Communication system and method
By employing two sets of control resources tailored to UE capabilities, the solution addresses the challenge of supporting diverse 5G scenarios with varying numerologies, enhancing network efficiency and reducing power consumption.
Patent Information
- Application Number
- JP2024139615
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-06
- Estimated Expiration
- 2037-01-06
Smart Images

Figure 2024157032000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to configuration of control resource sets in networks with multiple numerologies and capabilities of communication devices, and corresponding integrated circuits. [Background technology]
[0002] Currently, the 3rd Generation Partnership Project (3GPP) is working on the technical specifications for the next release (Release 15) of the next generation of cellular technology, also known as the fifth generation (5G). At the 71st Radio Access Network (RAN) meeting of the 3GPP Technical Specification Group (TSG) (March 2016, Gothenburg), the first 5G study item, "Study of new radio access technologies", including RAN1, RAN2, RAN3 and RAN4, was approved and is expected to be the Release 15 work item that will define the first 5G standards.
[0003] The objective of this study item is to develop "New Radio (NR) Access Technologies" that operate at frequencies up to 100 GHz and support a wide range of use cases as defined in the RAN Requirements Study (see, for example, 3GPP Announcement No. 14.0.0, available at www.3gpp.org, the entire contents of which are incorporated herein by reference).
[0004] One objective is to provide a single technical framework that addresses all usage scenarios, requirements, and deployment scenarios defined in Non-Patent Document 1, including at least enhanced mobile broadband (eMBB), ultra-reliable low latency communication (URLLC), and massive machine type communication (mMTC). For example, deployment scenarios for eMBB may include indoor hotspots, dense urban, rural, urban macro, high-speed, etc., and deployment scenarios for URLLC may include industrial control systems, mobile healthcare (remote monitoring, diagnosis, and treatment), real-time control of vehicles, wide-area monitoring and control systems for smart grids, while mMTC may include scenarios using a large number of devices with non-time-critical data transfer, such as smart wearables and sensor networks.
[0005] The second objective is forward compatibility: backward compatibility with Long Term Evolution (LTE) is not required, thereby facilitating the introduction of entirely new system designs and / or new features.
[0006] The basic physical layer signal wave will be based on Orthogonal Frequency Division Multiplexing (OFDM) to support non-orthogonal waveforms and multiple access as much as possible. Additional features to OFDM, such as Discrete Fourier Transform (DFT) Spread OFDM (DFT-S-OFDM) and / or variants of DFT-S-OFDM and / or filtering / windowing, are being considered. In LTE, Cyclic Prefix (CP)-based OFDM and DFT-S-OFDM are used as waveforms for downlink and uplink transmission, respectively. One of the design goals in NR is to seek common waveforms for downlink, uplink and sidelink as much as possible. It is believed that the introduction of DFT spreading may not be required in some cases for uplink transmission. The term "downlink" refers to communication from a higher-level node to a lower-level node (e.g., from a base station to a relay node or UE, from a relay node to a UE, etc.). The term "uplink" refers to communication from a lower-level node to a higher-level node (e.g., from a UE to a relay node or base station, from a relay node to a base station, etc.). The term "sidelink" refers to communication between nodes at the same level (e.g., between two UEs, or two relay nodes, or two base stations).
[0007] In addition to the waveform, several basic frame structures and channel coding schemes are under development to achieve the above-mentioned goals. As confirmed in Non-Patent Document 1, the various use cases / deployment scenarios of NR have diverse requirements in terms of data rate, latency, and coverage. For example, eMBB is expected to support peak data rates (20 Gbps for downlink and 10 Gbps for uplink) and user-perceived data rates about three times the speeds offered by International Mobile Telecommunications-Advanced (IMT-Advanced). On the other hand, for URLLC, more stringent requirements are imposed on ultra-low latency (0.5 ms for user plane latency for UL and DL respectively) and high reliability. Finally, mMTC demands high connection density (1,000,000 devices / km2 in urban environments), wide coverage in harsh environments, and extremely long battery life (15 years) for low-cost devices.
[0008] Therefore, OFDM numerology (e.g., subcarrier spacing, OFDM symbol period, CP period) and number of symbols per scheduling interval that are appropriate for one use case may not work well for another use case. For example, low latency applications may require a shorter OFDM symbol period (larger subcarrier spacing) and / or a smaller number of symbols per scheduling interval (also called transmission time interval (TTI)) than mMTC applications. Furthermore, deployment scenarios with large channel delay spreads require a longer CP period than scenarios with short delay spreads. Therefore, the subcarrier spacing should be optimized to maintain a similar CP overhead.
[0009] At the 3GPP RAN1#84bis meeting (April 2016, Busan), it was agreed that NR should support multiple values of subcarrier spacing. The subcarrier spacing value is derived from a specific value of the subcarrier spacing multiplied by N, where N is an integer scaling factor. At the 3GPP RAN1#85 meeting (May 2016, Nanjing), it was concluded as a practical assumption that LTE-based numerology with 15 kHz subcarrier spacing is the baseline design for NR numerology. For the scaling factor N, the baseline design assumption is N=2 n (n is an integer such as 0, 1, 2, -1, -2, ...) Correspondingly, subcarrier spacings such as 15 kHz, 30 kHz, and 60 kHz are being considered.
[0010] Figure 1 shows three different subcarrier spacing configurations (15 kHz, 30 kHz, and 60 kHz) and the corresponding symbol periods. The symbol period Tu and the subcarrier spacing Δf are directly related by the formula Δf=1 / Tu. Similar to LTE systems, the term "resource element" may be used to denote the smallest resource unit consisting of one subcarrier over the length of one OFDM symbol or Single Carrier (SC) Frequency Division Multiple Access (SC-FDMA) (used in the LTE uplink and possibly also in NR uplink) symbol.
[0011] To support multiplexing of various services with diverse requirements, it was agreed in the 3GPP RAN1#85 meeting that NR supports multiplexing of different numerologies within the same NR carrier bandwidth (from the network perspective). On the other hand, from the UE perspective, the UE may support one or multiple usage scenarios (e.g., eMBB UE or UE supports both eMBB and URLLC). However, supporting multiple numerologies may complicate UE processing.
[0012] It is also recognized that NR should support flexible network and user equipment (UE) channel bandwidths for several reasons: First, NR is expected to support operation in a very wide range of spectrum, from sub-GHz to tens of GHz, with a variety of very different configurations in terms of available spectrum and therefore also in terms of possible transmission bandwidths. Second, many frequency bands to be used for NR have not yet been fully identified, implying that the size of the spectrum allocation is still unknown. Third, NR is expected to support a wide range of applications and use cases, some of which require very wide UE transmit / receive bandwidths, and others that require very low UE complexity, which means much lower UE transmit / receive bandwidths. Thus, at the 3GPP RAN#85 meeting, it was agreed that the NR physical layer design should be such that devices with different bandwidth capabilities can efficiently access the same NR carrier, regardless of the NR carrier bandwidth. [Prior art documents] [Non-patent literature]
[0013] [Non-Patent Document 1] 3GPP TR 38.913 Study on Scenarios and Requirements for Next Generation Access Technologies Summary of the Invention
[0014] One non-limiting exemplary embodiment facilitates providing an efficient set of control resources for systems using complex numerologies.
[0015] In one general aspect, the technology disclosed herein features a communications device including a receiver capable of receiving control signals from a base station on a first set of control resources and a second set of control resources; a transmitter capable of transmitting control signals and data; and circuitry that, in operation, controls the transmitter to transmit a random access message associated with the first set of control resources and to transmit a communications device capability indication, controls the receiver to monitor control resources in the first set of control resources after transmitting the random access message and to receive a configuration of the second set of control resources in the first set of control resources, and controls the receiver to monitor control resources in the first set of control resources and / or the second set of control resources after receiving the configuration of the second set of control resources.
[0016] The general or specific embodiments may be implemented as a system, a method, an integrated circuit, a computer program, a storage medium, or any combination thereof.
[0017] Additional benefits and advantages of the disclosed embodiments will become apparent from the specification and drawings, and while those benefits and / or advantages may be obtained individually through the various embodiments and features of the specification and drawings, it is not necessary for all of them to be provided in order to obtain one or more of such benefits and / or advantages. [Brief description of the drawings]
[0018] [Figure 1] FIG. 1 is a schematic diagram showing various numerologies. [Diagram 2] FIG. 2 is a schematic diagram illustrating an example of the configuration of two control resource sets. [Diagram 3] FIG. 2 is a schematic diagram illustrating an example of the configuration of two control resource sets. [Figure 4] 1 is a flow diagram illustrating an example procedure performed by a communications device to acquire first and second control resource sets after powering on. [Diagram 5] FIG. 2 is a schematic diagram illustrating an example configuration of a first control resource set in a time-frequency resource grid. [Figure 6] FIG. 2 is a schematic diagram illustrating an example configuration of a second control resource set in a time-frequency resource grid. [Figure 7] FIG. 2 is a schematic diagram illustrating an example configuration of first and second control resource sets around frequency. [Figure 8] FIG. 1 is a schematic diagram illustrating an example configuration of first and second control resource sets that are not centered on frequency. [Figure 9] FIG. 11 is a schematic diagram illustrating an example of a configuration in which the first and second control resource sets are separated. [Figure 10] FIG. 2 is a schematic diagram showing frequency hopping of a first control resource set; [Figure 11] FIG. 2 is a schematic diagram illustrating frequency hopping of a first control resource set as well as a second control resource set. [Figure 12] FIG. 1 is a schematic diagram showing how different scheduling units in time are aligned to subframe boundaries (every 1 ms). [Figure 13] FIG. 2 is a schematic diagram illustrating how a control resource set is represented in the frequency domain. [Figure 14] FIG. 2 is a block diagram showing the configuration of a communication device and a base station. [Figure 15] FIG. 1 is a block diagram showing the architecture of a communication system. [Figure 16] 1 is a flow diagram illustrating a method for configuration of set 1 and set 2 in a communication device and a base station. [Figure 17] FIG. 2 is a schematic diagram illustrating division of radio resources into corresponding resource scheduling units according to three different numerology schemes; [Figure 18] FIG. 1 is a sequence diagram illustrating an exemplary random access procedure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] A "mobile station" or "mobile node" or "user terminal" or "user equipment (UE)" or "communication device" is a physical entity within a communication network. A node may have several functional entities. A functional entity refers to a software or hardware module that implements and / or provides a given set of functions to other functional entities of the node or network. A node may have one or more interfaces that attach the node to communication facilities or media over which the node may communicate. Similarly, a network entity may have logical interfaces that attach a functional entity to communication facilities or media over which the node may communicate to other functional entities or corresponding nodes.
