PC steel material hoisting jig
The prestressed steel material lifting jig addresses the inefficiencies of conventional methods by allowing flexible positioning and reducing the need for large machines, enhancing usability and cost-effectiveness in lifting operations.
Patent Information
- Application Number
- JP2023078357
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-11
- Publication Date
- 2024-11-21
- Estimated Expiration
- 2043-05-11
AI Technical Summary
Conventional lifting jigs for prestressed steel materials require large machines due to long lifting distances and cannot be easily transported to construction sites, posing challenges in installation space and cost efficiency.
A prestressed steel material lifting jig with a tapered jig body and adjustable presser plate that allows fixing and lifting at any position, including near the center, using a hook of a lifting machine, and featuring a female threaded portion for overtightening prevention.
Enables flexible lifting at any position, reducing the need for large machines, addressing transportation and installation space issues, and preventing damage from overtightening.
Smart Images

Figure 2024162640000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a jig for lifting PC steel strands, and more particularly to a jig for lifting PC steel strands. [Background technology]
[0002] Conventionally, large-span prestressed concrete (PC) structures have been constructed by introducing prestress into buildings and structures using post-tensioning methods such as the VSL (Vorspann System Losinger) method.
[0003] In this type of VSL method, tensioning fixtures are attached to the formwork and rebars of the PC structure, sheath pipes are installed, PC steel wire strands are inserted into the sheath pipes, concrete is poured, and after the concrete has developed a specified strength, tension is applied to introduce prestress. For this reason, PC steel materials such as PC steel wire strands must be hoisted and transported from the delivery point to the specified location by a lifting machine such as a crane. In addition, PC steel materials cannot be connected unless an appropriate joint method is used that can withstand the tension of the prestress, so they are inevitably long and heavy.
[0004] Furthermore, if the prestressing tendons are accidentally scratched, they may break from the scratch when tension is applied, and so a lifting jig that can lift the prestressing tendons without damaging them has been desired. Conventionally, there have been prestressing tendons that have been used to insert the ends of long prestressing tendons into holes in the jig to lift them. However, conventional prestressing tendon lifting jigs lift one end of a long prestressing tendon to lift the entire length of the tendons, which inevitably increases the lifting distance and requires a larger lifting machine. In other words, not only does this increase the cost of the lifting machine, but it is also difficult to transport the lifting machine to the construction site or to secure space to install the lifting machine. For this reason, there has been a strong demand for a prestressing tendon lifting jig that can fix and lift the prestressing tendons at any position, such as near the center of the length.
[0005] For example, Patent Document 1 discloses a metal fitting for constructing a PC structure, which has an attachment part at its upper end for attaching to a guide cable, and an attachment part at its lower end for attaching the core wires of each PC steel strand in a PC steel strand bundle (see claims 3 and 4 in the claims of Patent Document 1, paragraph
[0022] in the specification, Figures 1 and 2 in the drawings, etc.).
[0006] However, the construction fittings for PC structures described in Patent Document 1 suspend the entire length of the wire bundle 30 from the PC steel by attaching a connecting fitting 40 to one end of the wire bundle 30, which inevitably requires a longer lifting distance and a larger lifting machine. In other words, as mentioned above, not only does this increase the cost of the lifting machine, but it also fails to solve the problems of not being able to transport the lifting machine to the construction site or not being able to secure space to install the lifting machine.
[0007] As other prior art lifting tools, for example, Patent Document 2 discloses a column reinforcement lifting tool that is suspended from a suspension device via a suspension wire 30 and is equipped with a support member 20 having at least three suspension members that are connected to the upper part of the column reinforcement 10 to be suspended and suspend the column reinforcement 10, and that can appropriately adjust the positional relationship between the outer diameter of the pre-assembled column reinforcement and the wire that directly suspends the column reinforcement (see claim 1 in the claims of Patent Document 2, paragraphs
[0018] to
[0028] of the specification, Figure 2 in the drawings, etc.).
