Information processing device, mobile body control method, and mobile body control program
The information processing device optimizes vehicle operations by analyzing and adjusting schedules to prevent interference between manned and unmanned vehicles, ensuring efficient work execution.
Patent Information
- Application Number
- JP2023058457
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2043-03-31
AI Technical Summary
Existing systems fail to efficiently and flexibly manage interference between manned and unmanned vehicles during work operations, necessitating a solution that can adapt to varying work situations.
An information processing device that acquires and analyzes schedule information for both manned and unmanned vehicles, determining priorities and adjusting work schedules to avoid interference by setting appropriate work times and routes.
Enables efficient work performance while minimizing interference between manned and unmanned vehicles by dynamically adjusting their operations based on priority and work conditions.
Smart Images

Figure 2024145890000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to an information processing device, a control method for a moving object, and a control program for a moving object. [Background technology]
[0002] There are known control methods for suppressing interference between moving objects. For example, Patent Document 1 discloses a configuration for preventing interference between an unmanned vehicle that runs autonomously in a mine and a manned vehicle that runs in the mine with a driver. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 6368259 Summary of the Invention [Problem to be solved by the invention]
[0004] When performing work using manned and unmanned vehicles, a configuration is required that can flexibly suppress interference between both manned and unmanned vehicles depending on the work situation while performing the work efficiently.
[0005] The present disclosure has been made in consideration of the above, and aims to provide an information processing device, a method for controlling a mobile body, and a program for controlling a mobile body that are capable of flexibly suppressing interference between manned vehicles and unmanned vehicles depending on the work situation while performing work efficiently. [Means for solving the problem]
[0006] The information processing device of the present disclosure includes an acquisition unit that acquires at least first scheduled information including a target location and scheduled time period for work of a first moving body, which is a manned vehicle, and a processing unit that performs an analysis regarding work interference between the first moving body and a second moving body, which is an unmanned vehicle, based on the acquired first scheduled information.
[0007] The method for controlling a moving body according to the present disclosure includes a step of acquiring at least first scheduled information including a target location and a scheduled time period for work of a first moving body, which is a manned vehicle, and a step of analyzing work interference between the first moving body and a second moving body, which is an unmanned vehicle, based on the acquired first scheduled information.
[0008] The control program for a moving body according to the present disclosure causes a computer to execute at least a process of acquiring first scheduled information including a target location and a scheduled time period for work of a first moving body, which is a manned vehicle, and a process of analyzing work interference between the first moving body and a second moving body, which is an unmanned vehicle, based on the acquired first scheduled information. Effect of the Invention
[0009] According to the present disclosure, it is possible to flexibly avoid interference between manned and unmanned vehicles depending on the work situation while performing work efficiently. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a schematic diagram of a mobility control system according to the present embodiment. [Diagram 2] FIG. 2 is a schematic diagram of the configuration of the first moving body. [Diagram 3] FIG. 3 is a schematic diagram of the configuration of the second moving body. [Figure 4] FIG. 4 is a schematic block diagram of a control device of the second moving body. [Diagram 5] FIG. 5 is a schematic block diagram of the management device. [Figure 6] FIG. 6 is a schematic block diagram of an information processing device. [Figure 7] FIG. 7 is a diagram showing an example of a work order. [Figure 8] FIG. 8 is a diagram showing an example of the analysis result displayed on the display unit. [Figure 9] FIG. 9 is a diagram illustrating an example of a workable area. [Figure 10]FIG. 10 is a diagram illustrating another example of the movement of the moving object. [Figure 11] FIG. 11 is a diagram illustrating an example of candidates of the first scheduled information displayed on the display unit. [Figure 12] FIG. 12 is a flowchart showing an example of the operation of the information processing device according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Preferred embodiments of the present disclosure will be described in detail below with reference to the accompanying drawings. Note that the present disclosure is not limited to these embodiments, and when there are multiple embodiments, the present disclosure also includes combinations of the embodiments.
[0012] (Mobility Control System) FIG. 1 is a schematic diagram of a movement control system according to the present embodiment. As shown in FIG. 1, the movement control system 1 according to the present embodiment includes a moving body 10, a management device 12, and an information processing device 14. The movement control system 1 is a system that controls the movement of the moving body 10 belonging to a facility W. The facility W is, for example, a facility that is managed by logistics, such as a warehouse, but may be any facility that operates the moving body 10. In the movement control system 1, the moving body 10 picks up and transports an object P arranged within a working area AR of the facility W. The working area AR is an area in which an object is installed and the moving body 10 moves, for example, the floor surface of the facility W. In this embodiment, the object P transported by the moving body 10 is a transport object in which luggage is loaded on a pallet. However, the object P is not limited to a pallet with luggage loaded on it, and may be any form, for example, it may be only luggage without a pallet. In addition, the moving body 10 is not limited to a device that transports the object P, and may be a device that moves within the facility W for any purpose.
[0013] (work area) 1, a working area AR is set in the facility W. The working area AR is an area where the moving body 10 of this embodiment performs a predetermined operation such as loading and unloading. The working area AR includes a first area AR1 and a second area AR2.
