Automatic tracking survey system
The automatic tracking survey system addresses measurement errors by rotating and adjusting coordinate points to align with the actual horizontal direction, enhancing accuracy and continuity of measurements.
Patent Information
- Application Number
- JP2023060799
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-04
- Publication Date
- 2024-10-17
AI Technical Summary
Existing automatic tracking survey systems suffer from measurement errors due to the slight inclination of the survey instrument's coordinate system, which becomes significant when measuring over long distances, affecting the accuracy of coordinate point measurements.
An automatic tracking survey system that includes a control device to correct measurement errors by rotating the coordinate point group around an initial point, calculating the minimum rotation angle to minimize distance from a least squares straight line, and adjusting the coordinate values based on the actual horizontal direction.
The system effectively corrects measurement errors caused by the survey instrument's inclination, ensuring accurate and continuous coordinate point measurements over long distances.
Smart Images

Figure 2024147984000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an automatic tracking surveying system, and more specifically to an automatic tracking surveying system capable of correcting measurement errors caused by the inclination of the coordinate system of a surveying instrument for a group of coordinate points measured by the automatic tracking function of the surveying instrument. [Background technology]
[0002] A total station is a surveying instrument that has a distance measurement function using light waves and an angle measurement function using an encoder. In addition, a total station can construct the same coordinate system as the previous one by sighting two known points (reference points) whose coordinates are known. Some total stations have an automatic sighting function that automatically searches for and sights a target to measure its coordinate values, as well as an automatic tracking function that automatically tracks the target and measures its coordinate values when the target moves.
[0003] There is known an automatic tracking surveying device that can accurately measure the position and attitude of a boring machine by utilizing the automatic tracking function of the total station (see, for example, Patent Document 1). In this automatic tracking surveying device, a cart that can move freely inside the segment is set for the annular segments that are successively added after boring work, and a total station is fixed to the cart. Then, a target (reflective sheet) that the total station aims at is attached to the inner peripheral surface of each segment in succession after boring work.
[0004] As a result, even when a total station is mounted on a towed cart, it is possible to secure three or more targets (reflective sheets) with known coordinate values that the total station can aim at, and the coordinate values of the total station after movement can be determined with high accuracy based on the targets with known coordinate values. Therefore, even when the cart moves, the total station can accurately measure the position and direction of the boring machine by automatically aiming at the targets (reflective sheets) attached to the inner surfaces of the segments and the targets attached to the boring machine.
[0005] By the way, an automatic tracking surveying system is known in which a dolly carrying a surveying instrument and a dolly carrying a target (prism) are separately installed on a rail, and while the dolly carrying the surveying instrument is stationary and the dolly carrying the target is moved, the coordinate values of the target are measured for each predetermined section length by the automatic tracking function of the surveying instrument (see, for example, Patent Document 2). In this automatic tracking surveying system, the surveying instrument automatically tracks the target moving on the rail and measures the coordinate values of the target for the predetermined section length. After the measurement of the section length is completed, the dolly carrying the target is stationary and the dolly carrying the surveying instrument is moved close to the dolly carrying the target, and then the dolly carrying the surveying instrument is again stationary and the dolly carrying the target is moved while measuring the coordinate values of the target for the predetermined section length by the automatic tracking function of the surveying instrument. After that, the measurement of the coordinate values of the target for each predetermined section length by the automatic tracking function of the surveying instrument is repeated. This makes it possible to obtain continuous three-dimensional coordinates for the rail over a long distance. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] Japanese Patent Application Publication No. 11-94549 [Patent Document 2] JP 2016-205058 A Summary of the Invention [Problem to be solved by the invention]
[0007] Fig. 8 is an explanatory diagram showing the effect that the inclination of the coordinate system of a surveying instrument has on the measurement value. Fig. 8(a) shows the state where the surveying instrument is not inclined to the horizontal, and Fig. 8(b) shows the state where the surveying instrument is slightly inclined to the horizontal. As shown in Figure 8(a), when setting the instrument point (origin of the coordinate system) of a surveying instrument such as a total station, the instrument is set using a horizontal bubble or the like so that the bottom surface is parallel to the actual horizontal direction Ha. In this case, the measurement coordinate Pm of the prism and the actual coordinate Pa of the prism are equal.
