Reinforcing-bar processing management system
The reinforcing bar processing management system automates the allocation of processing tasks and maintenance predictions, addressing the inefficiencies in managing rebar processing equipment by generating accurate and efficient machining and transportation plans.
Patent Information
- Application Number
- JP2024163805
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-28
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Reinforcement processing companies face challenges in efficiently allocating processing contents to reinforcing bar processing devices due to the need for experience and knowledge, making it difficult to manage and operate rebar processing equipment effectively.
A reinforcing bar processing management system that includes a management device connected to processing equipment, which generates and transmits processing plan information based on building design data and operating status, automating the allocation of processing tasks and predicting maintenance needs.
The system enables efficient processing of reinforcing bars by generating appropriate machining and transportation plans, reducing reliance on human expertise and enhancing operational efficiency.
Smart Images

Figure 2024166419000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a reinforcing bar processing management system. [Background technology]
[0002] Conventionally, there exists a rebar processing cloud service that manages information such as the operating status of rebar processing equipment on a server. [Prior art documents] [Non-patent literature]
[0003] [Non-Patent Document 1] Toyo Construction Machinery Co., Ltd. Rebar processing cloud service <url: https: www.toyokensetsukohki.co.jp news ?p="228"> Summary of the Invention [Problem to be solved by the invention]
[0004] Rebar processing companies set the rebar processing details, etc., in rebar processing equipment such as rebar cutting machines or rebar bending machines according to building design data (e.g., BIM (Building Information Modeling) data) provided by construction companies, etc. In order to efficiently perform the required rebar processing, it is necessary to appropriately allocate the processing details to each rebar processing device. However, this task requires experience, knowledge, and time, and is not easy.
[0005] An object of the present invention is to provide a reinforcing bar processing management system that assists in the appropriate management of reinforcing bar processing equipment. [Means for solving the problem]
[0006] The technology of the present disclosure is as follows.
[0007] [1] Acquire design data for buildings, Obtain first information regarding rebar processing equipment installed in a specific processing facility; A reinforcing bar processing management system having a processor that generates and outputs processing plan information indicating the processing content to be performed by the reinforcing bar processing equipment installed in the specific processing facility based on the first information and the design data.
[0008] [2] The reinforcing bar processing management system according to [1], A management device is provided for each processing facility and connected to the reinforcing bar processing device provided in the processing facility, The processor is configured to be able to communicate with the management device via a network, and transmits the processing plan information to the management device installed in the specific processing facility; The management device is a reinforcing bar processing management system that sets the processing contents of the reinforcing bar processing device connected to the management device based on the processing plan information received from the processor.
[0009] [3] The reinforcing bar processing management system according to [2], The processor acquires second information regarding the operating status of the reinforcing bar processing equipment operated in accordance with the processing plan information from the management device connected to the reinforcing bar processing equipment via the network, and updates and outputs the processing plan information based on the second information.
[0010] [4] A reinforcing bar processing management system according to any one of [1] to [3], The processor generates and outputs transportation plan information regarding a transportation plan for the processed reinforcing bars in accordance with the processing plan information based on the processing plan information.
[0011] [5] A reinforcing bar processing management system according to any one of [1] to [3], The first information is a rebar processing management system including information regarding the processing capacity of the rebar processing equipment and information regarding the configuration of the processing line installed in the specific processing facility.
[0012] [6] obtaining second information regarding the operation status of the rebar processing equipment; Deriving third information regarding the processing performance of the reinforcing bar processing device based on the second information; A reinforcing bar processing management system having a processor that predicts the timing of maintenance of the reinforcing bar processing device based on fourth information regarding maintenance results included in the second information and the third information.
[0013] [7] [6] The reinforcing bar processing management system according to the present invention, The fourth information is a rebar processing management system that includes the timing when consumables were replaced in the rebar processing device and information about the consumables.
[0014] [8] [7] The reinforcing bar processing management system according to the present invention, The processor predicts the time to replace consumables of the reinforcing bar processing device as the time for the maintenance, in the reinforcing bar processing management system.
[0015] [9] [6] to [8], a reinforcing bar processing management system according to any one of the above, The processor controls the third information and the maintenance timing prediction results so that they can be viewed on a terminal. Effect of the Invention
[0016] According to [1], processing plan information can be appropriately generated regardless of human experience or knowledge. By operating a rebar processing device according to the output processing plan information and processing rebars, the rebar processing can be performed efficiently.
