Control device, disaster prevention system, control method, and program
The control device enhances disaster prevention systems by integrating real-time data and simulation models to predict and manage disaster progression, ensuring effective operation of prevention equipment.
Patent Information
- Application Number
- JP2023046676
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-23
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2043-03-23
AI Technical Summary
Conventional disaster prevention systems fail to accurately predict disaster progression due to not accounting for ever-changing conditions at the disaster site and the operation of disaster prevention equipment such as detectors and sprinklers.
A control device that includes data acquisition, prediction, and control units to monitor and operate disaster prevention equipment based on real-time measurements and simulations using computational fluid dynamics models, creating a database of disaster progression scenarios to inform equipment operation.
Enables accurate, real-time prediction and operation of disaster prevention equipment to mitigate disasters effectively.
Smart Images

Figure 2024135805000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a control device for a disaster prevention system, a disaster prevention system, a control method, and a program. [Background technology]
[0002] In general disaster prevention systems, after a fire breaks out, smoke detectors and heat detectors are activated in response to smoke and heat generated from the flames, and disaster prevention equipment such as sprinklers and fire doors are activated in conjunction with the detectors. In contrast, Patent Document 1 discloses a disaster prevention support system that predicts the progress of a disaster situation when disaster information and natural conditions are input, and develops appropriate disaster prevention measures based on the prediction results. Patent Document 2 discloses a fire monitoring system that judges a fire based on an estimated value output when image information of a monitoring area is input to multiple fire detectors that have been trained by deep learning for each type of fire. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Publication No. H9-35168 [Patent Document 2] JP 2019-79445 A [Non-patent literature]
[0004] [Non-Patent Document 1] Kajima Construction, "Development and deployment of advanced fire evacuation simulation system 'Human-Heat-Smoke Coupled Evacuation Simulator PSTARS', [Retrieved January 17, 2023], Internet https: / / www.kajima.co.jp / news / press / 201407 / 30a1-j.htm> Summary of the Invention [Problem to be solved by the invention]
[0005] Conventional technology predicts the progression of disaster situations based on input values, but does not predict the situation at the disaster site, which changes from moment to moment.Furthermore, when predicting disaster situations, it does not take into account the operation of disaster prevention equipment such as detectors, sprinklers, and fire doors.
[0006] The present disclosure provides a control device, a disaster prevention system, a control method, and a program that can solve the above problems. [Means for solving the problem]
[0007] The control device of the present disclosure comprises a data acquisition unit that acquires measurement information measuring the situation in a target area and operation information indicating the operating status of disaster prevention equipment, a database in which analysis results of an analysis of how a disaster will progress depending on the situation in the target area and the operating status of the disaster prevention equipment are registered, a prediction unit that predicts the progression of the disaster based on the measurement information, the operation information, and the database when a disaster occurs in the target area, and a control unit that controls the operation of the disaster prevention equipment based on the prediction result of the disaster progression by the prediction unit and disaster prevention countermeasure setting information that defines how the disaster prevention equipment is to operate depending on the situation of the disaster.
[0008] The disaster prevention system of the present disclosure includes a measuring device that measures the situation in a target area, a disaster prevention device, and the above-mentioned control device.
[0009] The control method disclosed herein includes the steps of acquiring measurement information measuring the situation in a target area and operation information indicating the operating status of disaster prevention equipment, predicting the progression of a disaster when a disaster occurs in the target area based on the measurement information, the operation information, and a database in which analysis results of how the disaster will progress depending on the situation in the target area and the operating status of the disaster prevention equipment are registered, and controlling the operation of the disaster prevention equipment based on the prediction results of the disaster progression obtained by the predicting step and disaster prevention countermeasure setting information that defines how the disaster prevention equipment is to operate depending on the situation of the disaster.
[0010] The program disclosed herein causes a computer to execute the steps of acquiring measurement information measuring the situation in a target area and operation information indicating the operating status of disaster prevention equipment; predicting the progression of a disaster when a disaster occurs in the target area based on the measurement information, the operation information, and a database in which analysis results of how the disaster will progress depending on the situation in the target area and the operating status of the disaster prevention equipment are registered; and controlling the operation of the disaster prevention equipment based on the prediction results of the disaster progression obtained by the prediction step and disaster prevention countermeasure setting information that defines how the disaster prevention equipment is to operate depending on the situation of the disaster. Effect of the Invention
[0011] According to the above-mentioned control device, disaster prevention system, control method and program, it is possible to accurately predict the progression of a disaster in real time according to the situation at the disaster site, and to operate disaster prevention equipment based on the prediction. [Brief description of the drawings]
[0012] [Figure 1] 1 is a functional block diagram illustrating an example of a disaster prevention system according to a first embodiment. [Diagram 2] 4 is a flowchart showing an example of a flow and operation of system construction of the disaster prevention system according to the first embodiment. [Diagram 3] 1 is a diagram illustrating an example of a system configuration of a disaster prevention system according to a first embodiment. [Figure 4] FIG. 11 is a functional block diagram showing an example of a disaster prevention system according to a second embodiment. [Diagram 5] FIG. 11 is a diagram illustrating an example of a system configuration of a disaster prevention system according to a second embodiment. [Figure 6] FIG. 13 is a functional block diagram showing an example of a disaster prevention system according to a third embodiment. [Figure 7] 13 is a flowchart showing an example of the flow and operation of system construction of a disaster prevention system according to a third embodiment. [Figure 8]FIG. 13 is a diagram illustrating an example of a system configuration of a disaster prevention system according to a third embodiment. [Figure 9] FIG. 2 is a diagram illustrating an example of a hardware configuration of a control device according to each embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] First Embodiment Hereinafter, a disaster prevention system according to the present disclosure will be described with reference to FIGS. (composition) FIG. 1 is a functional block diagram illustrating an example of a disaster prevention system according to a first embodiment. The disaster prevention system 100 quickly detects disasters that occur in various disaster prevention target facilities such as buildings, commercial facilities, schools, hospitals, parks, and outdoor structures, and predicts with high accuracy the future progression of the disaster in accordance with the ever-changing disaster situation. Based on the prediction, it appropriately operates disaster prevention equipment such as sprinklers and fire doors to prevent the disaster from progressing and the damage from spreading.
[0014] As shown in the figure, the disaster prevention system 100 includes a measuring device / detector 1 , a disaster prevention device 2 , and a control device 10 . The measuring instruments / detectors 1 are, for example, thermometers, hygrometers, pressure gauges, wind speed and direction gauges, smoke detectors, heat detectors, gas detectors, etc., installed in various locations in disaster prevention facilities. The control device 10 and the measuring instruments / detectors 1 are connected via a network or the like. Information detected by the measuring instruments / detectors 1 is transmitted to the control device 10.