[0008] However, it is nearly impossible to set a surveying instrument exactly horizontally. In reality, as shown in Figure 8(b), the surveying instrument is set in a state where it is slightly tilted (at an inclination angle θ) from the horizontal. This inclination angle θ is an extremely small amount, at the level of 0.01 degrees, but when the distance between the surveying instrument and the prism (target) is several tens or hundreds of meters, it can cause a measurement error Δ of several centimeters. The inclination angle θ cannot be ignored.
[0009] Fig. 9 is an explanatory diagram showing the measurement results of the X-coordinate value of the prism when the prism is automatically tracked over a long distance by the automatic tracking function of the surveying instrument while the target is moved and the surveying instrument is kept stationary. Fig. 9(a) is a graph showing the cumulative moving distance of the prism on the horizontal axis and the X-coordinate value of the prism on the vertical axis. Fig. 9(b) is an explanatory diagram showing the measurement form of the surveying instrument and the prism.
[0010] As shown in Figure 9(b), the measurement format of the surveying instrument and prism is as follows: a prism cart carrying a prism (target) and a surveying cart carrying a surveying instrument are set on the same rail, which is the object to be measured, and the coordinate values of the prism are measured by the automatic tracking function of the surveying instrument while the prism cart is moved for a specified section length (communication distance). After the prism cart has moved for the specified section length, the prism cart stops moving once, the surveying cart is moved close to the prism cart, and then the prism cart is moved again for the specified section length (communication distance) while the coordinate values of the prism are measured by the automatic tracking function of the surveying instrument.
[0011] As shown in Figure 9(a), when the survey cart is moved close to the prism cart while the prism cart is stopped, the prism is stationary, so the X coordinate value of the prism when measured by the surveying instrument from a position a specified distance away from the prism should be equal to the X coordinate value of the prism when measured from very close to the prism. However, in reality, the surveying instrument is set at a slight angle from the horizontal, so the X coordinate value of the prism when measured from a position a specified distance away from the prism is not equal to the X coordinate value of the prism when measured by the surveying instrument from very close to the prism, and it can be seen that a step occurs.
[0012] The above applies not only to the X coordinate value of the prism, but also to the Y and Z coordinate values of the prism. In other words, if the surveying instrument is set in a state where it is slightly tilted from the horizontal, the coordinate values (coordinate point cloud) of the prism measured by the automatic tracking function of the surveying instrument will contain errors caused by the inclination of the surveying instrument from the horizontal. The longer the section length, the larger the errors contained in the coordinate values. In particular, when measuring a prism (target) over a long distance using the automatic tracking function of the surveying instrument, the errors contained in the coordinate values cannot be ignored.
[0013] Therefore, the present invention has been made in consideration of the problems of the above-mentioned conventional technology, and its object is to provide an automatic tracking surveying system that automatically measures a group of coordinate points per specified section length for a target using the automatic tracking function of a surveying instrument, which is capable of correcting measurement errors in the measured group of coordinate points caused by the inclination of the coordinate system of the surveying instrument. [Means for solving the problem]
[0014] In order to achieve the above object, the automatic tracking surveying system according to the present invention is an automatic tracking surveying system in which a surveying instrument (1) and a target (2) are mounted on separate moving bodies (10, 20), the surveying instrument (1) is kept stationary with respect to an object to be measured (50), and the target (2) is moved by a predetermined interval length (D) at a time, while measuring the coordinate value of the target (2) by the automatic tracking function of the surveying instrument (1). The automatic tracking surveying system includes a control device (3) for controlling the surveying instrument (1), and the control device (3) executes a target coordinate setting program for stopping the target (2) and moving the surveying instrument (1) in the direction of the target (2) when the relative distance between the surveying instrument (1) and the target (2) becomes equal to the interval length (D), and sets as target coordinates (PG) the measured coordinate value of the target (2) when the surveying instrument (1) is brought as close as possible to the target (2). a coordinate point cloud rotation process (S4) for obtaining a rotated coordinate point cloud ({P0, P1, . . . , Pn'}) by rotating the coordinate point cloud ({P0, P1, . . . , Pn}) for each section length (D) of the target (2) around an initial coordinate point (P0) relating to the initial position of the target (2) by a predetermined rotation angle (θ); This method is characterized by comprising a distance calculation process (S5, S6) for drawing a least-squares line (L) through the partial rotation coordinate point cloud ({Pk',...,Pn'}) and determining the distance (V) between the least-squares line (L) and the target coordinate (PG), and a minimum rotation angle calculation process (S9) for determining the minimum rotation angle (θmin) that minimizes the distance (V) and the rotation coordinate point cloud ({P0min, P1min,...,Pnmin}) at that time.
