Excavation operation completion determination system

The excavation work completion determination system uses a load sensor and controller to assess excavation work completion by comparing detected load with a threshold, ensuring accurate and efficient determination of work completion on a target surface.

JP2024161795APending Publication Date: 2024-11-20KOBELCO CONSTR MASCH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023076824
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-08
Publication Date
2024-11-20

AI Technical Summary

Technical Problem

Existing systems cannot determine whether excavation work on a target surface has been completed, as they lack the ability to assess if the excavated object has been fully removed.

Method used

An excavation work completion determination system comprising an attachment, a load sensor, and a controller that sets a target surface and compares detected load with a threshold to determine work completion.

Benefits of technology

Enables accurate determination of excavation work completion on a target surface, reducing the need for manual judgment and improving work efficiency by preventing unnecessary operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024161795000001_ABST
    Figure 2024161795000001_ABST
Patent Text Reader

Abstract

To determine whether an excavation operation at a target surface has been complete.SOLUTION: An excavation operation completion determination system 1 includes an attachment 15, a load sensor 23, and a controller 50. The attachment 15 is provided on a work machine 10 and performs excavation operation to excavate an excavation target O. The load sensor 23 detects a load acting on the attachment 15. The controller 50 sets a target surface S of the excavation target O. The controller 50 determines whether the excavation operation on the target surface S has been completed based on a comparison between a load (L) detected by the load sensor 23 when the attachment 15 moves along the target surface S and a load threshold value Lth set in the controller 50.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an excavation operation completion determination system that determines whether or not an excavation operation has been completed. [Background technology]

[0002] For example, Patent Document 1 describes an invention that displays the trajectory of an attachment performing work (in this document, the tip of a bucket) (see the abstract of Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2016-186210 A Summary of the Invention [Problem to be solved by the invention]

[0004] The technology described in this document displays the trajectory line of the attachment, but it is not possible to determine whether the excavation target at the position where the attachment passed has actually been excavated.

[0005] Therefore, an object of the present invention is to provide an excavation operation completion determination system capable of determining whether or not excavation operation on a target surface has been completed. [Means for solving the problem]

[0006] The excavation operation completion determination system includes an attachment, a load sensor, and a controller. The attachment is provided on a work machine and performs excavation operation to excavate an object to be excavated. The load sensor detects a load acting on the attachment. The controller sets a target surface of the object to be excavated. The controller determines whether the excavation operation on the target surface has been completed based on a comparison between a load detected by the load sensor when the attachment moves along the target surface and a load threshold value set in the controller. Effect of the Invention

[0007] The above-described excavation operation completion determination system makes it possible to determine whether or not excavation operation on a target surface has been completed. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a side view of a work machine 10 of an excavation work completion determination system 1. [Diagram 2] FIG. 2 is a top view of the work machine 10 shown in FIG. [Diagram 3] 2 is a block diagram of the excavation operation completion determination system 1 shown in FIG. [Figure 4] 4 is a flowchart of a process of the controller 50 shown in FIG. 3. [Diagram 5] 4 is an explanatory diagram showing a specific example of an excavation operation completion determination by the controller 50 shown in FIG. 3. FIG. [Figure 6] 4 shows the display of an excavation work completed area Aa and an excavation work uncompleted area Ab by the output device 60 shown in FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] An excavation operation completion determination system 1 will be described with reference to Figs. 1 to 6.

[0010] The excavation work completion determination system 1 is a system that determines whether or not excavation work (construction) is completed. As shown in Fig. 1, the excavation work completion determination system 1 includes a work machine 10, an input device 31 (see Fig. 3), a controller 50, an output device 60 (see Fig. 3), and an external device 70.

[0011] The work machine 10 is a machine that performs work, and is a machine that performs excavation work (described later). The work machine 10 is, for example, a construction machine that performs construction work, such as a shovel. The work machine 10 may be operated by a worker (operator) in a cab 13a (described later), may be remotely operated by an operator from outside the work machine 10 (remote control device), or may be automatically operated (described in detail later). The work machine 10 includes a machine body 10a, an attachment 15, and, as shown in FIG. 3, an actuator 17, a drive control unit 19, an attitude sensor 21, and a load sensor 23.

[0012] As shown in Fig. 1, the machine body 10a is the main body of the work machine 10. The machine body 10a includes a lower running body 11 and an upper rotating body 13. The lower running body 11 is capable of running on a running surface (such as the ground). The lower running body 11 may include crawlers or wheels. The upper rotating body 13 is mounted on the lower running body 11 so as to be able to rotate. The upper rotating body 13 includes a cab 13a. The cab 13a is a section where a worker (operator) can operate the work machine 10.

[0013] (direction) The direction in which the rotation axis of the upper rotating body 13 rotates relative to the lower running body 11 extends is defined as the "up-down direction". The side from which the attachment 15 protrudes relative to the upper rotating body 13 is defined as the far side X1 in the front-rear direction X, and the side opposite to the far side X1 is defined as the near side X2 in the front-rear direction X. The direction in which the upper rotating body 13 rotates relative to the lower running body 11 is defined as the "rotation direction".

[0014] The attachment 15 is a part that performs work, and includes, for example, a boom 15a, an arm 15b, and a bucket 15c. The boom 15a is attached to the upper rotating body 13 so as to be able to rise and fall (to be able to rotate in the up-down direction). The arm 15b is attached to the boom 15a so as to be able to rotate (to be able to rotate in the forward-backward direction X and the up-down direction). The bucket 15c is a tip attachment provided at the tip of the attachment 15. The bucket 15c is attached to the arm 15b so as to be able to rotate (to be able to rotate in the forward-backward direction X and the up-down direction). The bucket 15c can excavate the object to be excavated O. The bucket 15c is in the shape of a container that can scoop up the object to be excavated O. The object to be excavated O is soil-like, granular, chip-like, powder-like, or the like. Specifically, for example, the object to be excavated O is soil and sand. The tip of the bucket 15c is referred to as a bucket tip 15ct. The bucket tip portion 15ct is an end portion of the bucket 15c opposite to the end portion (base end portion) attached to the arm 15b.

[0015] The actuator 17 (see FIG. 3) is a device that drives (moves) the work machine 10. The actuator 17 may be hydraulically driven (may be hydraulic type) or electrically driven (may be electric type). The actuator 17 may be equipped with a motor or may be equipped with an extendable cylinder. Specifically, the actuator 17 is equipped with a travel motor (not shown) that drives the lower traveling body 11, and a rotation motor (not shown) that rotates the upper rotating body 13 relative to the lower traveling body 11. The actuator 17 is also equipped with cylinders (not shown) that drive each part of the attachment 15 (the boom 15a, the arm 15b, and the bucket 15c).