[0015] The disaster prevention equipment 2 is, for example, a disaster prevention door, a sprinkler, a signal light, a notification device, an alarm device, etc., installed in various places in a disaster prevention facility. The disaster prevention equipment 2 also includes visual and audio devices such as a display device such as a PC monitor, an electronic bulletin board, and a speaker. The control device 10 and the disaster prevention equipment 2 are connected via a network or the like. The control device 10 transmits a control signal to operate the disaster prevention equipment 2. The disaster prevention equipment 2 transmits the operating state of its own device to the control device 10.
[0016] The control device 10 includes a data acquisition unit 11 , an input reception unit 12 , a disaster simulation unit 13 , a disaster prediction determination unit 14 , a control unit 15 , and a memory unit 16 .
[0017] The data acquisition unit 11 acquires information measured and detected by the measuring equipment / detector 1. For example, the data acquisition unit 11 acquires temperature, humidity, pressure, wind direction, wind speed, and detection results of fire, smoke, and gas. The data acquisition unit 11 also acquires the operating status (start, stop, operating mode, etc.) of the disaster prevention equipment 2. The data acquisition unit 11 stores the acquired information in the memory unit 16.
[0018] The input receiving unit 12 receives instruction information and setting information (such as a degree of coincidence and disaster prevention measures, which will be described later) input by a user using an input device such as a keyboard, a mouse, or a touch panel.
[0019] The disaster simulation unit 13 simulates the progression of various disasters such as fires under various assumed conditions. The various conditions are environmental and meteorological conditions such as wind direction, wind speed, and temperature (these are referred to as meteorological conditions), the location of the disaster (such as the location of a fire), and the operating conditions of disaster prevention equipment (for example, the temperature and smoke concentration at which the detector operates, the water discharge angle and water discharge amount of the sprinkler, whether the sprinklers and fire doors operate in conjunction with the detectors, and the timing of operating the sprinklers). The disaster simulation unit 13 changes these conditions to perform simulations for an enormous number of cases. In the simulation of the progression of a disaster, unsteady calculations are performed using a computational fluid dynamics (CFD: Computational Fluid Dynamic) model that targets heat flow, material transport, and the like, rather than using simple calculation formulas or models. For example, the CFD model is mainly composed of (1) a fluid dynamics model (mass, momentum, and energy conservation equations, material transport equations), (2) a combustion model, (3) a radiation model, and (4) a solid model. By performing a detailed simulation based on the CFD model, highly accurate calculation results can be obtained. Since the simulation based on the CFD model is a non-steady analysis, it can simulate the progress of a fire or the like from moment to moment, and can calculate the temperature, gas concentration, and smoke concentration at each location at each time. Furthermore, since the simulation takes into account the operating state of the disaster prevention equipment 2 (sprinklers, fire doors, etc.), calculation results that are more realistic in the event of a disaster can be obtained. The disaster simulation unit 13 performs simulations by changing the weather conditions, fire location, and operating conditions in various ways, performs calculations in advance using a huge number of input conditions, and stores the results in a database (this database is called the "disaster progress database" or "disaster progress DB").For example, when a fire is detected at point A at time t0, the weather conditions such as temperature, wind direction, and wind speed measured at each point at time t0 and the operating conditions of each disaster prevention device after time t0 (for example, when the sprinkler is activated immediately after the fire is detected, when it is activated one minute later, when it is activated five minutes later, etc.) are variously changed, and the future progress of the fire is calculated by the CFD model for each combination of various conditions, and the simulation results (also called analysis results) for each weather condition and operating condition are registered in the disaster progress DB 131. As a result, when a fire is actually detected at point A, the disaster progress DB 131 is searched based on the weather conditions of each place actually measured by the measuring device / detector 1 and the actual operating conditions of the disaster prevention device 2 at that time, and detailed fire progress prediction information obtained by a prior simulation can be obtained by referring to the analysis results that match or have a high degree of match with the weather conditions and operating conditions.
[0020] The disaster prediction determination unit 14 determines the occurrence and end of a disaster based on the information measured and detected by the measuring device / detector 1 acquired by the data acquisition unit 11, the operating state of the disaster prevention device 2, and the like. When the disaster prediction determination unit 14 determines that a disaster has occurred, it refers to the disaster progression DB 131 based on the information measured and detected by the measuring device / detector 1 acquired by the data acquisition unit 11 and the operating state of the disaster prevention device 2, and reads out a simulation result that matches or has a high degree of match with the actual weather conditions at the disaster site, the location of the disaster occurrence, and the operating conditions. The read-out simulation result includes, for example, the temperature at each point for each minute in the future, the arrival state of the flame, the concentration of smoke, and the like. In addition, since the calculation is performed in the prior simulation taking into account the state in which the disaster prevention device 2 operated, the simulation result includes the calculation result according to the operation of the disaster prevention device 2. The disaster prediction determination unit 14 refers to the disaster progression DB 131 based on new data acquired by the data acquisition unit 11 from moment to moment, obtains a simulation result according to the latest situation at the site, and performs a real-time disaster progression prediction. For example, even if the wind direction changes and the direction in which the flame spreads changes, the disaster prediction determination unit 14 can quickly predict the progress of the fire according to the change in the wind direction by selecting a simulation result from the disaster progression DB 131 in which the changed wind direction is used as the weather condition. In addition, if multiple simulation results with the same degree of coincidence with the latest weather conditions and operating conditions are found in the disaster progression DB 131, the disaster prediction determination unit 14 may select multiple simulation results as candidates for future disaster scenarios, assuming that all of these simulation results indicate a disaster situation that may progress from the current situation. In addition, the disaster prediction determination unit 14 may output the simulation results selected from the disaster progression DB 131 and the degree of coincidence to a display device or the like. The user can recognize the future disaster progress situation by referring to the displayed simulation results. In addition, the disaster prediction determination unit 14 may record the simulation results selected at each time in the storage unit 16, and later output a time-series list information of the simulation results selected at each time to a display device, an electronic file, or the like.
