Field water level management system

The field water level management system addresses inefficiencies in conventional water level adjustment by scheduling water supply and drainage to optimize field operations, ensuring stable seedling posture and tool durability, and enhancing operational efficiency.

JP2024165933AInactive Publication Date: 2024-11-28ISEKI & CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023082534
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-18
Publication Date
2024-11-28
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Conventional water level adjustment devices in fields do not manage water levels according to a time schedule, leading to inefficiencies and challenges in field operations such as seedling planting.

Method used

A field water level management system that controls water supply and drainage devices to maintain optimal water levels based on a predetermined schedule, incorporating real-time precipitation forecasts and soil quality adjustments to ensure efficient and stable field operations.

Benefits of technology

Enables efficient field work by stabilizing seedling posture, preventing floating seedlings, improving visibility of markers, and enhancing the durability of planting tools, thereby improving overall workability and operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024165933000001_ABST
    Figure 2024165933000001_ABST
Patent Text Reader

Abstract

To provide a field water level management system that can perform work in a field by water level management control of a field according to a time schedule or can perform the water level management of the field according to the time schedule of the work, since a conventional water level adjustment device for managing the water level of the field adjusts the water level of the field by manual operation and cannot manage the water level of the field according to the time schedule.SOLUTION: In a field water level management system that manages a water level of a field F by controlling a water supply device 1 that supplies water into the field F and / or a drainage device 2 that drains water from the field, a work start time schedule for work such as seedling planting is determined based on the water level management of the field F.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a water level management system for a farm field. [Background technology]

[0002] 2. Description of the Related Art Conventionally, there is a water level adjusting device that manages the water level in a farm field (see, for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2017-051137 A Summary of the Invention [Problem to be solved by the invention]

[0004] Conventional water level adjustment devices adjust the water level in a field manually, and do not manage the water level in the field according to a time schedule.

[0005] The present invention has been made in consideration of the above, and aims to provide a field water level management system that enables field work to be carried out in accordance with a time schedule by controlling the water level in the field, or that can manage the water level in the field in accordance with the work time schedule. [Means for solving the problem]

[0006] The invention described in claim 1 is a field water level management system that manages the water level of field F by controlling a water supply device 1 that supplies water into field F and / or a drainage device 2 that drains water from the field, and that determines a time schedule for starting work such as seedling planting based on the water level management of field F.

[0007] According to the invention described in claim 1, the start time schedule for work such as planting seedlings is determined based on the water level management of the field F, so that work can be carried out efficiently and with good workability.

[0008] In addition, because the water level in the field F is at the specified appropriate level for work, for example, when planting seedlings, the posture of the seedlings can be stabilized and the seedlings can be prevented from floating, the line marker marks drawn in the field F are easily visible, making it easier to operate the machine in a straight line, and the durability of the planting tines, etc. can be improved.

[0009] The invention described in claim 2 is a water level management system for a field as described in claim 1, which calculates the drainage volume of the drainage device 2 so that the water level in the field F becomes a predetermined water level, and adds the precipitation amount in a real-time precipitation forecast to the drainage volume to determine the work start time schedule.

[0010] The invention described in claim 3 is a water level management system for a farm field described in claim 1 or claim 2, which calculates the discharge time required to reach a predetermined water level from the discharge amount per unit time of the drainage device 2, and determines a time schedule for starting work such as planting seedlings.

[0011] The invention described in claim 4 is a water level management system for a farm field described in claim 1 or claim 2, which corrects the time schedule according to the soil quality of the field F.

[0012] The invention described in claim 5 is the water level management system for a farm field described in claim 1 or claim 2, which starts water supply to the farm field F by the water supply device 1 when it is determined that work in the farm field F has been completed.

[0013] The invention recited in claim 6 is the water level management system for a farm field recited in claim 5, in which the water level supplied by the water supply device 1 is calculated in accordance with the setting of the planting depth of the transplanter 20 that has performed the work. [Brief description of the drawings]

[0014] [Figure 1] 1 is an overall schematic diagram of a water level management system according to an embodiment of the present invention. [Diagram 2]FIG. 1 is a schematic diagram of the entire area around a farm field. [Diagram 3] FIG. 2 is a side view of a riding rice transplanter. [Figure 4] FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] Hereinafter, an embodiment of a water level management system for a farm field disclosed in the present application will be described in detail with reference to the accompanying drawings. Note that the present invention is not limited to the embodiment described below.

