Management device, management method, management program, and management system
The management device and method optimize inventory and contractor selection to balance delivery times and costs, addressing the challenges of inventory management in power transmission lines by ensuring timely delivery and reducing operational and storage expenses.
Patent Information
- Application Number
- JP2024145621
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2020-06-22
- Filing Date
- 2024-08-27
- Publication Date
- 2024-10-31
- Estimated Expiration
- 2040-09-15
AI Technical Summary
Existing inventory management systems for power transmission lines face challenges in balancing inventory levels to meet short delivery times without excessive costs, leading to either insufficient stock impacting customer operations or high inventory costs for manufacturing companies.
A management device and method that registers customer information, calculates inventory needs based on equipment usage, determines stock sufficiency, orders production when needed, and manages replacement costs, prioritizing contractors based on past performance, and adjusts inventory levels to maintain social infrastructure while reducing costs.
This approach maintains social infrastructure by minimizing the impact on customer operations and manufacturing costs, ensuring timely delivery and reducing inventory expenses by strategically managing inventory and contractor selection.
Smart Images

Figure 2024155998000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a management device, a management method, a management program, and a management system for managing facilities. [Background technology]
[0002] In transactions involving power transmission lines, a type of equipment, manufacturers generally prepare quotations in response to requests from companies wishing to purchase (hereafter referred to as customer companies). Note that power transmission lines are a comprehensive concept that includes bare wires, uncoated electric wires (insulated electric wires), CV (cross-linked polyethylene insulated vinyl sheath cable) cables, and OF cables. The customer company reviews the contents of the quotation and places an order. The manufacturing company processes the order for each part so that it will be delivered in time for the delivery date of the ordered product (designated delivery date) based on the parts and quantities required to produce the ordered product, the time it takes from ordering each part to delivery (hereafter referred to as delivery lead time), the time it takes to manufacture, and the schedule when the construction company can carry out the electric wire installation work.
[0003] If the parts required to manufacture the ordered product are not in stock, the product will be manufactured using the part or material with the longest delivery lead time, and there is a possibility that the request for a short delivery time cannot be met.
[0004] In response to this, technology has been proposed that sets a safety stock to secure inventory for parts or materials with long delivery lead times, allowing production to be carried out without being affected by the delivery lead time of the parts as long as the quantity is within the range of the safety stock (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2011-18253 A Summary of the Invention [Problem to be solved by the invention]
[0006] However, if the inventory amount is set low, the manufacturing company can suppress the costs of producing and storing the inventory because the inventory is not held in excess, but if there are orders exceeding the inventory amount, it becomes difficult to respond within the delivery lead time, and the request for short delivery cannot be met, which affects the operation of the customer company. On the other hand, if the inventory amount is set high, the equipment can be provided according to the orders from the customer company, and the operation of the customer company is not affected, but if the order situation continues in which the inventory amount is less than the inventory amount, the inventory will be held for a long period of time, making it difficult for the manufacturing company to suppress the costs of producing and storing the inventory. As a result, it becomes impossible to maintain social infrastructure, or the maintenance costs of social infrastructure increase.
[0007] The present invention aims to provide a management device, management method, management program, and management system that can maintain social infrastructure by minimizing the impact on client company operations and reducing the costs of manufacturing and storing equipment by manufacturing companies, thereby reducing maintenance costs. [Means for solving the problem]
[0008] In order to solve the above-mentioned problems and achieve the object, the management device of the present disclosure is a management device for managing equipment inventory, and includes a first registration unit that registers customer information including at least information regarding equipment used by a customer, a first calculation unit that calculates a total number of each type of equipment based on information regarding the equipment included in the customer information and calculates a first inventory number for each type of equipment based on the total number, a determination unit that compares the first inventory number calculated by the first calculation unit with an actual equipment inventory number and determines whether or not the actual equipment inventory number is insufficient, a first ordering unit that places an order for the manufacture of the equipment that is insufficient when the determination unit determines that the actual equipment inventory number is insufficient, a calculation unit that calculates a payment amount for each customer registered by the first registration unit based on the cost of a replacement for equipment, and a presentation unit that presents the payment amount calculated by the calculation unit to the customer.
[0009] The management device of the present disclosure, in the above disclosure, is configured to include a reception unit that receives equipment replacement requests from customers registered in the first registration unit, a subtraction unit that subtracts the number of equipment to be replaced received by the reception unit from the actual equipment inventory, and a second ordering unit that, when a request for equipment replacement is received by the reception unit, orders a contractor to replace the equipment.
[0010] The management device according to the present disclosure, in the above disclosure, includes at least a second registration unit that registers information about construction contractors including information about past construction, and when a plurality of construction contractors are registered and a request for replacing one piece of equipment is received by the reception unit, the management device determines a priority order of the construction contractors based on the information about the past construction included in the information about the construction contractors, or when a plurality of construction contractors are registered and a request for replacing a plurality of pieces of equipment is received by the reception unit, the management device determines a priority order of the construction contractors based on the information about the past construction included in the information about the construction contractors and performs the construction based on the information indicating the priority order of the equipment. and a first determination unit that determines a priority order for the equipment to be replaced, wherein the second ordering unit is configured, when a plurality of construction contractors are registered and a request for replacement of one piece of equipment is received by the reception unit, to select a construction contractor based on the priority order of the construction contractors determined by the first determination unit and place an order for the selected construction contractor to replace the equipment, or, when a plurality of construction contractors are registered and a request for replacement of a plurality of pieces of equipment is received by the reception unit, to select a construction contractor based on the priority order of the construction contractors determined by the first determination unit and place an order for the selected construction contractor to replace the equipment determined based on the priority order of the equipment determined by the first determination unit.
[0011] The management device according to the present disclosure, in the above disclosure, comprises at least a second registration unit which registers information regarding construction contractors including information regarding past construction, and a first determination unit which, when only one construction contractor is registered and a request for replacement of one piece of equipment is received by the reception unit, selects that construction contractor, or, when only one construction contractor is registered and a request for replacement of multiple pieces of equipment is received by the reception unit, selects that construction contractor and determines the priority of the equipment to be performed based on information indicating the priority of the equipment, and the second ordering unit is configured, when only one construction contractor is registered and a request for replacement of one piece of equipment is received by the reception unit, to order the replacement of the equipment to the construction contractor determined by the first determination unit, or, when only one construction contractor is registered and a request for replacement of multiple pieces of equipment is received by the reception unit, to order the replacement of the equipment determined based on the priority of the equipment determined by the first determination unit.
[0012] The management device according to the present disclosure, in the above disclosure, is configured to include a notification unit that, when a request for equipment replacement is received by the receiving unit, selects multiple construction companies based on the priority order of the construction companies determined by the first determination unit and notifies the selected multiple construction companies of a construction specification, a first receiving unit that receives quotations from the multiple construction companies, a first transmitting unit that transmits the quotations to a customer that received the request for equipment replacement by the receiving unit, a second receiving unit that receives a selection result by the customer that sent the quotations by the first transmitting unit, and a second transmitting unit that transmits the selection result to the multiple construction companies that received the quotations by the first receiving unit, and the second ordering unit is configured to place an order for equipment replacement with the construction company selected by the customer based on the selection result.
[0013] The management device of the present disclosure is configured in the above disclosure to include a second determination unit that determines the timing to purchase materials for manufacturing equipment, and the first ordering unit instructs the purchase of materials for manufacturing equipment at the timing determined by the second determination unit.
[0014] The management device of the present disclosure, in the above disclosure, is configured to include a second calculation unit that calculates information indicating the useful life of each type of equipment based on information on the equipment included in the customer information, and the first calculation unit determines the total number of each type of equipment based on the information on the equipment included in the customer information, and calculates a first inventory quantity for each type of equipment based on the total number and the information indicating the useful life of each type of equipment calculated by the second calculation unit.
[0015] The management device of the present disclosure, in the above disclosure, is configured such that the second calculation unit uses a predictive model generated based on information about equipment provided from an external device to calculate information indicating the useful life of each type of equipment based on information about equipment included in the customer information.
[0016] The management device of the present disclosure is configured in the above disclosure such that the calculation unit determines a reserve period based on information indicating the useful life of each type of equipment calculated by the second calculation unit, and calculates the reserve fund based on the reserve period and the cost of replacing the equipment.
[0017] The management device of the present disclosure is configured in the above disclosure such that the calculation unit determines a reserve period based on information indicating the useful life of each type of equipment calculated by the second calculation unit, and calculates the reserve fund based on the reserve period and costs associated with pre-emptive measures before replacing the equipment with a replacement for the equipment.
[0018] The management device of the present disclosure is configured in the above disclosure such that the calculation unit determines a reserve period based on information indicating the useful life of each type of equipment calculated by the second calculation unit, and calculates the reserve fund based on the reserve period and the costs associated with diagnosing initial defects when replacing equipment.
[0019] The management device of the present disclosure is configured in the above disclosure such that the calculation unit calculates the cost of a replacement for the equipment based on the manufacturing price of the equipment manufactured by order of the first ordering unit, recalculates the payment amount based on the calculated cost of the replacement for the equipment and the savings period, and the presentation unit presents the payment amount recalculated by the calculation unit to the customer.
