Information processing method, information processing device and program

The method and device address power supply and demand errors by dynamically adjusting power procurement strategies between generators and storage batteries, ensuring balanced electricity supply and reducing costs and emissions.

JP2024164621AActive Publication Date: 2024-11-27TOYOTA JIDOSHA KK
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023080233
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-15
Publication Date
2024-11-27
Estimated Expiration
2043-05-15

AI Technical Summary

Technical Problem

Existing systems fail to account for errors between predicted and actual power supply and demand, leading to disruptions in electricity supply and quality.

Method used

An information processing method and device that communicates with generators and storage batteries to dynamically adjust power procurement strategies based on cost and carbon dioxide emissions, selecting between generating power, purchasing from an external source, discharging from storage batteries, reducing generation, or charging batteries to maintain balanced power supply.

Benefits of technology

Ensures simultaneous achievement of the same amount of electricity despite prediction errors, reducing procurement costs and carbon dioxide emissions by optimizing power distribution between generators and storage batteries.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024164621000001_ABST
    Figure 2024164621000001_ABST
Patent Text Reader

Abstract

To achieve the same amount of power simultaneously even if an error occurs between predicted and actual power supply and demand.SOLUTION: Provided is an information processing method performed by an information processing device 1 that includes a control unit, a communication unit, and a storage unit. The information processing device 1 is capable of communicating with a generator 2 and a storage battery 3 via the communication unit. The method includes: upon detecting an error between predicted and actual power supply and demand, determining whether or not the error indicates a shortage of power; and procuring power using a method with lower power procurement cost or carbon dioxide emissions by determining which of a first method, in which power is generated by the generator 2, and a second method, in which power is purchased externally and discharged from the storage battery 3, has lower power procurement cost or carbon dioxide emissions when it is determined that the error indicates the shortage of power.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an information processing method, an information processing device, and a program. [Background technology]

[0002] Conventionally, there is known a system that rationally predicts the amount of externally procured power reservation that minimizes power procurement costs or maximizes profits at the time of reservation (see, for example, Patent Document 1). The system optimizes the amount of externally procured power under the probability distribution of demand for the planned time interval calculated from the probability distribution of demand forecast errors. The system optimizes the amount of externally procured power under the probability distribution of possible power generation for the planned time interval calculated from the probability distribution of possible power generation forecast errors. The system calculates the amount of externally procured power that minimizes the expected value of the externally procured power cost. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP2006-050834 Public Relations Summary of the Invention [Problem to be solved by the invention]

[0004] The above-mentioned background art minimizes the external procurement power cost by combining power generated by generators. However, there is no mention of combining anything other than generators, and there is room for improvement.

[0005] The purpose of this disclosure, made in consideration of such circumstances, is to achieve simultaneous equal amounts even if an error occurs between predictions and actual results regarding power supply and demand during operation of equipment (e.g., generators or storage batteries). "Simultaneous equal amounts" refers to the amount of electricity produced (i.e., supply amount) and the amount of electricity consumed (i.e., demand amount) being the same at the same time. If the supply amount and demand amount do not always match, the quality of electricity (e.g., frequency) will be disrupted and electricity will not be supplied normally. [Means for solving the problem]

[0006] An information processing method according to an embodiment of the present disclosure includes: An information processing method by an information processing device including a control unit, a communication unit, and a storage unit, the information processing device is capable of communicating with a generator and a storage battery via the communication unit; When detecting an error between a forecast and actual results regarding power supply and demand, determining whether the error indicates that there will be a power shortage; When it is determined that the error indicates a power shortage, determining which of a first method of generating power using the generator and a second method of purchasing power from an outside source and discharging the power from the storage battery has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission. when it is determined that the error indicates that the power is surplus, determining which of a third method of reducing the amount of power generated by the generator and a fourth method of charging the surplus power to the storage battery and reducing the amount of purchased power has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission; Includes.