[0016] <Configuration of the field water level management system> Figure 1 is an overall schematic diagram showing a water supply device 1 that fills water into field F, a drainage device 2 that drains water from field F, a water level sensor 3 that measures the water level in field F, an Internet communication network wireless repeater 4, a mobile terminal 5 (tablet) operated by a worker, and a management server 6.

[0017] FIG. 2 is a schematic overall view of each of the farm fields F1 to F17, the intake channel W1, the drainage channel W2, and the farm road R in which the water supply device 1 and the drainage device 2 are installed.

[0018] The water supply device 1 is equipped at the bottom with an electric water supply pump 7 that draws up water from the intake channel W1 and a water supply valve 8 that is opened and closed by an electric motor that puts the water drawn up by the electric water supply pump 7 into the field F, and is equipped at the top with a solar panel 9 and a power storage device (battery) that supply power to the electric motor that opens and closes the electric water supply pump 7 and the water supply valve 8.

[0019] The drainage device 2 is equipped at its lower part with an electric drainage pump 10 that sucks up water from the field F and a drainage valve 11 that is opened and closed by an electric motor that drains the water sucked up by the electric drainage pump 10 into a drainage channel W2, and is equipped at its upper part with a solar panel 9 and a power storage device (battery) that supply power to the electric motor that opens and closes the electric drainage pump 10 and the drainage valve 11.

[0020] The water level sensor 3 has its lower portion inserted into the field F near the water supply device 1, and measures the water depth with an electrode at its lower portion. Electricity to the water level sensor 3 is supplied from the water supply device 1.

[0021] The internet communication network wireless repeater 4 is installed near the farm field F, and allows the water supply device 1, the drainage device 2, the water level sensor 3 and the management server 6 to share information (commands) with each other via the internet.

[0022] The mobile terminal 5 is a tablet that is generally available on the market, and shares information (commands) with the management server 6 via the Internet.

[0023] The management server 6 is installed in a base house, stores a map database in which the fields F1 to F17 owned by users are registered, and has a field water level management system. It receives water level information from the water level sensor 3, real-time precipitation forecast information from weather information, and work information from a ride-on rice transplanter 20 (which may be any type of rice transplanter, such as an autonomously traveling fully automatic rice transplanter, or may be a direct seeding machine for paddy fields) that performs rice planting work as a transplanter in the field F, and issues commands to the water supply device 1 and drainage device 2 to perform water supply management and drainage management.

[0024] <Configuration of riding rice transplanter 20> FIG. 3 is a side view of an eight-row riding rice transplanter 20 for performing rice planting work in a farm field F.

[0025] The riding rice transplanter 20 includes a traveling body 21 capable of traveling in a field. The traveling body 21 includes a pair of left and right front wheels 23 and a pair of left and right rear wheels 24. The traveling body 21 is, for example, a four-wheel drive in which the front wheels 23 and the rear wheels 24 are driven. A seedling planting unit 50 that is raised and lowered by a lifting device 40 is provided at the rear of the traveling body 21.

[0026] The traveling body 21 includes a machine frame 25, an engine E mounted on the machine frame 25, and a power transmission device 26 that transmits the power generated by the engine E to the drive wheels and the seedling planting unit 50. In other words, the power generated by the engine E, which is the power source, is used not only to move the traveling body 21 forward or backward, but also to drive the seedling planting unit 50.

[0027] The engine E is disposed in the center of the traveling body 21 in the left-right direction at a position protruding above a floor step 27 on which an operator who gets on the traveling body 21 places his / her feet.

[0028] The floor step 27 is provided from the front of the vehicle body 21 to the rear of the engine E.

[0029] The floor step 27 is attached onto the vehicle frame 25. Of the floor step 27, for example, a part near a cockpit 29 described later is formed in a lattice shape in a plan view so that mud adhering to the worker's shoes can be removed into the field.

[0030] A front step 27F is provided in front of the floor step 27, and left and right extended side steps 27S are provided on the left and right outer sides of the floor step 27. A rear step 27R that also serves as a fender for the rear wheel 24 is provided in the rear of the floor step 27, and a boarding and alighting step for an operator to board and alight from the vehicle body is provided on the outer sides of the left and right extended side steps 27S.