[0020] The term "base station" as used herein refers to a physical entity in a communication network. The physical entity performs a number of control tasks for communication devices, including one or more of scheduling and configuration. The functions of a base station and communication devices may also be integrated into a single device. For example, a mobile terminal may implement the functions of a base station for other terminals.
[0021] The term "radio resource" or "resource" as used in the claim set and in this application should be interpreted broadly to refer to a physical radio resource, such as a physical time-frequency radio resource.
[0022] The term "numerology scheme" (and other similar terms such as "OFDM numerology") used herein should be understood broadly as referring to the way physical time-frequency radio resources are handled in a mobile communication system, in particular the way these resources are divided into resource scheduling units that are assigned by a scheduler (e.g. in a radio base station). In other words, the numerology scheme may also be considered as being defined by parameters used to divide the above-mentioned physical time-frequency radio resources into resource scheduling units, such as subcarrier spacing and corresponding symbol duration, TTI length, number of subcarriers and symbols per resource scheduling unit, cyclic prefix length, etc. These parameters are sometimes referred to as L1 (Layer 1) parameters, since they are mainly used in the physical layer to perform uplink transmissions and to receive downlink transmissions.
[0023] The term "resource scheduling unit" should be understood as a group of physical time-frequency radio resources that are the smallest unit that can be allocated by a scheduler. A resource scheduling unit thus comprises a time-frequency radio resource that is made up of one or more consecutive subcarriers over one or more symbol periods according to certain features of a numerology scheme.
[0024] The term "data transmission usage scenario" or simply "usage scenario" or "use case" as used in the claim set and in this application may be broadly interpreted as a range of use cases for mobile / fixed terminals. By way of example, the usage scenarios being considered for the new 5G considerations may be, for example, eMBB, mMTC, or URLLC, as introduced in the background section.
[0025] The term "control resource" refers to a resource for carrying control information rather than user data (payload), which may include, but is not limited to, resource allocations for the downlink, uplink, or sidelink.
[0026] This disclosure provides for configuration of control resource sets in networks with complex numerologies (eg, OFDM numerology) and UE capabilities.
[0027] An example of a system to which the present disclosure is applicable may be NR. For example, eMBB, URLLC and mMTC may have different OFDM numerology. For example, URLLC may achieve low latency, e.g., 0.5 ms or less, using large subcarrier spacing, such as more than 15 kHz, and short scheduling intervals. On the other hand, eMBB may use large subcarrier spacing and long scheduling intervals to reduce control overhead, while the latency requirement is somewhat relaxed, e.g., up to 4 ms. Furthermore, mMTC is expected to require small carrier spacing (e.g., 15 kHz or less) for a large number of connections in narrow bandwidth and wide coverage. In these and possibly further use cases, the control resource set configuration disclosed herein may be adopted.
[0028] In order to provide efficient access NR carriers to devices with different bandwidth capabilities, regardless of the bandwidth of the actual NR carrier, the control channel should not span the entire system bandwidth in all use cases, as is the case for normal UEs in LTE systems. Specifically, in legacy LTE, a physical downlink control channel (PDCCH) is used by a base station (called an eNB) to transmit downlink control information (DCI) to normal UEs. The DCI includes downlink scheduling assignments, uplink scheduling grants, and uplink power control information, as well as further configuration parameters. In the frequency domain, the PDCCH is mapped to resource elements that span the entire system bandwidth. In the time domain, the number of symbols occupied by the PDCCH is indicated by a physical control format indicator channel (PCFICH).
[0029] In general, in NR, there may also be a similar mechanism for transmitting control information (i.e., downlink control information) from the base station to the communication device. The control information may be used, among other things, to schedule resources that may be further used for control information or payload. For example, the base station transmits DCI in a control resource set that must be monitored by the communication device. Here, the term "monitoring" refers to receiving, by the communication device, signals carried in the control resource set and determining whether the control information is addressed to the communication device (either exclusively or to a group of which the communication device is a member). Such monitoring may include performing blind detection, as in LTE. In other words, the communication device detects and decodes signals in the control resources by using its own identity. The identity may be used to scramble the CRC or in another way. Blind detection may also be attempted with various group identities to monitor (group) common DCI. If the monitoring reveals a DCI addressed to the communication device, the communication device decodes the DCI and uses the information received therein (such as resource grant / allocation) to access the assigned resources signaled in the DCI. In legacy LTE, a DCI may be addressed to a group of UEs. Such a DCI is called a group or common DCI. On the other hand, a DCI may be addressed to an individual UE, in which case it is called a UE-specific DCI. PDCCHs carrying different DCIs for different UEs / groups are differentiated by a Radio Network Temporary Identifier (RNTI) embedded in a Cyclic Redundancy Check (CRC). For example, a UE-specific C-RNTI (cell RNTI) is used for normal unicast data transmission. After checking the CRC of the PDCCH with its own C-RNTI, the UE may determine whether the PDCCH is addressed to it or not.For the (group) common DCI, other types of common RNTIs are used, such as SI-RNTI, P-RNTI, RA-RNTI, and TPC-PUCCH / PUSCH-RNTI for system information, paging, random access response, and PUCCH / PUSCH uplink power control commands, respectively.
[0030] In addition to the PDCCH, a typical UE in legacy LTE may be configured to monitor an enhanced PDCCH (EPDCCH) across a subset of the system bandwidth. However, the configuration of the EPDCCH is typically provided to the UE via radio resource control (RRC) signaling with transmissions scheduled by the PDCCH. Thus, a UE monitoring the EPDCCH is typically capable of receiving the PDCCH. In general, a typical UE in LTE is required to have full system bandwidth capability to receive control information, even when the EPDCCH is employed.
[0031] Considering that in NR, the system aims to enable very wide bandwidth operation and UEs with diverse services accommodated in the same network, the bandwidth capability of the UE is usually smaller than the system bandwidth. As a result, a control channel spanning the entire system bandwidth does not facilitate efficient system design, at least for common DCI. To facilitate more efficient system design, in this disclosure, a (group) common control channel is transmitted with limited bandwidth so that all UEs (in a group) with different capabilities can decode it. Thus, duplicate messages do not need to be transmitted to each individual UE with matching capabilities, which would dramatically increase the signaling overhead.
[0032] On the other hand, even if an NR UE is capable of supporting the full system bandwidth, it may not always need to operate at the full bandwidth capability. A larger operating radio frequency (RF) bandwidth means a higher UE power consumption. If the control channel is transmitted using a subset of the system bandwidth, the monitoring effort of the UE can be reduced. This allows for a reduction in the UE power consumption.
[0033] Thus, a control subband or control resource set to be monitored by all UEs may be defined. A control resource set is a set of time-frequency radio resources in which the UE attempts to blindly decode the DCI (or, in general, control information). The control resource set is advantageously defined on a control subband that is narrower than the system bandwidth. In this disclosure, examples of control resource set configurations are presented that may be beneficial for NR where multiple numerologies coexist in the system and UEs have diverse bandwidth capabilities. To facilitate efficient system design, it is therefore desirable to obtain at least one search space (control resource set to be monitored) from system information (e.g., via cell broadcast) or implicitly derive it from initial access information. This at least one search space is then used by the UE to receive control messages that enable the UE to receive higher layer signaling (such as RRC) with the configuration of additional search spaces (control resource sets that may be monitored).
[0034] One issue with having an NR carrier that supports multiplexing of different numerologies is that a single configuration of control resource sets for one numerology case may not work well for another configuration. Furthermore, there is a general design objective to maintain low signaling overhead and UE power consumption. As the number of control resource sets assigned to a UE increases, the amount of signaling related to control information also increases. This can also lead to congestion when the network is serving too many UEs and when many UEs share the same control resource set. Furthermore, when multiple control resource sets are configured for a UE, the UE monitoring effort also increases, which can lead to increased UE power consumption.
[0035] Furthermore, it should be considered how the configuration of the control resource set can enable frequency diversity for UEs with different bandwidth capabilities. Frequency diversity is very important to achieve reliable transmission of control information. The configuration of the control resource set should support frequency diversity. However, in an NR carrier that accommodates UEs with different (bandwidth) capabilities, a single configuration for the control resource set does not work well.
[0036] Thus, according to an embodiment, there are two control resource sets for the UE: The "first control resource set" (set 1) is obtained by the UE from a random access procedure; The "second control resource set" (set 2) is configured by the base station after obtaining an indication of the UE capabilities.
[0037] Each set is associated with an RF bandwidth, where set 1 implicitly indicates a first RF bandwidth (BW), and the second RF BW together with set 2 is configured by the base station. The first and second RF bandwidths are the bandwidths in which any resources that may be assigned by a control message carried in the corresponding first and second control resource sets are located. In other words, the first and second RF bandwidths are the operating bandwidths of the UE. Nevertheless, these RF BWs are recommended from the perspective of a scheduler (e.g., a base station), and it is suggested that resources scheduled by DCI are limited within these RF BWs. The UE may set its RF operating BW according to this recommendation, but also in another manner different from the recommendation, as long as DCI and corresponding data transmissions can be received.
[0038] One reason for a UE to be configured with multiple control resource sets is for power saving purposes. The RF BWs associated with different control resources may be different. In that case, the UE's operating RF bandwidth may be set wisely. As a result, when the UE is idle or inactive, it may be instructed to monitor a control resource set (e.g., set 1) with an associated smaller RF operating bandwidth to save power consumption. When the UE is not inactive, it may be instructed to monitor a control resource set (e.g., set 2) with an associated larger RF operating bandwidth to allow for a larger allocation and therefore a higher data rate.
