Erection crane and installation vessel
Patent Information
- Application Number
- JP2023566688
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2022-02-03
- Filing Date
- 2022-04-29
- Publication Date
- 2025-05-12
AI Technical Summary
The installation of large and heavy offshore wind turbine monopiles is challenging due to their size and weight, requiring efficient and controlled erection methods that are less dependent on weather conditions and can be performed in deeper waters, while reducing installation costs and time.
An installation vessel equipped with a crane that includes a pivotable boom, a trolley guide, and a cart track system, allowing for the controlled erection of monopiles by guiding both the top and bottom ends of the monopile during the installation process, enabling assembly offshore and reducing the need for onshore facilities.
The solution provides a more controlled and efficient method for erecting large monopiles, allowing installation in deeper waters and reducing dependency on weather conditions, thus lowering costs and increasing operational windows for offshore wind turbine installations.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
[Background technology]
[0001] An offshore wind turbine includes a mast that supports the nacelle and blades of the wind turbine. The mast is mounted on a foundation (typically in the form of a monopile (i.e., a cylindrical foot section), part of which is driven into the sea floor. As an alternative foundation, a jacket (i.e., a truss or framework installed on the sea floor) can also be used.
[0002] Currently, many offshore wind turbine parks are being planned to allow large-scale power generation. For reasons of efficiency, wind turbines have an ever-increasing capacity and size. Recently, 5 MW and 8 MW turbines have been planned. In the future, 14 MW turbines are also envisaged. In the known design, the 8 MW turbine has a bladed hub diameter of 160 meters combined with a hub height of about 120 meters above sea level. The proposed 14 MW turbine has a blade diameter of 220 meters combined with a hub height of about 160 meters above sea level.
[0003] The weight of a wind turbine, including mast, nacelle, and blades, at least in future designs, will likely exceed 1000 t. The foundation itself will likely weigh hundreds of tonnes, depending on the type of foundation, for example. Many types of foundations are discussed in US 2007 / 243063. For example, JP 2018-053899 and EP 3153398 relate to floating foundations.
[0004] The foundations are first installed by driving piles into the seabed, and then the wind turbine (which includes the mast, nacelle, and blades) is installed on the piles, again either by installing the wind turbine as a whole at once, or by partially assembling the wind turbine on the piles. A transition piece may be provided between the piles and the mast of the wind turbine.
[0005] To facilitate transportation of the monopiles to the installation site, the piles are transported to the installation site in a horizontal position. Storing the monopiles in a horizontal position keeps their center of gravity close to the water surface, which is beneficial for the vessels transporting the monopiles.
[0006] At the installation site, the monopile must be erected, i.e., the top end of the monopile is lifted relative to the bottom end of the monopile, bringing the pile from a horizontal position to a vertical or upright position.
[0007] For example, from WO2019103611 it is known to transport the monopile in a horizontal position and to erect it at the installation site using two deck mounted cranes. The monopile is stored on the deck of the ship between the two deck mounted cranes.
[0008] Moreover, the monopile is stored with its top end in an overboard position and its bottom end supported on a truck cart, which is mounted on a truck. To erect the monopile, two cranes lift the top end of the monopile and the bottom end of the pile is guided along the guide truck.
[0009] A similar process is known, for example from WO2019231329, in which a monopile is erected by a single crane, the bottom end of which is supported by a monopile gripper, which tilts together with and supports the monopile during erection.
[0010] Monopiles can have diameters of 10 meters or more, lengths of 60 meters or more, and weights of 500 mt or more. There is a trend for larger wind turbines and also a desire to install offshore wind turbines in locations with greater water depths than currently encountered. Both result in larger and heavier foundations. It is therefore anticipated that in the near future monopiles larger than 100 meters, and in some cases even 120 meters or more, will need to be installed. The weight of such piles could be greater than 1000 mt, and in some cases could be 1300 mt or more.
[0011] There is also a trend towards reducing the costs of installing offshore wind turbines, and in particular towards improving the efficiency of wind turbine installation, which can be achieved, for example, by shortening the installation process and by expanding the operational window, i.e. by making the installation process less dependent on the surrounding environment (e.g. wind, swell, etc.). [Prior art documents] [Patent documents]
[0012] [Patent Document 1] US Patent Application Publication No. 2007 / 243063 [Patent Document 2] JP 2018-053899 A [Patent Document 3] European Patent No. 3153398 [Patent Document 4] International Publication No. 2019103611 Brochure [Patent Document 5] International Publication No. 2019231329 Brochure [Patent Document 6] International Publication No. 2019245374 Brochure [Patent Document 7] International Publication No. 2021245175 Brochure Summary of the Invention [Problem to be solved by the invention]
[0013] The present invention relates to a vessel and a method for the erection of foundations, in particular of monopiles, for offshore wind turbines. It is an object of the present invention to provide an alternative erection vessel and method for erecting monopiles. It is a further object of the present invention to provide an improved erection vessel and method for erecting monopiles. It is a further object of the present invention to provide an erection vessel and method for erecting monopiles, which allows for a more controlled erection process and thus preferably allows for an extended operating window. [Means for solving the problem]
[0014] Moreover, it is proposed to assemble the wind turbine offshore (i.e. on a dedicated vessel). Thus, the wind turbine can be transported to the installation site in a pre-assembled state, which is much easier than transporting an assembled wind turbine over long distances. At the installation site, the wind turbine is assembled and installed on a foundation (e.g. foundation pile or floating foundation).
[0015] Therefore, the present invention provides an erection crane according to claim 1.
[0016] A wind turbine component erecting crane according to claim 1, which is to be supported by a ship's hull adjacent to an erection deck for erecting a wind turbine component, e.g. a pile or a mast, comprises: - Crane base; - a crane housing and a slewing bearing, the slewing bearing being provided between the crane base and the crane housing, the slewing bearing enabling the crane housing to swivel about a vertical slewing axis; - a boom extending between a base end and an upper end, the boom being pivotally supported at the base end by the crane housing for pivoting between a lowered position for lifting a load at a predetermined distance from the crane base and an elevated erection position for erecting a wind turbine component (e.g., a monopile and a mast) adjacent the crane base; - a luffing winch and associated luffing wire (e.g., a luffing assembly including a luffing winch and associated luffing wire), the luffing winch mounted on the crane housing and the luffing wire extending between the luffing winch and the boom, enabling the boom to be pivoted between a lowered position and a raised erection position; - a hoist (e.g., a hoisting assembly including a hoist), the hoist including a hoisting winch and an associated hoisting wire, the hoisting wire being guided via an upper sheave assembly in the boom to a lower sheave assembly of the load coupling device for coupling with a load, e.g., an upper end of a wind turbine component, enabling the crane to lift the load using the hoisting winch; - a trolley guide mounted on the boom of the crane, e.g. a track including one or more guide rails; - a trolley, the trolley being coupled with a trolley guide so as to be guided along a boom of a crane, the trolley being provided with a wind turbine component engagement device configured to pivotally support a wind turbine component at an upper end thereof or the trolley being configured to receive the wind turbine component engagement device and / or a load coupling device supporting the wind turbine component engagement device; Includes.
[0017] A wind turbine component may refer to a pile or foundation pile for supporting a mast of a wind turbine, or a mast that supports a nacelle of a wind turbine.
[0018] With the crane according to the invention, the boom of the crane can be pivoted in the erection position to erect the wind turbine component, with its upper end guided by the trolley, which allows, inter alia, controlled erection of large and heavy monopiles and wind turbine masts.
[0019] The pivotable boom can be pivoted between a lowered hoist position for lifting a load at a predetermined distance from the crane base and a raised erection position for erecting the wind turbine component to an upright position adjacent the erection crane base. The crane is preferably set up at the end of the erection deck with a cart track and a support cart for guiding the bottom end of the wind turbine component during the erection process. The boom of the crane is provided with a trolley guide and a trolley for guiding the top end of the monopile during the erection process.
[0020] Thus, the erection crane according to claim 1 allows guiding both the bottom and top ends of the wind turbine component during the erection process and thus allows a more controlled movement of the wind turbine component during erection. Supporting the top end of the wind turbine component during the erection process provides additional stability to the wind turbine component, which is beneficial when erecting large and / or heavy monopiles.
[0021] For example, when erecting a monopile in the prior art, the top end of the monopile is supported by a crane, which allows the top end to swing. Guiding the top end of the monopile according to the present invention allows a more controlled process, more specifically a more controlled movement of the top end of the monopile. This is particularly beneficial when erecting large and heavy monopiles. Also, when the movement of the top end of the monopile is controlled by a trolley, the top end is not moved by wind or ship swings, which can happen when the top end is supported by a conventional crane. Thus, with a crane according to claim 1, the erection process is less susceptible to weather conditions, allowing a larger operating window.
[0022] In an embodiment, a crane according to the invention is mounted on a vessel including an erection deck, a cart track extending along the erection deck, and a support cart for supporting a bottom end of a monopile, the support cart being supported by the cart track and allowing the cart to move along the cart track to guide the bottom end of the monopile along the erection deck from a position distal to the crane to a position adjacent to the crane. In such an embodiment, the boom of the crane can be pivoted in the erection position to erect the monopile with the bottom end of the monopile guided by the cart and track and with the top end of the monopile guided by the trolley and trolley guides.
[0023] According to a further aspect, the invention provides a vessel adapted to enable the transport of a pre-assembled wind turbine (or parts thereof) and to assemble the wind turbine at or near an installation site, in particular the vessel adapted to erect a mast of the wind turbine, preferably adapted to mount and test the nacelle, hub and blades on the mast.
[0024] The erection crane according to the invention allows the mast of a wind turbine to be erected offshore. In particular, due to the erection boom, the mast can be erected in a controlled manner. Moreover, in certain embodiments, the erection crane can also be used to assemble the wind turbine.
[0025] The present invention therefore allows wind turbines to be assembled at sea, thus eliminating the need for costly wind turbine installation plants located adjacent to ports, and also obviates the need to transport assembled wind turbines at sea, which is time consuming and can only be done during limited periods of good weather.
[0026] In this approach, the wind turbine foundation (either sea-floor based or floating) can be pre-installed and an erection crane can be used to install the assembled wind turbine (i.e., mast with nacelle, hub, and blades) on the foundation.
[0027] It is noted that it is known to provide a vessel with a rigid upright tower provided with a trolley guide and a trolley for erecting monopiles. This type of construction is not provided with a pivotable boom and is therefore not configured to lift a load at a predetermined distance from the tower. The erecting crane according to claim 1 is configured for controlled erection (i.e. guiding the upper end of the wind turbine component) and for lifting a load (i.e. lifting the load with the boom in the lowered position), preferably for pivoting the boom while supporting the load and thus moving the load towards or away from the base of the crane.
[0028] The crane according to claim 1 can be used with a floating vessel (i.e. a non-jack-up type floating hull) that is configured to maintain its position and orientation relative to the installation site. Thus, the vessel does not need to be anchored or jacked up to enable the installation of the monopile, which allows for a fast process. Moreover, such a vessel can be deployed in deeper water for the installation of large size monopiles as well.
[0029] The boom of the crane can be pivoted in a lowered hoist position, allowing the crane to lift a load at a predetermined distance from the crane base. Moreover, by pivoting the boom while the crane is supporting a load, the load can be moved toward or away from the base of the crane.
[0030] When the boom is raised in the erection position, it is in a substantially vertical or upright position. When the load coupling device (supported by the hoist wire of the hoisting winch) is engaged by the trolley, the trolley can be used to guide the load coupling device along the boom of the crane. Thus, swaying of the load coupling device relative to the boom is prevented and the upper end of the wind turbine component supported by the load coupling device can be moved along the boom in a controlled manner.
[0031] With the crane according to the invention, the boom of the crane can be pivoted in an erection position to erect the wind turbine component, with the bottom end of the wind turbine component being guided by the erection track or cart on the cart track, and with the top end of the wind turbine component being guided by the trolley and trolley guide. Preferably, when the boom is in the erection position, the boom (or at least the trolley guide attached to the boom) extends essentially vertically.
[0032] In a further embodiment, the crane housing is provided with a boom support for engaging the boom when in the erection position, which boom support prevents the boom from moving beyond the erection position. Additionally or alternatively, the crane is provided with a boom securing means for securing the boom in the erection position during the erection process.
[0033] In an embodiment, a crane according to the invention is mounted on a vessel including an erection deck, a cart track extending along the erection deck, and a support cart for supporting a bottom end of a monopile, the support cart being supported by the cart track and allowing the cart to move along the cart track to guide the bottom end of the monopile along the erection deck from a position distal to the crane to a position adjacent to the crane. In such an embodiment, the boom of the crane can be pivoted in the erection position to erect the monopile with the bottom end of the monopile guided by the cart and track and with the top end of the monopile guided by the trolley and trolley guides.
[0034] In such an embodiment, the boom of the crane can be pivoted in the erection position to erect the monopile with the bottom end of the monopile guided by the cart and erection truck (or cart truck) and the top end of the monopile guided by the trolley and trolley guides.
[0035] In one embodiment, the crane includes a boom securing device, which includes a stop for positioning the boom in the erection position and a boom locking device for securing or locking the boom in the erection position. Such a boom securing device is provided, for example, on a gantry, which is mounted on or part of the crane housing. Securing the boom prevents the boom from moving from the erection position during the erection process, and preferably the boom is secured in place to prevent pivoting of the boom.
[0036] In a further embodiment, the boom securing device includes an active damper (e.g., a hydraulic cylinder) that resiliently engages the boom when it is moved to the erected position, for example, when the boom is at a 3 degree angle to the vertical. In one embodiment, the boom restraint includes a hydraulic cylinder that is driven into an extended position. Thus, when the boom pivots upward and engages the cylinder, the cylinder provides a resilient force that pushes the boom in a downward direction.
[0037] Thus, when the boom is in the upper zone, it is engaged by the damper, and when it is lowered from the upper zone, the damper disengages the boom. In one embodiment, the damper engages the boom when the boom is at an angle of 6 degrees or less (e.g., 3 degrees or less) to the vertical.