[0031] The engine E is covered by an engine cover 28. A cockpit 29 is provided above the engine cover 28.

[0032] The power transmission device 26 includes a belt-type power transmission section to which power is transmitted from the engine E, a hydraulic continuously variable transmission which is a transmission device that changes the speed of the power transmitted from the engine E via the belt-type power transmission section, and a transmission case.

[0033] The hydraulic continuously variable transmission is, for example, a hydrostatic continuously variable transmission known as HST. The hydraulic continuously variable transmission can change the output (rotation speed) and output direction (rotation direction) by operating the main shift lever. In other words, the hydraulic continuously variable transmission can change the forward / reverse movement and traveling speed of the traveling vehicle body 21 by changing the rotation speed and rotation direction.

[0034] The transmission case is provided with a transmission device that transmits the power from the engine E, which is changed in speed by the hydraulic continuously variable transmission, to each part. The transmission case is equipped with an auxiliary transmission mechanism that switches the traveling speed during travel and work. When the auxiliary transmission lever is operated, the transmission case can switch the traveling speed of the traveling body 21 between a low working speed during planting work and a high travel speed for transportation.

[0035] The traveling body 21 is equipped with a steering handle 30, a planting lever, and the like, in front of the driver's seat 29. The steering handle 30 is provided on the top of the bonnet 31 of the traveling body 21, and is operated by an operator to steer the traveling body 21. The planting lever is a clutch lever, and is provided on the bonnet 31, and is a lever that is operated to raise and lower the seedling planting unit 50 and to start and stop planting of seedlings by the seedling planting unit 50.

[0036] A display unit (monitor) 32 is provided on the upper part of the bonnet 31. The display unit 32 has a display surface that is inclined downward and rearward so as to face an operator who is seated in the cockpit 29 and faces forward.

[0037] The display unit 32 displays information from various sensors, such as a marker sensor that detects whether a line drawing marker 60 (described later), which forms a travel reference line on the field scene as a guide for straight driving, is present on the left or right side of the traveling vehicle body, a planting lever position sensor that detects the operating position of the planting lever, a main shift lever position sensor that detects the operating position of the main shift lever, a sub-shift lever position sensor that detects the operating position of the sub-shift lever, a fertilizer out-of-stock sensor that detects when the amount of fertilizer stored in the storage hopper falls below a predetermined amount and a fertilizer clogging sensor that detects when the fertilizer sent from the storage hopper has clogged the supply path if a fertilizer application device is provided, a chemical out-of-stock sensor that detects when the amount of chemical stored in the chemical tank falls below a predetermined amount and a chemical clogging sensor that detects when the chemical sent from the chemical tank has clogged the supply path if a chemical spraying device is provided, and information transmitted from the management server 6 via the Internet.

[0038] The riding rice transplanter 20 is equipped with a lifting device 40 and a seedling planting section 50.

[0039] The lifting device 40 is a parallel link that connects the rear of the running body 21 to the seedling planting unit 50, and is connected to both the link frame at the rear of the running body 21 and the seedling planting unit 50 so that it can rotate freely in the vertical direction, thereby connecting the seedling planting unit 50 to the running body 21 in a manner that allows it to be raised and lowered.

[0040] The lifting device 40 also includes a hydraulic lifting cylinder 41. The lifting cylinder 41 expands and contracts when the planting lever is operated to switch the hydraulic valve. The lifting cylinder 41 expands and contracts to drive the lifting link 42 and raise and lower the seedling planting unit 50. That is, when the planting lever is operated, the lifting cylinder 41 switches between a non-working position where the seedling planting unit 50 is raised and a ground work position (planting position) where the seedling planting unit 50 is lowered.

[0041] As described above, the seedling planting unit 50 is attached to the rear of the traveling body 21 via the lifting link 42. The seedling planting unit 50 plants seedlings in eight rows. The seedling planting unit 50 includes a seedling placement table 51, a float 52, and a planting device 53.

[0042] The seedling placement table 51 has eight seedling placement surfaces in the left-right direction of the machine body, the number of which corresponds to the number of planting rows. Each seedling placement surface is a downwardly sloping surface on which multiple mat seedlings (mat seedlings with soil) can be placed in the vertical direction.