[0021] The control unit 15 controls the operation of the disaster prevention equipment 2 based on the disaster progression prediction made by the disaster prediction determination unit 14 and the disaster prevention countermeasure settings. The disaster prevention countermeasure settings are set by determining how the disaster prevention equipment 2 should be operated to quickly end the disaster or minimize the damage in response to various disaster situations. For example, if it is predicted that a fire will spread and invade point B in 10 minutes, the control unit 15 transmits a control signal to a sprinkler installed at point B to spray water from the sprinkler a little before (e.g., 8 minutes after) based on the disaster prevention countermeasure settings. (In this example, the user has set in advance as a disaster prevention countermeasure setting that the sprinkler should be activated 2 minutes before the fire arrives.)
[0022] The storage unit 16 stores various information acquired by the data acquisition unit 11 and the input reception unit 12, a disaster progression DB 131, etc. The disaster progression DB 131 may be stored in an external storage device such as a so-called cloud computing system.
[0023] (operation) Next, the operation of the disaster prevention system 100 will be described with reference to Fig. 2 and Fig. 3, taking the case of a fire as an example. Fig. 2 is a flowchart showing an example of the system construction flow and operation of the disaster prevention system 100 according to the first embodiment. Fig. 3 is a diagram showing an example of the configuration of the disaster prevention system 100 according to the first embodiment. The symbols S1 to S11 in Fig. 2 and Fig. 3 correspond to each other. First, the disaster simulation unit 13 performs n analyses (simulations based on the CFD model) (step S1). The disaster simulation unit 13 performs an enormous number of unsteady analyses using the CFD model by changing as many conditions as possible regarding the weather conditions, the location of the fire, and the operating conditions of the disaster prevention equipment 2. The disaster simulation unit 13 stores the analysis results in the storage unit 16 as the disaster progression DB 131 (step S2).
[0024] Next, the on-site measuring instruments / detectors 1 and disaster prevention equipment 2 are connected to the control device 10 via a network (step S3). Next, the user sets the degree of agreement (step S4). For example, the user sets the degree to which the actual weather conditions, etc. must be similar to the weather conditions, etc. set in the preliminary simulation to be considered as an agreement, or the degree to which the actual disaster progression status and the simulation results must be similar to be considered as an agreement. For example, the following methods can be used to evaluate the degree of agreement between the actual disaster progression status and the simulation results. (Method 1) Compare the physical quantities of the points. For example, the instantaneous measured values of each measurement point, such as the temperature of a thermometer installed indoors, the temperature at the sprinkler sensor location, and the gas concentration of a gas detector, are compared with the simulation results to evaluate the degree of agreement. For example, the absolute value or percentage of the numerical difference that is considered to be an agreement for the temperature and gas concentration of each measurement point is set, and the degree of agreement is evaluated for each measurement point and measurement time. Simulation results with a large number of data points that can be considered to be an agreement are evaluated as simulation results with a high degree of agreement. (Method 2) Compare the physical quantities or changes in the physical quantities of the surfaces. Specifically, compare the statistical values of the physical quantities over time and space. For example, based on the physical quantities measured at a certain measurement point at a certain time, calculate the change in the physical quantity from the start to the end of the certain time, or the change rate of the physical quantity per unit time, and perform the same calculation on the simulation results to compare the two. A simulation result in which the difference between the change amount or change rate of the actual physical quantity and the change amount or change rate of the simulation result falls within a certain range is evaluated as a simulation result with a high degree of agreement. Also, for example, the standard deviation of the temperature distribution of the entire space is calculated from the temperatures of multiple measurement points at a certain time, and a simulation result in which the difference from the standard deviation of the actual temperature distribution falls within a certain range is evaluated as a simulation result with a high degree of agreement. For example, when multiple thermometers are installed in a room, the average value measured by the multiple thermometers may be compared with the average temperature of the entire room shown in the simulation result, or the difference between the measured values of the temperatures at the center and corners of the room may be compared with the temperature difference between the center and corners of the room shown in the simulation result. The user may set either (Method 1) or (Method 2) as the method for evaluating the degree of agreement, or may set both (Method 1) and (Method 2) as the method for evaluating the degree of agreement. In addition, the criteria for evaluating the agreement using these methods, such as the absolute value of the numerical difference (for example, if the temperature difference is within 50°C, it is considered to be an agreement), the ratio (for example, if the reality and the analysis result are within ±10%, it is considered to be an agreement), the range to be considered to be an agreement, etc., can be set arbitrarily by considering how conservative the user wants to operate. In addition, regarding the final evaluation of the degree of agreement, a simulation result with a larger number of points or faces that can be considered to be an agreement may be evaluated as a simulation result with a higher degree of agreement, or, instead of determining whether or not the difference between the reality and the simulation result for each point or face is included in the range to be considered to be an agreement, a numerical evaluation value may be calculated (for example, the smaller the difference, the larger the evaluation value), and the simulation result with a larger total evaluation value may be evaluated as a simulation result with a higher degree of agreement.
[0025] The setting of the degree of agreement is used in the following situations. For example, a fire breaks out at time t0. The disaster prediction determination unit 14 compares the actual weather conditions, fire location, and operation conditions at time t0 with the weather conditions, fire location, and operation conditions of the simulation results registered in the DB 131, and selects as candidates the simulation results in which the difference between each condition falls within a set range. Furthermore, X1 minutes after time t0, the disaster prediction determination unit 14 compares the analysis result after X1 minutes from the simulation results selected as candidates at time t0 with the actual situation at that time (the latest weather conditions and operation state acquired by the data acquisition unit 11), and selects as a fire progression scenario corresponding to the latest fire situation the simulation results in which the difference between each condition falls within a set range. At the scene, as the fire progresses, the operation status and measurement results of the detectors, thermometers, and disaster prevention equipment are updated. The updated results are immediately fed back to the disaster prevention system 100, and the analysis result with the highest degree of agreement is searched for. As a result, the analysis results with a high degree of agreement are narrowed down as time passes, and the accuracy of the fire progression prediction improves as time passes. Alternatively, X1 minutes after time t0, the disaster prediction determination unit 14 may select, for all simulation results registered in the DB 131, a simulation result in which the difference between the analysis result X1 minutes after the fire outbreak in each simulation result and the actual situation falls within a set range as a fire progression scenario corresponding to the latest fire situation. The user may also set a stage for the degree of agreement. For example, if the absolute value of the numerical difference is r1 or less, the simulation result is the most likely at present, and if the absolute value of the numerical difference is r2 (r2>r1) or less, the simulation result is (not very likely but) possible depending on the future situation. A plurality of stages may be set with different degrees of agreement. When the user inputs the setting of the degree of agreement, the input receiving unit 12 receives the setting and records it in the storage unit 16.
