Power supply system using renewable energy and method therefor
The power supply system addresses inefficiencies in renewable energy systems by predicting and adjusting power storage to stabilize power supply, ensuring efficient and stable delivery to the grid.
Patent Information
- Application Number
- JP2023050763
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-28
- Publication Date
- 2024-10-10
- Estimated Expiration
- 2043-03-28
AI Technical Summary
Existing power generation systems using renewable energy face inefficiencies and instability due to fluctuations in renewable energy output and demand, leading to inadequate utilization and storage battery imbalances.
A power supply system utilizing a first and second power storage unit, controlled by an arithmetic device, predicts renewable energy generation and demand, adjusting charging and discharging to stabilize power supply by alternating use and correcting power imbalances.
The system efficiently and stably supplies renewable energy to the grid by predicting and correcting power imbalances, reducing the risk of storage unit imbalances and ensuring consistent power delivery.
Smart Images

Figure 2024139843000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a power supply system and method for efficiently and stably supplying power using renewable energy. [Background technology]
[0002] Even in areas such as remote islands where electricity is currently supplied through a separate grid using internal combustion power generation facilities, electricity supplies using renewable energy sources such as solar power generation and wind power generation are being introduced. However, power generation using renewable energies is subject to frequent output fluctuations and operational shutdowns due to weather conditions, making it necessary to adjust output using internal combustion power generation equipment, which increases the burden on operations. In response to such issues, for example, Patent Document 1 discloses an invention called "Power generation system utilizing storage batteries and renewable energy, and its operation method." According to this power generation system, two storage batteries are provided between the power generation facility and the power grid, one for charging from the power generation facility and the other for discharging to the power grid, and the storage batteries are switched between charging and discharging, and the timing of the switch can be determined by comparing the total amount of charging and the total amount of discharging. Furthermore, Patent Document 2 discloses an invention entitled "Independent power supply system and control method thereof" in which a first storage battery and a second storage battery are provided between a renewable energy source and a load, one of which performs only the storage function and the other only the power supply function, and which is equipped with a control unit that controls the execution body to alternate over time. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2014-113034 A [Patent Document 2] Patent Publication No. 2021-5978 Summary of the Invention [Problem to be solved by the invention]
[0004] The invention disclosed in Patent Document 1 describes, as an example, that when switching between 12 hours of charging and 12 hours of discharging in a day, the time when the amount of power stored by 12 hours of charging matches the amount of power supplied by 12 hours of discharging is switched as the appropriate time (T). However, in such a case, although it is fine under ideal conditions (Fig. 4), when the wind speed is weak (Fig. 5), strong (Fig. 6), or when demand is high (Fig. 7), or when there is no wind (Fig. 8), etc., if the supply situation of renewable energy required for power generation changes, the storage battery is switched when time T arrives even if the charging is insufficient, or switching cannot be performed even if charging is completed before time T, and wind power generation is suppressed, so there is a problem that power generation by renewable energy cannot necessarily be utilized efficiently or stably. In addition, in the invention disclosed in Patent Document 2, the timing of switching the executor over time is either when the discharging battery reaches the discharge limit value or when the charging battery is at the upper charge limit value. However, in the case of such switching timing, when switching occurs due to the discharge limit value being reached, the charging of the switching battery may be insufficient, and when switching occurs due to the charge upper limit value being reached, the discharging battery may be insufficiently discharged. Therefore, as in the invention disclosed in Patent Document 1, there is a problem that power generation by renewable energy cannot necessarily be utilized efficiently or stably. The present invention has been made in response to such conventional circumstances, and aims to provide a power supply system and method that can efficiently and stably supply the amount of electricity generated using renewable energy to a power grid using a storage battery. [Means for solving the problem]
[0005] In order to achieve the above-mentioned object, a first invention is a power supply system comprising a first energy storage unit that charges and discharges electricity generated by a power generation facility that uses renewable energy, a second energy storage unit that charges and discharges in the opposite manner to the first energy storage unit, a control device that controls the charging and discharging of the first and second energy storage units, and a calculation device that predicts the amount of electricity to be generated by the power generation facility during a predetermined period, wherein the control device charges either the first or second energy storage unit with the amount of electricity actually generated by the power generation facility during the period, and discharges the predicted amount of electricity predicted using the calculation device from the other of the first or second energy storage unit to a power grid during the period. In this application, renewable energy means energy that can be steadily or repeatedly supplied by natural forces, including solar power, wind power, wave power, tidal power, etc. In addition, "conversely charging and discharging" means that the second power storage unit charges when the first power storage unit is discharging, and discharges when the first power storage unit is charging.
[0006] The second invention is a power supply system according to the first invention, characterized in that the calculation device adds the difference between the amount of power actually generated by the power generation equipment during the period and the predicted amount of power to the predicted amount of power for the next period that predicts the amount of power to be generated by the power generation equipment after the period, and corrects the difference between the actual amount of power generated during the period and the predicted amount of power discharged to the power grid during the period by the discharge in the next period.
[0007] A third invention is an electric power supply system according to the first invention, characterized in that the electric power system includes an internal combustion power generation facility and an adjustment storage unit which charges and discharges only between the electric power system, and the control device controls the first and second storage units, as well as the charging and discharging of the adjustment storage unit and the amount of electric power generated by the internal combustion power generation facility, and further, when the amount of electric power demand in the electric power system is greater than the sum of the discharged predicted amount of electric power and the amount of electric power generated by the internal combustion power generation facility, the control device causes the adjustment storage unit to discharge to the electric power system, and when the amount of electric power demand is less than the sum, the control device causes the adjustment storage unit to charge from the electric power system. In this application, the internal combustion power generating equipment refers to diesel power generating equipment, thermal power generating equipment, and hydroelectric power generating equipment.
[0008] A fourth invention is an electric power supply system according to the first invention, wherein the electric power system comprises an internal combustion power generation facility and an adjustment storage unit which charges and discharges only between the electric power system, and the control device controls the charging and discharging of the adjustment storage unit and the amount of electric power generated by the internal combustion power generation facility in addition to the first and second storage units, and further increases the amount of electric power generated by the internal combustion power generation facility when the amount of electric power demand in the electric power system is greater than the sum of the predicted amount of electric power discharged and the amount of electric power generated by the internal combustion power generation facility, and charges the adjustment storage unit from the electric power system when the amount of electric power demand is less than the sum.
[0009] The fifth invention is a power supply system according to the third or fourth invention, characterized in that the storage capacity of the adjustment storage unit is the amount of power that a generator with the maximum single-unit generating capacity of the internal combustion power generation equipment on the power grid can generate for at least one day.
[0010] A sixth invention is an electric power supply method, which uses a first energy storage unit that charges and discharges electric power generated by a power generation facility that utilizes renewable energy, and a second energy storage unit that charges and discharges in the opposite manner to the first energy storage unit, and discharges the electric power to a power grid, characterized in that a predicted amount of electric power to be generated by the power generation facility during a predetermined period is calculated, and either one of the first or second energy storage unit is charged with the amount of electric power actually generated by the power generation facility during the period, and the other of the first or second energy storage unit is controlled to discharge the predicted amount of electric power to the power grid during the period.
[0011] A seventh invention is a power supply method according to the sixth invention, characterized in that the difference between the amount of power actually generated by the power generation facility during the period and the predicted amount of power is added to a predicted amount of power for a next period that predicts the amount of power to be generated by the power generation facility after the period, and the difference between the actual amount of power generated during the period and the predicted amount of power discharged to the power grid during the period is corrected by the discharge in the next period.
