USER EQUIPMENT AND PROCESS FOR EXERCISING CONTROL IN A SET OF USER EQUIPMENT - Patent application

The model improvement module in user equipment enhances predictive model reliability and accuracy by alternating between training and idle modes, addressing inaccuracies and resource inefficiencies in distributed control systems.

JP2024540687AActive Publication Date: 2024-10-31MITSUBISHI ELECTRIC R&D CENTRE EUROPE BV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2024547957
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2022-02-09
Filing Date
2022-07-11
Publication Date
2024-10-31
Estimated Expiration
2042-07-11

AI Technical Summary

Technical Problem

Existing systems for determining the state of user equipment in a distributed control system face inaccuracies due to missing state measurements and limited effectiveness of predictive models, leading to reduced accuracy and increased resource requirements.

Method used

Implement a model improvement module that alternates between training and idle modes to enhance the predictive model's reliability and accuracy by collecting more state measurements during training, adjusting resource usage accordingly.

Benefits of technology

Improves the trade-off between resource requirements and state estimate accuracy by ensuring reliable predictive models are used, reducing resource demand while maintaining high accuracy during idle mode.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024540687000001_ABST
    Figure 2024540687000001_ABST
Patent Text Reader

Abstract

A user equipment that exercises control over the set of user equipment is provided with a model improvement module that is dedicated to updating the prediction model used to infer the state prediction values. The model improvement module alternates between a training mode, in which a new prediction model to be implemented next is determined, and an idle mode. A trade-off is obtained between limited resource requirements and accuracy of state knowledge. In the idle mode, the model improvement module can evaluate the validity of the currently used prediction model.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a user equipment adapted to implement a control in a set of user equipment. The invention also relates to a corresponding process and a set of user equipment. The present invention has many applications, in particular in the field of the Internet of Things. [Background technology]

[0002] There are systems made up of multiple user equipment, where each user equipment determines its own state based on measurements of at least one of the other user equipment. In this way, knowledge of the respective states of some or all of the user equipment is gradually built up and continuously updated, making it possible to control the operation of one, some or all of the user equipment in a consistent manner. When some of the user equipment are controlled, their control may be aimed at achieving a global mission, in which case it is called distributed control.

[0003] One example of such an application is the flight control of a set of several unmanned aerial vehicles, also known as flying drones, where for example these drones are intended to adopt a predefined relative position. However, many other applications exist, and the state definition considered for each user equipment to implement the control may differ for each application. In the case of drone applications, each drone constitutes a separate user equipment, whose state consists of a position in space, such position can be measured by a positioning system. In many other applications, control based on measurements involving multiple user equipment, for example network synchronization, is useful. In this latter application, the wireless devices are the user equipment, and their states are their respective reference points in time.

[0004] In such a system, each user equipment iteratively updates its state based on knowledge of the state of some other user equipment, and possibly based on knowledge of the state of only one other user equipment. Such a control system provides better accuracy in determining the state of each of the user equipments compared to determining the state of the user equipments individually. For this, each user equipment needs to obtain continuous measurements of the state of some of the other user equipments, possibly including, but not necessarily, a measurement of its own state. In practice, however, for many reasons, one or some of the state measurements required to update the state of one of the user equipments are not available at the time of performing the update. To avoid blocking the state update process, or simply to improve its accuracy, the state measurements are supplemented with state predictions in the user equipment currently updating its state. Each state prediction is based on previous state measurements available in the user equipment performing the state update, and the prediction model issues a state prediction from this previous state measurement. Then, for each of the user equipments used to perform the update, a respective state estimate is determined based on the state measurements and state predictions obtained for them. Then, a state update value is determined from these estimates. Instead of implementing a predictive model using previous condition measurements, it is possible to implement the predictive model based on statistics derived from these previous condition measurements.