[0007] An information processing device according to an embodiment of the present disclosure includes: An information processing device including a control unit, a communication unit, and a storage unit, The communication unit is capable of communicating with a generator and a storage battery, The control unit is When detecting an error between a forecast and actual results regarding power supply and demand, determining whether the error indicates that there will be a power shortage; When it is determined that the error indicates a power shortage, determining which of a first method of generating power using the generator and a second method of purchasing power from an outside source and discharging the power from the storage battery has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission. when it is determined that the error indicates that the power is surplus, determining which of a third method of reducing the amount of power generated by the generator and a fourth method of charging the surplus power to the storage battery and reducing the amount of purchased power has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission; The operation includes:

[0008] A program according to an embodiment of the present disclosure includes: A computer as an information processing device including a control unit, a communication unit, and a storage unit, the information processing device being capable of communicating with a generator and a storage battery via the communication unit, When detecting an error between a forecast and actual results regarding power supply and demand, determining whether the error indicates that there will be a power shortage; When it is determined that the error indicates a power shortage, determining which of a first method of generating power using the generator and a second method of purchasing power from an outside source and discharging the power from the storage battery has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission. when it is determined that the error indicates that the power is surplus, determining which of a third method of reducing the amount of power generated by the generator and a fourth method of charging the surplus power to the storage battery and reducing the amount of purchased power has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission; The method executes an operation including: Effect of the Invention

[0009] According to an embodiment of the present disclosure, even if an error occurs between the prediction and the actual results regarding the power supply and demand, it is possible to realize a simultaneous equal amount. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a schematic diagram of an information processing system. [Diagram 2] FIG. 1 is a block diagram showing a configuration of an information processing device. [Diagram 3] 11 is a flowchart showing a first operation of the information processing device. [Figure 4] 13 is a flowchart showing a second operation of the information processing device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] 1 is a schematic diagram of an information processing system S according to the present embodiment. The information processing system S includes an information processing device 1, a generator 2, and a storage battery 3 that can communicate with each other via a network NW. The network NW includes, for example, a mobile communication network, a fixed communication network, or the Internet.

[0012] 1, for ease of explanation, one each of the information processing device 1, the generator 2, and the storage battery 3 is illustrated. However, the respective numbers of the information processing device 1, the generator 2, and the storage battery 3 are not limited to this. For example, the process executed by the information processing device 1 of the present embodiment may be executed by a plurality of information processing devices 1 that are distributed.

[0013] An outline of the process executed by the information processing device 1 of this embodiment will be described. The operation of the control unit 11 of the information processing device 1 includes: when detecting an error between prediction and actual results of power supply and demand, determining whether the error indicates a power shortage; when determining that the error indicates a power shortage, determining which of a first method of generating power with the generator 2 and a second method of purchasing power from outside and discharging it from the storage battery 3 has a lower power procurement cost or carbon dioxide emission, and procuring power by the method with the lower power procurement cost or carbon dioxide emission; when determining that the error indicates a power surplus, determining which of a third method of reducing the amount of power generated by the generator 2 and a fourth method of charging the surplus power to the storage battery 3 to reduce the amount of purchased power has a lower power procurement cost or carbon dioxide emission, and procuring power by the method with the lower power procurement cost or carbon dioxide emission. With this configuration, even if an error occurs between prediction and actual results of power supply and demand, the information processing device 1 can achieve the same amount at the same time by compensating using both the generator 2 and the storage battery 3. Furthermore, the information processing device 1 can reduce the power procurement cost or carbon dioxide emission.

[0014] The information processing device 1 is a device that controls a generator 2 and a storage battery 3. In this example, the information processing device 1 is a power conditioner. The information processing device 1 supplies power to one or more consumers.

[0015] In FIG. 2, the internal configuration of the information processing device 1 will be described in detail.

[0016] The information processing device 1 includes a control unit 11, a communication unit 12, and a storage unit 13. The components of the information processing device 1 are connected to each other so as to be able to communicate with each other via, for example, a dedicated line.