[0015] In the above configuration, first, the initial coordinate point (P0) and the target coordinate (PG) are the coordinate points when the surveying instrument (1) is brought as close as possible to the target (2), so these two points can be considered to contain no measurement error caused by the inclination of the coordinate system of the surveying instrument. Therefore, the initial coordinate point (P0) and the target coordinate (PG) can be set as the reference points for coordinate value correction.
[0016] In addition, the coordinate point group ({P0, P1, . . . , Pn}) is measured based on the horizontal direction Hm (Fig. 8) of the surveying instrument, which is uniformly inclined with respect to the actual horizontal direction Ha (Fig. 8). Therefore, the coordinate point group ({P0, P1, . . . , Pn}) can be rotated by the angle (θ) between the actual horizontal direction Ha and the horizontal direction Hm of the surveying instrument, with the initial coordinate point (P0) as the center. In addition, this angle (θ) can be determined by drawing a least-squares line (L) for the partial rotated coordinate point group ({Pk', . . . , Pn'}) including the farthest coordinate point (Pn') for the rotated coordinate point group ({P0, P1', . . . , Pn'}), calculating the distance (V) between the least-squares line (L) and the above target coordinate (PG), and determining the minimum rotation angle (θmin) that minimizes the distance (V).
[0017] A second feature of the automatic tracking surveying system of the present invention is that the control device (3) decomposes the coordinate point cloud ({P0, P1,..., Pn}) into point clouds of three base coordinates of X coordinate, Y coordinate and Z coordinate ({X0, X1,..., Xn}, {Y0, Y1,..., Yn}, {Z0, Z1,..., Zn}), and executes the coordinate point cloud rotation process (S4), the distance calculation process (S5, S6) and the minimum angle calculation process (S9) for each point cloud of base coordinate.
[0018] In the above configuration, taking into consideration that the horizontal direction Hm (Figure 8) of the surveying instrument is inclined with respect to both the vertical axis (Z axis) and the horizontal plane (X axis, Y axis), the coordinate point cloud rotation process (S4), distance calculation process (S5, S6) and minimum angle calculation process (S9) are performed for each of the three base coordinate point clouds ({X0, X1,..., Xn}, {Y0, Y1,..., Yn}, {Z0, Z1,..., Zn}).
[0019] A third feature of the automatic tracking surveying system of the present invention is that the control device (3) arranges the point clouds of each base coordinate in a two-dimensional coordinate system whose vertical axis represents the coordinate value of the target (2) and whose horizontal axis represents the accumulated distance of the target (2), and executes the coordinate point cloud rotation process (S4), the distance calculation process (S5, S6), and the minimum angle calculation process (S9).