[0012] An eighth invention is an electric power supply method according to the sixth invention, characterized in that, in addition to the first and second storage units, an internal combustion power generation facility and an adjustment storage unit which charges and discharges only between the internal combustion power generation facility and the electric power grid are used, and when the amount of demanded electric power in the electric power grid is greater than the sum of the discharged predicted amount of electric power and the amount of electric power generated by the internal combustion power generation facility, the adjustment storage unit is controlled to discharge from the electric power grid, and when the amount of demanded electric power is less than the sum, the adjustment storage unit is controlled to charge from the electric power grid.
[0013] A ninth invention is an electric power supply method according to the sixth invention, characterized in that, in addition to the first and second storage units, an internal combustion power generation facility and an adjustment storage unit which charges and discharges only between the internal combustion power generation facility and the electric power grid are used, and when the amount of demanded electric power in the electric power grid is greater than the sum of the predicted amount of electric power discharged and the amount of electric power generated by the internal combustion power generation facility, the amount of electric power generated by the internal combustion power generation facility is increased, and when the amount of demanded electric power is less than the sum, the adjustment storage unit is controlled to be charged from the electric power grid.
[0014] A power supply method according to a tenth aspect of the present invention is the eighth or ninth aspect of the present invention, characterized in that the storage capacity of the adjustment storage unit is the amount of power that a generator with the maximum single-unit generating capacity of the internal combustion power generation equipment on the power grid can generate for at least one day. Effect of the Invention
[0015] In the power supply system according to the first invention, a calculation device is used to predict the amount of power generated by the power generation facility during a predetermined period, and a control device charges either one of the first or second power storage unit with the amount of power actually generated by the power generation facility during the period, and discharges the predicted amount of power predicted using the calculation device from the other of the first or second power storage unit during the period to the power grid, so that the amount of power actually generated and charged is close to the amount of power discharged to the power grid, and it is possible to keep the amount of power stored in the first and second power storage units constant after the predetermined period has elapsed. Therefore, even if charging and discharging are repeatedly performed during the predetermined period, there is a low possibility that the balance of the amount of stored power in the first and second power storage units will be lost during the course of the charging and discharging, and the risk of having to switch between the power storage units due to only one of the power storage units is reduced, so that it is possible to efficiently and stably provide the amount of power generated using renewable energy to the power grid by alternately using these power storage units.
[0016] In the power supply system of the second invention, the calculation device adds the difference between the amount of power actually generated by the power generation equipment during the previous period and the predicted amount of power to the predicted amount of power for the next period, which predicts the amount of power to be generated by the power generation equipment after the previous period, and corrects the difference between the actual amount of power generated during the previous period and the predicted amount of power discharged to the power system during the previous period by the discharge in the next period.Therefore, the difference between the amount of power actually generated and charged in the previous period and the amount of power discharged based on the predicted amount of power can be corrected in the next period, and it is possible to make the amount of power actually generated and charged up to the previous period and the amount of power discharged the same at the end of the next period. In other words, compared to the effect of the first invention, there is a lower possibility that the balance between the amounts of stored power in the first and second storage units will be disrupted during operation, and it is possible to further reduce the risk that charging and discharging will have to be switched between the storage units due to a problem in only one of the storage units. Therefore, compared to the effect of the first aspect of the present invention, by alternately using these power storage units, it is possible to more efficiently and stably provide the amount of electricity generated using renewable energy to the power grid.
[0017] In the power supply system according to the third invention, when the amount of power demand in the power grid is greater than the sum of the predicted discharged amount of power and the amount of power generated by the internal combustion power generation facility, the control device controls the adjustment storage unit to discharge power to the power grid, and when the amount of power demand is less than the sum, the control device controls the adjustment storage unit to charge power from the power grid, thereby making it possible for the adjustment storage unit to follow the load for the amount of power demand. Therefore, in addition to the effect of the first invention, there is no need to follow the load for the amount of power from the first and second storage units, and more stable supply is possible.
[0018] In the power supply system according to the fourth invention, when the amount of power demand in the power grid is greater than the sum of the predicted amount of discharged power and the amount of power generated by the internal combustion power generation equipment, the control device increases the amount of power generated by the internal combustion power generation equipment, and when the amount of power demand is less than the sum, the control device controls the adjustment power storage unit to charge from the power grid, thereby making it possible for the internal combustion power generation equipment to follow the load for the amount of power demand. Therefore, in addition to the effect of the first invention, there is no need to follow the load with the amount of power from the first power storage unit and the second power storage unit, and a more stable supply is possible.
[0019] In the power supply system of the fifth invention, in the third or fourth invention, the storage capacity of the adjustment storage unit is the amount of electricity that a generator with the maximum single-unit generating capacity of the internal combustion power generation equipment on the power grid can generate for at least one day. Therefore, even if a single failure occurs in the generator of the internal combustion power generation equipment, there is no need to stop operation of the power supply system for one day, and a grace period of one day can be ensured for the recovery of the equipment. Therefore, in addition to the effects of the third or fourth invention, it is possible to supply electricity more stably.
[0020] The sixth invention is an embodiment of the first invention as a method invention, and has the same effects as the first invention.
[0021] The seventh invention is an embodiment of the second invention as a method invention, and has the same effects as the second invention.
[0022] The eighth invention is an embodiment of the third invention as a method invention, and has the same effects as the third invention.
[0023] The ninth invention is an embodiment of the fourth invention as a method invention, and its effects are similar to those of the fourth invention.
[0024] The tenth invention is an embodiment of the fifth invention as a method invention, and has the same effects as the fifth invention. [Brief description of the drawings]
[0025] [Figure 1] 1 is a system configuration diagram of a power supply system according to an embodiment of the present invention. [Diagram 2] 2 is a conceptual diagram showing a configuration of a database of the power supply system according to the embodiment of the present invention. FIG. [Diagram 3] FIG. 2 is a first flow chart of a power supply method executed by the power supply system according to the embodiment of the present invention. [Figure 4] FIG. 5 is a second flow diagram of the power supply method executed by the power supply system according to the embodiment of the present invention. [Diagram 5] FIG. 2 is a conceptual diagram showing the relationship between the amount of power generated by renewable energy and the amount of discharge by a discharge unit. [Figure 6] FIG. 5 is a third flowchart of the power supply method executed by the power supply system according to the embodiment of the present invention. [Figure 7] FIG. 2 is a conceptual diagram showing operation during normal operation of the power supply system according to the embodiment of the present invention. [Figure 8] 1 is a conceptual diagram showing an operation of a power supply system according to an embodiment of the present invention during load following power generation by an internal combustion power generation facility. FIG. [Figure 9] 6 is a modified portion of a third flowchart of the power supply method executed by the power supply system according to the embodiment of the present invention. [Figure 10] FIG. 11 is a conceptual diagram showing an operation during direct power transmission operation as a modified example of the operation during normal operation of the power supply system according to the embodiment of the present invention. [Figure 11] FIG. 4 is a fourth flowchart of the power supply method executed by the power supply system according to the embodiment of the present invention. [Figure 12] 4 is a conceptual diagram showing an operation during load following power generation by an adjustment power storage unit of the power supply system according to the embodiment of the present invention. FIG. [Figure 13] FIG. 5 is a fifth flowchart of a power supply method executed by the power supply system according to the embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0026] Hereinafter, a power supply system according to an embodiment of the present invention will be described with reference to FIGS. 1 to 13. FIG. FIG. 1 is a system configuration diagram of a power supply system according to an embodiment of the present invention, and FIG. 2 is a conceptual diagram showing the configuration of a database of the power supply system. In Figure 1, the power supply system 1 is shown in the area surrounded by a two-dot dashed line, and is mainly composed of first power storage units 5, 6, second power storage units 7, 8, an adjustment power storage unit 13, a control device 2, a calculation device 3, and a database 4. The first power storage units 5, 6 and the second power storage units 7, 8 charge and discharge electricity generated by renewable energy. Specifically, for example, electricity generated by a solar power generator 18 and a wind power generator 19 is converted by a power conditioner 20 for the solar power generator and a power conditioner 21 for the wind power generator, respectively, and then charged by turning on the charge switches 9a-12a and turning off the discharge switches 9b-12b, and conversely, discharged by turning off the charge switches 9a-12a and turning on the discharge switches 9b-12b. The first power storage units 5, 6 and the second power storage units 7, 8 are each provided in two systems, one of the first power storage units 5, 6 and the second power storage units 7, 8 functions as a charging unit and the other as a discharging unit, and the functions of the charging unit and the discharging unit are alternated.