[0016] The drive control unit 19 (see FIG. 3) controls the actuator 17 (see FIG. 3). The drive control unit 19 may include a hydraulic circuit that controls the hydraulic actuator 17. This hydraulic circuit may include, for example, an electromagnetic valve unit. The drive control unit 19 may include an electric circuit that controls the electric actuator 17.

[0017] The attitude sensor 21 (see FIG. 3) detects the attitude of the work machine 10. The attitude sensor 21 detects the position and orientation of the work machine 10 relative to the work site where the work machine 10 performs work. In this case, the attitude sensor 21 may perform detection by a positioning system using light or radio waves. For example, the positioning system may be a satellite positioning system, such as a global navigation satellite system (GNSS), or a system using a (terrestrial) transmitter and receiver without using a satellite. For example, the positioning system may use a total station. The attitude sensor 21 detects the inclination of the work machine 10 with respect to a horizontal plane. The attitude sensor 21 detects the rotation angle of the upper rotating body 13 with respect to the lower running body 11. The attitude sensor 21 detects the angle of the boom 15a with respect to the upper rotating body 13. The attitude sensor 21 detects the attitude of the attachment 15. More specifically, the attitude sensor 21 detects the angle of the arm 15b with respect to the boom 15a. The attitude sensor 21 detects the angle of the bucket 15c with respect to the arm 15b. The attitude sensor 21 may include a sensor that detects an angle (e.g., a rotary encoder, etc.) or a sensor that detects an inclination relative to the horizontal direction. The attitude sensor 21 may include a sensor that detects an angle or a position using light (e.g., laser light, etc.). The attitude sensor 21 may include a sensor that detects a stroke of a cylinder (one example of an actuator 17 (see FIG. 3)) that drives the attachment 15. At least a part of the attitude sensor 21 may be provided outside the work machine 10. For example, when the work machine 10 is placed on a dredger, a sensor that detects the position and orientation of the dredger may be included in the attitude sensor 21. In this case, the position and orientation of the work machine 10 may be calculated based on the position and orientation of the dredger.

[0018] The load sensor 23 (see FIG. 3) detects a load (load) acting on the attachment 15. The load sensor 23 detects a load acting on the bucket 15c. The load sensor 23 may detect the load acting on the attachment 15 based on a load acting on the actuator 17 (specifically, a cylinder). The load sensor 23 may detect the load acting on the attachment 15 based on distortion (deformation) of the attachment 15 or distortion of the cylinder. The load sensor 23 may utilize a function (payload function) of detecting the mass of an excavation target O in the bucket 15c.

[0019] The input device 31 (see FIG. 3) is a device through which an operator inputs information. The input device 31 issues instructions to the controller 50 based on the operator's operation. When the input device 31 is provided in the work machine 10, the input device 31 may be, for example, a device (such as a cluster gauge) provided in the driver's cab 13a (the same applies to the output device 60 (see FIG. 3)). The input device 31 may be a tablet, a smartphone, or a personal computer (the same applies to the output device 60). The input device 31 may be provided in a device (such as an external device 70) external to the work machine 10 (the same applies to the output device 60).

[0020] The controller 50 is a computer that performs input and output of signals, calculations (processing), storage of information, and the like. For example, the functions of the controller 50 are realized by executing a program stored in the storage unit of the controller 50 in the calculation unit. The controller 50 and other devices may be connected by wireless communication or by wired communication. For example, as shown in FIG. 3, signals are input to the controller 50 from the attitude sensor 21, the load sensor 23, and the input device 31. For example, the controller 50 performs calculations such as judging whether or not the excavation work is completed. For example, the controller 50 outputs a command to the drive control unit 19 to operate the work machine 10. For example, the controller 50 outputs a signal to the output device 60 and the external device 70. For example, the controller 50 includes a work range setting unit 51, a target surface setting unit 52, an excavation work completion judgment unit 53, a command unit 54, a progress degree calculation unit 55, and a transmission unit 56.

[0021] The working range setting unit 51 sets a working range A (see FIG. 2) (construction area). Details of the functions of the working range setting unit 51 will be described later (the same applies to other functions of the controller 50). The target surface setting unit 52 sets a target surface S (see FIG. 1) of the excavation object O. The excavation work completion determination unit 53 determines whether or not the excavation work on the target surface S has been completed (performs an excavation work completion determination). The progress degree calculation unit 55 calculates the progress degree of the excavation work. The command unit 54 commands (controls) the operation of the work machine 10 (see FIG. 1). The command unit 54 may be capable of controlling automatic operation of the work machine 10. The transmission unit 56 transmits information to the outside of the controller 50.

[0022] The output device 60 is a device that outputs information. The output device 60 outputs information based on a signal output from the controller 50. The output device 60 outputs the result of the excavation work completion determination (details will be described later). The output device 60 may or may not be used as a device that outputs information other than the excavation work completion determination. For example, the above-mentioned "device that outputs information other than the excavation work completion determination" may be a bucket load display monitor that displays the load acting on the bucket 15c (see FIG. 1). The output device 60 outputs information to the worker. The output device 60 may output light (display, etc.) or may output sound. The output device 60 may be, for example, a display provided in the operator's cab 13a (see FIG. 1). When the output device 60 outputs light, the output device 60 may be a device (monitor) that displays at least one of a video and an image. The output device 60 may be a projection device that projects onto an object such as the ground. The output device 60 may be a device that utilizes VR (Virtual Reality) or AR (Augmented Reality) technology.

[0023] As shown in Fig. 1, the external device 70 is a device provided outside the work machine 10. The external device 70 may be, for example, a server, a tablet, a smartphone, or a personal computer. Specifically, for example, the external device 70 may be a management system that manages work (including excavation work) of the work machine 10. In this case, the external device 70 may manage work of one work machine 10, may manage work of multiple work machines 10, or may manage work at the entire work site where the work machines 10 are performing work.

[0024] (Activation) The excavation operation completion determination system 1 is configured to operate as follows. In the following, the work machine 10 will be described mainly with reference to FIG. 1, and the controller 50 will be described mainly with reference to FIG.

[0025] (Operation of the work machine 10) As described above, the work machine 10 shown in FIG. 1 may be operated by an operator in the cab 13a, may be remotely operated by an operator from outside the work machine 10 (remote control device), or may be automatically operated.