[0020] With the above configuration, it is possible to accurately correct measurement errors caused by the inclination of the coordinate system of the surveying instrument. Effect of the Invention
[0021] According to the automatic tracking surveying system of the present invention, in an automatic tracking surveying system in which the surveying instrument is kept stationary and the target is moved, while automatically measuring a cloud of coordinate points per specified section length for the target using the automatic tracking function of the surveying instrument, it is possible to correct measurement errors in the measured cloud of coordinate points caused by the inclination of the coordinate system of the surveying instrument. [Brief description of the drawings]
[0022] [Figure 1] 1 is an explanatory diagram showing an automatic tracking surveying system according to an embodiment of the present invention; [Diagram 2] 1 is an explanatory diagram showing measurement of a predetermined section length in a measurement method for an object to be measured using an automatic tracking surveying system according to an embodiment of the present invention; FIG. [Diagram 3] 1 is an explanatory diagram showing the acquisition of target coordinates after measurement of a predetermined section length is completed in a measurement method for a measured object using an automatic tracking surveying system according to one embodiment of the present invention. FIG. [Figure 4] 1 is an explanatory diagram showing a method of correcting measurement errors for a group of coordinate points of a prism measured over a predetermined section length by an automatic tracking function of a surveying instrument. FIG. [Diagram 5] 1 is an explanatory diagram of a group of coordinate points of a prism arranged on a two-dimensional coordinate system in which the vertical axis represents the prism X-coordinate value and the horizontal axis represents the prism integrated distance. [Figure 6] 1 is an explanatory diagram showing a group of rotated coordinate points obtained when a group of coordinate points of a prism arranged on a two-dimensional coordinate system is rotated by a predetermined rotation angle around an initial coordinate point; [Figure 7] 13 is an explanatory diagram showing a least-squares line drawn for a partial rotated coordinate point group including the farthest coordinate point, and a distance between the least-squares line and a target coordinate. FIG. [Figure 8] FIG. 1 is an explanatory diagram showing the effect that the inclination of the coordinate system of a surveying instrument has on a measurement value. [Figure 9] 1 is an explanatory diagram showing the measurement results of the X-coordinate value of a prism when the prism is automatically tracked over a long distance using the automatic tracking function of the surveying instrument while the surveying instrument is kept stationary and the target is moved. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0023] Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
[0024] Fig. 1 is an explanatory diagram showing an automatic tracking surveying system 100 according to an embodiment of the present invention. Fig. 2 and Fig. 3 are explanatory diagrams showing a measurement method for a measurement target object 50 using the automatic tracking surveying system 100.
[0025] As shown in Fig. 1, this automatic tracking surveying system 100 is an automatic tracking surveying system in which a first carriage 10 carrying a surveying instrument 1 and a second carriage 20 carrying a prism 2 are installed so as to be freely slidable on a measured object 50, and while the first carriage 10 is stationary and the second carriage 20 is slidably moved, the automatic tracking function of the surveying instrument 1 is used to automatically measure coordinate points for the prism 2 per predetermined section length D in sequence, thereby making it possible to obtain a coordinate point cloud over the entire length of the measured object 50. In particular, the coordinate point cloud of the prism 2 measured by the automatic tracking function of the surveying instrument 1 has been corrected for measurement errors caused by a slight tilt of the surveying instrument 1 when the coordinate system was set, making it possible to obtain a coordinate point cloud over the entire length of the measured object 50 in which the coordinate point cloud per predetermined section length D is smoothly continuous.
[0026] The coordinates of the prism 2 and the coordinates of the object to be measured 50 differ only in the prism height H (=constant value). Therefore, the coordinates of the prism 2 and the coordinates of the object to be measured 50 are equivalent to each other. The coordinates of the object to be measured 50 are uniquely determined from the coordinates of the prism 2, and conversely, the coordinates of the prism 2 are uniquely determined from the object to be measured 50. Therefore, in this specification, the coordinates of the prism 2 also mean the coordinates of the object to be measured 50, and conversely, the coordinates of the object to be measured 50 also mean the coordinates of the prism 2.
[0027] 1, this automatic tracking surveying system 100 is configured to include a surveying instrument 1 that measures the linear distance S, vertical angle V, and horizontal angle H to the prism 2 by irradiating the prism 2 with measurement light (e.g., laser light) and receiving the reflected light from the prism 2, a prism 2 that reflects the measurement light emitted from the surveying instrument 1 to the surveying instrument 1, a first cart 10 that carries the surveying instrument 1, a second cart 20 that carries the prism 2, and a computer 30 that corrects measurement errors resulting from a slight tilt of the surveying instrument 1 when setting the coordinate system for the coordinate point group of the prism 2 measured by the automatic tracking function of the surveying instrument 1. Each component will be described in further detail below.