[0005] In a known manner, a user equipment adapted to perform control in a set of user equipment, the user equipment under consideration updating its state on the basis of state measurements and state forecasts obtained for a subset of the user equipment, The user equipment - storage means adapted to store at least some of the condition measurements obtained for each user equipment of the subset or to store statistics derived from these condition measurements obtained for each user equipment of the subset; a prediction module adapted to infer a state prediction value for any of the subset of user equipment by implementing a prediction model using state measurements or statistics retrieved from the storage means; a state estimation module adapted to issue a state estimate for each of the subset of user equipment by combining state measurements and state predictions of the subset of user equipment; a resource control module adapted to select configuration parameters for controlling operation of resources of the user equipment based on the state estimate issued by the state estimation module; a state control module adapted to update the state of the user equipment under consideration based on the state estimate issued by the state estimation module; Equipped with.

[0006] The status measurements can be obtained internally in the user equipment under consideration, for example when the user equipment under consideration comprises a measurement module suitable for measuring the status of one or several of the other user equipments. Alternatively, the status measurements can be received by the user equipment under consideration via communication from any external suitable means, including measurement means on board each user equipment and suitable for measuring the respective status of this user equipment.

[0007] If the statistics are stored in the storage means, these statistics may have been provided by the state estimation module at an earlier point in time.

[0008] Such an architecture of a user equipment is shown in FIG. 1, in which the reference numerals have the following meaning: 1, 2, 3, 4 4 user devices 10 Resources allocated to user equipment, possibly including wireless type communication resources 13 storage means as described above of the user equipment 1 14 User Device 1 Prediction Module 15 User device 1 state estimation module 16 Resource Control Module of User Equipment 1 17 User device 1 state control module

[0009] In the example shown, user equipment 1 receives state measurements from users equipment 2 and 3, but not from user equipment 4. Thus, y 1 k , y 2 k and y 3 k denotes the state measurements obtained for each of the user equipments 1, 2 and 3 for the time instant k. These state measurements are provided to a state estimation module 15. Previous state measurements obtained before the time instant k for the user equipments 1, 2 and 3 are stored in storage means 13 and provided to a prediction module 14, which infers state predictions relating to the time instant k and to the users equipments 1, 2 and 3. It is reiterated that it is possible, but not necessary, to use the state measurements and predictions relating to this user equipment 1 within the user equipment 1.

[0010] X 1 k , X 2 k and X 3 k denote the state estimates issued by the state estimation module 15 for user equipments 1, 2 and 3, respectively, for time instant k. These state estimates are obtained by combining, in a known manner, the state estimates and state forecasts relating to time instant k.

[0011] The resource control module 16 may be a communication control module if the configuration parameters are intended to control the communication resources implemented between the user equipment.

[0012] In some cases, to select the configuration parameters, the resource control module 16 may also take into account requirements issued by the state control module 17, for example when the state of the user equipment is changing rapidly.

[0013] Finally, x 1 k and x 1 k+1 and x denote the true states of the user equipment 1 at time instants k and k+1, respectively. 1 k+1 After the operation of the state control module 17, the state x is changed to the state x through other inputs such as activation of the actuators of the user equipment 1 or an external instruction command. 1 k In some cases, the state control module 17 of the user equipment 1 can operate in coordination with other user equipments to form a distributed control system.

[0014] For such control actions, the accuracy of the states generated by the state control module 17 depends heavily on the accuracy of the state estimates and state forecasts used. In addition, the accuracy of each state forecast depends both on the measurements input to the predictive model and on the validity of the predictive model used. However, a predictive model that is valid at one time may no longer be valid at a later time. This limited validity of the predictive model may result in a state forecast that is less accurate.

[0015] The state measurement, i.e., y in Fig. 1 1 k , y 2 k and y 3 k will be more accurate and therefore more reliable if it is obtained from several base state measurements, each of which all relates to a time instant k. For this purpose, the collection frequency of the base state measurements should be higher than the state update frequency, and the state measurements input to the state estimation module 15 and to the storage means 13 for a time instant k are each the average of the base state measurements relating to the same time instant k. Such an average is calculated by the average calculation module 12 from the base state measurements received by the user equipment 1 or, if present, provided by its internal measurement module 11.

[0016] In this specification, the prediction model implemented by the prediction module 14 may perform a joint estimation of the states of the subset of user equipment, i.e., user equipment 1, 2 and 3 in the example of FIG. 1, or may be composed of individual models relating to the subset of user equipment individually.

