Fuel exchange method and fuel exchange device

The fuel exchange method and apparatus address the inefficiencies of conventional methods by temporarily placing used fuel within the reactor core, reducing transfer times and enabling parallel inspection and fuel movement, thus shortening the fuel exchange period.

JP2024164929AActive Publication Date: 2024-11-28HITACHI GE NUCLEAR ENERGY LTD

Patent Information

Application Number
JP2023080662
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-16
Publication Date
2024-11-28
Estimated Expiration
2043-05-16

AI Technical Summary

Technical Problem

Conventional fuel exchange methods in nuclear reactors are time-consuming due to the need to transfer fuel between the reactor and the spent fuel pool, and the process is heavily dependent on operator experience, lacking standardized guidelines for automation.

Method used

A fuel exchange method and apparatus that temporarily places used fuel in empty spaces within the reactor core, minimizing transfers to the spent fuel pool, and utilizes a fuel placement management device to generate efficient fuel movement patterns, ensuring subcriticality and reducing transfer times.

Benefits of technology

The method significantly shortens the fuel exchange period during periodic inspections by minimizing transfers to the spent fuel pool and allowing parallel execution of inspection and fuel movement tasks, ensuring subcriticality is maintained.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024164929000001_ABST
    Figure 2024164929000001_ABST
Patent Text Reader

Abstract

To provide a fuel exchange method and a fuel exchange device capable of shortening a fuel exchange work period in regular inspection compared to conventional arts.SOLUTION: A method for exchanging fuel in a reactor core 63 of a nuclear reactor 60 has the steps of: moving spent fuel assemblies 4 that have completed a predetermined in-reactor residence cycle to a spent fuel pool 70; and temporarily installing the fuel assemblies 4 loaded at the coordinates where core-related work is to be performed in a vacant space after the movement of the spent fuel assemblies 4.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method and apparatus for refueling in a boiling water nuclear reactor. [Background technology]

[0002] Patent Document 1 describes how fuel is transferred from the reactor core to an SFP (Spent Fuel Pool) in multiple units at the same time, and then the fuel is shuffled within the SFP taking into account the fuel arrangement in the core and replaced with new fuel, and the fuel is transferred and loaded in multiple units at the same time from the SFP to the reactor core.

[0003] Patent Document 2 describes that a target fuel arrangement for removal for each unit work period when core-related work is performed is determined based on fuel arrangement information, the work process for each unit work period, and constraint conditions, etc., and that a fuel movement work procedure for each unit work period is created based on this target fuel arrangement for removal, the upper limit of the number of fuel movements possible in the unit work period, fuel arrangement information, constraint conditions, etc. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Japanese Patent Application Publication No. 7-167977 [Patent Document 2] Japanese Patent Application Publication No. 3-248093 Summary of the Invention [Problem to be solved by the invention]

[0005] In nuclear power plants, as part of the management of nuclear fuel in the reactor, fuel exchange (fuel shuffling) is performed periodically to equalize the burnup of the nuclear fuel and to utilize it effectively. The fuel is classified according to the number of cycles it will stay in the reactor, and during fuel exchange, the fuel is moved to the position where the next number of cycles should be.

[0006] The number of cycles of fuel in the reactor ranges from 1 to 5, and the 5th cycle fuel, which has been there for the longest time, is removed from the reactor. Also, the 1st to 4th cycle fuels are moved to positions corresponding to the next cycles (2nd to 5th cycles).

[0007] This transfer may involve first passing through another location, such as a spent fuel pool, before being loaded into the final loading position, or it may involve being transferred directly from the source to the destination.

[0008] In the past, all fuel in the reactor was first moved to a spent fuel pool, where inspection work was carried out, and then the fuel was moved from the spent fuel pool to a designated position within the reactor based on fuel arrangement information after shuffling within the reactor.However, this required time to move the fuel between the spent fuel pool and within the reactor, which was a factor in prolonging the fuel movement process and the entire regular inspection work process.

[0009] In addition, the fuel exchange work procedures described above were created by workers, and the source and destination of each fuel must be set accurately, and the subcriticality of the reactor must be confirmed, which creates a heavy burden for the creators of the fuel exchange work procedures.

[0010] In particular, there was a demand to shorten the regular inspection process, and plans had to be made taking into consideration the parallel execution of the fuel transfer process and inspection work, but the plans that were created tended to depend on the experience and skill of the person who created them.

[0011] As described above, the conventional refueling procedure creation method is highly dependent on the creator, and therefore it is difficult to provide a guideline for creating a refueling procedure when automating the creation of the procedure.

[0012] Patent Document 1 shows that the fuel exchange work time can be shortened by moving fuel from the core to the SFP, performing fuel replacement in the SFP taking into account the in-core arrangement after fuel shuffling, and then simultaneously moving multiple fuel assemblies from the SFP to the core and loading them inside the core. This method is expected to reduce the number of fuel moves that impose restrictions on the in-core, and shorten the fuel movement process in a systematic way. However, since it takes time to move fuel between the SFP and the in-core, further time-saving measures are required.