[0027] The electricity discharged by the first storage units 5, 6 and the second storage units 7, 8 is supplied to the power grid 25 via the battery power conditioner 29 and the step-up transformer 30, and distributed to general consumers 26 together with electricity generated by internal combustion power generation equipment such as the diesel generator 23a and the hydroelectric generator 23b and supplied to the power grid 25. Basically, the first power storage units 5, 6 and the second power storage units 7, 8 are each operated as only one system, and the other system is used to respond to unforeseen circumstances such as a single failure of a power storage unit, but two systems may be operated when the supply of power other than that from renewable energy, i.e., the supply of power from the internal combustion power generation facility, is significantly reduced or an accident occurs in the power system 25. In this embodiment, the first power storage unit 5 shown by the solid line is described as being operated as a charging unit and the second power storage unit 7 as a discharging unit, each as one system. The first power storage unit 6 and the second power storage unit 8 shown by the dashed line are in a standby state with the charging switches 10a, 12a and the discharging switches 10b, 12b turned off, respectively.
[0028] Next, the adjustment power storage unit 13 will be described. The adjustment power storage unit 13 is not directly charged by power generation equipment using renewable energy such as the solar power generator 18 or the wind power generator 19, but is charged from the power grid 25 via the step-down transformer 32 and the power conditioner for the storage battery 31 by turning on the charge switch 14a and turning off the discharge switch 14b. In addition, in the case of discharging, the charge switch 14a is turned off and the discharge switch 14b is turned on via the power conditioner for the storage battery 29 and the step-up transformer 30 to supply power to the power grid 25. In other words, the adjustment power storage unit 13 charges and discharges only between itself and the power grid 25. The control device 2 controls the amount of power related to charging and discharging of the first energy storage units 5, 6, the second energy storage units 7, 8 and the adjustment energy storage unit 13 by transmitting on / off signals to the charging switches 9a-12a via a control signal line 15a, to the discharging switches 9b-12b via a control signal line 15b, to the charging switch 14a via a control signal line 16a, and to the discharging switch 14b via a control signal line 16b, respectively, to turn the switches on and off (close / open).
[0029] The control device 2 also acquires data on the amount of power generated from the solar power generator 18 and the wind power generator 19 via the data signal line 22 at any time, and stores the data in a readable manner in the database 4 as actual solar power generation amount data 36 and actual wind power generation amount data 39 (see FIG. 2), respectively. The control device 2 also acquires data on the amount of power generated from the diesel generator 23a and the hydroelectric generator 23b via the data signal line 24a. Therefore, if an event such as a malfunction or breakdown occurs in the diesel generator 23a or the hydroelectric generator 23b, the control device 2 can determine that an event has occurred based on a decrease in the data on the amount of power generated. The control device 2 can also transmit a control signal via a control signal line 24b to control the amount of power generated by the diesel generator 23a and the hydroelectric generator 23b. The control device 2 also obtains data on the amount of power demand from general consumers 26 via a data signal line 27. Furthermore, the control device 2 acquires data regarding SOC values (State of Charge: charging rate) from the first storage units 5, 6 and the second storage units 7, 8 via a data signal line 17, and also acquires data regarding the SOC value from the adjustment storage unit 13 via a data signal line 28.
[0030] Next, the database 4 will be described. As shown in Fig. 2, the database 4 readably stores sunrise / sunset data 33, a photovoltaic power generation prediction function 34, sunshine condition data 35, photovoltaic power generation record data 36, wind power generation prediction function 37, wind condition data 38, and wind power generation record data 39. The sunrise / sunset data 33 is data related to sunrise and sunset on any one day of the year, and is data that is read by the calculation device 3 and input to the photovoltaic power generation prediction function 34 when calculating a photovoltaic power generation prediction value. The photovoltaic power generation prediction function 34 is a function for predicting the amount of photovoltaic power generation using sunshine condition data 35 such as sunshine intensity, sunshine duration, and weather. The sunshine condition data 35 is data that is inputted at any time via an input device (not shown) using a weather observation system or the like so as to be readable. The photovoltaic power generation actual data 36 is time-series data on the amount of power generated by the photovoltaic generator 18. The wind power generation prediction function 37 is a function for predicting the amount of wind power generation using wind condition data 38 such as wind direction, time when the wind is blowing, and wind speed. The wind condition data 38 is data that is inputted at any time via an input device (not shown) using a meteorological observation system or the like so as to be readable. The wind power generation actual data 39 is time-series data on the amount of power generated by the wind power generator 19. The photovoltaic power generation prediction function 34 and the wind power generation prediction function 37 are expressed by regression curves or the like based on the actual values of the amounts of power generated by the photovoltaic generator 18 and the wind power generator 19, respectively.
[0031] Next, the arithmetic unit 3 will be described. The arithmetic unit 3 and other components will be described with reference to FIGS. 3 to 6, together with a description of the steps of the power supply method according to the present invention. 3 is a first flow diagram of a power supply method executed by a power supply system according to an embodiment of the present invention. This diagram shows the execution steps of the power supply method, and explaining the functions of the components of the power supply system 1 with reference to this diagram and other flow diagrams is equivalent to explaining an embodiment of the power supply method. Also, dashed lines indicate the components of the power supply system 1 related to that step, and the reference numerals indicate the components shown in FIGS. 1 and 2. Note that these components include not only the components of the power supply system 1, but also the components of peripheral devices. In the power supply system 1, first, in step S1, the arithmetic device 3 having a clock function reads out the sunrise / sunset data 33 from the database 4, and determines whether the current time is after sunrise and before sunset. If the current time is within that time range, the process proceeds to step S2, where the arithmetic device 3 reads from the database 4 a solar power generation prediction function 34 expressed by a regression curve or the like based on the actual amount of power generation by the solar power generator 18, and inputs the sunshine condition data 35 read from the database 4 to this function, to calculate a predicted value of the solar power generation amount of the solar power generator 18 for a period arbitrarily determined in advance for predicting the amount of power generation (hereinafter referred to as a prediction period), which in this embodiment is a period up to 10 minutes into the future. Note that if the current time is not within that time range in step S1, the process returns to step S1. The prediction period may be determined as a period desirable for operation, and a short prediction period is considered to result in a close relationship between the actual and predicted amounts of power generation, although frequent control of the entire power supply system 1 is required.