[0038] In one embodiment, the crane includes a boom mobilizer for moving the boom from the erection position, e.g., a hydraulic cylinder for pushing the boom away from the erection position, or a winch with an associated wire for pulling the boom away from the erection position. Thus, after the erection process, the boom can be pivoted from the upright position. It is noted that the luffing wire can only effectively support the boom when it is out of the upright position, e.g., at an angle of 3 degrees or more to the vertical, allowing the boom to be lowered. Thus, the boom mobilizer can be used to move the boom from the upright position to a position where the luffing wire can support the boom.
[0039] In a further embodiment, the boom mobilizer is integrated into the boom securing device, for example, the boom securing device includes a hydraulic cylinder that acts as a damper to receive the boom as it is pivoted into the erection position and also pushes the boom out of the erection position after the erection process.
[0040] In one embodiment, the trolley is configured to engage the load connection device to guide the load connection device, and thus the top end of the wind turbine component (e.g., the monopile) supported by the load connection device, along the trolley guides during erection of the monopile using the hoist.
[0041] In one embodiment, the load coupling device of the crane is configured to couple with a monopile engagement device (e.g., a monopile top end clamp), which is configured to pivotally support the monopile at its top end.
[0042] In an embodiment, the trolley is configured to couple with the wind turbine component engagement device. The monopile engagement device is preferably configured to pivotally support an upper end of the wind turbine component, allowing the monopile to pivot relative to the load coupling device and the trolley during erection.
[0043] In an embodiment, the load connection device and the trolley are configured to be coupled, and the trolley is provided with a load connection device configured to be coupled with an upper end of the wind turbine component. In such an embodiment, a hoisting wire of a hoisting winch supports the load connection device, which can be used to couple to the trolley. When the boom is raised in the erection position and the load connection device (which is supported by the wire of the erection winch) is connected to the trolley, the trolley can be used to erect the wind turbine component.
[0044] When the boom is lowered from the erection position to the hoist position and the load coupling device is not coupled to the trolley, the load coupling device can be used to lift a load a predetermined distance from the crane base.
[0045] In one embodiment, the crane further includes a secondary hoist including a secondary hoist winch with an associated secondary hoist wire supporting a secondary load coupling device configured to be connected to a load, the hoist wire being guided through the crown block to the load coupling device for lifting the load at a predetermined distance from the crane base using the secondary hoist winch.
[0046] In such an embodiment, the crane is provided with a secondary hoist in addition to the hoist, the secondary hoist including a secondary hoist winch for lifting a load a predetermined distance from the base of the crane when the boom is in the lowered position. In one embodiment, the secondary hoist is configured to lift and lower the trolley along the trolley guides, and more specifically, to move the trolley along the trolley guides into position for engaging and disengaging with the load coupling device of the main hoist.
[0047] In one embodiment, the trolley is configured to engage the load coupling device such that when they are coupled, the trolley moves with the load coupling device along the trolley guides, and the main hoist can then be used to move the trolley along the trolley guides.
[0048] In one embodiment, the boom is pivotally supported by the crane housing at the base end to pivot about the horizontal boom pivot axis between lowered and raised positions to lift a load and to move the load towards or away from the crane base, and the trolley guide extends below the horizontal boom pivot axis when the boom is in the erection position. In such an embodiment, the trolley guide extends along and below the crane boom. Thus, the trolley can not only be moved along the crane boom, but also can be lowered below the crane boom when the boom is in the erection position. Extending the trolley guide below the boom pivot axis allows the trolley to be lowered below the boom pivot axis, and thus allows the trolley to be moved closer to the erection deck. This is beneficial, for example, when the boom pivot axis is positioned some distance above the erection deck of the vessel. Since the trolley can be moved closer to the erection deck,
[0049] In a further embodiment, the lower section of the trolley guide (preferably the section extending below the boom pivot axis) is mounted to the crane housing and is hingedly connected to a section of the trolley guide connected to the boom, or is separate or separable from the trolley guide connected to the boom so that it does not pivot with the boom (and with the trolley guide connected to the boom) when the boom is pivoted about the boom pivot axis.
[0050] In one embodiment, the trolley guide includes a boom section attached to the boom of the crane and a base section attached to the base of the crane, and the trolley can be lowered from the boom section onto the base section to a position near the erection deck to connect the trolley with an upper end of the monopile, and the trolley can be moved from the base section onto the boom section to erect the monopile connected to the trolley.
[0051] In this embodiment, the trolley guide includes a base section that is mounted to the base of the crane and therefore extends along the base of the crane below the boom pivot axis so that the base section of the trolley guide does not move with the crane housing and boom as they are pivoted about the vertical axis.
[0052] It has been proposed that the crane housing could also be provided with a section of the trolley guide (i.e. a mid-section which forms an intermediate part between the boom section and the base section of the trolley guide when the boom of the crane is in the erected position). The mid-section is mounted to the crane housing and therefore does not pivot with the boom of the crane. In contrast to the base section of the trolley guide, the mid-section moves with the part of the crane that can be swiveled about the vertical pivot axis.
[0053] The base section of the trolley guide is preferably aligned with the cart track so that it can be used to lower the trolley in alignment with the cart track to a position near the deck, and thus to enable guiding the load coupling device to a position near the deck. Guiding the load coupling device near the deck allows it to engage with a monopile that is set up near the deck. When the trolley cannot be lowered near the deck, the lower section of the erection movement may not be guided and therefore not optimally controlled. This configuration allows for a compact trolley and / or wind turbine component engagement device. Moreover, the track can be set up near the deck and does not need to be elevated to present the wind turbine component at a height that allows the upper part of the wind turbine component to be coupled with the load coupling device, and for a controlled, fully controlled, i.e. guided erection movement.
[0054] Preferably, the base section of the boom guide is dimensioned to receive a trolley. Thus, the trolley can be parked on the base guide section of the trolley guide. When the trolley is parked on the base guide section, the boom of the crane can be operated without it supporting the trolley. This is particularly beneficial when the crane is to be used to lift a load rather than erecting a wind turbine component.
[0055] In a further embodiment, the base of the crane is provided with a plurality of trolley guide base sections, each of which can be aligned with a trolley guide boom section by pivoting the crane housing in position.
[0056] In one embodiment, the one or more trolley guide bases are configured to park one or more secondary trolleys (e.g., secondary trolleys that may be used in combination with an upper end support trolley of a wind turbine component to engage a lower end of the wind turbine component to stabilize the wind turbine component when it is lifted by a crane, or secondary trolleys configured to be used in place of a main trolley), and the secondary trolleys are configured to engage and support a nacelle or wind turbine blades for assembling the wind turbine.
[0057] In one embodiment, the trolley guide includes a boom section provided with a lower section that extends below the boom pivot axis, and the base section of the trolley guide aligns with this lower section of the boom guide when the crane is swung into position, in an alternative embodiment, the base section of the trolley guide extends up to or beyond the boom pivot axis.
[0058] In one embodiment, the crane is configured to allow the blades to be mounted to the hub of a nacelle, the nacelle being preferably mounted on a mast supported in an upright position on the vessel.
[0059] In one embodiment, the trolley guide includes one or more guides (e.g., one or more rails) and the trolley is provided with a guide engagement device (e.g., a guide wheel) that engages the guide and that movably secures the trolley to the trolley guide, such that the trolley can only move along the trolley guide and cannot move in a direction perpendicular to the trolley guide.
[0060] In one embodiment, the erection crane is mounted on a vessel having an erection deck, the vessel further comprising a storage deck supported by the hull of the vessel, the storage deck being provided with storage racks for supporting a plurality of wind turbine components, e.g. monopiles or masts, in a horizontal position, the storage deck and the storage racks being configured to support the plurality of wind turbine components parallel to each other and preferably parallel to a longitudinal axis of the vessel.
[0061] In an embodiment, the storage rack is configured to support a plurality (e.g., three) rows of the wind turbine components on the storage deck. In a further embodiment, the storage rack is configured to support two or more rows of the wind turbine components, one row stacked on top of the other. Preferably, the storage deck is positioned adjacent to the erection deck, and the wind turbine components are stored on the storage deck parallel to the cart track. This facilitates moving the wind turbine components from the storage deck to the erection deck and onto the cart track, because the orientation of the wind turbine components does not need to be changed when they are lifted from the storage deck onto the erection deck.
[0062] In one embodiment, the erection crane is mounted on the vessel and positioned at one end of the storage deck, and the vessel is provided with a storage crane at an opposite end of the storage deck, the erection crane and the storage crane configured to lift the wind turbine component together from the storage deck to the erection deck, the crane and the storage crane respectively lifting an end of the wind turbine component. In such an embodiment, the crane and the storage crane are positioned to lift the wind turbine component in a horizontal position from the storage deck onto the erection deck. In a further embodiment, the crane can be used to lift the wind turbine component from a supply vessel or from a quay onto the storage deck as well.
[0063] In some embodiments, the erection deck and the storage deck are both part of a single ship deck.
[0064] In one embodiment, the erection deck and the crane are configured to be parallel to the longitudinal axis of the vessel when the wind turbine component is supported in a horizontal position on the erection deck and when an upper end of the wind turbine component is connected to the load connection device.
[0065] In an embodiment, the active horizontal motion device is mounted between the trolley and the load coupling device when received in the trolley and / or the wind turbine component engagement device supported by the load coupling device, the active horizontal motion device being adapted to actively compensate for sea-state induced horizontal displacements of the wind turbine component engagement device relative to the installation site in two non-parallel horizontal directions, e.g. orthogonal horizontal directions, while the wind turbine component is supported in an upright position by the wind turbine component engagement device.
[0066] In a further embodiment, the active horizontal motion device includes one or more motor-powered displacement actuator assemblies, such as a hydraulic power assembly including a pump and one or more hydraulic cylinders or a winch assembly.
[0067] In an embodiment, the active horizontal motion device is configured to be used to damp movement of the upper end of the wind turbine component during erection and / or during lowering of the wind turbine component. For example, during erection of the foundation pile, for example, ship roll and / or wind may cause the upper end of the foundation pile to sway relative to the trolley. Instead of providing a super-rigid connection between the foundation pile and the trolley, the active horizontal motion device can be configured to damp and absorb the sway movement of the upper end of the foundation pile.
[0068] Also, when the foundation pile is lowered into the sea while being guided by the pile gripper, ocean currents may cause the pile to move, for example, to pivot relative to the pile gripper. The active horizontal motion can be used to dampen movements of the upper end of the wind turbine component. In a further embodiment, the control system controlling the active horizontal motion device is linked to the active horizontal motion device supporting the gripper, such that movements of the gripper and the load coupling device can both be controlled to optimally damp movements of the foundation pile and to optimally position the foundation pile in a vertical position above the foundation installation site.
[0069] In an embodiment, the trolley is provided with a wind turbine component engagement device configured to pivotally support a wind turbine component at an upper end thereof, the trolley being configured to couple with a load coupling device of a hoist.
[0070] In one embodiment, the trolley is configured to receive a wind turbine component engagement device supported by a load coupling device of the hoist.
[0071] In one embodiment, the trolley is configured to receive a load coupling device of a hoist, the load coupling device supporting a wind turbine component engagement device configured to pivotally support a wind turbine component at an upper end thereof.
[0072] In one embodiment, the trolley is configured to receive a wind turbine component engagement device supported by a load coupling device of the hoist.
[0073] In some embodiments, the crane further includes a trolley hoist including a trolley hoist winch with an associated trolley hoist wire that is guided to the trolley through the crown block for moving the trolley along the trolley guide. In such an embodiment, the crane hoist is used when lifting the load and the trolley hoist is used to move the trolley when erecting the wind turbine components.
[0074] In one embodiment, the crane further includes a secondary hoist including a secondary hoist winch with an associated secondary hoist wire supporting a secondary load coupling device configured to be connected to a load, the hoist wire being guided through the crown block to the load coupling device for lifting the load at a predetermined distance from the crane base using the secondary hoist winch.
[0075] The invention further relates to an installation vessel for the installation and preferably transportation of wind turbine components, such as monopiles or masts, the installation vessel comprising: - a hull forming a pier deck; - a crane according to the invention, the crane being supported by the hull of the vessel adjacent to the crane deck; - a cart track, the cart track extending along the erection deck; - a support cart for supporting a bottom end of a wind turbine component, the support cart being supported by a cart track and enabling the cart to move along the cart track to guide the bottom end of the wind turbine component along the erection deck from a position distal to the crane to a position adjacent to the crane; - a gripper, which extends outside the contour of the vessel, for example to guide a monopile that has been lowered in a vertical position into the water adjacent to the vessel, or to engage and preferably stabilise a floating foundation for mounting a mast; The present invention provides a vessel installation, including:
[0076] In one embodiment, the erection deck with the cart truck is positioned above the vessel's central axis, and the crane is mounted away from the vessel's central axis, for example along the vessel's side. In such an embodiment, the cart truck is therefore not aligned with the swivel axis of the erection crane. In such an embodiment, the wind turbine component is aligned with the vessel's central axis during the erection process. In a further embodiment, the gripper is likewise positioned above the vessel's central axis, and the wind turbine can be moved into the gripper without substantially deviating from the vessel's centerline. The latter allows for efficient transfer of the wind turbine component from an erection location above the vessel to an installation location adjacent to the vessel (i.e. outside the vessel's profile).
[0077] In an alternative embodiment of the installation vessel according to the invention, the cart track is aligned with the swivel axis of the crane such that the central axis of the wind turbine component supported by the cart at one end and connected to the trolley (or more specifically to the load connection device) at the opposite end is aligned with the swivel axis of the erection crane, so that the weight of the wind turbine component is optimally transferred to the crane during the erection process.
[0078] In a further embodiment, at least a portion of the storage deck is aligned with the central longitudinal axis of the vessel such that the wind turbine components may be stored on the storage deck above the centerline of the vessel. In such an embodiment, the erection deck is adjacent to the central longitudinal axis of the vessel and the wind turbine components supported on the erection deck are not positioned above the central longitudinal axis of the vessel.