[0026] The work machine 10 may be one that utilizes ICT (Information and Communication Technology) (e.g., ICT construction machine). For example, the work machine 10 may be operated by a machine control (MC; Machine Control system). Specifically, information (work plan) indicating the target of the work to be performed by the work machine 10 is set in the controller 50. Then, the worker operates only some of the elements of the attachment 15 (e.g., only the arm 15b, etc.). At this time, the controller 50 (command unit 54 (see FIG. 3)) automatically controls the elements not operated by the worker (e.g., the boom 15a, the bucket 15c) so that the work machine 10 works according to the work plan. At this time, the controller 50 controls the operation of the work machine 10 based on the detection value of the attitude sensor 21 (see FIG. 3) (the same applies in the case of automatic operation). Also, the controller 50 controls the operation of the work machine 10 by outputting a command to the drive control unit 19 (see FIG. 3) (the same applies in the case of automatic operation). Also, for example, the work machine 10 may be operated by automatic operation. In this case, the controller 50 (command unit 54) controls the operation of the work machine 10 so that the work machine 10 automatically works in accordance with the work plan.

[0027] (Excavation work by work machine 10) The work machine 10 performs excavation work. The excavation work is work to excavate an excavation target O. The excavation work is performed by an attachment 15, and more specifically, by a bucket 15c. The excavation work may be work to excavate an excavation target O on land, or may be work to excavate an excavation target O on the bottom of the water (dredging work).

[0028] (Operation of controller 50, etc.) The control (control method, control flow) by the controller 50 shown in Fig. 3 will be described with reference to the flowchart shown in Fig. 4. Note that the procedure of each process (each step) below is an example, and the procedure of each process may be changed in various ways. Each step will be described below with reference to Fig. 4.

[0029] (Drilling operation settings) In step S11, the controller 50 (working range setting unit 51) sets working range A (see FIG. 2). Working range A is a target range within which the work machine 10 performs excavation work. Working range A is a target range within which the attachment 15 performs excavation work (attachment working range). For example, working range A is set when the work machine 10 (see FIG. 2) is idling.

[0030] [Example 1 of a method for setting the working range A] The controller 50 may set the working range A (see FIG. 2) based on manual operation of the input device 31 by the worker. In this case, the worker may set the working range A by operation such as key operation or touch operation of the input device 31. Also, for example, the worker may set the working range A by teaching. Teaching is performed as follows. The worker operates the working machine 10 by riding on the working machine 10 or by remote operation. The worker operates the working machine 10 to place a specific part of the attachment 15 at a specific position (for example, an outer periphery or a corner position of the working range A) of the range that is to be set as the working range A. The specific part of the attachment 15 is, for example, the bucket tip 15ct shown in FIG. 1. The controller 50 shown in FIG. 3 calculates the position where the specific part is placed based on the detection result of the attitude sensor 21. Then, the controller 50 sets the working range A (see FIG. 2) based on the position where the specific part is placed. [Example 2 of method for setting working area A] The controller 50 may automatically set the working area A (see FIG. 2) in accordance with certain conditions. For example, the controller 50 may automatically set the working area A (see FIG. 2) in accordance with the state of the excavation target O around the work machine 10 shown in FIG. 1.

[0031] In step S12, the controller 50 (target surface setting unit 52) ​​shown in Fig. 3 sets the target surface S shown in Fig. 1. The target surface S is a target surface in the excavation work, and is a target surface of the excavation target object O. The target surface S is a surface of a target depth (excavation target depth) of the excavation target object O. The target surface S is a surface (reference surface) that serves as a reference for determining whether or not the excavation work is completed.

[0032] The target surface S is set at a position equal to or lower than the height of the excavation object O before the excavation work is started. [Example 1 of the height of the target surface S] The goal of the excavation work may be that the top surface of the excavation object O after the excavation work is completed is the same height as the target surface S or lower than the target surface S. For example, the target surface S may be the minimum value of the depth of the target surface of the excavation object O. [Example 2 of the height of the target surface S] The goal of the excavation work may be that the top surface of the excavation object O after the excavation work is completed is the same height as the target surface S. For example, the target surface S may be the target depth (height) of the excavation object O (construction design surface, construction plan surface).

[0033] The target surface S may be, for example, planar. The target surface S may be, for example, a horizontal surface. In this case, the information on the target surface S may only include depth information (target depth). The target surface S may be a plane inclined relative to the horizontal plane. The target surface S may not be planar. The target surface S may have a curved surface, may have steps, or may have irregularities.

[0034] The target surface S may be set in only one stage (one surface) or in multiple stages (multiple surfaces). When the target surface S is set in multiple stages, a target surface S at an intermediate stage of the excavation work (e.g., intermediate target depth) and a target surface S at a final stage of the excavation work (final target surface) (e.g., final target depth) are set. The target surface S at an intermediate stage of the excavation work may be set in only one stage or in multiple stages.

[0035] [Example 1 of a method for setting a target surface S] The controller 50 shown in FIG. 3 may set a target surface S (see FIG. 1) based on manual operation of the input device 31 by an operator. In this case, the operator may set the target surface S by key operation or touch operation of the input device 31. Specifically, for example, the operator may set the depth value of the target surface S with the input device 31. [Example 2 of a method for setting a target surface S] The controller 50 may automatically set the target surface S based on some condition. [Example 2a of a method for setting a target surface S] For example, the controller 50 may set the target surface S based on a work plan for an excavation work. [Example 2b of a method for setting a target surface S] When the target surface S is set in a plurality of stages, the controller 50 may set the target surface S as follows. For example, when the controller 50 determines that the excavation work is completed at a target surface S of a certain stage, the controller 50 may set a surface (for example, a surface that is a candidate for the target surface S) that is one stage deeper than the target surface S of the stage where the excavation work is completed as a new target surface S. In this case, the controller 50 automatically sets the target surface S in stages so as to approach the final stage target surface S. [Example 2c of method for setting the target surface S] For example, the controller 50 may automatically set the target surface S based on the position (height) of the surface of the excavation target object O before the excavation work is started.

[0036] After setting the working range A (see FIG. 2) and the target surface S (see FIG. 1), the controller 50 determines whether or not the conditions for starting an excavation operation are met (for example, steps S21 and S22).

[0037] In step S21, the controller 50 shown in Fig. 3 determines whether or not the operator has been instructed by the input device 31 to start excavation work. For example, the controller 50 determines whether or not an excavation work start switch (one example of the input device 31) is ON. If the operator has been instructed to start excavation work (YES in step S21), the flow of processing by the controller 50 proceeds to step S22. If the operator has not been instructed to start excavation work (NO in step S21), the controller 50 waits until the operator is instructed to start excavation work (the flow returns to step S21).

[0038] In step S22, the controller 50 determines whether or not the settings required for the excavation work have been completed. Specifically, the controller 50 determines whether or not the settings of the working area A (see FIG. 2) and the target surface S (see FIG. 1) have been completed. If the settings required for the excavation work have been completed (YES in step S22), the flow proceeds to step S31.