[0032] In step S3, the calculation device 3 transmits the calculated predicted solar power generation amount value to the control device 2, the control device 2 sets the predicted solar power generation amount value as a discharge output value of the second power storage unit 7 (discharge unit), and the control device 2 transmits an ON control signal to the discharge switch 11b via the control signal line 15b, and the second power storage unit 7 discharges the discharge output value to the power grid 25. From this step S3, in addition to step S4, the process also proceeds to symbol A shown in Fig. 6, but the steps from that transition destination will be described later, and step S4 will be described first. In step S4, after the prediction period has elapsed, that is, after 10 minutes have elapsed, the calculation device 3 reads out and acquires from the database 4 the actual photovoltaic power generation amount data 36 of the power generated during those 10 minutes. In step S5, the calculation device 3 compares the solar power generation forecast value for those 10 minutes with the solar power generation actual data 36 to determine whether there is a difference. If there is a difference, the difference is reflected in the solar power generation forecast function 34 when calculating the solar power generation forecast value for the next forecast period in step S6, and the difference between the solar power generation forecast value for the previous forecast period and the solar power generation actual data 36 is eliminated in the next forecast period, and the process returns to step S1. If it is determined that there is no difference in step S5, the process returns to step S1 as it is. When determining whether there is a "difference" in step S5, a suitable numerical range that serves as a reference in advance depending on the length of the forecast period, for example, a difference may be determined to exist when the difference exceeds ±5 kWh. By providing a numerical range, it is possible to prevent the calculation device 3 from always proceeding to step S6 based on a strict judgment, and there is a possibility that the efficiency and accuracy of the entire system can be improved by reducing the processing time by the calculation device 3.
[0033] Next, the steps of the power supply method and the functions of the arithmetic device 3 and other components of the power supply system 1 will be described with reference to Fig. 4. Fig. 4 is a second flow diagram of the power supply method executed by the power supply system according to the embodiment of the present invention. Although the steps are indicated starting from step S7, this is executed independently of the first flow diagram in Fig. 3. 4, in the power supply system 1, first in step S7, the calculation device 3 reads out wind power generation record data 39 from the database 4 and determines whether the wind power generator 19 generated power before the prediction period, that is, 10 minutes ago in this embodiment. If power was generated, the process proceeds to step S8, where the calculation device 3 reads out wind power generation prediction function 37 expressed by a regression curve or the like based on the actual power generation amount by the wind power generator 19 from the database 4, inputs current wind condition data 38 read out from the database 4 to this function, and calculates a predicted wind power generation value of the wind power generator 19 for the prediction period up to 10 minutes into the future. If it is determined in step S7 that the wind power generator 19 has not generated power before the prediction period, the process proceeds to step S9, where the calculation device 3 reads out and inputs sample wind conditions that have a certain degree of certainty based on the current wind condition data 38 and statistics, etc., from the database 4 into the wind power generation prediction function 37 in the same manner as in step S8, to calculate a predicted wind power generation value of the wind power generator 19 for the prediction period.
[0034] After steps S8 and S9 are executed, the process proceeds to step S10, where the calculation device 3 transmits the calculated predicted wind power generation amount value to the control device 2, the control device 2 sets the predicted wind power generation amount value as the discharge output value of the second power storage unit 7 (discharge unit), and the control device 2 transmits an ON control signal to the discharge switch 11b via the control signal line 15b, and the second power storage unit 7 outputs the discharge output value to the power grid 25. From this step S10, the process proceeds to not only step S11 but also to symbol B shown in Fig. 6, but the steps from that transition destination will be described later, and first step S11 will be described. In step 11, after the prediction period has elapsed, that is, after 10 minutes have elapsed, the calculation device 3 reads and acquires from the database 4 the wind power generation amount record data 39 for the power generation during those 10 minutes. In step S12, the calculation device 3 compares the wind power forecast value for those 10 minutes with the wind power actual data 39 to determine whether there is a difference, and if there is a difference, in step S13, the difference is reflected in the wind power forecast function 37 when calculating the wind power forecast value for the next forecast period, and the difference between the wind power forecast value for the previous forecast period and the wind power actual data 39 is eliminated in the next forecast period, and the process returns to step S7. If it is determined in step S12 that there is no difference, the process returns directly to step S7. When determining whether there is a "difference" in step S13, an appropriate numerical range that serves as a criterion similar to that in step S5 may be set in advance, and the same effect can be expected.
[0035] The relationship between the predicted photovoltaic power generation amount for each prediction period obtained by executing steps S1-6 and S7-13 and the photovoltaic power generation amount actual data 36 will be described with reference to Fig. 5. Fig. 5 is a conceptual diagram showing the relationship between the combined amount of power generation by the photovoltaic power generator and the amount of power generation by the wind power generator, that is, the amount of power generation by renewable energy and the amount of discharge by the discharge unit. 5, a renewable energy power generation amount line 40 shown by a two-dot chain line indicates the change over time in the power generation amount including the power generation amount by the photovoltaic power generator 18 and the power generation amount by the wind power generator 19, and a discharge unit discharge amount line 41 shown by a solid line indicates the change over time in the amount of power discharged by the second power storage unit 7. As described in FIGS. 3 and 4, since the difference between the photovoltaic power generation forecast value and the photovoltaic power generation actual data 36 and the difference between the wind power generation forecast value and the wind power generation actual data 39 occurring in the previous prediction period are included in the photovoltaic power generation amount forecast function 34 and the wind power generation amount forecast function 37, respectively, the difference throughout multiple prediction periods decreases, and the power generation amount by renewable energy including the photovoltaic power generation forecast value and the wind power generation forecast value generally matches the sum of the photovoltaic power generation actual data 36 and the wind power generation actual data 39. That is, the amount of power generated by the renewable energy is approximately equal to the amount of power discharged by the second power storage unit 7. In the present embodiment, both solar power and wind power are shown as renewable energy, but either one of them may be used, or other renewable energy may be adopted or combined.
[0036] Next, how to supply power in response to the power demand of general consumers 26 will be described with reference to Fig. 6. Fig. 6 is a third flow diagram of the power supply method executed by the power supply system according to the embodiment of the present invention. In this figure, the process starts from step S14, but it is executed independently from the first flow diagram in Fig. 3 and the second flow diagram in Fig. 4. However, there are cases where the two flow diagrams branch off or merge with each other. 6, in step S14, the control device 2 of the power supply system 1 acquires SOC value data of the first power storage units 5, 6 and the second power storage units 7, 8 via the data signal line 17, and SOC value data of the adjustment power storage unit 13 via the data signal line 28. In step S14, there is a joining step indicated by reference symbol E, which will be described later, and step S15 will be described first. Here, the steps indicated by reference symbols A and B are the steps in which the control device 2 acquires a predicted photovoltaic power generation amount value in step S3 and the steps in which the control device 2 acquires a predicted wind power generation amount value in step S10, and therefore, following these steps, in step S15, the control device 2 determines whether or not an event such as a malfunction or failure has occurred in the internal combustion power generation facility. As described above, since the control device 2 acquires data on the amount of power generated from the diesel generator 23a and the hydroelectric generator 23b, it is possible to determine whether or not a malfunction has occurred from the data. From this step S15, the process proceeds to step S16 as well as to symbol C shown in Fig. 11, but the steps from that step will be described later and step S16 will be described first.
[0037] If no event such as a malfunction is found in step S15, the process proceeds to step S16. In step S16, the control device 2 compares the total value of the predicted photovoltaic power generation amount and the predicted wind power generation amount in the prediction period with the SOC value of the second power storage unit 7 in this embodiment to determine whether charging is required when discharging from the discharge unit corresponding to the second power storage unit 7. Since the SOC value ranges from 0% (fully discharged state) to 100% (fully charged state), it is preferable to set the SOC value required for charging in advance taking into consideration the specifications of the power storage unit, the charging and discharging record, or the degree of deterioration, and the control device 2 makes a judgment based on that value. From this step S16, in addition to step S17, the process also proceeds to symbol D1 shown in Fig. 13, but the steps from that transition destination will be described later, and first step S17 will be described. If it is determined that charging is not necessary, the process proceeds to step S17, in which the control device 2 commands the second power storage unit 7 to discharge. Specifically, the control device 2 transmits a control signal via the control signal line 15b to turn on the discharge switch 11b, which is currently in the off state, to cause discharging. Note that in step S17, there is a merging from another flow diagram, which will be described later, and at that time, the adjustment power storage unit 13 may be operating. In that case, the adjustment power storage unit 13 is stopped in step S17. Also, in step S17, there is a merging process indicated by the symbol F, which will be described later. First, step S18 will be described. In step S18, the control device 2 acquires data on the amount of power demand from the general consumer 26 via the data signal line 27, and determines whether the sum of the amount of discharge by the second power storage unit 7 acquired via the data signal line 17 and the amount of power generated by the internal combustion power generation facilities such as the diesel generator 23a and the hydroelectric generator 23b acquired via the data signal line 24a is greater than the amount of power demand. Note that, in this embodiment, the amount of power demand from the general consumer 26 is illustrated in FIG. 1 as being acquired by the control device 2 directly via the data signal line 27, but in cases where demand in the power system 25 is monitored by a demand monitoring system or the like, the control device 2 may acquire data on the amount of power demand from the demand monitoring system or the like.