[0079] In one embodiment, the gripper is a monopile gripper and is positioned at the stern of the vessel and on the central longitudinal axis of the vessel. This is particularly beneficial when the vessel's hull has an elongated shape. When the gripper is positioned on the vessel's centerline, the transfer of the wind turbine components to the installation site (particularly the landing of the monopile on the seabed or the landing of the mast on the foundation) does not cause a large shift in the vessel's balance and therefore does not require the use of active ballast to compensate for the vessel's roll.
[0080] In one embodiment, the gripper is xy compensated, i.e. configured to position the wind turbine component supported by the erection crane in an erected (i.e. upright) position in the XY plane, and therefore configured to compensate for movements of the vessel relative to the wind turbine component installation site.
[0081] In one embodiment, the trolley is an xy compensated trolley, i.e. configured to position in an XY plane the top of the wind turbine component supported in the erected position, and thus configured to compensate for movements of the vessel relative to the wind turbine component installation site.
[0082] For example, in one embodiment, the active horizontal motion device is mounted between the trolley and the load coupling device when received in the trolley and / or the wind turbine component engagement device supported by the load coupling device, and the active horizontal motion device is adapted to actively compensate for sea-state induced horizontal displacements of the monopile engagement device in two non-parallel horizontal directions (e.g., in orthogonal horizontal directions) while the wind turbine component is supported in an upright position by the wind turbine component engagement device.
[0083] In a further embodiment, the active horizontal motion device includes one or more motor-powered displacement actuator assemblies, such as a hydraulic power assembly including a pump and one or more hydraulic cylinders or a winch assembly.
[0084] In a further embodiment, the active horizontal motion device is connected to a horizontal motion device linked to the gripper for moving the load coupling device and / or the wind turbine component engagement device independently from the movement of the gripper. For example, a control device can be provided that controls both the horizontal motion device of the trolley and the horizontal motion device of the gripper.
[0085] In one embodiment, the vessel includes a recess at the rear of the vessel, the recess being flanked by two deck sections. In a further embodiment, the gripper is a monopile gripper configured to guide a monopile supported in the recess by a raising crane. In a further embodiment, the monopile gripper is mounted on one of the deck sections and the raising crane is mounted on the opposing deck section.
[0086] In one embodiment, an erection deck is provided on the central axis of the vessel and aligned with the recess, and opposite the erection deck a storage deck is provided, the storage deck aligned with a deck portion on which a crane is mounted and providing storage for the wind turbine blades.
[0087] In one embodiment, the vessel is provided with a wind turbine assembly station at the end of the erection deck and adjacent to the erection crane for assembling the wind turbine, i.e. for mounting the nacelle on the mast and for providing the blades to the nacelle.
[0088] In one embodiment, the crane includes a blade installer device that can be mounted to a trolley for supporting the wind turbine blades and for positioning the blades relative to a nacelle that is mounted on a mast supported in a wind turbine assembly station adjacent to the erection crane.
[0089] In a further embodiment, the blade installer device comprises: - a base, the base being adapted to be mounted on a trolley or adapted to be integrated with a dedicated trolley; - a connector, the connector being configured to engage a wind turbine blade or to engage a blade support removably mounted on the blade; a pivot arm, the pivot arm being connected at a base end to a base for pivoting about a vertical axis in use and at an opposite end to a connector for pivoting about a vertical axis in use; Includes.
[0090] In one embodiment, the trolley is configured to support the assembled wind turbine, and the erection crane is provided with a second trolley to engage the mast of the assembled wind turbine at its lower end to stabilize the assembled wind turbine when supported by the erection crane.
[0091] In one embodiment, the gripper is a foundation gripper configured to engage the floating foundation and position the floating foundation in a horizontal plane relative to the vessel and / or stabilize the floating foundation relative to the vessel.
[0092] In one embodiment, the gripper is a monopile gripper, the monopile gripper configured to guide a monopile being lowered adjacent to a vessel using a crane.
[0093] In one embodiment, the vessel includes a foundation gripper and a monopile gripper, preferably the pile gripper is integrated into the foundation gripper.
[0094] In some embodiments, the crane further includes a crane tower for supporting a wind turbine component (e.g., a monopile) on a side of the crane opposite the side on which the boom is supported. For example, the crane tower can be used to support the monopile in a gripper and to lower the monopile in a vertical position into the water adjacent to the vessel while the boom of the erection crane is used to erect the mast.
[0095] The crane tower extends between a base end and a top end and is mounted in a fixed and upright position on the crane housing for rotation with the crane boom about a vertical pivot axis, the crane tower comprising: - a support trolley configured to support the wind turbine component at its upper end; - a trolley guide for guiding the trolley along the crane tower, e.g. a track with one or more guide rails; - a hoisting winch and associated hoisting wire, which is guided through the top of the crane tower to hoist the trolley along the trolley guide, e.g. to lower the monopile towards the seabed; is being offered.
[0096] In some embodiments, the crane (e.g., the crane housing and / or the crane boom) is provided with a wind turbine component securing arm or tugger for engaging a lower section of the wind turbine component supported in a vertical position by the crane, and in particular to prevent the wind turbine component from swaying during the swing of the crane while supporting the wind turbine component in a vertical position. Thus, the crane can also be used to move the wind turbine component from one location to another (e.g., from an on-board location to an off-board location) for installation of the wind turbine component at the installation site, e.g., for mounting the mast of an assembled wind turbine on a foundation.
[0097] In one embodiment, one or more hoisting wires are passed between the upper and lower sheave assemblies, and the one or more hoisting wires are connected to a hoist winch of a crane having sufficient capacity to lift a wind turbine component, for example, sufficient capacity to lift an assembled wind turbine or a foundation pile.
[0098] In one embodiment, the boom includes a jib and an upper sheave assembly is provided in the jib such that when the load connection device is received in the trolley, the hoist line is positioned away from the boom and at a location consistent with a central axis of a wind turbine component supported in a vertical position by the trolley.
[0099] In one embodiment, the boom is an A-frame including two legs and trolley guides are provided on both legs.
[0100] In one embodiment, the boom includes a jib and an upper sheave assembly is provided in the jib such that the hoist wire is positioned away from the boom when the load connection device is received in the trolley. In such an embodiment, the hoist wire (or, more specifically, the section of the hoist wire that is luffed between the upper sheave assembly and the lower sheave assembly) is aligned with the wind turbine component that is supported in a vertical position by the crane. This configuration prevents the trolley from experiencing moment forces caused by the weight of the wind turbine component.
[0101] In a further embodiment, a portion of the hoist wire extending between the trolley and the upper pulley assembly runs parallel to the trolley guide.
[0102] In one embodiment, the boom includes a gantry at a base end and a gantry jib at a top end, and is provided with one or more gantry wires extending between the gantry and the gantry jib, and luffing wires extending between a luffing winch and the boom, and more specifically between the luffing winch and the gantry of the boom. This configuration reduces bending forces in the A-frame of the boom, especially when the boom also includes a jib for spacing the hoisting wires from the boom.
[0103] The invention further preferably relates to a method for erecting a wind turbine component using an installation vessel according to the invention, the method comprising the steps of: - lifting a wind turbine component (e.g. a monopile) in a horizontal position above the erection deck using a crane with a boom in a lowered hoisting position to lift one end of the monopile and a hoisting crane to lift the opposite end of the monopile; - moving the boom from a lowered hoisting position to a raised erection position; - engaging a wind turbine with a wind turbine engagement device (e.g. a monopile wind turbine engagement device); - erecting the wind turbine component using a crane with the boom in an erecting position to lift one end of the wind turbine component by moving a trolley along the boom from a lowered coupled position to a raised support position. The present invention provides a method comprising:
[0104] In a further method according to the invention, the wind turbine component is a monopile and the gripper is a monopile gripper, the method comprising: - after the erecting step, pivoting the crane about a vertical pivot axis over a pivot angle of at least 180 degrees, preferably over a pivot angle of more than 180 degrees, for example over a pivot angle of 190 degrees, to move the monopile from the erecting deck over the side of the vessel and thereafter towards a monopile gripper mounted at the aft end of the vessel's hull, thereby moving the pile from the erecting location above the erecting deck to a setting location, where the monopile is aligned with the monopile gripper, Further includes:
[0105] The invention further provides a crane, the crane being supported by a hull of a vessel adjacent an erection deck for erecting and installing wind turbine components for supporting a wind turbine, the crane comprising: - a crane base that will be supported by the vessel's hull; - Crane housing and; - a slewing bearing provided between the crane housing and the crane base, the slewing bearing enabling the crane housing to swivel about a vertical slewing axis; - a boom extending between a base end and an upper end, the boom being pivotally supported by the crane housing at the base end for pivoting about a horizontal boom pivot axis between a lowered hoisting position and a raised erection position for erecting a wind turbine component; - a luffing winch and associated luffing wire, the luffing winch being mounted on the crane housing and the luffing wire extending between the luffing winch and the boom and enabling the boom to be pivoted between a lowered position and a raised position; - a trolley, the trolley being provided with a wind turbine component engagement device, the wind turbine component engagement device being configured to pivotally support a wind turbine component at an upper end thereof; - a trolley guide (e.g., a track including one or more guide rails) for guiding a trolley along a boom, the trolley guide including a boom section mounted to the boom of the crane and a base section mounted to the base of the crane, the trolley being capable of being received onto the base section of the trolley guide, allowing operation of the boom without the trolley; - a hoisting winch and associated hoisting wire, the hoisting wire being guided through the boom and supporting a load connection device, the load connection device being configured to be connected to a load and preferably to a trolley for hoisting the trolley along the trolley guide between a lowered connection position for connecting the load connection device to an upper end of a pile positioned in a horizontal position above the erection deck, and a raised support position for supporting a wind turbine component in a vertical position; The present invention provides a crane including
[0106] The invention further provides a crane, the crane being supported by a hull of a vessel adjacent an erection deck for erecting and installing wind turbine components for supporting a wind turbine, the crane comprising: - a crane base that will be supported by the vessel's hull; - Crane housing and; - a slewing bearing provided between the crane housing and the crane base, the slewing bearing enabling the crane housing to swivel about a vertical slewing axis; - a boom extending between a base end and an upper end, the boom pivotally supported by the crane housing at the base end for pivoting about a horizontal boom pivot axis between a lowered hoist position for lifting a load at a predetermined distance from the crane base and a raised erection position for erecting a wind turbine component adjacent the crane base; - a luffing winch and associated luffing wire, the luffing winch being mounted on the crane housing and the luffing wire extending between the luffing winch and the boom and enabling the boom to be pivoted between a lowered position and a raised position; - a trolley, the trolley being provided with a wind turbine component engagement device, the wind turbine component engagement device being configured to pivotally support a wind turbine component at an upper end thereof or configured to receive the wind turbine component engagement device and / or a load coupling device supporting the wind turbine component engagement device; - a trolley guide for guiding the trolley along the boom, e.g. a track including one or more guide rails; - a hoisting winch and associated hoisting wire, the hoisting wire being guided via an upper end of the wire and supporting a load connection device, the load connection device being configured to be connected to a load, preferably configured to be connected to a trolley for hoisting the trolley along the trolley guide between a lowered connection position for connecting the trolley to an upper end of the pile located in a horizontal position above the erection deck, and a raised support position for supporting the wind turbine component in a vertical position; - preferably an active horizontal motion device, mounted between the trolley on one side and the load coupling device and / or the wind turbine component engagement device on the other side, the active horizontal motion device adapted to actively compensate for sea-state induced horizontal displacements of the wind turbine component engagement device in two non-parallel horizontal directions (e.g. in orthogonal horizontal directions), while the wind turbine component is supported in an upright position by the wind turbine component engagement device; The present invention provides a crane including
[0107] In a further embodiment, the active horizontal motion device is connected to a horizontal motion device linked to the wind turbine component gripper for moving the load coupling device and / or the wind turbine component engagement device independent of movement of the wind turbine component gripper.
[0108] The invention further relates to an installation vessel for the installation and preferably transportation of monopiles and wind turbines, the vessel comprising: - a hull forming a pier deck; - a crane supported by the vessel's hull adjacent to the erection deck; Including, The crane is - Crane base; - a crane housing and a slewing bearing, the slewing bearing being provided between the crane base and the crane housing, the slewing bearing enabling the crane housing to swivel about a vertical slewing axis; - a boom extending between a base end and an upper end, the boom being pivotally supported at the base end by the crane housing for pivoting between a lowered position for lifting a load at a predetermined distance from the crane base and an elevated erection position for erecting a wind turbine component adjacent the crane base; - a luffing winch and associated luffing wire, the luffing winch being mounted on the crane housing and the luffing wire extending between the luffing winch and the boom, enabling the boom to be pivoted between a lowered position and a raised erection position; - a hoist, the hoist including a hoisting winch and an associated hoisting wire, the hoisting wire being guided through an upper sheave assembly in the boom to a lower sheave assembly of the load coupling device for coupling with a load (e.g. an upper end of a wind turbine component), enabling the crane to lift the load using the hoisting winch; - a trolley guide mounted on the boom of the crane, e.g. a track including one or more guide rails; - a trolley provided with a wind turbine component engagement device configured to pivotally support a wind turbine component at an upper end thereof or the trolley is configured to receive the wind turbine component engagement device and / or a load coupling device supporting the wind turbine component engagement device; - a cart track, the cart track extending along the erection deck; - a support cart for supporting a bottom end of a wind turbine component, the support cart being supported by a cart track and enabling the cart to move along the cart track to guide the bottom end of the wind turbine component along the erection deck from a position distal to the crane to a position adjacent to the crane; - a gripper, which extends outside the contour of the vessel, for example to guide a monopile that has been lowered in a vertical position into the water adjacent to the vessel, or to engage and preferably stabilise a floating foundation for mounting a mast; Including, The trolley provides an installation vessel coupled to the trolley guide to be guided along the boom of the crane for guiding a top end of the wind turbine component along the trolley guide while erecting the monopile with the bottom end of the wind turbine component being guided by the cart and erection truck.
