Control apparatus, power conditioner, control method, and program

The control device and method manage DC bus voltage fluctuations by setting PCS output power to zero and gradually adjusting limits, maintaining normal voltage ranges and ensuring maximum power capacity during converter trips in power storage systems.

JP2024145469AActive Publication Date: 2024-10-15MITSUBISHI HEAVY IND LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023057834
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15
Estimated Expiration
2043-03-31

AI Technical Summary

Technical Problem

Conventional power storage systems face issues where a DC/DC converter trip leads to abnormal DC bus voltage fluctuations, causing over-discharge or over-voltage conditions that result in system shutdown, as they fail to effectively manage power output limits during such events.

Method used

A control device and method that includes a voltage acquisition unit to monitor DC bus voltage, an output limiter to set PCS output power to zero when thresholds are exceeded, and a restriction release mechanism to gradually adjust the output limit value to maintain the DC bus voltage within normal operating ranges.

Benefits of technology

The solution enables continuous operation of the power storage system by preventing DC bus voltage from exceeding normal limits, ensuring maximum power capacity from operational storage battery units even during converter trips.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024145469000001_ABST
    Figure 2024145469000001_ABST
Patent Text Reader

Abstract

To provide a control apparatus that enables continuous operation by keeping a DC bus voltage from exceeding a normal operation voltage range when a drop or a rise in the DC bus voltage is detected.SOLUTION: A control apparatus comprises: a voltage acquisition unit that acquires a voltage of a DC bus that connects a power conditioner with a storage battery unit; an output limiting unit that sets an output limit value of a PCS output power to zero when the voltage exceeds an upper limit threshold or is lower than a lower limit threshold, the PCS output power being electric power output to a load side by the power conditioner; and a limit cancelling unit that gradually increases or decreases the output limit value after the output limit value is set to zero.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a control device, a power conditioner, a control method, and a program. [Background technology]

[0002] In recent years, power storage systems have been used in various places such as power generation facilities and factories that use renewable energy. A power storage system includes multiple battery units each having a storage battery and a DC / DC converter, a PCS (Power Conditioning System), and a DC bus that connects the battery units and the PCS.

[0003] Furthermore, in the case of a power storage system, if the total chargeable / dischargeable power of the entire battery unit becomes smaller than the PCS output power output from the PCS to the load side (the power grid when the battery unit is discharging, and the battery unit when it is charging), for example, when the DC / DC converter trips, over-discharge of the battery or overvoltage of the DC bus occurs, causing the system to stop. In order to continue operating the power storage system, it is necessary to limit the PCS output power when the voltage of the DC bus drops or rises significantly. For example, Patent Document 1 describes that when starting a load with a battery pack (power storage system) consisting of multiple single cells, if over-discharge of any of the single cells is detected, the power supply from the battery pack to the load is limited or stopped. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 4821363 Summary of the Invention [Problem to be solved by the invention]

[0005] FIG. 8 is a diagram showing an example of an output limiting process of a power storage system according to the conventional technology. As shown in Figure 8, a conventional energy storage system uses a DC bus voltage V dc As the PCS output power P PCS When the output limit value is a positive value, it indicates charging to the storage battery unit, and when it is a negative value, it indicates discharging from the storage battery unit.

[0006] For example, if a trip occurs during discharge from the battery unit, the total dischargeable power of the battery unit decreases (a1 in Figure 8), and the DC bus voltage V dc At this time, the storage system reduces the DC bus voltage V dc_t91 When a drop in the PCS output power P PCS (the output limit value is gradually increased) to limit the discharge from the storage battery unit (a3 in FIG. 8). Then, at time t92, the PCS output power P PCS Since the PCS output power P PCS DC bus voltage V dc continues to decrease. Then, the DC bus voltage V dc The DC bus voltage continues to decrease, and thereafter, the energy storage system keeps the DC bus voltage in an abnormally low state (the DC bus voltage V dc_t92 The inverter keeps the value at a constant value (a4 in Fig. 8) and continues operation.