[0013] Patent Document 2 shows that an efficient fuel shuffling plan can be created using a fuel database having data on the initial fuel arrangement in the core, the final target fuel arrangement, and the target fuel, a work environment database having data on the core structure and fuel pool structure of the target reactor, and a periodic inspection process database having data on the target, period, and work process plan of core-related work that requires fuel movement or control rod operation among periodic inspection work of the reactor. However, fuel movement between the SFP and inside the reactor is occurring as usual, and further measures to shorten the process are required.

[0014] The present invention has been made in consideration of the above-mentioned circumstances, and has an object to provide a refueling method and refueling apparatus that can shorten the period of refueling work during regular inspections compared to the conventional method. [Means for solving the problem]

[0015] The present invention includes a number of means for solving the above problems. One example is a method for refueling a core of a boiling water reactor, comprising the steps of moving spent fuel that has completed a predetermined in-core residence cycle to a spent fuel pool, and temporarily storing fuel loaded at coordinates where core-related work is to be performed in the space left vacant after the movement of the spent fuel. Effect of the Invention

[0016] According to the present invention, the period of fuel exchange work in a periodic inspection can be shortened as compared with the conventional art. Objects, configurations and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]

[0017] [Figure 1] 1 is a plan view of a nuclear power plant equipped with a refueling apparatus and peripheral equipment according to a first embodiment. [Diagram 2] 1 is a top view of a nuclear power plant equipped with a refueling apparatus and peripheral equipment according to a first embodiment. [Diagram 3] FIG. 13 is a diagram illustrating a movement constraint related to fuel movement. [Figure 4] FIG. 2 is a functional block diagram of the fuel exchange device according to the first embodiment. [Diagram 5] FIG. 4 is a functional block diagram of another embodiment of the fuel exchange device according to the first embodiment. [Figure 6] FIG. 2 is a conceptual diagram of fuel movement in the fuel exchange method according to the first embodiment. [Figure 7] FIG. 2 is a flow chart showing an outline of the work flow in the fuel exchange method according to the first embodiment. [Figure 8] FIG. 4 is a diagram showing the effect of fuel movement by the refueling apparatus and the refueling method of the first embodiment. [Figure 9] FIG. 13 is a diagram showing a reactor shutdown margin evaluation result for confirming subcriticality of the reactor regarding the temporary placement of fuel on the outermost periphery of the core in the fuel exchange method according to the second embodiment. [Figure 10] FIG. 13 is a diagram showing an outline of fuel movement in a fuel exchange method according to a third embodiment. [Figure 11] 13 shows an example of output of fuel transfer information in the fuel exchange apparatus according to the fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] Hereinafter, embodiments of the refueling method and the refueling device of the present invention will be described with reference to the drawings. In the drawings used in this specification, the same or similar reference numerals are used to designate the same or corresponding components, and the repeated description of these components may be omitted.

[0019] First Embodiment A first embodiment of a refueling method and a refueling apparatus according to the present invention will be described with reference to FIGS.

[0020] First, the configuration of a nuclear power plant equipped with a fuel exchange device and peripheral equipment will be described with reference to Figures 1 to 3. Figure 1 is a plan view of a nuclear power plant equipped with a fuel exchange device and peripheral equipment according to a first embodiment, Figure 2 is a top view thereof, and Figure 3 is a diagram for explaining movement constraints related to fuel movement.

[0021] 1 and 2 show a nuclear power plant 1 during a regular inspection, which is equipped with a nuclear reactor 60, a spent fuel pool 70, a fuel exchange machine 80, a fuel arrangement management device 120, a display unit 110, an input device 112, etc.

[0022] Among these, the fuel exchange system for the core 63 of the nuclear reactor 60 is composed of a fuel exchange machine 80 and a fuel arrangement management system 120.

[0023] The reactor 60 has a reactor pressure vessel 61 and a reactor well 68 provided on the upper part thereof. The reactor pressure vessel 61 is surrounded by a reactor containment vessel (not shown for convenience of illustration) and is installed in a reactor building (not shown). The reactor 60 is connected to a spent fuel pool 70 via a gate section 72. Furthermore, a plurality of fuel assemblies 4 are arranged in each of the core 63 of the reactor pressure vessel 61 and the spent fuel pool 70. Furthermore, the reactor 60, the spent fuel pool 70, and the gate section 72 are filled with water W indicated by dots.

[0024] The core 63 of the nuclear reactor 60 is composed of fuel assemblies 4, control rods 5, neutron instrumentation tubes (not shown), etc. The fuel assemblies 4 are composed of a bundle of fuel rods and water rods placed inside a channel box. The fuel rods are filled with fuel pellets. The channel box forms a flow path for the coolant, and is heated by the fuel rods, preventing the floating of boiling steam. Outside the channel box, i.e., between the fuel assemblies, there is an area of ​​non-boiling water, which promotes the moderation of neutrons and also serves as a space for the insertion of control rods and a place to install neutron instrumentation tubes.