[0008] However, the column reinforcement lifting jig described in Patent Document 2, like the conventional PC steel lifting jig described above, cannot fix and lift the PC steel at any position, such as near the center in the longitudinal direction, which inevitably results in a long lifting distance and makes it impossible to solve the disadvantages caused by the large size of the lifting machine. [Prior art documents] [Patent documents]
[0009] [Patent Document 1] JP 2011-241633 A [Patent Document 2] JP 2019-167762 A Summary of the Invention [Problem to be solved by the invention]
[0010] Therefore, the present invention has been devised in consideration of the above-mentioned problems, and its object is to provide a PC steel lifting jig that can fix and lift PC steel at any position. [Means for solving the problem]
[0011] The PC steel lifting jig of claim 1 is a PC steel lifting jig for fixing PC steel and hanging it on the hook of a lifting machine to lift it, and is characterized in that it comprises a jig body having a tapered cutout hole that reduces in diameter downwardly to correspond to the outer shape of the wedge, and a pressure plate that presses and fixes the wedge to the jig body, and the pressure plate and the jig body are bolted together so that they can be freely attached and detached.
[0012] The PC steel lifting jig of claim 2 is the PC steel lifting jig of claim 1, characterized in that the jig body is formed with a female thread portion for attaching a bolt to prevent overtightening.
[0013] The PC steel lifting jig of claim 3 is the PC steel lifting jig of claim 1 or 2, characterized in that a lifting plate having a lifting hole formed therein is attached to the end of the jig body. Effect of the Invention
[0014] According to the inventions of claims 1 to 3, the PC steel can be fixed and lifted at any position, such as the end or the center, in the longitudinal direction. This not only improves the ease of use when lifting with a lifting machine, but also solves the problem of long lifting distances. This also eliminates the need for a large lifting machine, and solves the problems of increased costs for the lifting machine, transporting the lifting machine to the construction site, and the space required to install the lifting machine.
[0015] In particular, according to the invention of claim 2, the jig body has a female thread for mounting an overtightening prevention bolt, so that the distance between the pressure plate and the jig body can be adjusted by the overtightening prevention bolt. This makes it possible to prevent the wedge from being damaged by overtightening the bolt that joins the pressure plate and the jig body bolt.
[0016] In particular, according to the invention recited in claim 3, since a lifting plate having a lifting hole formed therein is attached, it is easy to hang the PC steel lifting jig on the hook of a lifting machine using a shackle or the like. [Brief description of the drawings]
[0017] [Figure 1] FIG. 1 is a plan view showing a PC steel material lifting jig according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a cross-sectional view taken along line AA in FIG. 1, showing the PC steel member lifting jig. [Diagram 3] FIG. 3 is a perspective view showing a jig body of the PC steel material lifting jig. [Figure 4] FIG. 4 is a front view showing the jig body of the same. [Diagram 5] FIG. 5 is a plan view showing the jig body of the same. [Figure 6] FIG. 6 is a bottom view showing the jig body of the same. [Figure 7] FIG. 7 is a side view showing the jig body of the same. [Figure 8] FIG. 8 is a perspective view showing a pair of pressing plates of the PC steel material lifting jig. [Figure 9] FIG. 9 is a plan view showing a pair of pressing plates of the PC steel material lifting jig described above. [Figure 10] FIG. 10 is a photograph showing a state in which the end portion of the PC steel material is fixed with the PC steel material lifting jig described above and lifted by a hoist. [Figure 11] FIG. 11 is a photograph showing a state in which the middle portion of the PC steel material is fixed with the PC steel material lifting jig described above and lifted by a hoist.
Embodiment for Carrying out the Invention
[0018] Hereinafter, an embodiment of the PC steel material lifting jig according to the present invention will be described in detail with reference to the drawings.
[0019] <PC Steel Material Lifting Jig>
[0020] First, the PC steel material lifting jig 1 according to the embodiment of the present invention will be described with reference to FIGS. 1 to 9. The PC steel material lifting jig 1 according to the embodiment of the present invention is a jig for fixing the PC steel material P1 and hanging it on the hook of a hoist in order to lift it with a hoist such as a crane. FIG. 1 is a plan view showing the PC steel material lifting jig 1 according to the embodiment of the present invention, and FIG. 2 is a cross-sectional view taken along line A-A of FIG. 1 showing the PC steel material lifting jig 1.
[0021] As shown in FIGS. 1 and 2, the PC steel material lifting jig 1 includes a jig body 2 serving as a base, a hanging plate 3 attached to the jig body 2, a plurality of wedges 4 for sandwiching and fixing the PC steel material P1, and a pressing plate 5 for pressing and fixing these wedges 4 to the jig body 2.