[0020] The management device according to the present disclosure is configured in the above disclosure such that the equipment is a power transmission line that transmits electric power, the power transmission line has a plurality of specifications, a power transmission line configured with a higher specification is compatible with a power transmission line configured with a lower specification, and the first inventory quantity includes at least one power transmission line configured with a higher specification.
[0021] In the management device according to the present disclosure, in the above disclosure, the higher-level specifications are a higher allowable voltage that can be transmitted through the power transmission line, a larger size of the power transmission line, or a higher-level type of power transmission line.
[0022] The management device according to the present disclosure is configured in the above disclosure such that the second calculation unit calculates a useful life for each specification of a power transmission line based on information about equipment included in the customer information by utilizing a prediction model generated based on information about equipment included in the customer information or information about equipment provided by an external device, the first calculation unit obtains a total number of each specification of power transmission lines based on information about equipment included in the customer information, and calculates a first inventory number for each specification of the power transmission line based on the total number and the useful life for each specification of the power transmission line calculated by the second calculation unit, the determination unit compares the first inventory number calculated by the first calculation unit with an actual inventory number of power transmission lines and determines whether or not the actual inventory number of power transmission lines is insufficient, and when it is determined by the determination unit that the actual inventory number of power transmission lines is insufficient, the first order unit calculates a replacement date from the useful life for each specification of the power transmission line calculated by the second calculation unit, calculates a production start date taking into account a time required for manufacturing the power transmission line from the replacement date, and places an order for manufacturing the power transmission line based on the production start date.
[0023] In the management device of the present disclosure, in the above disclosure, a power transmission line configured with a higher specification is compatible with a power transmission line configured with a lower specification, and the first inventory quantity includes at least one power transmission line configured with the higher specification.
[0024] In order to solve the above-mentioned problems and achieve the object, the management method of the present disclosure, which manages equipment inventory, includes a first registration step of registering customer information including at least information regarding equipment used by a customer, a first calculation step of calculating a total number of each type of equipment based on information regarding the equipment included in the customer information and calculating a first inventory number for each type of equipment based on the total number, a determination step of comparing the first inventory number calculated in the first calculation step with an actual equipment inventory number to determine whether or not the actual equipment inventory number is insufficient, a first ordering step of ordering the manufacture of the equipment that is insufficient when it is determined by the determination step that the actual equipment inventory number is insufficient, a calculation step of calculating a payment amount for each customer registered in the first registration step based on costs related to replacement equipment, and a presentation step of presenting the payment amount calculated in the calculation step to the customer.
[0025] In order to solve the above-mentioned problems and achieve the objective, the management program for managing equipment inventory of the present disclosure is a program for causing a computer to execute the following steps: a first registration step of registering customer information including at least information regarding equipment used by a customer; a first calculation step of calculating the total number of each type of equipment based on information regarding the equipment included in the customer information, and calculating a first inventory number for each type of equipment based on the total number; a determination step of comparing the first inventory number calculated in the first calculation step with the actual equipment inventory number to determine whether or not the actual equipment inventory number is insufficient; a first ordering step of ordering the manufacture of the equipment that is insufficient when it is determined by the determination step that the actual equipment inventory number is insufficient; a calculation step of calculating a payment amount for each customer registered in the first registration step based on the cost of a replacement for the equipment; and a presentation step of presenting the payment amount calculated in the calculation step to the customer.
[0026] In order to solve the above-mentioned problems and achieve the objective, in a management system including a server according to the present disclosure and a management device for managing an inventory of equipment, the management device includes a first registration unit that registers customer information including at least information regarding equipment used by a customer and stores the customer information in the server, a first calculation unit that calculates a total number of each type of equipment based on information regarding the equipment included in the customer information and calculates a first inventory number for each type of equipment based on the total number, a determination unit that compares the first inventory number calculated by the first calculation unit with an actual inventory number of equipment and determines whether or not the actual inventory number of equipment is insufficient, a first ordering unit that places an order for the manufacture of the equipment that is insufficient when it is determined by the determination unit that the actual inventory number of equipment is insufficient, a calculation unit that calculates a payment amount for each customer registered by the first registration unit based on a cost related to a replacement for equipment, and a presentation unit that presents the payment amount calculated by the calculation unit to the customer. Effect of the Invention
[0027] According to the present disclosure, it is possible to maintain social infrastructure by reducing the impact on customer company operations and reducing the costs of manufacturing and storing equipment by manufacturing companies, thereby reducing the maintenance costs. [Brief description of the drawings]
[0028] [Figure 1] FIG. 1 is a diagram illustrating a configuration of a management system. [Diagram 2] FIG. 2 is a diagram illustrating customer information. [Diagram 3] FIG. 3 is a diagram showing equipment information for each piece of equipment (inventory) that requires replacement. [Figure 4] FIG. 4 is a diagram illustrating a table showing the inventory quantity for each piece of equipment. [Diagram 5] FIG. 5 is a diagram illustrating a configuration of the second calculation unit. [Figure 6] FIG. 6 is a diagram illustrating an example of the first information. [Figure 7] FIG. 7 is a diagram illustrating an example of the second information. [Figure 8] FIG. 8 is a diagram illustrating an example of the third information. [Figure 9] FIG. 9 is a diagram showing a typical model of the reserve fund calculated by the calculation unit. [Figure 10] FIG. 10 is a diagram illustrating an example of a model for calculating reserve funds before and after recalculation. [Figure 11] FIG. 11 is a diagram illustrating an example of information related to a construction contractor. [Figure 12] FIG. 12 is a diagram illustrating an example of information indicating the priority order of facilities. [Figure 13] FIG. 13 is a flowchart showing the steps of a management method for suppressing the impact on the operations of a client company and suppressing the costs of manufacturing and storing equipment by a manufacturing company. [Figure 14] FIG. 14 is a diagram showing the configuration of a computer. [Figure 15] FIG. 15 is a diagram showing another configuration of a computer. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0029] The configuration and operation of a management device, a management method, a management program, and a management system for managing equipment according to this embodiment will be described in detail below with reference to the drawings. Note that the present invention is not limited to the contents described in the following embodiment. Furthermore, the components described below include those that a person skilled in the art can easily imagine and those that are substantially the same. Furthermore, the components described below can be combined as appropriate.
[0030] (Management system configuration) 1 is a diagram showing the configuration of a management system 100 including a server 2 and a management device 1 for managing the inventory of equipment according to this embodiment. In the management system 100, a customer terminal device 3 and the management device 1 are connected to each other via a network NW1. In this embodiment, when referring to a "customer terminal device 3," it may refer to multiple customer terminal devices 3a, 3b, ..., 3n individually, or may refer to multiple customer terminal devices 3a, 3b, ..., 3n as a whole. Note that while the more customers, the better, the effects of this embodiment can be achieved even with just one company.
[0031] The management device 1 is a device operated by a company (hereinafter referred to as an equipment manufacturing management company) or organization that manufactures equipment and manages the inventory of the equipment. Equipment refers to materials that are laid on buildings and roads, both indoors and outdoors, such as electric wires (including communication lines and power lines), utility poles, power-related equipment (insulators, transformers, connection parts, etc.), optical fibers, and optical fiber-related equipment (closures). In this embodiment, electric wires will be described as a representative example of equipment. The customer terminal device 3 is a device operated by a company or organization that receives equipment manufactured by an equipment manufacturing management company.
[0032] In the management system 100, the contractor terminal device 4 and the management device 1 are connected to each other via a network NW2. In this embodiment, when referring to the contractor terminal device 4, it may refer to the multiple contractor terminal devices 4a, 4b, ..., 4n individually, or may refer to the multiple contractor terminal devices 4a, 4b, ..., 4n as a whole. The contractor terminal device 4 is a device operated by a company or organization that installs equipment manufactured by an equipment manufacturing management company.
[0033] In the management system 100, a management device 1 and a server 2 are connected. In this embodiment, when referring to a "server 2," it may refer to the multiple servers 2a, 2b, and 2c individually, or may refer to the multiple servers 2a, 2b, and 2c as a whole. Note that the multiple servers 2a, 2b, and 2c may be configured as a single server. Also, the server 2 may be configured to be mutually connected to the management device 1 via the network NW1 or the network NW2.
[0034] In addition, in the configuration example shown in FIG. 1, the network NW1 and the network NW2 are shown as separate networks, but the present invention is not limited to this configuration and they may be the same network.
[0035] (Management Device Configuration) As shown in FIG. 1, the management device 1 includes a first registration unit 11, a first calculation unit 13, a determination unit 14, a first ordering unit 15, a calculation unit 16, and a presentation unit 17.
[0036] The first registration unit 11 registers customer information including at least information regarding the equipment used by the customer. Here, the customer information will be explained. The customer uses the customer terminal device 3 to fill in the necessary items in a predetermined registration form provided by the management device 1. The customer also transmits the registration form with the necessary items entered to the management device 1. The first registration unit 11 generates customer information based on the contents of the registration form received from the customer terminal device 3.
[0037] 2 is a diagram showing a model of customer information I1. The customer information I1 is generated for each customer ID that uniquely identifies a customer, and includes information such as an equipment ID that is an ID (identification) for uniquely identifying the equipment, an installation date that indicates the date on which the equipment was installed, the equipment's useful life, and the manufacturing date of the equipment. The first registration unit 11 stores the generated customer information I1 in the server 2a.
[0038] The first calculation unit 13 obtains the total number of each type of equipment based on the information on the equipment included in the customer information I1, and calculates the first inventory quantity for each type of equipment based on the total number.