[0017] The control unit 11 includes, for example, one or more general-purpose processors including a CPU (Central Processing Unit) or an MPU (Micro Processing Unit). The control unit 11 may include one or more dedicated processors specialized for specific processing. Instead of including a processor, the control unit 11 may include one or more dedicated circuits. The dedicated circuits may be, for example, a FPGA (Field-Programmable Gate Array) or an ASIC (Application Specific Integrated Circuit). The control unit 11 may include an ECU (Electronic Control Unit). The control unit 11 transmits and receives any information via the communication unit 12.

[0018] The communication unit 12 includes a communication module compatible with one or more wired or wireless LAN (Local Area Network) standards for connecting to the network NW. The communication unit 12 may include a module compatible with one or more mobile communication standards including LTE (Long Term Evolution), 4G (4th Generation), or 5G (5th Generation). The communication unit 12 may include a communication module compatible with one or more short-range communication standards or specifications including Bluetooth (registered trademark), AirDrop (registered trademark), IrDA, ZigBee (registered trademark), Felica (registered trademark), or RFID. The communication unit 12 transmits and receives any information via the network NW.

[0019] The memory unit 13 includes, but is not limited to, for example, a semiconductor memory, a magnetic memory, an optical memory, or a combination of at least two of these. The semiconductor memory is, for example, a RAM or a ROM. The RAM is, for example, an SRAM or a DRAM. The ROM is, for example, an EEPROM. The memory unit 13 may function as, for example, a main memory device, an auxiliary memory device, or a cache memory. The memory unit 13 may store information resulting from analysis or processing by the control unit 11. The memory unit 13 may store various information related to the operation or control of the information processing device 1, etc. The memory unit 13 may store system programs, application programs, embedded software, etc. The memory unit 13 may be provided outside the information processing device 1 and accessed by the information processing device 1.

[0020] The generator 2 is a power device that generates electrical energy. In this case, the generator 2 is a fuel cell. Alternatively, the generator 2 may be any device capable of generating electricity.

[0021] The storage battery 3 is a battery that can be used repeatedly by being charged. The storage battery 3 may be called a secondary battery or a rechargeable battery.

[0022] Hereinafter, the information processing method performed by the information processing device 1 will be described in detail with reference to FIGS.

[0023] In step S1, the control unit 11 of the information processing device 1 detects an error between the prediction and the actual results of the power supply and demand. The prediction and the actual results data is acquired by the control unit 11 and stored in the storage unit 13.

[0024] In step S2, the control unit 11 determines whether or not the error indicates a power shortage.

[0025] If the answer is Yes in step S2, the control unit 11 determines in step S3 which of the first method of generating electricity with the generator 2 and the second method of purchasing electricity from outside (for example, the grid) and discharging it from the storage battery 3 has a lower power procurement cost or carbon dioxide emissions. It can be arbitrarily set whether to compare the power procurement cost or the carbon dioxide emissions between the first method and the second method.

[0026] The method for calculating the power procurement cost or the carbon dioxide emission amount is arbitrary. For example, the calculation of the carbon dioxide emission amount may be performed by the following method. (1) When generating electricity The control unit 11 calculates the amount of carbon dioxide emission per kWh from the amount of carbon dioxide emission when the fuel in the fuel cell is combusted and the power generation efficiency, and multiplies this by the amount of power generation. (2) When purchasing electricity For example, the following website publishes the amount of carbon dioxide emissions per kWh of purchased electricity for each electricity supplier. The control unit 11 multiplies the published amount of emissions by the amount of purchased electricity. https: / / ghg-santeikohyo.env.go.jp / files / calc / r05_coefficient.pdf (3) When selling electricity The control unit 11 subtracts the value obtained by multiplying the amount of carbon dioxide emission per kWh in the case of power generation by the amount of power sold.

[0027] When the control unit 11 determines that the second method has a lower power procurement cost or a lower amount of carbon dioxide emission, the control unit 11 sets the battery priority mode in step S4. The name of the mode can be set arbitrarily.