[0038] Here, with reference to FIG. 7 as well, an explanation will be given of how the power supply system 1 is operated in response to the difference between the sum of the amount of discharge from the second power storage unit 7 and the amount of power generated by internal combustion power generation facilities such as the diesel generator 23a and the hydroelectric generator 23b, and the amount of power demanded by general consumers 26. Fig. 7 is a conceptual diagram showing the operation of the power supply system according to the embodiment of the present invention during normal operation. The horizontal axis of Fig. 7 indicates the passage of time, and the vertical axis indicates the demand power amount, discharge amount, and power generation amount. In Fig. 7, the solid line is the discharge unit discharge amount line 41, the dashed line is the supply power amount line 42 obtained by adding the internal combustion power generation amount 45 to the discharge unit discharge amount line 41, and the dashed line is the demand power amount line 43. The discharge unit discharge amount line 41 is based on the discharge unit discharge amount 44a based on the predicted photovoltaic power generation amount and the predicted wind power generation amount, but since it reflects the difference between the actual measured value of the power generation amount by the photovoltaic generator 18 or the wind power generator 19 for each prediction period as described above, the sum of the prediction period generally coincides with the actual measured value. Furthermore, according to the power supply system 1 of this embodiment, it becomes possible to operate the internal combustion power generation facility as a base load power source, so that the internal combustion power generation amount 45 is kept roughly constant, but it is preferable to control the amount of power demand indicated by the demand power amount line 43 and the amount of power indicated by the supply power amount line 42 so that they roughly match.
[0039] Next, steps S19 and S20 will be described with reference to FIGS. If the sum of the discharge unit discharge amount 44a from the second storage unit 7 and the internal combustion power generation amount 45 is greater than the demand power amount line 43, that is, in the area hatched with diagonal lines slanting upward to the right in Figure 7, the process proceeds to step S19, and the control device 2 keeps the discharge switch 14b off and turns on the charge switch 14a via the control signal line 16a to charge the surplus power from the power grid 25 to the adjustment storage unit 13 via the step-down transformer 32 and the power conditioner for the storage battery 31. By charging the adjustment power storage unit 13 in this way, the internal combustion power generation facility can be operated for base load operation, and the discharge unit discharge amount 44a can discharge the same amount of power as the actual values of the power generation amounts of the photovoltaic power generator 18 and the wind power generator 19. Furthermore, operation that follows up on load fluctuations caused by general consumers 26 is also possible. Therefore, there is no need to suppress power generation of the photovoltaic power generator 18 or the wind power generator 19, and it is possible to efficiently and stably supply the amount of power generated by renewable energy to the power grid 25, thereby suppressing frequency fluctuations in the power grid 25 and stabilizing the system. When the execution of step S19 is completed, the process returns to step S14.
[0040] On the other hand, when the sum of the discharge unit discharge amount 44a and the internal combustion power generation amount 45 is less than the demand power amount line 43, that is, in the area hatched with diagonal lines slanting downward to the right in Fig. 7, the process proceeds to step S20, and the control device 2 either discharges the excess power demand amount from the adjustment power storage unit 13 by turning on the discharge switch 14b via the control signal line 16b while keeping the charge switch 14a off in order to perform load following operation, or transmits a control signal to the internal combustion power generation equipment such as the diesel generator 23a or the hydroelectric generator 23b via the control signal line 24b to increase the power generation amount so as to make up for the excess power demand amount. When the sum of the power generation amounts is greater than the power demand amount, the adjustment power storage unit 13 is charged, so basically, the discharge from the adjustment power storage unit 13 is selected, but when the charge rate of the adjustment power storage unit 13 is low or some kind of malfunction occurs, it is desirable to select an increase in the power generation amount by the internal combustion power generation equipment. In the case of step S20, it is also possible to efficiently and stably supply the amount of electricity generated by renewable energy to power grid 25, and it is also possible to increase the amount of electricity generated by the internal combustion power generation equipment, so that frequency fluctuations in power grid 25 can be suppressed and system stability can be achieved.
[0041] Such a case will be described with reference to FIG. Fig. 8 is a conceptual diagram showing operation of the power supply system according to the embodiment of the present invention during load-following power generation by the internal combustion power generation facility. The horizontal and vertical axes in Fig. 8 are the same as those in Fig. 7. Also, elements already explained in Fig. 7 are given the same reference numerals and their explanation will be omitted. In FIG. 8, when the internal combustion power generation equipment is operated as a baseload power source, if it is found that the storage rate of the adjustment storage unit 13 is decreasing, as shown by the symbol M, the control device 2 issues a command to the internal combustion power generation equipment, such as the diesel generator 23a and the hydroelectric generator 23b, to perform load following operation and change the internal combustion power generation amount 45 to the load following power generation amount 50a or the load following power generation amount 50b. By doing so, the amount of discharge by the adjustment storage unit 13 is reduced when the demand power line 43 increases, such as at the point of load following power generation 50a, and it is also possible to charge the adjustment storage unit 13 when the demand power line 43 falls below the supply power line 42, such as at the point of load following power generation 50b (step S19). The original storage capacity of the adjustment storage unit 13 is determined depending on the scale of the entire power supply system 1, the renewable energy power generation equipment, and the internal combustion power generation equipment, but as will be described with reference to Fig. 12, assuming a single failure of the generator with the maximum single unit generating capacity in the internal combustion power generation equipment, it is desirable for the storage capacity to be sufficient to cover the amount of power generated in one day by the generator with the maximum single unit generating capacity. By doing so, it is possible to assume a single failure of the generator with the maximum single unit generating capacity and a repair period until recovery of the generator, and it is possible to ensure the stability of the power system 25. Moreover, if the sum of the power generation amounts is the same as the power demand amount, the excess power demand amount becomes 0, so there is no discharge by the adjustment power storage unit 13 and no increase in the power generation amount by the internal combustion power generation facility. Moreover, when the execution of step S20 is completed, the process returns to step S14.