[0039] The base station may be a gNB, which is the name currently used in 3GPP to refer to an NR base station. However, the present disclosure is not limited to NR and, consequently, to gNB. Any other communication system may employ the configurations disclosed herein.
[0040] The first control resource set may be a subset of the second control resource set in the frequency domain. In other words, the bandwidth of the first set of control resources is included in the bandwidth of the second set of control resources. In addition, the first control resource set may be a subset of the second control resource set in the time domain. In other words, the number of symbols (OFDM) of the first set of control resources may be less than or equal to the number of symbols of the second set of control resources. Thus, the first control resource set continues to be used by the UE after configuring the second control resource set. However, the present disclosure is not limited to this example. This may be advantageous in some scenarios or systems when the UE stops monitoring the first control resource set after acquiring the second control resource set.
[0041] As mentioned above, the frequency range (bandwidth) of the first control resource set may be narrower than the frequency range (bandwidth) of the second control resource set to allow UEs with different capabilities to access the first control resource set, reduce UE power consumption, etc. Specifically, the frequency range of the first control resource set may overlap or be completely contained within the bandwidth of the second control resource set.
[0042] According to an example configuration, control information common to two or more UEs is carried only by the overlapping parts of Set 1 and Set 2. In other words, the group common search space (CSS) is carried only in resources included in both the first control resource set and the second control resource set. In contrast, the user specific search space (USS) may be carried by the remaining part of the second control resource set. This example configuration is illustrated in Figure 2. The terms UE specific / group / common "search space" represent a subset of the specific / group / common control information to be monitored by blind decoding.
[0043] Specifically, Figure 2 shows an example of the relationship between the control resource sets and the control information (DCI) types carried by them. Set 1 carries common control information to be read by all UEs, possibly group control information to be read by a specific group of UEs, and UE-specific control information addressed only to a specific UE. The non-overlapping part of Set 2 carries only UE-specific control information and no common / group control information. Set 1 is part of Set 2. When the UE is instructed to only monitor Set 2 for UE-specific DCI, there are more resources for DCI transmission (compared to the case of Figure 3), resulting in potentially larger diversity gains.
[0044] Figure 3 shows another example of the relationship between control resource sets and DCI. Specifically, another exemplary configuration of set 1 and set 2 is shown. In this configuration, similar to the configuration of Figure 2, set 1 carries common control information, group common control information and UE-specific control information, and set 2 carries UE-specific control information but no common / group control information. Set 1 and set 2 are disjoint (mutually exclusive) from each other in this example. When the UE is instructed to monitor only set 2 for UE-specific DCI, the monitoring effort is also reduced.
[0045] The examples described with reference to Figures 2 and 3 are merely illustrative, and in general, Set 1 and Set 2 may be composed of overlapping resources. Furthermore, in the above example, all common search spaces and group search spaces, including the common search space associated with all communication devices, are carried in Set 1. However, the present disclosure is not limited to such a configuration. Specifically, one or more group search spaces may also be carried in Set 2.
[0046] In LTE, a UE has two different RRC states: RRC_idle and RRC_connected.
[0047] In the idle state, no data transfer takes place since the UE sleeps most of the time to save power. The UE wakes up periodically, for example to receive paging messages. In the connected state, an established RRC context exists, i.e. the parameters required for communication between the UE and the radio access network are known to both entities. The connected state is intended for data transfer to / from the terminal.
[0048] In NR, these two state designs are expected to remain, but there is discussion about the need to introduce additional new states, such as an inactive state, to better trade off UE power saving and wake-up time. The behavior of the new states is still being defined.
[0049] In general, signaling traffic during idle and inactive states is considered to be lower than that in connected state. Thus, in some example operations, a communication device may be configured to monitor only set 1 in idle or inactive state, and to monitor set 2 and / or set 1 otherwise, e.g., in connected state. Furthermore, when a communication device is in connected state, the communication device may be configured to monitor only set 1 when traffic is low (e.g., below a certain threshold), and to monitor set 2 in addition to or instead of set 1 when traffic exceeds a certain threshold. Thus, the "power saving" mode may include RRC_idle, RRC_connected, or possibly new states.
[0050] 4 shows an overview of an exemplary UE procedure for obtaining the configuration of control resource sets 1 and 2 after power-on. Specifically, in step 410, a communications device (UE) is switched on.
[0051] At 420, the communication device performs synchronization tasks and reads system information. Specifically, step 420 may include operations similar to those performed by a UE after powering on in an LTE system. Such operations may include detecting a primary synchronization sequence (PSS) and a secondary synchronization sequence, and performing frame and symbol synchronization accordingly.
[0052] Furthermore, after synchronization, the communication device may read the system information broadcast by the base station. In LTE, the system information includes, among other things, a Master Information Block (MIB) and a Further System Information Block (SIB). The Master Information Block consists of a limited number of the most frequently transmitted parameters necessary to perform the first access to the cell. Although the detailed parameters in the MIB for NR are still under discussion, they may be designed similarly to LTE, i.e. may be reused to some extent. The first SIB, e.g. SIB1, then comprises a list of candidates for the first control resource set, each candidate being associated with a specific set of random access channel resources (in LTE, the Physical Random Access Channel (PRACH)). The association of each set of candidates with a unique set of random access channel resources brings the advantage that the base station is in a position to identify, based on the random access channel resources, the first control resource set from which the base station transmits control information to a particular communication device. Furthermore, each candidate may be associated with further parameters such as numerology, operating bandwidth (first bandwidth), frequency location, etc.
[0053] The numerology and time-frequency resources for transmitting the PSS / SSS / MIBs may be defined in the standard so that all UEs can decode this information. The numerology for transmitting the further SIBs (e.g., SIB1) to be read to perform random access may be the same as the MIB, or alternatively may be indicated by the MIB. The time-frequency resources for transmitting the further SIBs (e.g., SIB1) are known to the UE from the MIB, or alternatively defined in the standard. The reason for incorporating the configuration of Set 1 into the further SIBs (e.g., SIB1) is to avoid significantly increasing the MIB size, but still be able to utilize Set 1 to schedule the rest of the SIBs as early as possible. However, the present disclosure is not limited to the configuration of Set 1 being included in SIB1. The configuration of Set 1 may be broadcast by the base station as any format or structure that allows the UE to receive and decode it. For example, it may be included in the MIB. Furthermore, NR may apply a different structure than the MIB / SIB hierarchy used in LTE.
[0054] The above description is based on the initial access procedure of LTE. However, the synchronization and system information acquisition procedures in NR may differ from those known in LTE. In any case, after power-on, the communication device synchronizes with the base station to enable at least reading of the system information. The system information may include, for example, an indication of resources on which further control (system) information is carried and / or a numerology of the control (system) information. For example, the system information may indicate a first set of control resources or point to resources on which an indication of the first set of control resources is carried. In an exemplary implementation, the system information indicates a number of candidate control resource sets, one of which the communication device may select and monitor. The selection of the first control resource set from the candidate set is shown in step 430. The communication device may select one of the candidate sets according to the supported numerology and bandwidth capabilities as well. For example, there may be various candidate sets in the system information, each associated with a different numerology and bandwidth capabilities and different random access channel resources. To initiate a random access procedure, a communications device transmits a preamble using a pseudo-random sequence and uplink resources associated with the selected set.
[0055] In step 440, a random access procedure is performed. The random access procedure may also be employed to inform the base station of the first control resource set selected in step 430. Specifically, during the random access procedure, the communication device transmits a random access message using resources associated with the selected control resource set. For example, such association may be given by associating a particular control resource set with a respective random access signature from which the communication device selects one to include in the random access preamble.
[0056] In step 450, after the random access procedure is successful, a radio resource control (RRC) connection is established. In other words, a signaling bearer is established to facilitate further control information exchange between the communication device and the base station. Specifically, the base station may send UE-specific DCI in set 1, including scheduling information for RRC signaling in the downlink, to configure the UE.
[0057] In step 460, the communications device informs the base station of its capabilities. UE capabilities may include, for example, operating bandwidth capabilities and / or use cases.
[0058] After informing the base station of its capabilities, the communications device continues to monitor the first control resource set for control information in step 470. In response to receiving the notification of the UE capabilities, the base station may transmit to the communications device a configuration of a second control resource set to be monitored within the first control resource set. For example, the gNB determines the configuration of set 2 according to the UE numerology and the second RF bandwidth, bandwidth capabilities, and network conditions, and signals the configuration to the UE by an RRC reconfiguration message scheduled by the DCI carried in the first set of control resources.
[0059] The communications device receives the configuration of the second control resource set and, upon receipt, begins monitoring the second control resource set in step 480. As discussed above, in some examples the communications device also continues to monitor the first control resource set, while in other examples only the second control resource set is monitored.
[0060] FIG. 5 illustrates an example of a first control resource set and a first operating RF bandwidth (also referred to as the first bandwidth) of a UE in a network, where the bandwidth of set 1 is equal to the first UE operating RF bandwidth. Specifically, FIG. 5 illustrates an OFDM grid, the vertical dimension of which is given by the system bandwidth (SYS BW) extending on either side of the center frequency of the NR carrier, and the horizontal dimension of which is given by a subframe (of 1 ms) including two exemplary slots, each slot comprising seven OFDM symbols. As explained above, set 1 is used to carry both (group) common control information and UE-specific control information prior to the transfer of UE capabilities. Furthermore, set 1 only has control resources located within the first bandwidth (UE1's first RF BW), which is a subset of the system bandwidth. Furthermore, as can be seen from FIG. 5, the first control resource set is located only within some OFDM symbols. Specifically, in this example, the first control resource set is located within the first two OFDM symbols of each slot. However, the present disclosure is not limited to such a configuration, and in general, the first control resource set may be defined on any subset of the system bandwidth and (sub)frame. In this case, the symbols are OFDM symbols. However, the present disclosure is not limited to OFDM. Any other time-frequency system, such as SC-FDMA, may be used as well. In general, other than time-frequency radio resources may be configured.
[0061] In other words, after decoding the first system information (e.g., SIB1) required to perform random access, the UE selects one entry (ENTRY) from the list of the first control resource set candidates and returns its center frequency (i.e., the center frequency of the UE1 receiver in FIG. 5). The first RF BW of the UE may be set to the minimum requirement of this list entry, i.e., the minimum bandwidth configuration associated with the selected candidate set. In other words, the entry may define a range of RB BW to be supported, outside which the UE may be configured to apply the minimum requirement.