[0025] The reactor 60 is designed so that even if the control rod 5 with the maximum reactivity worth is not inserted, the reactor can be shut down by the other control rods 5. The reactor shutdown margin is an index showing the margin of the ability to shut down the reactor 60, and indicates how much margin the reactor 60 has against criticality when all the control rods 5 are inserted. If this reactor shutdown margin is equal to or greater than a predetermined value, it is determined that a subcritical state can be maintained.

[0026] 3 is a conceptual diagram of one section of a core 63 of a nuclear reactor 60. The core 63 of the nuclear reactor 60 is divided into a plurality of sections that are square in plan view, and each divided section is called a "cell 62."

[0027] 3(a), each cell 62 can accommodate four fuel assemblies 4. The upper surface of each fuel assembly 4 is provided with a rectangular ID (identification number) that is unique to each fuel assembly 4 and is stamped or printed thereon.

[0028] Here, if the fuel assemblies 4b and 4c are further removed from the state shown in FIG. 3(a) and an attempt is made to further remove the fuel assembly 4a, there is a risk that the fuel assembly 4a or the control rod 5 will tip over. Therefore, in order to satisfy the fuel movement constraints, a fuel assembly must be loaded or temporarily placed at the positions of the fuel assemblies 4b and 4c, or a double blade guide 6 corresponding to a dummy fuel must be inserted as shown in FIG. 3(b). In this case, the fuel assembly 4a cannot be further removed or loaded at the position of the fuel assembly 4a.

[0029] As shown in Fig. 3, the control rods 5 are cross-shaped and arranged in four fuel assemblies 4, i.e., one for each cell 62. The control rods 5 of a boiling water reactor are inserted from the bottom of the core. Neutron instrumentation tubes are installed in every 16 fuel assemblies 4.

[0030] Returning to Figures 1 and 2, the fuel exchange machine 80 is a device for moving the fuel assemblies 4 within the core 63 and between the core 63 and the spent fuel pool 70, and is equipped with a fuel exchange cart 81, an expansion tube 82, a cable 87, a fuel exchange control device 88, etc.

[0031] The refueling cart 81 is installed above the reactor 60 and the spent fuel pool 70 so as to be freely movable in the horizontal direction. The telescopic tube 82 is attached to the refueling cart 81, and moves the fuel assembly 4 in the vertical direction by gripping the fuel assembly 4 and telescopically extending and retracting. In this way, the refueling machine 80 can move the fuel assembly 4 to a desired position in the reactor 60 and the spent fuel pool 70.

[0032] The refueling trolley 81 and the telescopic pipe 82 are connected to a refueling control device 88 via a cable 87. The refueling control device 88 receives an operation signal instructing the contents of the refueling operation, etc., from the fuel arrangement management device 120, and moves the fuel assemblies 4 based on the operation signal. The refueling control device 88 can also execute the refueling operation, etc., through manual operation by an operator. The refueling control device 88 also outputs arrangement information of the fuel assemblies 4 after the refueling operation to the fuel arrangement management device 120.

[0033] 2, the refueling machine 80 is equipped with a pair of rails 83, another pair of rails 84, and a traverse cart 86. The rails 83 extend in the left-right direction in the figure above the reactor 60 and the spent fuel pool 70. The refueling cart 81 moves in the left-right direction along the upper surface of the rails 83. The rails 84 are laid on the upper surface of the refueling cart 81 in a direction perpendicular to the rails 83 (referred to as the front-rear direction), and move in the left-right direction along the rails 83 together with the traverse cart 86.

[0034] Furthermore, the traverse cart 86 moves in the front-rear direction along the rails 84. This allows the refueling cart 81 to move freely on a flat surface above the reactor 60 and the spent fuel pool 70, as described above.

[0035] The fuel arrangement management device 120 is a device that generates a fuel movement pattern and outputs an operation signal that instructs the fuel exchange control device 88 on the contents of the fuel exchange operation and the like. In this embodiment, the fuel arrangement management device 120 moves the spent fuel assemblies 4 that have passed a predetermined in-core residence cycle to the spent fuel pool 70, and then temporarily stores the fuel assemblies 4 loaded at the coordinates where the core-related operation is to be performed in the space left after the movement of the spent fuel assemblies 4. The details will be described later.

[0036] Moreover, it is preferable that the fuel arrangement management device 120 sets the spent fuel assemblies 4 as the spent fuel assemblies 4 loaded on the outermost periphery of the core 63. The details will be described later.

[0037] This fuel distribution management device 120 includes hardware as a general computer, such as a CPU (Central Processing Unit), RAM (Random Access Memory), ROM (Read Only Memory), SSD (Solid State Drive), etc., and the SSD stores an OS (Operating System), a management program, various data, etc. The OS and the management program are deployed in the RAM and executed by the CPU.

[0038] The input device 112 includes a mouse, a keyboard, and the like (not shown), and is operated by an operator.