[0028] In step S5, the control unit 11 determines whether the error between the prediction and the actual result (hereinafter, also simply referred to as "error") is equal to or less than the amount of stored power in the storage battery 3.

[0029] If the result of step S5 is Yes, the control unit 11 discharges the storage battery 3 to compensate for the error in step S6. Specifically, the control unit 11 discharges the storage battery 3 to compensate for the error.

[0030] If the answer is No in step S5 (ie, if the error exceeds the amount of stored power), the control unit 11 determines whether or not the error is equal to or smaller than the total value of the amount of stored power and the power generation reserve of the generator 2 in step S7.

[0031] If the answer is Yes in step S7, the control unit 11 performs full discharge of the storage battery 3 and power generation by the generator 2 in step S8 to compensate for the error.

[0032] If the result in step S7 is No, in step S9, the control unit 11 executes, in response to the error, power generation of the entire power generation reserve capacity of the generator 2 and full discharge of the storage battery 3. In this case, since the entire error is not filled, dealing with the remainder is given up.

[0033] When the control unit 11 determines in step S3 that the power procurement cost or the carbon dioxide emission amount of the first method is lower, it sets the generator priority mode in step S10.

[0034] In step S11, the control unit 11 determines whether the error is equal to or smaller than the power generation margin of the generator 2.

[0035] If the answer is Yes in step S11, the control unit 11 controls the generator 2 to generate power to compensate for the error in step S12, thereby compensating for the error.

[0036] If the result is No in step S11, the control unit 11 determines whether or not the error is equal to or smaller than the sum of the amount of stored electricity in the storage battery 3 and the power generation reserve of the generator 2 in step S13.

[0037] If the result of step S13 is Yes, the control unit 11 executes, in step S14, power generation of the entire power generation reserve capacity of the generator 2 and discharge of the storage battery 3 in response to the error.

[0038] If the result in step S13 is No, in step S15, the control unit 11 executes, in response to the error, power generation of the entire power generation reserve of the generator 2 and discharge of the entire charge reserve of the storage battery 3. As for the remaining error that has not been filled, no action is taken.

[0039] If the answer is No in step S2 (i.e., there is surplus electricity), the control unit 11 determines in step S21 which of the following methods has a lower electricity procurement cost or lower carbon dioxide emissions: the third method of reducing the amount of electricity generated by the generator 2, or the fourth method of charging the surplus electricity to the storage battery 3 to reduce the amount of electricity purchased.

[0040] When the control unit 11 determines in step S21 that the power procurement cost or the carbon dioxide emission amount of the fourth method is lower, the control unit 11 sets the generator priority mode in step S22.

[0041] In step S23, the control unit 11 determines whether the error is equal to or smaller than the reduction margin of the amount of power generation of the generator 2.

[0042] If the answer is Yes in step S23, the control unit 11 reduces the amount of power generated by the generator 2 in response to the error, thereby compensating for the error.

[0043] If the result in step S23 is No, the control unit 11 determines in step S25 whether the error is equal to or smaller than the sum of the reduction margin of the amount of power generated by the generator 2 and the charging margin of the storage battery 3.

[0044] If the determination in step S25 is Yes, the control unit 11 executes, in step S26, a reduction in the total reduction margin of the generator 2 and charging of the storage battery 3 in response to the error.

[0045] If the result in step S25 is No, in step S27, the control unit 11 executes, in response to the error, reducing the entire reduction margin of the generator 2 and charging the entire charge margin of the storage battery 3. For errors that cannot be filled, the control unit 11 gives up on dealing with them.

[0046] In step S21, it is determined that the third method has a lower power procurement cost or a lower amount of carbon dioxide emissions, and the control unit 11 sets the battery priority mode in step S28.

[0047] In step S29, the control unit 11 determines whether the error is equal to or smaller than the remaining charge capacity of the storage battery 3.

[0048] If the result of step S29 is Yes, the control unit 11 causes the storage battery 3 to be charged in step S30.