[0014] Hereinafter, one direction along the floor surface of the working area is the X direction, and a direction along the floor surface that intersects with the X direction is the Y direction. In this embodiment, the Y direction is a direction perpendicular to the X direction. The X direction and the Y direction may be said to be directions along a horizontal plane. In the X direction and the Y direction, the direction of the arrow is expressed as the + direction (or + side), and the direction opposite to the + direction is expressed as the - direction (or - side). In addition, the direction perpendicular to the X direction and the Y direction, more specifically, the direction going vertically upward, is expressed as the Z direction. In this embodiment, unless otherwise specified, the "position" refers to a position (coordinate) in a coordinate system (the coordinate system of the first area AR1) on a two-dimensional surface on the first area AR1. Furthermore, unless otherwise specified, the "posture (direction)" of the moving body 10, etc. refers to the direction of the moving body 10, etc. in the coordinate system of the first area AR1, and refers to the yaw angle (rotation angle) of the moving body 10 when the X direction is 0° when viewed from the Z direction.
[0015] The first area AR1 is an area where, for example, an object P to be loaded onto a transport vehicle V or an object P unloaded from a transport vehicle V is placed. In the first area AR1, a plurality of placement areas A for placing the object P are provided. The placement area A is an area set for placing the object P, and can be said to be an area where the object P may be installed. The shape and size of the placement area A are set in advance. In the example of FIG. 1, the placement area A is rectangular, but the shape and size may be arbitrary. In addition, the placement area A is partitioned for each object P, and one object P is placed in each placement area A. In each placement area A, an object P may or may not be placed depending on the status of the equipment W. In the example of FIG. 1, the placement areas A are set in line in the Y direction, but the arrangement and number of the placement areas A may be arbitrary.
[0016] The second area AR2 is provided at a position adjacent to the first area AR1. In the example of FIG. 1, the second area AR2 is located on the -Y side of the first area AR1. The second area AR2 has a storage area B. The storage area B stores an object P. The storage areas B are not limited to a configuration in which they are arranged side by side in the X and Y directions, and may be arranged side by side in the Z direction, for example, like shelves.
[0017] (Waypoint) In the working area AR, a waypoint WP is set for each position (coordinate). The movement route of the moving body 10 is set so as to connect the waypoints WP. That is, a route connecting the waypoints WP through which the moving body 10 is scheduled to pass becomes the movement route of the moving body 10. The waypoints WP are set according to the layout of the working area AR. For example, the waypoints WP may be set in a matrix shape in the working area AR in an area in which the moving body 10 can move. Also, the waypoints WP are set in advance according to the position where the object P is placed in the parking area ARV. Also, the waypoints WP can be set so as to correspond to the placement area A in which the object P is placed in the working area AR. For example, the waypoints WP can be set at positions (coordinates) corresponding to each placement area A.
[0018] (Mobile) In this embodiment, the moving bodies 10 include a first moving body 10A, which is a manned vehicle that moves by operation of a driver, and a second moving body 10B that moves autonomously.
[0019] (First mobile unit) FIG. 2 is a schematic diagram of the configuration of the first moving body. The first moving body 10A as a manned vehicle is a device that moves by the operation of a driver U. For example, the first moving body 10A moves by being operated by a driver U who boards the first moving body 10A. However, the present invention is not limited to this, and the first moving body 10A may move by being remotely operated by a driver U who is not boarding the first moving body 10A. In addition, in this embodiment, the first moving body 10A is a device that can transport an object. More specifically, in this embodiment, the first moving body 10A is a forklift. However, the first moving body 10A is not limited to being a forklift that transports an object, and may be any device that can be moved by the operation of a driver U.
[0020] As shown in Fig. 2, the first moving body 10A has an operation unit 70, a drive unit 72, an image capture unit 74, an input unit 76, a display unit 78, and a control device 80. The operation unit 70 is an interface mechanism that receives operations from the driver U, and may include, for example, a steering wheel, an accelerator, and a brake. The drive unit 72 is a drive mechanism that moves the first moving body 10A. The drive unit 72 is driven by the operation of the driver U received by the operation unit 70, and the first moving body 10A moves.
[0021] The photographing unit 74 is disposed, for example, on a head guard of the first moving body 10A. The photographing unit 74 is installed facing the ceiling and photographs the ceiling. The photographing unit 74 outputs photographed data to the control device 80.
[0022] The input unit 76 accepts information input by the driver U. Examples of the information input by the driver U include first scheduled information, which will be described later. The input unit 76 may be various input devices such as a touch panel, a keyboard, or the like.
[0023] The display unit 78 displays information such as characters, images, etc. As the display unit 78, various displays such as a liquid crystal display are used.
[0024] The control device 80 is a device that controls the first moving body 10A. The control device 80 is a computer, and includes a communication unit 82, a storage unit 84, and a control unit 86. The communication unit 82 is a module used by the control unit 86 to communicate with an external device such as the information processing device 14, and may include, for example, an antenna. The communication method by the communication unit 82 is wireless communication in this embodiment, but the communication method may be arbitrary. The storage unit 84 is a memory that stores various information such as the calculation contents and programs of the control unit 86, and includes, for example, at least one of a RAM (Random Access Memory), a main storage device such as a ROM (Read Only Memory), and an external storage device such as an HDD (Hard Disk Drive).
[0025] The control unit 86 is a calculation device and includes a calculation circuit such as a CPU (Central Processing Unit). The control unit 86 includes a position estimation unit 88, an information transmission unit 90, and a movement control unit 92. The control unit 86 realizes the position estimation unit 88, the information transmission unit 90, and the movement control unit 92 by reading and executing a program (software) from the storage unit 84, and executes the processes. The control unit 86 may execute these processes by one CPU, or may include multiple CPUs and execute the processes by the multiple CPUs. In addition, at least a part of the position estimation unit 88, the information transmission unit 90, and the movement control unit 92 may be realized by a hardware circuit. In addition, the program for the control unit 86 stored in the storage unit 84 may be stored in a recording medium readable by the control device 80.