[0017] The paper "Reinforcement Learning-Based Control and Networking Co-Designs for Industrial Internet of Things" by H. Xu et al., IEEE Journal on Selected Areas in Communications, Vol.38, No.5, May 2020, discloses training the communication control module, i.e., module 16 in Fig. 1, through reinforcement learning to make optimal decisions given the current state of the system. The optimal decision consists in recovering the maximum number of basic state measurements while avoiding congestion, in particular congestion of the measurement means or communication means connecting user equipments to each other for transmitting state measurements.

[0018] Starting from this situation, one object of the present invention is to improve the accuracy of state estimates determined by a user equipment to perform control, while reducing the resource requirements.

[0019] A secondary object of the present invention is to enable such improvements to be implemented from existing user equipment architectures. Summary of the Invention

[0020] To achieve these and other objectives, a first aspect of the present invention comprises, in addition to the storage means, prediction module, state estimation module, resource control module and state control module listed above, a model improvement module adapted to alternate between a training mode and an idle mode; The present invention proposes a user equipment comprising:

[0021] In the training mode, the model improvement module determines the prediction model to be next implemented by the prediction module from state measurements or statistics obtained for the subset of user equipment or from state estimates issued by the state estimation module.

[0022] The model improvement module is further configured to populate the prediction module with the prediction model determined in the training mode, such that the populated prediction model is used by the prediction module when the model improvement module is in the idle mode.

[0023] According to another feature of the invention, the model improvement module is further adapted to control the resource control module to adjust the reliability of the state measurements obtained for each user equipment of the subset, during a period dedicated to the training mode, to a level higher than another level of reliability valid during a preceding or subsequent period dedicated to the idle mode.

[0024] Thus, the control implementation requires fewer resources during periods dedicated to idle mode while still providing sufficiently reliable state estimates. Such reliability of the state estimates is provided by a training mode, in which the prediction model is trained with more resources. In this way, the prediction model used successively by the prediction module becomes more reliable, thus improving the quality of the state estimates issued by the state estimation module. The invention thus improves the trade-off between resource requirements and the accuracy of the state estimates used by the state control module.

[0025] In some cases, in idle mode, the predictive model has been predetermined by the model improvement module during a period dedicated to training mode, so that the model improvement module can evaluate the validity of this predictive model currently implemented by the prediction module.

[0026] In a possible embodiment of the invention, the resources are adapted to allow an improvement of the accuracy of each state measurement directly issued by the state measurement means used. In such a case, the accuracy of the state measurement results in the reliability of the state measurement.

[0027] In another possible embodiment of the invention, each state measurement of any user equipment of the subset stored by the storage means or used by the state estimation module can be obtained from one or several base state measurements relating to the same user equipment. The model improvement module is then further adapted to control the resource control module to adjust the frequency with which the base state measurement is obtained for each user equipment of the subset, such that a value of this frequency during a period dedicated to the training mode is higher than another value of the frequency valid during a preceding or subsequent period dedicated to the idle mode. In such an embodiment of the invention, the reliability of the state measurement is improved by increasing the number of base state measurements resulting in one state measurement.

[0028] For some applications of the invention, one or several of the following additional features can be advantageously implemented. The user equipments are adapted to communicate with each other by implementing a wireless communication mode and to wirelessly receive at least one state measurement or a basic state measurement of the subset of user equipment, where the resources of the set of user equipment may include wireless communication resources. The user equipment is adapted such that the state of any of the subset of user equipment includes coordinates of the position of the subset of user equipment. In such a case, the user equipment is further adapted to operate using baseline state measurements provided by at least one positioning system. The baseline state measurements of each of the subset of user equipment can then be wirelessly transmitted between the user equipment or transmitted internally to each user equipment. The model improvement module is adapted to switch from the training mode to the idle mode when a matching criterion for the training mode is met between state measurements and state prediction values ​​inferred using the currently determined prediction model, or after a request to release some resources is received by the user equipment, or at a time issued by the scheduling algorithm. The model improvement module satisfies the following conditions: the idle mode match criteria is no longer met between the state measurements and the state predictions issued by the prediction module; After receiving information that a certain amount of resources is available, after receiving information that the reliability of the state measurement exceeds a predetermined threshold; When issued by the scheduling algorithm, The apparatus is adapted to switch from the idle mode back to the training mode when at least one of the following occurs: Based on the state estimates issued by the state estimation module, and possibly also based on requirements from the state control module, the configuration parameters selected by the resource control module are suitable for controlling at least one of the following: the frequency of basic state measurements, the frequency of transmission of these basic state measurements, the modulation and coding scheme, and at least one transmission power implemented between the user equipments.