[0042] Next, with reference to Fig. 9 and Fig. 10, an operation of a power generating facility using renewable energy such as a solar power generator 18 or a wind power generator 19 when good sunshine and wind conditions continue will be described as a modified example of this embodiment. Fig. 9 shows a modified portion of the process from step S17 to step S20 of the third flow diagram (Fig. 6) of the power supply method executed by the power supply system according to the embodiment of the present invention. Fig. 10 is a conceptual diagram showing the operation during direct power transmission operation as a modified example of the operation during normal operation of the power supply system according to the embodiment of the present invention. The elements already described in Fig. 6 and Fig. 7 are given the same reference numerals and their description will be omitted. 9, in the modified example, the control device 2 first determines in step S17a whether the discharge amount from the discharge unit, i.e., the second power storage unit 7, is greater than the power generation amount by the internal combustion power generation equipment such as the diesel generator 23a and the hydroelectric generator 23b. If it is not greater, the process merges from step S17a to step S18 in FIG. 6, but if it is greater, the process proceeds to the next step S17b. In step S17b, the control device 2 turns off the discharge switch 11b via the control signal line 15b to stop discharging from the second power storage unit 7, and controls the power generation amounts from the solar power generator 18 and the wind power generator 19 to be all directly transmitted to the power grid 25 via the solar power generator power conditioner 20 and the wind power generator power conditioner 21, respectively, and further via the storage battery power conditioner 29 and the step-up transformer 30. Then, in step S18a, the control device 2 determines whether the sum of the amount of power generated by renewable energy power generation equipment such as the solar power generator 18 and the wind power generator 19 obtained via the data signal line 22 and the amount of power generated by internal combustion power generation equipment such as the diesel generator 23a and the hydroelectric generator 23b obtained via the data signal line 24a is greater than the amount of demanded power obtained via the data signal line 27.
[0043] Figure 10 shows the relationship between the amount of power demand and the amount of power generated and discharged during this type of operation. The horizontal and vertical axes in Fig. 10 are the same as those in Fig. 7, but unlike Fig. 7, a renewable energy power generation amount line 40 based on the renewable energy power generation amount 44b is shown instead of the discharge unit discharge amount line 41 based on the discharge unit discharge amount 44a. The vertical and horizontal axes are the same as those in Fig. 7 and Fig. 8. This is because, in step S17a, it was determined that the discharge amount from the discharge unit exceeds the power generation amount by the internal combustion power generation equipment, and therefore the discharge amount 44a of the discharge unit is being supplied stably, that is, there are many actual values for the power generation amount by the solar generator 18 and the wind power generator 19, and a stable and large power generation amount is being obtained. Therefore, in the modified example, it was determined that it would be more efficient to discharge directly from the solar generator 18 or the wind power generator 19 rather than discharging via the second storage unit 7. Therefore, in Figure 10, renewable energy power generation amount 44b indicating the actual power generation value by the solar generator 18 and the wind generator 19 is shown, rather than the discharge unit discharge amount 44a set by the sum of the predicted solar power generation amount and the predicted wind power generation amount for each prediction period, so the renewable energy power generation amount line 40 changes over time regardless of the prediction period compared to the discharge unit discharge amount line 41 in Figure 7. The operation regarding the difference between the demand power line 43 and the supply power line 42, which is the sum of the renewable energy power generation amount 44b and the internal combustion power generation amount 45, is the same as the operation regarding the difference between the sum of the discharge amount from the second storage unit 7 and the power generation amount by the internal combustion power generation equipment, as described using Figure 7. That is, if the control device 2 determines in step S18a that the sum of the renewable energy power generation amount 44b and the internal combustion power generation amount 45 is greater than the demanded power amount, that is, in the area hatched with diagonal lines slanting upward to the right in Fig. 10, the process proceeds to step S19a, where the control device 2 keeps the discharge switch 14b off and turns on the charge switch 14a via the control signal line 16a to charge the surplus power from the power grid 25 to the adjustment power storage unit 13 via the step-down transformer 32 and the power conditioner for the storage battery 31. When the execution of step S19a is completed, the process merges with step S14 in Fig. 6.
[0044] On the other hand, if it is determined that the sum of the power generation amounts is not greater than the demanded power amount, as in the embodiment, that is, in the area hatched with diagonal lines slanting downward to the right in Figure 10, the process proceeds to step S20a, and the control device 2 either discharges the excess power demand amount from the adjustment storage unit 13 by keeping the charging switch 14a off and turning on the discharge switch 14b via the control signal line 16b, in order to perform load following operation, or sends a control signal to the internal combustion power generation equipment, such as the diesel generator 23a or the hydroelectric generator 23b, via the control signal line 24b to increase the power generation amount so as to make up for the excess power demand amount. Therefore, it becomes possible to efficiently and stably supply the amount of power generated by renewable energy to the power system 25, and it is possible to suppress frequency fluctuations in the power system 25 and achieve system stability. When the execution of step S20a is completed, the process merges with step S14 in FIG. Having finished the explanation of the modified example, next, operation when an event such as a power generation malfunction occurs in the internal combustion power generation facility will be explained with reference to Figs.
[0045] FIG. 11 is a fourth flowchart of the power supply method executed by the power supply system according to the embodiment of the present invention. In Fig. 11, the symbol C indicates the diversion from step S15 in Fig. 6. When an event such as a malfunction occurs in the internal combustion power generation equipment, in step S21, the control device 2 acquires data on the amount of power generated from the diesel generator 23a and the hydroelectric generator 23b via the data signal line 24a, and increases the base output of the diesel generator 23a and the hydroelectric generator 23b based on the sum of the amounts of power generated so as to compensate for the amount of power generation lost due to the malfunction. Then, in step S22, similarly to step S16, the control device 2 compares the sum of the predicted photovoltaic power generation amount and the predicted wind power generation amount in the prediction period with the SOC value of the second power storage unit 7 to determine whether charging is required when the second power storage unit 7 is discharged. From this step S22, in addition to step S23, the process also proceeds to symbol D2 shown in Fig. 13, but the steps from that transition destination will be described later and step S23 will be described first. If it is determined that charging is not necessary, the process proceeds to step S23, where the control device 2 issues a command to discharge the second power storage unit 7. Specifically, the control device 2 transmits a control signal via the control signal line 15b to switch the discharge switch 11b, which is currently in the OFF state, to the ON state, thereby causing the second power storage unit 7 to discharge. Step S23 includes a joining process indicated by reference symbol G, but this will be described later. First, step S24 will be described. In step S24, similarly to step S18, the control device 2 acquires data regarding the demanded amount of electricity via the data signal line 27, and determines whether the sum of the amount of discharge by the second storage unit 7 obtained via the data signal line 17 and the amount of power generated by the internal combustion power generation equipment obtained via the data signal line 24a is greater than the demanded amount of electricity.
[0046] Here, with reference to FIG. 12 as well, an explanation will be given of how the power supply system 1 is operated in response to the difference between the sum of the amount of discharge from the second power storage unit 7 and the amount of power generated by internal combustion power generation facilities such as the diesel generator 23a and the hydroelectric generator 23b, and the amount of power demanded by general consumers 26. Fig. 12 is a conceptual diagram showing operation during load following power generation by the adjustment storage unit of the power supply system according to the embodiment of the present invention. The horizontal axis of Fig. 12 indicates the passage of time, and the vertical axis indicates the demand power amount, the discharge amount, and the power generation amount. In Fig. 12, the solid line is the discharge unit discharge amount line 41, the dashed line is the supply power amount line 42 obtained by adding the internal combustion power generation amount 45 to the discharge unit discharge amount line 41, and the dashed line is the demand power amount line 43. The discharge unit discharge amount line 41 is based on the discharge unit discharge amount 44a based on the predicted photovoltaic power generation amount and the predicted wind power generation amount, but since it reflects the difference between the actual measured value of the power generation amount by the photovoltaic generator 18 or the wind generator 19 for each prediction period as described above, it generally matches the actual measured value throughout the prediction period under normal circumstances. However, if an event such as a malfunction occurs in an internal combustion power generating facility such as the diesel generator 23a or the hydroelectric generator 23b at timing 46 indicated by an arrow in Fig. 12, the internal combustion power generation amount 45 will drop suddenly, causing frequency fluctuations in the power system 25, which may destabilize the system. For example, in the worst case scenario, if a generator having a maximum single-unit generating capacity 47 in the internal combustion power generating facility experiences a single failure and stops, the generating capacity 48 excluding the maximum single unit will be insufficient, and an auxiliary discharge amount 49 will be required to compensate for the maximum single-unit generating capacity 47. In such a case, the process proceeds to step S26, in which the control device 2 activates the adjustment power storage unit 13 to compensate as the auxiliary discharge amount 49. Specifically, the control device 2 keeps the charging switch 14a off and turns on the discharge switch 14b via the control signal line 16b to discharge the auxiliary discharge amount 49. Therefore, it is desirable that the storage capacity of the adjustment storage unit 13 be a storage capacity sufficient to cover the amount of electricity generated in one day by a generator having the maximum single-unit generating capacity 47 in the internal combustion power generation equipment, assuming a single failure of the generator having the maximum single-unit generating capacity 47. By providing the adjustment power storage unit 13 with such a storage capacity, even if a generator with the maximum single-unit generating capacity experiences a single failure, it is possible to stably supply power to the power grid 25 by operating the adjustment power storage unit 13. Note that it is preferable that the storage capacity of the adjustment power storage unit 13 be determined with a certain degree of likelihood based on the normal SOC value. Such a state is assumed in the process starting from reference C in FIG.
