Charging system

The charging system optimizes vehicle guidance to charging lanes by calculating power needs and traffic conditions, reducing congestion and ensuring vehicles with low battery charge can access necessary charging.

JP2024144854APending Publication Date: 2024-10-15SUBARU CORP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023057000
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing charging systems face congestion issues in charging lanes when multiple vehicles enter, and vehicles with low battery charge may be unable to access these lanes, leading to inefficiencies.

Method used

A charging system that includes a vehicle and a server, capable of communicating through a network, which acquires destination and stopover information, calculates power requirements, and guides vehicles to charging lanes based on available charging capacity and traffic conditions, ensuring only vehicles needing charge are directed to these lanes.

Benefits of technology

The system effectively reduces congestion in charging lanes by prioritizing vehicles that need charging, optimizing lane usage and ensuring vehicles can reach their destinations with sufficient power.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024144854000001_ABST
    Figure 2024144854000001_ABST
Patent Text Reader

Abstract

To reduce congestion of a charging lane, and guide a vehicle having a high need for charging to the charging lane.SOLUTION: A charging system includes a vehicle capable of charging a battery from a power transmitter installed on a road by noncontact charging, and a sever that can communicate with the vehicle. The charging system includes: an information acquisition section for acquiring information regarding a destination, a passing spot, and stay time in the passing spot; an electric energy calculation section for calculating electric energy required when the vehicle reaches a destination; a charge amount calculation section for calculating a charge amount that can be charged in a passing spot on the basis of information on facilities of the passing spot; an entry determination section for determining the propriety of entry into a charging lane in which the transmitter is installed on the basis of electric energy and a charge amount; and a guidance section for guiding entry to the charge lane when the entry determination section determines that entry into the charging lane is possible.SELECTED DRAWING: Figure 6
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to the technical field of charging systems. [Background technology]

[0002] 2. Description of the Related Art Conventionally, a technology has been proposed in which a charging lane is provided on a part of a road, and the batteries of vehicles traveling on the charging lane are charged in a contactless manner (see, for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2021-128571 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, if a large number of vehicles enter a charging lane, there is a risk that only the charging lane will become congested. In addition, there is a risk that vehicles with a low battery level or vehicles that do not have enough battery power to reach their destination will not be able to enter the charging lane.

[0005] The present invention has been made in consideration of the above circumstances, and has an object to guide vehicles that are highly in need of charging to the charging lane while alleviating congestion in the charging lane. [Means for solving the problem]

[0006] A charging system according to one embodiment of the present invention is a charging system comprising a vehicle whose battery can be charged by contactless charging from a power transmission device installed on a road, and a server capable of communicating with the vehicle, and comprises an information acquisition unit that acquires information regarding a destination, intermediate points, and a stay time at the intermediate points, an energy amount calculation unit that calculates the amount of energy required for the vehicle to reach the destination, a charge amount calculation unit that calculates the amount of charge that can be charged at the intermediate points based on facility information of the intermediate points, an entry determination unit that determines whether or not it is possible to enter a charging lane in which the power transmission device is installed based on the amount of energy and the charge amount, and a guidance unit that provides guidance to enter the charging lane when the entry determination unit determines that entry into the charging lane is possible. Effect of the Invention

[0007] According to the present invention, it is possible to guide vehicles that are highly in need of charging to the charging lane while reducing congestion in the charging lane. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a diagram showing an outline of the configuration of a charging system. [Diagram 2] FIG. 1 is a diagram showing a configuration of a vehicle. [Diagram 3] FIG. 1 is a diagram showing a configuration of a navigation device. [Figure 4] FIG. 2 illustrates a configuration of a server. [Diagram 5] FIG. 1 is a diagram showing an example of a road on which a vehicle travels. [Figure 6] 4 is a sequence chart showing a flow of a charging lane guidance process in the charging system. [Figure 7] FIG. 13 shows an input screen for a destination, intermediate points, and duration of stay. [Figure 8] FIG. 2 is a diagram showing a navigation screen. [Figure 9] FIG. 13 is a diagram showing a charging lane entry guidance screen. [Figure 10] FIG. 13 is a diagram showing a normal lane driving guidance screen. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] <1. Charging system configuration> 1 is a diagram showing an outline of the configuration of a charging system 1. As shown in FIG. The vehicle 2 is connected to a network 4 such as the Internet, for example, wirelessly. The server 3 is connected to the network 4, either wired or wirelessly. The vehicle 2 and the server 3 are capable of communicating with each other via the network 4.