[0026] The position estimation unit 88 analyzes the photographed data photographed by the photographing unit 74 by image processing or the like. The position estimation unit 88 estimates the position of the first moving body 10A in real time based on the analysis result of the photographed data and the moving conditions of the first moving body 10A, such as the speed and steering angle.
[0027] The information transmission unit 90 transmits the first moving body information indicating the position and speed of the first moving body 10A and the first scheduled information of the first moving body to an external device such as the information processing device 14. The movement control unit 92 controls the movement of the first moving body 10A. The specific processing contents will be described later. The movement control unit 92 automatically controls the first moving body 10A, for example, automatically stopping the first moving body 10A. However, since the first moving body 10A is a manned vehicle, it does not need to have a function of automatically controlling the first moving body 10A, in other words, it does not need to include the movement control unit 92.
[0028] (Second mobile unit) FIG. 3 is a schematic diagram of the configuration of the second moving body. The second moving body 10B as an unmanned vehicle is a device capable of moving automatically. In this embodiment, the second moving body 10B is a device capable of transporting an object. More specifically, in this embodiment, the second moving body 10B is a forklift, more specifically, a so-called AGV (Automated Guided Vehicle) or AGF (Automated Guided Forklift). However, the second moving body 10B is not limited to being a forklift that transports an object, and may be any device capable of moving automatically.
[0029] As shown in FIG. 3, the second moving body 10B includes a vehicle body 20, a wheel 20A, a straddle leg 21, a mast 22, a fork 24, a sensor 26A, and a control device 28. The straddle leg 21 is provided at one end of the vehicle body 20 in the front-rear direction and is a pair of shaft-shaped members protruding from the vehicle body 20. The mast 22 is movably attached to the straddle leg 21 and moves in the front-rear direction of the vehicle body 20. The mast 22 extends along a vertical direction (direction Z here) perpendicular to the front-rear direction. The fork 24 is attached to the mast 22 movably in direction Z. The fork 24 may also be movable in the lateral direction of the vehicle body 20 (a direction intersecting the vertical direction and the front-rear direction) relative to the mast 22. The fork 24 has a pair of claws 24A, 24B. The claws 24A, 24B extend from the mast 22 toward the rear of the vehicle body 20. The claws 24A and 24B are disposed apart from each other in the lateral direction of the mast 22. Hereinafter, in the front-rear direction, the direction on the side where the fork 24 is not provided on the second movable body 10B is referred to as the front direction, and the direction on the side where the fork 24 is provided is referred to as the rear direction.
[0030] The sensor 26A detects at least one of the position and the attitude of an object present around the vehicle body 20. It can also be said that the sensor 26A detects at least one of the position of the object relative to the second moving body 10B and the attitude of the object relative to the second moving body 10B. In this embodiment, the sensor 26A is provided at the rear end of each straddle leg 21 and on the front side of the vehicle body 20. However, the position at which the sensor 26A is provided is not limited thereto, and the sensor 26A may be provided at any position, and the number of sensors provided may also be arbitrary.
[0031] The sensor 26A is, for example, a sensor that irradiates a laser beam. The sensor 26A irradiates a laser beam while scanning in one direction (here, the horizontal direction), and detects the position and orientation of an object from the reflected light of the irradiated laser beam. That is, the sensor 26A can be said to be a so-called two-dimensional (2D)-LiDAR (Light Detection And Ranging). However, the sensor 26A is not limited to the above, and may be a sensor that detects an object by any method, for example, a so-called three-dimensional (3D)-LiDAR that is scanned in multiple directions, a so-called one-dimensional (1D)-LiDAR that is not scanned, or a camera.
[0032] FIG. 4 is a schematic block diagram of the control device of the second moving body. The control device 28 is a device that controls the second moving body 10B. The control device 28 is a computer, and includes a communication unit 100, a storage unit 102, and a control unit 104, as shown in FIG. 4. The communication unit 100 is a module used by the control unit 104 to communicate with an external device such as the information processing device 14, and may include, for example, an antenna. The communication method by the communication unit 100 is wireless communication in this embodiment, but the communication method may be arbitrary. The storage unit 102 is a memory that stores various information such as the calculation contents and programs of the control unit 104, and includes, for example, at least one of a RAM, a main storage device such as a ROM, and an external storage device such as an HDD.
[0033] The control unit 104 is a calculation device and includes a calculation circuit such as a CPU. The control unit 104 includes a route acquisition unit 110, a movement control unit 112, and an information transmission unit 114. The control unit 104 realizes the route acquisition unit 110, the movement control unit 112, and the information transmission unit 114 by reading and executing a program (software) from the storage unit 102, and executes the program. The control unit 104 may execute these processes using one CPU, or may include multiple CPUs and execute the processes using the multiple CPUs. At least a part of the route acquisition unit 110, the movement control unit 112, and the information transmission unit 114 may be realized by a hardware circuit. The program for the control unit 104 stored in the storage unit 102 may be stored in a recording medium that can be read by the control device 28.