[0017] According to [2], by outputting processing plan information to the management device, it is possible to automate the process from generating the processing plan information to setting the processing contents for each rebar processing device, thereby further improving the efficiency of rebar processing.
[0018] According to [3], since the processing plan information can be changed according to the progress of rebar processing at the processing facility, it becomes possible to process rebar more efficiently.
[0019] According to [4], since transportation plan information can be automatically generated based on processing plan information, transportation plan information can be generated appropriately regardless of human experience or knowledge.
[0020] According to [5], it is possible to generate appropriate processing plan information according to the capacity of the rebar processing equipment installed in the processing facility and the configuration of the processing line. Therefore, rebar processing can be performed efficiently even in processing facilities with complex processing lines. [Brief description of the drawings]
[0021] [Figure 1] 1 is a diagram showing a schematic configuration of a reinforcing bar processing management system 100. FIG. [Diagram 2] 1 is a sequence chart for explaining an operation performed by a server 40 in the reinforcing bar processing management system 100 when collecting operation status information. [Diagram 3] 1 is a sequence chart for explaining operations when a server 40 generates processing plan information in a reinforcing bar processing management system 100 and processing is performed by a reinforcing bar processing device according to the processing plan information. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0022] Hereinafter, a reinforcing bar processing management system according to one embodiment of the present invention will be described with reference to the drawings.
[0023] Fig. 1 is a diagram showing a schematic configuration of a reinforcing bar processing management system 100. The reinforcing bar processing management system 100 connects reinforcing bar processing devices (in the example of Fig. 1, five reinforcing bar processing devices 11, 12, 13, 21, and 22) installed in at least one processing facility (in the example of Fig. 1, two processing facilities 10 and 20) to a server 40 via a network 30, so that the server 40 can manage the operating status, etc. of each reinforcing bar processing device.
[0024] In the rebar processing management system 100, the server 40 is accessed from a user terminal 50 owned by the manager of the processing facility via the network 30, and various information provided by the server 40 can be viewed on the user terminal 50. The following describes an example in which the processing facility 10 and the processing facility 20 are managed by different managers. In this case, the user terminal 50 includes a terminal owned by the manager of the processing facility 10 and a terminal owned by the manager of the processing facility 20. Note that the processing facility 10 and the processing facility 20 may be managed by the same manager, in which case the user terminal 50 is a terminal owned by that manager.
[0025] The reinforcing bar processing management system 100 shown in Figure 1 comprises management devices 110, 120, and 130 installed in the processing facility 10 corresponding to each of the reinforcing bar processing equipment 11, 12, and 13 installed in the processing facility 10, management devices 210 and 220 installed in the processing facility 20 corresponding to each of the reinforcing bar processing equipment 21 and 22 installed in the processing facility 20, and a server 40.
[0026] The reinforcing bar processing devices 11, 12, 13, 21, and 22 are devices for processing reinforcing bars, such as reinforcing bar cutting machines or reinforcing bar bending machines. The reinforcing bar processing devices 11, 12, 13, 21, and 22 each include a device main body 11A, 12A, 13A, 21A, and 22A including various components such as a motor and a movable mechanism, and a control device 11B, 12B, 13B, 21B, and 22B that controls each part of the device main body.
[0027] In the following, each of the reinforcing bar processing devices 11, 12, 13, 21, and 22 will be simply referred to as a reinforcing bar processing device, each of the device bodies 11A, 12A, 13A, 21A, and 22A will be simply referred to as a device body, and each of the control devices 11B, 12B, 13B, 21B, and 22B will be simply referred to as a control device. The control devices are, for example, configured with a PLC (Programmable Logic Controller). Note that all of the control devices included in the reinforcing bar processing management system 100 may not be manufactured by a common manufacturer, and control devices manufactured by different manufacturers may be mixed.
[0028] By inputting the processing details (information indicating what type of rebar is to be processed and how) into the control device, for example manually, the device itself, which is controlled by the control device, can process the rebar according to the processing details that have been set.
[0029] If the reinforcing bar processing device is a reinforcing bar cutting machine, the processing content includes, for example, information on the reinforcing bar to be processed, such as reinforcing bar strength, reinforcing bar type, reinforcing bar diameter, fixed length dimensions, and fixed length number of bars, and information indicating processing details, such as cutting dimensions or number of bars to be cut. If the reinforcing bar processing device is a reinforcing bar bending machine, the processing content includes, for example, information on the reinforcing bar, and information indicating processing details, such as number of bends, bending angle, and bending dimensions.