[0022] (Jig Body) As shown in Fig. 3 to Fig. 7, the jig body 2 is a member having as its base a main body plate 20 made of a rectangular steel plate having a thickness of 32 mm and made of SS400 general structural rolled steel material specified in JIS G310. Fig. 3 is a perspective view showing the jig body 2 of the PC steel material lifting jig 1, and Fig. 4 is a front view showing the jig body 2. Fig. 5 is a plan view showing the jig body 2, Fig. 6 is a bottom view showing the jig body 2, and Fig. 7 is a side view showing the jig body 2.
[0023] Of course, the main body plate 20 is not limited to the general structural rolled steel material SS400, and may be made of other steel materials. However, in order to repeatedly use the PC steel member hoisting jig 1, it is preferable that the main body plate 20 has a certain degree of hardness so that it can withstand rubbing against the PC steel member P1.
[0024] Furthermore, in the main body plate 20, a plurality of (in the illustrated embodiment, 2 rows x 6 locations = 12 locations) truncated cone-shaped notched holes 21, 21 for hooking the wedge 4 corresponding to the shape (outer shape) of the truncated cone outer surface of the wedge 4 are formed. The notched holes 21 are composed of tapered wedge abutment portions 21a that decrease in diameter downward and hook in close contact with the outer surface of the wedge 4, and notched portions 21b for inserting the PC steel material P1 with the wedge 4 attached into the wedge abutment portions 21a.
[0025] Further, near both ends in the longitudinal direction of the main body plate 20, two pairs of bolt holes 22 are formed as through holes for bolting the presser plate 5, totaling four. Therefore, the presser plate 5 and the jig body 2 can be freely attached and detached by bolts 6, which will be described later. Furthermore, at both ends in the longitudinal direction of the main body plate 20 outside each of the two pairs of bolt holes 22, female thread portions 24 are formed for attaching M10 bolts 23 for preventing overtightening.
[0026] (Hanging plate) Further, the hanging plate 3 is attached to the end portion in the longitudinal direction of the main body plate 20. Specifically, the hanging plate 3 is joined to the end portion in the longitudinal direction of the main body plate 20 by full periphery fillet welding.
[0027] This lifting plate 3 is a plate having a plate body 30 made of a rectangular steel plate with a thickness of 12 mm made of general structural rolled steel SS400 as a base, similar to the jig body 2. A suspension hole 31 with a diameter of 20 mm for inserting a shackle or the like to be hooked to the hook of a hoist is formed in the plate body 30.
[0028] (Wedge) As shown in Fig. 2, the wedge 4 is for sandwiching and fixing the PC steel material P1, and has a semi-truncated cone shape with a hole formed for inserting the PC steel material P1.
[0029] (Pressing plate) Next, the pressing plate 5 will be described with reference to Figs. 8 and 9. Fig. 8 is a perspective view showing a pair of pressing plates 5, 5 of the PC steel material lifting jig 1, and Fig. 9 is a plan view showing the pair of pressing plates 5, 5.
[0030] As shown in Figs. 8, 9, and 2, the pressing plate 5 is a pair of symmetric members, and has a function of inserting the PC steel material P1 sandwiched by the wedge 4 and pressing and fixing the wedge 4 to the jig body 2.
[0031] This pressing plate 5 is a plate having a plate body 50 made of a rectangular steel plate with a thickness of 16 mm made of general structural rolled steel SS400 as a base, similar to the jig body 2. A plurality of (six places in the illustrated form) notches 51 for inserting the PC steel material P1 are formed in the plate body 50 (see also Fig. 2).
[0032] In addition, bolt holes 52, 52 for inserting bolts 6 of M16 and the jig body 2 are respectively formed at both ends in the longitudinal direction of the plate body 50 at positions corresponding to the bolt holes 22 of the jig body 2 described above.
[0033] <Usage method of PC steel material lifting jig> Next, a method of using the above-mentioned PC steel lifting jig 1 will be described with reference to Figures 1, 2, 10, and 11. Figure 10 is a photograph showing the state in which the end of PC steel P1 is fixed by the PC steel lifting jig 1 and lifted by a crane, and Figure 11 is a photograph showing the state in which the middle part of PC steel P1 is fixed by the PC steel lifting jig 1 and lifted by a crane.