[0062] FIG. 6 illustrates an example of a second control resource set and a second operating RF bandwidth of a UE in a network, where the bandwidth of set 2 is smaller than the second UE operating RF bandwidth. Specifically, FIG. 6 illustrates the same OFDM resource grid as that illustrated in FIG. 5, where the OFDM resource grid is given by the system bandwidth (SYS BW) in the frequency domain and a subframe of two slots in the time domain. The second control resource set is located within the second bandwidth. The second bandwidth (denoted as UE1's second RB BW in the figure) is a subset of the system bandwidth, i.e., the second bandwidth is smaller than or equal to the system bandwidth. In FIG. 6, the second control resource set is defined only within a subset of OFDM symbols (the first three symbols in each slot) in the time domain.
[0063] As mentioned above, in general, the second bandwidth may overlap with the first bandwidth. However, the present disclosure is not limited to such a configuration, and the first and second bandwidths may not overlap. A special example in which the first bandwidth forms a part of the second bandwidth is shown in FIG. 7. Specifically, FIG. 7 shows the same OFDM grid as FIG. 5 and FIG. 6, but here the first bandwidth (UE1's first RF BW) is completely contained within the second bandwidth (UE1's second RF BW). In this example, the center frequency of both the first and second bandwidths is the same (UE1 receiver center frequency). As can be seen from FIG. 7, in this example, the first control resource set is also completely contained within (and overlaps with) the second control resource set.
[0064] In other words, after the UE capability transfer, the gNB is ready to configure the second control resource set and the second bandwidth for the UE. According to FIG. 7, the first and second bandwidths of the UE are center-aligned, i.e., the center frequency of the first bandwidth is the same as the center frequency of the second bandwidth. This alignment brings the advantage that the UE does not need to retune when switching between monitoring set 1 and monitoring set 2, which results in a shorter transition time required between monitoring the two sets. Furthermore, since there is no need to indicate the center of the bandwidth, the message size for configuring the second control resource set can also be reduced.
[0065] FIG. 8 illustrates another example of set 1 and set 2, where set 1 and set 2 are non-overlapping and set 2 includes only UE-specific DCI. A connected UE may be configured to monitor both set 1 and set 2. Specifically, FIG. 8 illustrates another example where the first and second bandwidths are not centered relative to each other. In this example, the first and second bandwidths still fully overlap, but the first bandwidth forms a part of the second bandwidth. However, the first control resource set is not a subset of the second control resource set.
[0066] FIG. 9 shows an example of a configuration in which the first bandwidth is a part of the second bandwidth. However, the first and second control resource sets are separate and discontinuous from each other. In other words, set 1 and set 2 are discontinuous, and set 2 contains only UE-specific DCI. A connected UE can be configured to monitor both set 1 and set 2. This allows the gNB more flexibility to configure the control resource sets. However, in FIG. 9, the second UE operating BW is much larger than in FIGs. 7 and 8 to take into account the separate parts, and in particular to allow the UE to monitor both set 1 and set 2.
[0067] Either Set 1 or Set 2 (or both) in any of the examples shown above may be shared by multiple UEs.
[0068] All the examples described with reference to Figures 5-9 show continuous UE operating BWs (first and second UE operating BWs), i.e. the RF BW is formed by N consecutive subcarriers. For UEs with relatively high bandwidth capabilities, frequency diversity can be achieved by mapping the control channel to distributed physical resource blocks (PRBs) in the frequency domain within one control resource set and still inside the bandwidth supported by the UE. With such distributed mapping in the frequency domain, frequency diversity is improved. A physical resource block is a scheduling unit, each having a size of multiple subcarriers and multiple symbols.
[0069] Further frequency diversity improvements may be achieved by frequency hopping, where the control resource set and associated RF BW are comprised of non-contiguous frequency portions and the UE's reception window is hopped between those portions (i.e., one portion at a time). This may provide desirable frequency diversity improvements, especially for UEs with low bandwidth capabilities, e.g., mMTC UEs. For such narrowband UEs, frequency diversity may otherwise be difficult to achieve.
[0070] An example of such hopping is shown in Figure 10. In this configuration, the communication device follows a hopping pattern defined for a control resource set. The term "hopping pattern" in this specification refers to the location of the control resource set instance in a time-frequency grid. Specifically, in the case of frequency hopping, the hopping pattern indicates the change in frequency location of the control resource set instance over time.
[0071] Between different patterns, the UE may need to perform retuning. Therefore, it may be desirable to skip one or more OFDM symbols, i.e., not assign these symbols to a control resource set pattern, to provide transition time for retuning. Specifically, FIG. 10 illustrates the system bandwidth (SYS BW) and hopping between two patterns, as well as the two corresponding respective subbands. The first frequency portion 1010 includes a first instance 1015 of the first control resource set, and the second frequency portion 1020 includes a second instance 1025 of the first control resource set. As can be seen, the first instance is separated from the second instance in the time domain by one OFDM symbol (the seventh symbol) that does not carry the first control resource set. If this pattern of first and second instances is repeated for each slot, it can be seen that there is also one null OFDM symbol between the second instance and the subsequent repeated first instance. The term "null" means that the OFDM symbol does not carry any data (control or payload).
[0072] In this example, the time slot is 14 OFDM symbols long. Hopping is performed between two instances of every 7 OFDM symbols, with one instance being 6 OFDM symbols long.
[0073] The present disclosure is not limited to any particular number of OFDM symbols per slot or per subframe, nor is it limited to any particular number of slots per subframe. In general, hopping may occur every K symbols or any time unit. To facilitate less complex UE implementation, it may be advantageous if the length of an instance of a control resource set is less than or equal to the length of K symbols.
[0074] FIG. 11 illustrates the relationship between set 1 and set 2 with hopping, where set 1 is a subset of set 2. In this example, set 1 and set 2 have the same hopping interval, and switching between two instances in two different bandwidths is performed every seven OFDM symbols. In this example, group common message / control information (DCI) is transmitted in the overlapping portion of set 1 and set 2. The first bandwidth and the second bandwidth are not centered. The hopping pattern generally specifies the change in the operating bandwidth with time units. The above example only shows hopping between two instances. However, the present disclosure is not limited thereto, and a longer series of instances in which the bandwidth is switched may be defined. For example, the hopping pattern may also be defined over multiple subframes or slots, unlike the above example.
[0075] However, it is not necessary for set 1 and set 2 to have the same hopping pattern. The advantage of having the same hopping pattern for the two sets is that the monitoring effort for the communication device (UE) is reduced.
[0076] As mentioned above, the control resource set configuration may include various different parameters, whose values may be optimized for different use cases, such as eMBB or URLLC. Specifically, the communication device receives system information from the base station, such as system information necessary to perform a random access procedure, where the system information includes a list of entries for the first control resource set for each of the different configurations.
[0077] For example, an entry may have the following parameters for a first control resource set candidate: - Subcarrier Spacing (SCS), which specifies the spacing in the frequency domain between two consecutive subcarriers; - A set bandwidth (BW) that specifies the bandwidth of the control resource set A frequency location of a control resource set that defines a center frequency of the control resource set -PRB (Physical Resource Block) index (instead of signaling the center frequency and width, the BW of a set and its frequency location can be indicated by the PRB (Physical Resource Block) index that makes up the set) - 1st RF BW (operational bandwidth, i.e. the bandwidth within which any resource schedulable by the control information carried by the set is located, which can be assumed to be equal to the BW of the set. In such a case, no additional parameters are required. However, if the bandwidth of the set differs from the operational bandwidth, another parameter can be included) Physical Random Access Channel (PRACH) resources (including preamble sequences and PRACH time-frequency resources)
[0078] An exemplary list of candidate control resource sets may have, for example, the following entries: - Entry 1: SCS = 15 kHz, set BW = 5 MHz, set center frequency, PRACH time-frequency resource, preamble sequence - Entry 2: SCS = 60 kHz, set BW = 20 MHz, set center frequency, PRACH time-frequency resource, preamble sequence
[0079] In other words, entry 1 has a carrier spacing of 15 kHz and the bandwidth of the set is 5 MHz, which is assumed here to be the same as the operating bandwidth (similar to the example shown in Figure 5). The center frequency indicates the location of the band within the system bandwidth. The PRACH resource may include the location of the corresponding PRACH resource in the grid and the preamble sequence that may be used with this set.
[0080] For example, entry 1 may be selected by an eMBB UE, while entry 2 may be selected by a URLLC UE. In general, if a UE supports multiple services and / or numerologies, the UE may randomly select one of the entries that matches one of its numerologies. Alternatively, there may be a predefined default numerology based on which the UE selects an entry.
[0081] As another alternative, the UE may select an entry based on its UE ID. For example, an entry may be selected applying the following example rules: selected_entry_index=UE_ID mod number_of_numerologies_it_supports where mod is the modulo operation, selected_entry_index is the selection result (specifying the index of the entry among the selectable entries in the set), and number_of_numerologies_it_supports is the number of numerologies supported by the UE with UE_ID.
[0082] As yet another alternative, the UE may select an entry based on its channel conditions, e.g., if the channel is good, it selects a low diversity PRACH resource, otherwise it selects a high diversity PRACH resource (high repetition level occupying more uplink time-frequency resources).
[0083] The selection of an entry in the control resource set candidate list provides the advantage of associating the random access procedure with a particular numerology and bandwidth, so that no explicit signaling is required between the communication device and the base station. Rather, by performing the random access procedure, the base station is implicitly informed of the selected set of control resources that are monitored by the communication device and that can be used by the base station to transmit control information to the communication device.
[0084] The same configuration parameters for the above example of set 1 may also be used for set 2. However, the signaling overhead for system information may be further reduced if the entries of the second set are configured with only a subset of the parameters of the first set of configurations, with the remaining parameters assumed to be the same as the first set. For example, set 2 may be configured with only the second bandwidth. The remaining parameters may be considered to be the same as for set 1 previously selected by the UE.
