Boosting device, information generation device for detecting correction value, temperature estimation device, internal resistance estimation device, boosting method, information generation method for detecting correction value, and program
The multiphase boost chopper circuit addresses the challenge of poor controllability by using current measurement circuits and correction values to align phase differences, achieving precise feedback control and responsiveness.
Patent Information
- Application Number
- JP2023065808
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-13
- Publication Date
- 2024-10-25
AI Technical Summary
In multiphase boost chopper circuits, the difference between actual and sample current average values leads to poor controllability due to the complexity of current waveforms, making it difficult to achieve accurate feedback control and responsiveness.
A multiphase boost chopper circuit with current measurement circuits that can follow the speed required for feedback control, using a control unit to drive phases at the same switching cycle and apply current correction values to align phase differences, and a correction value detection information generation device to generate correction table data for precise control.
Enables good controllability in feedback control by correcting the difference between actual and sample current values, ensuring accurate voltage regulation and responsiveness in multiphase boost chopper circuits.
Smart Images

Figure 2024151957000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a boost device, a correction value detection information generating device, a temperature estimation device, an internal resistance estimation device, a boost method, a correction value detection information generating method, and a program. [Background technology]
[0002] 15 is a block diagram showing an example of a boost device 200, which is a so-called boost chopper. For example, a power storage device is connected to input terminals 201-1 and 201-2 of the boost device 200, and a voltage value V2 obtained by boosting a voltage value V1 supplied from the power storage device is output from output terminals 210-1 and 210-2. The mechanism of boosting by the boost device 200 is as follows.
[0003] When the switch element 203 is turned ON, a current flows through a path to the input terminal 201-2 via the input terminal 201-1, the inductor 202, the switch element 203, due to the voltage value V1 supplied to the input terminals 201-1 and 201-2. As the current flowing through the path increases, energy is accumulated in the inductor 202. When the switch element 203 is turned OFF after the energy is accumulated in the inductor 202, the current path is switched to a path to the input terminal 201-2 via the input terminal 201-1, the inductor 202, the diode 204, and the load connected between the output terminals 210-1 and 210-2. In this case, the inductor 202 releases energy, and as a result, a voltage value V2 higher than the voltage value V1 between the input terminals 201-1 and 201-2 is generated between the output terminals 210-1 and 210-2.
[0004] In such a boost device 200, for example, feedback control is performed to determine the ON / OFF timing of the switch element 203 so that the voltage value V2 between the output terminals 210-1 and 210-2 becomes a target voltage value. In order to improve the responsiveness of this feedback control, for example, the current value of the current flowing through the inductor 202 is detected by the sensor circuit 206. Analog data of the current value detected by the sensor circuit 206 is low-pass filtered by the filter circuit 207 to remove noise present in the circuit of the boost device 200, and then supplied to an AD (Analog-to-Digital) conversion unit 221 of the control unit 220.
[0005] The AD conversion unit 221 samples the analog data of the filtered current value at a constant sampling interval, converts it into digital data, and outputs it to the control signal generation unit 222. Based on the digital current value data and the target voltage value, the control signal generation unit 222 calculates the ON and OFF timing of the switch element 203 so as to bring the voltage value V2 closer to the target voltage value. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] Republished WO2018 / 070012 Summary of the Invention [Problem to be solved by the invention]
[0007] Fig. 16 is a graph showing changes in various current values observed in inductor 202. In Fig. 16, the vertical axis represents the current value expressed in units of [A], the horizontal axis represents the elapsed time expressed in units of "μs (microseconds)", and Ts is the switching period. The vertical axis indicates that the current value increases upward, and the horizontal axis indicates that the elapsed time increases toward the right.
[0008] Graph 231 is a graph showing a change in the value of a current actually flowing through inductor 202, which cannot be measured directly. Graph 232 is a graph showing a change in the value of a current detected by sensor circuit 206. Graph 233 is a graph showing a change in the value of a current after filtering by filter circuit 207. Graph 234 is a graph showing a change in the value of a current after graph 233 is sampled by AD conversion unit 221. As shown in FIG. 16, the sampling timings by AD conversion unit 221 are the times of "sampling t1", "sampling t2", "sampling t3", and "sampling t4", and the current value at the intersection of the positions of the times and graph 233 becomes the current value of graph 234. At the times of "sampling t1", "sampling t2", "sampling t3", and "sampling t4", the time between adjacent times is constant, and this interval becomes the sampling interval of AD conversion unit 221.
[0009] In the case of a one-phase boost chopper having only one pair of inductor 202 and switch element 203, such as boost device 200 shown in FIG. 15, the average value of graph 231 showing the change in the value of the current actually flowing through inductor 202 (hereinafter referred to as actual current average value) and the average value of graph 234 showing the change in the value of the current output by AD conversion unit 221 (hereinafter referred to as sample current average value) are both the value indicated by symbol 235.
[0010] In response to this, for example, a multi-phase boost chopper with multiple combinations of inductors and switch elements as disclosed in Patent Document 1 is known. In the case of such a multi-phase boost chopper, the waveform of the current flowing through the inductor of each phase becomes complex, and except in special cases, the actual current average value and the sampled current average value do not match. Therefore, since the current value flowing through the inductor cannot be obtained with high accuracy, there is a problem that good performance cannot be obtained in terms of controllability such as responsiveness and convergence of feedback control.
[0011] The difference between the actual current average value and the sample current average value changes depending on the so-called operating point, more specifically, the waveform of the current flowing through the inductor. Therefore, it is difficult to compensate for this difference by a simple method such as offset correction, which adds a constant value for correction. For example, as a method for solving the above problem, there is a method of detecting the current value using a current measurement circuit with a large time constant and slow response, instead of the high-speed sensor circuit 206 and filter circuit 207 for control provided in each phase. By using this method, the change in graph 233 showing the change in the current value after filtering by the filter circuit 207 becomes gentle, and the difference between the actual current average value and the sample current average value can be reduced. However, a current measurement circuit with a large time constant and slow response causes another problem in that it cannot follow the speed required for feedback control.
[0012] The present disclosure has been made in consideration of the above circumstances, and aims to provide a boost device, a correction value detection information generating device, a temperature estimation device, an internal resistance estimation device, a boost method, a correction value detection information generating method, and a program that are capable of performing feedback control with good controllability in a multi-phase boost chopper circuit while using a current measurement circuit that can track the speed required in the feedback control. [Means for solving the problem]
[0013] In order to solve the above problem, one aspect of the present disclosure is a boost device comprising: a multi-phase boost chopper circuit formed by a plurality of boost circuits, each having an inductor and a switch element, and a smoothing capacitor; a plurality of current measurement circuits that measure a current flowing through each of the inductors to obtain a measured inductor current value; and a corrected inductor current value obtained by applying a current correction value to a sample current value obtained by sampling the measured inductor current value at a constant sampling interval, the corrected inductor current value being obtained by applying a difference that occurs depending on the number of boost circuits and that corrects a difference between an average value of the sampled current value and an average value of a real inductor current value that is a true value of a current flowing through the inductor, the difference being a difference that occurs depending on the number of boost circuits, and Effect of the Invention
[0014] According to each aspect of the present disclosure, in a multi-phase boost chopper circuit, feedback control with good controllability can be performed while using a current measurement circuit that can follow the speed required in the feedback control. [Brief description of the drawings]
[0015] [Figure 1] 1 is a diagram showing a circuit diagram and a schematic block diagram of a functional unit of a boosting device according to an embodiment of the present invention; [Diagram 2] FIG. 4 is a graph showing changes in various current values observed in a reactor of the boost device according to the present embodiment. [Diagram 3] 5 is a diagram showing an example of correction table group data stored in a storage unit of the boost device according to the embodiment; FIG. [Figure 4] 1 is a schematic block diagram showing a configuration of a correction value detection information generating device according to an embodiment of the present invention. [Diagram 5]5 is a flowchart showing a flow of processing by the correction value detection information generating device according to the present embodiment. [Figure 6] 1 is a diagram (part 1) showing an example of a boost chopper circuit model equation determined in an actual current estimating section included in the correction value detection information generating device according to the present embodiment; FIG. [Figure 7] 13 is a diagram (part 2) showing an example of a boost chopper circuit model equation determined in an actual current estimating section included in the correction value detection information generating device according to the present embodiment. FIG. [Figure 8] 5 is a diagram showing a process of calculating an estimated actual reactor current value by an actual current estimator included in the correction value detection information generating device according to the present embodiment. FIG. [Figure 9] 4 is a circuit diagram showing an example of a current measuring circuit included in the boost device according to the embodiment. FIG. [Figure 10] 1A and 1B are a schematic block diagram of a control signal generating unit included in a boost device according to the present embodiment, and a block diagram showing feedback control performed by the control signal generating unit; [Figure 11] 11 is a diagram showing an example of correction using a current correction value by a control signal generating unit included in the boost device according to the embodiment; FIG. [Figure 12] FIG. 11 is a diagram showing an example of a boost chopper circuit model equation determined in an actual current estimating section included in a correction value detection information generating device according to another configuration example of the present embodiment. [Figure 13] FIG. 1 is a diagram showing an example of a usage form of a temperature estimation device used in connection with a booster device according to an embodiment of the present invention. [Figure 14] FIG. 1 is a diagram showing an example of a usage form of an internal resistance estimation device used in connection with a boost device according to an embodiment of the present invention. [Figure 15] 1 is a diagram showing an overall configuration of a general boost device called a boost chopper; [Figure 16] FIG. 1 is a graph showing changes in various current values observed in an inductor of a boost device commonly known as a boost chopper. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Hereinafter, embodiments of the present disclosure will be described with reference to the drawings. In each drawing, the same or corresponding components are designated by the same reference numerals and the description thereof will be omitted as appropriate.
[0017] FIG. 1 is a diagram showing a circuit diagram and a schematic block diagram of a functional unit of the boost device 1 according to the present embodiment. FIG. 2 is a diagram showing graphs 24 to 27 showing changes in various current values observed in the reactor 12A of the boost device 1 according to the present embodiment. FIG. 3 is a diagram showing an example of correction table group data 7A stored in the storage unit 6 of the boost device 1 according to the present embodiment. FIG. 4 is a schematic block diagram showing a configuration of the correction value detection information generating device 40 according to the present embodiment. FIG. 5 is a flowchart showing a flow of processing by the correction value detection information generating device 40 according to the present embodiment. FIGS. 6 and 7 are diagrams showing an example of a boost chopper circuit model formula determined in the real current estimating unit 41 included in the correction value detection information generating device 40 according to the present embodiment. FIG. 8 is a diagram showing a process of calculating an estimated actual reactor current value by the real current estimating unit 41 included in the correction value detection information generating device 40 according to the present embodiment. FIG. 9 is a circuit diagram showing an example of the current measuring circuits 16A and 16B included in the boost device 1 according to the present embodiment. FIG. 10 is a schematic block diagram of the control signal generating unit 5 included in the boost device 1 according to this embodiment, and a block diagram showing the feedback control performed by the control signal generating unit 5. FIG. 11 is a diagram showing an example of correction using a current correction value by the control signal generating unit 5 included in the boost device 1 according to this embodiment. FIG. 12 is a diagram showing an example of a boost chopper circuit model formula determined in the actual current estimating unit 41 included in the correction value detection information generating device 40 according to another configuration example of this embodiment. FIG. 13 is a diagram showing an example of a usage form of the temperature estimating device 110 used in connection with the boost device 1 according to this embodiment. FIG. 14 is a diagram showing an example of a usage form of the internal resistance estimating device 120 used in connection with the boost device 1 according to this embodiment.
[0018] (Overall configuration of boost device) As shown in Fig. 1, the boost device 1 includes a circuit portion and a functional portion that controls the circuit. In the boost device 1, the circuit portion includes an input terminal 10, a capacitor 11, boost circuits 13A and 13B, current measurement circuits 16A and 16B, a smoothing capacitor 19, and an output terminal 20. In the boost device 1, the functional portion that controls the circuit includes a control unit 3 and a storage unit 6. In Fig. 1, wiring within the circuit portion and within the functional portion of the boost device 1 are shown by solid lines, and wiring between the circuit portion and the functional portion are shown by dotted lines.