[0010] Fig. 2 is a diagram showing the configuration of vehicle 2. As shown in Fig. 2, vehicle 2 is an electric vehicle or a hybrid vehicle equipped with a motor 11. In addition to motor 11, vehicle 2 is equipped with an inverter 12, a battery 13, a charging plug 14, a power receiving unit 15, and a navigation device 16.

[0011] The motor 11 is a power source for propelling the vehicle 2, and is, for example, a three-phase AC motor. The motor 11 generates driving force using electric power supplied from the battery 13 via the inverter 12, and transmits the driving force to the drive wheels to propel the vehicle 2. If the vehicle 2 is a hybrid vehicle, it will also be equipped with an engine as a power source.

[0012] The motor 11 also generates electricity (power) by performing regenerative operation. The electricity generated by the regenerative operation of the motor 11 is supplied to the battery 13 via the inverter 12.

[0013] The inverter 12 converts the DC current supplied from the battery 13 into a three-phase AC current and supplies it to the motor 11. When the motor 11 performs regenerative operation, the inverter 12 converts the AC current supplied from the motor 11 into a DC current and supplies it to the battery 13.

[0014] The battery 13 is a so-called high-voltage secondary battery, and stores electricity to be supplied to the motor 11. The battery 13 can be charged by the regenerative operation of the motor 11.

[0015] The battery 13 can also be charged by electricity supplied from an external charging device via a charging gun or the like inserted into a charging plug 14.

[0016] Furthermore, a power receiving unit 15 is provided below the vehicle 2. The power receiving unit 15 receives electric power supplied from a power transmitting device 17 installed in the charging lane 104 in a wireless manner, and supplies the received electricity to the battery 13. This allows the battery 13 to be charged in a wireless manner. Note that the method of wireless charging that is adopted may be an electromagnetic induction method, an electric field resonance method, a microwave method, or the like.

[0017] Fig. 3 is a diagram showing the configuration of the navigation device 16. As shown in Fig. 3, the navigation device 16 includes a control unit 21, an operation unit 22, a display unit 23, a position information acquisition unit 24, an audio output unit 25, a storage unit 26, and a communication unit 27.

[0018] The control unit 21 is made up of a computer such as an ECU (Electronic Control Unit), and controls the entire navigation device 16. The control unit 21 functions as an information acquisition unit 31, a driving plan calculation unit 32, a charge amount calculation unit 33, an electric power amount calculation unit 34, and a guidance unit 35. These functional units will be described later.

[0019] The operation unit 22 includes buttons, dials, a touch panel, etc., and receives operations from a user. When the operation unit 22 receives an operation from a user, it outputs a signal to the control unit 21 according to the operation.

[0020] The display unit 23 is a liquid crystal display or an organic EL display, and displays various images (screens) based on the control of the control unit 21.

[0021] The position information acquisition unit 24 includes a receiver that receives a Global Navigation Satellite System (GNSS) signal. The position information acquisition unit 24 receives GNSS signals from a plurality of GNSS satellites, and calculates the position (current position) of the vehicle 2 based on the received GNSS signals. Note that the position information acquisition unit 24 only receives the GNSS signals, and the current position of the vehicle 2 may be calculated by the control unit 21.

[0022] The audio output unit 25 is, for example, a speaker, and outputs various sounds (music, voice, etc.) based on the control of the control unit 21.

[0023] The storage unit 26 is a non-volatile memory such as a hard disk drive (HDD) or a flash memory, and stores various information (for example, map data). The storage unit 26 may also store a program executed by the control unit 21.

[0024] The communication unit 27 communicates with the server 3 via the network 4 .

[0025] The control unit 21 reads out a map of the surroundings of the current position of the vehicle 2 from the map data stored in the storage unit 26, for example, and displays the read out map on the display unit 23 together with an icon indicating the current position of the vehicle 2. The control unit 21 also provides guidance via the display unit 23 and the audio output unit 25 on a route to a destination previously set by the user.

[0026] Fig. 4 is a diagram showing the configuration of the server 3. As shown in Fig. 4, the server 3 is a computer including a CPU (Central Processing Unit) 41, a ROM (Read Only Memory) 42, and a RAM (Random Access Memory) 43.

[0027] The CPU 41 executes a program stored in the ROM 42 or a program read from the storage unit 46 and deployed in the RAM 43, thereby controlling the entire server 3. The CPU 41 functions as a threshold updating unit 51 and an entry determining unit 52. These functional units will be described later.