[0034] The route acquisition unit 110 acquires information about the route along which the second moving body 10B moves, the movement control unit 112 controls the movement mechanisms of the second moving body 10B, such as the drive unit and steering, to control the movement of the second moving body 10B, and the information transmission unit 114 transmits second moving body information indicating the position of the second moving body 10B to an external device such as the information processing device 14. Specific processing contents of these will be described later.
[0035] (Management device) FIG. 5 is a schematic block diagram of the management device. The management device 12 is a system that manages logistics in the facility W. In this embodiment, the management device 12 is a WCS (Warehouse Control System) or a WMS (Warehouse Management System), but is not limited to a WCS or a WMS and may be any system, for example, a back-end system such as other production management systems. The location where the management device 12 is installed is arbitrary, and the management device 12 may be installed within the facility W or may be installed at a location away from the facility W to manage the facility W from the remote location. The management device 12 is a computer, and includes a communication unit 30, a storage unit 32, and a control unit 34 as shown in FIG. 5.
[0036] The communication unit 30 is a module used by the control unit 34 to communicate with an external device such as the information processing device 14, and may include, for example, an antenna. In this embodiment, the communication method by the communication unit 30 is wireless communication, but the communication method may be any. The storage unit 32 is a memory that stores various information such as the calculation contents and programs of the control unit 34, and includes, for example, at least one of a RAM, a main storage device such as a ROM, and an external storage device such as an HDD.
[0037] The control unit 34 is a calculation device and includes a calculation circuit such as a CPU. The control unit 34 includes a work order setting unit 40. The control unit 34 realizes the work order setting unit 40 by reading and executing a program (software) from the storage unit 32. The control unit 34 may execute the process by one CPU, or may include multiple CPUs and execute the process by the multiple CPUs. At least a part of the work order setting unit 40 may be realized by a hardware circuit. The program for the control unit 34 saved in the storage unit 32 may be stored in a recording medium readable by the management device 12.
[0038] The work order setting unit 40 sets a work order for the moving body 10 for each object P. The work order setting unit 40 causes the set work order to be transmitted from the communication unit 30. The contents of the work order will be described later.
[0039] The management device 12 may also execute processes other than setting the destination position. For example, the management device 12 may also set information for controlling mechanisms (such as elevators and doors) other than the moving body 10 provided in the facility W.
[0040] (Information processing device) FIG. 6 is a schematic block diagram of an information processing device. The information processing device 14 is a device that processes information related to the movement of the mobile body 10. The information processing device 14 is, for example, an FCS (Fleet Control System), but is not limited thereto, and may be any device that processes information related to the movement of the mobile body 10. The information processing device 14 is a computer, and includes a communication unit 50, a storage unit 52, and a control unit 54, as shown in FIG. 6. The communication unit 50 is a module used by the control unit 54 to communicate with external devices such as the management device 12 and the mobile body 10, and may include, for example, an antenna. In this embodiment, the communication method by the communication unit 50 is wireless communication, but the communication method may be any. The storage unit 52 is a memory that stores various information such as the calculation contents and programs of the control unit 54, and includes, for example, at least one of a RAM, a main storage device such as a ROM, and an external storage device such as an HDD.
[0041] The control unit 54 is a calculation device and includes a calculation circuit such as a CPU. The control unit 54 includes an acquisition unit 60, a setting unit 62, and a processing unit 64. The control unit 54 realizes the acquisition unit 60, the setting unit 62, and the processing unit 64 by reading and executing a program (software) from the storage unit 52, and executes the program. The control unit 54 may execute these processes using one CPU, or may include multiple CPUs and execute the processes using the multiple CPUs. At least a part of the acquisition unit 60, the setting unit 62, and the processing unit 64 may be realized by a hardware circuit. The program for the control unit 54 stored in the storage unit 52 may be stored in a recording medium that can be read by the information processing device 14.
[0042] The acquisition unit 60 acquires the work order transmitted from the management device 12. The acquisition unit 60 acquires the first work information transmitted from the first moving body 10A. The acquisition unit 60 acquires the second moving body information transmitted from the second moving body 10B. The setting unit 62 sets the second schedule information of the second moving body 10B based on the work order. The processing unit 64 performs an analysis regarding interference between the first moving body 10A and the second moving body 10B. The specific processing contents of these will be described later.
[0043] In the present embodiment, the management device 12 and the information processing device 14 are separate devices, but they may be integrated devices. That is, the management device 12 may have at least a part of the functions of the information processing device 14, and the information processing device 14 may have at least a part of the functions of the management device 12.
[0044] (Movement control system processing) The processing contents of the mobility control system 1 will be explained below.
[0045] (Acquisition of first scheduled information) When the driver U inputs the first scheduled information to the input unit 76 in the first moving body 10A, the information transmission unit 90 of the control unit 86 transmits the input first scheduled information to the information processing device 14. The first scheduled information includes information on the destination position (first destination position) of the work of the first moving body 10A, the scheduled time period of the work, and the priority of the work (first priority). The first scheduled information may include information on the movement route of the first moving body 10A. The first destination position may be any position within the facility W. The first destination position may be, for example, the position of the object to be received by the first moving body 10A, the destination position of the object to be transported by the first moving body 10A, or the like, which is the target position where the first moving body 10A will perform the work. The first scheduled time period may be the scheduled time period during which the driver U will perform the work by the first moving body 10A. The first priority may be set appropriately depending on the work situation, for example, and the first priority may be set relatively high for urgent work and relatively low for normal work. In the information processing device 14, the communication unit 50 receives the first scheduled information transmitted from the first moving object 10A. The acquisition unit 60 of the control unit 34 acquires the received first scheduled information.
[0046] (Acquisition of second scheduled information) The work order setting unit 40 of the management device 12 sets a work order for work by the second mobile body 10B, which is an unmanned vehicle. A work order is set for each object P. FIG. 7 is a diagram showing an example of a work order. As shown in FIG. 7, a work order includes an order ID, the ID of the object P corresponding to the order ID, source and destination information, the priority of the work, and the ID of the mobile body 10 to which the work is assigned. The work order setting unit 40 causes the communication unit 30 to transmit the set work order.
[0047] In the information processing device 14, the communication unit 50 receives the work order. The acquisition unit 60 acquires the received work order. The setting unit 62 generates second scheduled information for the work of the second moving body 10B based on the acquired work order. The second scheduled information includes information on the destination position (second destination position) of the work of the second moving body 10B, the scheduled time period (second scheduled time period) of the work, and the priority of the work (second priority). The second scheduled information may include information on the movement path of the second moving body 10B. The second destination position may be any position within the facility W. The second destination position may be, for example, the position of the object to be received by the second moving body 10B, the destination position of the object to be transported by the second moving body 10B, or the like, which is the target position where the second moving body 10B performs the work. The second scheduled time period may be the scheduled time period during which the work is scheduled to be performed by the second moving body 10B. The second priority is the priority set in the work order. The acquiring unit 60 acquires the set second schedule information.
[0048] (Interference Analysis 1) In the information processing device 14, the processing unit 64 performs an analysis of interference between the first moving body 10A and the second moving body 10B based on the acquired first scheduled information and second scheduled information. When the first moving body 10A performs a task according to the first scheduled information and the second moving body 10B performs a task according to the second scheduled information, the processing unit 64 analyzes whether or not there is a time period during which the moving paths or destination positions of the first moving body 10A and the second moving body 10B overlap.
[0049] The processing unit 64 determines, based on the priorities included in the first schedule information and the second schedule information, which of the first moving body 10A and the second moving body 10B is the moving body 10 that will perform the work with the higher priority.
[0050] When the priority included in the second schedule information is higher than the priority included in the first schedule information, the processing unit 64 determines that the second moving body 10B will perform a task with a higher priority than the first moving body 10A. In this case, the processing unit 64 transmits the analysis result to the first moving body 10A. At this time, the processing unit 64 can transmit information in which the analysis result and the second schedule information are associated by time to the first moving body 10A.
[0051] The first moving body 10A receives the analysis result through the communication unit 82. The received analysis result is presented to the driver U by being displayed on the display unit 78, for example. FIG. 8 is a diagram showing an example of the analysis result displayed on the display unit 78. FIG. 8 shows a state in which the number of vehicles passing by the second moving body 10B per predetermined time is superimposed on the map of the working area AR. Note that an indicator 78a may also be displayed on the display unit 78, and the indicator 78a may be slid to show the change in the number of vehicles passing by the second moving body 10B per predetermined time when time is changed. In addition, the area in which the first moving body 10A can move and the part representing the moving route (the diagonal line part surrounded by the dashed line in FIG. 8) may be superimposed on the map of the working area AR.
[0052] The driver U can determine the work content to be performed by the first moving body 10A based on the analysis result. For example, when the analysis result indicates that there is a time period in which the moving routes or destination positions of the first moving body 10A and the second moving body 10B overlap, the driver U can change the first schedule information so that the work is performed in a time period in which the moving routes or destination positions of the second moving body 10B do not overlap.
[0053] Furthermore, if the priority included in the second schedule information is higher than the priority included in the first schedule information, the processing unit 64 determines that the first moving body 10A will perform a task with a higher priority than the second moving body 10B. In this case, the processing unit 64 changes the second schedule information of the second moving body 10B based on the result of the analysis so as not to interfere with the first moving body 10A performing the task according to the first schedule information. For example, the processing unit 64 can set a time period during which the first moving body 10A does not perform the task as a time period of the second schedule information. The processing unit 64 transmits the changed second schedule information to the second moving body 10B. The second moving body 10B receives the transmitted adjusted second schedule information and performs the task based on the received adjusted second schedule information. The processing unit 64 may notify the first moving body 10A of a time period different from the time period set in the second schedule information as a time period during which the task can be performed.
[0054] (Interference Analysis 2) In the above example, the case where the second scheduled information is set by the setting unit 62 has been described as an example, but the present invention is not limited to this case. For example, when the first scheduled information is acquired in the information processing device 14 in a state where the second scheduled information is not set, the processing unit 64 can analyze interference between the first moving body 10A and the second moving body 10B based on the acquired first scheduled information, and set the second scheduled information based on the analysis result.
[0055] In this case, for example, the processing unit 64 calculates, based on the acquired first scheduled information, a moving route, a destination position, and a scheduled time period that do not overlap with the first scheduled information as an analysis result. Based on the result of the analysis, the setting unit 62 sets the second scheduled information for the second moving body 10B so as not to interfere with the first moving body 10A performing work according to the first scheduled information. The setting unit 62 can set the second scheduled information every time the first scheduled information is acquired.
[0056] When setting the second scheduled information, the processing unit 64 can calculate a workable area in which the first moving body 10A can work, for example, based on the analysis result. FIG. 9 is a diagram that shows an example of a workable area. As shown in FIG. 9, the workable area AR3 can be set to a range including, for example, the destination position and the moving route of the first moving body 10A. In this case, the setting unit 62 can set the second scheduled information according to the calculated workable area AR3. That is, the setting unit 62 can set the second scheduled information so that work is performed outside the calculated workable area AR3. This can reliably prevent interference between the first moving body 10A and the second moving body 10B.
[0057] In addition, the processing unit 64 may change the second scheduled information in accordance with the manner of work of the first moving body 10A when work is performed in a manner different from the first scheduled information, such as when the first moving body 10A deviates from a predetermined route based on the first scheduled information, when work is performed beyond the scheduled time period based on the first scheduled information, or when work is completed earlier than the scheduled time.
[0058] FIG. 10 is a diagram showing another example of the operation of the moving body 10. As shown in FIG. 10, for example, when the moving route R2 of the first moving body 10A deviates from the predetermined route R1 based on the first schedule information, the processing unit 64 can change the second schedule information so as to stop the work of all the second moving bodies 10B. Also, when the work of the first moving body 10A is performed beyond the scheduled time period based on the first schedule information, the processing unit 64 can change the scheduled time period of the work of the second moving body 10B to be delayed. Also, when the work of the second moving body 10B is completed earlier than the scheduled time, the processing unit 64 can change the scheduled time period of the work of the second moving body 10B to be advanced.
[0059] Further, the processing unit 64 may set a plurality of candidates of the first scheduled information and transmit the plurality of candidates to the first moving body 10A. FIG. 11 is a diagram showing an example of candidates of the first scheduled information displayed on the display unit 78. As shown in FIG. 11, in the first moving body 10A, a plurality of candidates are displayed on the display unit 78. In addition, a configuration may be made in which a moving route, a working area, etc. along with the plurality of candidates of the first scheduled information can be displayed on a map. The driver U can select the first scheduled information from the plurality of candidates displayed on the display unit 78. The driver U can input the selected first scheduled information by the input unit 76. The input first scheduled information is transmitted from the communication unit 82. The first scheduled information is received by the communication unit 50 of the information processing device 14. The received first scheduled information is acquired by the acquisition unit 60. In this manner, the acquisition unit 60 acquires a selection result in which the first moving body 10A selects one of the plurality of candidates. The processing unit 64 sets the first scheduled information based on the acquired selection result.
[0060] (Movement of the first moving body) The first moving body 10A, which is a manned vehicle, moves by operation of a driver U. The driver U drives the first moving body 10A based on the first scheduled information set as described above, so that the first moving body 10A can perform work according to the first scheduled information.
[0061] (Movement of the second moving body) The second moving body 10B, which is an unmanned vehicle, performs work according to the set second scheduled information. That is, the movement control unit 112 of the second moving body 10B moves the second moving body 10B in a scheduled time period based on the second scheduled information according to the route acquired by the route acquisition unit 110. More specifically, in this embodiment, it is preferable that the route acquisition unit 110 sets the second route (global path) based on the first route (layout path) which is the movement route of the second scheduled information transmitted from the information processing device 14. In this case, the route acquisition unit 110 sets the second route based on the first route and information on the vehicle specifications of the second moving body 10B. The information on the vehicle specifications is, for example, specifications that affect the route on which the second moving body 10B can move, such as the size and minimum turning radius of the second moving body 10B. The second route is also a route toward the destination position, like the first route. More specifically, the second route is a route that can be followed by the second moving body 10B and reaches the destination position.
[0062] The movement control unit 112 moves the second moving body 10B to pass through a set route (the second route in this embodiment) by sequentially grasping the position information of the second moving body 10B. The method of acquiring the position information of the second moving body 10B is arbitrary, but for example, in this embodiment, a detection body (not shown) is provided in the facility W, and the movement control unit 112 acquires information on the position and attitude of the second moving body 10B based on the detection of the detection body. Specifically, the second moving body 10B irradiates a laser beam toward the detection body and receives the reflected light of the laser beam by the detection body to detect its own position and attitude in the facility W. The method of acquiring the position and attitude information of the second moving body 10B is not limited to using the detection body, and for example, SLAM (Simultaneous Localization And Mapping) may be used.
[0063] The second scheduled information is set by the information processing device 14 so as not to interfere with the work of the first moving body 10A. Therefore, by the second moving body 10B performing work according to the second scheduled information, it is possible to appropriately prevent interference in work between the first moving body 10A and the second moving body 10B.
[0064] FIG. 12 is a flowchart showing an example of the operation of the information processing device 14 according to the present embodiment. As shown in FIG. 12, the information processing device 14 acquires the first scheduled information from the first moving body 10A in the acquisition unit 60 (step S10). The processing unit 64 judges whether the second scheduled information is set or not (step S20). When it is judged that the second scheduled information is set (Yes in step S20), the processing unit 64 acquires the second scheduled information (step S30). The processing unit 64 performs an analysis regarding interference between the work of the first moving body 10A and the work of the second moving body 10B based on the acquired first scheduled information and second scheduled information (step S40). When it is judged as a result of the analysis that there is a time period in which the work of the first moving body 10A and the work of the second moving body 10B interfere with each other (Yes in step S50), the processing unit 64 compares the priorities between the work of the first moving body 10A and the work of the second moving body 10B (step S60). In step S60, if it is determined that the work of the first moving body 10A has a higher priority (Yes in step S60), the analysis result is transmitted to the first moving body 10A (step S70).In addition, in step S60, if it is determined that the second moving body 10B has a higher priority (No in step S60), the second schedule information is changed so as not to interfere with the work of the first moving body 10A (step S80).
[0065] In addition, when it is determined in step S20 that the second scheduled information is not set (No in step S20), the processing unit 64 performs an analysis process based on the first scheduled information, and calculates a travel route, a destination position, and a scheduled time period that do not overlap with the first scheduled information as the analysis result (step S90).The processing unit 64 sets the second scheduled information based on the analysis result (step S100).
[0066] As described above, according to the first aspect of the present disclosure, an information processing device 14 is provided that includes an acquisition unit 60 that acquires at least first scheduled information including a destination location and scheduled time period for work of a first moving body 10A, which is a manned vehicle, and a processing unit 64 that performs an analysis regarding work interference between the first moving body 10A and a second moving body 10B, which is an unmanned vehicle, based on the acquired first scheduled information.
[0067] According to this configuration, by analyzing interference between the first moving body 10A and the second moving body 10B, information regarding interference between the work between the first moving body 10A and the second moving body 10B can be acquired in the information processing device 14. By appropriately using the information in the information processing device 14, it becomes possible to suppress interference between the work between the first moving body 10A and the second moving body 10B according to the status of the work while efficiently performing the work.
[0068] According to the second aspect of the present disclosure, in the information processing device 14 according to the first aspect, the acquisition unit 60 acquires second schedule information including a destination position and a scheduled time period for the work of the second moving body 10B, the first schedule information and the second schedule information each include information related to priority, and the processing unit 64 determines which of the first moving body 10A and the second moving body 10B is the moving body 10 performing the work with the higher priority. Therefore, by determining the priorities of the first moving body 10A and the second moving body 10B, the work can be appropriately performed according to the priority.
[0069] According to the third aspect of the present disclosure, in the information processing device 14 according to the second aspect, when the processing unit 64 determines that the second moving body 10B performs a task with a higher priority than the first moving body 10A, it transmits the analysis result to the first moving body 10A. Therefore, it is possible to prompt the driver U to reset the first schedule information of the first moving body 10A to match the second moving body 10B performing the task with a higher priority.
[0070] According to the fourth aspect of the present disclosure, in the information processing device 14 according to the third aspect, the processing unit 64 transmits information in which the analysis result and the second scheduled information are associated with each other by time to the first moving body 10A. Therefore, when prompting the driver U to reset the first scheduled information, it is possible to present appropriate information to make it easier for the driver U to avoid the second scheduled information of the second moving body 10B.
[0071] According to the fifth aspect of the present disclosure, in the information processing device 14 according to the second aspect, when the processing unit 64 determines that the first moving body 10A is performing a task with a higher priority than the second moving body 10B, the processing unit 64 changes the second scheduled information of the second moving body 10B based on the analysis result so as not to interfere with the first moving body 10A performing the task according to the first scheduled information. Therefore, the second scheduled information of the second moving body 10B can be automatically changed to match the first moving body 10A performing the task with a higher priority.
[0072] According to a sixth aspect of the present disclosure, the information processing device 14 according to the first aspect further includes a setting unit 62 that sets second scheduled information for the second moving body 10B based on the analysis result so as not to interfere with the first moving body 10A performing work according to the first scheduled information. Therefore, the second scheduled information can be set efficiently.
[0073] According to the seventh aspect of the present disclosure, in the information processing device 14 according to the sixth aspect, the processing unit 64 sets a plurality of candidates for the first scheduled information and presents the plurality of candidates to the first moving body 10A, the acquisition unit 60 acquires a selection result in which the first moving body 10A selects one of the plurality of candidates, and the processing unit 64 sets the first scheduled information based on the acquired selection result. Therefore, it is possible to widen the range of choices for the work schedule of the driver U.
[0074] According to the eighth aspect of the present disclosure, in the information processing device 14 according to the sixth aspect, the processing unit 64 calculates a workable area in which the first moving body 10A can work based on the analysis result, and the setting unit 62 sets the second scheduled information according to the calculated workable area. Therefore, interference between the first moving body 10A and the second moving body 10B can be appropriately avoided.
[0075] According to the ninth aspect of the present disclosure, in the information processing device 14 according to the sixth aspect, when the first moving body 10A performs work in a manner different from the first scheduled information, the processing unit 64 changes the second scheduled information according to the manner of work of the first moving body 10A. Therefore, the work schedule of the second moving body 10B can be flexibly changed according to the working state of the first moving body 10A. Therefore, interference between the first moving body 10A and the second moving body 10B can be suppressed.
[0076] According to the tenth aspect of the present disclosure, in the information processing device 14 according to the sixth aspect, the setting unit 62 sets the second scheduled information every time the first scheduled information is acquired. Therefore, when the first moving body 10A performs a new task, the second moving body 10B performs the task based on the second scheduled information that is appropriately set each time. Therefore, interference between the first moving body 10A and the second moving body 10B can be appropriately avoided.
[0077] According to an eleventh aspect of the present disclosure, there is provided a method for controlling a moving body, the method including at least a step of acquiring first scheduled information including a target position and a scheduled time period for work of a first moving body 10A, which is a manned vehicle, and a step of analyzing work interference between the first moving body 10A and a second moving body 10B, which is an unmanned vehicle, based on the acquired first scheduled information.