[0039] FIG. 4 shows a functional block diagram of the fuel exchange device according to the first embodiment, and FIG. 5 shows a variation.

[0040] 4, the inside of the fuel arrangement management device 120 is shown as blocks representing functions realized by a management program, etc. The fuel arrangement management device 120 includes an input unit 122, a fuel transfer plan database 126, a fuel transfer pattern generation unit 124, a remote control unit 144, a fuel transfer record database 127, a fuel transfer plan display unit 145, an output unit 142, etc.

[0041] The input unit 122 receives operation information from an operator or preprogrammed control information from the input device 112, and generates a fuel transfer process in a fuel transfer pattern generation unit 124 based on fuel transfer source and destination information from a fuel transfer plan database 126. In accordance with the generated fuel transfer process, fuel transfer information is sent to a remote control unit 144, and this information is stored in a fuel transfer record database 127 to record the fuel transfer status. In addition, a fuel transfer plan display unit 145 sequentially outputs fuel transfer plans, and the output results from the output unit 142 are presented to the operator on the display unit 110.

[0042] The fuel arrangement management device 120A in Fig. 5 is a functional block diagram in which a fuel loading state monitoring unit 134 that monitors whether fuel loading is performed correctly is added to the fuel arrangement management device 120 shown in Fig. 4. The "fuel arrangement management device 120" described above or below can be appropriately replaced with the "fuel arrangement management device 120A".

[0043] Regarding fuel status monitoring, there are systems that use camera images to automatically read fuel IDs and compare them with fuel movement plan information to monitor whether the fuel loading status is always correct. Methods of fuel loading status monitoring that do not rely on camera images are also included.

[0044] FIG. 6 is a simplified schematic quarter plan view of core 63 of reactor 60 shown in FIG.

[0045] As shown in Fig. 6, the fuel assemblies 4 loaded in the core 63 are arranged in the cells 62. The numbers inscribed in the center of the cells 62 indicate the cycle numbers classified according to the in-core residence time of the fuel assemblies 4 in the cells 62, and are indicated by numbers from "1" to "5", with the cycle number of newly loaded fuel being "1" and the cycle number of fuel that is loaded in the core and is to be removed from the core after a certain period of time has elapsed being "5". In the refueling work, the 1-cycle fuel is moved to the position where the 2-cycle fuel was loaded, and similarly the 2-cycle fuel is moved to the 3-cycle fuel position, and the 3-cycle fuel is moved to the 4-cycle fuel position.

[0046] In the conventional fuel transfer method, first, the fuel loaded at the inspection position (area hatched with dots) (the fuel shown in FIG. 6 is one each of 1-cycle, 2-cycle, 3-cycle, and 4-cycle fuel) is removed to the spent fuel pool 70. At this point, the fuel loading position at the inspection position is empty, so inspection can begin.

[0047] After the start of inspection, fuel that has completed a predetermined in-core residence cycle (fuel loaded on the outermost periphery in this embodiment) is removed to the spent fuel pool 70. All fuel moved here is moved to the spent fuel pool 70, and the movement time from the reactor core 63 to the spent fuel pool 70 is longer than the movement within the core, which is a factor in lengthening the process.

[0048] In fuel transfer, the fuel transfer source and the transfer destination are paired to enable the fuel transfer. Therefore, if there is no free space at the fuel transfer destination, the fuel loaded at that location is moved to another location to create free space, making it possible to transfer the fuel. Based on these findings, if there is another free space in the reactor regardless of the outermost circumference, the fuel loaded at the candidate location for the transfer destination is moved to that free space to secure the free space at the transfer destination, and the distance of the fuel transfer can be reduced.

[0049] Furthermore, in order to create empty space within the reactor 60, spent fuel that has completed a specified number of in-reactor residence cycles (fuel with five cycles) can be removed to the spent fuel pool 70, thereby creating empty space to which the fuel is to be moved without having to move any additional fuel to the spent fuel pool 70.

[0050] In the first embodiment, first, the spent fuel from the fifth cycle loaded on the outermost periphery as fuel that has completed a predetermined in-core residence cycle shown in Fig. 6 is moved to the spent fuel pool 70. After that, the fuel loaded at the inspection position (one each of 1st cycle, 2nd cycle, 3rd cycle, and 4th cycle fuels are loaded at the inspection position shown in Fig. 6) is moved to the space that has been vacated by removing the fuel.

[0051] In this movement, the empty space on the outermost circumference is the space where the 4th and 5th cycle fuels should be loaded, so the space where the 1st and 2nd cycle fuels loaded in the inspection position should be loaded does not exist on the outermost circumference. Therefore, these fuels are temporarily placed on the outermost circumference.

[0052] However, in the case of temporary storage, it is strongly recommended to confirm whether subcriticality can be ensured by loading fuel that is not the cycle fuel that should be loaded in that space.

[0053] The above-mentioned flow of fuel movement will be explained using a flow chart in Fig. 7. Fig. 7 is a flow chart showing an outline of the flow of work in the fuel exchange method according to the first embodiment.