[0007] Similarly, suppose that the DC / DC bus of one of the battery units trips during charging. This causes the total chargeable power of the battery units to decrease (b1 in Fig. 8), and the DC bus voltage V dc At this time, the storage system increases the DC bus voltage V dc_t93 When an increase in the PCS output power P PCS (the output limit value is gradually decreased) to limit the charging to the storage battery unit (b3 in FIG. 8). Then, at time t94, the PCS output power P PCSHowever, the PCS output power P PCS until the DC bus voltage V dc continues to rise. Then, the DC bus voltage V dc continues to rise, and thereafter, the energy storage system keeps the DC bus voltage abnormally high (DC bus voltage V at time t94 dc_t94 The inverter keeps the value as it is (b4 in Fig. 8) and continues operation.

[0008] An object of the present disclosure is to provide a control device, a power conditioner, a control method, and a program that can continue operation by preventing the DC bus voltage from exceeding the normal operating voltage range when a drop and an increase in the DC bus voltage are detected. [Means for solving the problem]

[0009] According to one aspect of the present disclosure, a control device includes a voltage acquisition unit that acquires the voltage of a DC bus connecting a power conditioner (PCS: Power Conditioning System) and a storage battery unit, an output limiting unit that sets to zero an output limit value of a PCS output power, which is the power that the PCS outputs to a load, when the voltage exceeds an upper threshold or falls below a lower threshold, and a limit release unit that gradually increases or decreases the output limit value after setting the output limit value to zero.

[0010] According to one aspect of the present disclosure, a control method includes the steps of acquiring a voltage of a DC bus connecting a power conditioner (PCS: Power Conditioning System) and a storage battery unit, setting to zero an output limit value of PCS output power, which is the power output by the PCS to a load, when the voltage exceeds an upper threshold or falls below a lower threshold, and gradually increasing or decreasing the output limit value after setting the output limit value to zero.

[0011] According to one aspect of the present disclosure, the program causes a control device to execute the steps of acquiring the voltage of a DC bus connecting a power conditioning system (PCS) and a storage battery unit, setting to zero an output limit value of PCS output power, which is the power that the PCS outputs to the load, when the voltage exceeds an upper threshold or falls below a lower threshold, and gradually increasing or decreasing the output limit value after setting the output limit value to zero. Effect of the Invention

[0012] According to the above aspect, when a drop and an increase in the DC bus voltage are detected, the DC bus voltage can be prevented from exceeding the normal operating voltage range and operation can be continued. [Brief description of the drawings]

[0013] [Figure 1] 1 is a diagram showing an overall configuration of a power storage system according to an embodiment; [Diagram 2] FIG. 2 is a block diagram showing a functional configuration of a control device according to an embodiment. [Diagram 3] FIG. 13 is a diagram illustrating upper and lower thresholds for a DC bus voltage according to one embodiment. [Figure 4] 5 is a flowchart illustrating an example of an output control process of a control device according to an embodiment. [Diagram 5] FIG. 1 is a first diagram for explaining an output control process according to an embodiment. [Figure 6] FIG. 2 is a second diagram for explaining the output control process according to an embodiment. [Figure 7] 5 is a flowchart illustrating an example of an update process of an output limit value of a control device according to an embodiment. [Figure 8] FIG. 13 is a diagram illustrating an example of an output limiting process of a power storage system according to the prior art. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] (Overall configuration of the energy storage system) FIG. 1 is a diagram showing an overall configuration of a power storage system according to an embodiment. As shown in FIG. 1, the power storage system 1 includes a PCS (Power Conditioning System) 2, a control device 3, a DC bus 4, and a plurality of storage battery units 5.