[0085] An example configuration parameter list for set 2 might be: -Set 2 BW specifying the bandwidth of control resource set 2 -A second RF BW (second bandwidth) that specifies the frequency resource to which the scheduling grant in the DCI applies -No PRACH resources required for Set 2
[0086] In the above example configuration of set 2, set 1 and set 2 are centrally aligned in the frequency domain (as shown in FIG. 7), so no explicit signaling is required to indicate the location of set 2. However, the disclosure is not so limited, and set 2 may be configurable with another parameter for the bandwidth of set 2.
[0087] In some of the above examples, the first control resource set carries both (group) common DCI and UE-specific DCI. Therefore, serving too many terminals may cause congestion. In other words, if there are many UEs to be provided with DCI, it may be difficult to receive user-specific DCI. This may be especially problematic when many UEs select the same control resource. To reduce the possibility of congestion, additional selection criteria apart from numerology may be applied.
[0088] Another example of an entry in the list of candidate sets could be: Entry 1: SCS = 15 kHz, configured BW = 5 MHz, 5 MHz <= UE capability <= 20 MHz (selection criteria), configured center frequency, preamble sequence, PRACH time-frequency resource Entry 2: SCS = 15 kHz, configured BW = 5 MHz, 20 MHz <= UE capability <= 80 MHz (selection criteria), configured center frequency, preamble sequence, PRACH time-frequency resource Entry 3: SCS = 60 kHz, configured BW = 20 MHz, 20 MHz <= UE capability <= 80 MHz (selection criteria), configured center frequency, preamble sequence, PRACH time-frequency resource
[0089] For example, entry 1 is characterized by a SCS of 15 kHz and a set bandwidth of 5 MHz, which is assumed here to be the same as the operating bandwidth. Furthermore, the UE bandwidth capability is due to the UE capability bandwidth range of 5 MHz to 20 MHz. The remaining parameters are similar to the example above.
[0090] The communication device then selects one set according to both its numerology and selection criteria. For example, in the above list, both entry 1 and entry 2 have the same subcarrier spacing and bandwidth, and thus both are suitable and targeted for the same use case, such as eMBB operation. However, they differ with respect to UE capabilities, which is an additional selection criterion here. Specifically, entry 1 is for UEs with a bandwidth capability of 5 MHz to 20 MHz, while entry 2 is for UEs with a bandwidth capability of 20 MHz to 80 MHz. Thus, a UE with a bandwidth capability of 20 MHz to 80 MHz (e.g., 40 MHz) may select entry 2, whereas a UE with a bandwidth capability of less than 20 MHz (e.g., 10 MHz) may select entry 1. Entry 3 is suitable and targeted for, for example, URLLC use case.
[0091] Specifically, the communication device may set the first operating BW to the minimum requirement of the UE capability for the same numerology. According to the exemplary list of entries 1-3 shown above, if a UE supporting 15 kHz SCS has a bandwidth capability of 80 MHz, entry 2 will be selected and the first RF UE operating BW may be set to 20 MHz (corresponding to the minimum requirement of the selection criteria in entry 2, in other words, corresponding to the minimum value of the UE capability range parameter). The advantage of such a setting is that the gNB (or scheduler) knows that all UEs monitoring the set of entry 2 have at least 20 MHz BW capability, so the DCI carried by this set can schedule resources matching this 20 MHz without worrying about any UE detection failure. On the other hand, selecting an operating BW of 20 MHz for a UE with 80 MHz capability will save power consumption of monitoring.
[0092] In the above example, entry 3 is the only entry for the numerology with SCS=60 kHz, however, the present disclosure is not so limited. In general, there may be one or more additional entries with the same SCS and BW, and additional selection parameters with different values.
[0093] If the set BW is smaller than the UE's first RF operating BW (first bandwidth), then: The control resource set may be centrally located inside the first bandwidth in the frequency domain, so that no signaling for the center frequency is required. The size relationship between the BW of the control resource set and the first BW may be specified in the standard or may be signaled. Alternatively, the offset between the center of the set and the center of the first bandwidth may also be incorporated as a parameter. Alternatively, the UE may perform blind decoding within the first bandwidth.
[0094] Thus, the congestion problem can be reduced by appropriately grouping the communication devices according to additional selection criteria. One possible selection criterion is the UE capability range in terms of bandwidth, as mentioned in the above example. With such a selection criterion, the range of UE bandwidth capabilities is implicitly known to the gNB during the random access procedure. Thus, the gNB may provide a resource allocation in the first control resource set to the DCI, which schedules resources that match the UE capabilities, i.e., resources that are located within the bandwidth included in the UE capabilities (e.g., the minimum UE capability range value). The above example shows only two different UE capability ranges. However, in general there may be more than two such capability ranges used as selection criteria.
[0095] The entries in the list of candidate sets may also include additional parameters indicating whether hopping is enabled or disabled, and possibly also signaling the hopping pattern. An example of such a list is shown as follows:
[0096] - Entry 1: SCS = 15 kHz, configured BW = 5 MHz, 5 MHz <= UE capability <= 20 MHz (selection criteria), configured center frequency, hopping = false, PRACH sequence, PRACH time-frequency resource - Entry 2: SCS = 15 kHz, configured BW = 5 MHz, 20 MHz <= UE capability <= 80 MHz (selection criteria), configured center frequency, hopping = false, PRACH sequence, PRACH time-frequency resource - Entry 3: SCS = 60 kHz, configured BW = 20 MHz, 20 MHz <= UE capability <= 80 MHz (selection criterion), configured center frequency, hopping = false, PRACH sequence, PRACH time-frequency resource - Entry 4: SCS = 15 kHz, configured BW = 180 MHz, 1.4 MHz <= UE capability <= 5 MHz (selection criterion), configured center frequency, hopping = true, hopping pattern, PRACH sequence, PRACH time-frequency resource
[0097] Thus, for each different entry in the list, there is a different hopping option: hopping can be switched on (in this example, value hopping=true) or off (in this example, value hopping=false). If hopping is true, a predefined or preconfigured hopping pattern can be applied.
[0098] In the above example, entries 1 and 2 may be appropriate for an eMBB use case, while entry 3 may be appropriate for a URLLC use case. Entries 1-3 have hopping turned off. Additionally, for entry 4, which has the lowest bandwidth, hopping is turned on and an additional parameter hopping pattern is configured. The parameter hopping pattern indicates the hopping pattern. This may be done by referencing one of several specific patterns that may be defined in the standard or may be configured by system information. Entry 4 may be particularly efficient for low bandwidth use cases, such as mMTC, since it allows for providing frequency diversity even for UEs with very low BW capabilities.
[0099] Also, there may be multiple entries with different hopping patterns that may be specified as additional parameters.
[0100] The above entry list is merely exemplary. Lists with many more entries using different parameter combinations may be provided. Providing greater freedom of choice may help reduce the likelihood of congestion.
[0101] To obtain greater freedom for configuration, other parameters in the basic parameters mentioned above may also be configured for the second set of control resources.
[0102] For a first eMBB UE, the following first and second control resource sets may be defined: Set 1: SCS = 15 kHz, configured BW = 5 MHz, 5 MHz <= UE capability <= 20 MHz (selection criterion), configured center frequency, hopping = false, PRACH sequence, PRACH time-frequency resource - Set 2: SCS = 15 kHz, set BW = 20 MHz, 2nd RF BW = 20 MHz, set center frequency, hopping = false
[0103] Specifically, in this example, set 1 has a set BW that is assumed to be the same as the first bandwidth, and set 2 allows for decoupling the configuration of the set bandwidth and the second bandwidth. Furthermore, set 2 may be located at a different center frequency than set 1. However, in the above entry for set 2, the operating (second RF BW) bandwidth is still set to be the same as the set bandwidth.
[0104] For the second eMBB UE, the following first and second control resource sets may be defined:
[0105] Set 1: SCS = 15 kHz, set BW = 5 MHz, 20 MHz <= UE capability <= 80 MHz (selection criteria), set center frequency, hopping = false, PRACH sequence, PRACH time-frequency resource Set 2: SCS = 15 kHz, set BW = 40 MHz, second RF BW = 40 MHz, set center frequency, hopping = false
[0106] Furthermore, for a possible URLLC UE, two sets may be defined as follows: Set 1: SCS = 60 kHz, set BW = 20 MHz, 20 MHz <= UE capability <= 80 MHz (selection criterion), set center frequency, hopping = false, PRACH sequence, PRACH time-frequency resource - Set 2: SCS = 60 kHz, set BW = 40 MHz, second RF BW = 80 MHz, set center frequency, offset between center of set BW and center of second BW, hopping = false
[0107] In the above entry for set 2, the set bandwidth is narrower than the second bandwidth and an offset is defined.
[0108] For a possible mMTC UE, two sets may be defined as follows: Set 1: SCS = 15 kHz, setting BW = 180 MHz, 1.4 MHz <= UE capability <= 5 MHz (selection criterion), hopping = true, hopping pattern, PRACH sequence, PRACH time-frequency resource Set 2: SCS=15kHz, Set BW=360kHz, Second RF BW=1.4MHz, Hopping=True, Hopping Pattern
[0109] Specifically, in this example, the center frequencies of Set 1 and Set 2 are not given in the configuration parameters. The default locations are used in this case. For example, the control resource sets are always located at the edge of the system bandwidth, as in the examples shown in Figures 10 and 11.
[0110] The above examples focus on the configuration of control resource sets in the frequency domain, however, it may also be useful to consider the location of the control resource sets in the time domain.
[0111] FIG. 12 illustrates an exemplary alignment of various time units within a subframe. A subframe is a time unit having a length of 1 ms in this example. However, the subframe length of 1 ms is merely an example, and the present disclosure is not limited to any particular time unit length. A subframe is further divided into slots or minislots. To support multiple numerologies, each numerology may have its own scheduling interval in terms of slot or minislot length. As can be seen from FIG. 12, scheduling intervals such as slots and minislots for different numerologies are aligned within the boundaries of a subframe. Additionally, the following scheduling interval lengths are illustrated in FIG. 12:
[0112] - Two 0.5 ms long slots within a subframe. This configuration corresponds to a 15 kHz SCS with 7 symbols per TTI (scheduling interval). - 7 minislots within a subframe. This configuration corresponds to a 15 kHz SCS and 2 symbols per TTI. - 16 minislots in a subframe. This configuration corresponds to a 30 kHz SCS and 2 symbols per minislot. - 8 slots in a subframe. This configuration corresponds to 60 kHz and 7 symbols per TTI.