[0054] First, as shown in FIG. 7, the spent fuel assemblies 4 that are present on the outermost periphery and in the reactor 60 and that have completed a predetermined in-reactor residence cycle are moved to the spent fuel pool 70 (S11).

[0055] Thereafter, the fuel assemblies 4 loaded at the positions where the inspection (core-related work) will be performed are temporarily placed in the empty spaces created at the outermost periphery in the previous step S11 (S12).

[0056] Next, it is determined whether or not fuel assemblies 4 are still present at the inspection position (S13), and if it is determined that fuel assemblies 4 are still present, the process proceeds to step S14, where temporary placement is also performed in the empty space inside the reactor 60 created in step S11 (S14), and all fuel assemblies 4 at the inspection position are temporarily placed in the empty space for temporary placement. Note that, if there is no more empty space left inside the reactor 60, the minimum number of fuel assemblies 4 are moved to the spent fuel pool 70.

[0057] If it is determined in step S13 that no fuel is present, or after step S14 is completed, the inspection work can begin when all fuel has been drained from the inspection position, and the inspection work is then performed (S15).

[0058] The inspection work includes work using the refueling cart 81 used for fuel movement, but this is not always necessary, and if it is not required, the refueling cart 81 will be in a waiting state for work.

[0059] Since the overall construction period can be shortened by performing in-core movement to positions other than the inspection position in parallel, in-core fuel movement to positions other than the inspection position is performed (S16) depending on the work situation without waiting for completion of step 15. Here, regarding the in-core movement in S16, continuous fuel movement can be realized by performing the domino movement of fuel shown in the third embodiment described later.

[0060] After the inspection work is completed, the fuel for the appropriate number of cycles is moved to the inspection position (S17), and new fuel is loaded into the position of the first cycle fuel (S18), completing the fuel movement (shuffling).

[0061] 8 is a diagram showing the effect of fuel transfer by the fuel exchange apparatus and the fuel exchange method of the first embodiment, and shows the process of inspection work in a boiling water reactor. In FIG. 8, the number of fuel assemblies transferred is assumed to be 872.

[0062] As shown in Fig. 8, in the conventional method, all fuel assemblies 4 are moved to the spent fuel pool 70, and the fuel is then moved to an appropriate loading location after the inspection work is completed, whereas in the present invention, the fuel is moved as much as possible using in-core movement, shortening the movement time between the spent fuel pool 70 and the inside of the core 60 by about two-thirds, and it is expected that the overall process can be shortened by about one day. This effect varies depending on the number of inspections and the number of fuel bodies to be moved, and the effect can also be achieved by parallelizing the fuel movement work and the inspection work.

[0063] Next, the effects of this embodiment will be described.

[0064] The fuel exchange device for the core 63 of the nuclear reactor 60 according to the first embodiment of the present invention includes a fuel exchange machine 80 for moving the fuel assemblies 4 within the core 63 and between the core 63 and the spent fuel pool 70, and a fuel arrangement management device 120 for generating a fuel movement pattern, and the fuel arrangement management device 120 moves the spent fuel assemblies 4 that have passed a predetermined in-core stay cycle to the spent fuel pool 70, and then temporarily stores the fuel assemblies 4 loaded at the coordinates where the core-related work is performed in the empty space after the movement of the spent fuel assemblies 4. The fuel exchange method for the core 63 of the nuclear reactor 60 according to the first embodiment of the present invention includes a step of moving the spent fuel assemblies 4 that have passed a predetermined in-core stay cycle to the spent fuel pool 70, and a step of temporarily storing the fuel assemblies 4 loaded at the coordinates where the core-related work is performed in the empty space after the movement of the spent fuel assemblies 4.

[0065] This minimizes the amount of fuel movement to the spent fuel pool 70, making it possible to shorten the fuel movement time during fuel shuffling, and therefore shorten the steps in regular inspections compared to conventional methods.

[0066] In addition, since the spent fuel assemblies 4 are loaded at the outermost periphery of the core 63, fuel with a high burnup can be temporarily stored at the outermost periphery, making it possible to easily ensure subcriticality, and making it possible to temporarily store fuel assemblies 4 of various burnups while ensuring subcriticality.

[0067] <Second embodiment> A fuel exchange method and a fuel exchange apparatus according to a second embodiment of the present invention will be described with reference to Fig. 9. Fig. 9 is a diagram showing a reactor shutdown margin evaluation method for confirming subcriticality of a nuclear reactor with respect to temporary fuel placement on the outermost periphery of the core.

[0068] In the second embodiment, in addition to the spent fuel assemblies 4 that have completed a specified number of in-core residence cycles, fuel assemblies 4 (mainly 4-cycle fuel assemblies 4) other than the spent fuel assemblies 4 located at the outermost periphery (5-cycle fuel assemblies 4) are also targeted for removal to create a temporary storage area, thereby creating free space to which fuel can be moved without separately checking the subcriticality of the fuel during temporary storage.