[0030] Each of the management devices 110, 120, 130, 210, 220 is an electronic device such as a personal computer, and is connected to a control device of the corresponding rebar processing device by wired or wireless connection, and is configured to be able to communicate with this control device. Each of the management devices 110, 120, 130, 210, 220 is configured to be connected to a network 30 such as a dedicated line or the Internet by wired or wireless connection, and is configured to be able to communicate with a server 40 via the network 30.
[0031] Each of the management devices 110, 120, 130, 210, and 220 acquires information indicating the operating status of the corresponding rebar processing equipment (hereinafter referred to as operating status information) from the control device of the rebar processing equipment, and performs a process of transmitting the acquired operating status information to the server 40.
[0032] The operating status information includes, for example, information on the set processing content, an operation log showing the input and output of each part (actuator, etc.) during the processing operation with that processing content (the period from the start of processing to the end of processing), and information on operation errors. By collecting the operation log for each processing operation of the rebar processing device, it is possible to derive the cumulative number of processing operations performed by the rebar processing device, etc. In this specification, the operating status information constitutes the second information.
[0033] Each of the management devices 110, 120, 130, 210, and 220 acquires processing plan information generated by the server 40 from the server 40, and sets processing contents for the corresponding reinforcing bar processing equipment based on the processing plan information. Each of the management devices 110, 120, 130, 210, and 220 inputs processing content setting information to the control device of the corresponding reinforcing bar processing equipment based on the processing plan information. As a result, the processing contents are set by the control device. The processing plan information is information that indicates the processing contents to be performed by the reinforcing bar processing equipment installed in a specific processing facility.
[0034] The server 40 is an electronic device including a processor 41 such as a CPU (Central Processing Unit), a memory 42 such as a semiconductor memory or a hard disk, and an interface connectable to the network 30, and is configured, for example, by a personal computer.
[0035] In the memory 42, first information on reinforcing bar processing equipment installed in each processing facility registered in the reinforcing bar processing management system 100 is registered in advance in correspondence with each processing facility.
[0036] The first information includes, for example, information indicating the configuration of each rebar processing equipment installed in the processing facility (information for identifying the model number, type, etc., information on the equipment configuration including options, etc.), information indicating the configuration of the processing line, and information indicating the processing capacity of each rebar processing equipment (the processing contents that can be performed and the processing efficiency for each processing content (e.g., the number of pieces that can be processed per hour), etc.).
[0037] A processing line is constructed in a processing facility by combining multiple rebar processing devices to perform multiple types of processing on rebars in a single operation. For example, by constructing a processing line with a rebar cutting machine installed upstream and a rebar bending machine installed downstream, a series of operations can be carried out, such as cutting rebars with the rebar cutting machine, transporting the cut rebars on a conveyor or the like, and bending them with the rebar bending machine. Since such processing lines may be constructed in a processing facility, the first information may also include information indicating the configuration of the processing line (information indicating what type of rebar processing devices are installed, how many of them, and in what arrangement).
[0038] In the example shown in Fig. 1, for example, the server 40 generates processing plan information corresponding to the processing facility 10, indicating what processing will be performed by which reinforcing bar processing equipment among the reinforcing bar processing equipment installed in the processing facility 10. Then, the server 40 transmits the generated processing plan information to the management devices 110, 120, 130 installed in the processing facility 10. When the received processing plan information includes information indicating that processing will be performed by the reinforcing bar processing equipment corresponding to the management devices 110, 120, 130, each of the management devices 110, 120, 130 sets the processing content for the reinforcing bar processing equipment corresponding to the management devices according to the information.
[0039] Fig. 2 is a sequence chart for explaining the operation when the server 40 collects operation status information in the rebar processing management system 100. Fig. 2 shows the flow of processing between the server 40, the management device 110, and the control device 11B, but the flow between the server 40, each of the management devices 120, 130, 210, and 220, and each of the control devices 12B, 13B, 21B, and 22B is the same as that shown in Fig. 2, so the explanation will be omitted.
[0040] The processor 41 transmits a setting file corresponding to the control device 11B to the management device 110 (step S1).