[0109] In an embodiment, the crane further includes a crane tower for supporting a wind turbine component on a side of the crane opposite the boom, e.g., for supporting a monopile in a monopile gripper, and for lowering the monopile to a vertical position adjacent to the vessel and into the water, the crane tower extending between a base end and a top end and mounted in a fixed and upright position on the crane housing for rotation with the boom of the crane about a vertical pivot axis, the crane tower comprising: - a support trolley configured to support the wind turbine component at its upper end; - a trolley guide for guiding the trolley along the crane tower, e.g. a track with one or more guide rails; - a hoisting winch and associated hoisting wire, the hoisting wire being guided through the top of the crane tower to hoist the trolley along the trolley guides for lifting and lowering the wind turbine components; is being offered.
[0110] The invention further provides a crane for providing the installation vessel according to the invention.
[0111] In this specification, a wind turbine component may refer to a pile or foundation pile for supporting a mast of a wind turbine, or a mast that supports a nacelle of a wind turbine.
[0112] The invention further relates to an installation vessel for the installation and preferably transportation of wind turbine components (e.g. monopiles or masts), the installation vessel comprising: - a hull forming a pier deck; - a crane supported by the vessel's hull adjacent to the erection deck; Including, The crane is - a crane base, a crane housing, and a slewing bearing, the slewing bearing being provided between the crane housing and the crane base, the slewing bearing enabling the crane housing to slewing about a vertical slewing axis; - a boom extending between a base end and a top end, the boom being pivotally supported at the base end by the crane housing for pivoting about a horizontal boom pivot axis between lowered and raised positions to lift a load and to move the load toward or away from the crane base; - a luffing winch and associated luffing wire, the luffing winch being mounted on the crane housing and the luffing wire extending between the luffing winch and the boom and enabling the boom to be pivoted between a lowered position and a raised position; - a hoist, the hoist including a hoisting winch and an associated hoisting wire, the hoisting wire being guided through an upper sheave assembly in the boom to a lower sheave assembly of the load coupling device for coupling with a load (e.g. an upper end of a wind turbine component), enabling the crane to lift the load using the hoisting winch; - a cart track, the cart track extending along the erection deck; - a support cart for supporting a bottom end of a wind turbine component, the support cart being supported by a cart track and enabling the cart to move along the cart track to guide the bottom end of the wind turbine component along the erection deck from a position distal to the crane to a position adjacent to the crane; - a gripper, which extends outside the contour of the vessel, for example to guide a monopile that has been lowered in a vertical position into the water adjacent to the vessel, or to engage a foundation for mounting a mast; - a trolley guide mounted on the boom of the crane, e.g. a track including one or more guide rails; - a trolley, the trolley coupled with the trolley guide to be guided along a boom of the crane, the trolley configured to engage with the load coupling device to guide the load coupling device, and thus to guide an upper end of the wind turbine component supported by the load coupling device, along the trolley guide during erection of the wind turbine component using a hoist, the boom of the crane being guided with a bottom end of the wind turbine component guided by the cart and erection truck and with a top end of the wind turbine component guided by the trolley and the trolley guide; and the trolley and the vessel are capable of being pivoted in an erection position to erect the wind turbine component, preferably the vessel further includes a boom fixing device, the boom fixing device including a stop for positioning the boom in the erection position, and a boom locking device for fixing and locking the boom in the erection position, and / or a boom mobilizer for moving the boom out of the erection position and away from the boom fixing device (e.g. a hydraulic cylinder for pushing the boom away from the erection position, or a winch with an associated wire for pulling the boom away from the erection position). The present invention provides a vessel installation, including:
[0113] The invention further relates to an installation vessel for the installation and preferably transportation of monopiles for supporting a wind turbine, the installation vessel comprising: - a hull forming a pier deck; - a crane supported by the vessel's hull adjacent to the erection deck; Including, The crane is - a crane base, a crane housing, and a slewing bearing, the slewing bearing being provided between the crane housing and the crane base, the slewing bearing enabling the crane housing to slewing about a vertical slewing axis; - a boom extending between a base end and a top end, the boom being pivotally supported at the base end by the crane housing for pivoting about a horizontal boom pivot axis between lowered and raised positions to lift a load and to move the load toward or away from the crane base; - a luffing winch and associated luffing wire, the luffing winch being mounted on the crane housing and the luffing wire extending between the luffing winch and the boom and enabling the boom to be pivoted between a lowered position and a raised position; - a hoist, the hoist including a hoisting winch and an associated hoisting wire, the hoisting wire being guided through an upper block to a load coupling device (or, respectively, through an upper sheave assembly in the boom to a lower sheave assembly of the load coupling device) for coupling with a load (e.g. the upper end of a monopile), enabling the crane to lift the load using the hoisting winch; - a cart track, the cart track extending along the erection deck; - a support cart for supporting a bottom end of the monopile, the support cart being supported by the cart track and enabling the cart to move along the cart track to guide the bottom end of the monopile along the erection deck from a position distal to the crane to a position adjacent to the crane; - a monopile gripper, the monopile gripper extending outside the contour of the vessel for guiding the monopile being lowered in a vertical position into the water adjacent to the vessel; - a trolley guide mounted on the boom of the crane, e.g. a track including one or more guide rails; - a trolley, the trolley being coupled to the trolley guide so as to be guided along the boom of the crane, the trolley being configured to engage with the load coupling device for guiding the load coupling device, and thus the upper end of the monopile supported by the load coupling device, along the trolley guide during erection of the monopile using the hoist; Including, The boom of the crane provides an erection vessel that can be pivoted in an erection position to erect the monopile, with the bottom end of the monopile guided by the cart and erection truck, and the top end of the monopile guided by the trolley and trolley guides.
[0114] As used herein, adjacent to a crane is considered to be within reach of the crane when the boom of the crane is in the raised erection position.
[0115] In an embodiment, the active horizontal motion device is mounted between the trolley and the load coupling device (when received in the trolley) and / or a wind turbine component engagement device supported by the load coupling device, and the active horizontal motion device is adapted to actively compensate for sea-state induced horizontal displacements of the wind turbine component engagement device in two non-parallel horizontal directions (e.g. in orthogonal horizontal directions) while the wind turbine component is supported in an upright position by the wind turbine component engagement device.
[0116] In a further embodiment, the active horizontal motion device includes one or more motor-powered displacement actuator assemblies (eg, a hydraulic power assembly including a pump and one or more hydraulic cylinders or a winch assembly).
[0117] In an embodiment, the marine vessel according to the claimed invention is provided with a cart track and a support cart, the support cart being configured to support a bottom end of the wind turbine component for guiding the bottom end of the wind turbine component along the erection deck, and the cart track is thus configured to engage the bottom end of the wind turbine component.
[0118] In an embodiment, the support cart includes a cart base and a wind turbine component engagement device, the cart base is movably supported on the cart track, and the wind turbine component engagement device is configured to engage a bottom end of the wind turbine component. Preferably, the wind turbine component engagement device is pivotally supported by the cart base, such that the wind turbine engagement device can be pivoted with the wind turbine component during erection. For example, the cart can include a cradle for supporting the bottom end of the foundation pile, or an insert to be inserted into the bottom end of the foundation pile to engage the bottom end of the foundation pile inside. In such an embodiment, the cradle or insert is pivotally supported by the cart base.
[0119] In one embodiment, the erection crane is mounted on the vessel and positioned relative to the storage deck such that the center of gravity of the piles stored on the storage deck is within the reach of the erection crane. The erection crane is thus positioned to lift the wind turbine components (e.g. foundation piles) from the storage deck to the erection deck in a horizontal position. In a further embodiment, the erection crane can be used to lift the wind turbine components from the supply vessel or from the quay to the storage deck as well.
[0120] In such an embodiment, there is no need for a second crane (e.g., a storage crane) to load the pile, since the erection crane can be used to lift the pile onto the vessel (i.e., to lift the pile in a horizontal position), and the erection crane can therefore be used to lift the pile from the storage position to the erection position.
[0121] Also, in some embodiments, the base guide section of the trolley guide extends down to a deck (e.g., a submersible deck) along the base of the crane and / or along the portion of the hull that supports the crane. In some embodiments, the trolley can be parked on the base guide section of the trolley guide. When the trolley is parked on the base guide section, the boom of the crane can be operated without it supporting the trolley. This is particularly beneficial when the crane is to be used to lift a load, but not to erect a wind turbine component. Additionally or alternatively, the base guide and trolley can be configured such that the trolley can be landed on the erection deck and can be detached from the base guide and stored on the erection deck (or on another deck) away from the base guide. In some embodiments, the trolley is configured to be moved along the cart track.
[0122] The erection crane according to the invention can also be combined with a semi-submersible or heavy-lift vessel. In one embodiment, the vessel is a monohull semi-submersible vessel (or heavy-lift vessel) provided with an elongated hull supporting a lowered submersible deck (i.e. a deck recessed into the hull structure). By flooding and emptying the ballast tanks, the heavy-lift vessel can be moved between a raised transport position and a lowered (or semi-submerged) position, in which the submersible deck is above the water surface and in which the submersible deck is submerged, i.e. below the water surface.
[0123] Such heavy lift vessels therefore include one or more hull sections extending upwardly from a submersible deck that support the vessel's pilot house, crew accommodation, cranes, second deck, etc.
[0124] In one embodiment, the hull of the heavy lift vessel includes a bow section that supports a crane and a submersible deck that extends from the bow section of the hull toward the rear of the vessel. Such vessels are disclosed, for example, in publications WO2019245374 and WO2021245175. In these embodiments, the base of the crane is supported on the bow section of the vessel's hull. The vertically lower hull of the vessel includes the crane support structure.
[0125] In one embodiment, the erection crane according to the invention is provided on a heavy lift vessel, the heavy lift vessel including a bow section and a submersible deck, the submersible deck being recessed relative to the bow section and extending from the bow section towards the rear of the vessel. In such an embodiment, the crane is positioned on the bow section adjacent the submersible deck and adjacent the side of the vessel. The erection crane is therefore supported by the bow section (i.e. the section of the hull extending above the submersible deck of the vessel).
[0126] In this embodiment the submersible deck of the heavy lift vessel includes a erection deck and preferably a storage deck.
[0127] The erection deck (i.e. the section of the submersible deck for erection) is provided with a cart track and a support cart for guiding the bottom end of the mast or monopile during the erection process. The cart track extends along the erection section of the submersible deck, parallel to the longitudinal axis of the vessel, between a track end distal to the crane and a track end adjacent to the erection crane (and thus adjacent to the bow section of the vessel supporting the erection crane).
[0128] The storage deck (i.e. the section of the submersible deck for storage of the wind turbine components) is provided with storage racks for supporting a number of monopiles or masts in a horizontal position. The storage deck is located adjacent to the erection deck and the wind turbine components are stored on the storage deck parallel to the cart track and thus parallel to the longitudinal axis of the vessel. This facilitates moving the wind turbine components from the storage deck to the erection deck and onto the cart track, because the orientation of the wind turbine components does not need to be changed when they are lifted from the storage deck onto the erection deck.
[0129] In this embodiment, the erecting crane has a trolley guide that includes a boom section that is attached to the crane's boom and a base section that is attached to the crane's base. In such an embodiment, the trolley guide extends along and below the crane's boom, i.e., below the horizontal boom pivot axis, when the boom is in the erecting position. Thus, the trolley can be moved along the crane's boom and lowered below the crane's boom when the boom is in the erecting position. Extending the trolley guide below the boom pivot axis allows the trolley to be lowered below the boom pivot axis.
[0130] In this embodiment, the base section of the trolley guide is provided on the side of the crane base facing the submersible deck of the vessel. Moreover, the base section of the trolley guide extends downwards from the crane base (which is supported on the bow section of the vessel) towards the submersible deck along a part of the bow section facing the submersible deck. Thus, extending the trolley guide allows the trolley to be lowered closer to the erection deck (i.e. closer to the submersible deck which is recessed relative to the bow section).
[0131] In this embodiment, the base section of the trolley guide is mounted to the base of the crane and to a portion of the vessel's hull and does not pivot with the boom and the trolley guide connected to the boom when the erection crane is rotated about the vertical pivot axis.
[0132] In a further embodiment, the submersible deck (more specifically, the erection section of the submersible deck) is provided with a cart track, allowing the lower ends of the wind turbine components (e.g., foundation piles) to be guided by the cart during erection.
[0133] In this embodiment, the base section of the trolley guide is aligned with the cart track on the submersible deck such that it can be used to lower the trolley into alignment with the cart track at a position near the deck. Thus, the trolley can be lowered from the boom section onto the base section and into a position near the erection deck aligned with the cart track. This allows, for example, a wind turbine component engagement device and / or a load coupling device supporting the wind turbine component engagement device to be guided to a position near the deck and coupled with the top end of the monopile.
[0134] In one embodiment, the heavy lift vessel is provided with grippers for guiding the monopile, which is lowered into a vertical position into the water adjacent to the vessel using a crane.
[0135] In a further embodiment, the pile gripper is supported adjacent the erection deck (i.e. adjacent the semi-submersible deck of the vessel) at the end of the deck in the bow section.
[0136] In such an embodiment, the pile grippers may be mounted to the side of the vessel (i.e., on a vertical section of the hull), adjacent the erection deck and at the end of the erection track.
[0137] In an alternative embodiment, the pile gripper includes a pile gripper support structure mounted on the erection deck at the end of the erection deck. In such an embodiment, the pile gripper support structure can be mounted on the end of the erection truck (or cart truck). Alternatively, the erection truck terminates in front of the pile gripper support. In such an embodiment, the semi-submersible deck includes a pile gripper set-up area between the end of the erection truck and the bow section, and thus between the erection truck and the base of the erection crane, when viewed in top view.
[0138] In such an embodiment, a support cart for supporting a bottom end of a wind turbine component (e.g., a foundation pile) is configured to hold the bottom end of the wind turbine component at a predetermined height above the semi-submersible deck such that it is able to hold the bottom end of the wind turbine component while it is supported by the erection crane above the pile gripper support structure.
[0139] For example, the support cart may include a cart base and a wind turbine component engagement device, the cart base being movably supported on the cart track, the wind turbine component engagement device being configured to engage a bottom end of the wind turbine component, and the wind turbine component engagement device being pivotally supported by the cart base. In such an embodiment, the cart base has a pivot axis at a predetermined height above the pile gripper (or at least the pile gripper support structure) such that when the wind turbine component is erected (i.e., pivoted to an upright position), a bottom surface of the wind turbine component is at the predetermined height above the pile gripper (or at least the pile gripper support structure).