[0049] If the result in step S29 is No, the control unit 11 determines in step S31 whether the error is equal to or smaller than the sum of the reduction margin of the power generation amount of the generator 2 and the charging margin of the storage battery 3.

[0050] If the result of step S31 is Yes, the control unit 11 reduces the entire reduction margin of the amount of power generated by the generator 2 and charges the storage battery 3 in response to the error in step S32.

[0051] If the result in step S31 is No, in step S33, the control unit 11 executes, in response to the error, reducing the entire amount of the power generation reserve of the generator 2 and charging the entire amount of the charging reserve of the storage battery 3. For errors that cannot be filled, the control unit 11 gives up on dealing with them.

[0052] As described above, according to the present embodiment, the operation of the control unit 11 of the information processing device 1 includes: when detecting an error between the prediction and the actual results of the power supply and demand, determining whether the error indicates a power shortage; when determining that the error indicates a power shortage, determining which of the first method of generating power with the generator 2 and the second method of purchasing power from the outside and discharging it from the storage battery 3 has a lower power procurement cost or carbon dioxide emission, and procuring power by the method with the lower power procurement cost or carbon dioxide emission; when determining that the error indicates a power surplus, determining which of the third method of reducing the amount of power generated by the generator 2 and the fourth method of charging the surplus power to the storage battery 3 to reduce the amount of purchased power has a lower power procurement cost or carbon dioxide emission, and procuring power by the method with the lower power procurement cost or carbon dioxide emission. With this configuration, even if an error occurs between the prediction and the actual results of the power supply and demand, the information processing device 1 can achieve the same amount at the same time by compensating using both the generator 2 and the storage battery 3. Furthermore, the information processing device 1 can reduce the power procurement cost or the carbon dioxide emission.

[0053] Furthermore, according to this embodiment, the operation of the control unit 11 includes, when it is determined that the power procurement cost or carbon dioxide emission amount of the second method is lower, comparing the error with the amount of electricity stored in the storage battery 3, and, when it is determined that the error is equal to or less than the amount of electricity stored, discharging the storage battery 3 in response to the error. The operation of the control unit 11 includes, when it is determined that the error exceeds the amount of electricity stored, comparing the error with the sum of the amount of electricity stored and the power generation reserve of the generator, and, when it is determined that the error is equal to or less than the sum, discharging the entire amount of the storage battery 3 and generating electricity with the generator 2 in response to the error. With this configuration, the information processing device 1 can fill in the error and achieve simultaneous equal amounts.

[0054] Furthermore, according to this embodiment, the operation of the control unit 11 includes, when it is determined that the power procurement cost or carbon dioxide emission amount of the first method is lower, comparing the error with the power generation reserve of the generator 2, and, when it is determined that the error is equal to or less than the power generation reserve, causing the generator 2 to generate power in response to the error. The operation of the control unit 11 includes, when it is determined that the error exceeds the power generation reserve, comparing the error with the sum of the amount of electricity stored in the storage battery 3 and the power generation reserve of the generator 2, and, when it is determined that the error is equal to or less than the sum, generating the entire amount of the power generation reserve of the generator 2 and discharging the storage battery 3 in response to the error. With this configuration, the information processing device 1 can fill in the error and achieve the same amount at the same time.

[0055] Furthermore, according to this embodiment, the operation of the control unit 11 includes, when it is determined that the power procurement cost of the fourth method is lower, comparing the error with the reduction margin of the power generation of the generator 2, and, when it is determined that the error is equal to or less than the reduction margin, reducing the power generation amount of the generator 2 in response to the error. The operation of the control unit 11 includes, when it is determined that the error exceeds the reduction margin, comparing the error with the sum of the reduction margin of the power generation amount of the generator 2 and the charging margin of the storage battery 3, and, when it is determined that the error is equal to or less than the sum, reducing the entire reduction margin of the generator 2 and charging the storage battery 3 in response to the error. With this configuration, the information processing device 1 can fill in the error and achieve simultaneous equal amounts.