[0019] The input terminal 10 includes a pair of input terminals 10-1 and 10-2. For example, a capacitor is connected to the input terminal 10. Hereinafter, the voltage value between the input terminals 10 is referred to as a voltage value V1. The output terminal 20 includes a pair of output terminals 20-1 and 20-2. For example, a load is connected to the output terminal 20. Hereinafter, the voltage value between the output terminals 20 is referred to as a voltage value V2.
[0020] The boost circuit 13A includes a reactor 12A, switching elements 14A-U and 14A-L, and free wheel diodes 15A-U and 15A-L. The boost circuit 13B includes a reactor 12B, switching elements 14B-U and 14B-L, and free wheel diodes 15B-U and 15B-L.
[0021] The reactor 12A and the reactor 12B are elements that realize the properties of inductance, and are a type of inductor. The reactor 12A and the reactor 12B are magnetically coupled to form a magnetically coupled reactor 12 that exists across the boost circuit 13A and the boost circuit 13B. By magnetically coupling the reactor 12A and the reactor 12B, a mutual induction effect is obtained, so that the size of the reactors 12A and 12B can be reduced. The reactor 12A is connected to the input terminal 10-1 at one end, and connected to the switch elements 14A-U and 14A-L at the other end. The reactor 12B is connected to the input terminal 10-1 at one end, and connected to the switch elements 14B-U and 14B-L at the other end.
[0022] The switch elements 14A-U, 14A-L, 14B-U, and 14B-L are, for example, IGBTs (Insulated Gate Bipolar Transistors). The switch elements 14A-U and 14B-U forming the upper arm have collector terminals connected to the output terminal 20-1. The switch elements 14A-L and 14B-L forming the lower arm have emitter terminals connected to the input terminal 10-2 and the output terminal 20-2. The emitter terminals of the switch elements 14A-U and 14B-U of the upper arm are connected to the collector terminals of the switch elements 14A-L and 14B-L of the lower arm corresponding to each other, and are also connected to the other ends of the reactors 12A and 12B corresponding to each other.
[0023] Switching elements 14A-L, 14B-L of the lower arm are mainly used to provide an action of boosting voltage value V1 across input terminals 10 to voltage value V2 in a powering state in which a current flows through reactors 12A, 12B from one end connected to input terminal 10-1 toward the other end, and power supplied by a battery connected to input terminal 10 is consumed by a load connected to output terminal 20. In contrast, switching elements 14A-U, 14B-U of the upper arm are mainly used to provide an action of lowering voltage value V2 across output terminals 20 to voltage value V1 in a regenerative state in which the direction of current flowing through reactors 12A, 12B is opposite to that in powering, and power returned from the load connected to output terminal 20 charges a battery connected to input terminal 10.
[0024] Each of the freewheeling diodes 15A-U, 15A-L, 15B-U, and 15B-L is connected to the corresponding switch element 14A-U, 14A-L, 14B-U, and 14B-L such that the cathode terminal is connected to the collector terminal and the anode terminal is connected to the emitter terminal.
[0025] The current measurement circuit 16A includes a sensor circuit 17A and a filter circuit 18A, and measures a current value. The sensor circuit 17A is inserted on a wiring that connects between a connection point where the emitter terminal of the switch element 14A-U and the collector terminal of the switch element 14A-L are connected, and the other end of the reactor 12A, and detects the current value of the current flowing through the wiring. The current measurement circuit 16B includes a sensor circuit 17B and a filter circuit 18B, and measures a current value. The sensor circuit 17B is inserted on a wiring that connects between a connection point where the emitter terminal of the switch element 14B-U and the collector terminal of the switch element 14B-L are connected, and the other end of the reactor 12B, and detects the current value of the current flowing through the wiring.
[0026] The current values detected by each of the sensor circuits 17A and 17B are continuous analog data with noise superimposed thereon. Each of the filter circuits 18A and 18B is, for example, a low-pass filter, and is connected to the corresponding sensor circuit 17A or 17B. Each of the filter circuits 18A and 18B filters the analog data of the current values output by the sensor circuits 17A and 17B connected thereto, thereby removing noise superimposed on the analog data.
[0027] Hereinafter, the current value detected and output by the sensor circuits 17A, 17B will be referred to as the sensor reactor current value, and the current value output after filtering by the filter circuits 18A, 18B will be referred to as the measured reactor current value. In contrast, the current value of the current that actually flows through the reactors 12A, 12B, which cannot be measured directly, i.e., the true value of the current flowing through the reactors 12A, 12B, will be referred to as the actual reactor current value.
[0028] In the boost device 1, the boost circuit 13A and the boost circuit 13B are connected in parallel to the output terminal 20, and the input terminal 10, the capacitor 11, the boost circuits 13A and 13B, the smoothing capacitor 19, and the output terminal 20 form a so-called two-phase boost chopper circuit 2. Hereinafter, the boost circuit 13A is also referred to as phase A, and the boost circuit 13B is also referred to as phase B. The control unit 3 performs interleave control so that the phase difference between the drive phase of the boost circuit 13A and the drive phase of the boost circuit 13B is 360° / number of phases. In the case of the boost device 1, since it is two-phase, interleave control is performed so that the phase difference is 360° / 2=180°. By making it multi-phase, load distribution is performed, and by performing interleave control, it is possible to reduce the size of the smoothing capacitor 19.
[0029] The control unit 3 includes an AD conversion unit 4A for phase A, an AD conversion unit 4B for phase B, and a control signal generation unit 5. The AD conversion unit 4A is connected to a filter circuit 18A. The AD conversion unit 4B is connected to a filter circuit 18B. Each of the AD conversion units 4A and 4B samples analog data of the measured reactor current value output by the filter circuits 18A and 18B connected to the AD conversion units 4A and 4B at a predetermined constant sampling interval and converts the analog data into digital data. Hereinafter, the measured reactor current value converted into digital data by the AD conversion units 4A and 4B is referred to as a sampled current value.
[0030] Here, the problems occurring in the boost chopper circuit having multiple phases described above will be specifically described using the boost device 1 as an example. Fig. 2 is a graph showing changes in the actual reactor current value, which is the current value of the current flowing through the A-phase reactor 12A in the boost device 1, the sensor reactor current value output by the sensor circuit 17A, the measured reactor current value output by the filter circuit 18A, and the sample current value output by the AD conversion unit 4A. In Fig. 2, the vertical axis is the axis of the current value expressed in the unit [A], and the horizontal axis is the axis of the elapsed time expressed in the unit "μs".
[0031] Graph 24 is a graph showing the change in the actual reactor current value. Graph 25 is a graph showing the change in the sensor reactor current value. Graph 26 is a graph showing the change in the measured reactor current value. Graph 27 is a graph showing the change in the sample current value. In FIG. 2, Ts is a switching period, and in FIG. 2, 0 to Ts [μs] is one switching period, and Ts to 2Ts [μs] is the next switching period. The sampling interval of the AD conversion unit 4A is half the switching period Ts, that is, Ts / 2, and the sampling timing is a time shifted by Tsample [μs] from each of the start time, center time, and end time of the switching period Ts. Here, the center time is the time obtained by adding half the switching period Ts to the start time. More specifically, the four sampling timings are 0.5Ts-Tsample [μs] indicated by reference numeral 31, Ts-Tsample [μs] indicated by reference numeral 32, 1.5Ts-Tsample [μs] indicated by reference numeral 33, and 2Ts-Tsample [μs] indicated by reference numeral 34, as shown in FIG. 2.
[0032] Since the phase difference between the drive phase of the boost circuit 13A and the drive phase of the boost circuit 13B is 180°, the switching period Ts is shifted by a half period between phase A and phase B. Therefore, when the reactor 12A and the reactor 12B are the same, the current measurement circuit 16A and the current measurement circuit 16B are the same, and the AD conversion unit 4A and the AD conversion unit 4B are the same, the changes in the actual reactor current value, the sensor reactor current value, the measured reactor current value, and the sample current value of phase B are represented as changes after the time 0.5T [μs] of phase A shown in FIG.
[0033] 2, in one switching period Ts, graph 24 showing the change in the actual reactor current value is point-symmetric between the first half period and the second half period. Therefore, the average value of graph 24 is 0 A. In contrast, in the case of graph 27 showing the change in the sample current value, the average value is a value other than 0 A, as shown by reference numeral 29, except for the case where voltage value V2 is twice the value of voltage value V1, and a difference occurs between the average value of the actual reactor current value and the average value of the sample current value.
[0034] In order to compensate for this difference, the storage unit 6 of the boost device 1 stores in advance correction table group data 7A for the A phase and correction table group data 7B for the B phase, as shown in Fig. 1. The correction table group data 7A is data including a plurality of correction tables 7A-1, 7A-2, 7A-3, ... shown in Fig. 3. Each of the correction tables 7A-1, 7A-2, 7A-3, ... has the same format, and the correction tables 7A-1, 7A-2, 7A-3, ... are generated for each different voltage value V2. Here, the format of the correction table 7A-1 will be described as an example.
[0035] 3, the correction table 7A-1 is a table for, for example, a voltage value V2=600V, and the voltage value V2=600V is written in the upper left item as an index so that a search can be performed based on the voltage value V2. The correction table 7A-1 is a matrix-format table having an item for a power value P in the horizontal direction and an item for a voltage value V1 in the vertical direction. The item for the power value P in the horizontal direction has subitems for multiple power values expressed in units of [kW], and the item for the voltage value V1 in the vertical direction has subitems for multiple voltage values expressed in units of [V]. A current correction value is written in an element of the matrix specified by the subitem for the power value and the subitem for the voltage value. For example, in the matrix element specified by the power value "30 kW" of the sub-item of the horizontal power value P and the voltage value "385 V" of the sub-item of the vertical voltage value V1, the current correction value "1.2" is written when the power value P = 30 kW, the voltage value V1 = 385 V, and the voltage value V2 = 600 V.
[0036] In each of the A-phase correction table group data 7A and the B-phase correction table group data 7B, the table format of the correction tables 7A-1, 7A-2, 7A-3, ... and the table format of the correction tables 7B-1, 7B-2, 7B-3, ... included therein are the same format.
[0037] Returning to Fig. 1, boost device 1 includes a first voltage measurement circuit that measures a voltage value V1 between input terminals 10 (not shown), and a second voltage measurement circuit that measures a voltage value V2 between output terminals 20. The first voltage measurement circuit and the second voltage measurement circuit are connected to control signal generation unit 5. Control signal generation unit 5 acquires voltage value V1 measured by the first voltage measurement circuit, voltage value V2 measured by the second voltage measurement circuit, and sample current values of phase A and phase B output by AD conversion units 4A and 4B.
[0038] The control signal generating unit 5 further takes in a target voltage value tr-V2, which is a target value of the voltage value V2, a power value P supplied by a power storage device connected to the input terminal 10, and a switching period Ts, which are given from the outside. Here, "given from the outside" may mean, for example, that data or information is supplied by a user's input operation, or that data or information stored in an external storage device is read out.
[0039] The target voltage value tr-V2 and the switching period Ts are constant values that are determined in advance. The power value P is a known constant value obtained as information indicating the performance of the battery connected to the input terminal 10. The control signal generating unit 5 detects a current correction value for the A phase and a current correction value for the B phase from the correction table group data 7A and the correction table group data 7B stored in the storage unit 6 based on the acquired voltage values V1, V2 and the acquired power value P.
[0040] The control signal generating unit 5 sets the sum obtained by adding the detected A-phase current correction value to the captured A-phase sample current value as the A-phase corrected reactor current value. The control signal generating unit 5 sets the sum obtained by adding the detected B-phase current correction value to the captured B-phase sample current value as the B-phase corrected reactor current value.
[0041] Based on the received voltage values V1 and V2, the A-phase and B-phase corrected reactor current values, the target voltage value tr-V2, and the switching period Ts, the control signal generating unit 5 calculates the ON / OFF timings of each of the switching elements 14A-U, 14A-L, 14B-U, and 14B-L so that the voltage value V2 approaches the target voltage value tr-V2 while driving at the switching period Ts. The control signal generating unit 5 outputs each of the control signals indicating the calculated ON / OFF timings of each of the switching elements 14A-U, 14A-L, 14B-U, and 14B-L to the gate terminals of the corresponding switching elements 14A-U, 14A-L, 14B-U, and 14B-L.