[0034] As shown in Figures 1 and 2, a half wedge 4 is fitted and attached to the PC steel material P1, and the PC steel material P1 with the wedge 4 attached is inserted into a truncated cone-shaped cutout hole 21 that corresponds to the outer shape of the wedge 4.
[0035] Then, the bolt 6 is inserted through the bolt hole 52 of the pressure plate 5 and the bolt hole 22 of the jig body 2 and the nut is tightened to bolt the pressure plate 5 to the jig body 2, and the wedge 4 is pressed and fixed against the tapered wedge abutment portion 21a, which decreases in diameter as it goes down the cutout hole 21 of the jig body 2.
[0036] At this time, since the jig body 2 is formed with a female thread portion 24 for mounting the overtightening prevention bolt 23, the distance between the pressing plate 5 and the jig body 2 can be adjusted by the overtightening prevention bolt 23. This makes it possible to prevent the wedge 4 from being damaged by overtightening the bolt 6.
[0037] Then, as shown in Figures 10 and 11, with the wedge 4 fixed, the PC steel lifting jig 1 with the PC steel P1 fixed thereto is lifted by hanging it on the hook of a crane with a wire rope using a shackle or the like through the lifting hole 31 of the lifting plate 3.
[0038] In addition, at this time, the PC steel lifting jig 1 can be fixed at any position of the PC steel P1 to which the wedge 4 is attached, so that it is possible to lift the longitudinal ends of the PC steel P1 as shown in Figure 10, or to lift the middle part, such as near the longitudinal center of the PC steel P1, as shown in Figure 11.
[0039] According to the PC steel tension rod lifting jig 1 according to the present embodiment described above, the PC steel tension rod P1 can be fixed and lifted at any position, such as the end or the center, in the longitudinal direction. This not only improves the ease of use when lifting with a lifting machine such as a crane, but also solves the problem of long lifting distances.
[0040] This also eliminates the need for a large lifting machine, eliminating the increased cost of the lifting machine, the problem of transporting the lifting machine to the construction site, and the problem of the space required to install the lifting machine.
[0041] Furthermore, since the PC steel lifting jig 1 is equipped with a lifting plate 3 having a lifting hole 31 formed therein, it is easy to hang the PC steel lifting jig 1 on the hook of a lifting machine using a shackle or the like.
[0042] The PC steel member lifting jig according to the embodiment of the present invention has been described in detail above. However, the above-mentioned and illustrated embodiments are merely examples of the present invention. Therefore, the technical scope of the present invention should not be interpreted as being limited by these. In particular, the diameters and dimensions of each member of the PC steel member lifting jig exemplified as an embodiment are merely examples, and it goes without saying that the design can be changed as appropriate depending on the diameter of the PC steel member. [Explanation of symbols]
[0043] 1: PC steel lifting jig 2: Jig body 20: Main body plate 21:Notched hole 21a: Wedge contact part 21b: Notch 22: Bolt hole 23: Bolt to prevent overtightening 24: Female thread 3: Hanging plate 30: Plate body 31: Hanging hole 4: Wedge 5: Presser plate 50: Plate body 51:Notch 52: Bolt hole 6: Bolt P1:PC steel material
Claims
1. A PC steel lifting jig for fixing PC steel and hanging it on a hook of a lifting machine to lift it up, A jig body having a tapered notch hole that decreases in diameter downwardly in accordance with the outer shape of the wedge, and a pressing plate that presses and fixes the wedge to the jig body, The pressing plate and the jig body are detachably joined by bolts. A PC steel lifting jig characterized by the above.
2. The jig body is formed with a female thread for mounting a bolt to prevent overtightening. The PC steel material lifting jig according to claim 1, characterized in that:
3. A hanging plate having a hanging hole formed therein is attached to the end of the jig body. The PC steel material lifting jig according to claim 1 or 2, characterized in that:
Citation Information
Patent Citations
JP1987055782U
JP1992088478U
Reinforcement binding fitting and method for tightening the same
JP2011132717A
Jig device for a steel reinforcement
KR1020180047258A
Construction method of PC structure and fitting for PC structure construction
JP2011241633A