[0026] Next, the user sets disaster prevention measures (step S5). For example, the user sets what disaster prevention measures are to be taken when what analysis results and degree of agreement are obtained. For example, the user sets that if an analysis result that a fire spreads to point B occurs and the degree of agreement with this analysis result falls within a set range, the sprinklers installed at point B will be activated two minutes before the fire spreads to point B. In addition, the user may set that fire doors are activated so that fire doors in places where fire progresses quickly are closed while leaving evacuation routes for people. For example, when the detectors in rooms A and B are activated, the fire doors on the east side are all activated immediately because fire and smoke tend to flow to the east side, but the fire doors on the west side are not activated for evacuation purposes until the detector in room C is activated. In addition, the user may set that evacuation instructions (such as instructions for an evacuation route with less smoke) are output using a display device or speaker. As an example of settings according to the degree of agreement, since room A is less susceptible to water damage, the sprinklers in room A are activated even if the degree of agreement is low, but since room B is more susceptible to water damage, the sprinklers in room B may be set to activate only when a high degree of agreement is obtained. The above is the processing carried out in advance. Disaster prevention system 100 is constructed by steps S1 to S5.
[0027] Next, a real-time progression prediction process in a scene where a fire actually occurs will be described. A fire occurs (step S6). For example, data indicating that heat or smoke corresponding to a fire has been detected is transmitted from a smoke detector or a heat detector (measuring device / detector 1) to the control device 10, and the disaster prediction determination unit 14 determines that a fire has occurred. The disaster prevention system 100 grasps the situation at the site (step S7). The measuring device / detector 1 transmits measurement results / detection results such as temperature, smoke, and heat at each location to the control device 10. The disaster prevention device 2 transmits the operating state of its own device to the control device 10. The data acquisition unit 11 acquires the transmitted data and records it in the storage unit 16. Next, the disaster prediction determination unit 14 performs a coincidence evaluation and an analysis result search (step S8). The disaster prediction determination unit 14 reads out data such as temperature recorded in the storage unit 16 in step S7, and compares it with the weather conditions, fire position, operating conditions, and analysis results in each simulation result registered in the disaster progression DB 131. The disaster prediction determination unit 14 selects the simulation result with the highest degree of coincidence based on the degree of coincidence set in step S4. If multiple simulation results with similar degrees of coincidence are registered in the disaster progression DB 131, the disaster prediction determination unit 14 may select all of them. Alternatively, the disaster prediction determination unit 14 may select multiple simulation results in descending order of degree of coincidence.
[0028] Next, the disaster prevention system 100 performs a fire progression prediction and disaster prevention measures (step S9). The disaster prediction determination unit 14 predicts the progression of the fire based on the simulation result selected in step S8. For example, when a certain simulation result is selected, the disaster prediction determination unit 14 sets the analysis result (for example, temperature and smoke / gas concentration at each time and each position) several minutes, 10 minutes, 30 minutes, etc., included in the simulation result as a fire progression prediction. The control unit 15 operates the disaster prevention device 2 connected by the network based on the fire progression prediction result and the disaster prevention measures set in step S5, and performs fire extinguishing and evacuation instructions. For example, the control unit 15 activates the sprinklers at the fire occurrence location, closes all fire doors except for those on the evacuation route, and displays a guide to the evacuation route.
[0029] Next, the disaster prevention system 100 updates the on-site situation and prediction (step S10). The disaster prevention system 100 repeats the processes of steps S7 to S9. The data acquisition unit 11 acquires data transmitted by the measuring instruments and detectors 1 from time to time, and the disaster prediction determination unit 14 selects the simulation result with the highest degree of agreement from the DB 131 based on the latest acquired data, and adopts the near-future disaster situation indicated by the simulation result as a prediction of the progression of the fire that has actually occurred. The control unit 15 operates the disaster prevention equipment 2 based on the fire progression prediction and the settings of disaster prevention measures, and implements disaster prevention measures according to the latest situation.
[0030] Next, the disaster prediction determination unit 14 determines whether the fire has ended or not (step S11). For example, when the temperature at each point acquired by the data acquisition unit 11 falls below a predetermined set value, the disaster prediction determination unit 14 determines that the fire has ended. Also, when the input reception unit 12 receives an input from the user indicating that evacuation has been completed, the disaster prediction determination unit 14 determines that evacuation has been completed. If it is determined that the fire has ended or that evacuation has been completed (step S11; Yes), the processing of the real-time progress prediction is terminated (step S12). If not (step S11; No), the processing from step S7 onwards is repeatedly executed.
[0031] (effect) As described above, according to this embodiment, the progress of a disaster can be predicted accurately in real time according to the moment-to-moment changes in the situation at the disaster site, and the disaster prevention equipment 2 can be operated based on the prediction. Simulation results including the physical model and the operating state of the disaster prevention equipment 2 can be compiled into a database, and by referring to the database, a highly accurate prediction of the progress of a fire can be made, and appropriate disaster prevention measures can be taken. Although it is necessary to create a database in advance, the disaster prevention system 100 can be constructed using existing equipment such as other detectors and disaster prevention equipment, so that the introduction cost can be reduced.
[0032] Second Embodiment A disaster prevention system 100a according to a second embodiment of the present invention will be described below with reference to Fig. 4 and Fig. 5. In the first embodiment, when a fire occurs, the situation at the scene is detected using an existing measuring device / detector 1 and disaster prevention device 2. In the second embodiment, a camera (for example, an existing surveillance camera) is combined with AI technology (machine learning) to add a configuration to the system that can determine fire or smoke from images captured by the camera.
[0033] 4 is a functional block diagram showing an example of a disaster prevention system 100a according to the second embodiment. Among the components according to the second embodiment of the present invention, the same functional units as those constituting the disaster prevention system 100 according to the first embodiment of the present invention are given the same reference numerals, and the description of each is omitted. The disaster prevention system 100a according to the second embodiment includes an AI-equipped camera 1a in addition to the components of the first embodiment. The AI-equipped camera 1a includes a camera and an AI function that detects fires and smoke from images based on images captured by the camera itself. For the AI function, for example, a huge number of images that show fires and smoke are learned, and a model that detects fires and smoke from images is constructed using machine learning and deep learning, and this is installed in the AI function. The AI function judges the occurrence of fires and smoke based on the installed model. There is no particular limitation on the learning method (what kind of machine learning or deep learning method is used). In addition, for example, the learning target may learn an image captured by an infrared camera when a fire occurs, and learn to detect the occurrence of a fire based on the temperature distribution in the image, or may learn to detect the occurrence of a fire based on the shape of a flame captured in an image captured when a fire occurs. In this case, the AI-equipped camera 1a calculates the probability of fire occurrence from the temperature distribution and the shape of the flame in the image captured by the camera itself. The user can arbitrarily set a threshold value for the calculated probability of fire occurrence. For example, the AI-equipped camera 1a transmits the probability of fire occurrence determined from the image to the control device 10. In the control device 10, the disaster prediction determination unit 14 determines that a fire has occurred if the occurrence probability received from the AI-equipped camera 1a exceeds a threshold value set by the user. In addition, when the AI-equipped camera 1a detects a fire or smoke from an image, the AI-equipped camera 1a may have a function of identifying the actual location of the fire or smoke from the position in the image where the fire or smoke was detected and map information of the camera's shooting range. In addition, the AI function may be incorporated in the control device 10 instead of the camera.