[0042] (Overall configuration of the correction value detection information generating device) 4 is a block diagram showing a configuration of a correction value detection information generating device 40 that generates correction table group data 7A, 7B stored in the storage unit 6 of the boost device 1, i.e., correction value detection information which is information for detecting a current correction value. The correction value detection information generating device 40 includes an actual current estimating unit 41, a measured current estimating unit 42, a sample current estimating unit 43, and an information generating unit 44.
[0043] The actual current estimation unit 41, for example, takes in reactor characteristic values of the reactors 12A and 12B of the boost device 1, which are given from the outside. Here, the reactor characteristic value is a value expressed by two kinds of numerical values, for example, the inductance value L of the reactors 12A and 12B expressed in the unit μH, and a coupling coefficient k. The inductance values of the reactors 12A and 12B change according to the power value P. However, here, the reactor 12A and the reactor 12B are assumed to be the same reactor. Therefore, the change in the inductance value according to the power value P in the reactor 12A and the reactor 12B is also the same. Therefore, the actual current estimation unit 41 takes in the reactor characteristic value in a form in which, for example, a plurality of power values P and a plurality of inductance values L corresponding to each of the power values P, which are common to the reactor 12A and the reactor 12B, are associated with each other.
[0044] The real current estimation unit 41 takes in a switching period Ts of the boost device 1 given from the outside. The switching period Ts is a numerical value expressed in units of [μs]. The real current estimation unit 41 takes in a plurality of parameters given from the outside. The parameters are generated by combining three values selected one for each of V1, V2, and P from a plurality of voltage values V1, a plurality of voltage values V2, and a plurality of power values P, each of which is determined at an arbitrary numerical interval from an arbitrary numerical range. The plurality of parameters are generated such that the combination of V1, V2, and P does not overlap in all parameters. The numerical values of the voltage values V1 and V2 included in the parameters are numerical values expressed in units of [V], and the power value P is a numerical value expressed in units of [kW]. The real current estimation unit 41 may generate the parameters by itself.
[0045] The actual current estimation unit 41 calculates an estimated actual reactor current value, which is an estimate of the actual reactor current value of each of the reactors 12A, 12B, for each parameter based on the imported reactor characteristic value, the switching period Ts, multiple parameters, and a boost chopper circuit model equation that models a predetermined boost chopper circuit 2.
[0046] The measured current estimation unit 42 takes in a current measurement circuit time constant given from the outside. Here, the current measurement circuit time constant refers to the time constant of each of the sensor circuits 17A and 17B provided in the current measurement circuits 16A and 16B, and the time constant of each of the filter circuits 18A and 18B. The time constant is a numerical value expressed in units of [s (seconds)].
[0047] The measured current estimation unit 42 calculates an estimated measured reactor current value of phase A and an estimated measured reactor current value of phase B for each parameter from the estimated actual reactor current values of phase A and phase B calculated by the actual current estimation unit 41 based on the imported current measurement circuit time constant and a current measurement circuit model equation that models the current measurement circuits 16A, 16B.
[0048] The sample current estimation unit 43 takes in the detection timing and the switching period Ts given from the outside. Here, the detection timing is, for example, a numerical value indicated in the unit "μs", and is a positive or negative value whose maximum absolute value is less than half the value of the switching period Ts, and may be 0. The numerical value indicated by the detection timing is determined in advance so that the sampling timing of the sampling process performed by the sample current estimation unit 43 coincides with each sampling timing of the AD conversion units 4A and 4B of the boost device 1. Here, it is assumed that the sampling timings of the AD conversion units 4A and 4B of the boost device 1 are the same. Therefore, the sample current estimation unit 43 takes in one detection timing common to the A phase and the B phase given from the outside.
[0049] The sampled current estimation unit 43 calculates the sampling timing by adding the detection timing to each of the start time, center time, and end time of each switching period Ts based on the captured detection timing and the switching period Ts. The sampled current estimation unit 43 samples each of the estimated measured reactor current values of phase A and phase B calculated by the measured current estimation unit 42 according to the calculated sampling timing, and extracts, for each parameter, an estimated sampled current value of phase A which is an estimate of the sampled current value corresponding to reactor 12A, and an estimated sampled current value of phase B which is an estimate of the sampled current value corresponding to reactor 12B.
[0050] The information generating unit 44 calculates a current correction value for the A phase for each parameter based on the estimated actual reactor current value for each parameter of the A phase calculated by the actual current estimating unit 41 and the estimated sample current value for each parameter of the A phase extracted by the sample current estimating unit 43. The information generating unit 44 calculates a current correction value for the B phase for each parameter based on the estimated actual reactor current value for each parameter of the B phase calculated by the actual current estimating unit 41 and the estimated sample current value for each parameter of the B phase extracted by the sample current estimating unit 43. The information generating unit 44 generates correction table group data 7A from the calculated current correction value for each parameter of the A phase, and generates correction table group data 7B from the calculated current correction value for each parameter of the B phase.
[0051] (Processing by correction value detection information generating device) 5 is a flowchart showing the flow of processing by the correction value detection information generating device 40. The actual current estimating unit 41 takes in a reactor characteristic value, a switching period Ts, and a plurality of parameters, which are provided from the outside. The measured current estimating unit 42 takes in a current measuring circuit time constant, which is provided from the outside, that is, the time constant of the sensor circuits 17A and 17B and the time constant of the filter circuits 18A and 18B. The sampled current estimating unit 43 takes in a detection timing and a switching period Ts, which are provided from the outside. The sampled current estimating unit 43 calculates a sampling timing common to the A phase and the B phase based on the taken-in detection timing and the switching period Ts. (S1).
[0052] (Boost chopper circuit model) The boost chopper circuit model equations obtained by modeling the predetermined boost chopper circuit 2 in the actual current estimation unit 41 will be described below. Specifically, the boost chopper circuit model equations are the following equation (1), equations (2) to (5) shown in Fig. 6, an equation shown in the format of the program language in Fig. 7, and equations (6) to (10) shown below.
[0053]
number
[0054] Equation (1) is used to calculate the on-duty ratio “duty” of the lower arm switching elements 14A-L and 14B-L. In equation (1), V1 and V2 are the voltage values V1 and V2 included in the parameters acquired by the actual current estimator 41.
[0055] FIG. 6 shows the current value I of the current flowing through the A-phase reactor 12A for each combination of the ON and OFF states of the lower arm switch elements 14A-L and 14B-L. LA Differential dI LA 13 is a diagram showing equations (2) to (5) for calculating / dt. Note that equations (2) to (5) are equations when the inductance values of reactors 12A and 12B are the same "L." In equations (2) to (5), M is the mutual inductance value, and is a value calculated as M=k×L using the inductance value L included in the reactor characteristic value and the coupling coefficient k.
[0056] As shown in FIG. 6, hereinafter, each of the combined ON and OFF states of the lower arm switch elements 14A-L, 14B-L is also referred to as a mode. "Mode 1" is a mode in which switch element 14A-L is ON and switch element 14B-L is OFF. "Mode 2" is a mode in which switch element 14A-L is OFF and switch element 14B-L is ON. "Mode 3" is a mode in which both switch elements 14A-L, 14B-L are OFF. "Mode 4" is a mode in which both switch elements 14A-L, 14B-L are ON.
[0057] The above current value I LA The derivative of dI LA / dt is the current value I LA Therefore, the equations (2) to (5) shown in FIG. 6 show the increase rate of the current value I LA In FIG. 6, the current value I LB Differential dI LB / dt is not shown, but dI LBFor / dt, the equations for the states of Mode 1 and Mode 2 are the opposite of those for Phase A. That is, for Mode 1, dI LB / dt is expressed on the right side of equation (3), and in the case of Mode 2, dI LB / dt is expressed on the right side of equation (2). For Mode 3 and Mode 4, the same as for Phase A, dI LA / dt=dI LB It becomes / dt.
[0058] One switching period Ts is divided into four sections. The time at the boundary between each of the four sections is the switching timing at which the ON and OFF states of the lower arm switching elements 14A-L, 14B-L are switched. Fig. 7 shows a procedure for calculating the time length of each of the four divided sections based on the "duty" calculated by equation (1), i.e., the on-duty ratio of the lower arm switching elements 14A-L, 14B-L, and a procedure for indicating which of Mode1 to Mode4 is to be assigned to each of the four sections.
[0059] Hereinafter, when the switching period Ts is divided into four sections, the sections are referred to in chronological order as Area(1), Area(2), Area(3), and Area(4). The time lengths of Area(1), Area(2), Area(3), and Area(4) are represented by variables T(1), T(2), T(3), and T(4). The modes assigned to Area(1), Area(2), Area(3), and Area(4) are represented by variables Mode(1), Mode(2), Mode(3), and Mode(4).
[0060] As shown by reference numeral 51, when "duty>0.5", the four equations shown by reference numeral 52 calculate the time lengths to be substituted into the variables T(1), T(2), T(3), and T(4) corresponding to Area(1), Area(2), Area(3), and Area(4). The four equations shown by reference numeral 53 assign 1, 4, 2, and 4, i.e., Mode1, Mode4, Mode2, and Mode4, to the variables Mode(1), Mode(2), Mode(3), and Mode(4) corresponding to Area(1), Area(2), Area(3), and Area(4), respectively.
[0061] On the other hand, when "duty<0.5" as indicated by reference numeral 54, the time lengths to be substituted for variables T(1), T(2), T(3), and T(4) corresponding to Area(1), Area(2), Area(3), and Area(4) are calculated by four equations indicated by reference numeral 55. The four equations indicated by reference numeral 56 assign 1, 3, 2, and 3, i.e., Mode1, Mode3, Mode2, and Mode3, to variables Mode(1), Mode(2), Mode(3), and Mode(4) corresponding to Area(1), Area(2), Area(3), and Area(4), respectively.
[0062] Although not shown in Fig. 7, in the case of "duty = 0.5", when the switch element 14A-L is ON, the switch element 14B-L is OFF, and when the switch element 14A-L is OFF, the switch element 14B-L is ON, and the switch elements 14A-L and 14B-L are never both ON or OFF. Therefore, the procedure of "duty > 0.5" in Fig. 7 may be adopted, or the procedure of "duty < 0.5" may be adopted. Regardless of which procedure is adopted, T(2) and T(4) become "0", and as a result, the switch elements 14A-L and 14B-L operate in either Mode 1 or Mode 2.
[0063] The following equation (6) represents the average current I aveIn equation (6), P and V1 are the power value P and the voltage value V1, respectively, included in the parameters taken in by the actual current estimation unit 41. P / V1 on the right side of equation (6) is an equation for calculating the current value of the current supplied from the input terminal 10-1 of the boost device 1. P / V1 is multiplied by 0.5 because, in an ideal state, the current supplied from the input terminal 10-1 is evenly distributed to the two reactors 12A and 12B. Finally, equation (6) is multiplied by 1000 because the power value P is expressed in units of "kW", and therefore the average current value I ave This is to convert it to a value expressed in units of [A].
[0064]
number
[0065] The following formulas (7) to (10) respectively represent the current values I end(1) ,I end(2) ,I end(3) ,I end(4) This is the formula for calculating
[0066]
number
[0067]
number
[0068]
number
[0069]
number
[0070] The operator Im(Mode(X)) (where X=1, 2, 3, or 4) in equations (7) to (10) is an operator that means application of the current increase rate of the current flowing through reactors 12A and 12B in the mode indicated by Mode(X). For example, when performing the calculations of equations (7) to (10) for phase A, if Im(Mode(3)) and Mode(3)=2, then Im(Mode(3)) represents the current increase rate of Mode 2 of phase A, that is, equation (3) in FIG. 6.