[0039] Here, the operation of the first calculation unit 13 will be described. The first calculation unit 13 accesses the server 2a, reads out the customer information I1, and generates equipment information based on the read out customer information I1. FIG. 3 is a diagram showing equipment information I2 for each equipment (inventory) that needs to be replaced. The equipment information I2 is generated for each type of equipment. In the example shown in FIG. 3, equipment information I2_1 for electric wires (power), equipment information I2_2 for electric wires (communication), and equipment information I2_n for optical fibers are shown as equipment, but are not limited to these. In addition, the equipment information I2 shows the number of pieces that need to be replaced for each customer ID. The total number of pieces of equipment that need to be replaced (total number) is the sum of the numbers for each piece of equipment. The equipment information I2 is stored in, for example, the server 2a.
[0040] The first inventory quantity is smaller than the total number of pieces of equipment that require replacement. Specifically, the first calculation unit 13 may be configured to calculate the first inventory quantity using a predetermined table or function for calculating the first inventory quantity based on the total number N of electric wires that require replacement.
[0041] Also, the rule for calculating the first stock quantity may be changed depending on the type of equipment. For example, when the total number of electric wires (electric wires used for signal transmission) is 600, the first calculation unit 13 reduces the number by 50% (the first stock quantity is 300) or 90% (the first stock quantity is 60). When the total number of electric wires (electric wires used for power transmission) is 600, the first calculation unit 13 reduces the number by 40% (the first stock quantity is 360) or 80% (the first stock quantity is 120). There is a social demand for shortening the delivery lead time after a wire breakage for both electric wires (electric wires used for signal transmission) and electric wires (electric wires used for power transmission). Here, for example, electric wires (electric wires used for signal transmission) can be temporarily restored using a mobile wireless vehicle or the like. Therefore, the stock quantity may be determined while taking these circumstances into consideration.
[0042] The determination unit 14 compares the first inventory quantity calculated by the first calculation unit 13 with the actual equipment inventory quantity, and determines whether the actual equipment inventory quantity is insufficient. As described above, the first inventory quantity is calculated based on the total number N of electric wires that will need to be replaced in the future. Therefore, generally, if the total number N increases, the first inventory quantity also increases, and if the total number N decreases, the first inventory quantity also decreases, but the increase rate or decrease rate of the total number N is not the same as the increase rate or decrease rate of the first inventory quantity. For example, even if the total number N increases by 300 from 600 (increase rate is +150%) to 900, the first inventory quantity does not increase by 150%. In other words, it is possible to reduce the resources that should be secured to maintain the infrastructure.
[0043] Fig. 4 is a diagram showing a schematic diagram of table T1 showing the stock quantity for each facility. Table T1 showing the actual stock quantity of facilities is stored in server 2b, and is updated to always show the latest stock quantity. In the example shown in Fig. 4, table T1_1 showing the stock quantity of electric wires (electric power), table T1_2 showing the stock quantity of electric wires (communication), and table T1_n showing the stock quantity of optical fiber are shown, but are not limited to these.
[0044] When the determination unit 14 determines that the actual inventory of the equipment is insufficient, the first ordering unit 15 places an order for the manufacture of the insufficient equipment. In response to the order from the first ordering unit 15, the company that manages the management device 1 starts the manufacture of the equipment.
[0045] The calculation unit 16 calculates the payment amount based on the cost related to the replacement of the equipment for each customer registered by the first registration unit 11. Specifically, the calculation unit 16 calculates the payment amount based on the cost related to the replacement of the equipment for each customer registered by the first registration unit 11, based on the information indicating the useful life of each type of equipment calculated by the second calculation unit 12, which will be described in detail later. The cost related to the replacement of the equipment includes the cost of manufacturing the replacement, the cost of storing the replacement, the cost of transporting the replacement to the site, and the cost of installing the replacement. The cost related to the replacement of the equipment may also include the cost of prior measures before the replacement of the equipment. The payment amount may be paid in a lump sum or in installments. In the following, the money paid in installments is referred to as a reserve fund.
[0046] For example, if the useful life of a certain piece of equipment is 20 years and the cost of replacing the equipment is set at 120 million yen, the monthly reserve fund will be 500,000 yen. Also, if the useful life of a certain piece of equipment is 20 years and the cost of replacing the equipment is set at 12 million yen, the monthly reserve fund will be 50,000 yen.
[0047] The presentation unit 17 presents to the customer the payment amount calculated by the calculation unit 16. Specifically, the presentation unit 17 notifies the relevant customer terminal device 3 of information related to the payment amount via the network NW1. For example, if the payment amount is a savings fund to be paid in installments, the customer deposits the savings fund into a designated bank account by a designated due date each month.
[0048] In this way, the management device 1 can receive payment for the equipment from the customer in advance and manufacture the equipment using this payment as a source of funds, thereby reducing the costs of manufacturing and storing the equipment by the manufacturing company.
[0049] In addition, when the judgment unit 14 judges that the actual equipment inventory is insufficient, the management device 1 orders the manufacture of the equipment through the first ordering unit 15, thereby ensuring a certain amount of inventory and reducing the impact of inventory shortages on the operations of the client company.
[0050] As described above, the management device 1 can reduce the impact on the operations of the client company and reduce the costs of manufacturing and storing the equipment by the manufacturing company. As a result, it is possible to maintain the social infrastructure and reduce the maintenance costs.
[0051] (Operation of the second calculation unit) The management device 1 includes a second calculation unit 12. The second calculation unit 12 accesses the server 2a, reads out the customer information I1, and calculates information indicating the useful life of each type of equipment based on information about the equipment included in the read out customer information I1 (for example, the useful life of the equipment and the date of manufacture of the equipment).
[0052] The information indicating the useful life of each type of equipment is information indicating the useful life of the equipment, or the extension or shortening of the useful life of the equipment. The useful life of the equipment may be indicated, for example, as "20 years left" or "30 years left", or may be indicated as "20 to 30 years left" or "30 to 35 years left". The details of the calculation procedure for the useful life of the equipment will be described later.
[0053] The information indicating the extension or shortening of the equipment's useful life may be shown, for example, as "useful life + useful life × 20%", "useful life - useful life × 20%", or "useful life ± useful life × 20%". For example, if the equipment's useful life was 20 years but it was actually replaced after 15 years, it is assumed that the useful life was shortened (25% shortened) due to the environmental conditions of the place where the equipment was installed. In this case, the second calculation unit 12 calculates "20 years - 5 years (20 years × 25%)" as the information indicating the extension or shortening of the equipment's useful life.
[0054] The first calculation unit 13 obtains the total number of each type of equipment based on the information on the equipment included in the customer information I1. The first calculation unit 13 calculates a first inventory quantity for each type of equipment based on the total number and the information indicating the useful life of each type of equipment calculated by the second calculation unit 12.
[0055] The first calculation unit 13 calculates the first inventory quantity by M / N based on the total number N of electric wires requiring replacement and the useful life (average useful life) M of the electric wires calculated by the second calculation unit 12. For example, if the total number of electric wires requiring replacement is 600 and the useful life (average useful life) of the electric wires calculated by the first calculation unit 13 is 20 years, the second calculation unit 12 sets the first inventory quantity for the first year to 30 (=600 / 20 years).
[0056] The first calculation unit 13 may also divide the useful life into periods and calculate the first stock quantity based on the total number of electric wires belonging to each useful life. For example, an i-th group is set for each decade. The first group is (0-10 years), the second group is (11-20 years), and the third group is (21-30 years). In addition, the number of electric wires Ni belonging to each group is assumed to be 100 wires as N1 in the first group, 300 wires as N2 in the second group, and 200 wires as N3 in the third group. Assuming that the ratio R of 1 / 10 wires is held for each group as the stock, the first group may have 10 wires (N1×R), the second group has 30 wires (N2×R), and the third group has 20 wires (N3×R).
[0057] Furthermore, the first calculation unit 13 may calculate the first inventory quantity by using a table for calculating a predetermined first inventory quantity based on the total number N of electric wires requiring replacement and the useful life (average useful life) M of the electric wires calculated by the second calculation unit 12. For example, if the total number of electric wires requiring replacement is 600 and the useful life (average useful life) of the electric wires calculated by the first calculation unit 13 is 20 years, the first inventory quantity may be reduced by 50% (the first inventory quantity is 300), or if the total number of electric wires requiring replacement is 600 and the useful life (average useful life) of the electric wires calculated by the first calculation unit 13 is 40 years, the first inventory quantity may be reduced by 90% (the first inventory quantity is 60).
[0058] (Useful life calculation procedure_1) The second calculation unit 12 calculates the useful life based on, for example, the "useful life" and "date of manufacture" included in the customer information I1 shown in FIG. 2. The useful life will now be described. Facilities installed in these buildings, including structures, generally have a set designed useful life. The useful life may be indicated in years, such as "20 years" or "30 years," or may be indicated in terms of time, such as "20 to 30 years" or "30 to 40 years."
[0059] The second calculation unit 12 obtains the replacement time from the useful life and the manufacturing date, and calculates the useful life from the replacement time and the calculation date. For example, if the useful life is "30 years", the manufacturing date of the equipment is "October 9, 1998", and the calculation date is "October 10, 2020", the second calculation unit 12 obtains the replacement time as "October 2028" and calculates the useful life as "(8 years) later".