[0039] If the settings required for the excavation work have not been completed (NO in step S22), the flow proceeds to step S23. In this case, the output device 60 notifies the worker that the settings required for the excavation work have not been completed (error). Specifically, for example, the output device 60 may notify that there are items that have not been set, or may notify which items have not been set. In this case, the controller 50 ends the current process (the flow proceeds to "RETURN") and starts the next process (the flow returns to "START"). Then, in the next process, a process of setting the items that have not been set (step S11 or step S12) is performed.

[0040] It should be noted that the determination as to whether or not the conditions for starting excavation work are satisfied (for example, steps S21 and S22) can be performed in various ways. For example, when the work machine 10 (see FIG. 1) is automatically operated, the controller 50 may automatically (without operation by the operator) decide to start excavation work.

[0041] When the conditions for starting an excavation operation are satisfied, the work machine 10 shown in FIG. 1 performs the excavation operation by manual operation or automatic operation. In the excavation operation, the attachment 15 (more specifically, the bucket 15c) excavates the excavation target O. Specifically, in one cycle of excavation operation, the bucket 15c excavates the excavation target O while moving from the rear side X1 to the front side X2. In the excavation operation, only one cycle of the excavation operation may be performed, or multiple cycles may be performed. For example, in the excavation operation, one or multiple cycles of the excavation operation may be performed at a position above the target surface S (high position, shallow position), and then one or multiple cycles of the excavation operation may be performed at the same height as the target surface S or at a position below the target surface S (low position, deep position).

[0042] In step S31, the controller 50 shown in Fig. 3 stores the position where the excavation work or the determination operation (described later) was performed. Specifically, the controller 50 stores the path (i.e., the trajectory T) taken by the attachment 15 shown in Fig. 1 during the excavation work or the determination operation. More specifically, the controller 50 stores the trajectory T (bucket tip trajectory history information) of the bucket tip 15ct (working part, specific part). At this time, the controller 50 calculates the position of the bucket tip 15ct based on the detection result of the attitude sensor 21 (see Fig. 3), and stores the trajectory T of the bucket tip 15ct.

[0043] In step S32, the controller 50 acquires the load acting on the attachment 15 (the bucket 15c). Specifically, the controller 50 acquires the detection result of the load sensor 23 shown in FIG.

[0044] In step S33, the controller 50 determines whether the position where the excavation work was performed has reached the target surface S (see FIG. 1). For example, the controller 50 determines whether the position where the excavation work was performed is at a height equal to or lower than the target surface S. If the position where the excavation work was performed has reached the target surface S (YES in step S33), the flow proceeds to step S41.

[0045] The "position where excavation work was performed" is, for example, a position where the bucket tip 15ct passed during excavation work (the position of the trajectory T). The "position where excavation work was performed" may be a position where the bucket tip 15ct actually passed. Specifically, for example, the "position where excavation work was performed" may be the position of the bucket tip 15ct calculated by the controller 50 based on the detection result of the attitude sensor 21. Furthermore, when the work machine 10 operates according to a work plan, the target position of the bucket tip 15ct in the information set as the work plan is changed as the excavation work progresses. In this case, the "position where excavation work was performed" may be the target position of the bucket tip 15ct in the information set as the work plan.

[0046] If the position where the excavation work has been performed has not reached the target surface S (see FIG. 1) (NO in step S33), the excavation work has not progressed to the stage where the excavation work completion determination (step S41) is performed. In this case, the controller 50 may exclude the area where the excavation work has been performed and has not reached the target surface S from the determination target for the excavation work completion determination (step S41) (see FIG. 5). In this case, the flow returns to "return" and returns to "start". In this case, it is assumed that the setting of the working range A (see FIG. 2) (step S11) and the setting of the target surface S (see FIG. 1) (step S12) have been completed, and the condition for starting the excavation work is satisfied (YES in steps S21 and S22). Therefore, the controller 50 continues the processing of steps S31, S32, and S33.

[0047] (Reasons for determining completion of excavation work) Here, even if the position where the excavation work shown in FIG. 1 was performed (specifically, the trajectory T) reaches the target surface S, the excavation object O on the target surface S is not necessarily gone. For example, the excavation object O may remain on the target surface S when the excavation object O spills from the bucket 15c during the excavation work. In addition, the excavation object O may remain on the target surface S when the excavation object O around the position where the excavation work was performed collapses due to its own weight. In addition, the excavation object O may remain on the target surface S when the excavation object O around the position where the excavation work was performed collapses due to influences from the surroundings (for example, water currents, wind, etc.).

[0048] There are cases where it is impossible or difficult for an operator to confirm whether the excavation target O on the target surface S has disappeared. For example, there are cases where it is impossible or difficult for an operator in the cab 13a to directly see the excavation target O on the target surface S. Specifically, there are cases where the excavation target O on the target surface S is blocked by an object (e.g., terrain, water, part of the work machine 10, etc.) when viewed by the operator in the cab 13a. Specifically, for example, when the excavation work is dredging, there are cases where the excavation target O on the target surface S is blocked by the terrain or water when viewed by the operator in the cab 13a. Also, for example, when the work machine 10 is remotely operated, an image captured by a camera attached to the work machine 10 is displayed on the monitor of the remote operation device. There are cases where the excavation target O on the target surface S is blocked by an object when viewed by this camera. Also, when the work machine 10 is automatically operated, a surrounding sensor (e.g., a distance sensor) detects the situation around the work machine 10 (terrain, etc.). When viewed from the surrounding sensor, the excavation target O on the target surface S may be blocked by an object. In this way, it may be impossible or difficult for an operator to confirm whether the excavation target O on the target surface S has disappeared.

[0049] Therefore, in step S41, the controller 50 (excavation work completion determination unit 53) shown in FIG. 3 determines whether or not the excavation work on the target surface S (see FIG. 1) has been completed. This determination is also referred to as an excavation work completion determination. The controller 50 performs the excavation work completion determination based on a comparison between the detected load L (see FIG. 5) described below and a load threshold value Lth (see FIG. 5). The details of the excavation work completion determination are as follows.

[0050] (judgment action) For example, the work machine 10 performs an excavation operation at the same height as the target surface S or at a position below the target surface S, and then performs a determination operation by manual operation or automatic driving. The determination operation is an operation in which the attachment 15 moves along the target surface S. Specifically, the determination operation is an operation in which the bucket 15c moves along the target surface S, and more specifically, an operation in which the bucket tip 15ct moves along the target surface S. Below, a case in which the bucket tip 15ct moves along the target surface S in the determination operation will be described. In the determination operation, the bucket tip 15ct may move so as to coincide with the target surface S (see FIG. 1), or may move in the vicinity of the target surface S so as to substantially coincide with the target surface S (see FIG. 5). In the determination operation, the bucket tip 15ct moves in the same or substantially similar manner as the excavation operation (one cycle of excavation operation) performed at the position where this determination operation is performed. Specifically, in the determination operation, the bucket tip 15ct moves from the rear side X1 to the front side X2.