[0056] Furthermore, according to this embodiment, the operation of the control unit 11 includes, when it is determined that the power procurement cost of the third method is lower, comparing the error with the charging reserve of the storage battery 3, and, when it is determined that the error is equal to or less than the charging reserve, charging the storage battery 3 in response to the error. Furthermore, when it is determined that the error exceeds the charging reserve, the operation of the control unit 11 includes, when it is determined that the error exceeds the charging reserve, comparing the error with the sum of the reduction reserve of the power generation amount of the generator 2 and the charging reserve of the storage battery 3, and, when it is determined that the error is equal to or less than the sum, reducing the entire reduction reserve of the generator 2 and charging the storage battery 3 in response to the error. With this configuration, the information processing device 1 can fill in the error and achieve simultaneous equal amounts.

[0057] Although the present disclosure will be described based on various drawings and examples, it should be noted that those skilled in the art may make various modifications and alterations based on the present disclosure. Other modifications are possible within the scope of the present disclosure. For example, the functions included in each means or step can be rearranged so as not to cause logical inconsistencies, and multiple means or steps can be combined into one or divided.

[0058] For example, in the above embodiment, a program for executing all or part of the functions or processes of the information processing device 1 can be recorded in a computer-readable recording medium. The computer-readable recording medium includes a non-transitory computer-readable medium, for example, a magnetic recording device, an optical disk, a magneto-optical recording medium, or a semiconductor memory. The program is distributed by, for example, selling, transferring, or lending a portable recording medium such as a DVD (Digital Versatile Disc) or a CD-ROM (Compact Disc Read Only Memory) on which the program is recorded. The program may also be distributed by storing the program in the storage of an arbitrary server and transmitting the program from the arbitrary server to another computer. The program may also be provided as a program product. The present disclosure can also be realized as a program executable by a processor.