[0028] The server 3 includes a CPU 41, a ROM 42, and a RAM 43, as well as an operation unit 44, a display unit 45, a storage unit 46, and a communication unit 47.

[0029] The operation unit 44 includes a keyboard, a mouse, buttons, a dial, a touch panel, etc., and receives operations from the user. When the operation unit 44 receives an operation from the user, it outputs a signal to the CPU 41 according to the operation.

[0030] The display unit 45 is a liquid crystal display or an organic EL display, and displays various images (screens) based on the control of the CPU 41.

[0031] The storage unit 46 is a non-volatile memory such as a hard disk drive (HDD) or a flash memory, and stores various information. The storage unit 46 may also store programs executed by the CPU 41.

[0032] The communication unit 47 communicates with the vehicle 2 (navigation device 16) via the network 4.

[0033] Fig. 5 is a diagram showing an example of a road 100 on which a vehicle 2 travels. As shown in Fig. 5, an example of the road 100 on which a vehicle 2 travels is an expressway. The road 100 has driving lanes 102 on either side of a central reservation 101, allowing vehicles to travel in opposite directions. The example in Fig. 5 shows a case in which two driving lanes 102 are provided on each side.

[0034] The travel lanes 102 are broadly divided into normal lanes 103 and charging lanes 104. The normal lane 103 is a lane in which no power transmission device 17 is installed. The charging lane 104 is a lane in which a power transmission device 17 is installed, for example, the lane farthest from the central reservation strip 101. However, the power transmission device 17 is not installed over the entire travel lane 102, but only in a certain section. Therefore, the normal lanes 103 are connected to the front and rear of the charging lane 104, respectively.

[0035] The number of driving lanes 102 is not limited to two and may be any number. The number of normal lanes 103 and charging lanes 104 is also not limited to one and may be any number.

[0036] FIG. 6 is a sequence chart showing the flow of the charging lane guidance process in the charging system 1. As shown in FIG. However, if a large number of vehicles 2 capable of being contactlessly charged by the power receiving unit 15 enter and travel in the charging lane 104, it may happen that only the charging lane 104 becomes congested, and almost no vehicles 2 travel in the normal lane 103. In such a case, there is a risk that vehicles 2 that do not have enough battery power to reach the destination may not be able to enter the charging lane 104.

[0037] Therefore, the charging system 1 executes a charging lane guidance process for preferentially guiding the vehicle 2 that needs to be charged in the charging lane 104 to the charging lane 104 for charging.

[0038] 7 is a diagram showing a destination, waypoint and stay time input screen 60. FIG.

[0039] The navigation device 16 can display on the display unit 23 an input screen 60 as shown in FIG. 7 that allows the user to input a destination, intermediate points, and duration of stay.

[0040] The input screen 60 is provided with a destination input field 61 for inputting a destination, a waypoint input field 62 for inputting a waypoint, and a stay time input field 63 for inputting a stay time at the waypoint.

[0041] The user inputs the destination, the stopover points, and the stay time into a destination input field 61, a stopover point input field 62, and a stay time input field 63 of the input screen 60, respectively, via the operation unit 22. As a result, the information acquisition unit 31 acquires information related to the destination, the stopover points, and the stay time in step S1 shown in FIG.

[0042] The information acquisition unit 31 may acquire information regarding the destination, intermediate points, and duration of stay by a method other than input via the input screen 60. For example, the information acquisition unit 31 may acquire the information via the communication unit 27 from a smartphone or the like owned by the user. Furthermore, the stay time is the predicted time that the user will stay at the route point, and the user does not necessarily have to stay at the route point for the entire stay time.

[0043] When the information on the destination, the waypoints, and the stay time is acquired, the driving plan calculation unit 32 calculates a route to the waypoints and the destination. Then, the control unit 21 displays a navigation screen 70 on the display unit 23, in which icons 71, 72, and 73 corresponding to the current position, the destination, and the waypoints, respectively, are superimposed on a map, as shown in Fig. 8 for example. In addition, the control unit 21 provides guidance on the route to the waypoints and the destination based on the current position of the vehicle 2 and map data input from the position information acquisition unit 24.

[0044] The information acquisition unit 31 acquires facility information of the acquired route points from the server 3 or another device. The facility information includes information on charging facilities, congestion status, and weather. The information about the charging facilities indicates the number of charging devices installed at the route points, the charging capacity of the charging devices, and the like. The congestion status indicates the usage status of charging devices (how many devices are in use) and the congestion level at stopover points. The weather is shown for the route. The facility information may be stored in the storage unit 26 of the server 3, or may be stored in another device via the network 4.

