Example of loop processing for a set period from a base date) Next, a specific example of loop processing for a set period from such a base date will be described. In this example, as shown in FIG. 6, the operator specifies "S001", which is the product code of product A, and specifies the inventory rank of "A", which indicates an A-rank product. In addition, "October 1, 2022" is specified as the base date, and "3 days" is specified as the period.

[0078] (Processing on October 1st (base date)) First, in the data preparation process for the relevant day for October 1 (reference date) as described in "1", the extraction unit 22 extracts records with the extraction condition "result display screen work date = maximum (result display screen work date) and lot No. <> lot undecided" as described above. Then, the storage control unit 25 inserts the extracted records into the result display screen work with their own date = the relevant date (in this case, the reference date of October 1). Note that the storage control unit 25 also inserts records with lot undecided into the result display screen work at this point.

[0079] Incidentally, October 1st corresponds to the "reference date," and since data exists (has already been extracted) as the result display screen work (initial) as shown in Figures 12 and 14, the selection unit 3 skips this data preparation process.

[0080] Next, in the process of adding inventory based on the production acceptance schedule data explained in "2", in this example, the extraction unit 22 extracts records that correspond to the extraction condition of "production acceptance schedule production delivery date = October 1, product code = S001, and product rank = A" from the production acceptance schedule data shown in Fig. 4. Note that in the case of the production acceptance schedule data shown in Fig. 4, no records that correspond to this extraction condition exist, so no record extraction is performed.

[0081] Next, in the allocation process based on the order data explained in "3", in this example, the extraction unit 22 extracts the order data that meets the extraction condition of "scheduled shipping date of the order data = October 1, and lot number of the order data = null, and product code = S001, and product rank = A" from the order data shown in Fig. 3. In this case, the record in the first column of Fig. 3, with the order slip number "J0000000001" and the order quantity "20 lots", is extracted by the extraction unit 22 as a record that meets the extraction condition.

[0082] The storage control unit 25 inserts the records extracted by the extraction unit 22 into the order data work shown in Fig. 15. At this timing, the storage control unit 25 also updates the SIM order data for simulation shown in Fig. 16 based on the records extracted by the extraction unit 22.

[0083] Next, the allocation process is performed in the order slip number order using the extracted data, in which case the extraction unit 22 extracts records that meet the extraction condition of "result display screen work's 'shipping deadline ≧ relevant date' with the shortest shipping date, and result display screen work carryover > 0" from the result display screen work, as shown in Fig. 17. In the example of Fig. 17, the record in the second column is the record with the shortest shipping deadline after the base date (relevant date), so the extraction unit 22 extracts the record in the second column with the lot number of "L001".

[0084] In addition, since the record in the first column in Figure 17 has a shipping deadline (September 20, 2022) that is earlier than the reference date (relevant date), it will not be extracted and will not be subject to allocation.

[0085] Also, if the allocation target cannot be found (if there is no record to allocate), the record with "Lot number = Lot undecided" will be treated as the allocation target, and the "Update process for result display screen work" and "Update process for order data work" described below will be performed.

[0086] Next, as an "update process of the result display screen work", the memory control unit 25 sets the unallocated quantity of "20 lots" in the order data work shown in FIG. 15 to the order allocated quantity of the record with lot number "L001", which is the record in the second row of the result display screen work shown in FIG. 18.

[0087] The calculation unit 23 also performs the calculation of "order allocation quantity × (-1) = -20 lots." The storage control unit 25 sets this calculation result, "-20 lots," to the fluctuation quantity of the record with the lot number "L001," which is the record in the second row of the result display screen work shown in FIG.

[0088] Furthermore, the memory control unit 25 sets the value of the unallocated quantity + the variable quantity to the carryover quantity of the record with the lot number "L001", which is the record in the second row of the result display screen work shown in Fig. 18. In this example, since the unallocated quantity is "30 lots" and the variable quantity is "-20 lots", the calculation unit 23 performs the calculation "30 lots + (-20 lots) = 10 lots". The memory control unit 25 sets the value of "10 lots", which is the result of this calculation, to the carryover quantity of the record with the lot number "L001".

[0089] Next, as an "update process of the received order data work", the memory control unit 25 sets the lot number of "L001" as shown in FIG. 19 to the lot number of the received order data work shown in FIG. 15. Also, the memory control unit 25 sets the order allocation quantity of "20 lots" of the result display screen work to the allocation quantity of the received order data work as shown in FIG. 19. Furthermore, the calculation unit 23 subtracts the allocation quantity in which "20 lots" is set as shown in FIG. 19 from the unallocated quantity in which the order quantity of "20 lots" is set as shown in FIG. 15 (20 lots-20 lots=0 lots). The memory control unit 25 sets the calculated "0 lots" to the unallocated quantity of the received order data work as shown in FIG. 19.

[0090] Next, in the "allocation process based on the production dispensing schedule data" explained in "4", in this example, the extraction unit 22 refers to the production dispensing schedule data shown in FIG. 5 and extracts production dispensing schedule data that matches the extraction conditions of "scheduled production date of the production dispensing schedule data = October 1, and lot number of the production dispensing schedule data = null data, and product code = S001, and product rank = A". In the example of FIG. 5, there is no production dispensing schedule data that matches this extraction condition. Therefore, it becomes "no corresponding data", and no production dispensing schedule data is extracted.

[0091] Next, as explained in "5" for "Reflection process of allocated order data as of the reference date", in this example, the extraction unit 22 extracts a record with a scheduled shipping date of October 1st from the first work (order data) shown in FIG. 9(a). The memory control unit 25 updates the result display screen work based on the extracted record. However, there is no record with a scheduled shipping date of October 1st in the first work (order data) shown in FIG. 9(a). For this reason, it becomes "no corresponding data", and the memory control unit 25 does not update the result display screen work.

[0092] Next, in the "reflection process of the production and dispensing schedule data as of the reference date" explained in "6", in this example, the extraction unit 22 extracts a record of the planned production date = October 1st from the first work (production and dispensing schedule data) shown in FIG. 10(a). The memory control unit 25 updates the result display screen work based on the extracted record. However, there is no record of the planned production date = October 1st in the first work (production and dispensing schedule data) shown in FIG. 10(a). For this reason, it becomes "no corresponding data", and the memory control unit 25 does not perform the update process of the result display screen work.

[0093] The display content of the result display area 55 of the manufacturing inventory plan inquiry screen at this point corresponds to the date October 1, 2022 (reference date), as shown in FIG. 20, although this is only an image.