[0113] Exemplary numerology schemes are shown in Figure 17. Specifically, Figure 17 is a simplified diagram of radio resource partitioning according to three different numerology schemes. The resulting resource scheduling units are shown as bold boxes in each of the numerology schemes.
[0114] Numerology scheme 1 of FIG. 17 is characterized by having a subcarrier spacing of 15 kHz (resulting symbol duration is 66.7 μs (see FIG. 1)), 12 subcarriers and 6 symbols per resource scheduling unit. The resulting resource scheduling unit has a frequency bandwidth of 180 kHz and a length of 0.5 ms (when considering exemplarily cyclic prefixes of 16.7 μs each, as known from LTE systems, for example). Correspondingly, in the frequency domain, the bandwidth of the frequency band is divided into 24 resource scheduling units, each with a bandwidth of 180 kHz. With these numerology features, numerology scheme 1 can be considered for data transmission of mMTC services. Thus, a UE following that numerology scheme can theoretically be scheduled by a scheduler every TTI, i.e., every 0.5 ms.
[0115] Numerology scheme 2 is characterized by a subcarrier spacing of (2 x 15 kHz =) 30 kHz (resulting symbol duration is 33.3 μs (see FIG. 1)), 12 subcarriers and 6 symbols per resource scheduling unit. The resulting resource scheduling unit therefore has a frequency bandwidth of 360 kHz and a length of 0.25 ms (when considering as an example a scaled cyclic prefix of 16.7 μs per two). Correspondingly, in the frequency domain, the bandwidth of the frequency band is divided into 12 resource scheduling units, each with a bandwidth of 360 kHz. With these numerology features, numerology scheme 2 can be considered for data transmission of eMBB services. A UE following that numerology scheme can therefore theoretically be scheduled by the scheduler every TTI, i.e., every 0.25 ms.
[0116] Numerology scheme 3 is characterized by a subcarrier spacing of (4 x 15 kHz =) 60 kHz (resulting symbol duration is 16.7 μs (see FIG. 1)), 12 subcarriers and 4 symbols per resource scheduling unit. The resulting resource scheduling unit therefore has a frequency bandwidth of 720 kHz and a length of 0.0833 ms (when considering an exemplary scaled cyclic prefix of 16.7 μs every 4). Correspondingly, in the frequency domain, the bandwidth of the frequency band is divided into 6 resource scheduling units, each with a bandwidth of 720 kHz. With these numerology features, numerology scheme 3 can be considered for data transmission of URLLC services. Thus, a UE following that numerology scheme can theoretically be scheduled by the scheduler every TTI, i.e., every 0.0833 ms.
[0117] Different numerology schemes must coexist in a mobile network, and radio resources of various numerology schemes should be available to be allocated to user terminals as needed. There are several possibilities regarding how to multiplex different numerologies in a frequency band and radio resources in the frequency domain and / or time domain. In general, the available time-frequency radio resources of a frequency band should be divided in an appropriate manner between the different numerology schemes coexisting in the system, so that radio resources can be allocated for data transmission according to each numerology scheme. Correspondingly, each numerology scheme is associated with a specific set of radio resources from among the available radio resources of the frequency band, which set of radio resources can then be used by a scheduler (such as a radio base station) to be allocated according to that numerology scheme, i.e. to allocate radio resources for transmitting data for the corresponding service (here URLLC, mMTC, mMBB) according to the numerology characteristics of the specific numerology scheme. Such multiplexing of various coexisting numerology schemes for a service can also be flexible, given that the traffic volume of each service varies over time.
[0118] The communications device then monitors the control resource at most every scheduling interval. To reduce the monitoring effort, greater power savings may be obtained as monitoring occurs less frequently.
[0119] The UE may be configured with RRC or, more generally, with higher layer protocols as to in which slots / minislots DCI is expected in one subframe. The configuration may depend on the DCI type (e.g., RA-RNTI, SI-RNTI, UE-specific DCI, etc.). For example, a first slot in a subframe may be configured to carry common control information, whereas a second slot in the same subframe may be configured to carry UE-specific control information and not common control information. In addition, the slot carrying group information may be designated separately from the first and second slots or may be the same. Such subdivision may also reduce the monitoring effort, since an attempt to decode control information with a particular type of RNTI (or RNTIs) may be made only on one slot.
[0120] The sizes in the time domain of the first and second control resource sets may be implicitly determined by the communication device based on another configurable parameter, or may be configured by the base station through explicit signaling. Specifically, the number of symbols of the control resource set in a scheduling interval may be a fixed value according to the length of the slot / minislot. In other words, the communication device determines the number of symbols of the control resource set based on the slot size (or scheduling interval size). The determination manner may be given in the standard, for example, as a table of the number of symbols of the control resource set for a particular configurable slot size and / or scheduling interval size.
[0121] Alternatively, the size of the resource control set is configurable. Specifically, the size of the (first or second) resource control set may be signaled in the first symbol of the (first and second) resource control set, i.e., in the Physical Control Format Indicator Channel (PCFICH). However, the present disclosure is not limited to such signaling. Alternatively, the size of the resource control set in the time domain is a parameter of the respective resource control set and may be selected by the communication device and indicated by a random procedure as indicated above with respect to the numerology and / or the operating bandwidth range.
[0122] Furthermore, the configurability of the size of the resource control set in the time domain may be configurable. For example, a parameter "PCFICH config possibility" may be included among the configuration parameters for set 1 and set 2. If the value of the parameter "PCFICH config possibility" is false, a fixed value is used for the number of symbols of set 1 and / or set 2, respectively. This fixed value is either a default value or a value determined by the communication device as described above. On the other hand, if the value of the parameter "PCFICH config possibility" is true, the number of symbols is signaled by the PCFICH located in the first symbol of the control set.
[0123] A communication device may utilize different control resource sets in various manners. For example, according to a first option (option 1), different sets are configured for different numerologies. The UE should perform blind decoding in all configured control resource sets. Specifically, the base station may control the communication device to monitor one or more configured control resource sets, such as a first control resource set and a second control resource set and / or another control resource set such as a third, fourth, etc. For example, there may be a control resource set transmitted based on a numerology similar to the numerology of the resources scheduled by the control information (DCI) carried in that set. Nevertheless, the monitoring effort increases with each new set monitored.
[0124] To further reduce the monitoring effort, according to option 2, one set is configured to carry DCI for data transmission of other numerology schemes. In other words, the numerology of the control resource set may be different from the numerology of the resources scheduled by the control resources of the control resource set. One of the advantages of this approach is that the UE only needs to monitor one numerology scheme for control information. The control information (DCI) may then indicate the numerology used by the data transmission assigned (scheduled) by that DCI as well.
[0125] The frequency resources and associated RF BW of a control resource set may be indicated by their absolute value or by an index that is assigned to a particular value, for example in the standard. Alternatively, to provide sufficient signaling flexibility and at the same time to save signaling resources, the frequency resources of the (first and / or second) control resource set may be indicated with reference to a resource grid in the same numerology scheme that the set targets.
[0126] For example, a resource grid is defined for each numerology scheme and is known to both gNB and UE. The grid does not change with respect to resource allocation. This is illustrated in FIG. 13. Specifically, FIG. 13 illustrates three respective grids for three different numerologies with subcarrier spacings of 60 kHz, 30 kHz, and 15 kHz as three rows. UE1 in FIG. 13 may be informed of a first RF BW as {RB#-13 to RB#-10} by an SCS of 15 kHz. In other words, the first bandwidth and / or the second bandwidth may be indicated by the index of the lowest resource block (RB) and the index of the highest resource block belonging to the respective bandwidth. A resource block may be the smallest allocatable unit in the frequency domain and may include a number of subcarriers, for example 12 subcarriers.
[0127] Thus, control information carrying control resource sets (eg, higher layer signaling, such as dedicated RRC signaling or broadcasted system information, and physical layer signaling) may be signaled with improved efficiency.
[0128] However, this disclosure is not limited to such signaling. In general, the operating bandwidth may be signaled by its center frequency and width, or in any other manner, such as by a minimum RB and bandwidth.
[0129] Furthermore, the signaling described above can be used to indicate any subband of the system band by its lowest and highest frequency (as indicated by the resource block index). In other words, this signaling scheme is not limited to signaling the operating bandwidth, but can be used to indicate any frequency band or range (e.g., the capability bandwidth range described above in connection with the candidate set configuration).
[0130] The present disclosure may be realized by software, hardware, or software cooperating with hardware. Each functional block used in the description of each embodiment above may be partially or entirely realized by an LSI such as an integrated circuit, and each process described in each embodiment may be partially or completely controlled by the same LSI or a combination of LSIs. The LSI may be formed individually as a chip, or one chip may be formed to include some or all of the functional blocks. The LSI may include a data input section and a data output section coupled thereto. The LSI here may be called an IC, a system LSI, a super LSI, or an ultra LSI depending on the degree of integration. However, the technology for implementing an integrated circuit is not limited to an LSI, and may be realized by using a dedicated circuit or a general-purpose processor or a special-purpose processor. In addition, a field programmable gate array (FPGA) that can be programmed after the manufacture of the LSI or a reconfigurable processor in which the connection and setting of the circuit cells arranged inside the LSI can be reconfigured may be used. The present disclosure may be realized as digital processing or analog processing. When a future integrated circuit technology replaces LSI as a result of advances in semiconductor technology or other derived technologies, the functional blocks may be integrated using that future integrated circuit technology. Biotechnology may also be applied.