[0060] (Useful life calculation procedure 2) As described above, the equipment installed in these buildings, including structures, generally has a design service life (10 to 20 years, etc.). However, the equipment deteriorates more than expected depending on the installation environment and usage conditions, and this service life changes. For example, the deterioration factors of an electric wire, which is an example of equipment, can be electrical factors such as overvoltage and overcurrent, water intrusion into the wire, mechanical factors (vibration, impact, compression, bending, etc.), thermal factors (decrease in physical properties due to high and low temperatures), ultraviolet rays and salt adhesion (decrease in physical properties), deterioration due to microorganisms, poor construction, etc. In addition, the combination of multiple deterioration factors can further accelerate the deterioration of the equipment, and it may become necessary to replace it before the service life. In addition, even if the equipment is the same, if the installation environment and usage conditions are different, the deterioration state and service life will be different for each equipment.
[0061] In particular, in long structures (e.g., 10 m or more, and preferably 100 m or more) such as electric wires and optical fibers, even if they are one unit, the structure, installation environment, or usage conditions differ depending on the part, and therefore the deterioration state differs. For example, in a power transmission line, the terminal part and the electric wire part have different structures. Furthermore, when an electric wire part is installed over a long distance (e.g., several kilometers), even the same electric wire part will have parts with different installation environments or usage conditions. As a result, the service life and deterioration state will differ depending on the part.
[0062] Therefore, the second calculation unit 12 has a configuration for calculating the useful life of the equipment based on the installation environment or the usage situation. Specifically, the second calculation unit 12 is configured to calculate (actually, predict) the useful life of the equipment based on the information on the equipment included in the customer information I1, using a prediction model generated based on the information on the equipment provided from an external device. The information on the equipment provided from the external device is, for example, information on the equipment (delivery time, product name, lot, year of installation, materials used, etc.), environmental information around the equipment (water, humidity, temperature, etc.), information on the reference equipment (the fact that it broke after 20 years, product name, lot, year of installation, materials used, etc.), and environmental information around the reference equipment (water, humidity, temperature, etc.).
[0063] 5 is a diagram showing the configuration of the second calculation unit 12. The second calculation unit 12 includes a learning unit 51, a data processing unit 52, and an analysis and prediction unit 53.
[0064] The learning unit 51 performs learning based on multiple data stored in the server 2, and generates multiple prediction models from the learning results. In this embodiment, a case will be described in which the prediction models are generated using machine learning or deep learning, but the present invention is not limited to this, and the prediction models may be generated using regression calculations.
[0065] Here, the operation of the learning unit 51 will be described. The learning unit 51 performs learning based on a plurality of data stored in the server 2, and generates a prediction model relating to the deterioration factors of the equipment and the useful life of the equipment from the learning results. The server 2 associates first information I3, second information I4, and third information I5 with each equipment ID. The first information I3, second information I4, and third information I5 are information provided by a person who operates and manages the equipment (for example, an administrator of the customer terminal device 3).
[0066] Fig. 6 is a diagram showing an example of the first information I3, Fig. 7 is a diagram showing an example of the second information I4, and Fig. 8 is a diagram showing an example of the third information I5.
[0067] 6, the first information I3 includes an equipment ID, a manufacturing date indicating the date when the equipment was manufactured, a manufacturer name indicating the name of the company that manufactured the equipment, specification information indicating the rated voltage and rated temperature of the equipment, an installation date indicating the date when the equipment was installed, an installation company name indicating the name of the company that installed the equipment, a worker name indicating the name of the worker who actually installed the equipment, and environmental information indicating information about the environment when the equipment was installed (information about temperature, humidity, weather, etc.). Note that the items included in the first information I3 are not limited to the items shown in FIG.
[0068] The same equipment ID is assigned to the same equipment based on the equipment's shape (flat, round, etc.), purpose (for communications, for power, etc.), material name (vinyl, polyethylene, etc.), size, etc.
[0069] In addition, there are cases where a unique ID is assigned to each manufacturing company. In this case, the management device 1 edits the equipment ID based on a predetermined conversion table or the like so that the same ID is assigned to similar products.
[0070] As shown in Fig. 7, the second information I4 is information that is composed of information on changes in the environment around the equipment and information on changes in the environment inside the equipment acquired by various sensors for each equipment ID in chronological order (hereinafter, sometimes referred to as sensing information). The sensing information includes the temperature, humidity, internal pressure, and amount of water in the equipment casing, the temperature of the cable body, the bending condition, tensile condition, and stress of the cable, etc.) Note that Fig. 7 shows a schematic representation of the second information I4 for "equipment ID: 0000000a" as a representative example.
[0071] The sensing information is information on the temperature, humidity, vibration frequency, bending and tension conditions of the cable, cable stress, etc. The sensing information is not limited to the temperature, humidity, vibration frequency, bending and tension conditions of the cable, cable stress, etc. around the equipment, but may also include the amount of solar radiation, amount of ultraviolet rays, acidity of precipitation, etc. around the equipment.
[0072] Various sensors are placed around the equipment to detect temperature, humidity, vibration, submersion, etc. The various sensors sense temperature, etc. at predetermined timings. The predetermined timings are, for example, every 10 minutes, every 30 minutes, every hour, etc. The timing of data sensing and the timing of data transmission do not have to be simultaneous. In addition, while it is preferable to acquire data online using a wired or wireless connection, data may also be acquired offline using a robot or human beings. Furthermore, environmental evaluation test pieces that do not use electronic circuits may also be used. That is, for example, a sensor that changes color when it comes into contact with water may be placed, and the color change may be analyzed offline.
[0073] The second information I4 may be composed of data obtained by averaging data sensed by various sensors for a predetermined period of time. For example, the temperature may be shown as an average value in the morning and an average value in the afternoon, or as a minimum and a maximum temperature for each day.
[0074] The second information I4 may be composed of all data sensed by various sensors. In this case, the management device 1 may perform processing such as averaging each data included in the second information I4 for a predetermined period of time.
[0075] As shown in Fig. 8, the third information I5 is information including a facility ID, date and time information indicating the date and time when the deterioration state of the facility was confirmed, and information on the deterioration state of the facility, etc. Note that the items included in the third information I5 are not limited to the items shown in Fig. 8.
[0076] The deterioration state of equipment is information that serves as a guide for repair or replacement of the equipment. The deterioration state of equipment for covered electric wires is explained below. For example, if an electric wire is broken and replaced, it is classified as "A" condition, if there is a change in the appearance of the electric wire (sheath (outer layer)) (discoloration, deterioration, corrosion, dust adhesion, etc.), it is classified as "B" condition, and if there is no change in the appearance of the electric wire, it is classified as "C" condition.
[0077] The data on the equipment may include information other than the first information I3, the second information I4, and the third information I5, for example, information on maintenance records (equipment inspection records, records of repairs to malfunctions). Means for inputting the data on the equipment include keyboards, cameras, videos, various sensors, etc. Furthermore, data input from a keyboard or the like may be secondary data that has been calculated and processed and used as the data on the equipment.
[0078] For example, the learning unit 51 extracts equipment IDs whose deterioration state is in the "A" state based on the third information I5.
[0079] The learning unit 51 extracts information that may be a deterioration factor from the information associated with the extracted facility ID. The information that may be a deterioration factor means data on high-quality facilities, such as the name of the installation company, the name of the worker, and information on the environment when the facility was installed, which are included in the first information I3, the sensing information, and the period until the facility's deterioration state becomes "A", which are included in the second information I4. The period until the facility's deterioration state becomes "A", for example, can be calculated from the installation date included in the first information I3 and the date and time information included in the third information I5.
[0080] The name of the installation company, the name of the worker, and information on the environment when the equipment was installed are information that can be the cause of poor construction. For example, equipment installed by Worker A may have a shorter lifespan than equipment installed by other workers. In such a case, the name of Worker A corresponds to information that characterizes the deterioration factor.
[0081] The sensing information can be information on water penetration into the wire, the presence of water around the wire, mechanical factors (vibration, impact, compression, bending, etc.), thermal factors (decrease in physical properties due to high or low temperatures), and other environmental factors (humidity, solar radiation, etc.) It is particularly desirable to measure the effects of water.
[0082] The learning unit 51 learns the characteristics of each deterioration factor based on the extracted information that may be the deterioration factor, and generates a prediction model regarding the deterioration factor and useful life of each piece of equipment from the learning results.
[0083] The learning unit 51 may also be configured to automatically evaluate a prediction model once generated at a predetermined timing and perform a process of updating the prediction model based on this evaluation. Specifically, when the learning unit 51 detects a decrease in accuracy of a certain prediction model, the learning unit 51 automatically updates the prediction model. For example, the learning unit 51 may detect a decrease in accuracy when the number of times the prediction model is used decreases. By being configured in this way, the learning unit 51 can maintain the prediction accuracy (quality of the prediction model). Furthermore, information regarding the decrease in prediction accuracy may be notified to the administrator of the management device 1 or the person who provided the first information I3, the second information I4, and the third information I5 (for example, the administrator of the customer terminal device 3).
[0084] The data processing unit 52 processes the customer information I1 registered by the first registration unit 11. For example, the data processing unit 52 processes the customer information I1 to identify an equipment ID, information about the environment in which the equipment is to be installed, and the like.