[0034] (operation) Next, an example of the operation of the disaster prevention system 100a in the second embodiment will be described with reference to Fig. 2 and Fig. 5. Fig. 5 is a diagram showing an example of the configuration of the disaster prevention system 100a in the second embodiment. The reference characters S1 to S11 in Fig. 2 and Fig. 5 correspond to each other. The same processes as those in the first embodiment will be briefly described. First, n analyses (simulations) are performed (step S1) using the disaster simulation unit 13. The disaster simulation unit 13 stores the analysis results in the storage unit 16 as the disaster progression DB 131 (step S2).
[0035] Next, the on-site measuring equipment / detector 1 and disaster prevention equipment 2 are connected to the control device 10 via a network (step S3). At this time, in the second embodiment, the AI-equipped camera 1a is also connected to the control device 10 via a network. Next, the user sets the degree of agreement (step S4) and sets disaster prevention measures (step S5). In addition to (Method 1) comparing the physical quantities of points and (Method 2) comparing the physical quantities or changes in the physical quantities of surfaces, which are described in the first embodiment, the degree of agreement can also be set using the following (Method 3) related to AI (machine learning), and operation conditions that reflect the user's intentions can be set. (Method 3) The image captured by the AI-equipped camera 1a is compared with the simulation result to evaluate the degree of agreement. For example, if the camera of the AI-equipped camera 1a is an infrared camera, the temperature distribution of the space to be photographed can be seen from the image captured by the AI-equipped camera 1a. Meanwhile, the temperature distribution of the space to be photographed is calculated from the simulation result. Then, the temperature distribution shown in the image captured by the AI-equipped camera 1a is compared with the temperature distribution based on the simulation result to evaluate the degree of agreement. For example, the standard deviation of the temperature distribution may be compared, or the average value may be compared. In addition, regarding the shape of the flame, the flame shape obtained by analyzing the image captured by the AI-equipped camera 1a by AI may be compared with the flame shape included in the simulation result, and if the difference (similarity) of the shapes is within a predetermined range, the simulation result may be evaluated as having a high degree of agreement. Regarding the similarity of the shapes, any known calculation method may be applied. The user sets one or more of (Method 1) to (Method 3) as the method for evaluating the degree of coincidence. The criteria for evaluating the degree of coincidence using these methods, for example, the threshold value or range for regarding the AI analysis result and the simulation result as a match, can be set arbitrarily by considering how conservative the user wants to operate. The disaster prevention system 100a is constructed by steps S1 to S5. Next, a fire occurs (step S6). For example, when the AI-equipped camera 1a detects the occurrence of fire or smoke from an image taken by the device itself using the AI function, the detection result is transmitted to the control device 10. The disaster prediction determination unit 14 determines the occurrence of a fire based on the detection result. The disaster prevention system 100a grasps the situation at the site (step S7). In addition to the measuring instrument and detector 1, the AI-equipped camera 1a transmits to the control device 10 the image taken by the device itself and the result of detecting fire or smoke from the image using the AI function. Next, the disaster prediction determination unit 14 performs a degree of coincidence evaluation and an analysis result search (step S8). At this time, the location of the fire may be determined using the location of the fire determined by the AI-equipped camera 1a. Next, the disaster prevention system 100a performs a fire progression prediction and disaster prevention measures (step S9). The disaster prevention system 100a updates the on-site situation and predictions (step S10).
[0036] Next, the disaster prediction determination unit 14 determines the end of the fire, etc. (Step S11). For example, when the AI-equipped camera 1a determines that the fire has been extinguished based on an image captured by the camera itself, it transmits information that the fire has been extinguished to the control device 10. When the disaster prediction determination unit 14 acquires information indicating that the fire has been extinguished through the data acquisition unit 11, it determines that the fire has been extinguished. If it is determined that the fire has been extinguished or evacuation has been completed (Step S11; Yes), the real-time progress prediction process ends (Step S12). If not, the processes from Step S7 onwards are repeatedly executed.
[0037] (effect) As described above, according to this embodiment, in addition to the effects of the first embodiment, it becomes possible to detect a fire early and take measures. When a fire occurs, information acquisition from the on-site measuring device / detector 1 and disaster prevention device 2 is a fixed-point observation, so in addition to the amount of information being small, there is a time lag between the fire occurrence and the detection of the fire (for example, even if a fire occurs, the measurement result of the thermometer increases after the fire has expanded). In contrast, by using the AI-equipped camera 1a, fire / smoke can be detected early at the stage where a small amount of flame or smoke has occurred within the camera's shooting range. Once a fire occurs and expands, it may not be possible to extinguish the fire even if a sprinkler is activated. According to the second embodiment, fire / smoke can be detected early, so that the initial action of disaster prevention, such as activating a sprinkler at the stage of a fire, is accelerated, and the possibility of realizing early extinguishing is increased. In addition, since the situation can be acquired from the entire shooting range of the camera, the accuracy of predicting the progress of a fire in real time is improved.
[0038] <Third embodiment> A disaster prevention system 100b according to a third embodiment of the present invention will be described below with reference to Figures 6 to 8. In the first and second embodiments, disaster prevention measures are implemented by focusing only on the progression of a disaster, but in the third embodiment, a disaster progression simulation is coupled with a human evacuation simulation, and a database is compiled including predictions of human evacuation, enabling more appropriate disaster prevention decisions to be made in the event of a fire.
[0039] FIG. 6 is a functional block diagram showing an example of a disaster prevention system 100b according to the third embodiment. Among the configuration according to the third embodiment of the present invention, the same functional units as those constituting the disaster prevention systems 100 and 100a according to the first and second embodiments of the present invention are given the same reference numerals, and the description of each is omitted. In addition to the configuration of the first embodiment, the disaster prevention system 100b according to the third embodiment includes an AI-equipped camera 1b, and includes a disaster simulation unit 13b instead of the disaster simulation unit 13 of the first embodiment.