[0041] The setting file is information that specifies which register information should be acquired from among the information stored in many registers included in the control device. The control device has a different register hierarchical structure and the address of the register in which the necessary information is stored for each manufacturer. Therefore, a setting file that specifies which register information should be acquired for each control device manufactured by multiple manufacturers is generated, and this setting file is sent to the management devices 110, 120, 130, 210, and 220. The management devices 110, 120, 130, 210, and 220 each acquire the specified register information from the control device connected to the device according to this setting file, so that even if control devices of different manufacturers are mixed in the reinforcing bar processing management system 100, it is possible to acquire operation status information including information of the same items from all reinforcing bar processing devices.
[0042] The management device 110, which has received the setting file transmitted in step S1, requests the control device 11B to transmit the operating status information stored in the register specified in the setting file (step S2).
[0043] The control device 11B that receives this request reads out the operation status information stored in the requested register and transmits it to the management device 110 (step S3). The operation status information transmitted from the control device 11B includes, for each piece of information included in the operation status information, date and time information when the information was stored.
[0044] When the management device 110 receives the operation status information, it compares the date and time information included in the operation status information with the date and time information acquired by its own device via the network 30 (its own device date and time information), and if there is a difference between the two, it corrects the date and time information included in the operation status information based on the own device date and time information (step S4). Then, the management device 110 transmits the operation status information with the corrected date and time information to the server 40 (step S5). Since the control device is not connected to the network 30 and cannot have accurate date and time information, the process of step S4 enables accurate recording of the operation status information. In the server 40 that has received the operation status information transmitted from the management device 110, the processor 41 stores the operation status information in the memory 42 (step S6).
[0045] After step S5, the management device 110 waits for a predetermined time (e.g., 2 seconds) (step S7), and then requests the control device 11B to transmit the operation status information stored in the register specified in the setting file (step S8). The control device 11B, which has received this request, reads out the operation status information stored in the requested register and transmits it to the management device 110 (step S9).
[0046] When the management device 110 receives the operation status information transmitted in step S9, it corrects the date and time information included in the operation status information, similar to the process of step S4 (step S10). Then, the management device 110 transmits the operation status information with the corrected date and time information to the server 40 (step S11) and waits for a predetermined time (step S12). In the server 40 that received the operation status information transmitted in step S11, the processor 41 stores the operation status information in the memory 42 (step S13). After step S12, the processes of steps S8 to S13 are repeated.
[0047] In this way, the management device 110 requests the control device 11B to transmit operating status information every time a predetermined time period has elapsed, and transmits to the server 40 the operating status information transmitted from the control device 11B in response to this request.
[0048] The management device 110 may be configured to transmit the operation status information acquired at the most recent timing from the control device 11B to the server 40 only if there is a change in the operation status information acquired at the most recent timing from the control device 11B compared to the operation status information acquired at the previous timing.
[0049] When consumables (e.g., oil, a force roller, a blade, a magnet switch, an air cylinder, a rebar receiver, or a battery of the control device 11B) in the reinforcing bar processing equipment 11 are replaced, the control device 11B (and similarly the other control devices) preferably stores maintenance information including information on the replaced consumables and the date and time of the replacement in a register as one piece of operation status information. Then, the management device 110 preferably acquires operation status information including this maintenance information from the control device 11B and transmits it to the server 40. The control device 11B may automatically recognize and generate the maintenance information regarding the replacement of consumables and store it in the register, or the administrator of the reinforcing bar processing equipment 11 may manually input the information to the control device 11B.
[0050] By the above-mentioned process, the memory 42 accumulates the operation status information of each reinforcing bar processing device. Based on the operation status information of each reinforcing bar processing device accumulated in the memory 42 in this way, the processor 41 derives information on the processing results, such as, for example, what type of processing was performed on what type of reinforcing bar and how much processing was performed, for each reinforcing bar processing device. The processor 41 also predicts, for example, the replacement time of consumables based on the maintenance information included in the operation status information and the above-mentioned processing results information. The processor 41 controls the derived processing results information and the information on the replacement time of consumables so that they can be viewed on the user terminal 50. This allows the manager of the processing facility 10, 20 to easily grasp the processing results of each reinforcing bar processing device installed in the processing facility 10, 20 and the replacement time of consumables of each reinforcing bar processing device. As a result, it can be used to formulate maintenance plans and new introduction plans for reinforcing bar processing devices.
[0051] 3 is a sequence chart for explaining the operation when the server 40 generates processing plan information and the reinforcing bar processing device performs processing according to the processing plan information in the reinforcing bar processing management system 100. Here, as an example, the operation will be explained when the processing facility 10 is contracted by a construction company to process reinforcing bars to be used in a building to be constructed.