[0085] The analysis and prediction unit 53 uses the prediction model generated by the learning unit to predict the useful life of the equipment based on the results processed by the data processing unit 52, depending on the environment in which the equipment is installed.
[0086] The second calculation unit 12 may also be configured to calculate the useful life of the equipment without using a prediction model as described above. For example, a dummy sample is placed near an actually installed equipment (electric wire) and collected after a predetermined period (for example, one year) has passed. The second calculation unit 12 may also be configured to analyze the collected dummy sample and calculate the useful life of the equipment (electric wire) that is installed near where the dummy sample was placed based on the analysis result. The dummy sample is assumed to be more susceptible to environmental influences and degradation than the installed equipment (electric wire).
[0087] Furthermore, as a basis for comparison, both information on the electric wire serving as teacher data and information on the customer's electric wire may be presented to present the customer with a useful life. That is, information on the electric wire serving as teacher data, information on the surrounding environment of the electric wire serving as teacher data, information on the customer's electric wire, or information on the surrounding environment of the customer's electric wire may be presented to the customer. For example, the average humidity around the electric wire serving as teacher data and the average humidity around the customer's electric wire serving as teacher data may be presented to present the deterioration of the customer's electric wire in comparison. That is, it may be quantitatively indicated that the humidity is "higher on average annually" than the electric wire serving as teacher data, "equal to" the humidity, or "lower on average annually". The surrounding environment information on the electric wire may be inferred from the measured values of a sensor near the electric wire stored in an external server.
[0088] (Regarding the first operation of the calculation unit) The calculation unit 16 may be configured to determine the reserve period based on the information indicating the useful life of each type of equipment calculated by the second calculation unit 12, and calculate the payment based on the reserve period and the cost of replacing the equipment. In the following, the payment will be described as an installment reserve.
[0089] Figure 9 is a diagram showing a typical model of the reserve fund calculated by the calculation unit 16. Figure 9(a) is a diagram showing a typical example of a model for calculating the reserve fund when the useful life of the equipment is 20 years.
[0090] For example, if the useful life of the equipment is 20 years and the total cost of replacing the equipment is set to 120 million yen, the calculation unit 16 calculates the monthly reserve fund to be 500,000 yen. The calculation unit 16 may be configured not to equalize the monthly reserve fund. For example, the calculation unit 16 may change the reserve fund up to the 10th year and the reserve fund after the 10th year.
[0091] FIG. 9(b) is a diagram showing an example of a model for calculating the reserve fund when the useful life of the equipment is 5 years remaining. When the useful life of the equipment is 5 years remaining and the total cost of replacing the equipment is set to 120 million yen, the calculation unit 16 calculates the reserve fund per month to be 2 million yen. As described above, the calculation unit 16 may be configured not to equalize the reserve fund per month. For example, the calculation unit 16 may change the reserve fund for the first 3 years and the reserve fund for the third year and thereafter.
[0092] In addition, after the reserve fund is full (total cost related to replacement equipment), the cost of transporting replacement equipment to the site and the cost of installing replacement equipment may rise due to rising fuel costs and labor costs, etc. Therefore, as shown in Figures 9(a) and 9(b), a certain amount of cost may be collected even after the reserve fund is full.
[0093] With this configuration, the management device 1 receives a portion of the cost of replacing equipment from the customer as a regular deposit in advance, and can manufacture the equipment using this deposit, thereby reducing the costs of manufacturing and storing the equipment by the manufacturing company. Also, the customer company can systematically save up the cost of replacing the equipment.
[0094] 9(c) is a diagram showing an example of a model for calculating the reserve fund when the equipment is damaged before the end of its useful life. Even if the equipment is damaged before the end of its useful life, the management device 1 can settle the payment to the client company with a small amount of money because the management device 1 has the reserve fund accumulated up until the time of the damage, and can provide a replacement for the equipment in a timely manner, so that the operation of the client company is not affected.
[0095] (Regarding the second operation of the calculation unit) The calculation unit 16 may be configured to determine the reserve period based on the information indicating the useful life of each type of equipment calculated by the second calculation unit 12, and to calculate the payment based on the reserve period and the cost of preparatory measures before replacing the equipment with a substitute. In the following, the payment will be described as a reserve for installment payments.
[0096] The cost of pre-emptive measures before replacing equipment with alternative parts refers to the cost of emergency measures or long-term measures. In emergency measures, electric wires are replaced as emergency measures, which are easy to install and can absorb differences in customer specifications. These emergency measures allow for quick emergency measures, for example by reducing current capacity and long-term reliability compared to long-term measures, making them lighter and easier to bend. In addition, the period during which the emergency measures are used is restricted by the customer's electricity usage and usage time. Furthermore, long-term measures with improved current capacity and long-term reliability are manufactured during the period in which the emergency measures are used. The reserve fund may be calculated from the costs required for these initial measures.
[0097] (Regarding the third operation of the calculation unit) The calculation unit 16 may be configured to determine the savings period based on information indicating the useful life of each type of equipment calculated by the second calculation unit 12, and calculate the payment (savings fund) based on the savings period and a diagnosis of initial defects when the equipment is replaced.
[0098] After the replacement, in order to diagnose initial defects in the replaced equipment, it will be necessary to install sensors to obtain environmental information and to analyze images of the installed equipment. The payment (reserve) may be calculated from the costs required for diagnosing initial defects when replacing these pieces of equipment.
[0099] The calculation unit 16 may also be configured to calculate the cost of a replacement for the equipment based on the manufacturing price of the equipment manufactured by the order of the first ordering unit 15, and recalculate the payment amount based on the calculated cost of the replacement for the equipment. In this configuration, the presentation unit 17 presents the payment amount recalculated by the calculation unit 16 to the customer. The payment amount may be paid in a lump sum or in installments. Money paid in installments is called a savings fund.
[0100] FIG. 10 is a diagram showing a model example for calculating the reserve fund before and after recalculation. For example, in the case of an electric wire made of copper, the base price of copper varies depending on the time of purchasing the copper. Therefore, if copper is purchased when the base price of copper is cheap and an electric wire is manufactured, the manufacturing price of the electric wire can be kept low. In addition, fuel costs and labor costs also vary depending on the time of year. Therefore, if the electric wire is transported and installed when fuel costs and labor costs are cheap, the cost of transporting a substitute to the site and the cost of installing the substitute can be kept low.
[0101] For example, as shown in Figure 10(a), if the useful life of a certain piece of equipment is 20 years and the cost of replacing the equipment (reserve amount P1) is set at 120 million yen, the monthly reserve will be 500,000 yen.
[0102] Then, after 10 years have passed and the copper base price and labor costs have fallen, the calculation unit 16 resets the cost (reserve amount P2) for replacement of equipment from the 10th year onwards to 100 million yen, as shown in FIG. 10(b). Also, since 60 million yen has been saved up by the 10th year, the remaining amount is 40 million yen. Therefore, the monthly reserve from the 10th year onwards will be about 330,000 yen. Note that, although the above example shows an example in which the reserve amount is recalculated in the 10th year for a useful life of 20 years, the present invention is not limited to this example, and the reserve amount may be recalculated at regular intervals (e.g., every 3 years) or at irregular intervals.
[0103] With this configuration, the management device 1 recalculates the reserve fund when the cost of equipment replacement changes, and notifies the client company of the recalculated reserve fund, thereby reducing the reserve fund burden of the client company. Note that the management device 1 may be configured to recalculate the reserve fund without changing it during the useful life, and to refund the difference to the client company when the reserve fund reaches its maximum amount.
[0104] (Regarding the manufacturing date of the equipment) 1, the management device 1 may be configured to include a second determination unit 28 that determines the timing for purchasing materials (raw materials) when manufacturing the equipment. According to this configuration, the first ordering unit 15 instructs the purchase of materials when manufacturing the equipment at the timing determined by the second determination unit 28.
[0105] As mentioned above, in the case of electric wires made from copper, the base price of copper varies depending on the time of purchase. Therefore, if copper is purchased when the base price of copper is low and electric wires are manufactured using the copper, the manufacturing cost of the electric wires can be kept low.
[0106] Second determination unit 28 determines the timing of purchasing materials (raw materials) for manufacturing equipment based on, for example, the average value of the copper price over the past N months (N is an integer equal to or greater than 1). Second determination unit 28 may also be configured to determine the timing of purchasing materials (raw materials) for manufacturing equipment based on information from a website that predicts price fluctuations of copper prices.
[0107] (First configuration of the two-sided platform) As shown in Fig. 1, the management device 1 includes a reception unit 18, a subtraction unit 19, and a second ordering unit 20. The reception unit 18 receives an equipment replacement request from a customer registered in the first registration unit 11. Specifically, when the reception unit 18 receives an equipment replacement request from the customer terminal device 3, the reception unit 18 accesses the server 2a to read out the customer information I1 and confirms that the customer is registered. In addition, when the reception unit 18 receives a replacement request before the useful life of the equipment, the calculation unit 16 calculates the payment amount based on the remaining balance.
[0108] The subtraction unit 19 subtracts the number of pieces of equipment to be replaced received by the reception unit 18 from the actual number of pieces of equipment in stock. Specifically, the subtraction unit 19 accesses the server 2b and updates the table indicating the number of pieces of equipment in stock so as to subtract the number of pieces of equipment to be replaced from the actual number of pieces of equipment in stock.