[0040] The AI-equipped camera 1b includes a camera and an AI function that detects the number of people and the congestion state from an image based on an image captured by the camera itself. For the AI function, for example, a huge number of images in which people are captured are learned, and a model is constructed to detect people from the image using machine learning or deep learning and determine the number of people and the congestion state, and this is mounted on the AI function. The AI function determines the number of people and the congestion state based on the constructed model. In addition, when the AI-equipped camera 1b detects a person from an image, it may have a function to identify the actual position where the person exists from the position in the image where the person is detected and map information of the shooting range of the camera. In addition, the AI-equipped camera 1b may have an AI function to detect fires and smoke similar to the AI-equipped camera 1a of the second embodiment, and a function to identify the actual position where the fire or smoke occurs. The AI function may be incorporated into the control device 10 instead of the camera. There is no limitation on the learning method.
[0041] In addition to the function of the disaster simulation unit 13 in the first embodiment (referred to as disaster progression simulation), the disaster simulation unit 13b has a function of simulating the state in which people evacuate, and a function of integrating and coupling the results of the evacuation simulation and the results of the disaster progression simulation. For example, the evacuation simulation is disclosed in Non-Patent Document 1. Any known simulator can be used for the evacuation simulation. In the case of only the disaster progression simulation, the time series of the disaster progression status is calculated. In contrast, when the number of people at each location is set as the initial condition in addition to the weather conditions, the fire location, and the operating conditions of the disaster prevention equipment 2, and the disaster progression simulation and the evacuation simulation are executed by the disaster simulation unit 13b, the results of analyzing how people at each location move as the fire progresses in addition to the progress of the disaster are obtained. The disaster simulation unit 13b performs simulations (simulations based on a CFD model and evacuation simulations) for a huge number of cases with variously different weather conditions, fire locations, disaster prevention equipment 2, and the number of people at each location, and registers the results in the disaster progression DB 131b by coupling (combining the progress of the disaster with the movement of people). The disaster progression DB 131b is stored in the storage unit 16 or an external storage device.
[0042] (operation) Next, the operation of the disaster prevention system 100b will be described with reference to Fig. 7 and Fig. 8. Fig. 7 is a flowchart showing an example of the system construction flow and operation of the disaster prevention system 100b according to the third embodiment. Fig. 8 is a diagram showing an example of the configuration of the disaster prevention system 100b according to the third embodiment. The reference characters S1 to S11 in Fig. 7 and Fig. 8 correspond to each other. Processing similar to the processing explained in Fig. 2 will be briefly explained. First, the disaster simulation unit 13b performs n analyses (disaster progression simulation and evacuation simulation based on a CFD model) (step S1). The disaster simulation unit 13b performs an enormous number of cases of unsteady analysis and evacuation simulation using a CFD model by changing as many conditions as possible regarding weather conditions, fire location, operating conditions of the disaster prevention equipment 2, and the number of people at each location. The number of people at each location may be fixed under certain conditions. The disaster simulation unit 13b associates (couples) the progress of the fire with the corresponding movement of people and registers them in the disaster progress DB 131b. The disaster simulation unit 13b stores the disaster progress DB 131b in the storage unit 16 (step S2).
[0043] Next, the measuring device / detector 1 and disaster prevention device 2 at the site are connected to the control device 10 through a network (step S3). At this time, in the second embodiment, the AI-equipped camera 1b and the control device 10 are also connected through a network. Next, the user sets the degree of agreement (step S4). In the case of the third embodiment, in addition to (method 1) to (method 3) described in the first and third embodiments, the degree of agreement may be set for the location and number of people present. Next, the user sets disaster prevention measures based on evacuation prediction (step S5). In the case of the third embodiment, the operating conditions of the disaster prevention device 2 are set using not only the evaluation of temperature, etc., but also the crowding situation of people as a judgment criterion. For example, if only the progress of the fire is taken into consideration, the disaster prevention measures can be set to activate the sprinklers located in the direction of the fire's expansion. However, if people evacuate in that direction, activating the sprinklers will cause people to get wet. Therefore, in the third embodiment, for example, if the direction of fire development is not the direction of people's movement, the sprinklers installed in that direction are activated early and the fire doors are closed, and if the direction of fire development is the direction of people's movement, the fire doors are left open and the sprinklers are not activated until the time when evacuation is expected to be completed. This makes it possible to prevent actions such as closing the fire doors when there are evacuees, which would result in a loss of escape route, or spraying water on people who are evacuating.
[0044] Next, a fire breaks out (step S6). The disaster prevention system 100b grasps the situation at the scene (step S7). In addition to the measuring equipment and detector 1, the AI-equipped camera 1b detects fire, smoke, the number of people, and the crowded situation from the images taken by the device itself and the images using AI functions, and transmits the detection results to the control device 10. Next, the disaster prediction determination unit 14 performs a coincidence evaluation and an analysis result search (step S8). When referring to the disaster progression DB 132b, the disaster prediction determination unit 14 selects a simulation result that is similar in terms of weather conditions, fire location, operating conditions, as well as the number of people and the crowded situation at each location specified by the AI-equipped camera 1b. Next, the disaster prevention system 100b performs a fire progression prediction, an evacuation prediction, and a disaster prevention measure (step S9). The disaster prediction determination unit 14 regards the temperature, smoke / gas concentration, and evacuees at each location several minutes ahead, 10 minutes ahead, and so on indicated by the selected simulation result as a fire progression prediction, and regards the number of people at each location several minutes ahead, 10 minutes ahead, and so on as an evacuation prediction. The control unit 15 controls the operation of the disaster prevention equipment 2 based on the fire progression prediction and evacuation prediction by the disaster prediction determination unit 14 and the setting of disaster prevention measures based on the evacuation prediction set in step S5b. Next, the disaster prevention system 100b updates the on-site situation and prediction (step S10). Next, the disaster prediction determination unit 14 determines the end of the fire and the completion of evacuation (step S11). For example, when the AI-equipped camera 1b determines that the fire has been extinguished based on an image captured by the device itself, it transmits to the control device 10 that the fire has been extinguished. When the disaster prediction determination unit 14 acquires information indicating that the fire has been extinguished through the data acquisition unit 11, it determines that the fire has been extinguished. For example, the AI-equipped camera 1b transmits the number of people at each location to the control device 10 based on an image captured by the device itself. The disaster prediction determination unit 14 acquires the number of people at each location through the data acquisition unit 11, and determines that the evacuation has been completed, for example, if the number of people at each location in the target area is zero. If it is determined that the fire has been extinguished or the evacuation has been completed (step S11; Yes), the process of real-time progress prediction is terminated (step S12). If not, the process from step S7 onwards is repeatedly executed.