[0052] First, the manager of the processing facility 10 imports the building design data (e.g., BIM data) received from the construction company into the user terminal 50, and operates the user terminal 50 to transmit the design data and identification information for identifying the processing facility 10 to the server 40 (step S21).
[0053] The processor 41 of the server 40 acquires the design data received from the user terminal 50 and stores it in the memory 42 (step S22). Next, the processor 41 acquires, from the memory 42, first information corresponding to the identification information of the processing facility 10 transmitted in step S21 (step S23).
[0054] Next, the processor 41 generates processing plan information that defines the processing content to be performed by the reinforcing bar processing equipment 11, 12, and 13 installed in the processing facility 10 based on the design data stored in the memory 42 and the first information acquired in step S23 (step S24).
[0055] Here, a detailed example of the process of step S24 will be described. First, the processor 41 groups reinforcing bars that need to be processed and are included in the design data, for example, by the same part of the building (wall or floor on which floor), type (deformed reinforcing bars, screw reinforcing bars, round bars, etc.), shape (L-shaped, U-shaped, straight, etc.), and dimensions (length and diameter of each side), and recognizes the number of reinforcing bars included in each group. The processor 41 also recognizes the processing capacity of the reinforcing bar processing devices 11, 12, and 13 and the processing line combining these devices, from the first information on the reinforcing bar processing devices 11, 12, and 13 installed in the processing facility 10. Then, the processor 41 assigns the processing of each group to the reinforcing bar processing devices installed in the processing facility 10, based on the contents (type, shape, dimensions, and number) of each group of reinforcing bars and the recognized processing capacity, so that the reinforcing bars of each group can be processed as efficiently as possible (preferably most efficiently).
[0056] For example, assume that in the processing facility 10, the reinforcing bar processing device 11 is used alone, and the reinforcing bar processing device 12 and the reinforcing bar processing device 12 are usable as a processing line. Also assume that the reinforcing bar groups included in the design data are divided into a first group and a second group.
[0057] In this case, if the processor 41 determines that the most efficient processing can be performed by processing the first group with the rebar processing equipment 11 and processing the second group on the processing line of the rebar processing equipment 12, 13, it generates processing plan information including information indicating that the first group will be processed with the rebar processing equipment 11 in accordance with the contents (type, shape, dimensions, and number) of the first group, and information indicating that the second group will be processed with the rebar processing equipment 12, 13 in accordance with the contents (type, shape, dimensions, and number) of the second group.
[0058] Alternatively, if the processor 41 determines that the most efficient processing is to process the first group with the rebar processing equipment 11 and the second group with the rebar processing equipment 13, it generates processing plan information including information indicating that the first group will be processed with the rebar processing equipment 11 in accordance with the contents (type, shape, dimensions, and number) of the first group, and information indicating that the second group will be processed with the rebar processing equipment 13 in accordance with the contents (type, shape, dimensions, and number) of the second group.
[0059] In addition, in step S24, the processor 41 may generate the processing plan information based on the operation status information of the reinforcing bar processing equipment 11, 12, 13 collected from the management devices 110, 120, 130 and the first information related to the reinforcing bar processing equipment 11, 12, 13. By referring to the operation status information, it is possible to determine, for example, a situation in which the reinforcing bar processing equipment 11 cannot be used or a situation in which the reinforcing bar processing equipment 11 cannot exert sufficient processing capacity. Therefore, by generating the processing plan information in consideration of the operation status information, it is possible to generate the processing plan information with higher accuracy.
[0060] After step S24, the processor 41 transmits the generated processing plan information to the management devices 110, 120, and 130 (step S25). Each of the management devices 110, 120, and 130 acquires processing plan information (step S26), and if the acquired processing plan information includes information indicating that processing is to be performed by the rebar processing device corresponding to the management device, sets processing contents in the control device of the rebar processing device corresponding to the management device according to the information (step S27).
[0061] Through the above process, the processing contents are set in the reinforcing bar processing devices 11, 12, and 13 in the processing facility 10. Therefore, in the processing facility 10, the reinforcing bar processing equipment starts processing according to the processing contents, so that the processing of the reinforcing bars contracted from the construction company can be efficiently performed. According to the reinforcing bar processing management system 100, the processing plan information can be appropriately generated by the server 40 regardless of the experience or knowledge of the person, so that the burden on the reinforcing bar processor can be reduced.