[0015] The PCS2 is a power conditioner that is connected to the power grid. The PCS2 includes an inverter 21, which is a bidirectional inverter that converts AC power and DC power. The PCS2 converts DC power discharged from each storage battery unit 5 to AC power by the inverter 21 and outputs the AC power to the power grid. The PCS2 also converts AC power supplied from the power grid to DC power by the inverter 21 and outputs the DC power to each storage battery unit 5. Power output from the PCS2 to the load side is referred to as PCS output power P PCS Also written as PCS output power P PCS is the power output from the PCS 2 to the power grid when the storage battery unit 5 is discharging, and is the power output from the PCS 2 to the storage battery unit 5 when the storage battery unit 5 is charging.

[0016] The control device 3 controls the power output by the PCS 2 to the load side (PCS output power P PCS ) is the total chargeable and dischargeable power (P1+P2+···+P N ) the output limit value LM2 of the PCS2 is set. Note that the control device 3 normally receives the output limit value LM1 of the PCS2 from the higher-level device 6 and controls the PCS2 according to this output limit value LM1. The specific functional configuration of the control device 3 will be described later.

[0017] The DC bus 4 is a bus for connecting the PCS 2 and the multiple storage battery units 5.

[0018] The multiple storage battery units 5 are connected in parallel to the PCS 2 via the DC bus 4. Each storage battery unit 5 includes a DC / DC converter 51 and a storage battery 52. ​​The DC / DC converter 51 converts the DC power supplied from the PCS 2 to a predetermined voltage and charges the storage battery 52. ​​The DC / DC converter 51 also converts the discharged power of the storage battery 52 to a predetermined voltage and supplies it to the PCS 2.

[0019] 1 shows a configuration example in which the PCS 2 includes the control device 3, but the present invention is not limited to this. In other embodiments, the control device 3 may be provided as separate hardware outside the PCS 2.

[0020] (Functional configuration of the control device) FIG. 2 is a block diagram illustrating a functional configuration of a control device according to an embodiment. As shown in FIG. 2, the control device 3 includes a processor 31, a memory 32, a storage 33, and a communication interface .

[0021] The processor 31 operates according to a predetermined program to thereby fulfill the functions of a voltage acquisition unit 310, an output limiting unit 311, a limit removal unit 312, and a limit value setting unit 313.

[0022] The voltage acquisition unit 310 acquires the voltage of the DC bus 4 connecting the PCS 2 and the storage battery unit 5 (hereinafter, referred to as the DC bus voltage V dc Also referred to as.)

[0023] The output limiting unit 311 limits the DC bus voltage V dc When the upper threshold VUL is exceeded or the lower threshold VLL is exceeded, the PCS output power P PCS The output limit value LM2 is set to zero. The upper limit threshold VUL and the lower limit threshold VLL will be described in detail later.

[0024] The limit removal unit 312 sets the output limit value LM2 to zero, and then gradually increases or decreases the output limit value LM2.

[0025] The limit value setting unit 313 is a DC bus voltage V dc When the PCS output power P reaches the upper limit value Vmax or the lower limit value Vmin of the normal operation voltage range R, the output limit value LM2 is fixed at the current value. PCS When the output limit value LM1 is received, if the output limit value LM1 is less than or equal to the output limit value LM2, the output limit value LM2 is overwritten with the value of the output limit value LM1. Details of the normal operation voltage range R will be described later.

[0026] The predetermined program executed by the processor 31 is stored in a computer-readable recording medium. The computer-readable recording medium refers to a magnetic disk, a magneto-optical disk, a CD-ROM, a DVD-ROM, a semiconductor memory, etc. The computer program may be distributed to a computer via a communication line, and the computer that receives the program may execute the program. The program may be for realizing part of the above-mentioned functions. The program may be a so-called difference file (difference program) that can realize the above-mentioned functions in combination with a program already recorded in the computer system.

[0027] The memory 32 has a memory area necessary for the operation of the processor 31 .