[0059] Some of the embodiments of the present disclosure are illustrated below. However, it should be noted that the embodiments of the present disclosure are not limited to these. [Appendix 1] An information processing method by an information processing device including a control unit, a communication unit, and a storage unit, the information processing device is capable of communicating with a generator and a storage battery via the communication unit; When detecting an error between a forecast and actual results regarding power supply and demand, determining whether the error indicates that there will be a power shortage; When it is determined that the error indicates a power shortage, determining which of a first method of generating power using the generator and a second method of purchasing power from an outside source and discharging the power from the storage battery has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission. when it is determined that the error indicates that the power is surplus, determining which of a third method of reducing the amount of power generated by the generator and a fourth method of charging the surplus power to the storage battery and reducing the amount of purchased power has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission; An information processing method comprising: [Appendix 2] In the information processing method according to claim 1, When it is determined that the power procurement cost or the carbon dioxide emission amount of the second method is lower, the error is compared with the amount of electricity stored in the storage battery, When it is determined that the error is equal to or less than the stored power amount, discharging the storage battery to compensate for the error. [Appendix 3] In the information processing method according to claim 2, When it is determined that the error exceeds the amount of stored electricity, the error is compared with a total value of the amount of stored electricity and the power generation margin of the generator; An information processing method including, when it is determined that the error is equal to or less than the total value, executing full discharge of the storage battery and power generation by the generator in response to the error. [Appendix 4] In the information processing method according to any one of Supplementary Notes 1 to 3, When it is determined that the power procurement cost or the carbon dioxide emission amount of the first method is lower, the error is compared with the power generation margin of the generator, When it is determined that the error is equal to or less than the power generation margin, the information processing method includes causing the generator to generate power in response to the error. [Appendix 5] In the information processing method according to claim 4, When it is determined that the error exceeds the power generation margin, the error is compared with a total value of the amount of stored power in the storage battery and the power generation margin of the generator; An information processing method including, when it is determined that the error is equal to or less than the total value, generating power at the full power generating capacity of the generator and discharging the storage battery in response to the error. [Appendix 6] In the information processing method according to any one of Supplementary Notes 1 to 5, When it is determined that the power procurement cost of the fourth method is lower, the error is compared with a reduction margin of the power generation amount of the generator, An information processing method including, when it is determined that the error is equal to or less than the reduction margin, reducing the amount of power generated by the generator in response to the error. [Appendix 7] In the information processing method according to claim 6, When it is determined that the error exceeds the reduction margin, the error is compared with a sum of the reduction margin of the power generation amount of the generator and the charging margin of the storage battery; An information processing method including, when it is determined that the error is equal to or less than the total value, reducing the entire amount of the diminution margin of the generator and charging the storage battery in response to the error. [Appendix 8] In the information processing method according to any one of Supplementary Notes 1 to 7, When it is determined that the power procurement cost of the third method is lower, the error is compared with the charging capacity of the storage battery; When it is determined that the error is equal to or less than the charging margin, charging the storage battery to compensate for the error. [Appendix 9] In the information processing method according to claim 8, When it is determined that the error exceeds the charging capacity, the error is compared with a total value of a reduction capacity of the power generation amount of the generator and a charging capacity of the storage battery; An information processing method including, when it is determined that the error is equal to or less than the total value, reducing the entire amount of the diminution margin of the generator and charging the storage battery in response to the error. [Appendix 10] An information processing device including a control unit, a communication unit, and a storage unit, The communication unit is capable of communicating with a generator and a storage battery, The control unit is When detecting an error between a forecast and actual results regarding power supply and demand, determining whether the error indicates that there will be a power shortage; When it is determined that the error indicates a power shortage, determining which of a first method of generating power using the generator and a second method of purchasing power from an outside source and discharging the power from the storage battery has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission. when it is determined that the error indicates that the power is surplus, determining which of a third method of reducing the amount of power generated by the generator and a fourth method of charging the surplus power to the storage battery and reducing the amount of purchased power has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission; An information processing device that performs operations including the steps of: [Appendix 11] A computer as an information processing device including a control unit, a communication unit, and a storage unit, the information processing device being capable of communicating with a generator and a storage battery via the communication unit, When detecting an error between a forecast and actual results regarding power supply and demand, determining whether the error indicates that there will be a power shortage; When it is determined that the error indicates a power shortage, determining which of a first method of generating power using the generator and a second method of purchasing power from an outside source and discharging the power from the storage battery has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission. when it is determined that the error indicates that the power is surplus, determining which of a third method of reducing the amount of power generated by the generator and a fourth method of charging the surplus power to the storage battery and reducing the amount of purchased power has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has the lower power procurement cost or carbon dioxide emission; A program that causes an operation to be performed, including [Explanation of symbols]

[0060] S Information Processing System

Claims

1. An information processing method by an information processing device including a control unit, a communication unit, and a storage unit, the information processing device is capable of communicating with a generator and a storage battery via the communication unit; When detecting an error between a forecast and actual results regarding power supply and demand, determining whether the error indicates that there will be a power shortage; when it is determined that the error indicates a power shortage, determining which of a first method of generating power using the generator and a second method of purchasing power from an outside source and discharging the power from the storage battery has a lower power procurement cost or carbon dioxide emission, and procuring power using the method with the lower power procurement cost or carbon dioxide emission; when it is determined that the error indicates that the power is surplus, determining which of a third method of reducing the amount of power generated by the generator and a fourth method of charging the surplus power to the storage battery and reducing the amount of purchased power has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has a lower power procurement cost or carbon dioxide emission; An information processing method comprising:

2. 2. The information processing method according to claim 1, When it is determined that the power procurement cost or the carbon dioxide emission amount of the second method is lower, the error is compared with the amount of electricity stored in the storage battery; When it is determined that the error is equal to or less than the stored power amount, discharging the storage battery to compensate for the error.

3. 3. The information processing method according to claim 2, When it is determined that the error exceeds the amount of stored electricity, the error is compared with a total value of the amount of stored electricity and the power generation margin of the generator; An information processing method including, when it is determined that the error is equal to or less than the total value, executing full discharge of the storage battery and power generation by the generator in response to the error.