[0045] In step S3, the charge amount calculation unit 33 calculates the charge amount that can be charged to the battery 13 while the vehicle 2 is staying at the route point, based on the acquired facility information and stay time. As a method for calculating the charge amount, a method is considered in which the time during which the vehicle 2 can use the charging device is calculated based on the congestion state and the number of charging devices, and the charge amount is calculated based on the calculated time, the charging capacity of the charging device, and the weather. At this time, the charge amount calculation unit 33 may calculate the charge amount based on a map in which the calculated time, the charging capacity of the charging device, and the weather are associated, or may calculate the charge amount using a model that has been machine-learned in advance, or may calculate the charge amount using another method. In the following, the charge amount that can be charged in the battery 13 while staying at a waypoint is referred to as a waypoint charge amount.

[0046] In step S4, the power amount calculation unit 34 determines whether the vehicle 2 has approached the entrance of the charging lane 104, based on the map data and the current position of the vehicle 2. At this time, it is sufficient that the map data includes position information of the charging lane 104. Note that whether the vehicle 2 has approached the entrance of the charging lane 104 may be determined by other methods. For example, the navigation device 16 may transmit the current position of the vehicle 2 to the server 3, and the server 3 may determine whether the vehicle 2 has approached the entrance of the charging lane 104 based on map data, and then transmit the result to the navigation device 16. Furthermore, the vehicle 2 may receive, via communication, from a communication device installed on the road 100, information that the vehicle 2 is approaching the entrance of the charging lane 104.

[0047] When the vehicle 2 approaches the entrance to the charging lane 104 (Yes in step S4), the power amount calculation unit 34 calculates the amount of power required to reach the destination, for example, by dividing the remaining distance to the destination by the power consumption of the vehicle 2 (motor 11). Furthermore, the power amount calculation unit 34 subtracts the current remaining amount of the battery 13 from the amount of power required to reach the destination, to calculate the amount of power that is insufficient to reach the destination. In the following description, the amount of power required to reach the destination is referred to as the required power amount, the current remaining amount of the battery 13 is referred to as the battery remaining amount, and the amount of power that is insufficient to reach the destination is referred to as the power shortage amount.

[0048] Furthermore, the power amount calculation unit 34 calculates the amount of charge that must be charged in the charging lane 104 by subtracting the waypoint charging amount from the amount of power shortage. That is, the power amount calculation unit 34 calculates the amount of charge that must be charged in the charging lane 104 by subtracting the remaining battery amount and the waypoint charging amount from the required amount of power. Hereinafter, the amount of charge that must be charged in the charging lane 104 is referred to as the amount of charge during driving.

[0049] For example, if the required amount of energy is 100 kWh and the remaining battery charge is 30 kWh, the energy shortage is 70 kWh. Also, if the charge amount at the waypoint is 40 kWh, the charge amount during driving is 30 kWh. For example, if the required amount of power is small or the remaining battery charge is large, the power shortage or the amount of charge during travel may become negative (the vehicle may be able to reach the destination without charging in the charging lane 104).

[0050] When the amount of charge during travel is calculated in this manner, the power amount calculation unit 34 transmits the calculated amount of charge during travel to the server 3 in step S6.

[0051] Meanwhile, in the server 3, the threshold update unit 51 acquires road information in step S11. The road information includes the total number of vehicles 2 traveling in the driving lane 102 (total number of vehicles) and the number of vehicles 2 traveling in the charging lane 104 (number of charging vehicles). For example, if the road 100 is an expressway, the total number of vehicles can be calculated from the number of vehicles 2 that have entered the expressway. The number of vehicles being charged can be calculated from the number of vehicles 2 being charged by the power transmitting device 17.

[0052] In step S12, threshold update unit 51 updates the threshold based on the total number of vehicles and the number of charging vehicles. Here, the threshold is a value used for comparison with the charge amount during traveling to determine whether or not to guide vehicle 2 into the charging lane 104. The larger the threshold is, the more difficult it is to guide vehicle 2 into the charging lane 104, and the smaller the threshold is, the easier it is to guide vehicle 2 into the charging lane 104.