[0094] (Processed on October 2nd) Next, in the data preparation process for the relevant day described in "1" corresponding to October 2, as described above, the extraction unit 22 refers to the result display screen work shown in Fig. 18 and extracts data that meets the extraction condition of "result display screen work date = maximum (result display screen work date) and lot No. <> lot undecided". As a result, the data of the result display screen work for October 1 shown in Fig. 18 is extracted.

[0095] The storage control unit 25 adds the date of October 2, 2022 (= the relevant date) to the date of the extracted data of the result display screen work for October 1, and inserts it into the result constant screen work as shown in Fig. 21. At this time, the storage control unit 25 sets the carryover number to the unallocated number of each record for October 2. In addition, the storage control unit 25 clears (empties) the fluctuation number, order allocated number, order allocated number, manufacturing issue allocated number, manufacturing issue allocated number, and manufacturing receipt number of each record for October 2.

[0096] Next, in the process of adding inventory based on the production acceptance schedule data explained in "2", in this example, the extraction unit 22 extracts records that correspond to the extraction condition of "production acceptance schedule production delivery date = October 2, product code = S001, and product rank = A" from the production acceptance schedule data shown in Fig. 4. Note that in the case of the production acceptance schedule data shown in Fig. 4, no records that correspond to this extraction condition exist, so no record extraction is performed.

[0097] Next, in the allocation process based on the order data explained in "3", in this example, the extraction unit 22 extracts the order data that meets the extraction condition of "scheduled shipping date of the order data = October 2, and lot number of the order data = null, and product code = S001, and product rank = A" from the order data shown in Fig. 3. In the case of the order data shown in Fig. 4, there is no record that meets this extraction condition, so no record is extracted.

[0098] Next, in the "allocation process based on the production dispensing schedule data" explained in "4", in this example, the extraction unit 22 refers to the production dispensing schedule data shown in Fig. 5 and extracts production dispensing schedule data that matches the extraction conditions of "scheduled production date of the production dispensing schedule data = October 2, and lot number of the production dispensing schedule data = null data, and product code = S001, and product rank = A". In the example of Fig. 5, the extraction unit 22 extracts a record with the production instruction slip number "SSZ00000003" and the order quantity of "40 lots" as a record that matches the extraction conditions.

[0099] The storage control unit 25 inserts the records extracted by the extraction unit 22 into the manufacturing and dispensing schedule data work as shown in Fig. 22(a). At this timing, the storage control unit 25 also updates the simulation SIM manufacturing and dispensing schedule data based on the records extracted by the extraction unit 22 as shown in Fig. 22(b).

[0100] Next, the allocation process is performed in the order of manufacturing instruction slip numbers using the extracted data, in which case the extraction unit 22 extracts records that meet the extraction condition of "the result display screen work's 'shipping deadline ≧ relevant date' and the shipping date is the shortest, and the result display screen work's carryover > 0" from the result display screen work, as shown in Fig. 23. In the example of Fig. 23, the record in the third column from the bottom is the record with the shortest shipping deadline after October 2nd, which is the relevant date, so the extraction unit 22 extracts this record with the lot number of "L002".

[0101] Incidentally, the records in the fifth column from the bottom and the fourth column from the bottom in FIG. 23 have shipping deadlines on September 20 and October 1, respectively, which are dates prior to October 2, so they will not be extracted and will not be subject to allocation.

[0102] Also, if no allocation target is found (if there are no records to extract), the record with "Lot number = Lot undecided" will be targeted, and the "Update process for result display screen work" and "Update process for order data work" described below will be performed.

[0103] Next, as an "update process for result display screen work", the memory control unit 25 sets the unallocated quantity for "10 lots" in the record with lot number "L002", which is the record in the third row from the bottom of the result display screen work shown in Figure 24, to the production release allocation quantity.

[0104] The calculation unit 23 also performs the calculation of "manufacturing delivery allocation quantity × (-1) = -10 lots." The memory control unit 25 sets the result of this calculation, "-10 lots," to the fluctuation quantity of the record with the lot number "L002," which is the record in the third row from the bottom of the result display screen work shown in FIG.

[0105] Furthermore, the memory control unit 25 sets the value of the unallocated quantity + the variable quantity to the carryover quantity of the record with lot number "L002", which is the record in the third line from the bottom of the result display screen work shown in Fig. 24. In this example, since the unallocated quantity is "10 lots" and the variable quantity is "-10 lots", the calculation unit 23 performs the calculation "10 lots + (-10 lots) = 0 lots". The memory control unit 25 sets the value of "0 lots", which is the result of this calculation, to the carryover quantity of the record in the third line from the bottom of the result display screen work shown in Fig. 24.

[0106] Next, as an "update process of the production dispatch schedule data work", the storage control unit 25 sets the lot number of "L002" to the lot number of the production dispatch schedule data work shown in FIG. 25(a). Also, the storage control unit 25 sets the order allocation quantity of "10 lots" of the result display screen work to the allocation quantity of the production dispatch schedule data work as shown in FIG. 25(a). Furthermore, the calculation unit 23 subtracts the allocation quantity in which "10 lots" is set as shown in FIG. 25 from the unallocated quantity in which the planned dispatch quantity of "40 lots" is set as shown in FIG. 22(a) (40 lots-10 lots=30 lots). The storage control unit 25 sets the calculated "30 lots" to the unallocated quantity of the production dispatch schedule data work as shown in FIG. 25(a).

[0107] Next, as shown in FIG. 25(b), the memory control unit 25 adds a record with the manufacturing instruction slip number "SSZ00000003" to the manufacturing dispatch schedule database. At this time, the memory control unit 25 clears the lot number (leaving it blank). The memory control unit 25 also increments the branch number by one to "2". The memory control unit 25 also sets the allocated quantity to "0". If the record has an unallocated quantity <> 0, then "allocation processing in manufacturing instruction slip order with extracted data" is executed again for the unallocated quantity.

[0108] Fig. 26 is a diagram showing an example of the result display screen work at this processing stage. In the example of the result display screen work for October 2nd shown in Fig. 26, the fluctuation numbers for the lot numbers "L002", "L004" and "lot undecided" are "-10 lots", "-10 lots", and "-20 lots", respectively, the carryover numbers are "0 lots", "0 lots", and "-20 lots", respectively, and the production issue allocation numbers are "10 lots", "10 lots", and "20 lots", respectively.