[0069] The hatched portions in the lattice shown in this embodiment of FIG. 6 indicate the portions where fuel is removed from the core.

[0070] In the first step, in addition to the five-cycle fuel present at the outermost periphery, the four-cycle fuel is removed from the reactor core 63. In the second step, the one-cycle fuel and two-cycle fuel at the inspection position are temporarily placed at the outermost periphery. In the third step, the three-cycle fuel is moved to the four-cycle fuel position at the outermost periphery, and the four-cycle fuel is moved to the five-cycle fuel position at the outermost periphery.

[0071] The above steps remove all fuel from the inspection position, so inspection work can begin at the inspection position. Note that the order of steps 3 and 4 does not matter, as the subsequent state will be the same regardless of which step is performed first.

[0072] Figure 9 shows the results of evaluating subcriticality using the reactor shutdown margin in the case where one control rod 5 falls when first cycle fuel with high burnup is loaded on the outermost circumference. If the reactor shutdown margin is 1% dk or more, it can be evaluated that subcriticality can be ensured.

[0073] In Figure 9, for fuel assembly 4d, which is on the inside and surrounded by control rods 5, fuel assembly 4e, which is on the outermost periphery and has no control rods 5 around it, and temporary storage fuel assembly 4f, which has high reactivity, as shown in Figure 9, if one control rod 5 falls, the reactor shutdown margin is 4.7% in case 1, 3.4% in case 2, and 2.7% in case 3, and it was confirmed that these values ​​can be secured in all cases. There are areas in some places where there are no control rods around, but even in those cases, subcriticality is guaranteed. From the above, it is possible to move fuel within the reactor using the empty space on the outermost periphery as temporary storage space for fuel with any number of cycles.

[0074] In addition, when there are many inspection positions, the number of fuels to be removed from the inspection positions also increases, and it may be the case that all the fuels cannot be loaded into the empty space created by removing the fuels from the outermost periphery. In that case, among the in-core four-cycle fuels other than the inspection positions, fuels that have completed a predetermined number of in-core residence cycles are removed to the spent fuel pool 70 to create empty space other than the outermost periphery, and the four-cycle fuels loaded at the inspection positions can be temporarily placed there, allowing the fuels at the inspection positions to be removed.

[0075] The other configurations and operations are substantially the same as those of the refueling method and refueling device of the first embodiment described above, and details thereof will be omitted.

[0076] The refueling method and refueling apparatus according to the second embodiment of the present invention also provides substantially the same effects as those of the refueling method and refueling apparatus according to the first embodiment described above.

[0077] In addition, by further including a step of temporarily moving the fuel assemblies 4 loaded on the outermost periphery of the core 63 to the spent fuel pool 70, and a step of temporarily placing the fuel assemblies 4 loaded at the coordinates where core-related work will be performed in the empty space created by the temporary movement, it is possible to realize in-core movement while reliably ensuring subcriticality.

[0078] <Third embodiment> A refueling method and a refueling apparatus according to a third embodiment of the present invention will be described with reference to Fig. 10. Fig. 10 is a diagram showing an outline of fuel movement in the refueling method according to the third embodiment.

[0079] In the third embodiment, similarly to the first embodiment, the fuel assemblies 4 to be removed are removed to the spent fuel pool 70, but the spent fuel assemblies 4 that have completed a specified number of in-core residence cycles are N+2 cycle fuel, and the N+1 cycle fuel is moved to the position of the N+2 cycle fuel that has become vacant due to the movement, and the N cycle fuel is moved to the position of the N+1 cycle fuel that has become vacant due to the movement.

[0080] More specifically, without removing all of the fuel that is to be removed, the same number of fuel assemblies 4 as the fuel assemblies 4 loaded in the cell 62 at the inspection position are removed. This creates a state in which fuel assemblies 4 are loaded in the cells 62 other than the cell 62 at the inspection position, and the fuel assemblies 4 in the cell 62 at the inspection position have been removed, making it possible to start the inspection work.

[0081] After the inspection work has started, fuel is moved to locations other than the inspection location. However, since the number of fuel exchange machines 80 used for fuel movement is limited, fuel movement can be carried out if there is fuel loading space equivalent to that number of machines.

[0082] Therefore, the fuel arrangement management device 120 can achieve fuel movement by moving the fuel assemblies 4 to the position in the reactor where they will be subsequently loaded, by only moving the minimum number of fuel assemblies 4 required to the spent fuel pool 70.

[0083] In addition, in order to prepare a destination for the fuel assembly 4, it is desirable for the fuel arrangement management device 120 to move the fuel assembly 4 loaded in the cell 62 at the target position to the position of a cell 62 where a fuel assembly 4 with an equivalent or longer in-core residence time is loaded.

[0084] More specifically, as shown in FIG. 10, the 3-cycle fuel moves to the 4-cycle fuel position, the 2-cycle fuel moves to the 3-cycle fuel position vacated by the previous move, and the 1-cycle fuel moves to the 2-cycle fuel position vacated by the previous move (hereinafter referred to as cascading moves), thereby enabling fuel moves to be performed continuously.