[0109] When the second ordering unit 20 receives an equipment replacement request from the receiving unit 18, it orders the contractor to replace the equipment. Specifically, the second ordering unit 20 places an order to the contractor terminal device 4 managed by the contractor via the network NW2. The contractor receives the equipment, transports it to the site in accordance with the ordered contents, and installs the equipment.
[0110] In this way, when the management device 1 receives a replacement request from a customer company, it deducts the equipment inventory and also places an order for installation with a contractor, so that it is possible to carry out intermediation procedures while managing inventory.
[0111] (About the second configuration of the two-sided platform) 1, the management device 1 includes a second registration unit 21 and a first determination unit 22. A case where there are multiple contractors and one exchange facility and a case where there are multiple exchange facilities will be described.
[0112] The second registration unit 21 registers at least information I6 about the contractor including information about past construction. Specifically, the second registration unit 21 generates information I6 about the contractor including information about which contractor constructed which facility, and stores the information I6 about the contractor in the server 2c.
[0113] Fig. 11 is a diagram showing a schematic example of information I6 about a construction contractor. Information I6 about a construction contractor includes items such as a construction contractor ID uniquely assigned to the construction contractor, a facility ID, a construction date indicating the date of construction, and a customer evaluation (information about past construction). A customer evaluation is an evaluation by a client company after construction. Note that the items included in information I6 about a construction contractor are merely examples, and are not limited to these items.
[0114] When multiple contractors are registered and a request to replace one piece of equipment is received by the receiving unit 18, the first determination unit 22 determines the priority order of the contractors based on information on past construction included in the contractor-related information I6. Specifically, the first determination unit 22 accesses the server 2c, reads out the contractor-related information I6, and determines the priority order of the contractors for each piece of equipment based on their past construction performance, etc.
[0115] In addition, when multiple construction contractors are registered and the receiving unit 18 receives requests to replace multiple pieces of equipment, the first determination unit 22 determines the priority of the construction contractors based on information about past construction included in the construction contractor information I6, and determines the priority of the equipment to be constructed based on information indicating the priority of the equipment.
[0116] 12 is a diagram showing an example of information I7 indicating the priority order of facilities. The information I7 indicating the priority order of facilities indicates the construction site and the priority order.
[0117] When multiple construction contractors are registered and a request for replacing one piece of equipment is received by the receiving unit 18, the second ordering unit 20 selects a construction contractor based on the priority order of the construction contractors determined by the first determination unit 22, and places an order for the equipment replacement with the selected construction contractor.
[0118] In addition, when multiple construction contractors are registered and the receiving unit 18 receives requests for replacement of multiple pieces of equipment, the second ordering unit 20 selects a construction contractor based on the priority order of the construction contractors determined by the first determination unit 22, and places an order for the replacement of the equipment determined based on the priority order of the equipment determined by the first determination unit 22 to the selected construction contractor.
[0119] In this way, when there are multiple contractors, the management device 1 determines the contractor based on the priority order, based on the contractor's past construction performance, etc. Therefore, since the contractor is determined based on the past construction performance and evaluation, by applying the management device 1, a contractor who performs reliable construction will be highly evaluated and will be able to continuously receive orders.
[0120] Furthermore, when there are multiple pieces of equipment to be replaced, the management device 1 selects the equipment with the highest priority by priority, so that the management device 1 can give top priority to the installation of the equipment in the location with the highest priority.
[0121] Next, the cases where there is only one construction contractor and one replacement facility and the cases where there are multiple replacement facilities will be described. The second registration unit 21 registers information I6 about the construction contractor, including at least information about past construction. When only one construction contractor is registered and the reception unit 18 receives a replacement request for one facility, the first determination unit 22 determines the construction contractor.
[0122] In addition, when only one construction company is registered and the receiving unit 18 receives requests to replace multiple pieces of equipment, the first determination unit 22 determines that construction company and determines the priority of the equipment to be carried out based on information indicating the priority of the equipment.
[0123] When only one construction company is registered and the reception unit 18 receives a request to replace one piece of equipment, the second ordering unit 20 places an order for the replacement of the equipment to the construction company determined by the first determination unit 22.
[0124] In addition, when only one construction company is registered and the reception unit 18 receives requests for replacement of multiple pieces of equipment, the second ordering unit 20 orders the replacement of the equipment determined based on the priority order of the equipment determined by the first determination unit 22 to the construction company determined by the first determination unit 22.
[0125] In this way, when there is one construction company and there are multiple pieces of equipment to be replaced, the management device 1 selects the equipment with the highest priority and places an order with this construction company. Therefore, the management device 1 can give top priority to construction of the equipment in the place with the highest priority.
[0126] (About the third configuration of the two-sided platform) As shown in FIG. 1, the management device 1 includes a notification unit 23, a first receiving unit 24, a first transmitting unit 25, a second receiving unit 26, and a second transmitting unit 27.
[0127] When the receiving unit 18 receives an equipment replacement request, the notifying unit 23 selects multiple contractors based on the contractor priority order determined by the first determining unit 22, and notifies the selected contractors of the construction specifications. Specifically, the notifying unit 23 notifies (sends) the construction specifications to contractor terminal devices 4 managed by the selected contractors via the network NW2.
[0128] The first receiving unit 24 receives quotations from a plurality of contractors. The contractors check the contents of the construction specifications, prepare quotations for carrying out the construction work, and transmit the prepared quotations to the management device 1 using the contractor terminal device 4.
[0129] The first transmission unit 25 transmits the estimate to the customer whose equipment replacement request has been accepted by the acceptance unit 18. The customer reviews the contents of the received estimate and selects one of the construction companies.
[0130] The second receiving unit 26 receives the selection result by the customer to whom the estimate was sent by the first transmitting unit 25. The second transmitting unit 27 transmits the selection result to the multiple construction companies whose estimates were received by the first receiving unit 24. The second transmitting unit 27 also transmits the selection result to construction companies that were not selected. The second ordering unit 20 places an order for equipment replacement with the construction company selected by the customer based on the selection result.
[0131] In this way, when the management device 1 receives an order for construction of equipment from a customer, it transmits construction specifications to multiple contractors based on the priority order, transmits quotations received from each contractor to the customer, and places an order for replacement of the equipment with the contractor selected by the customer. Thus, the customer can select a preferred contractor from among the multiple contractors selected based on the priority order.
[0132] (Configuration with upwardly compatible power transmission lines in stock) Here, if different power transmission cables are stocked for each specification, the amount of stock will increase. Power transmission cables are a concept that includes bare wires, insulated wires that are not covered, CV (cross-linked polyethylene insulated vinyl sheath cable) cables, and OF (oil-filled cable) cables. CV cables are power cables that use cross-linked polyethylene as the insulating material. OF cables are cables that have an insulating oil passage inside the cable and apply appropriate oil pressure in a gravity tank or pressure tank at the end to prevent the generation of air bubbles due to temperature changes. Also, when comparing CV cables and OF cables, which are types of power transmission lines, CV cables are superior cables.
[0133] The specifications of power transmission lines include size (thickness), type, allowable current, allowable voltage, etc. The size differs between solid wire and twisted wire. The size of twisted wire is, for example, 400sq (cross-sectional area of 400mm 2 ), 250sq (cross-sectional area is 250mm 2 ), 200sq (cross-sectional area is 200mm 2) and so on. The larger the size of the power transmission line, the higher the specification. In the above example, the specifications are 400sq (cross-sectional area of 400mm 2 ), 250sq (cross-sectional area is 250mm 2 ), 200sq (cross-sectional area is 200mm 2 ) The allowable current is, for example, 7A, 12A, 17A, etc. depending on the size of the power transmission line. Also, the larger the size of the power transmission line, the higher the allowable power. The allowable voltage is approximately 600V to 500kV. Also, the higher the voltage that can be transmitted through the power transmission line, the higher the allowable voltage specification. Also, power transmission lines are upwardly compatible. In other words, a 400sq power transmission line can be used as a substitute for a 250sq power transmission line.
[0134] For example, if a large-sized power transmission line (hereinafter referred to as an upper-level power transmission line) is prepared, it can be applied not only to the same large-sized power transmission line, but also to a small-sized power transmission line (hereinafter referred to as a lower-level power transmission line). Therefore, by having an upper-level power transmission line, the amount of inventory can be reduced. In addition, when connecting power transmission lines with different specifications, a connector called a heterogeneous connection part is used.
[0135] On the other hand, the upper transmission line is more expensive than the lower transmission line. Therefore, as described above, when replacing a power transmission line, changing from a lower transmission line to an upper transmission line will lead to a price increase (upgrade), and the cost of replacement will increase.
[0136] Therefore, while keeping inventory in the upper transmission line, a power transmission line with specifications suitable for replacement is manufactured at an appropriate time (for example, before the replacement date based on the useful life). For example, in the case of operation based on the useful life (i.e., replacement will not occur before the useful life), a power transmission line with the same specifications as the power transmission line in use is ready, so replacement can be performed without upgrading. Also, if a power transmission line in use is damaged before the useful life and needs to be replaced, by utilizing the upper transmission line in stock, an upgrade will occur, but the impact on the operation of the customer company can be suppressed.