[0109] In response to this, the memory control unit 25 stores the production and dispatch schedule data for the lot numbers "L002", "L004" and "lot undecided", whose production instruction slip numbers are "SSZ00000003" and whose branch numbers are "1", "2", and "3", respectively, in the production and dispatch schedule data work, as shown in FIG. 27, with the planned dispatch quantity being "40 lots", the allocated quantities being "10 lots", "10 lots", and "20 lots", and the unallocated quantities being "30 lots", "20 lots", and "0 lots".

[0110] Next, as explained in "5" for "Reflection process of allocated order data as of the reference date", in this example, the extraction unit 22 extracts a record with a scheduled shipping date of October 2nd from the first work (order data) shown in FIG. 9(a). The memory control unit 25 updates the result display screen work based on the extracted record. However, there is no record with a scheduled shipping date of October 2nd in the first work (order data) shown in FIG. 9(a). For this reason, it becomes "no corresponding data", and the memory control unit 25 does not update the result display screen work.

[0111] Next, in the "reflection process of the production and dispensing schedule data as of the reference date" explained in "6", in this example, the extraction unit 22 extracts a record of the planned production date=October 2nd from the first work (production and dispensing schedule data) shown in FIG. 10(a). In the first work (production and dispensing schedule data) shown in FIG. 10(a), a record of the planned production date=October 2nd exists. Therefore, the extraction unit 22 extracts a record of the planned production date=October 2nd as shown in FIG. 28.

[0112] The storage control unit 25 detects the record corresponding to the lot number "L002" of the record extracted from the first work (production and dispensing schedule data) among the records for October 2 on the result display screen work shown in Fig. 29. Then, the storage control unit 25 updates the production and dispensing allocated quantity of the record corresponding to the lot number "L002" for October 2 on the result display screen work shown in Fig. 29 to "30 lots", which is the planned dispensing quantity of the record of the lot number "L002" extracted from the first work (production and dispensing schedule data).

[0113] The display content of the result display area 55 of the manufacturing inventory plan inquiry screen at this point corresponds to the date of October 2, 2022, as shown in Fig. 30, which is an image. Note that in Fig. 30, "-20 lots", which is the carryover number of "lot undecided" for October 2, means that the lot cannot be allocated, or in other words, a "stockout" has occurred.

[0114] (Processed on October 3rd) Next, in the data preparation process for the relevant day described in "1" corresponding to October 3, as described above, the extraction unit 22 refers to the result display screen work shown in Fig. 18 and extracts data that meets the extraction condition of "result display screen work date = maximum (result display screen work date) and lot No. <> lot undecided". As a result, the data of the result display screen work for October 2 shown in Fig. 29 is extracted.

[0115] The storage control unit 25 adds the date of October 3, 2022 (= the relevant date) to the date of the extracted data of the result display screen work for October 2, in this case, and inserts it into the result constant screen work as shown in Fig. 31. At this time, the storage control unit 25 sets the carryover number to the unallocated number of each record for October 3. In addition, the storage control unit 25 clears (empties) the change number, order allocated number, order allocated number, manufacturing issue allocated number, manufacturing issue allocated number, and manufacturing receipt number of each record for October 3.

[0116] Next, in the process of adding inventory based on the production acceptance schedule data explained in "2", in this example, the extraction unit 22 extracts records that correspond to the extraction conditions of "production acceptance schedule production delivery date = October 3, product code = S001, and product rank = A" from the production acceptance schedule data shown in Fig. 4. This extracts the production acceptance schedule data shown in Fig. 32(a) with the production instruction slip number "SSZ00000001" and lot number "L005".

[0117] At this timing, the storage control unit 25 updates the SIM manufacturing acceptance schedule data for simulation based on the manufacturing acceptance schedule data extracted by the extraction unit 22, as shown in FIG. 32(b).

[0118] Next, the memory control unit 25 adds the extracted record of lot number "L005" to the result display screen work as shown in Fig. 33. Also, the memory control unit 25 sets "0 lot" to the unallocated quantity of the record with lot number "L005" among the records for October 3rd as shown in Fig. 33. Also, the memory control unit 25 sets the acceptance instruction quantity of "100 lots" in the production acceptance schedule data shown in Fig. 32(a) to the change quantity, carryover quantity, and production acceptance quantity of the record with lot number "L005" for October 3rd on the result display screen work shown in Fig. 33.

[0119] Next, in the allocation process based on the order data explained in "3", in this example, the extraction unit 22 extracts the order data that meets the extraction condition of "scheduled shipping date of the order data = October 3, and lot number of the order data = null, product code = S001, and product rank = A" from the order data shown in Fig. 3. In the case of the order data shown in Fig. 4, there is no record that meets this extraction condition, so no record is extracted.

[0120] Next, in the "allocation process based on the production and dispensing schedule data" explained in "4", in this example, the extraction unit 22 refers to the production and dispensing schedule data shown in Fig. 5 and extracts production and dispensing schedule data that matches the extraction condition of "scheduled production date of the production and dispensing schedule data = October 3, and lot number of the production and dispensing schedule data = null data, and product code = S001, and product rank = A". In the case of the production and dispensing schedule data shown in Fig. 5, since there is no record that corresponds to this extraction condition, record extraction is not performed.

[0121] Next, as explained in "5" for "Reflection process of allocated order data as of the reference date", in this example, the extraction unit 22 extracts a record with a scheduled shipping date of October 3rd from the first work (order data) shown in FIG. 9(a). The memory control unit 25 updates the result display screen work based on the extracted record. However, there is no record with a scheduled shipping date of October 3rd in the first work (order data) shown in FIG. 9(a). For this reason, it becomes "no corresponding data", and the memory control unit 25 does not perform update process of the result display screen work.

[0122] Next, in the "reflection process of the production and delivery schedule data as of the reference date" explained in "6", in this example, the extraction unit 22 extracts a record of the planned production date of October 3rd from the first work (production and delivery schedule data) shown in Fig. 10(a). Since there is no record of the planned production date of October 3rd in the first work (production and delivery schedule data) shown in Fig. 10(a), the extraction of the record is not performed.

[0123] At this point, on the result display screen work, result display screen data for a total of three days from October 1 to October 3, 2022, with October 1, 2022 as the base date, is generated. The calculation unit 23 calculates the total number of unallocated quantities and carried-over quantities corresponding to each date from October 1 to October 3 based on this result display screen data. The display control unit 21 displays the result display screen data to which the total number of unallocated quantities and carried-over quantities corresponding to each date from October 1 to October 3 has been added in the result display area 55 of the manufacturing inventory plan inquiry screen, as shown in FIG.