[0140] Moreover, the pivot axis is preferably at a height greater than a width of the wind turbine component when the wind turbine component is in a horizontal configuration before erection, such that when the wind turbine component is erected (i.e., pivoted to an upright position), the wind turbine component is adjacent to the pivot axis. Thus, the support cart can be moved next to the pile gripper support structure with the wind turbine component engagement device engaged with the wind turbine component, while the wind turbine component is supported by the erection crane above the pile gripper support structure.
[0141] Additionally or alternatively, the support cart is configured to vertically guide the bottom ends of the wind turbine components.
[0142] In one embodiment, the base of the crane is provided with an additional trolley guide base section, which is provided on the side of the crane base facing the side of the vessel. The additional trolley guide base section extends from the crane base (supported on the bow section of the vessel) along a part of the bow section of the vessel at the side of the vessel. The trolley can thus be lowered from the boom section onto the additional base section, optionally via the intermediate section, to a position near the water surface. This allows, for example, to guide a wind turbine component engagement device and / or a load coupling device supporting the wind turbine component engagement device below the additional trolley guide base section to a position near a pile guide supported on the side of the vessel.
[0143] The trolley guide base section and the additional trolley guide base section can be aligned with the trolley guide boom section by pivoting the crane housing in place. In one embodiment, the crane housing is pivoted through a 90 degree angle to move the trolley guide boom section from a position where the trolley guide boom section is aligned with the trolley guide boom section and a position where the trolley guide boom section is aligned with the additional trolley guide boom section.
[0144] In one embodiment, the heavy lift vessel is provided with grippers for guiding the monopile, which is lowered into a vertical position into the water adjacent to the vessel using a crane.
[0145] In a further embodiment, the vessel is configured to support a pile gripper adjacent the bow section of the vessel and adjacent the crane (preferably close to the water surface). In such an embodiment, the erecting crane is capable of moving erected piles from the submersible deck into or over the pile gripper by pivoting through a 90 degree angle.
[0146] In some embodiments, the vessel is provided with a mount for supporting the gripper (e.g. a mount fixed to a part of the vessel's hull configured to support a pile-raising crane). In such an embodiment, the gripper is preferably configured to be hoisted into position using the pile-raising crane. The pile-raising crane can thus be used to move the gripper between a stored position (e.g. for when the vessel is to enter the port) and a mounted position (for guiding the pile adjacent to the vessel).
[0147] In an alternative embodiment, the vessel is provided with a gripper support structure configured to transport the grippers from a position above the submersible deck to a position adjacent the vessel for guiding the pile, hi a further embodiment, the gripper support structure is configured to at least partially support the pile grippers in a position adjacent the vessel for guiding the pile.
[0148] In an alternative embodiment, the heavy lift vessel is provided with a pile gripper at the end of the erection track, near the bow section, adjacent to the submersible vessel for guiding the piles. In such an embodiment, the pile gripper preferably includes a pile gripper support structure configured to move the pile gripper between a storage position at one end of the erection track (to enable the erection crane to erect the foundation piles) and a position adjacent to the vessel on the other side of the erection track for guiding the erected piles.
[0149] In an embodiment the gripper is xy compensated, i.e. configured to position the wind turbine component supported by the erection crane in an erected (i.e. upright) position in the XY plane and therefore configured to compensate for movements of the vessel relative to the wind turbine component installation site. Preferably the gripper includes a gripper support structure configured to support the gripper adjacent to the vessel in a position for guiding the pile and configured to provide the gripper with xy compensation in that position.
[0150] In one embodiment, the gripper is xy compensated, e.g. configured to position the monopile (supported in an upright position) in the XY plane and therefore configured to compensate for vessel movements relative to the monopile installation site.
[0151] The invention furthermore relates to a single-hull vessel provided with an erection crane according to the invention, The marine vessel includes an elongated hull extending between a bow and an aft portion of the vessel, the elongated hull having a bow section supporting a crane and a pilot housing; the elongated hull supports a submersible deck extending from a bow section towards the aft of the vessel, the submersible deck being recessed into the hull structure relative to the bow section such that the bow section has a vertical hull surface facing towards the submersible deck and the aft of the vessel; The submersible deck includes a pile deck, the pile deck being provided with a cart track and a support cart for guiding a bottom end of the pile, the cart track extending parallel to a longitudinal axis of the ship between a track end distal to the bow section and a track end adjacent to the bow section; The submersible deck of the heavy lift vessel includes a storage deck adjacent to the erection deck, the storage deck being provided with storage racks for supporting a plurality of piles in a horizontal position parallel to the cart track and thus parallel to the longitudinal axis of the vessel; the erection crane being supported by a bow section of the vessel adjacent the submersible deck and adjacent the side of the vessel; A crane trolley guide includes a boom section attached to the crane boom and a base section attached to the crane base, the trolley guide base section being provided on a side of the crane base that faces the submersible deck of the vessel, and the trolley guide base section extends from the crane base (supported on the bow section of the hull) along a vertical hull surface of the bow section that faces the submersible deck so that the trolley can be lowered along the vertical hull surface towards the submersible deck.
[0152] In some embodiments, the bow section also supports a deck (eg, for storing transition pieces, removable gripper rings when not in use, etc.).
[0153] In one embodiment, the erection crane is provided with stabilizer arms, preferably located at the lower end of the boom and / or on the crane housing for engaging a wind turbine component supported by the erection crane, stabilizing the wind turbine component while the crane is pivoted about its pivot axis. In one embodiment, the stabilizer arms are provided with magnets for engaging the wind turbine component. In an alternative embodiment, the stabilizer arms are pivotable between an inactive upright position and an active horizontal position, in which they extend along the crane boom and in which they extend from the crane boom on opposite sides of the wind turbine component, holding the wind turbine component between them.
[0154] As used herein, the XY plane of a vessel has an X direction and a Y direction, where the X direction corresponds to the longitudinal direction of the vessel as known in the art, and the Y direction corresponds to the transverse direction of the vessel and is perpendicular to the X direction. The XY plane spans the X and Y directions. The vessel also has a Z direction perpendicular to the XY plane. Thus, when the vessel is floating in equilibrium on perfectly flat water, the XY plane is horizontal and the Z direction is vertical.
[0155] In an embodiment, the active horizontal motion device is mounted between the trolley and the load coupling device (when received in the trolley) and / or the wind turbine component engagement device supported by the load coupling device, and the active horizontal motion device is adapted to actively compensate for sea-state induced horizontal displacements of the load coupling device relative to the mounting location in two non-parallel horizontal directions (e.g., in orthogonal horizontal directions), while the wind turbine component is supported in an upright position by the wind turbine component engagement device. In a further embodiment, the horizontal motion device is configured to allow horizontal positioning of the load coupling device when not compensating for sea-state induced horizontal displacements. For example, the horizontal motion device can thus be used to move the load coupling device radially relative to the boom when the boom is in the erected position. This allows adjusting the position of the load coupling device, for example to vertically align the load coupling device with the load on the deck of the vessel, without having to pivot the boom from the erected position.
[0156] In one embodiment, the boom is pivotally supported by the crane housing at the base end via a horizontal boom pivot axis for pivoting between a lowered position for lifting a load at a predetermined distance from the crane base and a raised erection position for erecting a wind turbine component adjacent to the crane base.
[0157] In a further embodiment, the trolley includes a first trolley part connected to the trolley guide and a second trolley part hingeably connected to the first trolley part via a trolley hinge axis, the trolley hinge axis being parallel to a boom pivot axis such that when the boom is pivoted about the boom pivot axis, the second part of the trolley can be pivoted relative to the boom such that the second part maintains its orientation relative to the deck of the vessel. For example, in one embodiment, the trolley includes an active horizontal motion device mounted between the trolley and a load coupling device received within the trolley such that the active horizontal motion device is capable of actively compensating for sea-state induced horizontal displacements of the load coupling device in two non-parallel horizontal directions (e.g., orthogonal horizontal directions). Typically, the active horizontal motion device is configured to be capable of compensating for sea-state induced horizontal displacements of the load coupling device when the boom is in a raised erected position. When the horizontal motion device is part of the second part of the trolley, the active horizontal motion device can be maintained in the same orientation relative to the vessel deck when the boom is pivoted relative to the base of the crane (e.g., when lowered towards the vessel deck) by pivoting the second part of the trolley relative to the boom. Thus, the horizontal motion device can be used to position the load coupling device when the boom is not in an upright position (e.g., when it is pivoted slightly outward to position the load coupling device above the pile gripper, e.g., to align the load coupling device with the central axis of the gripper ring of the pile gripper).
[0158] In one embodiment, the trolley includes two support arms extending away from the boom and movable in a first direction relative to the trolley, the support arms supporting a yoke that is connectable to a load connection device connected to or supported by a hoisting device. In such an embodiment, the movable arms and the movable yoke enable movement of the load connection device relative to the boom (more specifically, in a plane perpendicular to the longitudinal axis of the boom).
[0159] In one embodiment, the support arm and yoke are part of the trolley's active horizontal motion device.
[0160] In a further embodiment, the support arm is pivotable about a trolley pivot axis parallel to the boom pivot axis, allowing the support arm to remain parallel to the deck surface when the boom is pivoted from the erected position.
[0161] For example, the arms may each be provided with a track extending therealong, and the yoke may be configured to move along the track such that the yoke is movably supported on opposite sides.
[0162] In an alternative embodiment, the arms are each mounted on a base, such that the arms and base form a U-shaped configuration, and the base is movably supported by the trolley for movement in a first direction, the first direction being perpendicular to the second direction, such that the yoke is capable of being moved in both the first and second directions.
[0163] In such an embodiment, an actuator is provided for moving the base relative to the trolley and an actuator is provided for moving the yoke relative to the arm, and a control system is provided for controlling the actuator and thus the movement of the yoke, the control system being preferably configured to compensate for sea state induced movement of the vessel supporting the crane, and more particularly configured to prevent sea state induced movement of the yoke relative to the sea floor and / or relative to the floating foundation or a mounting surface on the floating foundation.
[0164] In one embodiment, the control system is also linked to a hoisting device that supports the trolley and controls the hoisting device to provide swell compensation to the trolley (i.e., to provide compensation for vertical movement).
[0165] In a further embodiment, the control system is provided with one or more sensors configured to detect movement of an object to be engaged by the load engagement device coupled to or supported by the yoke, and the control system is configured to move the ring together with the object to be lifted, thus enabling the yoke to engage the object. By such an embodiment, for example, the control system can actively move the yoke in synchronism with a section of the wind turbine mast to be engaged by the load engagement device. Thus, the control system facilitates engagement with a mast of a wind turbine mounted on a foundation, for example, to lift the wind turbine from the foundation for maintenance and / or to replace the wind turbine with another wind turbine. This is particularly beneficial when the foundation is a floating foundation.
[0166] In one embodiment, the erection crane is provided with a jib and is configured to move the yoke along the arm (or move the hoist line together with the yoke) by pivoting the jib, thus adapting the distance between the boom and the hoist line extending between the jib and the load engagement device.
[0167] In an embodiment, the trolley is configured to allow limited movement of the foundation pile relative to the trolley and is also configured to damp said movement. Thus, for example, a roll of the vessel may cause a pile being erected in a plane parallel to the longitudinal axis of the vessel to move in a direction substantially perpendicular to the longitudinal axis of the vessel, and may in particular cause the upper end of the foundation pile to swing in that direction while being erected. In such an embodiment, the trolley may allow some movement of the upper end of the foundation pile relative to the trolley while at the same time damping the movement. For example, when the trolley is provided with an active horizontal motion device, the device may be used to allow swinging movement of the upper end of the foundation pile in a direction perpendicular to the longitudinal axis of the vessel. In such an embodiment, the active horizontal motion device may also be configured to damp the movement and / or the trolley may be provided with a damper to damp the movement.
[0168] It is submitted that the effect of vessel roll is more pronounced the further away from the vessel's longitudinal axis, and therefore in one embodiment the trolley is configured to allow increased swaying movement of the load when the trolley is moved upwards, e.g. when erecting a pile, and to increasingly reduce the swaying movement when the trolley is lowered, e.g. while lowering a pile through a pile gripper.
[0169] In an embodiment, the pile gripper ring is pivotable, i.e., the ring can pivot about a central vertical axis relative to a base of the pile gripper mounted on the vessel, such that the opening of the gripper ring can be oriented towards the pile supported by the erection crane, and such that the wind turbine can be moved into the ring by the swinging movement of the erection crane. Moreover, in such an embodiment, the gripper ring can be pivoted such that the opening faces away from the vessel when the wind turbine component is received therein, allowing the wind turbine component (e.g., a foundation piled into the seabed) to be moved out of the gripper ring through the opening of the gripper ring by moving the vessel away from the foundation pile (preferably laterally away from the foundation pile).
[0170] In one embodiment, the track cart is provided with a cradle for receiving a lower end of the wind turbine component (e.g., of a foundation pile). In a preferred embodiment, the cradle can be adapted to fit wind turbine components of different cross-sections. Additionally or alternatively, the trolley is configured to allow some movement of the cradle (and thus the bottom end of the wind turbine component supported by the cradle), for example to allow swinging movement of an upper portion of the wind turbine component supported by the trolley.
[0171] Advantageous embodiments of the erection crane and the erection vessel according to the invention as well as the method according to the invention are disclosed in the subclaims and in the present specification, where the invention is further illustrated and elucidated on the basis of a number of exemplary embodiments, some of which are illustrated in schematic drawings, in which components which correspond from the point of view of construction and / or function are provided with the same last two digits of reference numerals.