[0053] The threshold updating unit 51 calculates the number of vehicles 2 traveling in the normal lane 103 by subtracting the number of charging vehicles from the total number of vehicles. Furthermore, the threshold updating unit 51 updates the threshold based on the ratio between the number of vehicles 2 traveling in the normal lane 103 and the number of vehicles 2 traveling in the charging lane 104. For example, the threshold updating unit 51 lowers the threshold if the ratio of vehicles 2 traveling in the normal lane 103 is high, and raises the threshold if the ratio of vehicles 2 traveling in the charging lane 104 is high.

[0054] In step S13, the entry determination unit 52 determines whether or not the in-travel charge amount has been received from the vehicle 2. If the in-travel charge amount has not been received (No in step S13), steps S11 and S12 are repeated at predetermined intervals until the in-travel charge amount is received. This makes it possible to perform an entry determination (step S14) described later using a threshold value according to the state of the road 100 when the in-travel charge amount is received.

[0055] When the amount of charge during travel has been received (Yes in step S13), in step S14 the entry determination unit 52 determines whether entry into the charging lane 104 is possible based on the amount of charge during travel and the threshold value updated in step S12. Here, the entry determination unit 52 determines that entry is possible when the amount of charge during travel is equal to or greater than the threshold value. On the other hand, the entry determination unit 52 determines that entry is not possible when the amount of charge during travel is less than the threshold value. Then, in step S14, the entry determination unit 52 transmits the determination result in step S14 to the vehicle 2.

[0056] Fig. 9 is a diagram showing a charging lane entry guidance screen 81. Fig. 10 is a diagram showing a normal lane driving guidance screen 82. When the vehicle 2 receives the determination result, in step S7, the guidance unit 35 determines, based on the determination result, whether entry into the charging lane 104 is possible. As a result, if entry into the charging lane 104 is possible (Yes in step S7), in step S8, the guidance unit 35 causes the display unit 23 to display a charging lane entry guidance screen 81 that provides guidance on entering the charging lane 104, as shown in FIG.

[0057] On the other hand, if entry into the charging lane 104 is not possible (No in step S7), in step S9, the guidance unit 35 causes the vehicle to travel in the normal lane 103, as shown in FIG. 10, i.e., causes the display unit 23 to display a normal lane driving guidance screen 82 that does not provide guidance on entering the charging lane 104.

[0058] In this way, in the charging system 1, when the vehicle 2 stays at a route point, the charging system 1 determines whether or not to allow the vehicle 2 to enter the charging lane 104 taking into account the amount of charge at the route point, and provides guidance on entering the charging lane 104 or traveling in the normal lane 103. This reduces the situation where vehicles 2 are concentrated in either the normal lane 103 or the charging lane 104, which is likely to cause congestion, while enabling vehicles 2 that are in greater need of charging in the charging lane 104 to be given priority by running in the charging lane 104 and charging their batteries 13.

[0059] <2. Modifications> Although the embodiment of the present invention has been described above, the present invention is not limited to the above-mentioned specific examples and can adopt various configurations. For example, in the above embodiment, the functional units of the information acquisition unit 31, the driving plan calculation unit 32, the charging amount calculation unit 33, the power amount calculation unit 34, and the guidance unit 35 are provided in the navigation device 16 (control unit 21). However, some or all of the functional units of the information acquisition unit 31, the driving plan calculation unit 32, the charging amount calculation unit 33, the power amount calculation unit 34, and the guidance unit 35 may be provided in the server 3 (CPU 41).

[0060] In the above embodiment, the functional units of the threshold updating unit 51 and the entry determining unit 52 are provided in the server 3 (CPU 41). However, the functional units of the threshold updating unit 51 and the entry determining unit 52 may be provided in the navigation device 16 (control unit 21).

[0061] In the above embodiment, the guidance for entering the charging lane 104 or traveling in the normal lane 103 is provided by displaying the charging lane entry guidance screen 81 or the normal lane traveling guidance screen 82 on the display unit 23. However, the guidance unit 35 may provide the guidance for entering the charging lane 104 or traveling in the normal lane 103 by voice, or may provide the guidance by both the screen display and voice.

[0062] In the above embodiment, the user is prompted to input the stay time, but the average stay time at the intermediate points may be acquired as the stay time.

[0063] In the above embodiment, the facility information includes information about the charging facility, a congestion state of the charging facility, and information about the weather at the route point. However, the facility information does not need to include some of these information, and may include other information, as long as the route point charging amount can be calculated.