[0085] In Figure 10, the numbers with circles indicate the location of the fuel loading destination. In (a), the 3-cycle fuel is moved to the 4-cycle fuel position, in (b), the 2-cycle fuel is moved to the 3-cycle fuel position, in (c), the 1-cycle fuel is moved to the 2-cycle fuel position, and in (d), the 1-cycle fuel position becomes an empty space.

[0086] The empty space at the 1-cycle fuel position created by the above-mentioned cascade movement will eventually be filled with new fuel from outside the reactor, but in this cascade movement, the 4-cycle fuel is temporarily placed in the 1-cycle fuel position vacated by the previous movement to enable the next cascade movement. This allows the 3-cycle fuel to move to the 4-cycle fuel position, and the next cascade movement can be performed.

[0087] Regarding the fuel temporarily stored at the 1-cycle position in order to continue the cascade movement, after the fuel movement is completed, it will be moved to the spent fuel pool 70 or the final loading position within the reactor, and new fuel will be loaded into the 1-cycle fuel position, completing the fuel movement.

[0088] In the cascading movement in the third embodiment, since there is no free space other than the fuel movement destination space other than the inspection position, no constraints are imposed on the fuel movement, and there is a degree of freedom in selecting the fuel movement source.

[0089] 3, the double blade guide 6 may be necessary, but in the third embodiment, since there is only an empty space at the destination position and the other cells are loaded with fuel, it is possible to load and unload fuel without using the double blade guide 6. Since the movement of the double blade guide 6 is no longer necessary, a further shortening of the fuel movement process can be expected.

[0090] The other configurations and operations are substantially the same as those of the refueling method and refueling device of the first embodiment described above, and details thereof will be omitted.

[0091] The refueling method and refueling apparatus according to the third embodiment of the present invention also provides substantially the same effects as those of the refueling method and refueling apparatus according to the first embodiment described above.

[0092] In addition, when the fuel is moved within the reactor, the spent fuel that has passed a predetermined in-reactor residence cycle is N+2 cycle fuel, and by further having a step of moving the N+1 cycle fuel to the position of the N+2 cycle fuel that has become vacant due to the movement and moving the N cycle fuel to the position of the N+1 cycle fuel that has become vacant due to the movement, it becomes possible to move the in-reactor fuel to a position other than the inspection work position during the inspection work, so that the fuel movement work and the inspection work can be performed in parallel, and the movement between the reactor core 63 and the spent fuel pool 70, which is a factor of prolonging the fuel movement due to the frequent use of fuel exchange by the in-reactor movement, can be minimized, and the construction period can be further shortened. Furthermore, since the next fuel assembly 4 is loaded into the space from which the fuel assembly 4 was extracted, the adjacent fuel assembly 4 in the same cell 62 cannot be extracted, and the extracted fuel assembly 4 must be in a diagonal position. This makes it possible to easily satisfy the constraints on the extraction and loading of the in-reactor fuel, and further process shortening effects can be expected.

[0093] Furthermore, by further including a step of temporarily moving the fuel assembly 4 loaded at the desired position to a position where a fuel assembly 4 having an equivalent or longer in-core residence time is loaded, it is possible to realize in-core movement while ensuring subcriticality and achieve a shortened process.

[0094] <Fourth embodiment> A refueling method and a refueling apparatus according to a fourth embodiment of the present invention will be described with reference to Fig. 11. Fig. 11 shows an example of output of fuel transfer information in the refueling apparatus according to the fourth embodiment.

[0095] In the fourth embodiment, it is possible to confirm that the planned fuel transfer is being reliably performed by displaying the fuel transfer pattern and the next fuel transfer information on the display unit 110. An example of the display screen 50 on the display unit 110 is shown in FIG.

[0096] In the display screen 50 in FIG. 11, the inside of the core 63 is displayed on the left side of the screen, and the internal reactor conditions can be confirmed in more detail by using the Zoom button. The source and destination positions of the fuel to be moved in the next step are displayed in a rectangular frame on the screen, allowing the movement plan to be understood at a glance. The coordinates of the source and destination of the fuel and the ID of the fuel are displayed on the right side of the screen. By displaying the image of a separately installed camera (not shown), it is possible to check in real time whether the movement is being performed correctly.

[0097] The other configurations and operations are substantially the same as those of the refueling method and refueling apparatus of the first embodiment described above, and details thereof will be omitted.

[0098] The refueling method and refueling apparatus according to the fourth embodiment of the present invention also provides substantially the same effects as those of the refueling method and refueling apparatus according to the first embodiment described above.

[0099] In addition, by further including a step of displaying the movement pattern of the fuel assembly 4 and the fuel movement information for the next step on the display unit 110, the user can easily grasp the progress of the work and whether the movement work is proceeding correctly.

[0100] <Other> The present invention is not limited to the above-mentioned embodiment, but includes various modified examples. The above-mentioned embodiment has been described in detail to explain the present invention in an easily understandable manner, and the present invention is not necessarily limited to the embodiment having all of the described configurations.