[0062] In addition, even after the reinforcing bar processing is started by the reinforcing bar processing devices 11, 12, and 13 in the processing facility 10 according to the processing content set in step S27, the memory 42 of the processor 41 accumulates operation status information of the reinforcing bar processing devices 11, 12, and 13 operating according to the processing plan information by the process shown in Fig. 2. Therefore, after step S24, the processor 41 can determine the progress of the processing plan based on the processing plan information based on the operation status information of the reinforcing bar processing devices 11, 12, and 13 stored in the memory 42.
[0063] Therefore, after step S24, the processor 41 preferably generates new processing plan information based on the progress of the processing plan determined based on the operation status information, the processing content for each group obtained from the design data, and the first information on the reinforcing bar processing devices 11, 12, 13, and transmits the generated processing plan information to the management devices 110, 120, 130. In this case, the management devices 110, 120, 130 that receive the new processing plan information only need to update the settings of the processing content. In this way, the processing plan information can be appropriately updated in accordance with the progress of the processing plan, and reinforcing bar processing can be performed more efficiently.
[0064] For example, among the reinforcing bar processing devices 11, 12, and 13 that have been operated according to the processing plan information, if the reinforcing bar processing device 11 has completed processing and the processing at the reinforcing bar processing device 13 is delayed, by generating processing plan information that reallocates part of the processing that should be performed by the reinforcing bar processing device 13 to the reinforcing bar processing device 11, it is possible to shorten the time until all processing is completed compared to when the processing plan information is not updated.
[0065] Furthermore, the processor 41 may generate transportation plan information related to a transportation plan for the processed reinforcing bar according to the processing plan information generated in step S24, and output the generated transportation plan information. The method of outputting the transportation plan information is arbitrary, and may include, for example, displaying the transportation plan information on a website that is displayed when the user terminal 50 accesses the server 40, transmitting the transportation plan information to the user terminal 50 by email, or transmitting the transportation plan information to the management devices 110, 120, and 130.
[0066] The transportation plan information is information that specifies which transport vehicle each group of reinforcing bars obtained from the design data should be loaded onto and to where it should be transported. In this way, by generating the transportation plan information on the server 40, the burden on reinforcing bar processors can be further reduced.
[0067] The reinforcing bar processing management system 100 may be provided with a printing device corresponding to each of the management devices 110, 120, 130, 210, and 220. In this case, the management devices 110, 120, 130, 210, and 220 cause the printing device to print, on a tag sticker or the like, an image including information on the processing content (type, shape, dimensions, number, etc. of reinforcing bars) set in the reinforcing bar processing device according to the processing plan information acquired by each of them and information on the use part included in the processing plan information.
[0068] For example, when the first group of reinforcing bars is processed by the reinforcing bar processing device 11 and the processing is completed, the label sticker printed by the printing device displays the processing details of the first group of reinforcing bars and their used parts by characters and two-dimensional codes, respectively. The worker who worked at the reinforcing bar processing device 11 can use this label sticker to properly manage the first group of reinforcing bars after processing. [Explanation of symbols]
[0069] 10,20 Processing facilities 11A,12A,13A Device body 11B, 12B, 13B Control device 11,12,13,21,22 Steel bar processing equipment 30 Network 40 Servers 41 Processors 42 Memory 50 User terminals 100 Rebar processing management system 110,120,130,210,220 Management device< / url:>
Claims
1. obtaining second information regarding the operation status of the rebar processing device; Derive third information regarding the processing performance of the reinforcing bar processing device based on the second information; A rebar processing management system having a processor that predicts the timing of maintenance of the rebar processing equipment based on fourth information regarding maintenance results contained in the second information and the third information.
2. The reinforcing bar processing management system according to claim 1, A rebar processing management system, wherein the fourth information includes the timing when consumables were replaced in the rebar processing device and information about the consumables.
3. The reinforcing bar processing management system according to claim 2, The processor predicts the time to replace consumables of the reinforcing bar processing equipment as the time for maintenance, in a reinforcing bar processing management system.
4. The reinforcing bar processing management system according to any one of claims 1 to 3, The processor controls the third information and the maintenance timing prediction results so that they can be viewed on a terminal.
Citation Information
Patent Citations
Remote fault diagnosis system for reinforcing steel bar processing equipment and using method thereof
CN110196579A
Management system for communication facilities
JP2002132995A
Software for maintenance management
JP2003186508A
Operation management support system for plant
JP2007257376A
Visit plan preparation method
JP2008146292A