[0078] According to this configuration, by analyzing interference between the first moving body 10A and the second moving body 10B, it is possible to obtain information regarding interference between the work of the first moving body 10A and the second moving body 10B. By appropriately using the information, it is possible to suppress interference between the work of the first moving body 10A and the second moving body 10B.
[0079] According to a twelfth aspect of the present disclosure, in an information processing device 14 relating to the first aspect, a control program for a mobile body is provided that causes a computer to execute at least a process of acquiring first scheduled information including a destination position and a scheduled time period for work of a first mobile body 10A, which is a manned vehicle, and a process of analyzing work interference between the first mobile body 10A and a second mobile body 10B, which is an unmanned vehicle, based on the acquired first scheduled information.
[0080] According to this configuration, by analyzing interference between the first moving body 10A and the second moving body 10B, it is possible to obtain information regarding interference between the work of the first moving body 10A and the second moving body 10B. By appropriately using the information, it is possible to suppress interference between the work of the first moving body 10A and the second moving body 10B.
[0081] Although the embodiment of the present disclosure has been described above, the embodiment is not limited by the contents of this embodiment. In addition, the above-mentioned components include those that a person skilled in the art can easily imagine, those that are substantially the same, and those that are within the so-called equivalent range. Furthermore, the above-mentioned components can be appropriately combined. Furthermore, various omissions, substitutions, or modifications of the components can be made without departing from the gist of the above-mentioned embodiment. [Explanation of symbols]
[0082] 1. Movement Control System 10 Mobile 10A First Mobile Unit 10B 2nd mobile object 12 Management device 14 Information processing equipment 20 Body 20A Wheels 21 Straddle Leg 22 Mast 24 Fork 24A, 24B Claws 26A Sensor 28,80 Control device 30,50,82,100 Communications Department 32,52,84,102 Storage section 34,54,86,104 Control section 40 Work Order Setup Section 60 Acquisition Department 62 Setting section 64 Processing section 70 Operation section 72 Drive unit 74 Photography Department 76 Input section 78 Display section 78a Indicator 88 Position estimation part 90,114 Information transmission section 92,112 Movement control unit 110 Route Acquisition Unit A placement area B Storage area P Object P0 Fixed object R1 Route R2 Movement Path U Driver V Transport vehicle ID Order W Facilities X,Z direction AR workspace AR1 1st area AR2 2nd area AR3 Working Area WP Waypoints
Claims
1. an acquisition unit that acquires at least first schedule information including a destination position and a scheduled time period for work of a first moving body that is a manned vehicle; a processing unit that performs an analysis regarding interference of work between the first moving body and a second moving body that is an unmanned vehicle based on the acquired first schedule information; An information processing device comprising:
2. the acquisition unit acquires second schedule information including a destination position and a scheduled time period for the work of the second mobile body; the first schedule information and the second schedule information each include information related to priority; The processing unit determines which of the first moving body and the second moving body will perform the work with the higher priority. The information processing device according to claim 1 .
3. When the processing unit determines that the second mobile body will perform the work with higher priority than the first mobile body, the processing unit transmits a result of the analysis to the first mobile body. The information processing device according to claim 2 .
4. The processing unit transmits information in which the result of the analysis and the second schedule information are associated with each other by time to the first moving object. The information processing device according to claim 3 .
5. When the processing unit determines that the first moving body will perform the work with a higher priority than the second moving body, the processing unit changes the second schedule information of the second moving body based on a result of the analysis so as not to interfere with the first moving body that performs the work according to the first schedule information. The information processing device according to claim 2 .
6. a setting unit that sets the second schedule information for the second moving body based on a result of the analysis so as not to interfere with the first moving body that is performing work in accordance with the first schedule information; The information processing device according to claim 2 .
7. the processing unit sets a plurality of candidates for the first schedule information and presents the plurality of candidates to the first moving body; the acquisition unit acquires a selection result in which the first moving object selects one of a plurality of candidates; The processing unit sets the first schedule information based on the acquired selection result. The information processing device according to claim 6 .
8. The processing unit calculates a workable area in which the first moving body can work based on the analysis result, The setting unit sets the second schedule information according to the calculated workable area. The information processing device according to claim 6 .
9. When the first moving body performs work in a manner different from the first scheduled information, the processing unit changes the second scheduled information in accordance with the manner of work of the first moving body. The information processing device according to claim 6 .
10. The setting unit sets the second schedule information every time the first schedule information is acquired. The information processing device according to claim 6 .
11. acquiring at least first schedule information including a destination position and a scheduled time period for a work of a first moving body that is a manned vehicle; analyzing interference between the first moving body and a second moving body that is an unmanned vehicle based on the acquired first schedule information; A method for controlling a moving object, comprising:
12. A process of acquiring at least first schedule information including a destination position and a scheduled time period for work of a first moving body which is a manned vehicle; a process of analyzing interference between the first moving body and a second moving body that is an unmanned vehicle based on the acquired first schedule information; A control program for a moving object that causes a computer to execute the above.
Citation Information
Patent Citations
Method and device for preparing carry plan in carrying process, method and device for controlling carry, computer program, and memory medium to be read by computer
JP2002338052A
Road traffic control server, on-vehicle terminal apparatus, and road traffic control system
JP2016153987A
Cargo handling operation assignment system and method
JP2018144967A
Cargo handling operation allocation system
JP2018167991A
Management system for worksites and management method for worksites
WO2020204126A1