[0172] It will be recognized by those skilled in the art that a technical feature discussed herein as necessary or optional with respect to one embodiment of the present invention may be equally applicable to one or more other embodiments described herein, with the feature performing its designated function. All such combinations are contemplated herein, as long as the combination does not result in a technically impossible solution and / or does not meet the desired functionality. [Brief description of the drawings]
[0173] [Figure 1] FIG. 2 is a schematic top view of an exemplary embodiment of an installation vessel according to the invention, showing that the vessel is provided with an erection crane and an erection deck aligned with the swivel axis of the crane; [Diagram 2] FIG. 1 is a schematic side view of a crane according to the present invention, with the boom in an erecting position and with the trolley depicted in a first position and a second position; [Diagram 3] FIG. 3 is a schematic side view of the crane of FIG. 2 with the crane's boom in the erected and lowered positions and with the trolley parked on a section of the trolley guide located above the base of the crane. [Figure 4] FIG. 3 is a schematic side view of the crane of FIG. 2 with the monopile erected and with the monopile depicted in multiple erection positions. [Diagram 5]FIG. 5 shows the crane of FIG. 4 supporting the monopile in an outboard position (i.e. outside the vessel profile) at the installation site. [Figure 6] FIG. 1 shows an exemplary embodiment of a vessel provided with an erection crane according to the present invention, the erection crane including a crane tower, a storage crane and a monopile depicted in multiple intermediate positions of the erection process. [Figure 7] FIG. 2 shows a schematic top view of another exemplary embodiment of an installation vessel according to the present invention, the vessel being provided with an erection crane and an erection deck aligned with the central axis of the vessel; [Figure 8] FIG. 8 shows the vessel of FIG. 7 with the boom of the erection crane depicted in both a raised erection position and a lowered position. [Figure 9] FIG. 8 is a side view of the vessel of FIG. 7 with the erection and storage cranes supporting wind turbine components. [Figure 10] FIG. 8 is a side view of the vessel of FIG. 7 with the boom of the erection crane in the erection position, illustrating the monopile at several intermediate positions in the erection process. [Figure 11] FIG. 11 is a rear view of the vessel of FIG. 10 showing the crane supporting the monopile in its gripper at the stern of the vessel. [Figure 12] FIG. 11 is a rear view of the vessel of FIG. 10 showing the crane lowering the monopile towards the seabed, the monopile being guided by the gripper. [Figure 13] FIG. 11 is a rear view of the vessel of FIG. 10 showing the crane supporting a hammer for driving the monopile into the seabed. [Figure 14]FIG. 1 shows a top view of another exemplary embodiment of a vessel according to the invention, configured for transporting wind turbine components, for assembling the wind turbine and for mounting the assembled wind turbine on a foundation, the vessel being provided with an erection crane and an erection deck aligned with the pivot axis of the crane; [Figure 15] FIG. 15 is a side view of the vessel of FIG. 14 showing the mast depicted in several intermediate positions during the erection process. [Figure 16] FIG. 15 is a side view of the vessel of FIG. 14 showing the erection crane mounting the nacelle on the mast and the mast supported in an upright position. [Figure 17] FIG. 15 is a side view of the vessel of FIG. 14 showing the erection crane supporting the assembled wind turbine in an outboard position (i.e. outside the vessel's profile) at the installation site. [Figure 18] FIG. 1 shows a top view of another exemplary embodiment of a vessel according to the invention, configured for transporting wind turbine components, for assembling a wind turbine and for mounting the assembled wind turbine on a foundation, the vessel being provided with an erection crane and an erection deck aligned with the central axis of the vessel; [Figure 19] FIG. 19 is a schematic side view of the crane of FIG. 18 with the crane boom in an erecting position and with the trolley supporting a blade installer device that supports a blade adjacent to the nacelle of a wind turbine being assembled. [Figure 20] FIG. 20 is an enlarged view of the blade installer of FIG. 19. [Figure 21]FIG. 1 shows a top view of another exemplary embodiment of a vessel according to the present invention, the vessel being provided with an erection crane (only the crane base of the erection crane is depicted), an erection deck aligned with the central axis of the vessel, and a gripper for guiding the monopile, the gripper being supported on the vessel deck, the gripper being positioned to receive the lower end of the monopile supported by the erection crane; [Figure 22] FIG. 22 is a top view of the vessel of FIG. 21 showing the gripper moving with the crane to transfer the monopile from a position onboard to a position offboard. [Figure 23] FIG. 22 is a top view of the vessel of FIG. 21 showing the gripper positioned to guide the monopile at the installation site. [Figure 24] FIG. 1 is a side view of a ship equipped with an erection crane according to the invention, with the erection crane in the lowered position and the foundation piles on the deck of the ship. [Diagram 25] FIG. 25 shows the vessel of FIG. 24 with the erection crane in an upright position. [Figure 26] 26 shows the vessel of FIG. 25 for erecting the foundation piles, the foundation piles being shown in an intermediate position and in an erected position. [Figure 27] FIG. 1 shows a vessel according to the present invention supporting a pile gripper next to a submersible deck. [Figure 28] FIG. 1 shows a vessel according to the present invention supporting a pile gripper next to a crane supported on the bow section of the vessel. [Figure 29] FIG. 13 shows a vessel according to the present invention supporting a pile gripper in an alternative location next to the submersible deck. [Diagram 30] FIG. 2 shows an enlarged side view of the top end of the erection crane according to the present invention, showing the pile being pushed outward by the trolley. [Diagram 31]FIG. 2 is a top view of a trolley according to the present invention. [Diagram 32] FIG. 13 is a top view of three pile grippers movably mounted on a crane base. [Diagram 33] FIG. 1 is a perspective view of a vessel with a pile gripper supported next to the bow section of the vessel; [Diagram 34] FIG. 1 is a schematic perspective view of a crane according to the present invention; [Diagram 35] FIG. 13 illustrates subsequent steps in the monopile installation process following the erection process. [Diagram 36] FIG. 13 illustrates subsequent steps in the monopile installation process following the erection process. [Figure 37] FIG. 13 illustrates subsequent steps in the monopile installation process following the erection process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0174] The installation vessel 1 comprises a hull 2, a crane 3, an erection deck 4 with a cart truck 5 and a support cart 6, a monopile gripper 7 and a storage deck 8. In the embodiment shown, the vessel 1 is additionally provided with a storage crane 9.
[0175] In the embodiment shown, the vessel 1 has a non-jack-up type floating hull 2 and is configured to maintain its position and orientation relative to the installation site. The vessel can thus be positioned adjacent to the monopile installation site and the monopile can be installed using the monopile grippers 7 without the vessel needing to be anchored (the jack-up legs having to be deployed).
[0176] In the embodiment shown, the ship's hull forms the erection deck 4 and the storage deck 8. The erection deck and the storage deck are both part of a single ship deck. On the storage deck 8 three monopiles are stored next to each other. In a further embodiment according to the invention the storage deck is provided with a storage rack, which allows the storage of several rows of monopiles, stacked one row on top of the other.
[0177] Moreover, the monopile 10 is depicted above the erection deck 4. The crane 3 and storage crane 9 are configured to respectively engage an end of the monopile and thus lift it from the storage deck 8 onto the erection deck 4 (and vice versa). In Figure 1, the crane 3 and storage crane 8 are depicted lifting the monopile from a position adjacent to the vessel (e.g. from a supply vessel (e.g. a barge) or from a quay) before moving it to a storage position on the storage deck 8.
[0178] 2 and 3 show schematic side views of the ship's crane 3 depicted in FIG.
[0179] The crane 3 is supported by the hull 2 of the ship 1 adjacent the erection deck 4. The crane 3 includes a crane base 11, a boom 12, a luffing winch 13 and a hoist. Furthermore, the crane 3 is provided with a trolley guide 15 and a trolley 16.
[0180] The crane base 11 supports a slewing bearing 17 and a crane housing 18, which in turn supports the boom 12. The slewing bearing 17 is provided between the crane housing 18 and the crane base 11. The slewing bearing allows the crane housing 18 (and thus the boom supported by the crane housing) to pivot about a vertical pivot axis 19.
[0181] The hoist 14 includes a hoisting winch 23 and an associated hoisting wire 24. The hoisting wire 24 is guided through an upper block 25 to a load coupling device 26 for coupling with a load (e.g. the upper end of a monopile) enabling the crane to lift the load using the hoisting winch.
[0182] The boom 12 extends between a base end 12a and an upper end 12b. The boom 12 is pivotally supported at the base end 12a by a crane housing 18 for pivoting about a horizontal boom pivot axis 20. Thus, the boom 12 can be pivoted between a lowered position and a raised position. In Figure 3, the boom is depicted in both the lowered and raised positions.
[0183] The crane 3 is provided with a luffing winch 21 and associated luffing wires 22 for pivoting and supporting the boom 12 of the crane 3 in different positions. The luffing winch 21 is mounted on the crane housing 18. The luffing wires 22 extend between the luffing winch and the boom and enable the boom to be pivoted between lowered and raised positions.
[0184] The lowered position in Figure 3 is the storage position. This position is used during travel of the vessel between locations. By lowering the boom when not in use, the overall center of gravity of the vessel is lowered, which improves the dynamic behavior of the vessel.
[0185] The raised position depicted in Figure 3 is the erection position. With the boom in this upright position, the crane can be used to erect the monopile, as will be described in more detail below.
[0186] It is proposed that the boom can be pivoted and supported in a number of intermediate positions (raised to a stored position and lowered to an erected position) to lift a load at a position positioned away from the base of the crane. Moreover, by pivoting the boom while lifting a load, the load can be moved towards or away from the crane base.
[0187] In Figure 1 a range of crane 3 and storage crane 9 are depicted. In the embodiment shown it is proposed that the crane 3 has to lower its boom to reach the storage position beyond the storage deck. Moreover, in order to move the monopile over the erection deck to the storage deck, one or both of the crane and storage crane have to raise their booms compared to the boom position required to lift the monopile adjacent to the vessel.
[0188] In Fig. 1 the monopile gripper is depicted in an open and closed position. It is submitted that monopile grippers are generally known in the art. The monopile gripper is configured to engage the pile, thus positioning it and keeping it in place while it is being lowered towards the seabed. Typically the monopile gripper is provided with a gripper (e.g. a circular body provided with a monopile guide in the form of a roller) which can be opened to allow the monopile to be moved into the monopile gripper, which can be closed thereafter to position the monopile. The monopile can also be lowered into the closed monopile gripper. The monopile gripper must be opened to release the monopile after it has been driven into the seabed.
[0189] According to the invention, the installation vessel is adapted to guide both the bottom and top ends of the monopile during its erection. The vessel is therefore provided with a cart track 5 and a support cart 6 for guiding the bottom end of the monopile, and also with a trolley guide 15 and a trolley 16 for guiding the top end of the monopile during the erection process.
[0190] A cart track 5 extends along the erection deck 4. A support cart 6 is supported by the cart track 5 and allows the cart to move along the cart track to guide the bottom end of the monopile along the erection deck from a position distal to the crane to a position adjacent to the crane. The support cart 6 is configured to support the bottom end of the monopile and to allow the bottom end of the monopile to pivot while the support cart is moved along the cart track 5.
[0191] A trolley guide 15 is mounted on the boom 12 of the crane 3 for guiding a trolley 16 along the boom 12 of the crane. Thus, when the boom 12 is raised to an upright position, it can be used to guide the top end of the monopile during erection.
[0192] In the embodiment shown, the boom 12 is an A-frame and the trolley guide comprises a track provided on both legs of the A-frame. A trolley 16 is mounted on each leg of the A-frame and is moveable therewith and thus coupled with the trolley guide so as to be guided along the boom of the crane.
[0193] The trolley 16 is configured to engage a load connection device 26 (supported by the hoist 14) for guiding the load connection device, and thus the upper end of the monopile supported by the load connection device, along the trolley guides during erection of the monopile using the hoist.
[0194] Figure 4 shows a schematic side view of the crane of Figure 2 with the boom 12 of the crane raised to the erection position. In Figure 4, the monopile is depicted in several positions during erection. Thus, with the crane according to the invention, the boom of the crane can be pivoted in the erection position to erect the monopile with its bottom end guided by the cart and erection truck (or cart truck) and with its top end guided by the trolley and trolley guide.
[0195] In the exemplary embodiment shown, the load connection device is capable of being connected to the top end of the monopile. The load connection device is provided with a pivotable monopile top end clamp, which has a clamp configured to engage and secure the top end of the monopile. Moreover, the top end clamp is provided with a connector end configured to be engaged by the load connection device. The connector end and the clamp are pivotally connected such that the clamp is capable of pivoting relative to the connector end (and thus relative to the load connection device) between a position for engaging the top end of the monopile in a horizontal position (corresponding to the lowered position of the trolley in FIG. 2) and a position for engaging the top end of the monopile in a vertical position (corresponding to the raised position of the trolley in FIG. 2).
[0196] It is submitted that these types of top end clamps are generally known in the prior art and therefore will not be detailed.
[0197] When the load connection device and the top end clamp are connected, the trolley engages the load connection device and guides the load connection device (and thus the top end of the monopile) along the boom during erection of the monopile. In the embodiment shown, the trolley 16 and the load connection device 26 are connected such that the trolley moves vertically with the load connection device. Thus, a hoist is used to lower and raise the trolley along the boom of the crane.
[0198] Figure 5 shows the steps followed in erecting the monopile. Once the monopile is erected, the crane then lifts it vertically from the support cart, pivots about a vertical pivot axis and positions it above the monopile gripper (see Figure 5). The crane is then used to lower the monopile, guided by the pile gripper, towards the seabed.
[0199] In an alternative embodiment, the load connection device and the trolley supported by the hoist are configured to be coupled, and the trolley is provided with a load connection device configured to be coupled with a top end (e.g., a top end clamp) of the monopile. In such an embodiment, the trolley is intermediate between the load connection device and, for example, the top end clamp (which is mounted on the trolley).
[0200] Thus, the vessel 1 can be used to erect monopiles, the erection process being - lifting the monopile in a horizontal position onto the erection deck using a crane with the boom in a lowered hoisting position to lift one end of the monopile and using a hoisting crane lifting to lift the opposite end of the monopile (see e.g. FIG. 1); - moving the boom from a lowered hoisting position to a raised erection position; - engaging the monopile with a monopile engagement device (see FIG. 2 ); - erecting the monopile using a crane with the boom in a lowered erecting position to lift one end of the monopile by moving a trolley along the boom from a lowered articulated position to a raised support position (see figure 4). Includes.