[0028] The surveying instrument 1 has an angle measurement function using an encoder, and a distance measurement function using the prism 2 and measurement light. In addition to these functions, it has an automatic collimation function that automatically searches for and collimates the prism 2, and an automatic tracking function that automatically tracks and collimates the prism 2 when the prism 2 moves. The surveying instrument 1 also has a short-range wireless communication function such as Wi-Fi (registered trademark) or Bluetooth (registered trademark), and is configured to be able to wirelessly transmit the measured coordinate point group to the computer 30.
[0029] The prism 2 may be a 360° prism or a one-element prism.
[0030] The first cart 10 and the second cart 20 have a flat portion on the upper part for stably mounting the surveying instrument 1 or the prism 2, and a known running means (for example, the sliding portion described in JP 2016-205058 A) on the lower part that can slide while eliminating mechanical play between the object to be measured 50.
[0031] The computer 30 is configured by a personal computer, a mobile terminal device such as a tablet or a smartphone, or a control device such as a PLC (Programmable Logic Controller). The computer 30 is also configured to be connected to the Internet by short-range wireless communication such as Wi-Fi (registered trademark) or Bluetooth (registered trademark), or a wireless communication line (so-called 4G or 5G) via a SIM card provided by a mobile phone company, and to be able to access a company's own server or a cloud server constructed on the Internet to transmit and receive programs or data. The measured coordinate point cloud for the measured object 50 is stored, for example, in the internal storage area of the computer 30, the company's own server or cloud server on the Internet, or a portable storage medium such as a USB memory.
[0032] 2 and 3 are explanatory diagrams showing a measurement method for a measurement object 50 using the automatic tracking surveying system 100. Note that the measurement object 50 is two rails, and Fig. 2 shows a measurement method for one of the two rails.
[0033] 2(a), the surveying instrument 1 and the prism 2 are placed almost vertically directly above the measurement target object 50. In this case, the first carriage 10 and the second carriage 20 are joined together so that the prism 2 is located at the start position of the measurement section.
[0034] As shown in FIG. 2(b), while the first carriage 10 is stationary and the second carriage 20 is slidingly moved, the coordinate values of the prism 2 are automatically measured by the automatic tracking function of the surveying instrument 1 until the prism integrated distance reaches a predetermined section length D. Note that the "prism integrated distance" referred to here is the distance d (P k ,P k+1 ) the sum of Σd(P k ,P k+1 When the prism integrated distance of the second carriage 20 reaches a predetermined section length D, the second carriage 20 is stopped once.
[0035] As shown in FIG. 3(a), after the measurement of the section length D is completed, the first cart 10 is slid and moved close to the second cart 20 while the second cart 20 is stationary. When the first cart 10 is joined to the second cart 20, that is, when the surveying instrument 1 is located very close to the prism 2, the surveying instrument 1 measures the coordinates of the prism 2. When the surveying instrument 1 is located very close to the prism 2, the measurement error caused by the slight tilt of the surveying instrument 1 when the coordinate system is set is at a negligible level. In other words, the coordinates (PG) of the prism 2 measured by the surveying instrument 1 when it is located very close to the prism 2 can be considered not to include the measurement error caused by the slight tilt of the surveying instrument 1 when the coordinate system is set. Therefore, the coordinates (PG) of the prism 2 measured by the surveying instrument 1 when the surveying instrument 1 is located very close to the prism 2 become the target coordinates (reference coordinates) when correcting the measurement errors contained in the coordinate point group ({P1, P2, . . . , Pn} described below) of the prism 2. Note that error correction for the coordinate point group {P1, P2, . . . , Pn} of the prism 2 measured by the automatic tracking function will be described later with reference to FIG. 4.
[0036] As shown in Fig. 3(b), prism 2 becomes the starting position of a new measurement section. As in Fig. 2(b), the coordinate value of prism 2 is automatically measured by the automatic tracking function of surveying instrument 1 until the prism integrated distance reaches the specified section length D.
[0037] 3(c), while the second cart 20 is stationary, the first cart 10 is slid toward the second cart 20 to obtain the target coordinate (reference coordinate) PG when correcting the coordinate point cloud of the prism 2. After that, automatic measurement of the coordinate value of the prism 2 by the automatic tracking function of the surveying instrument 1 over a predetermined section length D and measurement of the target coordinate PG at the position where the surveying instrument 1 is closest to the prism 2 are repeated until the sum of the prism integrated distances reaches the full length of the object 50 to be measured.
[0038] The object to be measured 50 is not limited to a railroad track. This automatic tracking survey system 100 can also be applied to a tunnel or a sewer pipe in which the first carriage 10 and the second carriage 20 can move.
[0039] Fig. 4 is an explanatory diagram showing a measurement error correction method for the coordinate point cloud of the prism 2 measured over a predetermined section length D by the automatic tracking function of the surveying instrument 1. The measurement error correction method is performed for each base coordinate point cloud (X coordinate point cloud, Y coordinate point cloud, Z coordinate point cloud). Since the measurement error correction method for each base coordinate point cloud is the same, only the measurement error correction method for the X coordinate point cloud will be explained here.
[0040] First, in step S1, after measuring the prism 2 over a predetermined section length D, the surveying instrument 1 is brought close to the prism 2 to obtain the target coordinate PG (Xg). As shown in FIG. 3(a), the "target coordinate PG" of the prism 2 is the coordinate of the prism 2 measured by the surveying instrument 1 when the surveying instrument 1 is moved close to the prism 2 at the coordinate point Pn, which is the end position of the measurement section. If the surveying instrument 1 is not tilted, the "X coordinate Xn of the farthest coordinate point Pn" and the "X coordinate Xg of the target coordinate PG" will be equal. However, in reality, since the surveying instrument 1 is slightly tilted, the "X coordinate Xn of the farthest coordinate point Pn" and the "X coordinate Xg of the target coordinate PG" are not equal, and a measurement error ΔX occurs. This measurement error correction method is performed so that this measurement error ΔX becomes zero or is minimized.
[0041] Next, in step S2, an X-coordinate point group {X0, X1, . . . , Xn} is extracted from the coordinate point group {P0, P1, . . . , Pn} of the prism 2 measured over a predetermined section length D by the automatic tracking function of the surveying instrument 1.
[0042] As shown in FIG. 5, in step S3, the coordinate point group {P0, P1, . . . , Pn} of the prism 2 is arranged on a two-dimensional coordinate system with the prism X coordinate value on the vertical axis and the prism integrated distance on the horizontal axis.
[0043] The "prism integrated distance" on the horizontal axis is a value obtained by sequentially accumulating the distances between the coordinate points of adjacent prisms 2 from the initial coordinate point P0 at the start position of the measurement section to the coordinate point Pn at the end position of the measurement section in a predetermined section length D. For example, the prism integrated distance D4 at the coordinate point P4 is a value obtained by accumulating all of the following: "the distance between the initial coordinate point P0 and the coordinate point P1", "the distance between the coordinate point P1 and the coordinate point P2", "the distance between the coordinate point P2 and the coordinate point P3", and "the distance between the coordinate point P3 and the coordinate point P4". Therefore, the prism integrated distance Dn at the farthest coordinate point Pn is equal to the predetermined section length D. In general, the prism integrated distance Dk at the coordinate point Pk of the prism 2 is equal to the prism integrated distance Dk-1 at the coordinate point Pk-1 plus the distance between the coordinate point Pk-1 and the coordinate point Pk. The initial coordinate point P0 is the coordinate of the prism 2 at the start position of the measurement section, and does not include measurement errors caused by slight inclination of the surveying instrument 1. Therefore, the initial coordinate point P0, like the target coordinate PG, becomes the reference coordinate for this measurement error correction method.