[0071] Next, the process performed by the real current estimation unit 41 will be described using the boost chopper circuit model equation described above with reference to Fig. 8. The graph 60 shown in Fig. 8 is a graph represented by data arranging in time series the estimated real reactor current values calculated by the real current estimation unit 41 when the "duty" calculated by the equation (1) is a value larger than 0.5. In Fig. 8, the horizontal axis represents the elapsed time expressed in units of [μs], and the vertical axis represents the current value expressed in units of [A]. The vertical axis represents the current value increasing upward, and the horizontal axis represents the elapsed time increasing rightward.
[0072] The real current estimation unit 41 selects one parameter from the multiple parameters acquired in the process of S1. The real current estimation unit 41 calculates a "duty" using equation (1) based on the voltage values V1 and V2 included in the selected parameters. Here, it is assumed that the real current estimation unit 41 has calculated a duty greater than 0.5 (S2). The real current estimation unit 41 selects an inductance value L corresponding to the power value P included in the selected parameters from the acquired reactor characteristic values. The real current estimation unit 41 reads out a coupling coefficient k from the acquired reactor characteristic values. The real current estimation unit 41 multiplies the selected inductance value L by the coupling coefficient k to calculate a mutual inductance value M (S3). The real current estimation unit 41 calculates an average current value I using equation (6) based on the voltage value V1 and power value P included in the selected parameters. ave It should be noted that the steps S2, S3, and S4 may be performed in any order.
[0073] Here, as described above, the "duty" calculated by the actual current estimation unit 41 is a value larger than 0.5. Therefore, the actual current estimation unit 41 calculates the time length of each of Area(1) to Area(4) using the four equations indicated by reference numeral 52 in FIG. 7, and substitutes the time length into variables T(1) to T(4). As a result, as shown in FIG. 8, the width in the horizontal direction of Area(1) to Area(4), which are each a section obtained by dividing one switching period Ts into four sections, is determined. The actual current estimation unit 41 assigns Mode1, Mode4, Mode2, and Mode4 to Area(1) to Area(4), respectively, using the four equations indicated by reference numeral 53 in FIG. 7 (S5).
[0074] At the start time of Area(1), assuming that Mode1, i.e., switch element 14A-L is turned ON and switch element 14B-L is turned OFF, the actual current estimation unit 41 calculates the current increase rate by substituting the selected inductance value L, the calculated mutual inductance value M, and the voltage values V1 and V2 into equation (2) in FIG. 6 corresponding to Mode1. The actual current estimation unit 41 calculates the current increase rate by substituting the calculated average current value I ave The calculated current increase rate and the time length indicated by the variable T(1) are substituted to obtain the current value I of the reactor 12A at the end time of Area(1). end(1) Calculate.
[0075] At the start time of Area(2), assuming that Mode 4, i.e., both switch elements 14A-L and 14B-L are ON, the actual current estimation unit 41 calculates the current increase rate by substituting the selected inductance value L, the calculated mutual inductance value M, and the voltage value V1 into equation (5) in FIG. 6 corresponding to Mode 4. The actual current estimation unit 41 calculates the current increase rate by substituting the calculated current value I of the reactor 12A into equation (8). end(1) The calculated current increase rate and the time length indicated by the variable T(2) are substituted to obtain the current value I of the reactor 12A at the end time of Area(2). end(2) Calculate.
[0076] At the start time of Area(3), assuming that Mode2, i.e., switch element 14A-L is turned OFF and switch element 14B-L is turned ON, the actual current estimation unit 41 calculates the current increase rate by substituting the selected inductance value L, the calculated mutual inductance value M, and the voltage values V1 and V2 into equation (3) in FIG. 6 corresponding to Mode2. The actual current estimation unit 41 calculates the current increase rate by substituting the calculated current value I of reactor 12A into equation (9). end(2) The calculated current increase rate and the time length indicated by the variable T(3) are substituted to obtain the current value I of the reactor 12A at the end time of Area(3). end(3) Calculate.
[0077] At the start time of Area (4), assuming that Mode 4 has been entered again, the actual current estimation unit 41 calculates the current increase rate by substituting the selected inductance value L, the calculated mutual inductance value M, and the voltage value V1 into equation (5) in FIG. 6 corresponding to Mode 4. The actual current estimation unit 41 calculates the current increase rate by substituting the calculated current value I of the reactor 12A into equation (10). end(3) By substituting the calculated current increase rate and the time length substituted for T(4), the current value I of the reactor 12A at the end time of Area(4) is calculated. end(4) is calculated (S6).
[0078] The actual current estimation unit 41 estimates the current value of the reactor 12A at the start time of Area(1) as a current value I end(4) The actual current estimation unit 41 estimates the first value of the area (1) as the current value I end(4) The final value is the current value I end(1) Then, as indicated by reference numeral 61 in FIG. 8, a straight line is interpolated between the two values (hereinafter, the line segment indicated by reference numeral 61 is referred to as line segment 61).
[0079] The actual current estimation unit 41 estimates the first value of the area (2) as the current value I end(1) The final value is the current value I end(2) Then, as indicated by the reference numeral 62, a straight line is interpolated between the two values (hereinafter, the line segment indicated by the reference numeral 62 will be referred to as the line segment 62). The actual current estimation unit 41 determines the first value of the section Area(3) as the current value I end(2)The final value is the current value I end(3) Then, as indicated by the reference numeral 63, a straight line is interpolated between the two values (hereinafter, the line segment indicated by the reference numeral 63 will be referred to as the line segment 63). The actual current estimation unit 41 sets the first value of the section of Area(4) as the current value I end(3) The final value is the current value I end(4) Then, as indicated by reference numeral 64, a straight line is interpolated between the two values (hereinafter, the line segment indicated by reference numeral 64 is referred to as line segment 64).
[0080] As a result, the changes indicated by the line segments 61, 62, 63, and 64 indicate changes in the current value flowing through the reactor 12A in one switching period Ts, and this change is repeated for each switching period Ts. The actual current estimation unit 41 selects current values from the line segments 61, 62, 63, and 64 that are repeated in multiple switching periods Ts at time intervals that allow the changes indicated by the line segments 61, 62, 63, and 64 to be reproduced, and sets each of the selected current values as an estimated actual reactor current value corresponding to the A-phase reactor 12A. Note that the time intervals that allow the changes indicated by the line segments 61, 62, 63, and 64 in the actual current estimation unit 41 to be reproduced are set to be sufficiently shorter than the sampling intervals in the sampling performed by the sampled current estimation unit 43.
[0081] The actual current estimating unit 41 calculates the estimated actual reactor current value for the B-phase reactor 12B in a similar manner to the procedure for calculating the estimated actual reactor current value for the A-phase reactor 12A described above.
[0082] However, since the inductance values L of both reactors 12A and 12B are the same, the change in the estimated actual reactor current value corresponding to reactor 12B of phase B changes by a switching period Ts / 2 compared to graph 60 showing the change in the estimated actual reactor current value corresponding to reactor 12B of phase A. Therefore, the change in the estimated actual reactor current value corresponding to reactor 12B of phase B shows the change in line segment 63 in Area (1), the change in line segment 64 in Area (2), the change in line segment 61 in Area (3), and the change in line segment 62 in Area (4). Therefore, the actual current estimation unit 41 does not perform the calculations of the equations (7) to (10) and estimates the I calculated in the case of the A-phase reactor 12A. end(3) I end(1) And, I end(4) I end(2) And, I end(1) I end(3) And, I end(2) I end(4) Thus, the estimated actual reactor current value for the B-phase reactor 12B can be calculated.
[0083] The actual current estimation unit 41 outputs data in which the estimated actual reactor current values of the A phase for a predetermined time length are arranged in a time series and data in which the estimated actual reactor current values of the B phase for a predetermined time length are arranged in a time series to the measured current estimation unit 42. The actual current estimation unit 41 associates the data in which the estimated actual reactor current values of the A phase for a predetermined time length are arranged in a time series and the data in which the estimated actual reactor current values of the B phase for a predetermined time length are arranged in a time series with the selected parameters, and outputs the data to the information generation unit 44. Here, the predetermined time length is, for example, a time length m times the switching period Ts, where m is a natural number and m is at least a value of m≧1 (S7).
[0084] (Current measurement circuit model) The current measurement circuit model equation determined in advance in the measured current estimation unit 42 will now be described. The internal circuits of the sensor circuits 17A, 17B and the internal circuits of the filter circuits 18A, 18B provided in the current measurement circuits 16A, 16B can be approximated as an RC (Resistor-Capacitor) circuit 70 provided with a resistor 71 and a capacitor 72 shown in Fig. 9. The RC circuit 70 shown in Fig. 9 is a first-order lag system, and has a transfer function shown in the following equation (11) regarding the input voltage V in (s) and the output voltage V out The relationship with (s) is shown.
[0085]
number
[0086] In equation (11), R is the resistance value of resistor 71, resistive element C is the capacitance of capacitor 72, and CR is the time constant of RC circuit 70. When the transfer function of equation (11) is solved to obtain an equation for time n, which is a discrete time for current value i, the following equation (12) is obtained.
[0087]
number
[0088] In equation (8), i in [n] is the input current value at time n. out [n],i out [n-1] is the output current value at time n and time n-1, respectively. τ is the time constant, i.e., CR. Δt is the time length indicating the time interval between discrete times.
[0089] The measured current estimation unit 42 receives data of the estimated actual reactor current values of A phase arranged in a time series output by the actual current estimation unit 41 and data of the estimated actual reactor current values of B phase arranged in a time series. The measured current estimation unit 42 substitutes the data of the estimated actual reactor current values of A phase arranged in a time series into equation (12) to which the time constant of the sensor circuit 17A is applied, and acquires data of the estimated sensor reactor current values of A phase arranged in a time series, which are estimates of the sensor reactor current values output by the sensor circuit 17A (S8). The measured current estimation unit 42 substitutes the data of the estimated sensor reactor current values of A phase arranged in a time series into equation (12) to which the time constant of the filter circuit 18A is applied, and acquires data of the estimated measured reactor current values of A phase arranged in a time series, which are estimates of the measured reactor current values output by the filter circuit 18A (S9).
[0090] The measured current estimation unit 42 also performs processing in S8 of applying the time constant of the sensor circuit 17B and processing in S9 of applying the time constant of the filter circuit 18B to the captured data in which the estimated actual reactor current values of B phase are arranged in time series, thereby acquiring data in which the estimated measured reactor current values of B phase are arranged in time series. The measured current estimation unit 42 outputs to the sampled current estimation unit 43 the data in which the estimated measured reactor current values of A phase are arranged in time series and the data in which the estimated measured reactor current values of B phase are arranged in time series.
[0091] The sampled current estimation unit 43 receives data in which the estimated measured reactor current values of the A phase are arranged in time series and data in which the estimated measured reactor current values of the B phase are arranged in time series, which are output by the measured current estimation unit 42. The sampled current estimation unit 43 samples the received data in which the estimated measured reactor current values of the A phase are arranged in time series and data in which the estimated measured reactor current values of the B phase are arranged in time series, according to the sampling timing calculated by the processing of S1. By this sampling, the sampled current estimation unit 43 extracts the estimated sampled current values of the A phase in time series from the data in which the estimated measured reactor current values of the A phase are arranged in time series, and extracts the estimated sampled current values of the B phase in time series from the data in which the estimated measured reactor current values of the B phase are arranged in time series. The sampled current estimation unit 43 outputs the extracted data in which the estimated sampled current values of the A phase are arranged in time series and the data in which the estimated sampled current values of the B phase are arranged in time series to the information generation unit 44 (S10).
[0092] The information generating unit 44 receives data in which the estimated actual reactor current values of the A phase are arranged in time series, data in which the estimated actual reactor current values of the B phase are arranged in time series, and data in which parameters are associated with each other, the data being output by the actual current estimating unit 41. The information generating unit 44 receives data in which the estimated sampled current values of the A phase are arranged in time series, the data being output by the sampled current estimating unit 43, and data in which the estimated sampled current values of the B phase are arranged in time series.