[0028] The storage 33 is a so-called auxiliary storage device, and is, for example, a hard disk drive (HDD), a solid state drive (SSD), etc. The storage 33 stores data that each part of the processor 31 acquires, generates, and refers to during processing.

[0029] The communication interface 34 is an interface for transmitting and receiving various data and control signals between the PCS 2, the higher-level device 6, and the like.

[0030] (Regarding upper and lower thresholds of DC bus voltage) FIG. 3 is a diagram illustrating upper and lower thresholds of the DC bus voltage according to one embodiment. Figure 3 shows the DC bus voltage V dc 4 shows an example of an upper threshold VUL, a lower threshold VLL, and a normal operation voltage range R.

[0031] The DC bus voltage of each storage battery unit 5 when it is unloaded (when charging / discharging is not being performed) is set as a reference voltage V0.

[0032] The normal operation voltage range R is a voltage fluctuation range caused by droop during normal operation of the storage battery unit 5, centered on a reference voltage V0. The upper limit value of the normal operation voltage range is also referred to as Vmax, and the lower limit value is also referred to as Vmin.

[0033] The upper threshold VUL and the lower threshold VLL are thresholds for detecting an abnormality in the voltage of the DC bus 4. Taking into consideration transient voltage fluctuations due to overshoot and resonance during voltage control, errors in the voltage sensor, and the like, the upper threshold VUL is set to a value that is a predetermined amount α larger than the upper limit value Vmax of the normal operation voltage range. Similarly, the lower threshold VLL is set to a value that is a predetermined amount α smaller than the lower limit value Vmin of the normal operation voltage range. This predetermined amount α may be changed as desired depending on the characteristics of the storage battery unit 5, etc.

[0034] (Control device processing flow) Fig. 4 is a flowchart showing an example of an output control process of a control device according to an embodiment. Fig. 5 is a first diagram for explaining the output control process according to an embodiment. Fig. 6 is a second diagram for explaining the output control process according to an embodiment. Hereinafter, the flow of the output control process of the control device 3 in response to fluctuations in the DC bus voltage will be described with reference to FIGS.

[0035] During the series of processes in FIG. 3, the voltage acquisition unit 310 acquires the DC bus voltage V dc The output limiting unit 311 obtains the DC bus voltage V dcIt is determined whether or not the voltage VV exceeds the upper threshold VUL or falls below the lower threshold VLL (step S01).

[0036] When the storage battery unit 5 is being charged, the output limiting unit 311 limits the DC bus voltage V dc If the DC bus voltage V does not exceed the upper limit threshold VUL (step S01; NO), the process returns to step S01 and continues to monitor the DC bus 4. In addition, when the storage battery unit 5 is discharging, the output limiting unit 311 dc If the voltage VLL is not below the lower limit threshold VLL (step S01; NO), the process returns to step S01 and monitoring of the DC bus 4 is continued.

[0037] On the other hand, the output limiting unit 311 limits the DC bus voltage V dc When the output voltage VV exceeds the upper threshold VUL or falls below the lower threshold VLL (step S01; YES), the output control process of the PCS2 is executed.

[0038] First, a description will be given of an output control process during discharging of the power storage system 1. FIG. 5 shows, for example, a PCS output power P PCS and DC bus voltage V dc FIG. 6 illustrates a time series of the DC bus voltage V of the storage battery unit 5_2 measured at each time t01 to t05 in FIG. dc and the output limit value LM2.

[0039] In the example of FIG. 5, the storage battery unit 5_2 trips at time t01. Then, the power that the entire storage battery unit 5 can discharge is P1+P2+P3 before time t01, but drops to P1+P3 after time t01. At this time, the PCS2 cannot know that the storage battery unit 5_2 has tripped. Therefore, at the time t01, the PCS output power P PCS Therefore, after time t01, the PCS output power P PCS > The total dischargeable power of the storage battery unit 5 is P1 + P3, and as shown in the example of Figure 5, the DC bus voltage Vdc decreases over time.