[0137] A specific configuration and operation will be described below. The equipment is a power transmission line that transmits power. There are multiple specifications for the power transmission line. The second calculation unit 12 calculates the useful life of each specification of the power transmission line based on the equipment information included in the customer information, using a prediction model generated based on the equipment information included in the customer information, or based on the equipment information provided from an external device.
[0138] For example, the second calculation unit 12 calculates the respective useful lives of a 400 sq power transmission line, a 250 sq power transmission line, and a 200 sq power transmission line for all customers.
[0139] The first calculation unit 13 determines the total number of each specification of power transmission lines based on information about the equipment included in the customer information, and calculates a first inventory quantity for each specification of power transmission lines based on the total number and the useful life of each specification of power transmission lines calculated by the second calculation unit 12.
[0140] For example, the first calculation unit 13 calculates that the stock quantity of 400 sq power transmission lines is "20 units", the stock quantity of 250 sq power transmission lines is "50 units", and the stock quantity of 200 sq power transmission lines is "200 units".
[0141] The determination unit 14 compares the first stock quantity calculated by the first calculation unit 13 with the actual stock quantity of the power transmission lines, and determines whether or not the actual stock quantity of the power transmission lines is insufficient.
[0142] When the judgment unit 14 judges that the actual inventory of power transmission lines is insufficient, the first ordering unit 15 calculates the replacement date from the useful life of the power transmission line for each specification calculated by the second calculation unit 12, calculates a manufacturing start date taking into account the time required to manufacture the power transmission line from the replacement date, and places an order for the manufacture of the power transmission line based on the manufacturing start date.
[0143] For example, when the service life of the 250 sq. power transmission line calculated by the second calculation unit 12 is 25 years, the first ordering unit 15 calculates the replacement date as "December 10, 2020" based on the construction date (December 10, 1995). When the time required to manufacture the power transmission line is six months, the first ordering unit 15 places an order for the manufacture of the 250 sq. power transmission line on "June 10, 2020."
[0144] As described above, a power transmission line (upper transmission line) configured with higher specifications is compatible with a power transmission line (lower transmission line) configured with lower specifications. The first stock number includes at least one power transmission line configured with higher specifications. A higher specification means that the allowable voltage that can be transmitted through the power transmission line is high, that the size of the power transmission line is large, or that the type of the power transmission line is higher. The types of power transmission lines include OF cables, CV cables with water-impermeable layers, and CV cables without water-impermeable layers. When connecting cables of different types, they are connected by a heterogeneous connection part. The first stock number also includes heterogeneous connection parts (at least two) for connecting a power transmission line configured with higher specifications to a lower power transmission line.
[0145] By being configured in this manner, the management device 1 holds inventory in the upper transmission lines and manufactures power transmission lines with specifications suitable for replacement at an appropriate time (for example, before the replacement date based on the useful life). Therefore, in the case of operation based on the useful life, a power transmission line with the same specifications as the power transmission line in use is ready, so replacement can be performed without upgrading. Also, if a power transmission line in use is damaged before its useful life expires and replacement becomes necessary, by utilizing the upper transmission line in stock, an upgrade will occur, but the impact on the customer company's operations can be reduced.
[0146] In addition, if the production start date for other power transmission lines has not yet arrived, there may be a case where the inventory contains only one upper transmission line. This allows the manufacturing company to further reduce the cost of storing equipment.
[0147] (Management method) Next, a management method for reducing the impact on the operations of the client company and the costs for manufacturing and storing the equipment by the manufacturing company will be described. Fig. 13 is a flow chart showing the steps of the management method.
[0148] In step ST1, the first registration unit 11 registers customer information I1 including at least information on the equipment used by the customer (first registration step).
[0149] In step ST2, the first calculation unit 13 determines the total quantity of each type of equipment based on information about the equipment included in the customer information I1, and calculates the first inventory quantity for each type of equipment based on the total quantities (first calculation process).
[0150] In step ST3, the determination unit 14 compares the first stock quantity calculated in the first calculation step with the actual equipment stock quantity, and determines whether or not the actual equipment stock quantity is insufficient (determination step).
[0151] In step ST4, when it is determined in the determination step that the actual inventory of the equipment is insufficient, the first ordering unit 15 places an order for the manufacture of the equipment that is insufficient (first ordering step).
[0152] In step ST5, the calculation unit 16 calculates the payment amount for each customer registered in the first registration step based on the cost related to the replacement equipment (calculation step).
[0153] In step ST6, the presentation unit 17 presents the payment amount calculated in the calculation step to the customer (presentation step).
[0154] In this way, the management method receives payment for the equipment from the customer in advance and uses this payment as a source of funds to manufacture the equipment, thereby reducing the costs of manufacturing and storing the equipment by the manufacturing company.
[0155] In addition, in the management method, if it is determined in the judgment step that the actual equipment inventory is insufficient, an order is placed for the manufacture of the equipment in the first ordering step, so that a certain amount of inventory can be secured and the impact of inventory shortages on the client company's operations can be reduced.
[0156] (About the management program) The management program, which reduces the impact on the operations of the client company and reduces the costs for the manufacturing company to manufacture and store equipment, is mainly composed of the following steps and is executed by a computer 500 (hardware).
[0157] Step 1: A step of registering customer information I1 including at least information regarding the equipment used by the customer. Step 2: A step of calculating the total number of each type of equipment based on the information about the equipment included in the customer information I1, and calculating the first inventory quantity for each type of equipment based on the total number. Step 3: A step of comparing the first inventory quantity calculated in the first calculation step with the actual inventory quantity of the equipment to determine whether the actual inventory quantity of the equipment is insufficient. Step 4: If step 3 determines that the actual equipment inventory is insufficient, an order is placed for the manufacture of the insufficient equipment. Step 5: Calculating the payment for each customer registered in step 1 based on the cost of replacing the equipment. Step 6: Present the savings calculated in step 5 to the customer.
[0158] Here, the configuration and operation of the computer 500 will be described with reference to the drawings. Fig. 14 is a diagram showing the configuration of the computer 500. As shown in Fig. 14, the computer 500 is configured by connecting a processor 501, a memory 502, a storage 503, an input / output I / F 504, and a communication I / F 505 on a bus A, and the functions and / or methods described in this disclosure are realized by the cooperation of each of these components.
[0159] A display and a pointing device (e.g., a mouse and a keyboard) are connected to the input / output I / F 504. The communication I / F is an interface that complies with a predetermined communication standard, and communicates with devices (e.g., the customer terminal device 3 and the contractor terminal device 4) via the networks NW1 and NW2, either wired or wirelessly. The communication I / F corresponds to the presenting unit 17, the accepting unit 18, the notifying unit 23, the first receiving unit 24, the first transmitting unit 25, the second receiving unit 26, and the second transmitting unit 27.
[0160] The memory 502 is configured with a RAM (Random Access Memory). The RAM is configured with a volatile memory or a non-volatile memory.
[0161] The storage 503 is composed of a ROM (Read Only Memory). The ROM is composed of a non-volatile memory, and is realized, for example, by an HDD (Hard Disc Drive) or an SSD (Solid State Drive). The storage 503 corresponds to the above-mentioned server 2. The storage 503 stores various programs such as the management program realized in the above-mentioned steps 1 to 6.
[0162] For example, the processor 501 controls the overall operation of the computer 500. The processor 501 is an arithmetic device that loads an operating system and various programs that realize various functions from a storage 503 into a memory 502 and executes instructions included in the loaded programs.
[0163] Specifically, when processor 501 receives a user operation, it reads out a program (for example, a management program according to the present invention) stored in storage 503, expands the read out program in memory 502, and executes the program. Furthermore, by processor 501 executing the management program, the functions of first registration unit 11, second calculation unit 12, first calculation unit 13, judgment unit 14, first order placement unit 15, calculation unit 16, subtraction unit 19, second order placement unit 20, second registration unit 21, first determination unit 22, and second determination unit 28 are realized.
[0164] Here, a description will be given of the configuration of the processor 501. The processor 501 is realized by, for example, a central processing unit (CPU), a micro processing unit (MPU), a graphics processing unit (GPU), various other arithmetic devices, or a combination of these.
[0165] In order to realize the functions and / or methods described in the present disclosure, some or all of the functions of the processor 501, memory 502, storage 503, etc. may be configured in a processing circuit 601 that is dedicated hardware. Fig. 15 is a diagram showing the configuration of the processing circuit 601 of the computer 600. The processing circuit 601 is, for example, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), or a combination of these.
[0166] In addition, although the processor 501 has been described as a single component, the present invention is not limited to this and may be configured as a set of multiple physically separate processors. In this specification, a program or instructions included in the program described as being executed by the processor 501 may be executed by a single processor 501, or may be distributed and executed by multiple processors. In addition, a program or instructions included in the program executed by the processor 501 may be executed by multiple virtual processors.
[0167] In this way, by executing the management program on computers 500, 600, payment for the equipment can be received in advance from the customer and this payment can be used as the source of funds to manufacture the equipment, thereby reducing the costs of manufacturing and storing the equipment by the manufacturing company.
[0168] In addition, by executing the management program on computers 500 and 600, if it is determined in step 3 (determination step) that the actual equipment inventory is insufficient, an order is placed for the manufacture of the equipment in step 4 (first ordering step), so that a certain amount of inventory can be secured and the impact of inventory shortages on the operations of the client company can be reduced.