[0093] The information generating unit 44 calculates the average value of the A-phase estimated actual reactor current value from the data in which the A-phase estimated actual reactor current values are arranged in a time series. The information generating unit 44 calculates the average value of the A-phase estimated sampled current value from the data in which the A-phase estimated sampled current values are arranged in a time series. The information generating unit 44 subtracts the average value of the A-phase estimated sampled current value from the average value of the A-phase estimated actual reactor current value, and sets the subtracted value as the A-phase current correction value corresponding to the captured parameter. The information generating unit 44 performs the same process as that performed for the A-phase on the data in which the B-phase estimated actual reactor current values are arranged in a time series and the data in which the B-phase estimated sampled current values are arranged in a time series, and calculates the B-phase current correction value corresponding to the captured parameter.
[0094] In this case, since the inductance values L of the A phase and the B phase are assumed to be the same, the data in which the estimated actual reactor current values of the A phase are arranged in a time series is shifted by half a switching period Ts to become the data in which the estimated actual reactor current values of the B phase are arranged in a time series. Therefore, if the time length of the section in which the average value is calculated is a natural number multiple of the switching period Ts, the average value of the estimated actual reactor current values of the A phase and the average value of the estimated actual reactor current values of the B phase will be the same. In this case, the information generating unit 44 may set the average value of the estimated actual reactor current values of the A phase that has already been calculated as the average value of the estimated actual reactor current values of the B phase, instead of calculating the average value of the estimated actual reactor current values of the B phase.
[0095] The information generating unit 44 associates the A-phase current correction value and the B-phase current correction value corresponding to the parameters and records them in an internal area. The information generating unit 44 outputs a processing continuation instruction signal to the actual current estimating unit 41 (S11).
[0096] When the actual current estimation unit 41 receives a processing continuation instruction signal from the information generation unit 44, it selects one of the unselected parameters and starts the processing from S2 onwards again (loop L1s to L1e). If the actual current estimation unit 41 has performed the processing of S2 for all parameters when it receives the processing continuation instruction signal from the information generation unit 44, it outputs a processing end notification signal to the information generation unit 44. This ends the repeated processing of loops L1s to L1e.
[0097] When the information generating unit 44 receives a processing end notification signal from the actual current estimating unit 41, the information generating unit 44 generates correction tables 7A-1, 7A-2, 7A-3, ... for each parameter from a plurality of parameters stored in an internal storage area and the A-phase current correction values corresponding to each of the parameters, and generates correction table group data 7A that compiles the generated correction tables 7A-1, 7A-2, 7A-3, .... Similarly, the information generating unit 44 generates correction table group data 7B from a plurality of parameters stored in an internal storage area and the B-phase current correction values corresponding to each of the parameters (S12). This ends the processing by the correction value detection information generating device 40.
[0098] (When the time constants of the current measurement circuits for phases A and B are the same) In the process of FIG. 5 described above, the inductance values L of the A phase and the B phase are the same. Therefore, there is a relationship in which the data in which the estimated actual reactor current values of the A phase are arranged in a time series is shifted by half a switching period Ts to become the data in which the estimated actual reactor current values of the B phase are arranged in a time series. In addition to the condition that the inductance values L of the A phase and the B phase are the same, it is assumed that the time constants of the sensor circuit 17A and the sensor circuit 17B are the same, and the time constants of the filter circuit 18A and the filter circuit 18B are the same. In the above example, the sampling timings of the A phase and the B phase are the same. Therefore, if the time constants of the sensor circuit 17A and the sensor circuit 17B are the same, and the time constants of the filter circuit 18A and the filter circuit 18B are the same, the data in which the estimated sampled current values of the A phase are arranged in a time series is shifted by half a switching period Ts to become the data in which the estimated sampled current values of the B phase are arranged in a time series.
[0099] In this case, the average value of the estimated actual reactor current value of the A phase and the average value of the estimated actual reactor current value of the B phase become the same, and the average value of the estimated sample current value of the A phase and the average value of the estimated sample current value of the B phase become the same. Therefore, the current correction value of the A phase and the current correction value of the B phase for each parameter become the same, and the correction table group data 7A and the correction table group data 7B become the same data. Therefore, the information generating unit 44 may generate the correction table group data 7A and generate data obtained by duplicating the generated correction table group data 7A as the correction table group data 7B. In addition, when the correction table group data 7A and the correction table group data 7B become the same data in this way, only the correction table group data 7A generated by the information generating unit 44 may be stored in the storage unit 6 of the boost device 1, and the control signal generating unit 5 may refer to the correction table group data 7A stored in the storage unit 6 when performing the processing of the A phase and when performing the processing of the B phase.
[0100] (Regarding the control signal generation unit) 10 is a block diagram showing the internal configuration of the control signal generating unit 5 included in the control unit 3 of the boost device 1, and the flow of processing performed by the control signal generating unit 5. The internal configuration and processing of the control signal generating unit 5 will be described with reference to FIG. 10, on the assumption that the correction table group data 7A and 7B generated by the correction value detection information generating device 40 are stored in the storage unit 6.
[0101] (Internal configuration of the control signal generating unit) The control signal generating unit 5 includes a voltage control unit 81, a current control unit 82, a duty calculation unit 83, and a pulse generating unit 84. The voltage control unit 81 is, for example, an AVR (Automatic Voltage Regulator), and includes a summing point 91, a voltage PI (Proportional-Integral) block 92, and a multiplication block 93. The voltage control unit 81 calculates a target current value tr-I1 that is a target value of a current value I1 flowing through the magnetic coupling reactor 12 from a target voltage value tr-V2 that is a target value of a voltage value V2 between the output terminals 20.
[0102] The current control unit 82 is, for example, an ACR (Automatic Current Regulator), and includes a 0.5 multiplication block 94, current value correction blocks 95A and 95B, summing points 96A and 96B, and current PI blocks 97A and 97B. The current control unit 82 calculates the voltage V between both terminals of the reactor 12A from the target current value tr-I1. LA The target voltage tr-V LA and the voltage V between the two terminals of the reactor 12B LB The target voltage tr-V LB Calculate the following:
[0103] The duty calculation unit 83 includes division blocks 98A and 98B and summing points 99A and 99B. The duty calculation unit 83 calculates the target voltage value tr-V LA ,tr-V LB A pulse generating unit 84 calculates the on-duty ratios of switching elements 14A-U and 14B-U of the upper arm from the on-duty ratios of switching elements 14A-U and 14B-U of the upper arm. A pulse generating unit 84 generates a control signal to be output to each gate terminal of switching elements 14A-U, 14A-L, 14B-U, and 14B-L from the on-duty ratios of switching elements 14A-U and 14B-U of the upper arm.
[0104] As described above, the control signal generating unit 5 is supplied with the voltage values V1 and V2 as feedback information from a first voltage measuring circuit that measures the voltage value V1 between the input terminals 10 (not shown) and a second voltage measuring circuit that measures the voltage value V2 between the output terminals 20. Hereinafter, the voltage values V1 and V2 as feedback information will be referred to as the voltage value fb-V1 and the voltage value fb-V2, respectively. The control signal generating unit 5 is supplied with the sampled current values of phases A and B as feedback information from each of the AD converting units 4A and 4B. Hereinafter, the sampled current values of phases A and B as feedback information will be referred to as the sampled current value fb-I, respectively. LA , sample current value fb-I LB He said.
[0105] The control signal generating unit 5 further includes a functional unit (hereinafter referred to as a boost ratio calculating unit) that calculates a boost ratio (not shown) and a functional unit (hereinafter referred to as a reverse boost ratio calculating unit) that calculates a reverse boost ratio. The boost ratio calculating unit takes in the voltage value fb-V2 and the voltage value fb-V1 that are supplied as feedback information, and calculates the ratio between the taken-in voltage value fb-V2 and the voltage value fb-V1, that is, the boost ratio fb-V2 / fb-V1. The reverse boost ratio calculating unit takes in the voltage value fb-V1 and the voltage value fb-V2 that are supplied as feedback information, and calculates the ratio between the taken-in voltage value fb-V1 and the voltage value fb-V2, that is, the reverse boost ratio fb-V1 / fb-V2.
[0106] (Processing by the voltage control unit of the control signal generation unit) In the voltage control unit 81, the summing point 91 receives the target voltage value tr-V2 given from the outside and the voltage value fb-V2 supplied as feedback information. The summing point 91 outputs a subtraction value obtained by subtracting the voltage value fb-V2 from the target voltage value tr-V2. The voltage PI block 92 receives the subtraction value output by the summing point 91, performs PI control on the received subtraction value for voltage, for which parameters for PI control are previously determined, and calculates and outputs a target current value tr-I2, which is a target value of the current value I2 between the output terminals 20. The multiplication block 93 multiplies the target current value tr-I2 output by the voltage PI block 92 by the boost ratio fb-V2 / fb-V1 output by the boost calculation unit, and calculates and outputs a target current value tr-I1, which is a target value of the current value I1 flowing through the magnetic coupling reactor 12.
[0107] (Processing by the current control unit of the control signal generation unit) In the current control unit 82, the 0.5 multiplication block 94 calculates the target current value of each of the current supplied to the A-phase reactor 12A and the current supplied to the B-phase reactor 12B. That is, the 0.5 multiplication block 94 takes in the target current value tr-I1 output by the multiplication block 93, multiplies the taken-in target current value tr-I1 by 0.5, and calculates and outputs the target current value (tr-I1) / 2 of each of the A-phase and B-phase.
[0108] The process performed by the current control unit 82 for the A phase will be described below. The current value correction block 95A calculates the sample current value fb-I LA The current value correction block 95A takes in the sample current value fb-I, the voltage value fb-V1, the voltage value fb-V2, and the power value P given from outside. The current value correction block 95A selects a correction table corresponding to the voltage value fb-V2 from among the correction tables 7A-1, 7A-2, 7A-3, ... included in the correction table group data 7A stored in the storage unit 6. The current value correction block 95A detects, as the current correction value, the value of an element in the correction table corresponding to the selected voltage value fb-V2, whose horizontal power value matches the taken-in power value P and whose vertical voltage value matches the voltage value fb-V1. The current value correction block 95A detects, as the current correction value, the value of an element in the correction table corresponding to the selected voltage value fb-V2, whose horizontal power value matches the taken-in power value P and whose vertical voltage value matches the voltage value fb-V1. LA The corrected reactor current value CI is calculated by adding the detected current correction value to the LA Calculate the corrected reactor current value CI LA Output.
[0109] The summing point 96A is a sum of the target current value (tr-I1) / 2 output by the 0.5 multiplication block 94 and the corrected reactor current value CI output by the current value correction block 95A. LA The summing point 96A takes in the corrected reactor current value CI from the target current value (tr-I1) / 2. LA The current PI block 97A receives the subtraction value output by the summing point 96A, and performs PI control on the received subtraction value, for which parameters for PI control are predefined, to obtain the voltage V LA The target voltage tr-V LA Calculate and output.
[0110] In the current control unit 82, the same process as that performed for the A phase is performed, except that the current value correction block 95A is replaced with a current value correction block 95B, and the sample current value fb-I LA The sample current value fb-I LB, the correction table group data 7A is replaced with the correction table group data 7B, the correction tables 7A-1, 7A-2, 7A-3, ... are replaced with the correction tables 7B-1, 7B-2, 7B-3, ..., and the correction reactor current value CI LA Correct the reactor current value CI LB The summing point 96A is replaced with a summing point 96B, and the current PI block 97A is replaced with a current PI block 97B. This causes the current PI block 97B of the B phase to detect the voltage V LB The target voltage value tr-V LB Calculate and output.
[0111] Here, an example of the change when the current correction value is applied will be described with reference to Fig. 11. Fig. 11 is a diagram in which the change caused by the application of the current correction value is added to Fig. 2. Sample current value fb-I LA are supplied to the current value correction block 95A in chronological order as values at the positions indicated by the reference characters 31, 32, 33, and 34. In this case, the current value correction block 95A calculates the sample current values fb-I LA Assume that all the current correction values detected for the sample current value fb-I are positive values. In this case, the current correction value is applied by the current value correction block 95A, and the sample current value fb-I LA The corrected reactor current value CI corresponding to LA The sample current value fb-I at the position of the reference numeral 32 is LA The corrected reactor current value CI corresponding to LA The sample current value fb-I at the position of the reference numeral 33 is LA The corrected reactor current value CI corresponding to LA The sample current value fb-I at the position of the reference numeral 37 is LA The corrected reactor current value CI corresponding to LA is located at the position indicated by reference numeral 38. As a result, the sample current values fb-I arranged in time series indicated by reference numeral 29 are LA The average value of the actual reactor current I LAwill approach the average value of
[0112] (Processing by the duty calculation unit of the control signal generation unit) The process performed for the A phase in the duty calculation unit 83 will be described below. The division block 98A divides the target voltage value tr-V LA and the voltage value fb-V2 supplied as feedback information. The division block 98A takes in the target voltage value tr-V LA Divide by the voltage value fb-V2 to get tr-V LA / fb-V2 is calculated and output. The summing point 99A calculates and outputs tr-V LA / fb-V2 and the reverse boost ratio fb-V1 / fb-V2 output by the reverse boost ratio calculation unit. The summing point 99A takes in fb-V1 / fb-V2 to tr-V LA / fb-V2 is subtracted to get {(fb-V1)-(tr-V LA )} / fb-V2 is calculated. LA )} / fb-V2 is the on-duty ratio (DutyA) of the switching element 14A-U of the upper arm of phase A. A summing point 99A outputs the calculated on-duty ratio (DutyA) of the switching element 14A-U of the upper arm of phase A.
[0113] In the duty calculation unit 83, the same process as that performed for the A phase is performed, except that the division block 98A is replaced with the division block 98B, the current PI block 97A is replaced with the current PI block 97B, and the target voltage value tr-V LA The target voltage value tr-V LB and summing point 99A is read as summing point 99B, and the process is performed for phase B. As a result, summing point 99B is {(fb-V1)-(tr-V LB )} / fb-V2 is calculated. LB) / fb-V2 is the on-duty ratio (DutyB) of the switch element 14B-U in the upper arm of phase B. A summing point 99B outputs the calculated on-duty ratio (DutyB) of the switch element 14B-U in the upper arm of phase B.
[0114] (Processing by the pulse generating unit of the control signal generating unit) The pulse generating unit 84 includes a PWM (Pulse Width Modulation) circuit therein. The pulse generating unit 84 receives a switching period Ts provided from the outside. The process performed by the pulse generating unit 84 for the A phase will be described below. The pulse generating unit 84 receives an on-duty ratio (DutyA) of the upper arm switch element 14A-U output from the summing point 99A. The pulse generating unit 84 generates a pulse signal indicating the timing of switching the upper arm switch element 14A-U and the lower arm switch element 14A-L between ON and OFF in one switching period Ts received by the PWM circuit based on the received DutyA. The pulse generating unit 84 repeatedly outputs a pulse signal for the upper arm as a control signal to the gate terminal of the switch element 14A-U and outputs a pulse signal for the lower arm as a control signal to the gate terminal of the switch element 14A-L every switching period Ts.
[0115] In pulse generating unit 84, the same processing as that performed for phase A is performed, except that summing point 99A is replaced with summing point 99B, switching element 14A-U is replaced with switching element 14B-U, switching element 14A-L is replaced with switching element 14B-L, and Duty A is replaced with Duty B.
[0116] (Actions and Effects of This Embodiment) In the boost device 1 according to the embodiment described above, correction table group data 7A, 7B, which is correction value detection information used for detecting a current correction value, is stored in advance in the storage unit 6. The correction table group data 7A, 7B includes correction tables 7A-1, 7A-2, 7A-3, ... and correction tables 7B-1, 7B-2, 7B-3, ... which indicate the relationship between the current correction value and information related to the electrical input / output of the boost chopper circuit 2, such as the voltage value V1 between the input terminals 10, the voltage value V2 between the output terminals 20, and the power value P of the power supplied by the battery connected to the input terminals 10.
[0117] The correction table group data 7A, 7B are data generated by a correction value detection information generating device 40. In the correction value detection information generating device 40, an actual current estimating unit 41 calculates an estimated actual inductor current value corresponding to each of a plurality of parameters generated by combining information related to the electrical input / output of the boost chopper circuit 2, based on the reactor characteristic values of the reactors 12A, 12B, the switching period Ts of the boost chopper circuit 2, and a boost chopper circuit model equation that models the boost chopper circuit 2.
[0118] The measured current estimation unit 42 calculates an estimated measured inductor current value for each parameter from the estimated real inductor current value for each parameter based on a current measurement circuit time constant, which is the time constant of the current measurement circuits 16A, 16B, and a current measurement circuit model equation that models the current measurement circuits 16A, 16B. The sample current estimation unit 43 samples the estimated measured inductor current value for each parameter at the same sampling timing as the sampling timing of the AD conversion units 4A, 4B, and extracts an estimated sample current value for each parameter. The information generation unit 44 calculates a current correction value for each parameter from the estimated real inductor current value calculated by the real current estimation unit 41 and the estimated sample current value extracted by the sample current estimation unit 43, and generates correction table group data 7A, 7B indicating the relationship between the parameters and the current correction values.
[0119] The control signal generating unit 5 included in the control unit 3 of the boost device 1 receives the sampled current value fb-I from the AD conversion units 4A and 4B. LA,fb-I LB When the control signal generating unit 5 obtains the sample current value fb-I, the control signal generating unit 5 detects the current correction values of the A phase and the B phase from the correction table group data 7A and 7B based on the information related to the electrical input / output of the boost chopper circuit 2 at the time of obtaining the sample current value fb-I, i.e., the voltage values fb-V1 and fb-V2 included in the feedback information and the power value P given from the outside. LA ,fb-I LB The corrected reactor current value CI is obtained by applying the corresponding current correction value to each of the LA ,CI LB Calculate.
[0120] The control signal generating unit 5 generates a corrected reactor current value CI LA ,CI LB The voltage values fb-V1 and fb-V2 included in the feedback information, i.e., the information related to the electrical input / output of the boost chopper circuit 2 when the above is calculated, and the calculated corrected reactor current value CI LA ,CI LB Based on this, feedback control is performed with the control target value set to the target voltage value tr-V2. The control signal generating unit 5 generates a control signal indicating switch timing for one switching period Ts such that the phase difference between the drive phases of the boost circuits 13A and 13B, which are driven in the same switching period Ts, coincides with 180° while the voltage value V2 between the output terminals 20 approaches the target voltage value tr-V2 through the feedback control. The control signal generating unit 5 outputs the generated control signal to the gate terminals of the switch elements 14A-U, 14A-L, 14B-U, and 14B-L repeatedly for each switching period Ts.
[0121] A current measurement circuit used for feedback control, such as the current measurement circuits 16A and 16B included in the boost device 1, is required to have high responsiveness in order to follow the feedback control. On the other hand, when the current measurement circuits 16A and 16B having such high responsiveness are used, the actual reactor current value I LA ,I LB The average value of each of the sample current values fb-I LA ,fb-I LBTherefore, the control signal generating unit 5 generates a difference between the average value of the sampled current value fb-I supplied from the AD conversion units 4A and 4B. LA ,fb-I LB If feedback control is performed using the above as is, good controllability cannot be obtained.
[0122] In contrast, in this embodiment, the correction value detection information generating device 40 calculates a current correction value that compensates for the difference for each of a plurality of parameters generated by combining information related to the electrical input / output of the boost chopper circuit 2, and generates the correction table group data 7A, 7B. Each time feedback information is supplied, the control signal generating unit 5 detects a current correction value corresponding to the information related to the electrical input / output of the boost chopper circuit 2 at the time when the feedback information was supplied from the correction table group data 7A, 7B generated by the correction value detection information generating device 40. Based on the detected current correction value, the control signal generating unit 5 calculates the sample current value fb-I supplied from the AD conversion units 4A, 4B. LA ,fb-I LB The corrected reactor current value CI is calculated by correcting LA ,CI LB get.
[0123] In other words, by using the boost device 1 of this embodiment and the correction value detection information generating device 40, in the multi-phase boost chopper circuit 2, the actual reactor current value I LA ,I LB The average value of each of the sample current values fb-I LA ,fb-I LB The difference between the average value of the corrected reactor current CI can be corrected. LA The average value of is the actual reactor current I, which is the current value of the current actually flowing through the reactor 12A. LA The corrected reactor current value CI obtained by the correction approaches the average value of LB The average value of is the actual reactor current I LBTherefore, in the feedback control performed by the control signal generating unit 5, good controllability can be obtained.
[0124] (Another configuration example of this embodiment) In the above embodiment, the parameters given to the correction value detection information generating device 40 are selected from a plurality of voltage values V1, a plurality of voltage values V2, and a plurality of power values P, one for each of V1, V2, and P, and combined. In contrast, the current value V2 may be a parameter fixed to, for example, the target voltage value tr-V2. In other words, the parameter may be a combination of a plurality of voltage values V1 and a plurality of power values P, one for each of V1 and P, plus the target voltage value tr-V2. In this case, the correction table group data 7A generated by the correction value detection information generating device 40 includes only one correction table 7A-1 with an index of "voltage value V2 = target voltage value tr-V2", and the correction table group data 7B also includes only one correction table 7B-1 with an index of "voltage value V2 = target voltage value tr-V2". Therefore, each of the current value correction blocks 95A, 95B of the control signal generating unit 5 does not need to retrieve a correction table from the correction table group data 7A, 7B, and therefore does not need to import the voltage value fb-V2, and detects the A-phase and B-phase current correction values from the corresponding correction tables 7A-1, 7B-1, respectively, based on the voltage value fb-V1 and the power value P. Note that the voltage value V2 may be fixed to a constant value other than the target voltage value tr-V2 to generate parameters.
[0125] In the above embodiment, the inductance value of the reactor 12A and the inductance value of the reactor 12B are values that show the same change depending on the power value P, and are inductance values that are the same for the same power value P. In contrast, it is assumed that the inductance value of the reactor 12A and the inductance value of the reactor 12B are the same inductance value that does not change depending on the power value P, or the change in the inductance value depending on the power value P is small, and there is no problem in determining one inductance value common to the reactors 12A and 12B as a representative value. In this case, the reactor characteristic value provided to the actual current estimation unit 41 includes one inductance value L common to the reactors 12A and 12B. Therefore, in the process of S3 in FIG. 5, the actual current estimation unit 41 does not select the inductance value L corresponding to the power value P from among the reactor characteristic values, but reads out one inductance value L included in the reactor characteristic value and applies the read inductance value L to the subsequent processes.
[0126] In this way, if the inductance values L of the reactors 12A and 12B are constant and the same value, which does not change with the power value P, the current increase rates in the formulas (7) to (10) do not change with the power value P. Therefore, the graph 60 showing the change in the estimated actual reactor current value shown in FIG. 8 shows that the I on the horizontal axis does not change even if the power value P changes. end(1) ~I end(4) The value of is the reference current average value I ave In other words, even if the power value P changes, the shape of the graph 60 does not change. Therefore, regardless of the value of the power value P, if the combination of the voltage value V1 and the voltage value V2 is the same, the same current correction value will be obtained.
[0127] Therefore, when the inductance values of the reactors 12A and 12B are constant values that do not change with the power value P and are the same value, a correct current correction value can be calculated without using the power value P. Therefore, the power value P included in the parameters given to the correction value detection information generating device 40 may be fixed to a constant value, for example, "0". In other words, the parameters may be a combination of a plurality of voltage values V1 and a plurality of voltage values V2, one for each of V1 and V2, and a predetermined constant value added as the power value P. Also, the power value P may not be included in the parameters. In this case, the actual current estimating unit 41 applies a predetermined constant value as the power value P to "P" in equation (6) when performing the calculation of equation (6).
[0128] When the correction table group data 7A, 7B is generated by fixing the power value P to a constant value, each of the correction tables 7A-1, 7A-2, 7A-3, ... and the correction tables 7B-1, 7B-2, 7B-3, ... included in the correction table group data 7A, 7B has only one numerical value corresponding to the constant value as a sub-item of the horizontal power value P, and is a table with only one column. In this case, it is not necessary to provide the power value P to the control signal generating unit 5. Each of the current value correction blocks 95A, 95B of the control signal generating unit 5 only needs to detect the current correction values of the A phase and the B phase from the corresponding correction tables 7A-1, 7A-2, 7A-3, ... and the correction tables 7B-1, 7B-2, 7B-3, ... based on the two numerical values of the voltage values fb-V1 and fb-V2.
[0129] When the power value P is fixed to a constant value, the voltage value V2 may be fixed to a constant value such as the target voltage value tr-V2. In this case, the correction table group data 7A, 7B includes one correction table 7A-1, 7B-1, respectively. Each of the correction tables 7A-1, 7B-1 has an index of "voltage value V2 = fixed constant voltage value V2" and is a table with only one column in which only one numerical value corresponding to the fixed constant power value P is indicated in the subitem of the horizontal power value P. In this case, each of the current value correction blocks 95A, 95B of the control signal generating unit 5 detects the current correction values of the A phase and the B phase from the corresponding correction tables 7A-1, 7B-1, respectively, based on only the voltage value fb-V1, without taking in the voltage value fb-V2.
[0130] In the above embodiment, the correction value detection information generated by the correction value detection information generating device 40 is in a data format such as the correction table 7A-1 shown in FIG. 3. In contrast to this, the correction value detection information generating device 40 may generate, as the correction value detection information, a function indicating the relationship between the information related to the electric input / output of the boost chopper circuit 2 and the current correction value. For example, as such a function, the information generating unit 44 of the correction value detection information generating device 40 may generate a function indicating the relationship between the voltage value V1 and the current correction value, which is a plurality of functions for each combination of the voltage value V2 and the power value P. The function indicating the relationship between the voltage value V1 and the current correction value may be a function in a format including a plurality of functions that approximate the relationship between the voltage value V1 and the current correction value for each range of the voltage value V1, for example, by dividing the voltage value V1 into ranges such as 200V to 240V, 245V to 300V, and 305V to 400V.
[0131] In the above embodiment, the inductance value of the reactor 12A and the inductance value of the reactor 12B are the same, but the inductance value of the reactor 12A and the inductance value of the reactor 12B may be different. In this case, for the A phase, instead of the formulas (2), (3), (4), and (5) shown in FIG. 6, the formulas (2), (3), (4), and (5) shown in FIG. 12 are applied, and for the B phase, the formulas (2B), (3B), (4B), and (5B) shown in FIG. 12 are applied. In FIG. 12, L1 is the inductance value of the reactor 12A, and L2 is the inductance value of the reactor 12B. In addition, when the inductance value of the reactor 12A and the inductance value of the reactor 12B change depending on the power value P, the inductance values of the reactors 12A and 12B may have different changes.
[0132] As shown in the above embodiment, the boost chopper circuit 2 is two-phase, but may be a boost chopper circuit with three or more phases. The boost chopper circuit 2 includes an input terminal 10, a capacitor 11, boost circuits 13A and 13B, a smoothing capacitor 19, and an output terminal 20, but may be a boost chopper circuit that does not include the input side capacitor 11, as in a boost device 200 shown in FIG. 15. The boost circuits 13A and 13B of the boost chopper circuit 2 include upper arm switch elements 14A-U and 14B-U, but may be a boost chopper circuit that does not include upper arm switch elements 14A-U and 14B-U, as in a boost device 200 shown in FIG. 15. Although the boost circuits 13A and 13B of the boost chopper circuit 2 are equipped with freewheeling diodes 15A-U, 15A-L, 15B-U, and 15B-L, the boost chopper circuit may be a boost chopper circuit that does not include the freewheeling diodes 15A-U, 15A-L, 15B-U, and 15B-L. However, if the boost chopper circuit 2 is a boost chopper circuit that does not include the switch elements 14A-U and 14B-U in the upper arm, a diode is required in the upper arm as in the boost device 200 in FIG.
[0133] In the above embodiment, the reactor 12A and the reactor 12B are magnetically coupled, but they may not be magnetically coupled. In this case, the coupling coefficient k is not included in the reactor characteristic value provided to the actual current estimation unit 41. In the case of a boost chopper circuit having three or more phases, all of the reactors included in each of the boost circuits forming the boost chopper circuit may not be magnetically coupled, some of the reactors may be magnetically coupled, or all of the reactors may be magnetically coupled.
[0134] In the above embodiment, the sampling timings of the AD conversion units 4A and 4B are the same, and one detection timing corresponding to the sampling timing common to the AD conversion units 4A and 4B is provided to the sample current estimation unit 43 of the correction value detection information generating device 40. In contrast, when the sampling timing of the AD conversion unit 4A is different from the sampling timing of the AD conversion unit 4B, the sample current estimation unit 43 is provided with two detection timings, that is, the detection timing for the A phase corresponding to the sampling timing of the AD conversion unit 4A and the detection timing for the B phase corresponding to the sampling timing of the AD conversion unit 4B. In this case, the sample current estimation unit 43 calculates the sampling timing for the A phase from the detection timing for the A phase and calculates the sampling timing for the B phase from the detection timing for the B phase in the process of S1 in FIG. 5. In the process of S10 in FIG. 5, the sampled current estimation unit 43 samples the data in which the estimated measured reactor current values of phase A are arranged in time series at the sampling timing for phase A to extract data in which the estimated sampled current values of phase A are arranged in time series, and samples the data in which the estimated measured reactor current values of phase B are arranged in time series at the sampling timing for phase B to extract data in which the estimated sampled current values of phase B are arranged in time series.
[0135] In the above-described embodiment, the switch elements 14A-U, 14A-L, 14B-U, and 14B-L are, for example, IGBTs. Alternatively, bipolar transistors or MOSFETs (Metal Oxide Semiconductor Field Effect Transistors) may be used as the switch elements 14A-U, 14A-L, 14B-U, and 14B-L. When MOSFETs are used, for example, the freewheel diodes 15A-U, 15A-L, 15B-U, and 15B-L may not be provided, and the parasitic diodes of the switch elements 14A-U, 14A-L, 14B-U, and 14B-L, which are MOSFETs, may be used instead of the freewheel diodes 15A-U, 15A-L, 15B-U, and 15B-L.
[0136] In the above embodiment, the current measurement circuits 16A and 16B are respectively provided with the sensor circuits 17A and 17B and the filter circuits 18A and 18B. In contrast, the current measurement circuits 16A and 16B may be circuits that include only the sensor circuits 17A and 17B, or may be circuits that measure a current other than that constituted by the sensor circuits 17A and 17B and the filter circuits 18A and 18B.
[0137] In the embodiment described above, the control target of the control signal generating unit 5 is the target voltage value tr-V2 of the voltage value V2. In contrast to this, for example, the control target of the control signal generating unit 5 may be the current value of the current flowing through each of the reactors 12A and 12B, the current value of the current supplied to the load connected to the output terminal 20, or any other value related to the electrical input / output of the boost chopper circuit 2.
[0138] (Other uses of current correction value) The control signal generating unit 5 of the boosting device 1 corrects the reactor current value CI of the reactor 12A using the current correction value detected from the correction table group data 7A and 7B in the storage unit 6. LA , and the corrected reactor current value CI of reactor 12B LBBy using either one or both of the above, it becomes possible to estimate the temperature and the resistance value as described below.
[0139] (Temperature estimation usage) The condenser 100 shown in FIG. 13 is, for example, a condenser connected to input terminals 10-1 and 10-2 of a booster 1. If the condenser 100 is not used when the temperature of the electrode plate is below a predetermined temperature, its lifespan may be shortened. However, the temperature of the electrode plate present in the electrolyte cannot be measured directly. In such a case, a situation is assumed in which the location of the electrode plate present in the electrolyte is set as a measurement target location 101 in the condenser 100, and the temperature Ta of the measurement target location 101 is monitored.
[0140] 13 is connected to the control signal generating unit 5 of the boost device 1. The temperature estimating device 110 receives the corrected reactor current value CI LA and the corrected reactor current value CI LB The temperature estimation device 110 includes a temperature sensor, and measures the temperature Tb at a location 102 that can be measured from outside the electricity storage device (hereinafter, referred to as the measurable location 102) by the temperature sensor.
[0141] If the thermal resistance value of thermal resistor 103 in electricity storage pack 100 is thermal resistance value Rth, temperature Ta of measurement target point 101 can be calculated by the following formula (13).
[0142]
number
[0143] The thermal resistance value Rth is a value indicating the difficulty of heat transfer, and is expressed in units of, for example, [°C / W]. The "loss" shown in formula (13) indicates the amount of heat at the measurable location 102, and the "loss" can be calculated, for example, from the current value I of the current flowing through the battery 100. Therefore, the temperature estimation device 110 estimates the corrected reactor current value CI LA and the corrected reactor current value CILB and calculates the current value I of the current flowing through the battery 100, and calculates the "loss" in equation (13) from the calculated current value I. The temperature estimation device 110 calculates the temperature Ta of the measurement target location 101 by substituting the temperature Tb of the measurable location 102 measured by the temperature sensor and the calculated "loss" into equation (13). The value of the temperature Ta calculated by the temperature estimation device 110 is a corrected reactor current value CI that approximates with high accuracy the current value of the current actually flowing through the reactors 12A and 12B. LA and the corrected reactor current value CI LB Since the temperature value is calculated from the above, it is a highly accurate temperature value.
[0144] In the above, an example has been described in which the target is the electric storage device 100 and the location of the electrode plate of the electric storage device 100 is the measurement target location 101. In contrast to this, for example, instead of the electric storage device 100, an element such as a semiconductor present in the boost device 1 may be the target. There is a situation in which such an element is also destroyed when the temperature of a specific location exceeds a predetermined temperature. In this case, for example, if the specific location is a location where the temperature cannot be measured directly or a location where the temperature becomes too high to be measured by a temperature sensor, the specific location is set as the measurement target location 101, and a measurable location of the element is set as the measurable location 102, and the temperature value of the measurement target location 101 can be estimated by the temperature estimation device 110 in the same procedure as above.
[0145] (How resistance estimation is used) For example, assume that a case is to measure the resistance value of the internal resistance 105 in the battery 100 connected to the input terminals 10-1 and 10-2. An internal resistance estimation device 120 shown in FIG. 14 is connected to the control signal generation unit 5 of the boost device 1. The internal resistance estimation device 120 receives a corrected reactor current value CI LA and the corrected reactor current value CI LB The internal resistance estimation device 120 is connected to the input terminals 10-1 and 10-2 of the boost device 1, and measures the voltage value V1 between the input terminals 10-1 and 10-2.
[0146] The internal resistance estimation device 120 acquires the corrected reactor current value CI LA and the corrected reactor current value CI LB and calculates the current value I of the current flowing through the battery 100. The internal resistance estimation device 120 calculates the resistance value of the internal resistance 105 by dividing the measured voltage value V1 between the input terminals 10-1, 10-2 by the calculated current value I. The resistance value of the internal resistance 105 calculated by the internal resistance estimation device 120 is a corrected reactor current value CI that approximates with high accuracy the current value of the current actually flowing through the reactors 12A, 12B. LA and the corrected reactor current value CI LB Since the resistance value is calculated using and, the resistance value is highly accurate.
[0147] When the inductance values of the reactor 12A and the reactor 12B are the same, the temperature estimation device 110 and the internal resistance estimation device 120 estimate the corrected reactor current value CI LA and the corrected reactor current value CI LB Instead of adding and, the corrected reactor current value CI LA , and the corrected reactor current value CI LB Alternatively, the temperature estimation device 110 and the internal resistance estimation device 120 may calculate the corrected reactor current value CI LA , and the corrected reactor current value CI LB It is sufficient to obtain either one of the above from the control signal generating unit 5.
[0148] In the above-described use of the temperature estimation device 110 and the internal resistance estimation device 120, the controllability required for feedback control is not required, so that, for example, a current measurement circuit with a large time constant and slow response can be used to obtain and use a sample current value whose average value is small in difference from the actual reactor current value. In this case, however, the boost device 1 must be provided with a current measurement circuit with a large time constant and slow response in addition to the current measurement circuits 16A and 16B. In contrast, as shown in Figs. 13 and 14, the corrected reactor current value CI output by the control signal generation unit 5 is LA ,CILB By utilizing this, it becomes possible to estimate the temperature value and the resistance value without increasing the number of components of the voltage boosting device 1.
[0149] The control signal generating unit 5 and the correction value detection information generating device 40 according to the above-described embodiment can be configured using a computer such as a microcomputer or a CPU (Central Processing Unit), and hardware such as peripheral circuits and devices of the computer. The control signal generating unit 5 includes a voltage control unit 81, a current control unit 82, a duty calculation unit 83, and a pulse generating unit 84 as a functional configuration configured by a combination of hardware and software such as a program executed by the computer, and the correction value detection information generating device 40 includes an actual current estimating unit 41, a measured current estimating unit 42, a sample current estimating unit 43, and an information generating unit 44 as a functional configuration configured by a combination of hardware and software such as a program executed by the computer.
[0150] The control signal generating unit 5 and the correction value detection information generating device 40 may be configured using a custom LSI (Large Scale Integrated Circuit) such as a PLD (Programmable Logic Device). Examples of PLDs include PAL (Programmable Array Logic), GAL (Generic Array Logic), CPLD (Complex Programmable Logic Device), and FPGA (Field Programmable Gate Array). In this case, some or all of the functions realized by the processor may be realized by the integrated circuit.
[0151] A part or all of the programs executed by the computer in the above-described embodiment can be distributed via a computer-readable recording medium or a communication line.
[0152] In the above-described embodiment, the reactors 12A and 12B are elements that realize the properties of inductance and are a type of inductor. That is, there are elements that realize various inductance properties other than those called reactors. Such elements that realize various inductance properties other than those called reactors may be applied to the boost device 1 in place of the reactors 12A and 12B. In consideration of such application, it is preferable to use the names inductors 12A and 12B as names that include the reactors 12A and 12B, and in the case of using the names inductors 12A and 12B, all the descriptions of "reactor" in the above-described embodiment are to be read as "inductor".
[0153] Although an embodiment of the present invention has been described above with reference to the drawings, the specific configuration is not limited to the above embodiment, and also includes design modifications and the like within the scope of the gist of the present invention. [Explanation of symbols]
[0154] 1...Boost device 2...Boost chopper circuit 3...Control unit 4A, 4B...AD conversion unit 5...Control signal generation unit 6...Memory unit 7A, 7B...Correction table group data 10, 10-1, 10-2...Input terminal 11...Capacitor 12...Magnetic coupling reactor 12A, 12B...Reactor 13A, 13B...Boost circuit 14A-U, 14A-L, 14B-U, 14B-L...Switch element 15A-U, 15A-L, 15B-U, 15B-L...Freewheel diode 16A, 16B...Current measurement circuit 17A, 17B...Sensor circuit 18A, 18B...Filter circuit 19...Smoothing capacitor 20, 20-1, 20-2...Output terminal 40...Correction value detection information generation unit 41...Actual current estimation unit 42...Measured current estimation unit 43... Sample current estimation unit 44... Information generation unit
Claims
1. a multi-phase boost chopper circuit formed by a plurality of boost circuits each having an inductor and a switch element, and a smoothing capacitor; a plurality of current measurement circuits for measuring the current through each of the inductors to obtain measured inductor current values; a control unit which drives the switch elements so that a phase difference between the drive phases of the boost circuits, each of which is driven in the same switching cycle, coincides with a phase amount obtained by dividing 360° by the number of the boost circuits, while approaching a predetermined control target value by performing feedback control based on a corrected inductor current value obtained by applying a current correction value to a sampled current value obtained by sampling the measured inductor current value at a constant sampling interval, the current correction value correcting a difference between an average value of the sampled current value and an average value of a real inductor current value, which is a true value of a current flowing through the inductor, the difference occurring depending on the number of the boost circuits, and a voltage value between the input terminals and the output terminals of the boost chopper circuit; A booster device comprising:
2. a storage unit that stores in advance information related to an electrical input / output of the boost chopper circuit, the information including at least a voltage value between input terminals of the boost chopper circuit, and correction value detection information indicating a relationship between the current correction value, The control unit is Detecting the current correction value based on information related to an electrical input / output of the boost chopper circuit when the sample current value is obtained and the correction value detection information, and applying the detected current correction value to the sample current value to obtain the corrected inductor current value. The boosting device according to claim 1 .
3. A device for generating information for correction value detection, which generates information for correction value detection indicating a relationship between a current correction value used for correcting a difference between an average value of a real inductor current value, which is a true value of a current flowing through an inductor included in a boost chopper circuit of a boost device that performs interleaving control of the boost chopper circuit and an average value of a sampled current value obtained by measuring the current flowing through the inductor by a current measuring circuit and sampling the current at a constant sampling interval, and information related to an electrical input / output of the boost chopper circuit, an actual current estimating unit that calculates an estimated actual inductor current value for each of a plurality of parameters that are generated by combining information related to an electrical input / output of the boost chopper circuit, based on an inductor characteristic value indicating a characteristic of the inductor, a switching period of the boost chopper circuit, and a boost chopper circuit model equation that models the boost chopper circuit; a measured current estimating unit that calculates an estimated measured inductor current value for each of the parameters from the estimated actual inductor current value for each of the parameters based on a time constant of the current measuring circuit and a current measuring circuit model equation that models the current measuring circuit; a sampled current estimator that samples the estimated measured inductor current value for each of the parameters at a sampling timing identical to a sampling timing of the sampling interval, and extracts an estimated sampled current value for each of the parameters; an information generating unit that calculates the current correction value for each of the parameters from the estimated actual inductor current value and the estimated sample current value, and generates the correction value detection information indicating a relationship between the parameters and the current correction value; A correction value detection information generating device comprising:
4. the information relating to the electrical input / output of the boost chopper circuit includes a voltage value between input terminals of the boost chopper circuit and a voltage value between output terminals of the boost chopper circuit, and the parameter is generated by combining the voltage value between the input terminals of the boost chopper circuit and the voltage value between the output terminals of the boost chopper circuit. The correction value detection information generating device according to claim 3 .
5. In the parameter, the voltage value between the output terminals is fixed to a constant value. The correction value detection information generating device according to claim 4 .
6. the information relating to the electrical input / output of the boost chopper circuit further includes a power value supplied between input terminals of the boost chopper circuit, and the parameter is generated by adding the power value supplied between the input terminals of the boost chopper circuit to an element of a combination.
6. The correction value detection information generating device according to claim 4 or 5.
7. The inductor characteristic value includes an inductance value of the inductor, the inductor characteristic value being a predetermined inductance value for each of the plurality of power values. The correction value detection information generating device according to claim 6 .
8. All or a part of the inductors are magnetically coupled inductors, and the characteristic values of the magnetically coupled inductors include a coupling coefficient. The correction value detection information generating device according to claim 3 .
9. The current measurement circuit includes: a sensor circuit for detecting a sensor inductor current value indicating a current value of a current flowing through the inductor; a filter circuit for performing low-pass filtering on the sensor inductor current value detected by the sensor circuit to obtain a measured inductor current value; Equipped with The time constant of the current measurement circuit includes a time constant of the sensor circuit and a time constant of the filter circuit. The correction value detection information generating device according to claim 3 .
10. The information generating unit generating, as the correction value detection information, information shown in a table format including discrete values of the current correction value as elements, or generating information shown by a function for calculating the current correction value; The correction value detection information generating device according to claim 3 .
11. A temperature estimation device connected to a control unit of the booster device according to claim 1, measuring a temperature of a measurement target location in the boost chopper circuit or a location that can be measured from outside a member including the measurement target location in a device connected between input terminals of the boost chopper circuit, and calculating the temperature of the measurement target location based on the measured temperature and the corrected inductor current value obtained from the control unit; Temperature estimation device.
12. An internal resistance estimation device connected to a control unit of the boost device according to claim 1, calculating an internal resistance value of a capacitor connected between the input terminals of the boost chopper circuit based on a voltage value between the input terminals of the boost chopper circuit and the corrected inductor current value acquired from the control unit; Internal resistance estimation device.
13. measuring a current flowing through each of the inductors in a multi-phase boost chopper circuit formed by a plurality of boost circuits each having an inductor and a switch element, and a smoothing capacitor, to obtain a measured inductor current value; calculating a corrected inductor current value by applying a current correction value to sampled current values obtained by sampling the measured inductor current value at a constant sampling interval, the current correction value correcting a difference between an average value of the sampled current value and an average value of a real inductor current value, which is a true value of a current flowing through the inductor, the difference occurring depending on the number of boost circuits; a feedback control based on the calculated corrected inductor current value and a voltage value between the input terminals and the output terminals of the boost chopper circuit is performed to approach a predetermined control target value, and the switch elements are driven so that a phase difference between the drive phases of the boost circuits, each of which is driven in the same switching cycle, coincides with a phase amount obtained by dividing 360° by the number of the boost circuits. Boosting method.
14. A method for generating information for correction value detection, the method comprising: generating information for correction value detection indicating a relationship between a current correction value used for correcting a difference between an average value of a real inductor current value, which is a true value of a current flowing through an inductor included in a boost chopper circuit of a boost device that performs interleaving control of the boost chopper circuit, and an average value of a sampled current value obtained by measuring the current flowing through the inductor by a current measuring circuit and sampling the current at a constant sampling interval, and information related to an electrical input / output of the boost chopper circuit, the method comprising: calculating an estimated actual inductor current value for each of a plurality of parameters generated by combining information related to an electrical input / output of the boost chopper circuit based on an inductor characteristic value indicating a characteristic of the inductor, a switching period of the boost chopper circuit, and a boost chopper circuit model equation that models the boost chopper circuit; calculating an estimated measured inductor current value for each of the parameters from the estimated actual inductor current value for each of the parameters based on a time constant of the current measurement circuit and a current measurement circuit model equation that models the current measurement circuit; sampling the estimated measured inductor current value for each of the parameters at a sampling timing identical to a sampling timing of the sampling interval to extract an estimated sampled current value for each of the parameters; calculating the current correction value for each of the parameters from the estimated actual inductor current value and the estimated sample current value, and generating the correction value detection information indicating a relationship between the parameters and the current correction value; A method for generating information for detecting a correction value.
15. On the computer, a step of calculating a corrected inductor current value by applying a current correction value to a sample current value extracted by sampling a measured inductor current value, which is a measurement value of a current flowing through each of the inductors in a multi-phase boost chopper circuit formed by a plurality of boost circuits each having an inductor and a switch element, and a smoothing capacitor, at a constant sampling interval, the current correction value correcting a difference between an average value of the sampled current value and an average value of a real inductor current value, which is a true value of a current flowing through the inductor, the difference being caused according to the number of boost circuits; a step of driving the switch element so that a phase difference between the drive phases of the boost circuits, each of which is driven in the same switching cycle, coincides with a phase amount obtained by dividing 360° by the number of the boost circuits, while approaching a predetermined control target value by performing feedback control based on the calculated corrected inductor current value and a voltage value between the input terminals and the output terminals of the boost chopper circuit; A program for executing the above.
16. a computer that generates correction value detection information indicating a relationship between a current correction value used to correct a difference between an average value of a real inductor current value, which is a true value of a current flowing through an inductor included in a boost chopper circuit of a boost device that performs interleave control of the boost chopper circuit, and an average value of a sampled current value obtained by measuring the current flowing through the inductor by a current measuring circuit and sampling the current at a constant sampling interval, and information related to an electrical input / output of the boost chopper circuit; A step of calculating an estimated actual inductor current value of each of a plurality of parameters generated by combining information related to an electrical input / output of the boost chopper circuit based on an inductor characteristic value indicating a characteristic of the inductor, a switching period of the boost chopper circuit, and a boost chopper circuit model equation that models the boost chopper circuit; calculating an estimated measured inductor current value for each of the parameters from the estimated actual inductor current value for each of the parameters based on a time constant of the current measurement circuit and a current measurement circuit model equation that models the current measurement circuit; sampling the estimated measured inductor current value for each of the parameters at a sampling timing identical to a sampling timing of the sampling interval to extract an estimated sampled current value for each of the parameters; a step of calculating the current correction value for each of the parameters from the estimated actual inductor current value and the estimated sample current value, and generating the correction value detection information indicating a relationship between the parameters and the current correction value; A program for executing.