[0040] Here, as a comparative example, a case where the output control process of the present embodiment is not performed will be described. BAT1 If V is the highest, BAT1 is V dc In this case, the storage battery unit 5_1 compensates for the insufficient load without relying on the control of the DC / DC converter 51 of the storage battery unit 5_1. In this case, the storage battery unit 5_1 may be over-discharged.

[0041] In order to suppress such over-discharge of the storage battery unit 5_1, the control device 3 according to this embodiment executes an output control process as described below.

[0042] In the examples of Figures 5 and 6, the DC bus voltage V dc decreases over time, and at time t02, the DC bus voltage V dc_t02 falls below the lower limit threshold VLL (step S01; YES). Then, the output limiting unit 311 sets the output limit value LM2 of the PCS2 to zero (step S02). When the output limit value LM2 of the PCS2 becomes zero, at time t03, the PCS output power P PCS becomes zero, and the DC bus voltage V dc_t03 returns (rises) to the no-load reference voltage V0.

[0043] After setting the output limit value LM2 of PCS2 to zero, the limit removal unit 312 gradually reduces the output limit value LM2 of PCS2 (step S03).

[0044] Next, the limit value setting unit 313 calculates the DC bus voltage V dc It is determined whether or not the voltage reaches the lower limit Vmin of the normal operation voltage range R (step S04).

[0045] At time t04 in Figures 5 and 6, the DC bus voltage V dc_t04does not reach the lower limit value Vmin of the normal operation voltage range R (step S04; NO). In this case, the limit value setting unit 313 waits until the next determination timing.

[0046] Also, at time t05 in Figures 5 and 6, the DC bus voltage V dc_t05 = lower limit value Vmin (step S04; YES). In this case, the limit value setting unit 313 stops the gradual decrease of the output limit value LM2 and fixes the output limit value LM2 at the current value (step S05). dc_t05 If the value of is within a certain range from the lower limit Vmin, the DC bus voltage V dc_t05 It may be determined that the output limit value LM2 has reached the lower limit value Vmin (step S04; YES), and the output limit value LM2 may be fixed at the current value (step S05).

[0047] DC bus voltage V dc When the normal operation voltage range R reaches its lower limit Vmin, the output power P of PCS2 is PCS is approximately equal to the maximum power that can be discharged from the entire storage battery units 5. Therefore, even if the storage battery unit 5_2 trips during discharging, the control device 3 can control the other operating storage battery units 5 to discharge at the maximum power that can be discharged and at the DC bus voltage V dc is controlled so as to be within the normal operation voltage range R, so that the operation of the electricity storage system 1 can be continued.

[0048] Next, the output control during charging of the power storage system 1 will be described with reference to Fig. 6. Fig. 6 shows the DC bus voltage V dc and the output limit value LM2 are illustrated.

[0049] For example, assume that the storage battery unit 5_2 trips at time t11. Then, at the time t11, the output limit value LM2 of the PCS2 and the PCS output power P PCS does not change, but the DC bus voltage Vdc increases over time and exceeds the upper limit threshold VUL at time t12 (step S01; YES).

[0050] Then, the output limiting unit 311 sets the output limit value LM2 of the PCS2 to zero (step S02). When the output limit value LM2 of the PCS2 becomes zero, at time t13, the PCS output power P PCS becomes zero, and the DC bus voltage V dc_t13 returns (decreases) to the no-load reference voltage V0.

[0051] After setting the output limit value LM2 of PCS2 to zero, the limit removal unit 312 gradually increases the output limit value LM2 of PCS2 (step S03).

[0052] Next, the limit value setting unit 313 calculates the DC bus voltage V dc It is determined whether or not the voltage Vmax reaches the upper limit Vmax of the normal operation voltage range R (step S04).