[0064] <3. Summary of the embodiment> As described above, the charging system 1 of the embodiment includes the vehicle 2 capable of charging the battery 13 by contactless charging from the power transmission device 17 installed on the road 100, and the server 3 capable of communicating with the vehicle 2. The charging system 1 also includes an information acquisition unit 31 that acquires information on the destination, the waypoints, and the stay time at the waypoints, an electric power amount calculation unit 34 that calculates the amount of electric power (required electric power amount) required for the vehicle 2 to reach the destination, a charge amount calculation unit 33 that calculates the amount of charge that can be charged at the waypoints (waypoint charge amount) based on facility information of the waypoints, an entry determination unit 52 that determines whether or not entry into the charging lane 104 in which the power transmission device 17 is installed is possible based on the amount of electric power and the amount of charge, and a guidance unit 35 that provides guidance on entry into the charging lane 104 when the entry determination unit 52 determines that entry into the charging lane 104 is possible. As a result, the charging system 1 calculates the amount of power that is insufficient in the battery 13 until the vehicle arrives at the destination, taking into account the amount of charge at the intermediate points. This enables the charging system 1 to more accurately determine the vehicle 2 that needs to be charged in the charging lane 104. Thus, in the charging system 1, it is possible to guide vehicles 2 that are highly in need of charging to the charging lane 104 while reducing congestion in the charging lane 104.

[0065] In addition, the entry judgment unit 52 makes a judgment to permit entry into the charging lane 104 when the value (shortage of power) obtained by subtracting the remaining amount (remaining battery amount) of the battery 13 and the charging amount (waypoint charging amount) from the amount of power (required amount of power) is equal to or greater than a threshold value. This makes it possible to change the threshold value depending on the condition of the road 100, so that the vehicle 2 can be optimally guided to the charging lane 104 depending on the condition of the road 100, thereby making it possible to further reduce congestion.

[0066] The vehicle also includes a threshold updating unit 51 that updates the threshold based on the total number of vehicles traveling on the road 100 including the charging lane 104 and the number of vehicles traveling in the charging lane 104 . This allows the charging system 1 to change the threshold value depending on the ratio of vehicles 2 traveling in the normal lane 103 and the charging lane 104. Therefore, the charging system 1 can guide vehicles 2 that highly require charging to the charging lane 104 while further reducing congestion.

[0067] The threshold updating unit 51 updates the threshold at predetermined time intervals. As a result, in the charging system 1, the threshold value when the vehicle 2 approaches the entrance of the charging lane 104 can be used to determine whether or not the vehicle 2 is permitted to enter the charging lane 104. Therefore, the charging system 1 can accurately determine whether or not entry into the charging lane 104 is permitted.

[0068] The facility information includes information about the charging facility, the congestion status of the charging facility, and information about the weather at the route points. This allows the charging system 1 to accurately calculate the amount of charge at the intermediate points. [Explanation of symbols]

[0069] 1 Charging System 2 Vehicles 3 Server 16 Navigation devices 17 Power transmission equipment 31 Information Acquisition Department 32 Driving plan calculation unit 33 Charge amount calculation section 34 Power Calculation Section 35 Information Department 51 Threshold Update Unit 52 Entry Judgment Section

Claims

1. A charging system including a vehicle capable of charging a battery by wireless charging from a power transmission device installed on a road, and a server capable of communicating with the vehicle, An information acquisition unit that acquires information regarding a destination, a stopover point, and a stay time at the stopover point; an energy calculation unit that calculates an amount of energy required for the vehicle to reach the destination; a charge amount calculation unit that calculates a charge amount that can be charged at the route point based on facility information of the route point; an entry determination unit that determines whether or not the vehicle is permitted to enter a charging lane in which the power transmitting device is installed, based on the amount of power and the amount of charge; a guidance unit that provides guidance for entering the charging lane when the entry determination unit determines that entry into the charging lane is possible; and A charging system comprising:

2. The entry determination unit is When the value obtained by subtracting the remaining amount of the battery and the charging amount from the amount of power is equal to or greater than a threshold, a determination is made to permit entry into the charging lane. The charging system of claim 1 .

3. A threshold updating unit that updates the threshold based on the total number of vehicles traveling on a road including the charging lane and the number of vehicles traveling on the charging lane. The charging system according to claim 2 .

4. The threshold update unit, The threshold is updated at predetermined intervals. The charging system according to claim 3 .

5. The facility information includes information on charging facilities, congestion status of the charging facilities, and weather information on the route points. The charging system of claim 1 .

Citation Information

Patent Citations

  • Route retrieval device, terminal device and route retrieval method

    JP2019191200A

  • Wireless power supply system

    JP2021128571A