[0047] 11, if an event such as a malfunction occurs at timing 46, and the supply power line 42 based on the discharge unit discharge amount 44a and auxiliary discharge amount 49 from the second power storage unit 7 and the power generation capacity 48 excluding the largest single unit of the internal combustion power generation equipment is greater than the demand power line 43, the control device 2 transmits a control signal via the control signal line 16b to reduce the auxiliary discharge amount 49 from the adjustment power storage unit 13 so as not to exceed the demand power line 43. Specifically, a plurality of discharge switches 14b are provided, and a control signal is transmitted to change some of them from on to off. By controlling the adjustment power storage unit 13 in this way, even if a malfunction event occurs, the discharge unit discharge amount 44a can discharge the same amount of power as the actual value of the amount of power generated by the photovoltaic power generator 18 and the wind power generator 19. Furthermore, by controlling the adjustment power storage unit 13, it is also possible to operate the adjustment power storage unit 13 to follow load fluctuations caused by general consumers 26. Therefore, it is not necessary to suppress power generation by the photovoltaic power generator 18 or the wind power generator 19, and it is possible to efficiently and stably supply the amount of power generated by renewable energy to the power system 25, thereby suppressing frequency fluctuations in the power system 25 and stabilizing the system. When the execution of step S25 is completed, the process returns to symbol E in FIG. 6.
[0048] On the other hand, even if the adjustment storage unit 13 is started to compensate for the maximum single-unit power generation capacity 47 and the auxiliary discharge amount 49 is discharged, the demand power line 43 may exceed the supply power line 42 due to fluctuations. In such a case, the process proceeds to step S26, and the control device 2 transmits a control signal to the discharge switch 14b of the adjustment storage unit 13 via the control signal line 16a to control the discharge to further compensate for the shortage of demand power. Specifically, the control is performed to increase the number of the multiple discharge switches 14b that are turned on. When the execution of step S26 is completed, the process returns to symbol E in FIG. 6.
[0049] Next, operation in a case where charging of the second power storage unit 7 is required will be described with reference to Fig. 13. Fig. 13 is a fifth flowchart of the power supply method executed by the power supply system according to the embodiment of the present invention, in which reference symbol D1 indicates the diversion from step S16 in Fig. 6 and reference symbol D2 indicates the diversion from step S22 in Fig. 11. In FIG. 13, in step S27, the control device 2 obtains data on the SOC value of the charging unit, that is, the first power storage unit 5 from the data signal line 17 to determine whether the SOC value (charging rate) of the first power storage unit 5 is 90% or higher. If the SOC value of the first storage unit 5 is 90% or more, the process proceeds to step S28, where the control device 2 determines whether or not there is a system fluctuation during the shutdown operation by comparing the discharge amount of the second storage unit 7, which is a discharge unit, with the amount of power supplied to general consumers 26 in the entire power system 25, and if it determines that there is no fluctuation, the process proceeds to step S30. In step S30, the control device 2 issues a command to stop the second power storage unit 7 and switch the first power storage unit 5 from a charging unit to a discharging unit. Specifically, the control device 2 turns off the discharge switch 11b of the second power storage unit 7 via the control signal line 15b, turns off the charge switch 9a of the first power storage unit 5 via the control signal line 15a, turns on the discharge switch 9b of the first power storage unit 5 via the control signal line 15b, and turns on the charge switch 9a of the second power storage unit 7 via the control signal line 15a. When the execution of step S30 is completed, the process returns to F in FIG. 6 in the case of the process flow from D1, or returns to G in FIG. 11 in the case of the process flow from D2. Next, if the SOC value of the charging unit is lower than 90% in step S27, and if the control device 2 determines in step S28 that system fluctuation will occur during the stopping operation of the discharging unit, the process proceeds to step S29. In step S29, the control device 2 controls the discharge unit to be switched to the adjustment power storage unit 13 without stopping the discharge unit, and to discharge the adjustment power storage unit 13. Therefore, it is possible to stably supply the amount of power without causing system fluctuation in the power system 25.
[0050] Next, in step S31, the control device 2 acquires data regarding the demanded amount of electricity via the data signal line 27, and determines whether the sum of the amount of discharge by the adjustment storage unit 13 obtained via the data signal line 28 and the amount of power generated by the internal combustion power generation equipment obtained via the data signal line 24a is greater than the demanded amount of electricity. Therefore, if it is greater, the process proceeds to step S32, where the control device 2 transmits a control signal via the control signal line 16b to reduce the number of discharge switches 14b turned on, thereby lowering the amount of discharge by the adjustment power storage unit 13 and controlling it so as not to exceed the demand power line 43. If it is less, the process proceeds to step S33, where the control device 2 transmits a control signal via the control signal line 16b to increase the number of discharge switches 14b turned on, thereby controlling it so as to increase the amount of discharge by the adjustment power storage unit 13. When the execution of steps S32 and S33 is completed, the process returns to symbol E in FIG.
[0051] As described above, according to the power supply system 1 and power supply method of the present embodiment, the calculation device 3 is used to predict the amount of power generated in the renewable energy power generation facility during a prediction period, and the control device 2 charges either the first energy storage units 5, 6 or the second energy storage units 7, 8 with the amount of power actually generated during the prediction period, and discharges the predicted amount of power predicted using the calculation device 3 from the other of the first energy storage units 5, 6 or the second energy storage units 7, 8 to the power grid 25 during the prediction period. As a result, the amount of power actually generated and charged and the amount of power discharged to the power grid 25 approximate each other, and it is possible to keep the amount of power stored in the first energy storage units 5, 6 and the second energy storage units 7, 8 constant after the lapse of a predetermined prediction period. Therefore, even if charging and discharging are repeatedly performed during the prediction period, the balance of the stored power in the first storage units 5, 6 and the second storage units 7, 8 is unlikely to be lost along the way, and the risk of having to switch between charging and discharging between the storage units due to an issue in only one of the storage units is reduced. Therefore, by alternately using these storage units, it is possible to efficiently and stably provide the amount of power generated using renewable energy to the power grid 25.