[0124] In FIG. 35, as described above, the carryover number for "lot undecided" on October 2nd, "-20 lots", means that the lot cannot be allocated, or in other words, a "stockout" has occurred.

[0125] The display control unit 21 hides records that satisfy the conditions of unallocated quantity = 0, change quantity = null, carryover quantity = 0, and nulls from order allocated quantity to production accepted quantity on the manufacturing inventory plan inquiry screen.

[0126] (Simulation processing) Next, the inventory management device 1 of the embodiment can simulate the allocation situation when the manufacturing instruction plan is changed and the shipping date is changed when a stockout occurs as described above. This makes it possible to deal with the stockout.

[0127] (Simulation process to change manufacturing order plan) First, a case where a simulation is performed to change a production instruction plan due to a shortage will be described. Fig. 36 is a diagram showing an example of a production inventory plan inquiry screen. When the display control unit 21 displays the display content shown in Fig. 37 in the result display area 55 of this production inventory plan inquiry screen, it locks each of the input fields for the product code, inventory rank, base date, and period so that re-input is not possible.

[0128] To unlock each input field (to re-enter data), the operator operates the screen clear button 53. This clears the input information in each input field of the product code, stock rank, base date, and period (returning them to an uninputted state), and also clears the display contents of the result display area 55 (making them non-displayed).

[0129] Next, for example, when changing the manufacturing delivery date to October 2nd, the operator selects the record for October 2nd, 2022, which is the date when the stockout occurred, from the display contents displayed in the result display area 55, and operates the adjust button 51. As a result, the display control unit 21 displays the manufacturing inventory plan inquiry schedule adjustment screen shown in FIG. 38 on the output device 7, instead of the manufacturing inventory plan inquiry screen. This manufacturing inventory plan inquiry schedule adjustment screen has a data addition auxiliary area equipped with an add order button 57, add delivery schedule button 58, and add receipt schedule button 59, as well as display columns for simulated order data, simulated delivery schedule data, and simulated receipt schedule data.

[0130] The display control unit 21 reads out the SIM order data shown in Figure 39(a), the SIM manufacturing and dispensing schedule data shown in Figure 39(b), and the SIM manufacturing and accepting schedule data shown in Figure 39(c) from the memory unit 2, and displays them in the simulation order data display column, the simulation dispensing schedule data display column, and the simulation accepting schedule data display column on the manufacturing inventory plan inquiry schedule adjustment screen as shown in Figure 38.

[0131] When there are multiple pieces of simulation order receiving data, simulation scheduled delivery data, or simulation scheduled delivery data, the display control unit 21 displays the multiple pieces of data in a column direction. In Fig. 38, scroll bars corresponding to each piece of data are illustrated, and these scroll bars are for the operator to scroll through the multiple pieces of data.

[0132] Next, since this example is for a simulation in which the manufacturing delivery date is changed to October 2nd, the operator changes the manufacturing delivery date in the simulation expected acceptance data, which was previously set to "October 3rd, 2022," to "October 2nd, 2022," as shown in Figure 40, and then operates the Confirm button 61.

[0133] Although this is an example of bringing forward the production delivery date of the production acceptance schedule data, it is also possible to bring forward the scheduled shipping date of the order data, or the scheduled production date of the production unloading schedule data.

[0134] For the simulated order data, it is possible to change the "scheduled shipping date" and "inventory rank", and for the simulated planned removal data, it is possible to change the "scheduled production date" and "inventory rank". For the simulated planned receipt data, it is possible to change the "production delivery date", as well as the "inventory rank", "shipping deadline" and "expiration date". When the close button 62 is operated, the display control unit 21 closes this manufacturing inventory plan inquiry schedule adjustment screen, and displays the manufacturing inventory plan inquiry screen shown in FIG. 36 on the output device 7.

[0135] Next, when the manufacturing delivery date of the simulation acceptance schedule data is changed to "October 2, 2022", the storage control unit 25 updates the manufacturing delivery date of the SIM manufacturing acceptance schedule data stored in the storage unit 2 to "October 2, 2022" as shown in Fig. 41(c). Note that Fig. 41(a) is an example of SIM order data, and Fig. 41(b) is an example of SIM manufacturing delivery schedule data.

[0136] At the same time, the storage control unit 25 sets a SIM update flag. This SIM update flag is updated from "0" to "1" when a change input is made in the simulation to the SIM order data, SIM manufacturing and dispensing schedule data, and SIM manufacturing and receiving schedule data. That is, the SIM update flags of the SIM order data, SIM manufacturing and dispensing schedule data, and SIM manufacturing and receiving schedule data are initially "0", but are updated to "1" when the above-mentioned change input is made.

[0137] This SIM update flag is used for target judgment when updating actual data. In other words, by detecting the SIM update flag, it is possible to recognize data (SIM order data, SIM manufacturing delivery schedule data, or SIM manufacturing acceptance schedule data) that has been changed as a simulation, and to reflect this change in the actual data (order data, manufacturing delivery schedule data, or manufacturing acceptance schedule data).

[0138] Next, as described with reference to Fig. 40, when the production due date of the simulation planned receiving data is changed and input to "October 2, 2022" and the Confirm button 61 is operated, the display control unit 21 displays the product inventory plan inquiry screen again, as shown in Fig. 42. The operator operates the inquiry execution button 50 on the product inventory plan inquiry screen to check the simulation results in which the production due date of the simulation planned receiving data has been changed to "October 2, 2022".

[0139] As a result, the manufacturing delivery date of the simulation acceptance schedule data is brought forward from "October 3, 2022" to "October 2, 2022", and as shown in FIG. 43, the product with the lot number "L005" and "100 lots" is received on October 2 (the number of manufactured acceptances of 100 lots), and the number of fluctuations and the number of carryovers are "100 lots - 10 lots - 10 lots = 80 lots". In addition, the manufacturing dispatch allocation number due to this is "10 lots + 10 lots = 20 lots". In addition, since the storage control unit 25 has allocated 20 lots of products from the product with the lot number "L005" in this way, the lot number of the manufacturing dispatch schedule data work, which was "lot undecided" as shown in FIG. 27, is updated to "L005" as shown in FIG. 44 (b), and the lot number of the lot to be allocated is identified. Note that FIG. 44 (a) is the order data of the above-mentioned order data work.

[0140] As shown in Fig. 45(c), the SIM update flag of the SIM manufacturing and receiving schedule data has been updated to "1," as described above. Fig. 41(a) and Fig. 41(b) are the above-mentioned SIM order data and SIM manufacturing and dispensing schedule data, respectively.