[0044] Additionally, the "prism X coordinate value" on the vertical axis is the value obtained by extracting only the X coordinate value from the coordinate point (X, Y, Z) of the prism 2. Similarly, the "prism Y coordinate value" and "prism Z coordinate value," the explanation of which is omitted here, are values obtained by extracting only the Y coordinate value and only the Z coordinate value, respectively, from the coordinate point (X, Y, Z) of the prism 2. As shown in FIG. 2(a), the initial coordinate point P0 is the coordinate point of the prism 2 at the start position of the measurement section in a predetermined section length D. Therefore, the prism integrated distance D0 at the initial coordinate point P0 is equal to zero.
[0045] 6, in step S4, the coordinate point group {P0, P1, . . . , Pn} of the prism 2 is rotated around the initial coordinate point P0 by a rotation angle θ in the two-dimensional coordinate system. The range of the rotation angle θ is preset. For example, −10°≦θ≦10°.
[0046] As shown in FIG. 7, in step S5, a least-squares line L is obtained for the group of rotated coordinate points {P0, P1', . . . , Pn'} of the prism 2 rotated by the rotation angle θ. The least-squares line L is a least-squares line for the group of partial rotated coordinate points {Pk', . . . , Pn'} relating to a plurality of X coordinates included in a predetermined circle centered on the farthest coordinate point Pn' located at the farthest position (from the initial coordinate point P0). The number of coordinate points included in the group of partial rotated coordinate points depends on the tracking accuracy of the surveying instrument 1, but basically, by increasing the number of points, the probability that the prism actually passes within a 1-millimeter range centered on the least-squares line L can be increased to about 95%. In other words, the least-squares line L and the trajectory of the movement of the prism 2 can be made to almost coincide with each other. Therefore, the rotation angle θ that minimizes the distance V between this least-squares line L and the target coordinate PG can be determined as the amount by which the group of coordinate points {P0, P1, . . . , Pn} of the prism 2 should be rotated.
[0047] In step S6, the distance V between the least squares line L and the target coordinates PG is calculated.
[0048] In step S7, it is determined whether the number of trials n has reached the set number of trials N. The number of trials n is the number of times that the distance V between the target coordinate PG and the least squares line L has been calculated. For example, it is 100 times. If the number of trials n has reached the set number of trials N (YES), step S9 is executed. On the other hand, if the number of trials n has not reached the set number of trials N (NO), step S8 is executed.
[0049] In step S8, the rotation angle θ is updated. The updating method can be a known binary search method.
[0050] In step S9, the minimum rotation angle θmin and the rotated X-coordinate point group {X0min, . . . , Xnmin} when the distance V between the "target coordinate PG" and the "least squares line L for the X-coordinate point group" is minimum are obtained.
[0051] By applying the above steps S1 to S9 in the same way to the prism Y coordinate, the rotational Y coordinate point group {Y0min, ···, Ynmin} can be obtained when the distance V between the "target coordinate PG(Yg)" and the "least squares straight line L for the partial rotational coordinate point group related to the Y coordinate" becomes minimum. Further, by applying the same method to the prism Z coordinate, the rotational Z coordinate point group {Z0min, ···, Znmin} can be obtained when the distance V between the "target coordinate PG(Zg)" and the "least squares straight line L for the partial rotational coordinate point group related to the Z coordinate" becomes minimum.
[0052] Therefore, a coordinate point group {P0min, P1min, ···, Pnmin} in which the measurement error caused by the inclination of the measuring instrument 1 is corrected can be obtained. That is, P0min = (X0min, Y0min, Z0min), P1min = (X1min, Y1min, Z1min), ···, Pnmin = (Xnmin, Ynmin, Znmin) can be obtained.
[0053] When the above is generalized as an equation, it becomes the following equation (1).