[0051] (Comparison of detection load L and load threshold Lth) As shown in FIG. 5, the controller 50 performs an excavation operation completion determination based on a comparison between the detected load L and a load threshold Lth. The detected load L is a load detected by the load sensor 23 (see FIG. 3) when the attachment 15 moves along the target surface S (specifically, during the determination operation). The load threshold Lth is a threshold set in advance (before the excavation operation completion determination) in the controller 50 (see FIG. 3). The range (range of positions) in which the controller 50 determines that the excavation operation is completed is set as an excavation operation completion area Aa. The range (range of positions) in which the controller 50 determines that the excavation operation is not completed is set as a non-excavation operation completion area Ab. Specifically, the controller 50 performs an excavation operation completion determination by determining whether the detected load L is equal to or less than the load threshold Lth.

[0052] (Example of when excavation work is determined to be complete) When the detected load L is equal to or less than the load threshold Lth (YES in step S41), the controller 50 (excavation operation completion determination unit 53) (see FIG. 3) determines that the excavation operation is completed (step S42). A specific example of a situation in which the excavation operation is determined to be completed is as follows. In the determination operation, the bucket tip 15ct moves to a certain position (referred to as a "determination position") along the target surface S. At this time, if there is no (or almost no) excavation object O at the determination position, the bucket 15c passes through the determination position without contacting (excavating) the excavation object O (or without contacting it much). In this case, the attachment 15 moves with a lighter force than when the bucket 15c excavates the excavation object O, and the reaction force acting on the attachment 15 is smaller. In such a case, the detected load L is equal to or less than the load threshold Lth (YES in step S41). At this time, the controller 50 (see FIG. 3) determines that the excavation operation at this determination position is completed (step S42). The controller 50 determines that this determination position is the excavation work completed area Aa. In this case, the flow proceeds to step S51.

[0053] (Example of when excavation work is determined to be incomplete) When the detected load L is greater than the load threshold Lth (NO in step S41), the controller 50 (excavation work completion determination unit 53) (see FIG. 3) determines that the excavation work is not completed. A specific example of a situation in which the excavation work is determined to be not completed is as follows. In the determination operation, the bucket tip 15ct moves to a certain position (determination position) along the target surface S. If an excavation target O is present at the determination position at this time, the bucket 15c contacts the excavation target O and excavates the excavation target O. In this case, the force required to move the attachment 15 becomes larger and the reaction force acting on the attachment 15 becomes larger, compared to a case in which the attachment 15 does not excavate the excavation target O. In such a case, the detected load L becomes greater than the load threshold Lth (NO in step S41). In this case, the controller 50 determines that the excavation work at this determination position is not completed. The controller 50 determines that this determination position is a non-excavation work completion area Ab. In this case, the flow returns to "RETURN" and then to "START." In this case, the excavation operation continues, and the controller 50 continues the processes of steps S31, S32, and S33.

[0054] It is preferable that the controller 50 shown in Fig. 1 performs an excavation completion determination at the same time (in real time) as the work machine 10 performs the determination operation. Note that the controller 50 does not have to perform the excavation completion determination at the same time as the determination operation. For example, the controller 50 may perform an excavation completion determination at the position where the determination operation was performed after one cycle of the determination operation has ended.

[0055] The range of positions (determination range) within which the controller 50 determines the completion of excavation work can be set in various ways.

[0056] [Example 1 of Judgment Target Range] The controller 50 may perform an excavation work completion judgment for each work point (the judgment target range may be the work point). The work points are each successive position along the path of the bucket tip 15ct when the work machine 10 performs the judgment operation.

[0057] [Example 2 of the range to be determined] The controller 50 may determine whether or not the excavation work is complete for each one-cycle work range A1 (see FIG. 2) (the range to be determined may be the one-cycle work range A1). The one-cycle work range A1 is a range as follows. One cycle of excavation work is performed by turning the upper rotating body 13 in a certain rotation direction and moving the bucket 15c from the rear side X1 to the front side X2 once. The position (range) where the excavation work is performed in one cycle of the excavation work of the bucket 15c is the one-cycle work range A1. For example, the controller 50 may determine whether or not the excavation work is complete in the entire one-cycle work range A1 (at all work points in the one-cycle work range A1). Specifically, the controller 50 may determine that "the excavation work in the one-cycle work range A1 is complete" when the detected load L is greater than the load threshold value Lth in the entire one-cycle work range A1. In this case, the entire one-cycle work range A1 in which the excavation work is determined to be complete may be set as the excavation work completion area Aa.

[0058] [Example 3 of the range to be judged] The controller 50 may judge whether the excavation work is completed in the entire working range A shown in FIG. 2 (the range to be judged may be the entire working range A). The working range A is the range set in step S11. The working range A is set, for example, to the following range. For example, in this example, the excavation work in the above-mentioned "one cycle working range A1" is repeated while the upper rotating body 13 changes the rotation direction. At this time, the range in which the "one cycle working range A1" when the upper rotating body 13 faces each rotation direction is superimposed (or a range close to this range) is set as the working range A. For example, the controller 50 may judge that "the excavation work in the entire working range A is completed" when the detected load L is larger than the load threshold value Lth in the entire working range A (at all work points within the working range A).

[0059] The above examples of the ranges to be determined may be combined. For example, the controller 50 may determine whether or not excavation work has been completed at each work point within the one-cycle work range A1 (see FIG. 5), and may further determine whether or not excavation work has been completed throughout the one-cycle work range A1. Alternatively, for example, the controller 50 may determine whether or not excavation work has been completed at each work point within the work range A (see FIG. 6), and may further determine whether or not excavation work has been completed throughout the work range A.

[0060] (Multiple-stage target surface S) As described above, the target surface S shown in FIG. 1 may be set in multiple stages. In this case, the controller 50 judges whether or not the excavation work on the target surface S is completed for each of the target surfaces S in multiple stages. Specifically, for example, the work machine 10 (the attachment 15 and the bucket 15c) performs excavation work with the target surface S of a certain stage as a target. The controller 50 judges whether the excavation work is completed on the target surface S of this stage. If the controller 50 judges that the excavation work on the target surface S of this stage is completed, the controller 50 (the target surface setting unit 52 (see FIG. 3)) sets a candidate for the target surface S that is one stage deeper than the target surface S of the stage where the excavation work is completed as a new target surface S. Then, the controller 50 judges whether the excavation work is completed on the new target surface S.