[0169] Although some of the embodiments of the present application have been described in detail above with reference to the drawings, these are merely examples, and the present invention can be embodied in other forms that incorporate various modifications and improvements based on the knowledge of those skilled in the art, including the forms described in the disclosure of the present invention. [Explanation of symbols]
[0170] 1 Management device 2 Server 3 Customer terminal equipment 4. Contractor terminal device 11 First Registration Section 12 Second calculation section 13 First Calculation Section 14 Judgment section 15 First Ordering Department 16 Calculation section 17 Presentation section 18 Reception Department 19 Subtraction section 20 2nd Ordering Department 21 Second Registration Section 22 First Decision Section 23 Notification Department 24 First Receiving Unit 25 First Transmission Unit 26 Second Receiving Unit 27 Second Transmission Unit 28 Second Decision Section 51 Learning Department 52 Data Processing Unit 53 Analysis and Forecasting Department 100 Management Systems
Claims
1. In a management device for managing equipment inventory, a first registration unit that registers customer information including at least information regarding the equipment used by the customer; a first calculation unit that calculates a total number of each type of equipment based on information about the equipment included in the customer information, and calculates a first inventory quantity for each type of equipment based on the total number; a determination unit that compares the first inventory quantity calculated by the first calculation unit with an actual inventory quantity of the equipment and determines whether or not the actual inventory quantity of the equipment is insufficient; a first ordering unit that places an order for manufacturing the equipment that is insufficient when the determining unit determines that the actual inventory of the equipment is insufficient; a calculation unit that calculates a payment based on a cost related to a replacement of equipment for each customer registered by the first registration unit; a presentation unit that presents the payment calculated by the calculation unit to a customer, The calculation unit calculates the cost of the replacement of the equipment based on the manufacturing price of the equipment manufactured by the order of the first ordering unit, and recalculates the payment based on the calculated cost of the replacement of the equipment, The presentation unit is a management device that presents the payment amount recalculated by the calculation unit to the customer.
2. a reception unit that receives a request for replacement of equipment from a customer registered in the first registration unit; a subtraction unit that subtracts the number of pieces of equipment to be replaced received by the reception unit from the actual number of pieces of equipment in stock; The management device according to claim 1 , further comprising: a second ordering unit that, when a request for replacing the equipment is received by the receiving unit, orders a contractor to replace the equipment.
3. A second registration unit that registers information about the construction company including at least information about past construction work; a first determination unit which, when a plurality of construction contractors are registered and a request for replacing one piece of equipment is received by the reception unit, determines the priority of the construction contractors based on information on the past construction work included in the information on the construction contractors, or, when a plurality of construction contractors are registered and a request for replacing a plurality of pieces of equipment is received by the reception unit, determines the priority of the construction contractors based on information on the past construction work included in the information on the construction contractors, and determines the priority of the equipment to be constructed based on information indicating the priority of the equipment; 3. The management device of claim 2, wherein the second ordering unit, when a plurality of construction contractors are registered and a request for replacement of one piece of equipment is received by the reception unit, selects a construction contractor based on the priority of the construction contractors determined by the first determination unit and places an order for replacement of the equipment to the selected construction contractor; or, when a plurality of construction contractors are registered and a request for replacement of multiple pieces of equipment is received by the reception unit, selects a construction contractor based on the priority of the construction contractors determined by the first determination unit and places an order for replacement of the equipment determined based on the priority of the equipment determined by the first determination unit to the selected construction contractor.
4. A second registration unit that registers information about the construction company including at least information about past construction work; a first determination unit that, when only one construction company is registered and the reception unit receives a replacement request for one piece of equipment, determines that construction company; or, when only one construction company is registered and the reception unit receives a replacement request for multiple pieces of equipment, determines that construction company, and determines a priority order for the equipment to be constructed based on information indicating the priority order of the equipment; 3. The management device of claim 2, wherein the second ordering unit, when only one construction company is registered and the reception unit receives a request to replace one piece of equipment, orders the replacement of the equipment to the construction company determined by the first determination unit, or, when only one construction company is registered and the reception unit receives a request to replace multiple pieces of equipment, orders the replacement of the equipment determined based on the priority of the equipment determined by the first determination unit to the construction company determined by the first determination unit.
5. A notification unit that, when the reception unit receives a request to replace equipment, selects a plurality of construction companies based on the priority order of the construction companies determined by the first determination unit, and notifies the selected plurality of construction companies of a construction specification; A first receiving unit that receives quotations from the plurality of construction companies; a first transmission unit that transmits the estimate to a customer whose equipment replacement request has been accepted by the acceptance unit; a second receiving unit that receives a selection result by the customer to which the quotation was sent by the first transmitting unit; a second transmission unit that transmits the selection result to the plurality of construction companies that have received the estimate by the first reception unit; The management device according to claim 3 , wherein the second ordering unit places an order for replacement of the equipment with the construction company selected by the customer based on the selection result.
6. A second determination unit that determines a timing for purchasing materials when manufacturing the equipment, The management device according to claim 1 , wherein the first ordering unit instructs the purchase of materials for manufacturing equipment at the time determined by the second determination unit.
7. a second calculation unit that calculates information indicating a useful life of each type of equipment based on information regarding the equipment included in the customer information; The management device of any one of claims 1 to 6, wherein the first calculation unit determines a total quantity of each type of equipment based on information about the equipment included in the customer information, and calculates a first inventory quantity for each type of equipment based on the total quantity and information indicating the useful life of each type of equipment calculated by the second calculation unit.
8. The facility is a power transmission line that transmits power, The power transmission line has a plurality of specifications, Power transmission lines that are configured with higher specifications are compatible with power transmission lines that are configured with lower specifications. The management device according to claim 1 , wherein the first inventory quantity includes at least one power transmission line configured with higher specifications.
9. The management device according to claim 8 , wherein the higher specification is a higher allowable voltage that can be transmitted through the power transmission line, a larger size of the power transmission line, or a higher type of power transmission line.
10. In a management method for managing equipment inventory, a first registration step of registering customer information including at least information regarding the equipment used by the customer; a first calculation step of calculating a total number of each type of equipment based on information on the equipment included in the customer information, and calculating a first inventory quantity for each type of equipment based on the total number; a determination step of comparing the first inventory quantity calculated in the first calculation step with an actual inventory quantity of the equipment to determine whether or not the actual inventory quantity of the equipment is insufficient; a first ordering step of ordering the manufacture of the equipment that is insufficient when it is determined that the actual inventory of the equipment is insufficient by the determining step; a calculation step of calculating a payment amount based on a cost related to a replacement of equipment for each customer registered by the first registration step; a presentation step of presenting the payment amount calculated by the calculation step to a customer, In the calculation step, a cost related to a replacement of the equipment is calculated based on a manufacturing price of the equipment manufactured by the order in the first ordering step, and the payment is recalculated based on the calculated cost related to the replacement of the equipment; In the presenting step, the payment amount recalculated in the calculation step is presented to the customer.
11. In a management program that manages equipment inventory, On the computer, a first registration step of registering customer information including at least information regarding the equipment used by the customer; a first calculation step of calculating a total number of each type of equipment based on information on the equipment included in the customer information, and calculating a first inventory quantity for each type of equipment based on the total number; a determination step of comparing the first inventory quantity calculated in the first calculation step with an actual inventory quantity of the equipment to determine whether or not the actual inventory quantity of the equipment is insufficient; a first ordering step of ordering the manufacture of the equipment that is insufficient when it is determined that the actual inventory of the equipment is insufficient by the determining step; a calculation step of calculating a payment amount based on a cost related to a replacement of equipment for each customer registered by the first registration step; a presentation step of presenting the payment amount calculated by the calculation step to a customer, In the calculation step, a cost related to a replacement of the equipment is calculated based on a manufacturing price of the equipment manufactured by the order in the first ordering step, and the payment is recalculated based on the calculated cost related to the replacement of the equipment; In the presentation step, the management program presents the payment amount recalculated in the calculation step to the customer.
12. A management system including a server and a management device for managing an inventory of equipment, The management device includes: a first registration unit that registers customer information including at least information regarding equipment used by the customer and stores the customer information in the server; a first calculation unit that calculates a total number of each type of equipment based on information about the equipment included in the customer information, and calculates a first inventory quantity for each type of equipment based on the total number; a determination unit that compares the first inventory quantity calculated by the first calculation unit with an actual inventory quantity of the equipment and determines whether or not the actual inventory quantity of the equipment is insufficient; a first ordering unit that places an order for manufacturing the equipment that is insufficient when the determining unit determines that the actual inventory of the equipment is insufficient; a calculation unit that calculates a payment based on a cost related to a replacement of equipment for each customer registered by the first registration unit; a presentation unit that presents the payment calculated by the calculation unit to a customer, The calculation unit calculates the cost of the replacement of the equipment based on the manufacturing price of the equipment manufactured by the order of the first ordering unit, and recalculates the payment based on the calculated cost of the replacement of the equipment, The presentation unit is a management system that presents the payment amount recalculated by the calculation unit to the customer.
Citation Information
Patent Citations
Electric wire use control device and electric wire use control program
JP2004021800A
Parts maintenance method for controller and system
JP2004240484A
Component arrangement device and component arrangement method
JP2011213453A
Operation support system, operation support device, operation support method, and program
JP2020057230A
Method and system for managing time interval for replacing service parts
WO2013186880A1