[0054] (Equation 1): min{V|V = f(r(P, θ), g)} < C, provided that P: The group of all coordinate points obtained by the automatic tracking function of the measuring instrument 1 (coordinate point group {P0, P1, ···, Pn}), θ: The inclination of the coordinate system of the measuring instrument (the amount by which the coordinate point group {P0, P1, ···, Pn} should be rotated around the initial coordinate point P0), r(P, θ): A function that returns the rotated coordinate point group {P0, P1’, ···, Pn’} obtained by rotating the coordinate point group {P0, P1, ···, Pn} by the rotation angle θ around the initial coordinate point P0, g: The target coordinate PG, f(x, g): A function that draws a least squares straight line L for several points from the farthest coordinate point Pn’ among the rotated coordinate point group {P0, P1’, ···, Pn’} and returns the distance between the least squares straight line L and the target coordinate PG, C: A threshold value that varies depending on the required accuracy, and is basically zero or a positive value close to zero.
[0055] As described above, the automatic tracking surveying system 100 of the present invention has been described with reference to the drawings, but the present invention is not limited to the above. In other words, various modifications, changes, additions, etc. can be made within the scope of the technical scope of the present invention. For example, the first cart 10 and the second cart 20 may each be equipped with two surveying instruments 1 and two prisms 2, and two objects 50 to be measured may be measured simultaneously. In addition, the first cart 10 and the second cart 20 may be remotely controlled. [Explanation of symbols]
[0056] 1 Survey instrument 2 Reflective Prism (Target) 10 First bogie 20 2nd bogie 30 Computers (control devices) 50 Object to be measured 100 Automatic Tracking Survey System
Claims
1. A surveying instrument (1) and a target (2) are mounted on separate moving bodies (10, 20), and the surveying instrument (1) is kept stationary with respect to an object to be measured (50), and the target (2) is moved by a predetermined distance (D) at a time, while the coordinate values of the target (2) are measured by the automatic tracking function of the surveying instrument (1), The automatic tracking surveying system includes a control device (3) for controlling the surveying instrument (1), a target coordinate setting process (S1) in which, when the relative distance between the surveying instrument (1) and the target (2) becomes equal to the section length (D), the control device (3) stops the target (2), moves the surveying instrument (1) toward the target (2), and sets the measured coordinate value of the target (2) when the surveying instrument (1) is brought as close as possible to the target (2) as a target coordinate (PG); a coordinate point cloud rotation process (S4) for obtaining a rotated coordinate point cloud ({P0, P1', ..., Pn'}) by rotating the coordinate point cloud ({P0, P1, ..., Pn}) for each section length (D) of the target (2) by a predetermined rotation angle (θ) around an initial coordinate point (P0) related to the initial position of the target (2); a distance calculation process (S5, S6) for drawing a least squares line (L) through a partial rotated coordinate point group ({Pk', ..., Pn'}) including the farthest coordinate point (Pn') for the rotated coordinate point group ({P0, P1', ..., Pn'}) and determining a distance (V) between the least squares line (L) and the target coordinate (PG); and a minimum rotation angle calculation process (S9) for determining the minimum rotation angle (θmin) when the distance (V) is minimized and the rotation coordinate point group ({P0min, P1min, ..., Pnmin}) at that time. An automatic tracking surveying system.
2. 2. The automatic tracking surveying system according to claim 1, The control device (3) decomposes the coordinate point group ({P0, P1, ..., Pn}) into point groups of three base coordinates of X coordinate, Y coordinate, and Z coordinate ({X0, X1, ..., Xn}, {Y0, Y1, ..., Yn}, {Z0, Z1, ..., Zn}), and executes the coordinate point group rotation process (S4), the distance calculation process (S5, S6), and the minimum angle calculation process (S9) for each point group of base coordinates. An automatic tracking surveying system.
3. 3. The automatic tracking surveying system according to claim 2, The control device (3) arranges the point clouds of each base coordinate in a two-dimensional coordinate system whose vertical axis represents the coordinate value of the target (2) and whose horizontal axis represents the integrated distance of the target (2), and executes the coordinate point cloud rotation process (S4), the distance calculation process (S5, S6), and the minimum angle calculation process (S9). An automatic tracking surveying system.
Citation Information
Patent Citations
Auto-tracking surveying device
JP1999094549A
Track inspection method and device thereof
JP2016205058A