[0201] Moreover, the vessel enables, after erection, the monopile to be moved from the erection position above the erection deck to the installation location (see FIG. 5) by pivoting the crane about a vertical pivot axis over a pivot angle of at least 180 degrees, preferably over a pivot angle of more than 180 degrees, for example over a pivot angle of 190 degrees, to move the pile from the erection deck over the side of the vessel and thereafter towards a monopile gripper mounted at the aft end of the vessel's hull, where the monopile is aligned with the monopile gripper.
[0202] In the embodiment shown, the trolley guide 15 extends below the horizontal boom pivot axis 20 when the boom is in the erected position (see, for example, FIG. 5). In such an embodiment, the trolley guide extends along and below the crane boom. Thus, the trolley can not only be moved along the crane boom, but can also be lowered below the crane boom when the boom is in the erected position.
[0203] Moreover, in the embodiment shown, the trolley guide 15 includes a boom section 15A and a base section 15B, the boom section being mounted to the boom 12 of the crane 1 and the base section being mounted to the base 11 of the crane 1 (see, for example, FIG. 5 ).
[0204] The base section 15B is mounted to the base of the crane. Moreover, in the exemplary embodiment shown, the base section 15B of the trolley guide is aligned with the cart track 5. Thus, the base section can be used to lower the trolley into position near the deck, in alignment with the cart track (see, for example, FIG. 2). Guiding the load coupling device near the deck allows it to engage a monopile that is set up near the deck.
[0205] Also, in the embodiment shown, the base section 15B of the trolley guide 15 is sized to receive the trolley 16 (see, for example, FIG. 3). Thus, the trolley can be parked on the base section 15B of the trolley guide. When the trolley is parked on the base guide section, the boom of the crane can be operated without it supporting the trolley. This is particularly beneficial when the crane is to be used to lift a load rather than to erect a monopile.
[0206] In the embodiment shown, the boom of the crane is provided with a monopile fixing arm for engaging a lower section of a monopile supported in a vertical position by the crane (see Figure 5). Fixing the position of the monopile relative to the boom thus prevents swaying of the monopile during the swing of the crane whilst supporting it in a vertical position.
[0207] In the embodiment shown, the boom 12 includes a jib 28. Moreover, an upper sheave assembly 29 is provided in the jib 28 such that the hoist wire 24 is positioned away from the boom 12 when the load connection device 26 is received in the trolley 16. Thus, the hoist wire 24 (or, more specifically, the section of the hoist wire luffed between the upper sheave assembly 29 and the lower sheave assembly 30) is aligned with the monopile supported in a vertical position by the crane.
[0208] Additionally, the portion of the hoist wire 24 that extends between the trolley 16 and the upper pulley assembly 29 runs parallel to the trolley guide 15 .
[0209] In the exemplary embodiment shown, the boom 12 includes a gantry 31 at a base end 12A and a gantry jib 32 at an upper end 12B, and is provided with gantry wires 33 extending between the gantry 31 and the gantry jib 32. Additionally, luffing wires extend between the luffing winch and the boom, and more specifically, between the luffing winch and the gantry of the boom.
[0210] Figure 6 shows an embodiment of a crane 103 according to the invention, which in addition to a boom 112 that can be raised in an erecting position includes a crane tower 134 for supporting a monopile on the side of the crane opposite the boom. The crane tower 134 is configured to support the monopile in a monopile gripper 107 and is configured to lower the monopile in a vertical position into the water adjacent to the vessel 101. The crane tower 134 extends between a base end 134A and an upper end 134B and is mounted in a fixed and upright position on the crane housing 118 for rotation together with the boom 112 of the crane 101 about a vertical pivot axis. The crane tower 134 is - a trolley 116 configured to support the monopile at its upper end; - a trolley guide 115 for guiding the trolley along the crane tower 134, e.g. a track including one or more guide rails; - a hoisting winch 123 and associated hoisting wire, which is guided through the top of the crane tower to hoist the trolley along the trolley guide to lower the monopile towards the seabed; is being offered.
[0211] FIG. 7 shows a schematic top view of another exemplary embodiment of an installation vessel 201 according to the present invention, the vessel being provided with an erection crane 203 and an erection deck 204 aligned with the vessel's central axis 235.
[0212] FIG. 8 shows the vessel 201 of FIG. 7 with the boom 212 of the erection crane 203 depicted in both a raised erection position and a lowered position.
[0213] FIG. 9 shows a side view of the vessel 201 of FIG. 7 with the erection crane 203 and storage crane 209 supporting a wind turbine component 236.
[0214] FIG. 10 shows a side view of the vessel of FIG. 7 with the boom 212 of the erection crane 203 in the erection position, showing the monopile 236 depicted in several intermediate positions during the erection process.
[0215] Figures 11-13 show how the process continues for the erection of the monopile 236. Once the monopile 236 has been erected, the crane 203 further lifts it vertically from the support cart 206, pivots about the vertical pivot axis 219 and positions it above the monopile gripper 207 (see Figure 11). Afterwards, the crane 203 is used to lower the monopile 236 towards the sea bed, while it is guided by the pile gripper 207 (see Figure 12). Once the monopile 236 has landed on the sea bed, the crane 203 is used to mount a hammer 237 on the monopile 236, which is driven into the sea bed (see Figure 13).
[0216] 14 shows a top view of another exemplary embodiment of a vessel 301 according to the present invention, configured to transport wind turbine components, configured to assemble the wind turbine, and configured to mount the assembled wind turbine on a foundation. The vessel 301 is provided with an erection crane 303 and an erection deck 304, the erection deck 304 being aligned with the pivot axis 319 of the crane 303.
[0217] FIG. 15 shows a side view of the vessel 301, illustrating the mast 338 depicted in several intermediate positions during the erection process.
[0218] FIG. 16 shows a side view of a vessel 301, showing an erection crane 303 mounting a nacelle 339 on a mast 338, the mast being supported in an upright position.
[0219] FIG. 17 shows a side view of the vessel 301, showing the erection crane 303 supporting the assembled wind turbine 341 in an outboard position (i.e. outside the outline of the vessel 301) at the installation site.
[0220] 18 shows a top view of another exemplary embodiment of a vessel 401 according to the present invention, configured for transporting wind turbine components, assembling a wind turbine, and mounting the assembled wind turbine on a foundation. The vessel 401 is provided with an erection crane 403 and an erection deck 404, the erection deck 404 being aligned with the central axis 435 of the vessel 401.
[0221] In the embodiment shown, the vessel is provided with a wind turbine assembly station at one end of the erection deck, on the crane side of which a number of wind turbine blades are stored and on the pile gripper side of which a number of wind turbine masts are stored.
[0222] In this embodiment, the mast is moved to the erection deck and erected using an erection crane. Once the mast is in the upright position, the lower end of the mast is secured in the mount. The crane can then release the mast and can be used to lift the wind turbine components.
[0223] FIG. 19 shows a schematic side view of the crane 403 with the crane's boom 412 in an erection position and the trolley 416 supporting a blade installer device 442 which supports a blade 440 adjacent to the nacelle 439 of the wind turbine being assembled.
[0224] Figure 20 shows a close-up of the blade installer device 442. The blade installer device includes an arm that can be reached from the trolley to engage a cradle that holds the wind turbine (see Figure 18) and to position the blade adjacent the hub of the nacelle that is mounted on the upright wind turbine mast (see Figure 19).
[0225] It is proposed that when the vessel is used for assembly, the monopile gripper can be removed from the vessel and, in one embodiment, replaced with a foundation gripper (i.e. a gripper for securing the vessel to the foundation). In yet another embodiment, a pile gripper is provided that is also configured to engage the wind turbine foundation.
[0226] 21 shows a top view of another exemplary embodiment of a vessel 501 according to the invention. The vessel 501 is provided with a erection crane 503 (only the crane base 511 of the erection crane 503 is depicted), an erection deck 504 aligned with the vessel's central axis 535, and a gripper 507 for guiding a monopile 536.
[0227] In the embodiment shown, the vessel 501 includes a recess 543 (i.e. a setback in the vessel profile) at the rear of the vessel. The recess 543 is flanked by two deck sections 544. The gripper is a monopile gripper 507 configured to guide a monopile 535, which is supported by an erection crane 503 in the recess 543.
[0228] In the particular embodiment shown, the monopile gripper includes a gripper ring 545 for guiding the monopile and a frame 546 for supporting the gripper ring outside the vessel profile and for moving the gripper ring in the horizontal plane to compensate for movements of the vessel relative to the installation site and thus relative to the pile supported at the installation site.
[0229] The gripper ring 545 is provided with two door sections 547 which, in the closed position, form part of the gripper ring and which can be opened to provide an entry opening which allows the monopile to be moved laterally relative to the gripper ring into or out of the gripper ring. Figure 21 depicts the ring with the door sections closed and Figures 21 and 23 show the ring with the door sections open.
[0230] In the particular embodiment shown, the gripper ring 545 is movably supported by a support frame 546 such that the gripper ring can be rotated about a vertical axis and thus the entry opening 548 of the gripper ring can be moved. Thus, the gripper ring 456 can be positioned with the entry opening 548 facing the bow of the vessel to receive a monopile supported by the erection crane 503 in the erection position, as shown in Figure 21, and with the entry opening facing the aft of the vessel to allow a monopile driven into the sea bed to be moved out of the gripper ring by the vessel moving away from the installation site. The latter position of the gripper ring is shown in Figure 23.
[0231] Moreover, in the illustrated exemplary embodiment, the support frame 546 is pivotally supported with one end mounted on a semicircular support track 549 such that the frame can be pivoted about a vertical pivot axis (see Figures 21-23). The frame is configured to telescopically support the gripper ring such that it can move the gripper ring towards and away from the semicircular track. The gripper ring can thus be moved in a horizontal plane relative to the vessel, with the lower end of the monopile being moved along the vessel's central axis from a position onboard to a position overboard. The monopile is thus fully supported at its upper end by the trolley and at its lower end by the gripper ring while the monopile is being moved.
[0232] The gripper 507 is supported on the deck of the vessel 501. The gripper 507 is positioned to receive the lower end of the monopile 535 supported by the erection crane 503.
[0233] Figure 22 shows a top view of the vessel 501. The gripper 507 travels with the crane to transfer the monopile 535 from a position onboard (depicted in Figure 21) to a position offboard (depicted in Figure 23).
[0234] FIG. 23 shows a top view of the vessel 501 with the gripper 507 positioned to guide the monopile 535 at the installation site.
[0235] Figure 24 shows a side view of a vessel 50 equipped with an erection crane 51 according to the invention. The erection crane 51 is shown in a lowered position. The foundation piles 52 are in a horizontal position above the submersible deck 53 of the vessel.
[0236] The vessel 50 shown in Figure 24 is a single-hull vessel. The vessel includes an elongated hull extending between a bow 54 and an aft 55 of the vessel.
[0237] The elongated hull has a bow section 56 which supports the crane 51, and the elongated hull supports a submersible deck 53. The submersible deck 53 extends from the bow section 56 towards the aft of the vessel. The submersible deck 53 is recessed into the hull structure relative to the bow section 56 such that the bow section has a vertical hull surface 57 which faces towards the aft of the submersible deck 53 and the vessel 50.
[0238] The erection crane 51 is supported by the bow section 56 of the hull adjacent the submersible deck 53 and adjacent the side of the vessel.
[0239] The submersible deck includes a pile deck provided with cart tracks for guiding the bottom ends of the piles and a support cart 58. The cart tracks extend parallel to the longitudinal axis of the vessel 50 between a track end distal to the bow section and a track end adjacent to the bow section.
[0240] The submersible deck 53 of the vessel 50 includes a storage deck adjacent to the erection deck. The storage deck is provided with storage racks (not shown) for supporting a plurality of piles in a horizontal position parallel to the cart tracks (and thus parallel to the longitudinal axis of the vessel).
[0241] Figure 24 shows a single pile 52 in position above the storage deck. The erection crane 51 is shown with the boom 59 in the lowered position, which is used when the vessel travels between locations.
[0242] In accordance with the present invention, the erection crane 51 includes a boom 59 with a trolley guide 60. In the embodiment shown, the trolley guide 60 includes a boom section 61 and a base section 62, with the boom section 61 mounted to the boom of the crane and the base section 62 mounted to the base of the crane.
[0243] In the particular embodiment shown, the trolley guide also includes a mid-section 63 that forms an intermediate portion between the boom section 61 and the base section 63 of the trolley guide 60 when the crane's boom is in the erected position.
[0244] Moreover, in the embodiment shown, the base section 62 of the trolley guide is provided on the side of the crane base that faces the submersible deck 53 of the vessel and extends from the crane base downwardly along the vertical hull surface 57 of the bow section that faces the submersible deck. Thus, the trolley 64 can be lowered towards the submersible deck 53 along that vertical hull surface.
[0245] Figure 25 shows the erection crane 51 with its boom in an upright position, for example to erect a foundation pile. The boom section, the mid-section and the base section of the trolley guide are aligned and thus form a trolley guide for moving the trolley 64 between a lowered position near the deck of the vessel and a raised position at the top of the erection crane's boom. With the erection crane in this position, the trolley can therefore be used to erect a monopile that is positioned on the erection deck.
[0246] Figure 26 shows a vessel 50 erecting a foundation pile 52. The foundation pile 52 is shown in an intermediate position and in an erected (upright) position.
[0247] The bottom end of the foundation pile is guided by a support cart, which moves along a cart track above the erection deck during erection of the foundation pile.
[0248] In the embodiment shown, the support cart 58 is configured to pivotally engage the bottom end of the pile such that the support cart is able to hold the bottom end of the foundation pile when it is supported by the erection crane above the pile gripper 66, or at least above a pile gripper support structure that supports the pile gripper in a position next to the vessel for guiding the foundation pile as it is lowered into the sea by the erection crane.