[0061] (Calculation of progress) The controller 50 (progress calculation section 55 (see FIG. 3)) calculates the progress of the excavation work based on the result of the determination as to whether or not the excavation work has been completed.

[0062] The degree of progress may be a numerical value or may be information related to display on the output device 60 (see FIG. 3). Specifically, for example, the degree of progress may be a ratio (proportion) of the excavation work completed area Aa (see FIGS. 5 and 6) to the range where excavation work should be performed (range to be determined). The degree of progress may be information related to a display (see FIG. 6) visually showing the ratio of the excavation work completed area Aa to the range where excavation work should be performed (range to be determined).

[0063] The controller 50 may calculate, as the degree of progress, a ratio of the excavation work completed area Aa (see FIG. 6) to one cycle work range A1 (see FIG. 2). The controller 50 may calculate, as the degree of progress, a ratio of the excavation work completed area Aa (see FIG. 6) to the entire work range A (see FIG. 2). The controller 50 may calculate, as the degree of progress, a ratio of the one cycle work range A1 where excavation work has been completed to the entire work range A. When the target surface S is set in a plurality of stages, the controller 50 may calculate, as the degree of progress, a ratio of the number of stages where excavation work has been completed to the total number of stages of the target surface S.

[0064] A plurality of working ranges A (see FIG. 6) may be set. When a plurality of working ranges A are set, the controller 50 may calculate the proportion of the excavation work completed area Aa (see FIG. 6) to the entirety of the plurality of working ranges A as the degree of progress. When there are a plurality of work machines 10, the controller 50 may calculate the proportion of the excavation work completed area Aa to the entirety of the working ranges A in which the plurality of work machines 10 work, as the degree of progress. The controller 50 may calculate the proportion of the excavation work completed area Aa to the entire work site in which the work machines 10 work, as the degree of progress.

[0065] (Output of judgement result) In step S51, the controller 50 (transmission unit 56) shown in FIG. 3 causes the output device 60 to perform output. The output device 60 notifies the worker of information on the determination result of whether or not the excavation work has been completed (of the determination of the completion of the excavation work). The output device 60 may output the determination result itself (i.e., whether or not the excavation work has been completed). The output device 60 may output information calculated based on the determination result (for example, the progress degree, etc.). The information calculated based on the determination result is included in the above-mentioned "information on the determination result of whether or not the excavation work has been completed." Since the output device 60 notifies the worker of the information on the determination result of whether or not the excavation work has been completed, the need for the worker to determine whether or not the excavation work has been completed is suppressed. In addition, the worker is prevented from erroneously determining whether or not the excavation work has been completed. As a result, the burden on the worker and the work efficiency are improved.

[0066] Specific examples of notifications by the output device 60 are as follows. As described above, notifications by the output device 60 may be notifications by light (including display) or by sound. Below, a case where the output device 60 notifies by display will be described. In this case, the output device 60 is, for example, a monitor.

[0067] The output device 60 may display the excavation work completion area Aa as shown in Fig. 6. In this case, the operator can understand that it is possible to omit excavation work in the excavation work completion area Aa. As a result, when the operator manually operates the work machine 10, the operator can operate the work machine 10 so as not to perform excavation work in the excavation work completion area Aa.

[0068] The output device 60 may display the non-excavation work completion area Ab. In this case, when an operator manually operates the work machine 10, the operator can operate the work machine 10 so as to perform excavation work in the non-excavation work completion area Ab.

[0069] The output device 60 may simultaneously display the excavation work completed area Aa and the non-excavation work completed area Ab. In this case, it is preferable that the output device 60 displays the excavation work completed area Aa and the non-excavation work completed area Ab in a manner that is distinguishable (distinguishable by the worker). Specifically, for example, the output device 60 uses different display modes (such as colors) for the excavation work completed area Aa and the non-excavation work completed area Ab.

[0070] (Output other than the judgment result) The output device 60 may output information different from the determination result of whether or not the excavation work has been completed (excavation work completion determination). For example, the output device 60 may display a position (range) related to the excavation work. For example, the output device 60 may display a display showing the relative position of one cycle work range A1 (see FIG. 2) with respect to the work machine 10, or may display a display showing the relative position of the work range A with respect to the work machine 10.

[0071] (Display of the location where excavation work completion was determined, etc.) The output device 60 may display the position where the controller 50 has determined that the excavation work is complete (for example, a range to be determined). Specifically, the output device 60 may display a trajectory T of the bucket tip 15ct when the tip of the bucket 15c moves along the target surface S (during the determination operation) as shown in Fig. 1. This display may be a display of the working range A viewed from the side as shown in Fig. 1, a display of the working range A viewed from above as shown in Fig. 6, or a display of the working range A viewed from diagonally above (not shown). The output device 60 may be capable of switching the viewpoint for displaying the trajectory T.

[0072] It is preferable that the output device 60 distinguishably displays the positions where an excavation work completion determination has been made from the positions where an excavation work completion determination has not been made. In the example shown in Fig. 5, the range (the range of positions in the forward and backward direction X) where the trajectory T is at a height equal to or lower than the target surface S is the position where an excavation work completion determination has been made. Also, the range where the trajectory T is higher than the target surface S is the position where an excavation work completion determination has not been made. Also, in the example shown in Fig. 6, the range within the working range A is the position where an excavation work completion determination has been made, and the range outside the working range A is the position where an excavation work completion determination has not been made.

[0073] (Progress output) The output device 60 may output information on the calculated degree of progress to the controller 50 (progress degree calculation unit 55) (see FIG. 3). For example, the output device 60 may notify a numerical value (such as a ratio) indicating the degree of progress. For example, as shown in FIG. 6, a visual display of the ratio of an excavation work completed area Aa to a certain range (such as a work range A) is included in the output of the degree of progress by the output device 60.

[0074] (Transmission of information to external device 70) The controller 50 (transmitter 56) shown in FIG. 3 transmits information to the external device 70. For example, the controller 50 transmits information including the determination result of whether or not the excavation work has been completed (of the excavation work completion determination) to the external device 70. Specific examples of the information transmitted to the external device 70 are similar to the specific examples of the information output by the output device 60. For example, the information transmitted to the external device 70 may be the determination result of the excavation work completion determination itself, or may be information calculated based on the determination result (such as the progress degree). For example, when the progress degree is transmitted to the external device 70, a worker outside the work machine 10 (see FIG. 1) can check the progress degree of the work of the work machine 10, and the progress management of the excavation work can be easily performed.