[0029] A second aspect of the invention proposes a process for implementing control in a set of user equipment, where each user equipment updates its state based on state measurements and state predictions obtained for a subset of the user equipment. For this purpose, each user equipment performs the following steps: storing at least some of the obtained condition measurements for each user equipment of the subset or storing statistics derived from these obtained condition measurements for each user equipment of the subset; inferring a state prediction value for any of the subset of user equipment by implementing a prediction model using pre-stored state measurements or statistics; issuing a respective estimate for a state of each of the subset of user equipment by combining the state measurements and state predictions of the subset of user equipment; selecting configuration parameters for controlling operation of resources of the user equipment based on the state estimate; updating a state of the user equipment, also based on the state estimate; Execute.

[0030] According to the invention, at least one of the user equipments, referred to as model improvement user equipment, operates alternately in a training mode and an idle mode.

[0031] In the training mode, a predictive model is determined from state measurements or statistics obtained for each user equipment of the subset, or from state estimates issued for each user equipment of the subset.

[0032] Next, the process further includes updating a predictive model implemented to estimate the state forecast value according to the predictive model determined in the training mode.

[0033] The configuration parameters are also adjusted such that the reliability of the state measurements obtained for each user equipment of the subset is at a higher level during the period dedicated to the training mode than another level of reliability valid during a preceding or subsequent period dedicated to the idle mode.

[0034] Optionally, in idle mode, the validity of the currently implemented predictive model is evaluated since this predictive model was previously determined during a period dedicated to training mode.

[0035] In a possible embodiment of the invention, each state measurement value stored or used to issue one of the state estimates for any of the user equipments of the subset may be derived from one or several base state measurements, whereby the frequency with which the base state measurement value is obtained for each user equipment of the subset may be adjusted such that a value of this frequency during a period dedicated to the training mode is higher than another value of the frequency valid during a preceding or subsequent period dedicated to the idle mode.

[0036] The model improvement user equipment may be according to the first aspect of the invention.

[0037] In a similar manner to the first invention embodiment, the following features can be implemented for the process of the second invention embodiment. The state measurements or the base state measurements may be wirelessly transmitted by at least one of the user equipment of the subset to the model improvement user equipment. The state of any of the subset of user equipment may include coordinate values ​​of the position of the subset of user equipment. In such a case, the base state measurements may be provided by at least one positioning system. The base state measurements for each user equipment of the subset may then be wirelessly transmitted to the model refinement user equipment or may be transmitted internally to the model refinement user equipment. The model improved user equipment can switch from the training mode to the idle mode when a matching criterion for the training mode is met between the state measurements and the state prediction values ​​inferred using the currently determined prediction model, or after a request to release some resources is received by the model improved user equipment, or at a time issued by the scheduling algorithm. The model improvement module satisfies the following conditions: the idle mode match criteria are no longer met between the state measurements and the state predictions used to issue the state estimates; After receiving information that a certain amount of resources is available, after receiving information that the reliability of the state measurement exceeds a predetermined threshold; When issued by the scheduling algorithm, When at least one of the following occurs, it may switch back from the idle mode to the training mode. Configuration parameters may be selected based on the state estimates, and possibly also based on control requirements, to control at least one of the frequency of basic state measurements, the frequency of transmission of these basic state measurements, the modulation and coding scheme, and at least one transmission power implemented between the user equipments.

[0038] Finally, a third aspect of the invention proposes a set of user equipment adapted to implement the control, at least one of these user equipment being according to the first invention aspect.

[0039] These and other features of the present invention will now be described with reference to the accompanying drawings, which relate to preferred, but non-limiting, embodiments of the invention. [Brief description of the drawings]

[0040] [Figure 1] FIG. 1 illustrates an architecture of a user equipment suitable for implementing controls, known prior to the present invention; [Diagram 2] FIG. 1 illustrates a possible application of the present invention. [Diagram 3] FIG. 2 is a diagram corresponding to FIG. 1 for a user equipment according to the present invention. [Figure 4] FIG. 4 illustrates a schematic diagram of a prediction model that can be implemented in the user equipment of FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0041] For clarity in the detailed description below, when reference numbers appearing in different figures, including FIG. 1 already described, are the same, they refer to one or more identical elements having the same function.

[0042] Here, the present invention describes a particular application of controlling a set of unmanned aerial vehicles, commonly referred to as drones, to have desired relative flight positions. For such an example, each drone constitutes a separate user equipment as introduced above, and each drone's respective current flight position is its current state. Thus, the state of drone i at time k is x i k where i is an integer index that uniquely identifies each drone from the others in the entire set.

[0043] However, the present invention can be applied to many systems other than drone sets, and the type of user equipment will depend on each system and the conditions considered for these user equipment.

[0044] Figure 2 shows a simple system in which the flight position of each of four drones is controlled, for example using distributed control. The drones are labelled with references 1, 2, 3 and 4, which correspond to the integer index i as just introduced. For each drone i, the corresponding darkened circle indicates its true position at time instant k: x i k As an illustrative but non-limiting example, a target of distributed control implemented in a drone set is forming and maintaining a defined rectangular pattern with the relative positions of drones 1-4.

[0045] Each drone i may be equipped with its own GPS (GPS stands for "Global Positioning System") receiver, constituting the measurement module of this drone i, although alternatively any other positioning system may be used. Thus, in the case of drone 1, its measurement module 11 consists of a GPS positioning receiver. Thus, each drone i is in principle able to collect at least one elementary measurement of its position relative to any instant k, and preferably several such measurements.

[0046] Each drone i may also be provided with communication means (not shown) designed to communicate with the other drones. The communication means may then be part of the resources 10, in addition to the measurement module 11. These resources 10 may also include other communication components, such as central nodes or master nodes, which may be at least partially of wireless type, in particular of radio type. Thus, each drone is able to transmit basic measurements of its position, provided by its GPS receiver, to at least some of the other drones of the set.

[0047] Alternatively, other systems for measuring the drones' positions may be used. For example, each drone i can be equipped with suitable means for measuring the respective positions of at least some of the other drones. Yet another possibility is that each drone i wirelessly receives respective position measurements of at least some of the other drones from an external position measurement system. It will be understood that the invention applies whatever the actual measurement means and communication model used to provide at least one of the drones with the required position measurements.

[0048] Continuing with drone 1, we assume that drone 1 does not receive position measurements of drone 4, but only drones 2 and 3. Drones 1, 2 and 3 thus form a subset within the overall drone set that is used to implement control on drone 1. Let j be an integer index that identifies the drones of this subset, i.e. j=1, 2 or 3. The elementary position measurements relating to time instant k and drone j, when multiple, are averaged by average calculation module 12 to issue a resulting position measurement, which again relates to time instant k and drone j, y j k When only one basic position measurement is collected for time instant k and drone j, this is the position measurement y j k Also, in some cases, no basic measurements are collected for time instant k and drone j. Due to measurement errors and noise, each position measurement y j k is the corresponding true position x j k In FIG. 2, position measurements are represented as open circles for each drone i, and each dotted circle represents its target relative position with respect to the other drones.

[0049] The basic position measurement of the drone 1 can be provided internally by the GPS receiver 11 and can also be averaged by the average calculation module 12 of the drone 1 to obtain the position measurement y 1 k However, it is not mandatory for drone 1 to use its own position measurements, drone 1 may use only the position measurements of drones 2 and 3. In the following, the position of drone 1 is referred to as the measurement y 1 k is the position measurement y 2 k and y 3 k In addition, it is deemed available.

[0050] Drone 1 takes y for each of the points k-1, k-2, etc., before point k. 1 k-1 , y 1 k-2 ..., y 2 k-1 , y 2 k-2 ... and y 3 k-1 , y 3 k-2 ..., where k, k-1, k-2... are the times when drone 1 updates its position and the true position x 1 k+1 , x 1 k , x 1 k-1 .... The previous position measurements y 1 k-1 , y 1 k-2 ..., y 2 k-1 , y 2 k-2 ... and y 3 k-1 , y 3 k-2 ..., the prediction module 14 estimates a position prediction value at time k for each of the drones 1 to 3. Alternatively, the storage means 13 may store previous position measurements y j k-1 , y j k-2 ... for each drone j can be stored. Such statistical distributions can be transmitted by state estimation module 15 to storage means 13. Position predictions are inferred by prediction module 14 using a prediction model discussed below. The position measurements and position predictions relating to time instant k are calculated based on the position estimates X 1 k , X 2 k and X 3 kThe rest of the control operation remains unchanged with respect to the prior art already described.

[0051] Position measurement y j k , y j k-1 , y j k-2 ... can be improved by increasing the number of basic position measurements related to the drone j and the time point of interest and combined through averaging by the average calculation module 12. It is therefore necessary that the collection frequency of the basic position measurements is higher than the state update frequency. Adjusting the collection frequency of the basic position measurements involves setting the configuration parameters of the drone as the measurement frequency and the transmission band. Thus, the reliability of the position measurements y used to implement the distributed control is improved by increasing the number of basic position measurements related to the drone j and the time point of interest and combined through averaging by the average calculation module 12. j k , y j k-1 , y j k-2 ... can be made more reliable, but at the cost of increased resource requirements.

[0052] Another challenge concerns the validity of the prediction model implemented by the prediction module 14. Indeed, this prediction model constitutes an assumption of the movement of drones 1, 2 and 3 and provides a prediction of their position at time instant k from previous positions. However, this prediction model may no longer be valid for any reason, such as a new external instruction command, the influence of at least one drone actuator, any interference event, etc.

[0053] The operation of the global control can be supported by a formula derived from the well-known Bayesian framework. This framework is based on the updated position estimate X j k This framework combines the location measurements and the location predictions to obtain a location estimate X j kIt shows that the accuracy of depends heavily on the reliability of the measurements and predictions. As shown above, the reliability of the measurements can be improved by increasing the frequency with which the basic measurements are input to the average calculation module 12 of at least some of the drones j. However, an insufficient validity of the prediction model implemented by the prediction module 14 leads to a vulnerability of the overall control. The improvements of the invention described below with reference to FIG. 3 aim to reduce or eliminate this vulnerability.

[0054] As shown in Fig. 3, the control system on board the drone 1, and preferably also on other drones, is completed with an additional module 18 called model improvement module. For this reason, the drone 1 is called model improvement user equipment in the overview part of this specification. For this reason, the architecture of Fig. 1, known from the prior art, including modules 11 to 17, is maintained, but combined with a new module 18. This module 18 is designed according to the invention to improve the trade-off between resource demand and prediction reliability. According to the invention, the model improvement module 18 receives, in parallel with the prediction module 14, the position measurements y from the storage means 13, j k and is connected to control the resource control module 16. The model improvement module 18 may alternatively receive the position measurements y from the storage means 13. j k , from the state estimation module 15 in parallel with the resource control module 16 and the state control module 17. j k The model improvement module 18 may be connected to receive the location information, or statistics of the location measurements. The model improvement module 18 is also connected to the prediction module 14 for updating the prediction model actually implemented by the prediction module 14 and for monitoring the accuracy of the resulting location predictions. Most conveniently, the model improvement module 18 may be implemented as a software module.

[0055] The model improvement module 18 is designed to operate alternately in a training mode and an idle mode. As explained above, the model improvement module 18 operates in either mode while the control is continuously performed. The training mode is dedicated to issuing a new prediction model to be subsequently used by the prediction module 14. This new prediction model will provide a more accurate position prediction value. In fact, the training mode brings about an update of the prediction model to be implemented by the prediction module 14 to take into account changes that may have occurred in the operation of the set of drones, such as external instruction commands or perturbations. At the end of each period dedicated to the training mode, the updated prediction model is input by the model improvement module 18 to the prediction module 14 and is used instead of the current prediction model. The model improvement module 18 can then switch to the idle mode and monitor the validity of the prediction model newly implemented by the prediction module 14 in the idle mode, but this is not necessary. Since the prediction model was trained immediately before the preceding period dedicated to the training mode, its validity is more certain and the resulting position prediction value is more accurate and reliable. During the next period dedicated to the idle mode, the model refinement module 18 refines each position measurement y j k The validity of this prediction model can be checked by comparing with the corresponding position prediction issued by prediction module 14.

[0056] In the training mode, a sufficient number of position measurements must be collected so that the prediction model currently trained by the model improvement module 18 is sufficiently accurate. For this purpose, the model improvement module 18 forces the resource control module 16 in the training mode to make the basic position measurements and to transmit the basic position measurements with a sufficiently high frequency. Conversely, during the idle mode, the requirement for a sufficiently high number of basic position measurements no longer holds, since the prediction model is sufficiently accurate to estimate the position measurements. This allows a reduction in the demand for measurement and communication resources during the period dedicated to the idle mode. In particular, the frequency of the basic position measurements and the frequency of transmission of the basic position measurements, controlled by the resource control module 16, can be significantly reduced with respect to the training mode. This allows a reduction in the transmission load of the communication resources, but due to the reliability of the prediction model provided by the training mode, such a reduction results in little loss of accuracy of the position estimates. This advantage of the invention applies in particular when the communication between the user equipments, i.e. drones, is of the wireless type. The invention then allows a reduction in the wireless load.

[0057] Thus, during each period dedicated to the training mode, the model improvement module 18 controls the resource control module 16 to obtain sufficient basic location measurements for training a new predictive model, each based on an increased number of location measurements, to obtain the resulting location measurements y j k , y j k-1 , y j k-2 ... is more reliable. The cost of this is the resource requirement in the training mode to collect basic position measurements with a sufficiently high frequency. This resource requirement is met during each training mode period by forcing the appropriate configuration parameters of the drone set. For the exemplary application of Figures 1 and 3, the reliable position measurements y collected in this way for drones 2 and 3 and within drone 1 are j kis calculated by the state estimation module 15 as a more accurate position estimate X j k , which is then used in parallel in the model improvement module 18 to train a new predictive model. At this point, the prediction module 14 still implements the prediction model provided by the model improvement module 18 at the end of the preceding period dedicated to the training mode. During each period dedicated to the training mode, the state estimation module 15 relies largely on the position measurements, since these are sufficient in number and accuracy.

[0058] 4 shows the predictive model being trained by the model improvement module 18 in training mode. Such representations are familiar to those skilled in the art of artificial intelligence. As shown in the left part of FIG. 4, the input of the model is, for the application example of FIG. 2, the position measurements y of drones 1, 2 and 3 at at least one previous time point k−1 in the operation of the entire control system. j k-1 In some cases, these position measurements y j k-1 is the position estimate X issued for drones 1, 2 and 3 and for time instant k-1. j k-1 or the associated statistical distribution. j k The output of the predictive model is the position predictions for these drones 1, 2 and 3 and for the next time instant, i.e. k, as denoted by y 1 k , y 2 k and y 3 k In different embodiments of the invention, the predictive model may treat drone j collectively or may be composed of individual predictive models each relating to drone j separately.

[0059] The end of each training mode period can be triggered in a variety of ways. The first way is that a criterion is met by the currently trained prediction model, and the trained prediction model provides a position prediction value z j k and the position measurement y j k This means providing sufficient consistency between the norm ||y j k -z j k falls below a predefined threshold for several subsequent times k. Another possibility for stopping the training mode period is that the drone 1 receives a request for available resources from any other element of the system, including one of the other drones. Such a request may be issued because another function implemented in the drone set requires sufficient communication bandwidth. Yet another possibility for stopping the training mode period is a command issued by a scheduling algorithm. Such a scheduling algorithm is dedicated to distributing communication resources between the various functions of the drone set, whatever these functions may be, based on their allocation rules and their respective resource requirements. At the end of the training mode period, the freshly trained new prediction model is injected into the prediction module 14, replacing the previous one. The prediction module 14 then operates with this new prediction model, and the model improvement module 18 switches to an idle mode.