[0249] In the embodiment shown, the pile holder 66 is supported by a pile holder support structure which is mounted on the vessel's deck 53 between the end of the cart track 68 and the bow section. Figure 27 shows a top view of the vessel 50 with the pile gripper 66 and pile gripper support structure 67 mounted on the vessel's deck 53.
[0250] Figures 28 and 29 show alternative positions for the pile gripper. It is suggested that the pile gripper is preferably positioned with its centre on the turning radius of the crane so that an erected crane can be moved into position aligned with the pile gripper by simply pivoting the crane.
[0251] FIG. 28 shows a vessel according to the present invention supporting a pile gripper adjacent to a crane supported on the bow section of the vessel.
[0252] FIG. 29 shows a vessel according to the present invention supporting a pile gripper in an alternative location next to the submersible deck.
[0253] Figure 33 shows a perspective view of a vessel 50 with the pile gripper supported next to the bow section of the vessel. In this embodiment the trolley guide includes a secondary base section 69 which extends along the base of the crane on the side facing the vessel's side and also extends along the hull at the bow to allow the trolley to be lowered towards the sea surface and towards the pile gripper supported on the vessel's side.
[0254] Figure 30 shows an enlarged side view of the top end of the erection crane according to the invention, with the pile being pushed outwards by the trolley, so that the pile can be positioned above the pile gripper without the erection crane boom having to be moved.
[0255] Figure 31 shows a top view of a trolley according to the invention. In the embodiment shown, the trolley 64 includes a trolley frame that is movably supported by trolley guides and is mounted in part to the boom 59 of the erection crane 51. The trolley frame movably supports two support arms 71 such that the support arms can be moved horizontally along the trolley frame.
[0256] In the embodiment shown, the support arm is pivotable. The support arm is shown in an active position and is capable of being pivoted about a pivot axis 72 in an inactive upright position.
[0257] The support arms movably support a cross beam 73 such that the cross beam 73 can move along the support arms. In the embodiment shown, the cross beam is coupled to a hoisting device to enable a crane to lift and lower the trolley along the trolley guides.
[0258] By moving the support arms relative to the trolley frame and by moving the cross beam along the support arms, the wind turbine engagement element 74 supported by the trolley can be moved in a horizontal plane relative to the boom of the erection crane.
[0259] When the trolley is disconnected from the crane's hoisting assembly, e.g., parked on the base section of the trolley guide, the hoisting assembly can be used to lift objects freely, i.e., without being guided by the trolley and with the boom in a pivoted position (i.e., not in an upright erected position).
[0260] Figure 34 shows a schematic perspective view of a crane 1003 according to the invention. The crane 1003 is supported by the hull 1002 of the vessel 1001 adjacent to the erection deck 1004. The crane 1003 comprises a crane base 1011, a boom 1012, a luffing winch 1013 and a hoist. Furthermore, the crane 1003 is provided with a trolley guide 1015 and a trolley 1016.
[0261] The crane base 1011 supports a slewing bearing 1017 and a crane housing 1018, which in turn supports the boom 1012. The slewing bearing 1017 is provided between the crane housing 1018 and the crane base 1011. The slewing bearing allows the crane housing 1018 (and thus the boom supported by the crane housing) to pivot about a vertical pivot axis 1019.
[0262] The hoist 1014 includes a hoisting winch 1023 and an associated hoisting wire 1024. The hoisting wire 1024 is guided through an upper block 1025 to a load coupling device 1026 for coupling with a load (e.g., the upper end of a monopile) allowing the crane to lift the load using the hoisting winch.
[0263] The boom 1012 extends between a base end 1012a and an upper end 1012b. The boom 1012 is pivotally supported at the base end 1012a by a crane housing 1018 for pivoting about a horizontal boom pivot axis 1020. Thus, the boom 1012 can be pivoted between a lowered position and a raised position.
[0264] The crane 1003 is provided with a luffing winch 1021 and associated luffing wires 1022 for pivoting and supporting the boom 1012 of the crane 1003 in different positions. The luffing winch 1021 is mounted on the crane housing 1018. The luffing wires 1022 extend between the luffing winch and the boom and allow the boom to be pivoted between lowered and raised positions.
[0265] Figures 35-37 show the subsequent steps of the monopile installation process, which follows the erection of the monopile. Once the monopile has been erected, the crane then lifts it vertically from the support cart (see Figure 35) and pivots about a vertical pivot axis to position it above the monopile gripper (see Figure 36). The crane is then used to lower the monopile towards the seabed, while it is guided by the pile gripper (see Figure 37).
[0266] In an alternative embodiment, the load connection device and the trolley supported by the hoist are configured to be coupled, and the trolley is provided with a load connection device configured to be coupled with a top end (e.g., a top end clamp) of the monopile. In such an embodiment, the trolley is intermediate between the load connection device and, for example, the top end clamp (which is mounted on the trolley). [Explanation of symbols]
[0267] 1 Ships, stationary ships 2. Hull 3 Lifting devices, cranes 4. Raised deck 5. Kart Track 6 Support Cart 7 Monopile Gripper 8 Storage Deck 9 Storage Crane 10 Monopile 11 Crane Base 12. Boom 12a Base end 12b Upper end 13 Luffing winch 14 Hoist 15 Trolley Guide 15A Boom Section 15B Bass Section 16 Trolley 17 Slewing bearing 18 Crane housing 19 Vertical pivot axis 20 Horizontal boom pivot axis 21 Luffing winch 22 Luffing Wire 23 Hoisting winch 24 Hoisting wire 25 Upper Block 26 Road Linking Device 50 ships 51 Erection crane 52 Foundation pile 53 Submersible Deck 54 Bow 55 Rear 56 Bow Section 57 Vertical hull surface 58 Support Cart 59 Boom 60 Trolley Guide 61 Boom Section 62 Bass Section 63 Mid Section 64 Trolley 66 Pile holder, pile gripper 67 Pile Gripper Support Structure 68 Kart Track 69 Secondary Bass Section 71 Support Arm 72 Pivot axis 73 Crossbeam 74 Wind turbine engaging element 201 Installation vessels 203 Erection Crane 204 Raised Deck 206 Support Cart 207 Monopile Gripper 209 Storage Crane 212 Boom 219 Vertical swivel axis 235 Center axis 236 Wind Turbine Components, Monopiles 237 Hammer 301 Ship 303 Erection Crane 338 Mast 339 Nacelle 341 Wind Turbines 401 Ship 403 Erection Crane 404 Raised Deck 416 Trolley 435 Center axis 439 Nacelle 440 Blade 442 Blade Installer Device 501 Ship 503 Erection Crane 504 Raised Deck 507 Gripper 511 Crane Base 535 Center axis 536 Monopile 543 Recess 545 Gripper Ring 546 frames 547 Door Section 548 Entry opening 549 Support Truck 1001 Ship 1002 Hull 1003 Crane 1004 Raised Deck 1005 Kart Track 1006 Support Cart 1007 Monopile Gripper 1008 Storage Deck 1009 Storage Crane 1010 Monopile 1011 Crane Base 1012 Boom 1012a Base end 1012b Upper end 1013 Luffing winch 1014 Hoist 1015 Trolley Guide 1016 Trolley 1017 Slewing bearing 1018 Crane Housing 1019 Vertical swivel axis 1020 Horizontal boom pivot axis 1021 Luffing winch 1022 Luffing Wire 1023 Hoisting winch 1024 Winding Wire 1025 Upper Block 1026 Load Connection Device
Claims
1. 1. An erection crane configured to be supported by a hull of a vessel adjacent to an erection deck of the vessel for erecting a wind turbine component, the erection crane comprising: - Crane base; - a crane housing and a slewing bearing, the slewing bearing being provided between the crane base and the crane housing, the slewing bearing enabling the crane housing to slewing about a vertical slewing axis; - a boom extending between a base end and an upper end, the boom being pivotally supported at the base end by the crane housing for pivoting about a horizontal boom pivot axis between a lowered position for lifting a load at a predetermined distance from the crane base and a raised erection position for erecting a wind turbine component adjacent to the crane base; - a luffing winch and associated luffing wire, the luffing winch mounted on the crane housing and the luffing wire extending between the luffing winch and the boom to enable pivoting of the boom between the lowered position and the raised erection position; - a hoist, the hoist including a hoist winch and an associated hoist wire, the hoist wire being guided through an upper sheave assembly in the boom to a lower sheave assembly of a load coupling device for coupling with a load, enabling the crane to lift the load using the hoist winch; - a boom securing device, the boom securing device including a stop for positioning the boom in the erecting position and a boom locking device for securing the boom in the erecting position; - a trolley guide including one or more guide rails attached to the boom of the crane, wherein when the boom is in the erecting position, the boom, or at least the trolley guide attached to the boom, extends in a generally vertical direction; - a trolley, the trolley being coupled with the trolley guide so as to be guided along the boom of the crane, the trolley being provided with a wind turbine component engagement device configured to pivotally support a wind turbine component at an upper end thereof or the trolley being configured to receive a wind turbine component engagement device and / or the load coupling device supporting the wind turbine component engagement device; Including, erection cranes.
2. The erection crane of claim 1 , further comprising a boom mobilizer for moving the boom from the erection position.
3. An erection crane as described in claim 1 or 2, wherein the trolley guide extends downward from above the horizontal boom pivot axis when the boom is in the erection position.
4. 3. The erection crane of claim 1 or 2, wherein the trolley guide includes a boom section mounted on the boom of the crane and a base section mounted on the base of the crane, the trolley being configured to be lowered from the boom section onto the base section to engage the trolley with an upper end of a wind turbine component using the wind turbine component engagement device, and the trolley being configured to be moved from the base section onto the boom section to erect the wind turbine component coupled to the trolley, or the crane housing is provided with an intermediate section forming an intermediate portion between the boom section and the base section of the trolley guide when the boom of the crane is in an erection position.
5. 3. The erection crane according to claim 1 or 2, wherein an active horizontal motion device is mounted between the trolley and the load coupling device and / or a wind turbine component engagement device supported by the load coupling device when received in the trolley, the active horizontal motion device being adapted to actively compensate for sea-state induced horizontal displacements of the wind turbine component engagement device in two non-parallel horizontal directions, while the wind turbine component is supported in an upright position by the wind turbine component engagement device.
6. The crane further includes a crane tower for supporting a wind turbine component on a side of the crane opposite the boom, the crane tower extending between a base end and an upper end thereof, the crane tower being mounted in a fixed and upright position on the crane housing for rotation with the boom of the crane about the vertical pivot axis, the crane tower comprising: - a support trolley configured to support a wind turbine component at said upper end thereof; - a trolley guide including one or more guide rails for guiding the trolley along the crane tower; - a hoisting winch and associated hoisting wire, the hoisting wire being guided through an upper portion of the crane tower for hoisting the trolley along the trolley guide for lifting and lowering the wind turbine component; The erection crane according to claim 1 or 2, which is provided with:
7. 3. The erection crane according to claim 1 or 2, wherein the crane is provided with a wind turbine component securing arm or tugger for engaging a lower section of a wind turbine component supported in a vertical position by the crane, in particular for preventing swaying of the wind turbine component during swinging of the crane while supporting the wind turbine component in the vertical position.
8. the boom includes a jib, the upper sheave assembly being provided in the jib such that the hoist line is positioned away from the boom when the load connection device is received in the trolley; 3. The erection crane of claim 1 or 2, wherein a portion of the hoist wire extending between the trolley and the upper sheave assembly extends parallel to the trolley guide.
9. the trolley is provided with a wind turbine component engagement device configured to pivotally support a wind turbine component at the top end thereof, the trolley being configured to couple with the load coupling device of the hoist; or the trolley is configured to receive a wind turbine component engagement device supported by a load connection device of the hoist; or 3. The erection crane of claim 1 or 2, wherein the trolley is configured to receive the load connection device of the hoist, the load connection device supporting a wind turbine component engagement device configured to pivotally support a wind turbine component at the top end thereof.
10. 3. The erection crane of claim 1 or 2, wherein the crane further comprises a trolley hoist, the trolley hoist including a trolley hoist winch with an associated trolley hoist wire, the trolley hoist wire being guided to the trolley via a crown block for moving the trolley along the trolley guide.
11. An installation vessel for installation of wind turbine components, comprising: - a hull forming a pier deck; - a crane as claimed in claim 1 or 2, the crane being supported by the hull of the vessel adjacent the crane deck; - a cart track, the cart track extending along the erection deck; - a support cart for supporting a bottom end of the wind turbine component, the support cart being supported by the cart track and enabling the cart to move along the cart track to guide the bottom end of the wind turbine component along the erection deck from a position distal to the erection crane to a position adjacent to the erection crane; a gripper, the gripper extending outside the contour of the vessel; Including, installation vessels.
12. the vessel includes a recess at the rear of the vessel, the recess being flanked by two deck sections, the gripper being a monopile gripper configured to guide a monopile in the recess; 12. The vessel according to claim 11, wherein the monopile gripper is mounted on one of the deck sections and the erection crane is mounted on an opposing deck section.
13. the crane includes a blade installer device mountable to the trolley for supporting a wind turbine blade and for positioning the blade relative to a nacelle mounted on a mast supported in a wind turbine assembly station adjacent to the erection crane; The blade installer device comprises: - a base, said base being adapted to be mounted on said trolley or adapted to be integrated with a dedicated trolley; - a connector configured to engage a wind turbine blade or to engage a blade support removably mounted on the blade; and - a pivot arm, said pivot arm being connected at a base end to said base for pivoting in use about a vertical axis and at an opposite end to said connector for pivoting in use about a vertical axis; 12. The vessel of claim 11, comprising:
14. 12. A method for erecting a wind turbine component using an installation vessel as claimed in claim 11, the method comprising: - lifting the wind turbine component in a horizontal position above an erection deck using the crane with the boom in a hoisting position for lifting one end of the wind turbine component and a storage crane for lifting the opposite end of the wind turbine component; - moving the boom from the hoisting position to the elevated erecting position; - engaging the wind turbine component with a wind turbine component engagement device supported by the load coupling device and / or the trolley; - erecting the wind turbine component using the crane with the boom in the erecting position for lifting one end of the wind turbine component by moving the trolley along the boom from a lowered articulated position to a raised support position. A method comprising: