Test control program, test system, and test method
The test control program addresses the rank discrepancy issue in complex LSIs by iteratively refining test conditions based on pre- and post-process results, enhancing accuracy and reducing misclassification.
Patent Information
- Application Number
- JP2023069881
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-21
- Publication Date
- 2024-10-31
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In LSIs with complex functions like processors, there is often a significant discrepancy between predicted and actual ranks due to the use of general-purpose testers for predictive tests and dedicated testers for actual tests, leading to misclassification and loss of profits.
A test control program that sets an initial evaluation value based on pre-process test results, corrects test conditions using post-process test results, and iteratively refines the test environment to align predicted and actual ranks through a series of tests.
Improves test accuracy by efficiently correcting rank discrepancies, reducing misclassification, and optimizing the test process to minimize costs and maximize profit by ensuring accurate ranking of LSIs.
Smart Images

Figure 2024155277000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a test control program, a test system, and a test method. [Background technology]
[0002] It is known that a test called SLT (System Level Test) is performed on LSIs (Large Scale Integrations) that have complex functions such as processors.
[0003] In SLT, a test machine equivalent to the device in which the LSI will be installed is used to set up a test environment that closely resembles actual operation, and test programs are run to verify whether the LSI will operate correctly on the system in which it will be installed.
[0004] In addition, in SLT, LSIs may be ranked according to performance ranking based on an upper limit of operating frequency, power consumption ranking based on a lower limit of operating voltage, or the like.
[0005] As a method for testing semiconductor devices, for example, a method is known in which a ranking test is performed in a wafer state in a front-end process, and in a back-end process, the results of the ranking test in the front-end process are used to select conditions for a ranking test to be performed in a packaged state (see, for example, Reference 1).
[0006] Hereinafter, a test in a front-end process may be referred to as a predictive test, and a rank determined by a predictive test may be referred to as a predicted rank. A test in a back-end process may be referred to as an actual test, and a rank determined by an actual test may be referred to as an actual rank. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] JP 2006-267056 A [Patent Document 2] JP 2013-002892 A [Patent Document 3] JP 2002-237505 A Summary of the Invention [Problem to be solved by the invention]
[0008] In LSIs with relatively simple functions, such as DRAMs (Dynamic Random Access Memory), the difference between the predicted rank and the actual rank is small. In contrast, in LSIs with relatively complex functions, such as processors, the difference between the predicted rank and the actual rank may be large.
[0009] This is because the LSI testers primarily used in predictive testing are general-purpose test machines, while the SLT used in actual testing uses dedicated test machines, which result in differences in various aspects, such as power consumption, whether the clock can operate continuously, and circuit operating efficiency.
[0010] If a difference occurs between the predicted rank and the actual rank, the following problem occurs.
[0011] In other words, an LSI that is given a predicted rank lower than its actual rank will result in reduced profits because it is actually shipped with a lower predicted rank, even though it could have been shipped with a higher rank than the predicted rank.
[0012] In addition, LSIs that are given a predicted rank higher than their actual rank are treated as defective products and cannot be shipped, even though they could have been shipped at a lower rank than the predicted rank, resulting in reduced profits.
[0013] In one aspect, the present invention aims to efficiently perform tests on test subjects. [Means for solving the problem]
[0014] For this reason, this test control program causes the processor to execute the following processes: set a first evaluation value for the test object based on a first test result obtained by conducting a first test on the test object; conduct a second test on the test object under initial test conditions set based on the first evaluation value; and conduct a third test on the test object under test conditions corrected according to the second test result obtained by conducting the second test. Effect of the Invention
[0015] According to one embodiment, the accuracy of testing a test subject can be improved. [Brief description of the drawings]
[0016] [Figure 1] FIG. 1 is a diagram illustrating a schematic configuration of a test system according to an embodiment. [Diagram 2] FIG. 2 is a diagram illustrating a hardware configuration for implementing a function as a front-end testing section of a test system according to an embodiment. [Diagram 3] FIG. 2 is a diagram illustrating hardware for implementing a function as a back-end process testing section of a test system according to an embodiment. [Figure 4] 1 is a block diagram showing an example of a hardware (HW) configuration of a computer that realizes the functions of a test control device of a test system according to an embodiment. [Diagram 5] 11 is a diagram illustrating an example of rank condition information in a test system according to an embodiment. [Figure 6] 11 is a flowchart illustrating a process of testing a processor in a test system according to an embodiment. [Figure 7] 1 is a flowchart for explaining a process in a development phase of a test system according to an embodiment. [Figure 8] 1 is a flowchart for explaining a process of a front-end test in a mass-production phase of a test system according to an embodiment. [Figure 9]1 is a flowchart for explaining a process of a post-process test in a mass-production phase of a test system according to an embodiment. [Figure 10] 11 is a flowchart for explaining processing of an optimization processing unit of a test system according to an embodiment. [Figure 11] 11 is a flowchart for explaining a process in a case where optimization of a prediction formula is combined and executed in a post-process test process in a mass production phase of a test system according to an embodiment. [Figure 12] FIG. 11 is a diagram for explaining test results performed by a test system according to an embodiment. [Figure 13] FIG. 11 is a diagram for explaining test results performed by a test system according to an embodiment. [Figure 14] FIG. 11 is a diagram for explaining test results performed by a test system according to an embodiment. [Figure 15] 11 is a flowchart for explaining a process of a post-process test after completion of optimization of a prediction formula in a mass production phase of a test system according to an embodiment. [Figure 16] 11 is a flowchart for explaining a process in which optimization of a prediction formula and a correction rank test are performed in combination in a post-process test process in a mass production phase of a test system according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] Hereinafter, an embodiment of the present test control program, test system, and test method will be described with reference to the drawings. However, the embodiment shown below is merely an example, and there is no intention to exclude the application of various modified examples and techniques not explicitly stated in the embodiment. In other words, this embodiment can be implemented with various modifications within the scope of its purpose. Furthermore, each figure is not intended to include only the components shown in the figure, but can include other functions, etc.
[0018] (A) Configuration FIG. 1 is a diagram illustrating a schematic configuration of a test system 1 according to an embodiment.
[0019] The test system 1 tests a test object. The test object is a component device that functions while being attached (mounted) to a host device.
[0020] In this embodiment, an example is shown in which the test subject is an LSI, more specifically, a processor. The processor or the LSI is an example of the test subject. The processor is mounted on an information processing device and used. The information processing device to which the processor is attached is an example of an attached device.
[0021] The manufacturing process of a processor includes, for example, a first manufacturing process of forming a processor device (circuit) on a wafer, and a second manufacturing process of separating (dicing) the formed circuits and packaging individual devices.
[0022] The processor may include, for example, multiple types of ROSC (Ring Oscillator) circuits.
[0023] The manufacturing of a processor includes a development phase (prototype phase) and a mass production phase. Processors that have been confirmed to satisfy predetermined conditions such as performance during the prototyping phase in the development phase are mass-produced in the mass production phase.
[0024] In both the development phase and the mass production phase, the processor is manufactured through a first manufacturing process and a second manufacturing process.
[0025] Processor testing is performed during the manufacture of a processor. The testing process of a processor includes front-end testing, which tests a single processor, and back-end testing, which tests the processor as a system by mounting it on an SLT device 21 (see FIG. 3). The front-end testing may be simply referred to as the front-end process, and the back-end testing may be simply referred to as the back-end process. The front-end testing may be simply referred to as the unit testing, and the back-end testing may be simply referred to as the device testing.
[0026] The front-end test is performed in parallel with the first and second manufacturing steps in the processor manufacturing process. Testing of devices on a wafer manufactured in the first manufacturing step is performed using a first front-end test equipment 11, and testing of a processor manufactured in the second manufacturing step is performed using a second front-end test equipment 12.
[0027] FIG. 2 is a diagram illustrating a hardware configuration for realizing the functions of the front-end test section 10 of the test system 1 according to one embodiment, and FIG. 3 is a diagram illustrating hardware for realizing the functions of the back-end test section 20.
[0028] The functions of the front-end testing section 10 are realized by a first front-end testing device 11, a second front-end testing device 12, LSI testers 113 and 123, and a test control device 100, as shown in FIG.
[0029] The first front-end test equipment 11 is a wafer test equipment that tests devices formed on a wafer.
[0030] The first front-end test equipment 11 has a stage 111, a probe 112, and an LSI tester 113. On the stage 111, the probe 112 is connected to a wafer to be tested, and the LSI tester 113 applies test signals to, for example, individual devices on the wafer via the probe 112 and collects responses from the devices as test results.
[0031] In the first front-end test equipment 11, the LSI tester 113 may measure the quiescent power supply current of the device. The LSI tester 113 may also measure the oscillation frequencies of at least some of the multiple ROSC circuits built into the device (processor). The LSI tester 113 may measure, for example, the oscillation frequencies of 28 types of ROSC built into the processor.
[0032] That is, in the first front-end test equipment 11, the LSI tester 113 may collect a total of 29 kinds of numerical values (characteristic information) by measuring the quiescent power supply current and the oscillation frequencies of 28 kinds of ROSCs built into each processor. The test results collected by the LSI tester 113 are input to the test control equipment 100.
[0033] The second front-end test equipment 12 is a package test equipment that tests packaged processors.
[0034] The second front-end test equipment 12 has a socket 122, a cooler 124, and an LSI tester 123. A processor to be tested (test target processor) is attached to the socket 122, and the cooler 124 is attached to the processor. The LSI tester 123 inputs, for example, a test signal to the processor via the socket 122, and obtains a response from the processor as a test result.
[0035] In the second front-end test equipment 12, the LSI tester 123 may measure the quiescent power supply current of the processor as a test item. The LSI tester 123 may also measure the oscillation frequencies of at least some of the multiple ROSC circuits built into the processor as a test item. The LSI tester 123 may perform measurements for multiple test items. For example, the LSI tester 123 may measure the oscillation frequencies of 28 types of ROSC built into the processor.
[0036] That is, in the second front-end test equipment 12, the LSI tester 123 may collect a total of 29 kinds of numerical values (characteristic information) by measuring the quiescent power supply current and the oscillation frequencies of 28 kinds of ROSCs built into each processor. The test results collected by the LSI tester 123 are input to the test control equipment 100.
[0037] The front-end test section 10 corresponds to a first test section that performs a first test (front-end test, unit test) on a processor (test subject).
[0038] The function of the back-end process testing section 20 is realized by an SLT device 21 and a test control device 100, as shown in FIG.
[0039] The SLT device 21 is a testing device that ranks processors by verifying whether the processors under test operate normally under test conditions. The SLT device 21 realizes SLT that is performed under operating conditions similar to those of the product in which the processor is mounted.
[0040] As an example, the SLT device 21 includes a memory 211, a mounting unit 212, a cooler 213, an IO (Input Output) card 214, a storage device 215, a console 216, and a power supply 217, as shown in FIG.
[0041] The IO card 214 is an expansion card for connecting an input / output device to the processor under test in the SLT device 21. In the example shown in Fig. 3, a storage device 215 and a console 216 are connected to the processor under test via the IO card 214.
[0042] The storage device 215 stores an OS (Operating System), test programs, test data, etc. Examples of the storage device 215 include various storage devices such as a magnetic disk device such as an HDD (Hard Disk Drive), a semiconductor drive device such as an SSD (Solid State Drive), and a non-volatile memory. Examples of the non-volatile memory include a flash memory, an SCM (Storage Class Memory), and a ROM (Read Only Memory).
[0043] A processor under test is attached to the mounting section 212. By mounting the processor under test in the mounting section 212, the SLT apparatus 21 functions as a computer.
[0044] The processor attached to the mounting portion 212 executes an OS and a test program stored in the storage device 215 .
[0045] The memory 211 temporarily stores programs executed by the processor under test and data to be processed.
[0046] The console 216 displays various information that is output while the processor under test is executing the test program.
[0047] The SLT device 21 is equipped with various sensors, and various pieces of information are measured in the SLT device 21 while the processor under test executes the test program. For example, the SLT device 21 may measure the lower limit operating voltage of the processor under test as a test item. A processor with a lower voltage is treated as a product with lower power consumption. In this embodiment, the lower limit operating voltage is used as an index for determining the rank of the processor. The test results by the SLT device 21 may be said to be an index of the processor rank. The SLT device 21 may measure a plurality of test items.
[0048] The values of the test items measured by the SLT device 21 are used as indexes of the rank of the processor in the test control device 100 described later.
[0049] The back-end process testing section 20 corresponds to a second testing section that performs a second test (back-end process test, SLT test, initial rank test) on the processor (test subject).
[0050] The results measured by the SLT device 21 (for example, the lower limit voltage of the operation) are input to the test control device 100.
[0051] The test control device 100 controls the testing of the processor by the front-end test section 10 and the back-end test processing section 22 .
[0052] The functions of the test control device 100 may be realized by one computer or two or more computers. Furthermore, at least a part of the functions of the test control device 100 may be realized using HW (Hardware) resources and NW (Network) resources provided by a cloud environment.
[0053] FIG. 4 is a block diagram showing an example of a hardware (HW) configuration of a computer 200 that realizes the functions of the test control device 100 of the test system 1 according to an embodiment.
[0054] As shown in FIG. 4, the computer 200 may include, as a HW configuration, a processor 200a, a graphics processing unit 200b, a memory 200c, a storage unit 200d, an IF (Interface) unit 200e, an IO (Input / Output) unit 200f, and a reading unit 200g, for example.
[0055] The processor 200a is an example of a processing unit that performs various controls and calculations, and is a control unit that executes various processes. The processor 200a may be connected to each block in the computer 200 via a bus 200j so that they can communicate with each other. The processor 200a may be a multiprocessor including multiple processors, a multicore processor having multiple processor cores, or a configuration having multiple multicore processors.
[0056] The processor 200a may be, for example, an integrated circuit (IC) such as a CPU, an MPU, an APU, a DSP, an ASIC, or an FPGA. The processor 200a may be a combination of two or more of these integrated circuits. CPU is an abbreviation for Central Processing Unit, and MPU is an abbreviation for Micro Processing Unit. APU is an abbreviation for Accelerated Processing Unit. DSP is an abbreviation for Digital Signal Processor, ASIC is an abbreviation for Application Specific IC, and FPGA is an abbreviation for Field-Programmable Gate Array.
[0057] The graphics processing device 200b performs screen display control for an output device such as a monitor in the IO unit 200f. The graphics processing device 200b may also have a configuration as an accelerator that executes machine learning processing and inference processing using a machine learning model. The graphics processing device 200b may be various types of arithmetic processing device, such as a GPU (Graphics Processing Unit), an APU, a DSP, an ASIC, or an integrated circuit (IC) such as an FPGA.
[0058] The memory 200c is an example of HW that stores various data, programs, and other information. The memory 200c may be, for example, one or both of a volatile memory such as a dynamic random access memory (DRAM) and a non-volatile memory such as a persistent memory (PM).
[0059] The storage unit 200d is an example of HW that stores various data, programs, and other information. Examples of the storage unit 200d include various storage devices such as a magnetic disk device such as a hard disk drive (HDD), a semiconductor drive device such as a solid state drive (SSD), and a nonvolatile memory. Examples of the nonvolatile memory include a flash memory, a storage class memory (SCM), and a read only memory (ROM).
[0060] The storage unit 200d may store a program 200h (test control program) that realizes all or part of the various functions of the computer 200.
[0061] For example, the processor 200a can realize the functions of the prediction method creation unit 14, the prediction rank determination unit 15, the prediction rank acquisition unit 23, the initial test condition setting unit 24, the test control unit 25, and the optimization processing unit 26 shown in Figure 1 by expanding the program 200h stored in the storage unit 200d into the memory 200c and executing it.
[0062] The IF unit 200e is an example of a communication IF that controls the connection and communication between the computer 200 and other computers. For example, the IF unit 200e may include an adapter that complies with a LAN (Local Area Network) such as Ethernet (registered trademark) or optical communication such as FC (Fibre Channel). The adapter may support one or both of wireless and wired communication methods.
[0063] For example, the computer 200 may be connected to a database (not shown) or other information processing devices via the IF unit 200e and a network so that they can communicate with each other. The program 200h may be downloaded from the network to the computer 200 via the communication IF and stored in the storage unit 200d.
[0064] The IO unit 200f may include one or both of an input device and an output device. Examples of the input device include a keyboard, a mouse, a touch panel, etc. Examples of the output device include a monitor, a projector, a printer, etc. The IO unit 200f may also include a touch panel in which the input device and the output device are integrated. The output device may be connected to the graphics processing device 200b.
[0065] The reading unit 200g is an example of a reader that reads out data or program information recorded on the recording medium 200i. The reading unit 200g may include a connection terminal or device to which the recording medium 200i can be connected or inserted. Examples of the reading unit 200g include an adapter that complies with USB (Universal Serial Bus) or the like, a drive device that accesses a recording disk, and a card reader that accesses a flash memory such as an SD card. Note that the recording medium 200i may store a program 200h, and the reading unit 200g may read the program 200h from the recording medium 200i and store it in the storage unit 200d.
[0066] Examples of the recording medium 200i include non-transitory computer-readable recording media such as magnetic / optical disks and flash memories. Examples of the magnetic / optical disks include flexible disks, CDs (Compact Discs), DVDs (Digital Versatile Discs), Blu-ray Discs, and HVDs (Holographic Versatile Discs). Examples of the flash memory include semiconductor memories such as USB memories and SD cards.
[0067] The above-described HW configuration of the computer 10 is an example. Therefore, the HW in the computer 200 may be increased or decreased (for example, adding or deleting any block), divided, integrated in any combination, or the bus may be added or deleted, etc. as appropriate.
[0068] 1, the computer 200 may exemplarily include functions as a prediction method creation unit 14, a prediction rank determination unit 15, a prediction rank acquisition unit 23, an initial test condition setting unit 24, a test control unit 25, and an optimization processing unit 26. These functions may be realized by the hardware of the computer 200 (see FIG. 4).
[0069] The prediction method creation section 14 creates a prediction method used to set a prediction rank for a processor based on the test results by the front-end test section 10 and the back-end test section 20 in the development phase.
[0070] The predicted rank is a provisional rank that is set for a processor to be tested before a post-process test is performed on the processor to be tested. Setting a predicted rank may be called predicted ranking.
[0071] The rank index varies depending on the LSI specifications, but the operating frequency and power consumption may be used as indexes. The test results used to predict the rank also vary depending on the LSI specifications, but the results of quiescent power supply current, ROSC, delay tests, etc. may be used.
[0072] The predicted rank may be determined, for example, based on a value calculated using a prediction formula, or may be determined by estimation using a machine learning model, and may be implemented in various modified forms.
[0073] In the following, an example of predicting a rank using a prediction formula as a prediction method will be shown, and an example of how the prediction method creation unit 14 creates the prediction formula will be shown.
[0074] The prediction method creation unit 14 creates a prediction formula for calculating a value serving as an index for prediction ranking when at least a portion of measured values measured from a processor under test in a front-end test is input.
[0075] Before the prediction method creation unit 14 creates a prediction formula, the test control device 100 selects test items to be used for rank prediction from among a plurality of types of measurement results measured in a previous test process. The selection of test items to be used for rank prediction may be performed in advance, for example, by a user. The user may determine the test items to be used for rank prediction based on feedback from past experience or prediction accuracy.
[0076] The items used as inputs for calculating the prediction formula may be, for example, measurement items selected in advance by the user based on past experience that are thought to have a high correlation with the index at that time (operating frequency, lower limit operating voltage, etc.) In addition, the number of measurement items is preferably several tens (e.g., 20 to 30) that a human being can grasp.
[0077] If the correlation is high among the selected measurement items (if there are only a few items with high contribution rates in the case of principal component analysis of an experiment), those measurement items may be adopted. If the correlation is low, the measurement items may be replaced and reevaluation may be repeated. All measurement results may be used as input for determining the prediction rank. This is considered to be particularly effective when, for example, a machine learning model is used to determine the prediction rank.
[0078] The prediction method creation unit 14 analyzes the correlation between the front-end test results of the evaluation processor and the measurement results of the rank index (correlation analysis). The prediction method creation unit 14 may perform the correlation analysis using, for example, a principal component analysis method.
[0079] The prediction method creation unit 14 creates a mathematical expression (prediction formula) for predicting the value of a rank index (for example, a lower operating limit voltage) based on the result of the correlation analysis and using the result of the front-end test as an input.
[0080] In this example, it is assumed that the processor is a server processor and the rank indicator is the lower limit operating voltage.
[0081] As described above, in the front-end testing section 10, in the first front-end testing equipment 11, the LSI tester 113 measures the quiescent power supply current and the oscillation frequency of the 28 types of ROSC built in each processor, thereby collecting a total of 29 types of numerical values (characteristic information, measurement results). In the second front-end testing equipment 12, the LSI tester 123 also measures the quiescent power supply current and the oscillation frequency of the 28 types of ROSC built in each processor, thereby collecting a total of 29 types of numerical values (characteristic information, measurement results). Therefore, in the front-end testing section 10, a total of 58 types of measurement results are obtained from the wafer test and the package test.
[0082] In the development phase, the front-end test section 10 collects a total of 58 types of numerical values (characteristic information) for each of a plurality of test target processors by measuring, for example, the quiescent power supply current and the oscillation frequency of 28 types of ROSC built into each processor in each of the wafer tests and package tests. These numerical values are input to the prediction method creation section 14.
[0083] In addition, the values of the lower operating limit voltages measured by the back-end testing section 20 in an SLT test after mounting each of the multiple test target processors in the SLT device 21 are also input to the prediction method creation section 14 .
[0084] The prediction method creation unit 14 creates a prediction formula using at least a part of the test results acquired by the front-end test unit 10. In the example shown below, the prediction method creation unit 14 creates a prediction formula using 29 types of numerical values (characteristic information) including the quiescent power supply current and the oscillation frequencies of 28 types of ROSC built into each processor, which are measured in a package test.
[0085] The prediction method creation unit 14 analyzes the correlation between the 29 types of values measured by the front-end testing unit 10 and the values of each lower operating limit voltage measured by the back-end testing unit 20 by principal component analysis. The prediction method creation unit 14 may perform principal component analysis using the 29 types of values measured by the front-end testing unit 10 as principal components.
[0086] The principal component analysis is well known and will not be described here. The prediction method creation unit 14 may realize the principal component analysis by, for example, executing a well-known principal component analysis program.
[0087] The prediction method creation unit 14 determines the principal components to be used in the prediction formula based on, for example, the results of principal component analysis of each test result measured by the first front-end test equipment 11 and each test result measured by the second front-end test equipment 12, the contribution rate of each principal component, etc.
[0088] For example, when the result of the principal component analysis shows that the combined contribution rate of the first principal component and the second principal component among multiple principal components exceeds a predetermined threshold, the prediction method creation unit 14 may use the first principal component and the second principal component for rank prediction.
[0089] The prediction method creation unit 14 may create a prediction formula for finding the lower operating limit voltage using a first principal component and a second principal component, as shown in the following formula (1), for example.
[0090] Lower operating limit voltage = a × first principal component – b × second principal component + c (1) a, b, and c are coefficients.
[0091] The prediction method creation unit 14 stores the created prediction formula in a predetermined storage area of the memory 200c or the storage unit 200d.
[0092] In the mass production phase, the predicted rank determination unit 15 sets a predicted rank of the processor based on the test results measured by the first front-end test equipment 11, the test results measured by the second front-end test equipment 12, and the prediction formula created by the prediction method creation unit 14.
[0093] For example, the prediction rank determination unit 15 extracts a value corresponding to a first principal component and a value corresponding to a second principal component from the test results measured by the front-end test unit 10. The prediction rank determination unit 15 inputs the extracted values corresponding to the first principal component and the second principal component into a prediction formula to calculate a predicted value of the lower operating limit voltage of the processor to be tested. The prediction rank determination unit 15 compares the calculated predicted value of the lower operating limit voltage with a preset threshold value to determine the predicted rank of the processor to be tested.
[0094] FIG. 5 is a diagram illustrating an example of rank condition information in the test system 1 according to an embodiment.
[0095] The rank condition information is information that indicates conditions for ranking processors. In the rank condition information illustrated in FIG 5, an operating voltage, an operating frequency, and a judgment condition are associated with each rank.
[0096] In Fig. 5, the rank condition information is indicated by the symbol T1. Hereinafter, it may be referred to as rank condition information T1. The rank condition information T1 illustrated in Fig. 5 is configured as a table, but is not limited to this and can be implemented in various modifications.
[0097] 5 shows an example of classifying (ranking) a processor into one of three categories, A, B, or NG, depending on the value of the operating voltage (lower limit operating voltage), under the condition that the operating frequency is constant (2.2 GHz). In the rank condition information T1, the operating voltage corresponds to a threshold value that is preset for ranking.
[0098] However, in the rank condition information T1 illustrated in FIG. 5, the judgment voltage for the predicted rank is set to be 3 mV lower than the lower limit operating voltage of the product rank with a margin.
[0099] That is, if the lower limit operating voltage of a processor is 0.984 (=0.987-0.003) V or lower, the rank of the processor is set to A.
[0100] Furthermore, if the lower limit operating voltage of a processor is greater than 0.984 (=0.987-0.003) V and is equal to or less than 1.047 (=1.050-0.003) V, the processor is assigned a rank of B.
[0101] Furthermore, if the minimum operating voltage of a processor is greater than 1.047 (=1.050-0.003) V, the rank of the processor is determined to be NG. Note that an NG rank indicates that the processor does not meet the required precision as a product (is defective).
[0102] The rank condition information T1 can be modified as appropriate. For example, a condition may be set to classify processors into two or less ranks or four or more ranks. The operating voltage is not limited to the value exemplified in FIG. 5. For example, a condition may be set to classify processors into ranks according to the value of the operating frequency under a condition that the operating voltage is constant.
[0103] Furthermore, in the rank condition information T1, the operating voltage and the operating frequency may both be variable values, and a condition may be set in which ranking is performed according to a combination of the operating voltage value and the operating frequency value. Furthermore, the rank condition information T1 may include parameters other than the operating voltage and the operating frequency.
[0104] The predicted rank determination unit 15 compares the predicted value of the lower operating limit voltage of the test target processor calculated based on the prediction formula with the value (threshold value) of the operating voltage of the rank condition information T1, and determines the predicted rank of the test target processor.
[0105] The predicted rank determination unit 15 corresponds to a first evaluation value setting unit that sets a predicted rank (first evaluation value) for a processor (test subject) based on the first test result obtained by the front-end testing unit 10 (first testing unit) through the first test (front-end test, unit test).
[0106] The predicted rank determination unit 15 stores information representing the determined predicted rank in a predetermined storage area of the storage unit 200d, for example, in association with information identifying the test target processor. The predicted rank determination unit 15 may store the information representing the determined predicted rank in a database connected to the test control device 100, or may store the information in a storage unit (not shown), such as a non-volatile memory, provided in the test target processor.
[0107] The predicted rank acquisition unit 23 acquires the predicted rank determined by the predicted rank determination unit 15 for the processor under test.
[0108] The predicted rank acquiring unit 23 may read out the predicted rank stored in association with the identification information of the test target processor from the storage unit 200d, for example. The predicted rank acquiring unit 23 may read out the predicted rank stored in association with the identification information of the test target processor from a database (not shown). The predicted rank acquiring unit 23 may read out the predicted rank from the storage unit of the test target processor.
[0109] The initial test condition setting unit 24 sets test conditions for the post-process testing unit 20 (SLT device 21) to perform an initial rank test on the test target processor based on the predicted rank of the test target processor acquired by the predicted rank acquisition unit 23. Among the test conditions, the test conditions for performing the initial rank test may be called the initial test conditions.
[0110] The first rank test is the first test among a plurality of tests performed consecutively on the processor under test using the SLT device 21. The first rank test may be called an initial rank test.
[0111] The initial test condition setting unit 24, for example, refers to the rank condition information T1 and acquires an operating voltage and an operating frequency corresponding to the predicted rank as the initial test conditions.
[0112] That is, the operating voltage of the rank condition information T1 is used as the initial test condition in the initial rank test.
[0113] Furthermore, the initial test condition setting section 24 may refer to test condition information provided in advance separately from the rank condition information T1, and acquire values of the operating voltage, operating frequency, and the like corresponding to the predicted rank as the initial test conditions.
[0114] The initial test condition setting unit 24 stores the acquired initial test conditions in a predetermined storage area of the memory 200c or the storage unit 200d.
[0115] The test control unit 25 causes the SLT device 21 to perform a test on the processor under test. The test control unit 25 causes the SLT device 21 to realize an environment according to the test conditions. The environment according to the test conditions in the SLT device 21 may be called a test environment.
[0116] For example, the test control unit 25 notifies the SLT device 21 of the value of the operating voltage and the value of the operating frequency, and operates the SLT device 21 at the notified operating voltage and operating frequency. Note that a method for realizing a test environment in the SLT device 21 is known, and a detailed description thereof will be omitted.
[0117] Then, in the test environment thus realized, the test control unit 25 causes the test target processor to execute a test program, etc., thereby causing the test target processor to perform a test.
[0118] The test control unit 25 also causes the test target processor to perform a number of tests in succession, including an initial rank test and a corrected rank test.
[0119] In the initial rank test, the test target processor is tested in a test environment realized by the initial test conditions set by the initial test condition setting unit 24 .
[0120] That is, in the initial rank test, the test control unit 25 executes a test of the test target processor under initial test conditions according to the predicted rank determined for the test target processor by the predicted rank determination unit 15. The initial rank test may be called a predicted rank test.
[0121] In the initial rank test, if the processor to be tested is operable under the conditions corresponding to the predicted rank in the rank condition information T1, the test control unit 25 judges that the processor to be tested has passed (PASS). On the other hand, if the processor to be tested is not operable under the conditions corresponding to the predicted rank in the rank condition information T1, the test control unit 25 judges that the processor to be tested has failed (FAIL).
[0122] That is, the operating voltage of the rank condition information T1 may also be used as a pass / fail threshold for determining whether the processor to be tested passes or fails in the initial rank test of the processor.
[0123] 5, when a test target processor with predicted rank A is operated at an operating frequency of 2.2 GHz, if the operating voltage is equal to or lower than 0.984 (=0.987-0.003) V, the test control unit 25 determines that the test target processor has passed the initial rank test. On the other hand, if the operating voltage is higher than 0.984 V, the test control unit 25 determines that the test target processor has failed the initial rank test.
[0124] The test control unit 25 corresponds to a first control unit that causes the post-process testing unit 20 (second testing unit) to perform a second test (post-process test, SLT test, initial rank test) on the processor (test subject) under initial test conditions set based on the predicted rank (first evaluation value).
[0125] The corrected rank test is a test that is performed from the second test onward among a plurality of tests that are successively performed on the processor under test using the SLT device 21.
[0126] The correction rank test is performed to correctly set the rank of a processor that has a predicted rank that differs from its actual rank.
[0127] In the corrected rank test, the test target processor is tested in a test environment realized by test conditions updated (set) by correcting the initial test conditions by the test control unit 25. It can be said that the test control unit 25 includes a function for updating the test conditions.
[0128] In the corrected rank test, if the test result of the previous test on the test target processor is a pass, the test control unit 25 corrects the test conditions to be stricter, and then causes the test target processor to be tested in a new test environment realized by the corrected test conditions.
[0129] For example, the test control section 25 may set an operating voltage that is one rank higher than the rank used in the previous test in the rank condition information T1 as the corrected test condition (new test condition).
[0130] On the other hand, in the corrected rank test, if the test result of the previous test on the test target processor is a failure, the test control unit 25 corrects the test conditions to be more lenient, and then causes the test target processor to be tested in a new test environment realized by the corrected test conditions.
[0131] For example, the test control section 25 may set an operating voltage that is one rank lower than the rank used in the previous test in the rank condition information T1 as the corrected test condition (new test condition).
[0132] That is, the operating voltage of the rank condition information T1 may also be used as a corrected test condition in the corrected rank test.
[0133] In the corrected rank test, the test control unit 25 experimentally changes the rank of the processor to be tested from the rank in the previous test (rank correction +1, rank corrected rank test -1), and evaluates (PASS / FAIL) the processor to be tested using the pass / fail threshold (rank condition information T1) corresponding to the changed rank.
[0134] In a corrected rank test, changing the test conditions from those corresponding to the current rank to those corresponding to another rank may be called rank correction.
[0135] The test control unit 25 causes the SLT device 21 to retest the processor under test in a new test environment realized by the test conditions after rank correction.
[0136] In the corrected rank test, if the processor to be tested is operable under the test conditions after the rank correction in the rank condition information T1, the test control unit 25 judges the processor to be tested as PASS. On the other hand, if the processor to be tested is not operable under the test conditions after the rank correction in the rank condition information T1, the test control unit 25 judges the processor to be tested as FAIL. If there is no rank that passes, the processor is determined to be defective.
[0137] That is, the operating voltage of the rank condition information T1 may also be used as a pass / fail threshold for determining whether a test target processor passes or fails in a corrected rank test of a processor.
[0138] The corrective rank test can correct the rank of a processor whose predicted rank is different from its actual rank, thereby eliminating the negative costs caused by incorrect rank setting.
[0139] The test control unit 25 corresponds to a second control unit that causes the post-process test unit 20 (second test unit) to perform a corrected rank test (third test) on the test object under test conditions corrected according to the second test result (PASS / FAIL) obtained by performing the initial rank test (second test).
[0140] The test control unit 25 repeats the rank correction and the retest of the test target processor in the new test environment realized by the test conditions after the rank correction until the end condition is satisfied. At the time when the end condition is satisfied, the highest rank at which the test target processor has passed is determined as the actual rank of the test target processor.
[0141] The end condition may be that the rank after rank correction reaches either an upper limit value (corrected upper limit, maximum rank) or a lower limit value (corrected lower limit, minimum rank).
[0142] The upper and lower correction limits are set in advance, and may be set according to the specifications of the processor, for example.
[0143] The test control unit 25 corresponds to a third control unit which, after a corrected rank test (the third test), repeatedly corrects the test conditions according to the results (PASS / FAIL) of the previous test, and tests the processor (test subject) under the corrected test conditions (corrected rank test) until a termination condition is satisfied.
[0144] Furthermore, the test control unit 25 may set a limit on the number of times that rank correction and retesting of the test target processor are performed.
[0145] By repeatedly performing rank correction and retesting of the processor under test until the upper or lower correction limit is reached, the time required for the corrected rank test in the post-process testing section 20 is extended, which increases costs.
[0146] Therefore, the cost of performing the next rank correction and retesting of the processor to be tested may be compared with the expected increase in value of the processor resulting from performing the next rank correction and retesting of the processor to be tested, and if the latter is higher, the next rank correction and retesting of the processor to be tested may be performed.
[0147] The expected value of the processor increase resulting from the next rank correction and retest of the test target processor may be calculated, for example, using the following formula (2).
[0148] Expected value = “difference between the value of the current rank and the next rank” × “probability of a false positive” (2)
[0149] In the above formula (2), the difference between the value of the current rank and the next rank corresponds to the value obtained by correcting the misjudgment.
[0150] The further the predicted rank is from the actual rank, i.e., the lower the prediction accuracy of the predicted rank, the more times the rank correction is performed. Conversely, the closer the predicted rank is to the actual rank, i.e., the higher the prediction accuracy of the predicted rank, the less times the rank correction is performed.
[0151] In addition, when the number of times that rank correction has been performed reaches a preset number, the test control unit 25 may terminate the rank correction and the testing of the test target processor in a new test environment realized by the test conditions after the rank correction.
[0152] The optimization processor 26 optimizes the prediction formula created by the prediction method creator 14 .
[0153] By optimizing the prediction formula, the prediction accuracy of the predicted rank can be improved, thereby reducing the number of correction rank tests performed.
[0154] The optimization processor 26 calculates a correction value for optimizing the prediction formula, and updates the prediction formula using the calculated correction value.
[0155] The optimization processing unit 26 does not need to perform the process every time a test is performed, but may perform the process at predetermined time intervals or when the number of tests performed reaches a predetermined number or more.
[0156] The optimization processor 26 optimizes the prediction formula by executing, for example, the following processes (1) to (5).
[0157] (1) Rank determination results (predicted rank and actual rank) are collected for a predetermined period of time.
[0158] (2) If the value obtained from the rank determination result is within a predetermined target value, it is determined that the optimization work is unnecessary. The value obtained from the rank determination result may be, for example, the defect rate or the acquisition rate of each rank, or may be the occurrence rate of erroneous determination of the predicted rank with respect to the actual rank.
[0159] (3) If the value obtained from the rank judgment result is not within the target value, the optimization processing unit 26 calculates a correction value for the prediction formula by performing correlation analysis again based on the rank judgment result collected in process (1). In this correlation analysis, a target regarding the relationship between the predicted rank and the actual rank may be reflected.
[0160] For example, a goal may be that erroneous determination of predicted rank from actual rank occurs equally.Also, a goal may be that erroneous determination of predicted rank A resulting in actual rank B and erroneous determination of predicted rank B resulting in actual rank A occur approximately equally.
[0161] (4) The prediction method is updated based on the current prediction formula and the results of the correlation analysis in process (3).
[0162] For example, in the mass production phase, the optimization processor 26 performs a principal component analysis using measurement results obtained from multiple processors to generate a prediction formula. The optimization processor 26 creates a prediction formula candidate by replacing at least a part of the coefficients (e.g., a', b', c') of the new prediction formula generated with at least a part of the coefficients (e.g., a, b, c) of the original prediction formula. For example, the optimization processing unit 26 creates a candidate prediction formula by replacing the coefficient c with c' among the multiple coefficients included in the original prediction formula.
[0163] The optimization processing unit 26 evaluates the created prediction formula candidate. In evaluating the prediction formula candidate, for example, it may be determined whether a value obtained from a rank determination result based on the predicted rank of the processor determined using the prediction formula candidate and the actual rank of the processor is within a predefined target value. If the result of this determination is that the value obtained from the rank determination result is within the predefined target value, the optimization processing unit 26 determines that the prediction formula candidate is valid and uses it to update the prediction formula.
[0164] On the other hand, if the value obtained from the rank determination result based on the predicted rank and the actual rank is not within a predetermined target value, the optimization processing unit 26 determines that the prediction formula candidate is invalid and creates a new prediction formula candidate.
[0165] For example, the optimization processor 26 may create a new prediction formula candidate by replacing other coefficients (in the above example, a and b) among the multiple coefficients included in the original prediction formula. The optimization processor 26 may also create a new prediction formula (prediction formula candidate) by using the second principal component and onward, and may further create a new prediction formula (prediction formula candidate) by changing the type or number of measurement results to be used.
[0166] The difference between the prediction formula candidate and the prediction formula corresponds to the correction value. The optimization processor 26 updates the prediction formula by adding this correction value to the prediction formula. The optimization processor 26 may update the prediction formula by replacing the prediction formula with the prediction formula candidate.
[0167] The optimization processing unit 26 corresponds to an update unit that updates a prediction method (first evaluation generation method, prediction formula, machine learning model) that generates a predicted rank (first evaluation value) based on the predicted rank (first evaluation value) for multiple test target processors and the result (actual rank) of a corrected rank test (third test).
[0168] (5) Return to process (1) to confirm the update results.
[0169] (B) Operation The process of testing a processor in the test system 1 according to the embodiment configured as described above will be described with reference to the flow chart (steps A1 to A15) shown in FIG.
[0170] The processes in steps A1 to A3 are performed in a pre-process, and the processes in steps A4 to A15 are performed in a post-process.
[0171] It is also assumed that a prediction formula has been created by the prediction method creation unit 14 in the development phase before this flow is executed.
[0172] In step A1, the front-end test section 10 performs a front-end test. The front-end test includes a test of devices formed on a wafer by a first front-end tester 11 and a test of a packaged processor by a second front-end tester 12.
[0173] In step A2, the test results measured in the front-end test are stored in a predetermined storage area of the test control device 100, such as the storage unit 200d.
[0174] In step A3, the test control device 100 checks whether the test results are stored in the storage unit 200d or the like. The prediction rank determination unit 15 determines a prediction rank for the test target processor based on the test results and the prediction formula. The prediction rank determination unit 15 also stores information representing the determined prediction rank in a predetermined storage area of the storage unit 200d, for example, in association with information identifying the test target processor.
[0175] In step A4, the predicted rank acquisition unit 23 acquires the predicted rank that the predicted rank determination unit 15 has set for the test target processor from the storage unit 200d or the like.
[0176] In step A5, the initial test condition setting unit 24 refers to the rank condition information T1 based on the predicted rank of the processor to be tested, and sets test conditions (e.g., operating voltage and operating frequency) for the post-process testing unit 20 (SLT device 21) to perform an initial rank test on the processor to be tested.
[0177] In step A6, the test control unit 25 executes a test of the test target processor under initial test conditions according to the predicted rank determined for the test target processor by the predicted rank determination unit 15. The test control unit 25 determines whether the test target processor passes (PASS) or fails (FAIL) as a result of the initial rank test.
[0178] If the result of the initial rank test is a pass (see PASS route in step A6), the process proceeds to step A7.
[0179] In step A7, the test control unit 25 performs rank correction to raise the rank by one rank.
[0180] In step A8, the test control unit 25 causes the SLT device 21 to retest the test target processor in a new test environment realized by the test conditions after rank correction. The test control unit 25 determines whether the test target processor passes (PASS) or fails (FAIL) as a result of the retest of the test target processor.
[0181] If the result of the retest of the target processor is a pass (see PASS route in step A8), the process proceeds to step A9.
[0182] In step A9, the test control unit 25 checks whether the rank (current rank) set by performing rank correction in step A7 is the correction upper limit. If the check result shows that the current rank has not reached the correction upper limit (see NO route in step A9), the process returns to step A7.
[0183] Moreover, if the result of the check in step A9 is that the current rank has reached the correction upper limit (see the YES route in step A9), the process proceeds to step A10.
[0184] Furthermore, if the result of the determination in step A8 is that the retest of the test target processor fails (see the FAIL route in step A8), the process also proceeds to step A10.
[0185] In step A10, the test control unit 25 determines the highest rank at which the test target processor has passed as the actual rank of the test target processor, and ends the process.
[0186] On the other hand, if the result of the initial rank test carried out in step A6 is a failure (see the FAIL route in step A6), the process proceeds to step A11.
[0187] In step A11, the test control unit 25 performs rank correction so as to lower the rank by one rank.
[0188] In step A12, the test control unit 25 causes the SLT device 21 to retest the test target processor in a new test environment realized by the test conditions after rank correction. The test control unit 25 determines whether the test target processor passes (PASS) or fails (FAIL) as a result of the retest of the test target processor.
[0189] If the retest result of the target processor fails (see the FAIL route in step A12), the process proceeds to step A13.
[0190] In step A13, the test control unit 25 checks whether the rank (current rank) set by performing rank correction in step A11 is the correction lower limit. If the check result shows that the current rank has not reached the correction lower limit (see NO route in step A13), the process returns to step A11.
[0191] On the other hand, if the result of the check in step A13 is that the current rank has reached the correction lower limit (see the YES route in step A13), the process proceeds to step A14.
[0192] In step A14, the test control unit 25 checks whether the test target processor has passed the rank in the test performed in step A12. If the check result shows that the test target processor has not passed the rank (see NO route in step A14), the test target processor is determined to be defective (step A15), and the process ends.
[0193] Also, if the result of the check in step A14 indicates that there is a passed rank (see the YES route in step A14), the process proceeds to step A10. In step A10, the passed rank is determined as the actual rank of the processor under test, and the process then ends.
[0194] Furthermore, if the result of the determination in step A12 is that the retest of the test target processor passes (see the PASS route in step A12), the process also proceeds to step A10.
[0195] In step A10, the test control unit 25 determines the highest rank at which the test target processor has passed as the actual rank of the test target processor, and ends the process.
[0196] Next, the process in the development phase of the test system 1 according to one embodiment will be described with reference to the flowchart (steps B1 to B6) shown in FIG.
[0197] In step B1, the front-end testing section 10 performs a unit test on each of the multiple test target processors. As a result, unit test results including, for example, 28 types of ROSC oscillation frequencies and quiescent power supply currents are collected for each test target processor (step B2).
[0198] In step B3, the back-end test section 20 performs an SLT test (device test) on each of the multiple test target processors, thereby collecting, for example, the value of the lower limit operating voltage of each test target processor (step B4).
[0199] In step B5, the prediction method creation unit 14 checks whether the items to be used as inputs for calculating the prediction formula have been determined (evaluation complete). If the items to be used in the prediction formula have not been determined (see NO route in step B5), the process returns to step B1.
[0200] Moreover, when the items to be used in the prediction formula have been determined (see the YES route from step B5), the process proceeds to step B6.
[0201] In step B6, the prediction method creation unit 14 creates a prediction formula by performing correlation analysis based on the unit test results and the device test results. Then, the process ends. Then, the process moves to the mass production phase.
[0202] For example, the prediction method creation unit 14 analyzes the correlation between the ROSC oscillation frequency and the lower limit voltage (voltage) by principal component analysis, and creates a prediction formula. After that, the process ends and the process moves to the mass production phase.
[0203] Next, a process of a front-end test in the mass production phase of the test system 1 according to an embodiment will be described with reference to a flow chart (steps C1 to C7) shown in FIG.
[0204] In step C1, the front-end testing section 10 performs a unit test on each of a plurality of test target processors, and in step C2, the test results (unit test results) are collected.
[0205] In step C3, for example, the test control device 100 performs a pass / fail judgment to determine whether the test target processor is good or bad based on the result of the unit test. For example, the test control device 100 may perform the pass / fail judgment by determining whether the value obtained as a result of the unit test is within a predetermined reference range.
[0206] If the result of this quality check is PASS (see PASS route in step C3), the tested processor is determined to be a good product (step C6). If the result of this quality check is FAIL (see FAIL route in step C3), the tested processor is determined to be a defective product (step C7).
[0207] In step C4, the prediction rank determination unit 15 extracts measurement values (items) used for rank prediction from the unit test results.
[0208] The predicted rank determination unit 15 uses the extracted value and the prediction formula to predict the rank of the processor under test.
[0209] In step C5, the predicted rank determination unit 15 stores information indicating the determined predicted rank in a predetermined storage area of the storage unit 200d, for example, in association with information identifying the test target processor that has been determined to be a pass. Then, the process ends.
[0210] Next, the process of post-process testing in the mass-production phase of the test system 1 according to one embodiment is shown in the flowchart (steps A4 to A15) in FIG.
[0211] The process shown in FIG. 9 is carried out after the process of the front-end test in the mass production phase shown in FIG.
[0212] In addition, in the figure, the processes denoted by the same reference numerals as those already described indicate similar processes, and therefore the description thereof will be omitted. That is, the processes of steps A4 to A15 shown in Fig. 9 are the same as steps A4 to A15 in the flowchart shown in Fig. 6.
[0213] Next, the process of the optimization processor 26 of the test system 1 according to the embodiment will be described with reference to the flowchart (steps D1 to D5) shown in FIG.
[0214] In step D1, the optimization processing unit 26 collects the rank determination results (predicted ranks and actual ranks) for a predetermined period of time.
[0215] In step D2, the optimization processor 26 analyzes the rank determination result. Specifically, in step D3, the optimization processor 26 determines whether the value obtained from the rank determination result is within a predefined target. For example, the optimization processor 26 determines whether the occurrence rate of erroneous determination of predicted rank with respect to actual rank is within a target.
[0216] If the incidence rate is not within the target range (see NO route from step D3), the process proceeds to step D4. In step D4, the optimization processing unit 26 performs correlation analysis again based on the collected rank determination results to calculate a correction value for the prediction formula.
[0217] In step D5, the optimization processor 26 updates the prediction method (prediction formula) using the calculated correction value, and then returns to step D1.
[0218] Moreover, if the result of the check in step D3 is that the incidence rate is within the target range (see the YES route in step D3), the process ends.
[0219] Next, a process in the case where optimization of the prediction formula is combined with a process of post-process testing in the mass production phase of the test system 1 according to an embodiment is shown in the flowchart (steps A4 to A17) in FIG.
[0220] The process shown in Fig. 11 is obtained by adding step A16 and step A17 to the process (steps A4 to A15) of the front-end test in the mass-production phase shown in Fig. 9. The process of steps A4 to A15 shown in Fig. 11 is similar to steps A4 to A15 in the flowchart shown in Fig. 9, and therefore a description of these processes will be omitted.
[0221] In step A10, the test control section 25 determines the maximum rank at which the test target processor has passed as the actual rank of the test target processor, and then proceeds to step A16. In step A16, the optimization processing unit 26 calculates update information (correction value) for the rank prediction method (prediction formula) from a correlation analysis of the rank determination results.
[0222] In step A17, the optimization processor 26 updates the prediction formula (prediction method) in accordance with the update information calculated in step A16.
[0223] 12 to 14 are diagrams for explaining the results of tests performed by the test system 1 according to one embodiment.
[0224] In the example shown below, the processor under test is a server processor, and the lower limit operating voltage is used as an index of rank.
[0225] In the development phase, the front-end test section 10 obtained a total of 29 values, including the quiescent power supply current obtained from the front-end test results using 15 processors, and the oscillation frequencies of 28 types of ROSC built into the processors. In addition, the back-end test section 20 measured the lower limit voltage of operation in the SLT test.
[0226] In the prediction method creation unit 14, the correlation between the lower operating limit voltage and 29 kinds of numerical values including the quiescent power supply current and the oscillation frequencies of 28 kinds of ROSCs built into the processor was analyzed by a principal component analysis program.
[0227] As a result, the combined contribution rate of the first and second principal components was 98.1%, so we decided to use up to the second principal component for prediction.
[0228] The initial prediction equation for calculating the lower limit voltage is expressed by the following equation (3) using the first principal component and the second principal component.
[0229] Lower limit voltage = 0.004238 × first principal component - 0.01 × second principal component + 0.983806 (3)
[0230] The prediction rank determination unit 15 calculates the first and second principal components from the quiescent power supply current and ROSC values using a principal component analysis program. This is input into a prediction formula to predict the lower operating limit voltage. The prediction rank determination unit 15 determines the prediction rank based on the rank condition information T1 illustrated in FIG. 5.
[0231] FIG. 12 shows the relationship between the predicted ranks obtained from the prediction formula and the actual ranks set based on the post-process test for the 220 processors.
[0232] In FIG. 12, the number of processors and the percentage of that number are shown in association with each combination of predicted rank (prediction) and actual rank (performance).
[0233] 12, the percentage of cases where the actual rank B was erroneously determined to be predicted rank A, "A prediction → B actual results," was 0.9% (see symbol P1). In contrast, the percentage of cases where the actual rank A was erroneously determined to be predicted rank B, "B prediction → A actual results," was 20.5% (see symbol P2), indicating that the rank predictions tended to be underestimated. In addition, the numbers of these erroneous determination cases, 2 and 45, are unbalanced.
[0234] Therefore, the optimization processor 26 performs correlation analysis with the goal of having approximately the same number of cases of "A prediction → B actual results" as those of "B prediction → A actual results", and modifies the prediction formula. As a result, it is determined that the prediction formula can be optimized by correcting the constant term of the prediction formula, and the lower operating limit voltage correction amount = -0.0163 (V) is determined as the correction value. The optimization processor 26 applies the calculated lower limit operational voltage correction amount to the equation (5) to update it as shown in the following equation (4).
[0235] Lower limit voltage = 0.004238 × first principal component - 0.01 × second principal component + 0.967506 (4)
[0236] FIG. 13 shows the relationship between the predicted ranks obtained from the prediction formula updated by the optimization processing unit 26 and the actual ranks set based on the post-process test for the 220 processors.
[0237] In FIG. 13, the number of cases in which the actual rank A was erroneously determined to be the predicted rank B, "prediction B -> actual result A", has decreased to 13 (see symbol P3), indicating that the number of erroneous determinations has decreased.
[0238] In addition, the number of cases in which the actual rank B was erroneously judged as predicted rank A (prediction A → actual result B) and the number of cases in which the actual rank A was erroneously judged as predicted rank B (prediction B → actual result A) each accounted for 5.9% (see symbols P3 and P4), and it can be seen that the number of cases in which misjudgments were made was balanced.
[0239] To confirm the effect, the number of ranking tests for each rank was compared. Figure 14 shows the results of comparing the number of tests for each case where the prediction formula before correction (initial prediction formula) was used and the corrected prediction formula (corrected prediction formula) was used.
[0240] In FIG. 14, the initial prediction formula and the corrected prediction formula are each associated with the number of tests in which the formula was selected as rank A (A selection), the number of tests in which the formula was selected as rank B (B selection), and the sum of these numbers (total number of tests).
[0241] As shown in Fig. 14, the optimization processor 26 optimizes (modifies) the prediction formula, and the number of tests is reduced from 317 to 234. The reduction in the number of tests also reduces the test time. In Fig. 14, the reduction in test time is 26.2 {= 1 - (234 / 317)} %.
[0242] (C) Effects As described above, in the test system 1 according to an embodiment, the predicted rank determination section 15 predicts the rank of the processor to be tested based on the results of the front-end test performed by the front-end test section 10, and sets the predicted rank.
[0243] Furthermore, the test condition setting unit 24 sets test conditions for the back-end test unit 20 (SLT device 21) to perform an initial rank test on the processor to be tested, according to the set predicted rank.
[0244] Then, the test control unit 25 performs an initial rank test of the processor to be tested in a test environment realized by the initial test conditions set by the initial test condition setting unit 24, and then performs a correction rank test to correctly set the rank of the processor to which a predicted rank different from the actual rank has been set.
[0245] As a result, even if an erroneous determination occurs in which the predicted rank differs from the actual rank, the correct rank can be set for the processor under test, thereby improving the test accuracy.
[0246] In the corrected rank test, the test control unit 25 performs rank correction by changing the test conditions from those corresponding to the current rank to those corresponding to the rank one rank higher or lower according to the results of the previous test. This makes it possible to efficiently determine the actual rank of the processor under test.
[0247] The optimization processing unit 26 performs correlation analysis again based on the rank determination results (predicted rank and actual rank) to calculate a correction value for the prediction formula and update (optimize) the prediction formula.
[0248] This improves the accuracy of the prediction formula and reduces erroneous judgments of the predicted rank, so that the number of times the correction rank test is performed (the number of loops) can be reduced. Therefore, the number of times that unnecessary correction rank tests are performed can be reduced, and the correction rank tests can be performed efficiently. In addition, the cost of the correction rank tests can be reduced.
[0249] (D) Other The configurations and processes of this embodiment may be selected as necessary, or may be combined as appropriate.
[0250] The disclosed technology is not limited to the above-described embodiment, but can be implemented in various modifications without departing from the spirit of the present embodiment.
[0251] For example, if the target defect rate and yield rate can be achieved by the results of the predicted rank test alone through optimization by the optimization processing unit 26, the corrected rank test may be omitted. This allows further reduction in test time. Therefore, it is desirable for the optimization processing unit 26 to monitor the defect rate and yield rate of the processor.
[0252] The process of post-process testing after completion of optimization of the prediction formula in the mass production phase of the test system 1 according to one embodiment will be described with reference to the flowchart (steps E1 to E5) shown in FIG.
[0253] In step E1, the predicted rank acquisition unit 23 acquires the predicted rank that the predicted rank determination unit 15 has set for the processor under test from the storage unit 200d or the like.
[0254] In step E2, the initial test condition setting unit 24 refers to the rank condition information T1 based on the predicted rank of the processor to be tested, and sets test conditions (e.g., operating voltage and operating frequency) for the post-process testing unit 20 (SLT device 21) to perform an initial rank test on the processor to be tested.
[0255] In step E3, the test control unit 25 executes a test of the test target processor under initial test conditions according to the predicted rank determined for the test target processor by the predicted rank determination unit 15. The test control unit 25 determines whether the test target processor passes (PASS) or fails (FAIL) as a result of the initial rank test.
[0256] If the result of the initial rank test is a pass (see PASS route at step E3), the process proceeds to step E4.
[0257] In step E4, the test control section 25 determines the predicted rank of the processor under test as the actual rank, and ends the process.
[0258] Also, in step E3, if the result of the initial rank test is a failure (see the FAIL route in step E3), the process proceeds to step E5.
[0259] In step E5, the test control section 25 determines that the processor under test is defective, and ends the process.
[0260] 15, the corrected rank test may be partially performed. For example, the test control unit 25 may perform the corrected rank test on a certain amount of test target processors. The test control unit 25 may not normally perform the corrected rank test, but may perform the corrected rank test periodically or whenever the number of tests reaches a predetermined threshold.
[0261] Furthermore, the test control unit 25 may perform a correction rank test in a sampling manner. For example, the test control unit 25 selects a processor to be monitored in a sampling manner at a predetermined timing (for example, random timing) to perform a correction rank test and check the difference between the predicted rank and the actual rank of the processor. For example, the test control unit 25 may perform a correction rank test when the difference between the predicted rank and the actual rank is equal to or greater than a threshold. In this case, the optimization processing unit 26 may perform a correlation analysis by reflecting a target regarding the relationship between the predicted rank and the actual rank of the sampled processor, and calculate a correction value for the prediction formula.
[0262] In addition, the test control unit 25 may check whether the defect rate in the initial rank test is within a preset target range, and perform a correction rank test if the defect rate in the initial rank test is outside the target range.
[0263] Furthermore, the test control unit 25 checks the impact when any change that affects the prediction method is made, such as an improvement in the semiconductor process (manufacturing recipe) or an update of the manufacturing equipment (for example, repair of a broken equipment or replacement of an aging equipment). If an adverse effect due to the change is confirmed as a result of this check, a correction rank test may be performed. The adverse effect due to the change may be, for example, an increase in the number of cases where the difference between the predicted rank and the actual rank is equal to or greater than a threshold, or an increase in the defect rate in the initial rank test.
[0264] A process of performing a combination of optimization of a prediction formula and a correction rank test in a post-process test in a mass production phase of a test system according to an embodiment will be described with reference to a flowchart (steps E1 to E5, A6 to A17, F1) shown in FIG.
[0265] The processing in steps A4 to A17 in Fig. 16 is similar to steps A4 to A17 in the flowchart shown in Fig. 11, and the processing in steps E1 to E5 in Fig. 16 is similar to steps E1 to E5 in the flowchart shown in Fig. 15. Detailed description of these will be omitted.
[0266] In step E2, the initial test condition setting unit 24 refers to the rank condition information T1 based on the predicted rank of the processor to be tested, and sets test conditions (e.g., operating voltage and operating frequency) for the post-process testing unit 20 (SLT device 21) to perform an initial rank test on the processor to be tested.
[0267] In step F1, the test control unit 25 determines whether or not to perform a corrected rank test. The test control unit 25 may perform the corrected rank test on a certain amount of test target processors. For example, the test control unit 25 may not normally perform the corrected rank test, but may perform the corrected rank test periodically or whenever the number of tests reaches a predetermined threshold. The test control unit 25 may also perform the corrected rank test on a sampling basis.
[0268] If the corrected rank test is not performed (normally), the process proceeds to step E3, whereas if the corrected rank test is performed, the process proceeds to step A6.
[0269] Furthermore, in the above-described embodiment, the predicted rank determined by the predicted rank determination unit 15 is stored in the memory unit 200d of the test control device 100, and the predicted rank acquisition unit 23 acquires the predicted rank from the memory unit 200d, but this is not limited to this.
[0270] Instead of the predicted rank, the measurements required for rank prediction may be stored in the processor's non-volatile memory.
[0271] In the manufacturing process of a processor, the front-end process and the back-end process are often carried out in different factories. Also, the processing of the above-mentioned predictive rank determination unit 15 may be carried out in the front-end process or in the back-end process.
[0272] When the processing of the prediction rank determination unit 15 is performed in a front-end process, i.e., when a prediction formula is used in the front-end process, the prediction rank determined in the front-end process is recorded in a processor, etc. On the other hand, when the processing of the prediction rank determination unit 15 is performed in a back-end process, i.e., when a prediction formula is used in the back-end process, the value of the unit test result, rather than the prediction rank, is recorded in a processor, etc.
[0273] Furthermore, when the processing of the prediction rank determination unit 15 is performed in a factory where the upstream process is performed, when the optimization processing unit 26 updates the prediction formula, the correction contents of the prediction formula calculated based on the SLT test results of the downstream process must be transferred between factories, which takes more time.
[0274] Therefore, in order to save time, during the mass production phase, values from the unit test results used for rank prediction (e.g., the quiescent power supply current value and the 28 types of ROSC values) may be recorded in the processor's non-volatile memory, etc., before shipping.
[0275] Furthermore, the predicted ranks determined by the predicted rank determination unit 15 and values of the unit test results used for rank prediction (preceding process test results necessary for prediction) may be stored in a database (not shown).
[0276] In the above embodiment, the prediction method creation unit 14 creates a prediction formula, but the present invention is not limited to this example and may be modified in various ways. For example, the prediction method creation unit 14 may determine the prediction formula by having a machine learning model make an estimation.
[0277] When using a machine learning model instead of a prediction formula, the optimization processing unit 26 may achieve optimization by, for example, using the results of unit testing (pre-process testing) of the processor in the mass production phase as input and training the machine learning model using the actual rank determined in the corrected rank test as corrective data.
[0278] In addition, the training of the machine learning model may include test results of a prototype processor in the development phase. For example, if a prototype processor has a manufacturing problem that is resolved in a mass-production phase processor, the test results of the prototype processor in the development phase are excluded from the training data. The test results of the prototype processor may be included if they are within the range of manufacturing variation.
[0279] Furthermore, the functions of the test control device 100 may be distributed among a plurality of computers.
[0280] For example, a first computer provided at a first site may realize the functions of the prediction method creation unit 14 and the prediction rank determination unit 15, and a second computer provided at a second site may realize the functions of the prediction rank acquisition unit 23, the initial test condition setting unit 24, the test control unit 25, and the optimization processing unit 26, and various modifications can be made. In this case, necessary data (prediction rank, prediction formula, correction value of the prediction formula, etc.) may be exchanged between the first computer and the second computer via a network, database, etc.
[0281] In the above-described embodiment, the test object is a processor, but the present invention is not limited to this. The test object may be an LSI other than a processor, and various modifications can be made.
[0282] In the above-described embodiment, the operating voltage of the rank condition information T1 is used as the initial test conditions in the initial rank test, the pass / fail threshold for determining whether the test target processor passes or fails in the initial rank test of the processor, the corrected test conditions in the corrected rank test, and the pass / fail threshold for determining whether the test target processor passes or fails in the corrected rank test of the processor, but is not limited to this. These test conditions and thresholds may be provided separately from the rank condition information T1.
[0283] Furthermore, the above disclosure enables a person skilled in the art to implement and manufacture the present embodiment. (E) Notes Regarding the above embodiment, the following supplementary notes are further disclosed.
[0284] (Appendix 1) setting a first evaluation value for the test object based on a first test result obtained by a first test device performing a first test on the test object; causing a second testing device to perform a second test on the test object under initial test conditions set based on the first evaluation value; causing the second test device to perform a third test on the test object under test conditions corrected according to a second test result obtained by performing the second test; A test control program that causes a processor to execute a process.
[0285] (Appendix 2) After the third test, Correction of test conditions according to the results of previous tests; and repeating the test on the test object by the second test device under the corrected test conditions until a termination condition is satisfied. 2. The test control program according to claim 1, wherein the program causes the processor to execute a process.
[0286] (Appendix 3) updating a first evaluation generation method for generating the first evaluation value based on the first evaluation value and the results of the third test for a plurality of test subjects; 3. The test control program according to claim 1 or 2, which causes the processor to execute a process.
[0287] (Appendix 4) a first testing unit that performs a first test on a test object; a second testing unit that performs a second test on the test object; a first evaluation value setting unit that sets a first evaluation value for the test object based on a first test result obtained by the first testing unit through the first test; a first control unit that causes the second testing unit to perform a second test on the test object under initial test conditions set based on the first evaluation value; A second control unit causes the second testing unit to perform a third test on the test object under test conditions corrected according to a second test result obtained by performing the second test; A test system comprising:
[0288] (Appendix 5) a third control unit that repeatedly performs, after the third test, correction of test conditions according to the results of the previous test and a test on the test object under the corrected test conditions until a termination condition is satisfied. 5. The test system according to claim 4, comprising:
[0289] (Appendix 6) an update unit that updates a first evaluation generation method for generating the first evaluation value based on the first evaluation value and a result of the third test for a plurality of test subjects; 6. The test system according to claim 4 or 5, comprising:
[0290] (Appendix 7) setting a first evaluation value for the test object based on a first test result obtained by performing a first test on the test object; conducting a second test on the test subject under initial test conditions set based on the first evaluation value; A third test is performed on the test subject under test conditions corrected according to the second test results obtained by performing the second test. A test control method, characterized in that processing is executed by a processor.
[0291] (Appendix 8) After the third test, Correction of test conditions according to the results of previous tests; and repeating the test on the test object under the corrected test conditions until a termination condition is satisfied. 8. The test control method according to claim 7, wherein the processing is executed by the processor.
[0292] (Appendix 9) updating a first evaluation generation method for generating the first evaluation value based on the first evaluation value and the results of the third test for a plurality of test subjects; 9. The test control method according to claim 7 or 8, wherein the processing is executed by the processor. [Explanation of symbols]
[0293] 1 Test system 10 Front-end Testing Department 11 First front-end test equipment 12 Second front-end test equipment 13 Front-end test processing section 14. Forecasting Method Creation Department 15 Prediction Ranking Division 20 Post-process Testing Department 21 SLT equipment 22 Post-process test processing section 23 Prediction Rank Acquisition Section 24 Initial test condition setting section 25 Test control section 26 Optimization Processing Section 100 Test control device 113,123 LSI tester 200 Computers 200a processor 200b Graphics processing unit 200c Memory 200d storage section 200e IF section 200f IO section 200g Reading section 200h Program 200i recording media 200j bus 211 Memory 212 Mounting part 213 Cooler 214 IO card 215 Storage device 216 Console 217 Power supply T1 Rank Condition Information
Claims
1. setting a first evaluation value for the test object based on a first test result obtained by performing a first test on the test object; conducting a second test on the test subject under initial test conditions set based on the first evaluation value; A third test is performed on the test subject under test conditions corrected according to the second test results obtained by performing the second test. A test control program that causes a processor to execute a process.
2. After the third test, Correction of test conditions according to the results of previous tests; and repeating the test on the test object under the corrected test conditions until a termination condition is satisfied.
2. The test control program according to claim 1, wherein the program causes the processor to execute a process.
3. updating a first evaluation generation method for generating the first evaluation value based on the first evaluation value and the results of the third test for the plurality of test subjects; 3. The test control program according to claim 1, wherein the program causes the processor to execute a process.
4. a first testing unit that performs a first test on a test object; a second testing unit that performs a second test on the test object; a first evaluation value setting unit that sets a first evaluation value for the test object based on a first test result obtained by the first testing unit through the first test; a first control unit that causes the second testing unit to perform a second test on the test object under initial test conditions set based on the first evaluation value; a second control unit that causes the second testing unit to perform a third test on the test object under test conditions corrected according to a second test result obtained by performing the second test; A test system comprising:
5. setting a first evaluation value for the test object based on a first test result obtained by performing a first test on the test object; conducting a second test on the test subject under initial test conditions set based on the first evaluation value; A third test is performed on the test subject under test conditions corrected according to the second test results obtained by performing the second test. A testing method comprising the steps of: executing a process by a processor;
Citation Information
Patent Citations
System for testing semiconductor device, and method of testing
JP2002237505A
Semiconductor device, and testing method therefor
JP2006267056A
Test management device
JP2013002892A