[0045] (effect) As described above, according to this embodiment, in addition to the effects of the first embodiment, by predicting the evacuation of people in addition to the progression of a fire and storing the predictions in a database, it is possible to implement more appropriate disaster prevention measures in the event of a fire.
[0046] In addition, with regard to the detection of the number of people and the congestion state, a human sensor or the like may be installed on-site in addition to or instead of the AI-equipped camera 1b, and the detection results of the human sensor or the like may be transmitted to the control device 10 for judgment. Furthermore, the results of the human evacuation simulation may be visualized using VR (Virtual Reality) technology, etc., and disaster prevention measures based on evacuation predictions may be set. By evaluating disaster prevention measures while experiencing actual human flow in a virtual space using VR, it is expected that more effective disaster prevention measures can be formulated.
[0047] As described above, according to the first to third embodiments, highly accurate disaster progression prediction results can be referred to in real time, and desired disaster prevention measures can be implemented according to the progress of the disaster.
[0048] FIG. 9 is a diagram showing an example of a hardware configuration of a control device according to each embodiment. A computer 900 includes a CPU 901, a main storage device 902, an auxiliary storage device 903, an input / output interface 904, and a communication interface 905. The above-mentioned control device 10 is implemented in the computer 900. The above-mentioned functions are stored in the auxiliary storage device 903 in the form of a program. The CPU 901 reads the program from the auxiliary storage device 903, loads it in the main storage device 902, and executes the above-mentioned processing according to the program. The CPU 901 also secures a storage area in the main storage device 902 according to the program. The CPU 901 also secures a storage area in the auxiliary storage device 903 for storing data being processed according to the program.
[0049] A program for realizing all or part of the functions of the control device 10 may be recorded on a computer-readable recording medium, and the program recorded on the recording medium may be read into a computer system and executed to perform processing by each functional unit. The term "computer system" as used herein includes hardware such as an OS and peripheral devices. In addition, if a WWW system is used, the term "computer system" also includes a homepage providing environment (or display environment). In addition, the term "computer-readable recording medium" refers to a portable medium such as a CD, DVD, or USB, or a storage device such as a hard disk built into a computer system. In addition, if the program is distributed to the computer 900 via a communication line, the computer 900 that receives the program may deploy the program in the main storage device 902 and execute the above processing. In addition, the above program may be for realizing part of the above-mentioned functions, or may be capable of realizing the above-mentioned functions in combination with a program already recorded in the computer system.
[0050] As described above, several embodiments of the present disclosure have been described, but all of these embodiments are presented as examples and are not intended to limit the scope of the invention. These embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. These embodiments and their variations are included within the scope of the invention and its equivalents as described in the claims, as well as within the scope and gist of the invention. Note that the information detected and measured by the measuring instrument / detector 1 is an example of measurement information. A disaster prevention target facility is an example of a target area.
[0051] <Additional Notes> The control device, the disaster prevention system, the control method, and the program described in each embodiment can be understood, for example, as follows.
[0052] (1) The control device 10 according to the first aspect includes a data acquisition unit 11 that acquires measurement information obtained by measuring a situation in a target area and operation information indicating an operating state of disaster prevention equipment, a database (disaster progression DB131) in which analysis results of an analysis of how a disaster will progress depending on the situation in the target area and the operating state of the disaster prevention equipment are registered, a prediction unit (disaster prediction determination unit 14) that predicts the progression of the disaster based on the measurement information, the operation information, and the database when a disaster occurs in the target area, and a control unit 15 that controls the operation of the disaster prevention equipment based on the prediction result of the disaster progression by the prediction unit and disaster prevention countermeasure setting information that defines how to operate the disaster prevention equipment depending on the situation of the disaster. This makes it possible to accurately predict the progression of a disaster based on the situation at the disaster site, and to operate disaster prevention equipment based on that prediction.
[0053] (2) A control device according to a second aspect is a control device of (1), further comprising a simulation unit that analyzes how the disaster will progress depending on the situation of the disaster and the operating state of the disaster prevention equipment. This will enable accurate prediction of the progression of disasters.
[0054] (3) A control device according to a third aspect is the control device according to (1) to (2), further comprising a reception unit that receives settings of the disaster prevention countermeasure setting information. This allows disaster prevention equipment to be activated in desired situations.
[0055] (4) A control device according to a fourth aspect is a control device of (1) to (3), wherein even after the disaster occurs, the data acquisition unit repeatedly acquires the latest measurement information and operation information, the prediction unit updates the prediction of the disaster progression based on the latest measurement information and operation information and the database, and the control unit controls the operation of the disaster prevention equipment based on the updated prediction of the disaster progression and the disaster prevention countermeasure setting information. This will make it possible to predict disasters in response to changing conditions.
[0056] (5) A control device according to a fifth aspect is a control device according to any one of (1) to (3), further comprising a second database (disaster progression DB131b) in which analysis results of how the disaster will progress and how people will move depending on the disaster situation and the operating state of the disaster prevention equipment are registered, wherein the data acquisition unit acquires evacuee information including the number of people present in the target area and their locations, the prediction unit predicts the progress of the disaster and the movement of the people included in the evacuee information based on the measurement information, the operation information, the evacuee information, and the second database, and the control unit controls the operation of the disaster prevention equipment based on the prediction results of the disaster progress and the movement of the people by the prediction unit and second disaster prevention countermeasure setting information that defines how to operate the disaster prevention equipment depending on the disaster situation and the movement of the people. This will enable disaster prevention measures to be implemented according to not only the progression of the disaster but also people's movements.
[0057] (6) A control device according to a sixth aspect is a control device according to any one of (1) to (5), wherein the prediction unit compares the measurement information (measurement values of a thermometer, an image taken by an AI-equipped camera 1a, a detection result of a human sensor, etc.) measured at various measurement points and / or a statistical value of the measurement information with the analysis results recorded in the database, selects the analysis result having the highest degree of agreement with the measurement information, and predicts that the disaster will progress as indicated by the selected analysis result. This allows an analysis result that is highly consistent with reality to be selected, and the progression of a disaster can be predicted with high accuracy based on the selected analysis result.
[0058] (7) A disaster prevention system according to a seventh aspect includes a measuring device that measures a situation in a target area, a disaster prevention device, and a control device according to any one of (1) to (6). This makes it possible to accurately predict the progression of a disaster based on the situation at the disaster site, and to operate disaster prevention equipment based on that prediction.