[0075] (e.g. restricting the entry of attachment 15 depending on the result of the assessment) The controller 50 shown in Fig. 1 may control the movement of the work machine 10 (e.g., the movement of the attachment 15) based on the result of the excavation work completion determination. This restriction is referred to as an "attachment 15 entry restriction." For example, the controller 50 may restrict the entry of the attachment 15 into an excavation work completion area Aa (see Fig. 6). Note that this excavation work completion area Aa may be, for example, the above-mentioned work point or one-cycle work range A1.

[0076] For example, restricting the entry of the attachment 15 involves restricting the entry of the bucket 15c (e.g., the bucket tip 15ct (see Figure 1)) into the inside of the excavation work completion area Aa when viewed from above. Restricting the entry of the attachment 15 suppresses excavation work (wasteful work) in the excavation work completion area Aa (see Figure 6). This improves the work efficiency of the excavation work and reduces the work time for the excavation work. Restricting the entry of the attachment 15 may be performed when the work machine 10 is manually operated, or may be performed when the work machine 10 is automatically operated.

[0077] The entry restriction of the attachment 15 is performed, for example, as follows. Assume that excavation work is completed in the rear side X1 portion of the one-cycle working range A1 shown in FIG. 2, and excavation work is not completed in the front side X2 portion. In this case, the controller 50 restricts the movement of the attachment 15 so that the bucket 15c does not enter (or does not enter almost at all) the rear side X1 portion of the one-cycle working range A1. Also assume that excavation work is completed in the entire one-cycle working range A1, and excavation work is not completed in other working ranges A. In this case, the controller 50 restricts the movement of the attachment 15 (more specifically, the rotation of the upper rotating body 13) so that the bucket 15c does not enter (or does not enter almost at all) the one-cycle working range A1 where excavation work has been completed.

[0078] The entry restriction of the attachment 15 may be such that the entry of the attachment 15 (more specifically, the bucket 15c) into the excavation work completion area Aa is "restricted." The entry restriction of the attachment 15 does not need to strictly prohibit the entry of the attachment 15 (more specifically, the bucket 15c) into the excavation work completion area Aa. For example, when the entry restriction of the attachment 15 is performed, depending on the conditions, the entry of the attachment 15 (more specifically, the bucket 15c) into the excavation work completion area Aa (see FIG. 6) may be permitted. Specifically, for example, when an excavation work completion area Aa exists between two non-excavation work completion areas Ab in the front-rear direction X, the entry of the bucket 15c into this excavation work completion area Aa may be permitted.

[0079] When the work machine 10 shown in Figure 1 is operated automatically, the controller 50 causes the attachment 15 to automatically perform excavation work in an area where it is determined that excavation work has not been completed (non-excavation work completion area Ab (see Figure 6)).

[0080] (Effects of the first invention) The effects of the excavation work completion determination system 1 shown in Fig. 1 are as follows. The excavation work completion determination system 1 includes an attachment 15, a load sensor 23 (see Fig. 3), and a controller 50. The attachment 15 is provided on the work machine 10, and performs excavation work to excavate the excavation target O. The load sensor 23 (see Fig. 3) detects the load acting on the attachment 15. The controller 50 sets a target surface S of the excavation target O.

[0081] [Configuration 1] The controller 50 determines whether or not excavation work on the target surface S has been completed based on a comparison between the load (detected load L) detected by the load sensor 23 when the attachment 15 moves along the target surface S and a load threshold value Lth set in the controller 50.

[0082] With the above [Configuration 1], the excavation operation completion determination system 1 can determine whether or not the excavation operation on the target surface S has been completed (excavation completion determination). This determination is made (automatically) by the controller 50. Therefore, it is possible to reduce the need for an operator to determine whether or not the excavation operation on the target surface S has been completed.

[0083] As a result, the following effects may be obtained. Even in a situation where an operator cannot or has difficulty visually observing the position where the excavation work is performed, the controller 50 can determine whether or not the excavation work on the target surface S has been completed. Also, even in a situation where a sensor (e.g., a camera, a surrounding sensor) cannot or has difficulty detecting the position where the excavation work is performed, the controller 50 can determine whether or not the excavation work on the target surface S has been completed.

[0084] (Effects of the second invention) [Configuration 2] The excavation work completion determination system 1 includes an output device 60 (see FIG. 3). The output device 60 notifies the worker of information on the determination result as to whether or not the excavation work has been completed.

[0085] According to the above [Configuration 2], the output device 60 (see FIG. 3) can allow the worker to grasp information on the determination result as to whether or not the excavation work has been completed.

[0086] (Effects of the third invention) [Configuration 3] As shown in FIG. 6, the output device 60 displays an area where excavation work has been determined to be completed (excavation work completed area Aa).

[0087] By means of the above [Configuration 3], the output device 60 can allow the operator to grasp the excavation work completion area Aa. As a result, when the work machine 10 is manually operated by the operator, the following effects are obtained. The operator can operate the work machine 10 so as to omit excavation work in the excavation work completion area Aa. As a result, unnecessary operations by the operator and unnecessary movements of the work machine 10 can be suppressed.

[0088] (Effect of the fourth invention) [Configuration 4] The output device 60 displays in a distinguishable manner an area where excavation work has been determined to be completed (excavation work completed area Aa) and an area where excavation work has been determined to be incomplete (non-excavation work completed area Ab).

[0089] With the above [Configuration 4], the output device 60 enables the operator to distinguish between the excavation work completed area Aa and the non-excavation work completed area Ab. As a result, when the work machine 10 is manually operated by the operator, the following effects are obtained. The operator can operate the work machine 10 so as to omit excavation work in the excavation work completed area Aa and perform excavation work in the non-excavation work completed area Ab. As a result, unnecessary operations by the operator and unnecessary movements of the work machine 10 can be suppressed.

[0090] (Effect of the fifth aspect of the invention) [Configuration 5] The output device 60 displays the trajectory T (see FIGS. 1 and 2) of the attachment 15 when the attachment 15 moves along the target surface S.

[0091] With the above [Configuration 5], the output device 60 can allow the worker to grasp the trajectory T of the attachment 15 when the attachment 15 moves along the target surface S (for example, the trajectory T in the determination operation).

[0092] (Effect of the sixth aspect of the invention) [Configuration 6] The controller 50 shown in Fig. 1 is configured to be able to control the operation of the work machine 10. The controller 50 restricts the entry of the attachment 15 into an area where it is determined that excavation work has been completed (excavation work completed area Aa (see Fig. 6)).