[0043] A vertical seedling transport belt operated by an electric motor is provided on each seedling placement surface of the seedling placement table 51, and the electric motor is operated at the left and right moving ends of the seedling placement table 51 to transport the mat-like seedlings with soil placed on each seedling placement surface downward by one seedling at a time.

[0044] When some of the planting devices 53 are stopped with the ridge clutch lever to plant a fractional number of rows, the electric motor of the seedling vertical feed belt on the seedling loading surface corresponding to the planting device 53 stopped by the ridge clutch lever is slightly reversed to slightly reverse the seedling vertical feed belt and prevent the mat-like seedlings with soil from being crushed and to prevent problems such as seedling clogging.

[0045] In addition, the greater the amount of lateral movement of the seedling placement table 51, the more likely the seedlings are to be crushed. Therefore, the greater the amount of lateral movement, the greater the amount of reverse rotation of the electric motor and the more the seedling vertical feed belt is reversed, thereby appropriately preventing the seedlings from being crushed.

[0046] The float 52 levels the field (paddy field) while gliding over the field surface in accordance with the movement of the traveling vehicle body 21. The float 52 includes a center float arranged in the center of the machine body in the left-right direction, and side floats arranged on the outside in the left-right direction with the center float sandwiched between them. The illustrated riding rice transplanter 20 includes a soil leveling rotor 54, which is a soil leveling device.

[0047] The rear portions of each float (center float and side float) of the float 52 are rotatably attached to the planting frame of the seedling planting section 50 so that the front portions can move up and down in response to the unevenness of the field surface.

[0048] The planting depth of the seedlings can be adjusted by adjusting up and down the pivot shaft attached to the rear of the float 52 in a freely rotatable manner using a well-known planting depth adjustment lever.

[0049] A planting depth adjustment position detection sensor is provided to detect the adjustment position of the planting depth adjustment lever, and planting depth adjustment position information (planting depth adjustment information) detected by the planting depth adjustment position detection sensor is transmitted to the management server 6 via the Internet by the transmitter / receiver 63.

[0050] During planting, the up and down movement of the front part of the center float is detected by a rotation sensor, and depending on the detection result of the rotation sensor, the control unit switches the hydraulic valve that controls the extension and contraction movement of the lifting cylinder 41 to raise and lower the seedling planting section 50, thereby adjusting the planting depth of the seedlings.

[0051] The planting device 53 is supported by the planting frame of the seedling placement table 51 and is disposed below the seedling placement table 51. The planting device 53 has a general configuration in which a planting tool with planting claws is attached to both ends of a rotary case containing a variable speed transmission device consisting of an eccentric gear train, and the planting claws of the planting tool scrape off one seedling from the soil-covered mat-like seedlings placed on the seedling placement table 51 and plant it in a field.

[0052] The riding rice transplanter 20 is equipped with a spare seedling carrying section 60' on each of the left and right sides at the front of the running body 21, a GPS receiver 62' and a transmitter / receiver 63 mounted on a front support 61', a center mascot 64 mounted in the center on the left and right, and a control device 65 mounted inside the bonnet 31.

[0053] The control device 65 performs rice planting work in the field F while receiving signals from a positioning satellite using the GPS receiver 62' and calculating position information using the satellite positioning system, and transmits the position information of the riding rice transplanter 20 in real time to the management server 6 via the Internet using the transmitter / receiver 63.

[0054] The center mascot 64 allows the operator seated in the cockpit 29 to operate the machine in a straight line, aligning it with the line indicating the center of the machine that was drawn in the field in the previous process using the left-right line drawing marker 60. The cockpit 29 is located in the left-right center of the machine, and therefore the operator seated in the cockpit 29 to operate the machine is also located in the left-right center of the machine.

[0055] The riding rice transplanter 20 is equipped with left and right line drawing markers 60 that draw a line on both the left and right sides of the seedling planting section 50 to indicate the center position of the machine body in the next process.

[0056] The left and right line drawing markers 60 are each configured with a waterwheel-shaped marker 62 that is freely rotatable at the tip of a line drawing marker support rod 61 whose base is pivotally supported on the left and right frames of the seedling planting section 50, and can be freely switched between a stored state (a) in which it is raised inside the machine body, and a line drawing state (b) in which the waterwheel-shaped marker 62 is placed in the field and draws lines in the field.