[0059] (8) A disaster prevention system according to an eighth aspect is the disaster prevention system of (6), further comprising a camera that photographs a target area, and a means for detecting fire or smoke from the image captured by the camera. This will enable fires to be detected earlier and disaster prevention measures to be implemented.
[0060] (9) A disaster prevention system according to a ninth aspect includes a measuring device that measures a situation in a target area, a means for detecting people present in the target area, disaster prevention equipment, and the control device (5). This will enable disaster prevention measures to be implemented according to not only the progression of the disaster but also people's movements.
[0061] (10) A control method according to a tenth aspect includes the steps of: acquiring measurement information measuring a situation in a target area and operation information indicating an operating state of disaster prevention equipment; predicting, when a disaster occurs in the target area, the progression of the disaster based on the measurement information, the operation information, and a database in which analysis results of how the disaster will progress depending on the situation in the target area and the operating state of the disaster prevention equipment are registered; and controlling the operation of the disaster prevention equipment based on the prediction result of the progression of the disaster obtained by the predicting step and disaster prevention countermeasure setting information that defines how to operate the disaster prevention equipment depending on the situation of the disaster.
[0062] (11) A program relating to an eleventh aspect causes a computer to execute the steps of acquiring measurement information measuring a situation in a target area and operation information indicating the operating status of disaster prevention equipment; predicting, when a disaster occurs in the target area, the progression of the disaster based on the measurement information, the operation information, and a database in which analysis results of how the disaster will progress depending on the situation in the target area and the operating status of the disaster prevention equipment are registered; and controlling the operation of the disaster prevention equipment based on the prediction result of the disaster progression obtained by the prediction step and disaster prevention countermeasure setting information that defines how the disaster prevention equipment is to operate depending on the situation of the disaster. [Explanation of symbols]
[0063] 100, 100a, 100b... Disaster prevention system 1. Measuring instruments and detectors 1a, 1b... AI-equipped camera 2...Disaster prevention equipment 10. Control device 11 Data acquisition section 12 Input reception section 13. Disaster Simulation Department 131, 131b···Disaster Progression Database (DB) 14. Disaster prediction judgment section 15 Control section 16...Storage section 900...Computer 901···CPU 902...Main memory 903...Auxiliary storage device 904 Input / Output Interface 905 Communication Interface
Claims
1. A data acquisition unit that acquires measurement information that measures a situation in a target area and operation information that indicates an operation state of the disaster prevention equipment; a database in which an analysis result of how a disaster will progress depending on the situation in the target area and the operating state of the disaster prevention equipment is registered; a prediction unit that predicts the progress of a disaster based on the measurement information, the operation information, and the database when a disaster occurs in the target area; A control unit that controls the operation of the disaster prevention equipment based on a result of the prediction of the progress of the disaster by the prediction unit and disaster prevention countermeasure setting information that defines how the disaster prevention equipment is to be operated depending on the situation of the disaster; A control device comprising:
2. The control device according to claim 1 , further comprising a simulation unit configured to analyze how the disaster will progress depending on the situation in the target area and the operating state of the disaster prevention equipment.
3. The control device according to claim 1 or 2, further comprising a reception unit that receives the setting of the disaster prevention countermeasure setting information.
4. Even after the disaster occurs, the data acquisition unit repeatedly acquires the latest measurement information and the latest operation information, The prediction unit updates the prediction of the progress of the disaster based on the latest measurement information and operation information and the database; and The control unit controls the operation of the disaster prevention equipment based on the updated prediction of the progress of the disaster and the disaster prevention countermeasure setting information. The control device according to claim 1 or 2.
5. A second database in which an analysis result of how the disaster progresses and how people move according to the disaster situation and the operating state of the disaster prevention device is registered, The data acquisition unit acquires evacuee information including the number of people present in the target area and their locations, The prediction unit predicts the progress of the disaster and the movement of the people included in the evacuee information based on the measurement information, the operation information, the evacuee information, and the second database; The control unit controls the operation of the disaster prevention equipment based on the prediction result of the disaster progression and the movement of the people by the prediction unit and second disaster prevention countermeasure setting information that defines how to operate the disaster prevention equipment according to the disaster situation and the movement of the people. The control device according to claim 1 .
6. the prediction unit compares the measurement information and / or statistical values of the measurement information at various measurement points with the analysis results recorded in the database, selects the analysis result having a high degree of agreement with the measurement information, and predicts that the disaster will progress as indicated by the selected analysis result. The control device according to claim 1 or 2.
7. A measuring device that measures the conditions in the target area; Disaster prevention equipment, The control device according to claim 1 or 2, A disaster prevention system equipped with:
8. A camera for photographing the target area; A means for detecting fire or smoke from an image captured by the camera; The disaster prevention system according to claim 7, further comprising:
9. A measuring device that measures the conditions in the target area; A means for detecting a person present in the target area; Disaster prevention equipment, The control device according to claim 5 ; A disaster prevention system equipped with:
10. acquiring measurement information that measures a situation in a target area and operation information that indicates an operation state of the disaster prevention equipment; When a disaster occurs in the target area, predicting the progress of the disaster based on the measurement information, the operation information, and a database in which an analysis result of analyzing how the disaster will progress depending on the situation of the target area and the operation state of the disaster prevention equipment is registered; A step of controlling an operation of the disaster prevention equipment based on a result of the prediction of the progress of the disaster by the prediction step and disaster prevention countermeasure setting information that defines how to operate the disaster prevention equipment according to the situation of the disaster; The control method includes:
11. On the computer, acquiring measurement information that measures a situation in a target area and operation information that indicates an operation state of the disaster prevention equipment; When a disaster occurs in the target area, predicting the progress of the disaster based on the measurement information, the operation information, and a database in which an analysis result of analyzing how the disaster will progress depending on the situation of the target area and the operation state of the disaster prevention equipment is registered; A step of controlling an operation of the disaster prevention equipment based on a result of the prediction of the progress of the disaster by the prediction step and disaster prevention countermeasure setting information that defines how to operate the disaster prevention equipment according to the situation of the disaster; A program that executes the following.
Citation Information
Patent Citations
Floor fire engineering planning method based on BIM (Building Information Modeling) technology
CN115600851A
Automatic fire reporting equipment provided with simulation function
JP1999039578A
Comprehensive disaster prevention and belief system
JP2000113357A
Fire phase managing device and fire phase managing method
JP2004110371A
Apparatus and method for aiding disaster
JP2005202699A