[0131] FIG. 14 shows a block diagram of a system including a communication device 1410 and a scheduling device 1460 that communicate with each other via a (wireless) physical channel 1450. The communication device 1410 includes a transceiver 1420 and a circuit 1430. The transceiver 1420 includes a receiver and a transmitter. The circuit 1430 may be one or more hardware, such as one or more processors or any LSI mentioned above. Between the transceiver 1420 and the circuit 1430, there is an input / output point 1425, through which the circuit controls the transceiver 1420 in operation, i.e. controls the receiver and / or transmitter and exchanges receive / transmit data. The transceiver 1420 may include an RF front including one or more antennas, an amplifier, an RF modulator / demodulator, etc. The circuitry 1430 may specifically implement control tasks such as controlling the transceiver 1420 to transmit user data, to control data provided by the circuitry, and / or to receive user data and control data that is further processed by the circuitry.
[0132] A simple exemplary scenario is shown with a radio base station and several user equipments in Figure 15. The three UEs shown each support a different service, namely mMTC, eMBB and URLLC services already introduced in the background section. As shown, one UE is assumed to support and be configured for two different services, typically URLLC and eMBB services.
[0133] 14. The radio base station in FIG. 15 may correspond to the base station 1460 in FIG. 14. Any of the three UEs in FIG. 15 may correspond to the communication device 1410 in FIG.
[0134] According to one embodiment, a communications device 1410 is provided, comprising a receiver 1420 capable of receiving control signals from a base station 1460 on a first set of control resources and a second set of control resources. The communications device 1410 further comprises a transmitter 1420 capable of transmitting control signals and data, and a circuit 1430, which in operation: controlling a transmitter to transmit a random access message associated with a first set of control resources and to transmit a communication device capability indication; - controlling the receiver to monitor control resources in the first set of control resources after transmitting the random access message and to receive within the first set of control resources an indication of a configuration of a second set of control resources; - controlling the receiver to monitor control resources in the first set of control resources and / or the second set of control resources after receiving a configuration of the second set of control resources.
[0135] The indication of the configuration of the second set of control resources may be, for example, a resource assignment in higher layer signaling conveying the configuration of the second set of control resources for the communication device. However, the disclosure is not limited to this example. For example, the indication may also be a direct reference to the second control resource set.
[0136] The first set of control resources is located within a first bandwidth and the second set of control resources is located within a second bandwidth, where the first bandwidth is the bandwidth within which any resources assigned by control information carried in the first set of control resources are located and the second bandwidth is the bandwidth within which any resources assigned by control information carried in the second set of control resources are located.
[0137] The first and second bandwidths may be the same. In other words, an allocation received in the first control resource set may span the same operating bandwidth as an allocation received in the second resource set. However, if the first bandwidth is a subset of the second bandwidth, monitoring effort and power consumption may be reduced.
[0138] In one example, the first and second bandwidths are centered relative to each other in the frequency domain. Similarly, the bandwidths of the first and second control resource sets may also be centered relative to each other.
[0139] Regarding the relationship between the two sets, in one example, the bandwidth of the first set of control resources is included in the bandwidth of the second set of control resources. Furthermore, the first set of control resources may be a subset of the second set of control resources. For example, when the resources are defined in a time-frequency grid of a number of symbols in time and a number of subcarriers in frequency, in addition, the symbols carrying the first set of control resources may be included in the symbols carrying the second set. However, the present disclosure is not limited by the relationship between set 1 and set 2 in the time domain.
[0140] According to another example, the first control resource set and the second control resource set are separate from each other or only partially overlap each other in the frequency domain.
[0141] The bandwidth of the first control resource set is equal to or smaller than the first bandwidth, and similarly, the bandwidth of the second control resource set is equal to or smaller than the second bandwidth.
[0142] In any of the above examples, the first set of control resources advantageously includes common control information for decoding by multiple communication devices as well as user-specific control information for decoding only by a particular communication device, and the second set of control resources includes user-specific control information.
[0143] The second set of control resources may also contain (group) common control information, which is especially true when set 1 is a subset of set 2. On the other hand, if set 1 and set 2 are separate from each other (or partially overlap), set 2 does not need to contain any (group) common control information.
[0144] The circuitry, in operation, may control the receiver to monitor a first set of control resources when the communications device is in an operating mode that facilitates power savings.
[0145] A mode that facilitates power saving may, for example, be a mode in which the communications device has no active data connection or only a data connection with low activity (e.g., below a certain traffic threshold). For example, a mode that facilitates power saving may correspond to the idle mode defined in LTE (no data bearers are established).
[0146] Additionally, the circuitry may, in operation, control the receiver to monitor a second set of control resources when the communications device is not in an operating mode that facilitates power savings In addition to monitoring the second set, the receiver may also be controlled to still monitor the first set.
[0147] Alternatively, the circuitry may be configured to control the receiver, in operation, to monitor a first set of control resources if the communication device traffic does not exceed a threshold, and to monitor a second set of control resources if the communication device traffic exceeds a threshold. The threshold may be configured by the base station and provided to the communication device via higher layer signaling. Alternatively, it may be specified by a standard. Alternatively, the threshold may be used only by the base station, and the base station directs communication according to the threshold whether the first or second control resource set should be monitored.
[0148] To further improve frequency diversity, the first control resource set is distributed in the frequency domain, and the circuitry, in operation, controls the receiver to perform frequency hopping at every first predetermined time interval to monitor the first control resource set.
[0149] In one example, the second control resource set is distributed in the frequency domain, and the circuitry, in operation, controls the receiver to perform frequency hopping at every second predetermined time interval to monitor the second control resource set, and the hopping pattern of the first control resource set is similar to the hopping pattern of the second resource set.
[0150] The first and second predetermined time intervals may be a particular number K of symbols or slots or subframes, etc. They may be the same or different from each other. Frequency hopping may generally be applied only to the first set, only to the second set, to neither of the sets, or to both.
[0151] In one example, the second control resource set is distributed in the frequency domain, and the circuitry, in operation, controls the receiver to perform frequency hopping at every second predetermined time interval to monitor the second control resource set, and the hopping pattern of the first control resource set differs from the hopping pattern of the second resource set in at least one time interval and at least in the frequency band.
[0152] The hopping pattern of the first set of control resources defines a sequence of the first set of bandwidths (and corresponding operating bandwidths) that change over time, and the pattern may be applied repeatedly and periodically.
[0153] According to an exemplary combination of the above examples, the circuitry is further configured to control the receiver to receive system information including a list of entries, the entries representing respective candidates for the first control resource set configuration, and to control the receiver to select the first control resource set configuration.
[0154] The selection may be performed, for example, based on the supported numerology.
[0155] Specifically, the first control resource set configuration parameters include at least one of a subcarrier spacing and a bandwidth of the first control resource set, and at least one of a preamble sequence and a resource of a random access channel.
[0156] In one example, the circuitry, in operation, selects a first control resource set according to at least one of a subcarrier spacing and a bandwidth of the first control resource set supported by the communication device.
[0157] The second control resource set configuration may also be given by a second control resource set configuration parameter, which includes at least the bandwidth of the second control resource set or the second bandwidth (operation bandwidth for receiving data scheduled by the control information carried in the second set). However, the second control resource set configuration parameter may also include numerology.
[0158] In one example, the first control resource set configuration parameters further include a range of bandwidth capabilities of the communication device, and the circuitry, in operation, also selects the first control resource set according to the bandwidth capabilities.
[0159] Further, in operation, when the communications device supports multiple configurations, the circuitry controls selection of the first control resource set configuration by: -Random selection of one of the supported configurations, - selection of a configuration having a default subcarrier spacing and / or a bandwidth of a first control resource set; - Selection based on a communications device identifier; -Selection based on current channel conditions for communication devices The present invention may be implemented as any one of the following:
[0160] The first control resource set configuration parameter and / or the second control resource set configuration parameter may also further include a hopping indication indicating whether frequency hopping should be applied to the corresponding control resource set.
[0161] Furthermore, the first control resource set configuration parameters and / or the second control resource set configuration parameters may further include a hopping pattern indication if the hopping indication indicates that hopping should be applied to the corresponding control resource set.
[0162] A hopping pattern indicates the sequence in time of frequencies (bandwidth) that carry a control resource set.
[0163] The configuration of the second control resource set may include either the bandwidth of the second control resource set or the second bandwidth, or a subset of the configuration parameters, and the circuitry, upon operation, applies the remaining parameters of the first control resource set to the second control resource set.
[0164] In one exemplary embodiment, the circuit, in operation, - monitoring the first control resource set and / or the second control resource set; - controlling the receiver to receive control information indicating resource allocation for data transmission to the communication device within the first control resource set and / or the second control resource set; The resource allocation also indicates time-frequency numerology including at least one of subcarrier spacing, bandwidth, number of symbols, or cyclic prefix length.
[0165] The present disclosure also relates to a scheduling node 1460 comprising a transmitter 1470 capable of transmitting control signals to a communication device on a first set of control resources and a second set of control resources, a receiver 1470 capable of receiving control signals and data, and a circuit 1480, the circuit 1480 being operable to: controlling a receiver to receive a random access message associated with a first set of control resources and to receive a communications device capability indication; - controlling the transmitter to transmit control information in a first set of control resources after receiving the random access message and to transmit within the first set of control resources an indication of a configuration of a second set of control resources; - controlling the transmitter to transmit control information on the first set of control resources and / or the second set of control resources after transmitting the configuration of the second set of control resources.
[0166] 14, there is also an input / output node 1475 located between the transceiver 1470, including a transmitter and a receiver, and the circuitry 1480. The input / output node 1475 services the input / output of data and control commands between the transceiver 1470 and the circuitry 1480. The scheduling node 1460 may be, for example, a base station. However, the disclosure is not so limited, and the scheduling node may be a relay node or a communication device acting as a base station or relay node for other communication devices.
[0167] As can be seen from Fig. 14, both the communication device and the base station use the same configurations of set 1 and set 2 and exchange configuration information as already explained above in relation to the communication device. Therefore, the above embodiments and examples described with focus on the communication device also apply to the scheduling node (base station).