[0053] At time t14 in Figure 6, the DC bus voltage V dc_t14 does not reach the upper limit value Vmax of the normal operation voltage range R (step S04; NO). In this case, the limit value setting unit 313 waits until the next determination timing.

[0054] Also, at time t15 in Figure 6, the DC bus voltage V dc_t15 = upper limit value Vmax (step S04; YES). In this case, the limit value setting unit 313 stops gradually increasing the output limit value LM2 and fixes the output limit value LM2 at the current value (step S05). dc_t15 If the value of is within a certain range from the upper limit value Vmax, the DC bus voltage V dc_t15 It may be determined that the upper limit value Vmax has been reached (step S04; YES), and the output limit value LM2 may be fixed at the current value (step S05).

[0055] DC bus voltage V dc When the normal operation voltage range R reaches its upper limit Vmax, the output power P of PCS2 is PCSis approximately equal to the maximum power that can be charged to the entire storage battery unit 5. Therefore, even if the storage battery unit 5_2 trips during charging, the control device 3 can charge the other operating storage battery units 5 with the maximum power that can be charged and the DC bus voltage V dc is controlled so as to be within the normal operation voltage range R, so that the operation of the electricity storage system 1 can be continued.

[0056] After fixing the output limit value LM2, the control device 3 returns to step S01. In this manner, the control device 3 repeatedly executes the series of processes in FIG.

[0057] In step S03, it is preferable that the limit removal unit 312 gradually increases or decreases the output limit value LM2 by setting a time constant that is sufficiently larger than that during normal voltage control. For example, the limit removal unit 312 sets the time constant so that the time it takes for the DC bus voltage to reach the upper limit value Vmax or the lower limit value Vmin of the normal operation voltage range R after it reaches the reference voltage V0 is X seconds. The value of X may be changed arbitrarily depending on the characteristics of the storage battery unit 5, etc.

[0058] FIG. 7 is a flowchart illustrating an example of an update process of the output limit value of the control device according to an embodiment. The control device 3 may execute the process shown in FIG.

[0059] For example, the control device 3 may detect the DC bus voltage V dc When it is detected that the output limit value LM1 of the PCS2 exceeds the upper limit threshold value VUL or falls below the lower limit threshold value VLL, the upper level device 6 may be configured to notify the abnormality. In addition, the upper level device 6 receives an operation to specify an output limit value LM1 of the PCS2 from the manager of the power storage system 1, and transmits this output limit value LM1 to the control device 3.

[0060] Then, the control device 3 executes the process shown in Fig. 7. Specifically, when the limit value setting unit 313 of the control device 3 receives a new output limit value LM1 from the higher-level device 6 (step S11), it judges whether the output limit value LM1 is equal to or less than the output limit value LM2 (step S12). If the output limit value LM1 is less than or equal to the output limit value LM2 (step S12; YES), the limit value setting unit 313 sets the value of the output limit value LM2 to the value of the output limit value LM1 received from the higher-level device 6 (step S13). On the other hand, if the output limit value LM1 is greater than the output limit value LM2 (step S12; NO), the limit value setting unit 313 ends the process without changing the value of the output limit value LM2.

[0061] That is, the control device 3 controls the DC bus voltage V dc When an abnormality is detected (step S01 in FIG. 3; YES), the series of processes in FIG. 3 are executed to perform automatic control to provisionally change the output limit value LM2. dc is within the normal operation voltage range R), when a new output limit value LM1 is received from the higher-level device 6, if the output limit value LM1≦the output limit value LM2, the output limit value LM2 is reset according to the output limit value LM1. Thereafter, the power storage system 1 continues to operate according to the output limit value LM1 specified by the higher-level device 6. For example, after the storage battery unit 5_2 is repaired and replaced to become operable, the output limit value LM2 is reset according to the output limit value LM1 from the higher-level device 6, thereby maximizing the power that can be charged and discharged by the entire power storage system 1.

[0062] (Action, effect) As described above, the control device 3 according to this embodiment controls the DC bus voltage V dc a voltage acquisition unit 310 for acquiring a DC bus voltage V dc When the upper threshold VUL is exceeded or the lower threshold VLL is exceeded, the PCS output power P PCSand a limit release section 312 which gradually increases or decreases the output limit value LM2 after setting the output limit value LM2 to zero.

[0063] In this way, the control device 3 controls the DC bus voltage V dc When an abnormality is detected, the output limit value LM2 of PCS2 is temporarily set to zero and the DC bus voltage V dc to the reference voltage V0, and then gradually increase or decrease the output limit value LM2 to dc This prevents the normal operating voltage range R from exceeding the normal operating voltage range R, allowing operation to continue.

[0064] The control device 3 also controls the DC bus voltage V dc When the output limit value LM2 reaches an upper limit value Vmax or a lower limit value Vmin of a predetermined normal operation voltage range R, the output limit value LM2 stops increasing or decreasing and fixes it.

[0065] DC bus voltage V dc When the normal operation voltage range R is approximately equal to the upper limit Vmax or the lower limit Vmin, the output power P PCS is approximately equal to the maximum power that can be charged and discharged from the entire storage battery units 5. Therefore, by having the above-described configuration, even if an abnormality (such as a trip) occurs in some of the storage battery units 5, the control device 3 can control the maximum power that can be charged and discharged by the operating storage battery units 5 and the DC bus voltage V dc is controlled so as to be within the normal operation voltage range R, so that the operation of the electricity storage system 1 can be continued.

[0066] Furthermore, the limit value setting unit 313 receives a new output limit value LM1 from the higher-level device 6, and if the new output limit value LM1 is smaller than the output limit value LM2, overwrites the output limit value LM2 with the value of the new output limit value LM1.

[0067] In this way, for example, after the storage battery unit 5 has been repaired or replaced and is once again operable, the control device 3 can reset the output limit value LM2 according to the output limit value LM1 newly instructed from the higher-level device 6, thereby maximizing the amount of power that can be charged and discharged throughout the entire storage system 1.

[0068] As described above, the embodiments according to the present disclosure have been described, but the above-mentioned embodiments are presented as examples and are not intended to limit the scope of the invention. These embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. These embodiments and their modifications are included in the scope of the invention and its equivalents described in the claims, as well as in the scope and gist of the invention.

[0069] <Additional Notes> The control device, the power conditioner, the control method, and the program described in the above-described embodiments can be understood, for example, as follows.

[0070] (1) According to the first aspect of the present disclosure, the control device 3 controls the voltage V of the DC bus 4 connecting the PCS 2 and the storage battery unit 5. dc A voltage acquisition unit 310 that acquires V dc When the upper threshold VUL is exceeded or the lower threshold VLL is exceeded, the PCS output power P PCS and a limit release section 312 which gradually increases or decreases the output limit value LM2 after setting the output limit value LM2 to zero.

[0071] In this way, the control device 3 controls the DC bus voltage V dc When an abnormality is detected, the output limit value LM2 of PCS2 is temporarily set to zero and the DC bus voltage V dc to the reference voltage V0, and then gradually increase or decrease the output limit value LM2 to dc This prevents the normal operating voltage range R from exceeding the normal operating voltage range R, allowing operation to continue.

[0072] (2) According to the second aspect of the present disclosure, the control device 3 according to the first aspect controls the voltage V dc When the output limit value LM2 reaches an upper limit value Vmax or a lower limit value Vmin of a predetermined normal operation voltage range R, the output limit value LM2 stops increasing or decreasing and fixes it.

[0073] DC bus voltage V dc When the normal operation voltage range R is approximately equal to the upper limit Vmax or the lower limit Vmin, the output power P PCS is approximately equal to the maximum power that can be charged and discharged from the entire storage battery units 5. Therefore, by having the above-described configuration, even if some of the storage battery units 5 trip, the control device 3 can maintain the maximum power that can be charged and discharged from the operating storage battery units 5 and the DC bus voltage V dc is controlled so as to be within the normal operation voltage range R, so that the operation of the electricity storage system 1 can be continued.

[0074] (3) According to a third aspect of the present disclosure, in the control device 3 relating to the second aspect, the limit value setting unit 313 receives a new output limit value LM1 from the higher-level device 6, and if the new output limit value LM1 is smaller than the output limit value LM2, overwrites the output limit value LM2 with the value of the new output limit value LM1.

[0075] In this way, for example, after the storage battery unit 5 has been repaired or replaced and is once again operable, the control device 3 can reset the output limit value LM2 based on a command value from the higher-level device 6, thereby maximizing the amount of power that can be charged and discharged throughout the entire storage system 1.

[0076] (4) According to a fourth aspect of the present disclosure, the PCS 2 includes the control device 3 according to any one of the first to third aspects.

[0077] (5) According to a fifth aspect of the present disclosure, the control method includes: dcand the step of obtaining the voltage V dc When the upper threshold VUL is exceeded or the lower threshold VLL is exceeded, the PCS output power P PCS and, after setting the output limit value LM2 to zero, gradually increasing or decreasing the output limit value LM2.

[0078] (6) According to a sixth aspect of the present disclosure, the program dc and the step of obtaining the voltage V dc When the upper threshold VUL is exceeded or the lower threshold VLL is exceeded, the PCS output power P PCS and, after setting the output limit value LM2 to zero, gradually increasing or decreasing the output limit value LM2. [Explanation of symbols]

[0079] 1. Energy storage system 2 PCS 21 Inverter 3. Control device 31 Processors 310 Voltage acquisition unit 311 Output Limiter 312 Restriction Relief Department 313 Limit value setting section 32 Memory 33 Storage 34 Communication Interface 4 DC Bus 5. Battery unit 51 DC / DC Converter 52 Storage battery 6 Upper device

Claims

1. A voltage acquisition unit that acquires a voltage of a DC bus that connects a power conditioner (PCS) and the storage battery unit; An output limiting unit that sets an output limit value of a PCS output power, which is power output by the power conditioner to a load side, to zero when the voltage exceeds an upper threshold or falls below a lower threshold; a limit release unit that gradually increases or decreases the output limit value after setting the output limit value to zero; A control device comprising:

2. A limit value setting unit that stops the gradual increase or decrease of the output limit value and fixes it when the voltage reaches an upper limit value or a lower limit value of a predetermined normal operation voltage range. The control device according to claim 1 .

3. the limit value setting unit receives a new output limit value from a higher-level device, and if the new output limit value is smaller than the output limit value, overwrites the output limit value with the new output limit value; The control device according to claim 2.

4. A power conditioner comprising the control device according to any one of claims 1 to 3.

5. Acquiring a voltage of a DC bus connecting a power conditioner (PCS) and a storage battery unit; When the voltage exceeds an upper threshold or falls below a lower threshold, setting an output limit value of a PCS output power, which is the power output by the power conditioner to a load side, to zero; setting the output limit value to zero and then gradually increasing or decreasing the output limit value; The control method includes:

6. Acquiring a voltage of a DC bus connecting a power conditioner (PCS) and a storage battery unit; When the voltage exceeds an upper threshold or falls below a lower threshold, setting an output limit value of a PCS output power, which is the power output by the power conditioner to a load side, to zero; setting the output limit value to zero and then gradually increasing or decreasing the output limit value; A program that causes a control device to execute the above.

Citation Information

Patent Citations

  • Power supply system and control method for power supply system

    JP2009033840A

  • Control command system and power conversion device

    JP2019118212A

  • Energy management system, charging system and charge / discharge management method

    JP2021044972A

  • Motor drive apparatus and motor drive system

    WO2019163729A1

  • JP1973021363B1