[0093] With the above [Configuration 6], the excavation completion determination system 1 can suppress unnecessary movement of the work machine 10, such as the work machine 10 performing excavation work in the excavation work completion area Aa (see FIG. 6). Note that the "restriction" on the entry of the attachment 15 into the excavation work completion area Aa does not need to be a strict prohibition on the attachment 15 from entering the excavation work completion area Aa.

[0094] (Effects of the seventh aspect of the invention) [Configuration 7] The controller 50 is configured to automatically operate the work machine 10. The controller 50 automatically causes the attachment 15 to perform excavation work in an area where it is determined that excavation work has not been completed (non-excavation work completion area Ab (see FIG. 6)).

[0095] By the above [Configuration 7], the excavation completion determination system 1 can cause the work machine 10 to automatically perform excavation work in an area of ​​the target surface S where excavation work has not been completed.

[0096] (Effect of the eighth aspect of the invention) [Configuration 8] The controller 50 sets a multi-stage target surface S. For each of the multi-stage target surfaces S, the controller 50 determines whether or not the excavation work on the target surface S has been completed.

[0097] According to the above [Configuration 8], the excavation operation completion determination system 1 can determine whether or not the excavation operation is completed in stages before the excavation object O reaches the final target surface S (at an intermediate stage of the operation).

[0098] (Effect of the ninth aspect of the invention) [Configuration 9] The controller 50 calculates the progress of the excavation work based on the result of the determination as to whether the excavation work has been completed.

[0099] According to the above [Configuration 9], the information on the progress of the excavation work can be utilized (for example, for notifying the workers, etc.).

[0100] (Effect of the 10th Invention) [Configuration 10] The controller 50 transmits information including the result of the determination as to whether or not the excavation work has been completed to the external device 70. The external device 70 is provided outside the work machine 10.

[0101] According to the above [Configuration 10], information including the result of the determination as to whether or not excavation work has been completed can be used outside the work machine 10 (for example, for notifying the worker, etc.).

[0102] (Effects of the eleventh aspect of the invention) [Configuration 11] The controller 50 calculates the progress of the excavation work based on the result of the determination as to whether or not the excavation work has been completed. The controller 50 transmits information including the result of the determination as to whether or not the excavation work has been completed to the external device 70. The external device 70 is provided outside the work machine 10.

[0103] According to the above [Configuration 11], information on the progress of the excavation work can be used outside the work machine 10 (for example, for notifying the worker, etc.).

[0104] (Modification) The above embodiment may be modified in various ways. For example, the modified examples of the above embodiment may be combined in various ways. For example, the number of components (including the modified examples) of the above embodiment may be changed, or some of the components may not be provided. For example, the connection of each component shown in FIG. 3 may be changed. For example, the arrangement of each component may be changed. For example, the inclusion relationship of the components may be changed in various ways. For example, a component described as a lower component included in a higher component may not be included in this higher component, and may be included in another component. For example, a component described as a plurality of different members or parts may be treated as a single member or part. Specifically, for example, at least one of the input device 31, the output device 60, and the controller 50 may be a component of the work machine 10 (see FIG. 1). For example, a component described as a single member or part may be provided separately as a plurality of different members or parts. Specifically, for example, the controller 50 may be provided separately as a plurality of parts.

[0105] For example, the order of the steps in the flowchart shown in FIG. 4 may be changed, or some of the steps may not be performed. For example, various parameters (thresholds, ranges, etc.) may be set in advance in the controller 50 shown in FIG. 3, or may be set directly by manual operation by an operator (operation of the input device 31). Various parameters may be calculated by the controller 50 based on information set by manual operation by an operator, or may be calculated by the controller 50 based on information detected by a sensor (e.g., an ambient sensor that detects the surrounding conditions of the work machine 10 (see FIG. 1)). For example, various parameters may not be changed, may be changed by manual operation, or may be automatically changed by the controller 50 in response to some condition. For example, each component may have only a portion of each feature (action function, arrangement, shape, operation, etc.). [Explanation of symbols]

[0106] 1. Excavation work completion determination system 10. Working Machinery 15 Attachment 23 Load Sensor 50 Controller 60 Output Device 70 External device Aa Excavation work completed area (area where excavation work is determined to be completed) Ab Uncompleted excavation area (area where excavation work is determined to be incomplete) L Detected load (detected load) Lth Load Threshold O Excavation target S target surface T locus

Claims

1. An attachment that is provided to the work machine and performs an excavation operation to excavate an excavation target; A load sensor that detects a load acting on the attachment; A controller; Equipped with The controller: Setting a target surface of the excavation target; determining whether or not the excavation operation on the target surface has been completed based on a comparison between a load detected by the load sensor when the attachment moves along the target surface and a load threshold value set in the controller; Excavation work completion determination system.

2. The excavation operation completion determination system according to claim 1, and an output device that notifies an operator of information on a determination result as to whether or not the excavation work has been completed. Excavation work completion determination system.

3. The excavation operation completion determination system according to claim 2, The output device displays an area in which it has been determined that the excavation operation has been completed. Excavation work completion determination system.

4. The excavation operation completion determination system according to claim 3, the output device displays, in a distinguishable manner, an area for which it has been determined that the excavation work has been completed and an area for which it has been determined that the excavation work has not been completed. Excavation work completion determination system.

5. The excavation operation completion determination system according to claim 2, The output device displays a trajectory of the attachment as the attachment moves along the target surface. Excavation work completion determination system.

6. The excavation operation completion determination system according to claim 1, the controller is configured to be able to control the operation of the work machine and to restrict entry of the attachment into an area in which it has been determined that the excavation operation has been completed; Excavation work completion determination system.

7. The excavation operation completion determination system according to claim 6, The controller is configured to automatically operate the work machine, and causes the attachment to automatically perform the excavation work in an area where it is determined that the excavation work has not been completed. Excavation work completion determination system.

8. The excavation operation completion determination system according to claim 1, the controller sets a plurality of stages of the target surface, and determines whether or not the excavation work on the target surface has been completed for each of the plurality of stages of the target surface. Excavation work completion determination system.

9. The excavation operation completion determination system according to claim 1, the controller calculates a progress degree of the excavation work based on a determination result of whether the excavation work has been completed. Excavation work completion determination system.

10. The excavation operation completion determination system according to claim 1, The controller transmits information including a determination result as to whether or not the excavation operation has been completed to an external device provided outside the work machine. Excavation work completion determination system.

11. The excavation operation completion determination system according to claim 1, The controller: Calculating a progress of the excavation work based on a result of determining whether the excavation work has been completed; transmitting the information on the progress to an external device provided outside the work machine; Excavation work completion determination system.

Citation Information

Patent Citations

  • Shovel

    JP2016186210A