[0168] This disclosure also provides corresponding methods that may be implemented by the circuitry 1430 of the communications device 1410 and / or the circuitry 1480 of the base station 1460. Specifically, the circuits may control corresponding receivers / transmitters of the communications device and base station to perform receiving / transmitting tasks as follows:
[0169] Specifically, as also shown in FIG. 16, a method for a communication device, comprising: a step 1620 of transmitting a random access message associated with a first set of control resources; a step 1630 of monitoring control resources in the first set of control resources after transmitting the random access message; - a step 1640 of transmitting a communications device capability indication; - after a step 1640 of transmitting a communications device capability indication, a step 1650 of receiving an indication of a configuration of a second set of controlled resources within the first set of controlled resources; - monitoring 1660 control resources in the first set of control resources and / or the second set of control resources after receiving a configuration of the second set of control resources.
[0170] Furthermore, the method may also include receiving 1610 control information including a configuration of the candidate first control resource set before transmitting the random access message. This control information may be received within a system broadcast.
[0171] Further, a method for a scheduling node, comprising: - receiving 1625 a random access message associated with a first set of control resources; - a step 1645 of receiving a communications device capability indication (after the step 1625 of receiving the random access message); - after a step 1625 of receiving the random access message, a step 1635 of transmitting control information on the first set of control resources; - a step 1655 of transmitting an indication of a configuration of a second set of controlled resources within the first set of controlled resources; - transmitting 1665 control information on the first set of control resources and / or the second set of control resources after transmitting the configuration of the second set of control resources.
[0172] The steps described above may be implemented as disclosed above with reference to operations performed by the respective devices.
[0173] Moreover, the above examples relate to a "communication device" or "UE" or "base station" or "gNB" or "scheduling device". However, the respective circuitry of these devices (see circuits 1430 and 1480 in FIG. 14) alone may already provide the improvements mentioned above. The circuitry controls the transmitter and receiver of the device, which may be, for example, a standard radio transmitter and receiver including one or more antennas, amplifiers and modulators, etc. The control is performed by outputting control commands to the input / output nodes (1425, 1475) and by inputting received data (control and / or user data) from the input / output nodes for further processing by the circuitry.
[0174] FIG. 18 illustrates an exemplary random access procedure.
[0175] In step 1810, a UE (communication device) uses the sequence to send a random access preamble (ie, a random access message) over uplink time-frequency resources associated with control resource set 1 selected from the candidate set.
[0176] In step 1820, the BS (base station, scheduling device) detects the random access attempt and then transmits a message via a downlink data channel, the message including: - the index of the random access preamble sequence that the network detects and for which the response is valid; - the timing correction calculated by the random access preamble receiver, - a scheduling grant indicating the resources that the terminal will use for the transmission in step 1830, -Contains TC-RNTI, a temporary identity used for further communication between the UE and the network.
[0177] Since each Set 1 candidate has a distinct sequence (and / or associated uplink resource for sending the preamble), the BS knows which Set 1 the UE selected after decoding the preamble sequence. Therefore, the DCI indicating the resource carrying the above-mentioned message is transmitted in the Set 1 selected by the UE.
[0178] The UE that transmitted the preamble monitors the corresponding set 1 to receive the DCI and therefore the message.
[0179] In step 1830, after step 1820, the UE uplink is time synchronized to the network. In step 1830, the UE transmits the identifier to the BS via a normal uplink data channel to perform an RRC connection request (no modifications compared to the LTE procedure).
[0180] In step 1840, contention resolution is performed. If several UEs happen to select the same random access resource (preamble sequence and associated uplink resource) from step 1820, those UEs performing simultaneous random access attempts using the same preamble resource in the first step 1810 will listen to the same response message in the second step 1820 and therefore have the same temporary identifier. Thus, in a fourth step 1840, each terminal receiving the downlink message will compare the identity in the message with the identity transmitted in the third step 1830. Only the terminal observing a match between the identity received in the fourth step 1840 and the identity transmitted as part of the third step 1830 will declare the success of the random access procedure.
[0181] Step 1840 of the above illustrated random access procedure is similar to the procedure of LTE, except that in step 1840, the DCI scheduling message is transmitted again in set 1 selected by the UE. The random access procedure described with reference to FIG. 18 is merely exemplary. The present disclosure is not limited by this random access procedure, and random access may also be implemented in different manners. In general, any access with randomly selected resources (by the random access message transmitter) may be applied.
Claims
1. a receiver capable of receiving control signals from a base station on a first control resource set and a second control resource set; a transmitter capable of transmitting control signals and data; 1. A circuit comprising: controlling the transmitter to transmit a random access message associated with the first control resource set and to transmit a communications device capability indication; controlling the receiver to monitor control resources in the first control resource set and to receive in the first control resource set an indication of a configuration of the second control resource set; and a circuit for controlling the receiver to monitor control resources in the first control resource set and / or the second control resource set after receiving the configuration of the second control resource set; The circuit further comprises: controlling the receiver to receive, using system information, a plurality of entries, the entries indicating respective candidates for configuration of the first control resource set; selecting a configuration of the first control resource set from the plurality of entries; notifying a base station of a configuration of the selected first control resource set using a random access message associated with the first control resource set; Communication devices.
2. the first control resource set is located within a first bandwidth and the second control resource set is located within a second bandwidth; the first bandwidth being a bandwidth in which any resources assigned by control information carried in the first control resource set are located; the second bandwidth being a bandwidth within which any resources assigned by control information carried in the second control resource set of control resources are located. The communication device of claim 1 .
3. the first bandwidth and the second bandwidth are centered relative to each other in the frequency domain. The communication device of claim 2.
4. a bandwidth of the first control resource set is included in a bandwidth of the second control resource set; the first control resource set is a subset of the second control resource set. The communication device of claim 2.
5. The first control resource set includes common control information that is decoded by a plurality of communication devices, and user-specific control information that is decoded only by a particular communication device; the second control resource set includes the user specific control information; The communication device of claim 1 .
6. the circuitry controls a receiver to monitor the first control resource set when the communications device is in an operating mode that facilitates power savings. The communication device of claim 1 .
7. the first control resource set is distributed in a frequency domain; the circuitry controls the receiver to perform frequency hopping at each first predetermined time interval to monitor the first set of control resources. The communication device of claim 1 .
8. the second control resource set is distributed in a frequency domain; the circuitry controls the receiver to perform frequency hopping at second predetermined time intervals to monitor the second set of control resources; a hopping pattern for the first control resource set differs from the hopping pattern for the second control resource set in at least one time interval, at least in a frequency band; The communication device of claim 1 .
9. The configuration parameters of the first control resource set and / or the second control resource set include at least one of a subcarrier spacing and a bandwidth of the corresponding control resource set, and at least one of a preamble sequence and a resource of a random access channel of the first control resource set; the circuitry selecting the first control resource set according to at least one of a subcarrier spacing and a bandwidth of the first control resource set supported by the communication device. The communication device of claim 1 .
10. the configuration parameters of the first control resource set further include a range of bandwidth capabilities of the communication device; The communications device of claim 9 , wherein the circuitry selects the first set of control resources according to the bandwidth capability.
11. The circuitry further comprises, when the communications device supports multiple control resource set configurations, selecting the first control resource set configuration by: - random selection of one of the supported configurations; Selection of a configuration having a default subcarrier spacing and / or a bandwidth of the first control resource set; - selection based on an identifier of said communication device; - Selection based on current channel conditions of the communication device; either 10. The communication device of claim 9.
12. the configuration parameters of the first control resource set and / or the configuration parameters of the second control resource set further include a hopping indication specifying whether frequency hopping should be applied to the corresponding control resource set; 10. The communication device of claim 9.
13. the configuration parameters of the first control resource set and / or the configuration parameters of the second control resource set further include a hopping pattern indication if the hopping indication indicates that hopping should be applied to the respective control resource set; 13. A communication device as claimed in claim 12.
14. The configuration of the second control resource set includes either a bandwidth of the second control resource set or a second bandwidth, or a subset of configuration parameters; the circuitry applies remaining parameters of the first control resource set to the second control resource set.
10. The communication device of claim 9.
15. The circuit comprises: monitoring the first control resource set and / or the second control resource set; and controlling the receiver to receive control information indicating resource allocation for data transmission to the communications device within the first control resource set and / or the second control resource set; The resource allocation indicates numerology including at least one of a subcarrier spacing or a cyclic prefix length. The communication device of claim 1 .
16. a transmitter capable of transmitting control signals to a communication device on a first control resource set and a second control resource set; a receiver capable of receiving control signals and data; 1. A circuit comprising: controlling the receiver to receive a random access message associated with the first control resource set and to receive a communications device capability indication; controlling the transmitter to transmit control information in the first control resource set and to transmit within the first control resource set an indication of a configuration of a second control resource set; a circuit for controlling the transmitter to transmit control information on the first control resource set and / or the second control resource set after transmitting the configuration of the second control resource set; Equipped with The circuit further comprises: controlling the transmitter to transmit using system information a plurality of entries, the entries indicating respective candidates for configuration of the first control resource set; being notified of a configuration of the first control resource set selected from the plurality of entries using a random access message associated with the received first control resource set; Scheduling node.
17. 1. A method for a communication device, comprising: Transmitting a random access message associated with a first control resource set; monitoring control resources in the first control resource set; Transmitting a communications device capability indication; receiving an indication of a configuration of a second control resource set within the first control resource set after transmitting the communications device capability indication; monitoring control resources in the first control resource set and / or the second control resource set after receiving the configuration of the second control resource set; receiving, using system information, a plurality of entries, the entries indicating respective candidates for the configuration of the first control resource set; selecting a configuration of the first control resource set from the plurality of entries; notifying a base station of a configuration of the selected first control resource set using a random access message associated with the first control resource set; method.
18. A method for a scheduling node, comprising: receiving a random access message associated with a first control resource set; Transmitting a communications device capability indication; Transmitting control information on the first control resource set; Transmitting an indication of a configuration of a second control resource set within the first control resource set; transmitting control information on the first control resource set and / or the second control resource set after transmitting the configuration of the second control resource set; Transmitting a plurality of entries using system information, the entries indicating respective candidates for the configuration of the first control resource set; being notified of a configuration of the first control resource set selected from the plurality of entries using a random access message associated with the received first control resource set; method.
Citation Information
Patent Citations
Method and Apparatus For Receiving A Control Channel
US20140036747A1
Cited By
Composite particles, method for producing composite particles
CN122892751A
Composite particles and method for producing composite particles
WO2025187623A1