[0141] Also, Fig. 46 is a diagram showing the display contents displayed in the result display area 55 of the product inventory plan inquiry screen by the display control unit 21. From the display contents of Fig. 46, the operator etc. can recognize that by moving up the manufacturing delivery date from October 3rd to October 2nd, the lot to be allocated is not undecided (allocation is not made for an undecided lot), and therefore no shortage will occur.

[0142] (Simulation process to change the shipping date due to stock shortage) Next, as another example of simulation processing, a simulation of dealing with a shortage by changing the shipping date will be described. As an example, assume that on October 2, 2022, the day the shortage occurred, it was discovered that there was stock that needed to be remade, although the lot was not yet determined. In this case, the operator checks the shortest delivery date after the change for the order placed on October 1, in order to prevent erroneous shipments such as shipping expired products, while enabling the delivery of products to customers in the shortest possible delivery date.

[0143] In this case, the operator operates the adjustment button 51 while the inquiry content shown in Fig. 48 is displayed on the product material manufacturing plan inquiry screen shown in Fig. 47 as described above. This causes the display control unit 21 to display the simulated order data, simulated delivery schedule data, and simulated receipt schedule data on the manufacturing inventory plan inquiry schedule adjustment screen shown in Fig. 49 based on the SIM order data, SIM manufacturing delivery schedule data, and SIM manufacturing receipt schedule data shown in Fig. 50(a) to Fig. 50(c).

[0144] On the manufacturing inventory plan inquiry schedule adjustment screen, the operator changes the scheduled shipping date of the simulation order data, for example, from "October 1, 2022" to "October 3, 2022," as shown in FIG. 51, and then operates the confirm button 61.

[0145] As a result, the storage control unit 25 updates the scheduled shipping date of the SIM order data to "October 3, 2022" as shown in Fig. 52(a), and updates the SIM update flag from "0" to "1." Note that in this case, no data updates are performed on the SIM manufacturing and dispensing schedule data shown in Fig. 52(b) and the SIM manufacturing and receiving schedule data shown in Fig. 52(c).

[0146] Furthermore, when the Confirm button 61 is operated, the display control unit 21 returns the display screen from the manufacturing inventory plan inquiry schedule adjustment screen to the manufacturing inventory plan inquiry screen shown in Fig. 53. The operator operates the inquiry execution button 50 on the manufacturing inventory plan inquiry screen shown in Fig. 53. This causes the above-mentioned "loop processing of the set period from the reference date" to be performed again, and the result display screen data shown in Fig. 54 is generated.

[0147] At this time, since the scheduled shipping date has been changed from "October 1, 2022" to "October 3, 2022", the product with the lot number "L001" shown in FIG. 54 will expire on October 1, so the memory control unit 25 releases the allocation from the product with the lot number "L001". Then, the memory control unit 25 allocates "20 lots" from the "100 lots" of the product with the lot number "L005" whose shipping deadline is October 20 as shown in FIG. 54, with the allocation from the product with the lot number "L001" released. As a result, the memory control unit 25 sets the change number and carryover number of the record with the lot number "L005" to "100 lots - 20 lots = 80 lots", respectively, and sets the order allocation number to "20 lots", as shown in FIG. 54.

[0148] Also, the storage control unit 25 updates the lot number indicating the allocation source of the order data work, which was previously set to "L001", to "L005" as shown in Fig. 55(a). Note that no update is made to the production and delivery schedule data work for Fig. 55(b).

[0149] The storage control unit 25 also clears (updates from "1" to "0") the SIM update flag of the SIM order data shown in Fig. 56(a) corresponding to the order data for which the allocation has been released, and sets (updates from "0" to "1") the SIM update flag of the SIM manufacturing acceptance schedule data shown in Fig. 56(c) corresponding to the lot number "L005" that has newly become the subject of allocation. Note that the storage control unit 25 does not perform an update process on the SIM manufacturing and dispensing schedule data shown in Fig. 56(b).

[0150] As a result, the result display screen data of the result display screen work becomes result display screen data indicating that the allocation from the lot "L001" on October 1, 2022 has been released and instead the lot "L005" on October 3, 2022 has been allocated, as shown in FIG. 57. The display control unit 21 displays this result display screen data in the result display area 55 shown in FIG. 53. This allows same-day allocation to be made for the incoming inventory on the day, and the operator can confirm that the goods can be shipped on October 3 at the earliest. Therefore, the operator can negotiate the delivery date with the delivery destination based on this confirmation result.

[0151] (Actual data update process based on simulation results) Next, the inventory management device 1 of the embodiment is capable of updating the actual data based on the simulation results. Fig. 59 shows an overview of the updating process of the actual data based on the simulation results. When the operator updates the production acceptance schedule data, which is an example of the actual data, with the reflection result on the SIM production acceptance schedule data by performing the above-mentioned simulation, for example, the allocation confirmation button 52 shown in Fig. 58.

[0152] When this allocation confirmation button 52 is operated, the extraction unit 22 extracts SIM manufacturing acceptance schedule data for which the SIM update flag is set to "1" as shown in Fig. 60 from the SIM manufacturing acceptance schedule data. The storage control unit 25 identifies the manufacturing acceptance schedule data with the same manufacturing instruction slip number as the manufacturing instruction slip number "SSZ00000001" attached to the extracted SIM manufacturing acceptance schedule data as shown in Fig. 61(a).

[0153] Then, the storage control unit 25 updates the manufacturing instruction slip number, manufacturing delivery date, product code, number of receipt instructions, lot number, inventory rank, shipping deadline, and expiration date of the identified manufacturing acceptance schedule data to the manufacturing instruction slip number, manufacturing delivery date, product code, number of receipt instructions, lot number, inventory rank, shipping deadline, and expiration date of the extracted SIM manufacturing acceptance schedule data. As a result, as shown in FIG. 61(b), manufacturing acceptance schedule data is generated in which the shipping deadline is updated to "October 19, 2022" and the expiration date is updated to "April 19, 2022".

[0154] In addition, when the SIM update flag is "0" like the SIM order data shown in FIG. 62(a) and the SIM manufacturing and delivery schedule data shown in FIG. 62(b), the storage control unit 25 does not reflect the change in the actual data.

[0155] (Actual data update process based on data work) Next, the inventory management device 1 of the embodiment is also capable of updating actual data based on various data works as shown in Figure 63. For example, when updating order data based on an order data work, the extraction unit 22 extracts the order slip number, line number, scheduled shipping date, product code, order quantity, lot number, inventory rank, and branch number from the order data work shown in Figure 64(a). The storage control unit 25 refers to the order data shown in Figure 64(b) based on the order slip number and line number extracted from the order data work, and detects order data with the same order slip number and line number as the order slip number and line number extracted from the order data work as shown in Figure 64(c).

[0156] The storage control unit 25 then updates the order slip number, line number, scheduled shipping date, product code, order quantity, lot number, inventory rank, and branch number of the detected order data to the order slip number, line number, scheduled shipping date, product code, order quantity, lot number, inventory rank, and branch number of the order data work. This allows the data in the order data work to be reflected in the order data.

[0157] In addition, it is also possible to update the production take-out schedule data based on the production take-out schedule data work as shown in Fig. 63. In this case, the extraction unit 22 extracts each data of the production take-out schedule data work as shown in Fig. 65(a). The storage control unit 25 refers to the production take-out schedule data shown in Fig. 65(b) based on the production instruction voucher number and row number of each data of the extracted production take-out schedule data work, and specifies the production take-out schedule data record of the same production instruction voucher number and row number as the production instruction voucher number and row number of each data of the extracted production take-out schedule data work.

[0158] In this example, since the manufacturing instruction slip number of each data of the extracted manufacturing take-out schedule data work is "SSZ00000003" and the row number is "1", the storage control unit 25 identifies the manufacturing take-out schedule data of the second column record shown in Fig. 65(b) with the manufacturing instruction slip number "SSZ00000003" and the row number "1". Then, the storage control unit 25 updates the identified manufacturing take-out schedule data with the manufacturing take-out schedule data extracted from the manufacturing take-out schedule data work.

[0159] Specifically, since the identified production take-out schedule data is one column of records, the storage control unit 25 temporarily deletes this production take-out schedule data. Then, the storage control unit 25 adds the production take-out schedule data of three columns of records extracted from the production take-out schedule data work to the production take-out schedule data as shown in FIG. 65(c). This allows the production take-out schedule data to be updated based on the production take-out schedule data work.

[0160] In addition, the storage control unit 25 performs an update process for records in which the lot number of the production and delivery schedule data work is "lot undecided" by leaving the lot number of the production and delivery schedule data blank.

[0161] (Data addition assistance function) Next, the inventory management device 1 of the embodiment is provided with a "data addition assistance function" that enables a simulation of changing the date by calling up data outside the range of dates initially specified. Specifically, as shown in Fig. 66, the product inventory plan inquiry schedule adjustment screen has an input field for the planned shipping date and stock rank of "order", an input field for the planned production date and stock rank of "delivery schedule", an input field for the production due date and stock rank of "receive schedule" in the data addition assistance area. Also, the data addition assistance area has an add order button 57, an add delivery schedule button 58, and an add receipt schedule button 59.

[0162] When calling up additional data from manufacturing acceptance data, the operator inputs a date outside the range of the originally specified date, such as "October 5, 2022," into the manufacturing delivery date field of "Planned acceptance" in the data addition assistance area, inputs an inventory rank such as "A," and operates the Add planned acceptance button 59, as shown in FIG.

[0163] When the acceptance schedule addition button 59 is operated, the extraction unit 22 refers to the manufacturing acceptance schedule data and the SIM manufacturing acceptance schedule data shown in FIG. 67, and extracts manufacturing acceptance schedule data that matches the following extraction conditions.

[0164] Extraction conditions = Production delivery date of production acceptance schedule data ≦ input production delivery date AND Inventory rank of production acceptance schedule data = input inventory rank AND does not exist in SIM production acceptance schedule data

[0165] As a result, in the example of FIG. 67, the extraction unit 22 extracts the manufacturing acceptance schedule data of the record in the second column as the manufacturing acceptance schedule data of the A-ranked product with the manufacturing delivery date of "October 5, 2022" input by the operator and that does not exist in the SIM manufacturing acceptance schedule data. The storage control unit 25 adds and stores the extracted manufacturing acceptance schedule data of the record in the second column to the simulation acceptance schedule data in the storage unit 2. The display control unit 21 reads out the manufacturing acceptance schedule data in the state in which the manufacturing acceptance schedule data of the record in the second column has been added in this way from the storage unit 2, and displays it in the display column of the simulation acceptance schedule data as shown in FIG. 68. This makes it possible to additionally call and display data outside the range of dates initially specified.

[0166] Next, the operator changes the production delivery date of the added production acceptance schedule data to, for example, "October 3, 2022." This makes it possible to use the added production acceptance schedule data in the above-mentioned simulation.

[0167] Furthermore, the storage control unit 25 updates the SIM manufacturing acceptance schedule data as described above based on the added manufacturing acceptance schedule data, thereby allowing the added manufacturing acceptance schedule data to be reflected in the manufacturing acceptance schedule data, which is actual data.

[0168] Next, if you want to retrieve order data outside the range of dates originally specified, enter the desired scheduled shipping date in the "Order" scheduled shipping date input field as shown in Figure 69, enter the desired inventory rank in the inventory rank input field, and then operate the Add Order button 57.

[0169] As a result, similarly to the above, the extraction unit 22 extracts order data that meets the following extraction conditions, and adds it to the simulation order data shown in FIG. 68 for display.

[0170] Extraction condition = Order data production date ≦ input production date AND Order data inventory rank = input inventory rank AND Does not exist in SIM order data

[0171] By changing the manufacturing lead time of the added order data, the added order data can be used in the above-mentioned simulation. Also, since the SIM order data is updated based on the added order data as described above, the added order data can be reflected in the order data, which is the actual data.

[0172] Next, if you want to call up production and delivery schedule data outside the range of dates originally specified, enter the desired scheduled production date in the "Scheduled Delivery" scheduled production date input field as shown in Figure 70, enter the desired inventory rank in the inventory rank input field, and operate the Add Delivery Schedule button 58.

[0173] As a result, similarly to the above, the extraction unit 22 extracts production delivery schedule data that meets the following extraction conditions, and adds it to the simulation delivery schedule data shown in FIG. 68 and displays it.

[0174] Extraction condition = Production delivery date of production delivery schedule data ≦ input production delivery date AND Stock rank of production delivery schedule data = input stock rank AND Does not exist in SIM production delivery schedule data

[0175] By changing the manufacturing delivery date of the added manufacturing delivery schedule data, the added manufacturing delivery schedule data can be used in the above-mentioned simulation. Also, since the SIM manufacturing delivery schedule data is updated as described above based on the added manufacturing delivery schedule data, the added manufacturing delivery schedule data can be reflected in the manufacturing delivery schedule data, which is the actual data.

[0176] (Effects of the embodiment) Nowadays, for example, manufacturers who manufacture products based on make-to-stock production or made-to-order production check the number of stocks that can be shipped when an order is received, and make decisions about shipping and manufacturing. As one example, chemical manufacturers who manufacture highly functional products place great importance on quality control, and because they handle products with short shelf lives, they must make shipping and manufacturing decisions taking into account the handling period (expiration date or (and) shipping period, etc.).

[0177] Previously, decisions about shipping and manufacturing were made based on the trend in total inventory (including shipping and production plans), making it difficult to determine whether inventory was available within the shipping deadline and / or expiration date, and making it difficult for sales or operations staff to grasp accurate inventory information at the customer ordering stage.

[0178] However, the inventory management device 1 according to the embodiment can generate and confirm production and shipping schedule information that reflects the inventory allocation results that take into account the product's shipping deadline and / or expiration date.

[0179] in particular, 1. It is possible to check the trends in inventory information for a specified period (including shipping schedules, production schedules, and arrival schedules). 2. You can check the information on inventory trends for which provisional allocation has been made (provisional allocation is implemented starting with inventory with the oldest shipping deadline). 3. It is possible to grasp the total number of allocated lots for each date, the number of inventory items whose shipping deadline has expired, and the number of inventory items that are within the deadline. 4. You can check the quantity, shipping deadline, expiration date, and inventory rank for each lot number on a daily basis. 5. It is possible to perform simulations by changing the dates of order data, scheduled delivery data, and scheduled receipt data. 6. Simulation results can be reflected in actual data.

[0180] Therefore, the inventory management device 1 of the embodiment allows the person in charge to quickly decide on shipping when the product is ordered, and the manufacturing department etc. to decide on the production plan. Also, in the shipping process, the shipping process can be efficiently performed while ensuring the quality.

[0181] [Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, and can therefore contribute to Goals 8 and 9 of the SDGs.

[0182] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to Goals 12, 13, and 15 of the SDGs.

[0183] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[0184] [Other embodiments] The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

[0185] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.

[0186] In addition, the processing procedures, control procedures, specific names, registered data for each process, information including parameters such as search conditions, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

[0187] Furthermore, with regard to the inventory management device 1, the components shown in the figures are merely conceptual functional components, and the device does not necessarily have to be physically configured as shown in the figures.

[0188] For example, the processing functions of the inventory management device 1, particularly the control unit 3 and each processing function performed by the control unit 3, may be realized in whole or in part by a CPU (Central Processing Unit) and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded in a non-transient computer-readable recording medium containing programmed instructions for causing the information processing device to execute the processing described in this embodiment, and is mechanically read by the inventory management device 1 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processing is recorded in a storage unit such as a ROM or HDD. This computer program is executed by being loaded into a RAM, and constitutes the control unit 3 in cooperation with the CPU.

[0189] In addition, the inventory management program of this inventory management device 1 may be stored in another server device connected to the inventory management device 1 via any network, and it is also possible to download all or part of it as needed.

[0190] In addition, the inventory management program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the term "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical Disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.

[0191] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration as multiple modules or libraries, and a program that works with a separate program, such as an OS, to achieve its function. Note that well-known configurations and procedures can be used for the specific configuration and reading procedure for reading a recording medium in the inventory management device 1 shown in the embodiment, as well as the installation procedure after reading.

[0192] The memory unit 2 is a storage means such as a memory device such as RAM or ROM, a fixed disk device such as a hard disk, a flexible disk, or an optical disk, and stores various programs, tables, databases, and web page files used for various processes and providing websites.

[0193] The inventory management device 1 may be configured as an information processing device such as a known personal computer device or a workstation, or may be configured as an information processing device connected to any peripheral device. The information processing device may be realized by implementing software (including programs or data, etc.) that realizes the processing described in this embodiment.

[0194] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Industrial Applicability]

[0195] The present invention is suitable for application to inventory management operations in industries that manage product inventory based on handling deadlines (expiration dates or shipping deadlines, etc.) In particular, more significant effects can be obtained by applying the invention to inventory management in industries that require strict quality control, such as food manufacturers and chemical (high-performance materials, pharmaceuticals, etc.) manufacturers. [Explanation of symbols]

[0196] 1. Inventory management device 2 Storage section 3. Control Unit 4. Communication Interface Section 5 Input / Output Interface Section 6 Input Devices 7 Output Devices 21 Display control unit 22 Extraction part 23 Calculation section 24 Data Generation Section 25 Memory control unit 50 Inquiry execution button 51 Adjustment button 52 Allocation confirmation button 53 Clear screen button 55 Results display area 57 Add order button 58 Add payment schedule button 59 Add receipt schedule button 61 Confirm button 62 Close button

Claims

1. A detection unit that detects the number of products in stock for each expiration date by referring to inventory data based on the expiration date attached to the product; a calculation unit that calculates an unallocated quantity for each of the products having the handling deadline by subtracting the number of products that have been allocated or are scheduled to be allocated from the inventory number of the products having the handling deadline; an allocation processing unit that allocates the allocated number of the products from the unallocated number of products with the shortest handling deadline among the handling deadlines on or after a reference date that is a specified date; a data generating unit that generates allocation result data including at least the handling deadline, the allocated number, and a carryover number obtained by subtracting the allocated number from the unallocated number for each of the commodities for which the inventory number has been detected; an output control unit that controls output of the generated allocation result data; An inventory management device having the following:

2. the allocation processing unit, when a period of a predetermined number of days from the reference date is specified together with the reference date, performs the allocation processing for each day corresponding to the number of days of the period from the reference date; the data generation unit generates allocation result data of the allocation process for each day; 2. The inventory management device according to claim 1,

3. The number of products allocated is an order allocation number corresponding to the number of orders for the products, or a production delivery allocation number corresponding to the number of products to be delivered; 3. The inventory management device according to claim 2, wherein:

4. The detection unit detects the number of manufactured and received products of the product during the period including the reference date by referring to manufacturing and receiving schedule data including a receiving instruction number, which is the number of the product to be delivered by a specified manufacturing delivery date; The allocation processing unit performs allocation processing on the allocated number of the products based on the production acceptance number, the data generation unit generates allocation result data including the manufacturing acceptance quantity on the date of the manufacturing acceptance as the allocation result data on the date of the manufacturing acceptance within the period; 4. The inventory management device according to claim 3,

5. The said product is a lot unit in which a predetermined number of products are bundled together and the said expiration date and lot number are added, the allocation processing unit performs the allocation processing based on the number of lots of products having the same lot number; 5. The inventory management device according to claim 4,

6. The detection unit generates data indicating the number of products in stock for each handling deadline detected by referring to the inventory data, and data indicating that the number of products in stock is set to "0", the handling deadline is left blank, and a lot number to be allocated is not yet determined, When the inventory quantity of the product does not reach the allocation quantity, the allocation processing unit performs allocation processing from the inventory quantity of "lot undecided", the data generating unit generates the allocation result data indicating that the allocation process has been performed based on the inventory quantity of "lot undecided"; 6. The inventory management device according to claim 5,

7. The data generating unit generates SIM order data, which is order data for a simulation and includes a scheduled shipping date, an order quantity, and an update flag, SIM production and delivery schedule data, which is production and delivery schedule data for a simulation and includes a scheduled production date, a scheduled delivery quantity, and an update flag, and SIM production and delivery schedule data, which is production and delivery schedule data for a simulation and includes a production delivery date, a number of delivery instructions, a handling deadline, and an update flag, When an adjustment for simulation is instructed, the output control unit outputs simulation order data corresponding to the SIM order data, simulation take-out schedule data corresponding to the SIM manufacturing take-out schedule data, and simulation acceptance schedule data corresponding to the SIM manufacturing acceptance schedule data; At least the scheduled shipping date, the scheduled manufacturing date, or the manufacturing delivery date can be changed to a desired value, the data generation unit, when the scheduled shipping date is changed, changes the scheduled shipping date in the SIM order data and changes the update flag to a value indicating that the scheduled shipping date has been changed; when the scheduled manufacturing date is changed, changes the scheduled manufacturing date in the SIM manufacturing and discharging schedule data and changes the update flag to a value indicating that the scheduled manufacturing date has been changed; when the manufacturing delivery date is changed, changes the manufacturing delivery date in the SIM manufacturing and receiving schedule data and changes the update flag to a value indicating that the manufacturing delivery date has been changed; the allocation processing unit, when a scheduled shipping date of the SIM order data is changed and an instruction to execute a simulation is given, cancels the allocation result of the order quantity before the change in the scheduled shipping date, and performs an allocation process for the order quantity of the commodity as the allocation quantity from the unallocated quantity of the commodity with the shortest handling deadline among the handling deadlines on and after the changed scheduled shipping date of the SIM order data; when a scheduled production date of the SIM production dispensing schedule data is changed and an instruction to execute a simulation is given, cancels the allocation result of the scheduled dispensing quantity before the change in the scheduled production date, and performs an allocation process for the scheduled dispensing quantity of the commodity as the allocation quantity from the unallocated quantity of the commodity with the shortest handling deadline among the handling deadlines on and after the changed scheduled production date of the SIM production dispensing schedule data; when a production delivery date of the SIM production acceptance schedule data is changed and an instruction to execute a simulation is given, cancels the allocation result before the change in the production delivery date, and performs an allocation process based on the production acceptance quantity to be received on the production delivery date; the output control unit controls output of a result of the simulation as the allocation result data; 7. The inventory management device according to claim 6,

8. a storage control unit which, when execution of an allocation determination process for updating actual data based on the results of the simulation is specified, detects data including the update flag indicating that the value has been changed from among the SIM order data, the SIM production outgoing data, and the SIM production acceptance schedule data, and updates the order data, production outgoing data, or production acceptance schedule data, which is the actual data stored in the storage unit, based on the detected SIM order data, SIM production outgoing data, or SIM production acceptance schedule data; 8. The inventory management device according to claim 7,

9. when another scheduled shipping date, scheduled manufacturing date, or scheduled manufacturing delivery date is additionally specified as the scheduled shipping date, the scheduled manufacturing date, or the scheduled manufacturing delivery date, the detection unit detects order data corresponding to the additionally specified other scheduled shipping date, detects scheduled manufacturing take-out data corresponding to the additionally specified other scheduled manufacturing date, or detects scheduled manufacturing acceptance data corresponding to the additionally specified other scheduled manufacturing delivery date, the output control unit controls output of the record of the order data corresponding to the other detected scheduled shipping dates as an additional record of the simulated order data, controls output of the record of the production outgoing schedule data corresponding to the other detected scheduled production dates as an additional record of the simulated outgoing schedule data, and controls output of the record of the production acceptance schedule data corresponding to the other detected production delivery dates as an additional record of the simulated acceptance schedule data; 9. The inventory management device according to claim 7 or 8,

10. A detection step in which a detection unit detects the number of products in stock for each expiration date by referring to inventory data based on the expiration date attached to the product; a calculation step in which a calculation unit calculates an unallocated quantity for each of the products having the handling deadline by subtracting the number of products that have been allocated or are scheduled to be allocated from the inventory number of the products having the handling deadline; an allocation processing step in which an allocation processing unit allocates the allocated number of the products from the unallocated number of the products having the shortest handling deadline among the handling deadlines on or after a reference date that is a specified date; a data generating step in which a data generating unit generates allocation result data including at least the handling deadline, the allocated number, and a carryover number obtained by subtracting the allocated number from the unallocated number for each of the commodities for which the inventory number has been detected; an output control step in which an output control unit controls output of the generated allocation result data; An inventory control method having the following features.

11. Computer, A detection unit that detects the number of products in stock for each expiration date by referring to inventory data based on the expiration date attached to the product; a calculation unit that calculates an unallocated quantity for each of the products having the handling deadline by subtracting the number of products that have been allocated or are scheduled to be allocated from the inventory number of the products having the handling deadline; an allocation processing unit that allocates the allocated number of the products from the unallocated number of products with the shortest handling deadline among the handling deadlines on or after a reference date that is a specified date; a data generating unit that generates allocation result data including at least the handling deadline, the allocated number, and a carryover number obtained by subtracting the allocated number from the unallocated number for each of the commodities for which the inventory number has been detected; functioning as an output control unit that controls output of the generated allocation result data; An inventory management program that features:

Citation Information

Patent Citations

  • Inventory managing system and inventory managing method

    JP2005060034A

  • Stock allocation management system and stock allocation management method

    JP2006318280A

  • Inventory re-reservation execution device, inventory re-reservation execution method, and inventory re-reservation execution program

    JP2020052831A

  • Assorted product creating device, assorted product creating method, and assorted product creating program

    JP2020166663A

  • System and method for optimizing product inventory through intelligent adjustment of inbound purchase orders

    JP2023018105A