[0052] In addition, the control device 2 adds the difference between the actual value of the amount of power actually generated by the power generation equipment using renewable energy during the prediction period and the predicted solar power generation amount or the predicted wind power generation amount as a correction value to the solar power generation amount prediction function 34 or the wind power generation amount prediction function 37, and reflects this in the power generation prediction value for the period in which the amount of power generated by those power generation equipment after the prediction period is predicted, and corrects the difference between the actual power generation amount during the previous prediction period and the predicted amount of power discharged to the power grid 25 during the previous prediction period for the discharge in the next period.Therefore, the difference between the amount of power actually generated and charged in the previous prediction period and the amount of power discharged based on the predicted amount of power can be corrected in the next prediction period, and it is possible to make the amount of power actually generated and charged up to the previous prediction period the same as the amount of power discharged at the end of the next prediction period. Therefore, there is a lower possibility that the balance of stored power in the first storage units 5, 6 and the second storage units 7, 8 will be disrupted during operation, and the risk of having to switch between charging and discharging between the storage units due to an issue in only one of the storage units can be further reduced, making it possible to more efficiently and stably provide the amount of power generated using renewable energy to the power grid 25.
[0053] Furthermore, when the amount of power demanded by general consumers 26 in the power system 25 is greater than the sum of the amount of power discharged from the discharge unit and the amount of power generated by the internal combustion power generation facility, the control device 2 controls the adjustment storage unit 13 to discharge to the power system 25, and when the amount of power demanded is less than the sum, the control device 2 controls the adjustment storage unit 13 to charge from the power system 25, thereby making it possible to load-follow the amount of power demanded by the adjustment storage unit 13. Also, instead of the adjustment storage unit 13, it is possible to load-follow power generation by internal combustion power generation facilities such as the diesel generator 23a and the hydroelectric generator 23b. Therefore, in either case, when discharging from the first storage units 5, 6 or the second storage units 7, 8, it is not necessary to load-follow the amount of power demanded, and it is possible to supply the amount of power generated by renewable energy more efficiently and stably. [Industrial Applicability]
[0054] INDUSTRIAL APPLICABILITY As described above, the present invention can be used as a power supply system and a power supply method for efficiently and stably supplying renewable energy. [Explanation of symbols]
[0055] 1...Power supply system 2...Control device 3...Calculation device 4...Database 5,6...First power storage unit 7,8...Second power storage unit 9a-12a...Charge switch 9b-12b...Discharge switch 13...Adjustment power storage unit 14a...Charge switch 14b...Discharge switch 15a,15b...Control signal line 16a,16b...Control signal line 17...Data signal line 18...Solar power generator 19...Wind power generator 20...Power conditioner for solar power generator 21...Power conditioner for wind power generator 22...Data signal line 23a...Diesel generator 23b...Hydroelectric generator 24a...Data signal line 24b...Control signal line 25...Power system 26...General consumer 27...Data signal line 28...Data signal line 29...Power conditioner for storage battery 30...Step-up transformer 31...Power conditioner for storage battery 32...Step-down transformer 33...Sunrise and sunset data 34...Photovoltaic power generation forecast function 35...Sunshine condition data 36...Actual photovoltaic power generation data 37...Wind power generation forecast function 38...Wind condition data 39...Actual wind power generation data 40...Renewable energy power generation line 41...Discharge unit discharge amount line 42...Power supply amount line 43...Demand power amount line 44a...Discharge unit discharge amount 44b...Renewable energy power generation amount 45...Internal combustion power generation amount 46...Timing 47...Maximum single unit power generation capacity 48...Power generation capacity excluding maximum single unit 49...Auxiliary discharge amount 50a...Load following power generation amount 50b...Load following power generation amount
Claims
1. a control device that controls the charging and discharging of the first and second energy storage units; and a calculation device that predicts an amount of power to be generated by the power generation facility during a predetermined period, wherein the control device charges one of the first or second energy storage unit with an amount of power actually generated by the power generation facility during the period, and discharges the predicted amount of power predicted using the calculation device from the other of the first or second energy storage unit to a power grid during the period.
2. 2. The power supply system according to claim 1, wherein the calculation device adds a difference between the amount of power actually generated by the power generation facility during the period and the predicted amount of power to a predicted amount of power for a next period that predicts the amount of power to be generated by the power generation facility after the period, and corrects the difference between the actual amount of power generated during the period and the predicted amount of power discharged to the power grid during the period by the discharge for the next period.
3. 2. The power supply system according to claim 1, wherein the power system includes an internal combustion power generation facility and an adjustment storage unit which charges and discharges only between the internal combustion power generation facility and the power system, and the control device controls the charging and discharging of the adjustment storage unit and the amount of power generated by the internal combustion power generation facility in addition to the first and second storage units, and further controls the adjustment storage unit to discharge power to the power system when an amount of power demand in the power system is greater than a sum of the discharged predicted amount of power and the amount of power generated by the internal combustion power generation facility, and controls the adjustment storage unit to charge power from the power system when the amount of power demand is less than the sum.
4. 2. The power supply system according to claim 1, wherein the power system includes an internal combustion power generation facility and an adjustment storage unit which charges and discharges only between the internal combustion power generation facility and the power system, and the control device controls the charging and discharging of the adjustment storage unit and the amount of power generated by the internal combustion power generation facility in addition to the first and second storage units, and further increases the amount of power generated by the internal combustion power generation facility when the amount of power demand in the power system is greater than the sum of the discharged predicted amount of power and the amount of power generated by the internal combustion power generation facility, and charges the adjustment storage unit from the power system when the amount of power demand is less than the sum.
5. 5. The power supply system according to claim 3, wherein the storage capacity of the adjustment storage unit is an amount of power that can be generated for at least one day by a generator with a maximum single-unit generating capacity of the internal combustion power generation equipment on the power grid.
6. A power supply method for discharging power generated by a power generation facility that utilizes renewable energy to a power grid using a first power storage unit that charges and discharges the power, and a second power storage unit that charges and discharges the power in a reverse manner to the first power storage unit, comprising: Calculating a predicted amount of power to be generated by the power generation facility for a predetermined period of time; a control for controlling a power supply in such a manner that an amount of power actually generated by the power generation facility during the period is charged to one of the first and second power storage units, and the other of the first and second power storage units is discharged to the power grid during the period.
7. 7. The power supply method according to claim 6, further comprising the steps of: adding a difference between an amount of power actually generated by the power generation facility during the period and the predicted amount of power to a predicted amount of power for a next period that predicts an amount of power to be generated by the power generation facility after the period; and correcting the difference between the actual amount of power generated during the period and the predicted amount of power discharged to the power grid during the period by a discharge for the next period.
8. 7. The power supply method according to claim 6, further comprising the steps of: using, in addition to the first and second power storage units, an internal combustion power generation facility and an adjustment power storage unit which charges and discharges only between the internal combustion power generation facility and the power grid; and controlling so that, when an amount of demanded power in the power grid is greater than a sum of the discharged predicted amount of power and an amount of power generated by the internal combustion power generation facility, the adjustment power storage unit is discharged to the power grid; and, when the amount of demanded power is less than the sum, the adjustment power storage unit is charged from the power grid.
9. 7. The power supply method according to claim 6, further comprising the steps of: using, in addition to the first and second power storage units, an internal combustion power generation facility and an adjustment power storage unit which charges and discharges only between the internal combustion power generation facility and the power grid; and controlling so that, when an amount of power demand in the power grid is greater than a sum of the predicted amount of power discharged and an amount of power generated by the internal combustion power generation facility, an amount of power generated by the internal combustion power generation facility is increased; and, when the amount of power demand is less than the sum, the adjustment power storage unit is charged from the power grid.
10. 10. The power supply method according to claim 8 or 9, wherein the storage capacity of the adjustment storage unit is an amount of power that can be generated for at least one day by a generator with a maximum single-unit generating capacity of the internal combustion power generation equipment on the power grid.
Citation Information
Patent Citations
Natural energy power generation system
JP2006311707A
Device, method, and program for evaluating photovoltaic power generation system
JP2008141918A
Wind turbine generator system
JP2009197587A
Power supply apparatus and power supply system using the same
JP2013070585A
Power supply system
JP2013078194A