[0057] When the seedling planting section 50 is lowered in the field and moved forward to perform rice planting work, one of the left and right line-drawing markers 60 on the next process side is set to the line-drawing action state (B) to draw a line indicating the center position of the machine body in the next process, but when turning at the edge of the field, the line-drawing marker 60 in the line-drawing action state (B) is switched to a stored state (A) in which it is raised inside the machine body as the seedling planting section 50 rises.

[0058] When switching from the line drawing state (B) to the stored state (A) toward the inside of the aircraft, there was a problem that the mud held by the waterwheel-shaped marker 62 and the mud attached to it would fly into the inside of the aircraft and onto the operator sitting in the cockpit 29 operating the aircraft.

[0059] Therefore, in this embodiment, as shown in Figs. 3 and 4, the middle portion of the line drawing marker support rod 61 is bent rearward so that the waterwheel-shaped marker 62 is positioned at the rear of the aircraft body.

[0060] Therefore, the distance between the waterwheel-shaped marker 62 and the cockpit 29 becomes greater, and when switching from the line drawing state (b) to the storage state (a), the mud held by the waterwheel-shaped marker 62 or the mud attached thereto can be prevented from falling on the operator seated in the cockpit 29 while operating, improving operability.

[0061] In addition, when switching the left and right line drawing markers 60 from the line drawing state (b) to the stored state (a), mud held by the waterwheel-shaped marker 62 or mud attached to it is scattered inside the aircraft, causing problems for the operator seated in the cockpit 29 and operating the aircraft.As another means of solving this problem, the following configuration is provided.

[0062] In other words, when the left and right line drawing markers 60 are in the line drawing operating state (B), the base of the line drawing marker support rod 61 extends diagonally forward from the pivoted position of the aircraft, and when switched to the stored state (A), the waterwheel-shaped marker 62 moves toward the rear of the aircraft, thereby preventing mud held by the waterwheel-shaped marker 62 or mud attached to it from scattering toward the rear of the aircraft and falling on the operator seated in the cockpit 29 while operating the aircraft.

[0063] In addition, when the left and right line drawing markers 60 are in the line drawing operating state (B), they are configured to extend straight in the left and right directions from the pivoted position at the base of the line drawing marker support rod 61, and when they are switched to the stored state (A), the waterwheel-shaped marker 62 moves vertically upward inside the aircraft, thereby preventing mud held by the waterwheel-shaped marker 62 or mud attached to it from scattering upward toward the aircraft and falling on the operator seated in the cockpit 29 while operating the aircraft.

[0064] In addition, by providing an electric motor that changes the phase of the eccentric gear train in the rotary case of the planting device 53, and operating the electric motor to change and control the phase of the eccentric gear train of the planting device 53 on the side in which the left and right line drawing markers 60 are in the line drawing action state (b) so that the eccentricity is increased, thereby improving the planting posture and preventing the seedlings planted on the next process side from falling over, the planted seedlings will be less likely to be affected by the progress of the machine in the next process, improving the planting performance of the seedlings throughout the field and enabling appropriate rice planting work to be carried out.

[0065] In addition, a pulse meter is attached as a rotation sensor to the pivot shaft of the waterwheel-shaped marker 62 of the left and right line drawing marker 60 to detect the number of rotations of the waterwheel-shaped marker 62.

[0066] Then, the slip ratio of the wheels is calculated from the detection value of the pulse meter on the side in the line drawing state (b) and the detection value of a rotation sensor provided in the drive system that drives the front wheels 23 and / or rear wheels 24.

[0067] Then, if the vehicle speed based on the detection value of the pulse meter becomes faster than the vehicle speed based on the detection value of a rotation sensor provided in the drive system that drives the front wheels 23 and / or the rear wheels 24, it is determined that the waterwheel-shaped marker 62 is not properly in contact with the ground, and the slip ratio is not calculated, or the height position of the waterwheel-shaped marker 62 above the ground is lowered.

[0068] <Control of the field water level management system> In order to perform plowing, a preliminary task before rice planting, a worker operates the mobile terminal 5 to activate the electric motor of the water supply device 1 in each of the fields F1 to F17, open the water supply valve 8, and operate the electric water supply pump 7, thereby filling each of the fields F1 to F17 with water.

[0069] After plowing, each of the fields F1 to F17 was filled with water and left for several days, after which it became suitable for rice planting.