4. 2. The information processing method according to claim 1, When it is determined that the power procurement cost or the carbon dioxide emission amount of the first method is lower, the error is compared with the power generation margin of the generator, When it is determined that the error is equal to or less than the power generation margin, the information processing method includes causing the generator to generate power in response to the error.

5. 5. The information processing method according to claim 4, When it is determined that the error exceeds the power generation margin, the error is compared with a total value of the amount of stored power in the storage battery and the power generation margin of the generator; An information processing method including, when it is determined that the error is equal to or less than the total value, generating power at the full power generating capacity of the generator and discharging the storage battery in response to the error.

6. 2. The information processing method according to claim 1, When it is determined that the power procurement cost of the fourth method is lower, the error is compared with a reduction margin of the power generation amount of the generator, An information processing method including, when it is determined that the error is equal to or less than the reduction margin, reducing the amount of power generated by the generator in response to the error.

7. 7. The information processing method according to claim 6, When it is determined that the error exceeds the reduction margin, the error is compared with a sum of the reduction margin of the power generation amount of the generator and the charging margin of the storage battery; An information processing method including, when it is determined that the error is equal to or less than the total value, reducing the entire amount of the diminution margin of the generator and charging the storage battery in response to the error.

8. 2. The information processing method according to claim 1, When it is determined that the power procurement cost of the third method is lower, the error is compared with a charge margin of the storage battery; When it is determined that the error is equal to or less than the charging margin, charging the storage battery to compensate for the error.

9. 9. The information processing method according to claim 8, When it is determined that the error exceeds the charging capacity, the error is compared with a total value of a reduction capacity of the power generation amount of the generator and a charging capacity of the storage battery; An information processing method including, when it is determined that the error is equal to or less than the total value, reducing the entire amount of the diminution margin of the generator and charging the storage battery in response to the error.

10. An information processing device including a control unit, a communication unit, and a storage unit, The communication unit is capable of communicating with a generator and a storage battery, The control unit is When detecting an error between a forecast and actual results regarding power supply and demand, determining whether the error indicates that there will be a power shortage; when it is determined that the error indicates a power shortage, determining which of a first method of generating power using the generator and a second method of purchasing power from an outside source and discharging the power from the storage battery has a lower power procurement cost or carbon dioxide emission, and procuring power using the method with the lower power procurement cost or carbon dioxide emission; when it is determined that the error indicates that the power is surplus, determining which of a third method of reducing the amount of power generated by the generator and a fourth method of charging the surplus power to the storage battery and reducing the amount of purchased power has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has a lower power procurement cost or carbon dioxide emission; An information processing device that performs operations including the steps of:

11. A computer as an information processing device including a control unit, a communication unit, and a storage unit, the information processing device being capable of communicating with a generator and a storage battery via the communication unit, When detecting an error between a forecast and actual results regarding power supply and demand, determining whether the error indicates that there will be a power shortage; when it is determined that the error indicates a power shortage, determining which of a first method of generating power using the generator and a second method of purchasing power from an outside source and discharging the power from the storage battery has a lower power procurement cost or carbon dioxide emission, and procuring power using the method with the lower power procurement cost or carbon dioxide emission; when it is determined that the error indicates that the power is surplus, determining which of a third method of reducing the amount of power generated by the generator and a fourth method of charging the surplus power to the storage battery and reducing the amount of purchased power has a lower power procurement cost or carbon dioxide emission, and procuring power using the method that has a lower power procurement cost or carbon dioxide emission; A program that causes an operation to be performed, including

Citation Information

Patent Citations

  • Power demand / supply control method and apparatus

    JP2015037355A

  • Power management device, power management method, and power management program

    JP2018170884A

  • Energy storage system for peak-shaving of drilling rig power usage

    US20110148209A1

  • Power adjustment device, power adjustment method, power adjustment system, power storage device, server, program

    WO2014208059A1

  • Risk management support system for power supply enterprise

    JP2006050834A