[0101] It is also possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, to add the configuration of another embodiment to the configuration of one embodiment, and to add, delete, or replace part of the configuration of each embodiment with the configuration of another embodiment.

[0102] For example, the functions described above may be implemented in hardware, or may be programmed and implemented in software. [Explanation of symbols]

[0103] 1. Nuclear power plant 4,4a,4b,4c,4d,4e,4f…Fuel assembly 5…Control rod 6…Double blade guide 50…Display screen 60…Nuclear reactor 61...Reactor pressure vessel 62...Cell (division) 63…Core 68…Reactor well 70…Spent Fuel Pool (SFP) 72…Gate section 80…Fuel exchange machine 81…Fuel exchange trolley 82...Extension pipe 83,84…Rail 86…Traverse cart 87…Cable 88...Fuel exchange control device 110...Display section 112...Input device 120,120A…Fuel placement management device 122...Input section 124...Fuel movement pattern generation unit 126...Fuel Transfer Plan Database 127...Fuel transfer record database 134…Fuel loading status monitoring unit 142...Output section 144...Remote control unit 145…Fuel transfer plan display section W…Water

Claims

1. 1. A method for refueling a core of a boiling water nuclear reactor, comprising: transferring spent fuel that has completed a predetermined in-core residence cycle to a spent fuel pool; and temporarily placing the fuel loaded at the coordinates where the core-related work is performed in the space left after the spent fuel is moved. How to change fuel.

2. 2. The refueling method of claim 1, The spent fuel that has passed the predetermined in-core residence cycle is loaded as fuel at the outermost periphery of the core. How to change fuel.

3. 2. The refueling method of claim 1, The method further includes a step of moving the fuel within the reactor, where N is a natural number, and the spent fuel that has completed the predetermined in-reactor residence cycle is an N+2 cycle fuel, moving the N+1 cycle fuel to a position of the N+2 cycle fuel that has become vacant due to the movement, and moving the N cycle fuel to a position of the N+1 cycle fuel that has become vacant due to the movement. How to change fuel.

4. 2. The refueling method of claim 1, The spent fuel that has passed the predetermined in-core residence cycle is fuel loaded at the outermost periphery of the core, The method further includes a step of temporarily placing the fuel loaded at the coordinates where the core-related work is performed in the vacant space created by moving the fuel. How to change fuel.

5. 2. The refueling method of claim 1, comprising: When the fuel is moved within the reactor, the fuel is temporarily placed in a vacant space of a cycle fuel having an equivalent or longer residence time within the reactor. How to change fuel.

6. 2. The refueling method of claim 1, The method further includes a step of displaying the fuel movement pattern and fuel movement information for the next step on a display device. How to change fuel.

7. 1. A refueling apparatus for a boiling water nuclear reactor core, comprising: a refueling machine for moving fuel within the reactor core and between the reactor core and a spent fuel pool; A fuel arrangement management device that generates a fuel movement pattern, The fuel distribution management device includes: Spent fuel that has completed a predetermined in-core residence cycle is moved to the spent fuel pool, and then fuel loaded at the coordinates where core-related work is to be performed is moved to the space left after the movement of the spent fuel. Fuel exchange device.

8. 8. The refueling system of claim 7, The fuel arrangement management device arranges the spent fuel that has passed the predetermined in-core residence cycle as fuel loaded on the outermost periphery of the core. Fuel exchange device.

9. 8. The refueling system of claim 7, When the fuel is moved within the reactor, the spent fuel that has passed the predetermined in-reactor residence cycle is N+2 cycle fuel, and N+1 cycle fuel is moved to the position of the N+2 cycle fuel that has become vacant due to the movement, and N cycle fuel is moved to the position of the N+1 cycle fuel that has become vacant due to the movement. Fuel exchange device.

10. 8. The refueling system of claim 7, The fuel arrangement management device moves the spent fuel that has passed the predetermined in-core residence cycle to the spent fuel pool, and moves the fuel loaded at the coordinates where the core-related work is to be performed to the created vacant space. Fuel exchange device.

11. 8. The refueling system of claim 7, The fuel arrangement management device moves the fuel loaded at a target position to a vacant space of cycle fuel that has an in-core residence time equal to or longer than the fuel arrangement management device. Fuel exchange device.

12. 8. The refueling system of claim 7, and a display device for displaying the fuel transfer pattern and next fuel transfer information. Fuel exchange device.

Citation Information

Patent Citations

  • Method for loading reactor core of million-kilowatt pressurized water reactor nuclear power plant for 18 months

    CN112259269A

  • Method for preparing fuel exchange procedure

    JP1989312491A

  • Supporting device for planning of fuel transfer

    JP1991248093A

  • Fuel loading method and core of nuclear reactor

    JP1993080175A

  • Operation method for reactor core

    JP1997127281A

Cited By

  • Low temperature indicator mixture, device and method for monitoring a temperature transition at low temperatures

    US12370541B2