[0070] Therefore, the worker starts the water level control system for the fields, manages the water levels in each of the fields F1 to F17, and performs rice planting work as follows.

[0071] First, the management server 6 performs drainage control for each of the fields F1 to F17 in preparation for the start of rice planting work.

[0072] The management server 6 receives water level information H1 from the water level sensors 3 of each of the fields F1 to F17, and operates the electric motors of the drainage devices 2 of each of the fields F1 to F17 to open the drainage valves 11 and operate the electric drainage pumps 10 so that the water reaches the specified water depth H2 for rice planting work, thereby draining the water from each of the fields F1 to F17 into the drainage channel W2.

[0073] At this time, the amount of drainage Q required to reach the specified water depth H2 during rice planting work from the water level H1 before drainage in each of the fields F1 to F17 is calculated using the following formula.

[0074] Q = (H1-H2) × field area The time t required to discharge the required drainage amount Q is calculated by the following formula, since the drainage amount Q1 per unit time (h) of the electric drainage pump 10 is determined.

[0075] t=Q / Q1 Therefore, using the above formula, the management server 6 calculates the time required for each field F1 to F17 to reach the specified water depth H2 for rice planting work, calculates the start time of rice planting work for each field F1 to F17, determines the time schedule for the start of rice planting work for each field F1 to F17, and displays this on the monitor of the management server 6, as well as on the display unit 32 of the ride-on rice transplanter 20 and the monitor of the mobile terminal 5 via the Internet, so that the workers holding the mobile terminal 5 in the field and the workers riding the ride-on rice transplanter 20 can be confirmed.

[0076] Therefore, the worker riding on the riding rice transplanter 20 moves to each of the fields F1 to F17 and performs rice planting work according to the time schedule for the start of rice planting work in each of the fields F1 to F17 displayed on the display unit 32 sent from the management server 6, so that the rice planting work can be performed efficiently and with good workability.

[0077] In addition, since each of the fields F1 to F17 is set to the predetermined appropriate water depth H2 for rice transplanting work, the posture of the planted seedlings can be stabilized and floating seedlings can be prevented. The lines drawn by the left and right line markers 60 on the field F are easily visible, making it easy to operate the machine in a straight line, and the durability of the planting tines of the planting device 53, etc. can also be improved.

[0078] As another control method, an operator may create a time schedule by determining the start time of rice planting work for each of the fields F1 to F17 using the management server 6 or the mobile terminal 5, and the discharge amount Q1 per unit time (h) of the electric drainage pump 10 in each of the fields F1 to F17 may be changed and controlled so that each of the fields F1 to F17 has a predetermined water depth H2 for rice planting work in accordance with the determined time schedule.

[0079] Then, using real-time precipitation forecast information from the weather information, the precipitation per unit time (h) is added to the drainage amount Q required to bring each field F1 to F17 from the water level H1 before drainage to the specified water depth H2 for rice planting work, and the time t for each field F1 to F17 to reach the specified water depth H2 for rice planting work is calculated (correction control in which precipitation per unit time (h) is added to the drainage amount Q), and an appropriate time schedule for each field F1 to F17 to reach the specified water depth H2 for rice planting work can be determined.

[0080] In addition, instead of using real-time precipitation forecast information from weather information, a precipitation gauge may be installed in the field F and actual precipitation may be used for correction control.

[0081] In addition, the time schedule may be corrected depending on the soil quality of each of the fields F1 to F17.

[0082] In other words, if the soil type of fields F1 to F17 is black soil, which becomes viscous when it absorbs water and is prone to mud pushing during rice planting work, the time schedule is determined to be slightly earlier than the time t required to discharge the required drainage volume Q.

[0083] If the soil of fields F1 to F17 is sandy, it dries out easily and the seedlings will be planted shallowly, so the time schedule is determined to be slightly later than the time t required to discharge the required drainage volume Q.

[0084] In addition, the time schedule may be determined taking into consideration the rice planting work time of the riding rice transplanter 20 in each of the fields F1 to F17.

[0085] That is, the rice planting time of the riding rice transplanter 20 in each of the fields F1 to F17 is calculated by the following formula.

[0086] Transplanting time (min) = Field area x Work efficiency (constant value according to the number of planting rows and whether or not chemicals were sprayed) x Field correction constant (for squares or rectangles, the field correction constant is 1, for trapezoidal, polygonal, uneven, or irregular fields, the field correction constant is a constant for each field that is greater than 1) Next, the management server 6 controls the water supply to each of the fields F1 to F17 where rice planting work has been completed.

[0087] In other words, when the management server 6 recognizes from the position information of the riding rice transplanter 20 sent from the riding rice transplanter 20 that the riding rice transplanter 20 has left the field F where rice planting work was being performed and moved more than a predetermined distance away from the field F, it determines that rice planting work in the field F has been completed, and operates the electric motor of the water supply device 1 until the water level sensor 3 detects a predetermined water level, opens the water supply valve 8, and operates the electric water supply pump 7 to suck up water from the intake channel W1 and supply it to the field F.

[0088] In the case of conventional cultivation, the water level supplied to field F should be such that the tips of the leaves of the planted seedlings are slightly above the water surface.

[0089] The management server 6 calculates the above-mentioned water supply level from the length of the seedlings planted in field F that protrude above the mud surface, calculated from the input seedling length used for rice planting work and the planting depth adjustment position information sent from the riding rice transplanter 20.

[0090] That is, if the planting depth is deep, the water supply level will be low, and if the planting depth is shallow, the water supply level will be high.

[0091] In addition, when using granular, flowable, or water dispersible granular herbicides in field F, the water supply level should be 3 to 5 cm, and when using jumbo or self-diffusing granular herbicides, the water supply level should be 5 to 6 cm to allow the herbicide to be effective.

[0092] In addition, in order to suppress the activity of the giant snail, it is a good idea to control the water supply by keeping the water level at shallow water level of 4 cm or less for 2 to 3 weeks after rice planting, in order to suppress the activity of the giant snail.

[0093] In addition, the means for determining that the riding rice transplanter 20 has completed rice planting work in field F can be changed to position information of the riding rice transplanter 20, and it can be determined that rice planting work in field F has been completed based on information from the sub-transmission lever position sensor of the riding rice transplanter 20 that the sub-transmission lever has been switched from the low working speed used for planting work to the high travel speed.

[0094] In addition, a front-to-rear tilt detection sensor may be provided on the riding rice transplanter 20, and information on the front-to-rear tilt detection sensor may be sent to the management server 6 via the Internet. In this way, it may be possible to determine that rice planting work in field F has been completed based on information on the front-to-rear tilt detection of the machine body that indicates a large front-to-rear tilt when crossing a ridge to leave field F.

[0095] In the above embodiment, an example is shown in which an operator drives the riding rice transplanter 20, but a well-known autonomously running fully automatic rice transplanter may be used and the management server 6 may manage the fully automatic rice transplanter and also manage and control the rice planting work.

[0096] In addition to rice transplanters, paddy field working machines such as direct seeding machines for paddy fields may also be used. [Explanation of symbols]

[0097] 1 Water supply device 2 Drainage device 20 Transplanter (Ride-on rice transplanter) F Field

Claims

1. A field water level management system that manages the water level of a field (F) by controlling a water supply device (1) that supplies water into the field (F) and / or a drainage device (2) that drains water from the field, characterized in that the field water level management system determines a time schedule for starting work such as planting seedlings based on the water level management of the field (F).

2. A field water level management system as described in claim 1, characterized in that the drainage volume of the drainage device (2) is calculated so that the water level in the field (F) reaches a predetermined water level, and the precipitation amount in a real-time precipitation forecast is added to the drainage volume to determine the work start time schedule.

3. A water level management system for a farm field as described in claim 1 or claim 2, characterized in that the drainage time required to reach a predetermined water level is calculated from the discharge amount per unit time of the drainage device (2) and a time schedule for starting work such as seedling planting is determined.

4. 3. The water level management system for a field according to claim 1 or 2, characterized in that the time schedule is corrected according to the soil quality of the field (F).

5. 3. The water level management system for a farm field according to claim 1 or 2, characterized in that, when it is determined that work in the farm field (F) has been completed, the water supply device (1) starts supplying water to the farm field (F).

6. 6. A water level management system for a farm field according to claim 5, characterized in that the water level supplied by the water supply device (1) is calculated according to the setting of the planting depth of the transplanter (20) that performed the work.

Citation Information

Patent Citations

  • Water level adjustment device for paddy field with rice field dam function and method for damming rice field

    JP2017051137A