[0060] During the idle mode, the model improvement module 18 may continually check the validity of the prediction model currently implemented by the prediction module 14. To this end, the model improvement module 18 may iteratively update the location predictions resulting from the prediction model currently implemented by the prediction module 14 based on the location measurements, i.e., y 1 k , y2 k and y 3 k , compared to . Due to the improved effectiveness of the prediction models used, the control operations during the idle mode period are provided with a reduced number of basic position measurements. This makes the idle mode less demanding in measurement and communication resources than the training mode, thereby allowing a larger amount of resources to be allocated to functions other than the distributed control. In particular, the frequency of the basic position measurements performed for each drone and the transmission of the basic position measurements between the drones is set by the model improvement module 18, through the resource control module 16, to a higher value in the training mode compared to the value of this frequency valid in the idle mode. The idle mode period is extended by a factor of 10, i.e., 0.5, and 1.0, i.e., 0.5, and 1.0, respectively. j k The idle mode may continue until a match criterion is no longer met between the position measurement y and the position prediction issued by the prediction module 14. This match criterion for the idle mode may be similar to, but not necessarily similar to, the match criterion for the training mode. Alternatively, the idle mode period may continue until the drone 1 receives information that a certain amount of resources is available or until a switch command is issued by the scheduling algorithm. The model improvement module 18 then switches back to the training mode. Also, in the idle mode, the model improvement module 18 may perform a match criterion for the position measurement y. j k , and switches to training mode when it determines that the reliability is good enough to allow training of a new predictive model. Triggering such a switch can be facilitated by increasing the frequency of base position measurements when possible in idle mode. Again, in idle mode, model improvement module 18 may request a temporary increase in the frequency of base position measurements to obtain measurements with improved reliability.

[0061] The present invention is not limited to the field of controlling a set of drones, but can be advantageously applied to many other systems consisting of multiple user equipment. The number of user equipment in the system and the number of these equipments actually used in one user equipment as a subset to perform distributed control can be arbitrary. Therefore, the number of user equipment in the system, 4, and the number of user equipment in the subset, 3, are used for illustrative purposes only, not for limitation.

Claims

1. A user equipment adapted to perform control in a set of user equipment, the user equipment updating its state based on state measurements and state predictions obtained for the subset of user equipment, The user equipment, - storage means adapted to store at least some of the condition measures obtained for each user equipment of said subset or to store statistics derived from the condition measures obtained for each user equipment of said subset; a prediction module adapted to infer a state prediction value for any of the subset of user equipment by implementing a prediction model using state measurements or statistics retrieved from the storage means; a state estimation module adapted to issue a state estimate for each of the subset of user equipment by combining the state measurements and the state predictions of the subset of user equipment; a resource control module adapted to select configuration parameters for controlling operation of resources of the user equipment based on the state estimate issued by the state estimation module; a state control module adapted to update a state of the user equipment based on the state estimate issued by the state estimation module; In a user equipment comprising: The user equipment, a model improvement module adapted to alternate between a training mode and an idle mode; In the training mode, the model improvement module determines, from the state measurements or statistics obtained for the subset of user equipment or from the state estimates issued by the state estimation module, a prediction model to be subsequently implemented by the prediction module; the model improvement module is further configured to input the prediction model determined in the training mode into the prediction module, whereby when the model improvement module is in the idle mode, the input prediction model is used by the prediction module; 4. The user equipment according to claim 3, wherein the model improvement module is further adapted to control the resource control module to adjust the reliability of the state measurements obtained for each user equipment of the subset, during a period dedicated to the training mode, to a level higher than another level of reliability valid during a preceding or subsequent period dedicated to the idle mode.

2. 2. The user equipment of claim 1, wherein the model improvement module is further adapted to evaluate the validity of the prediction model currently implemented by the prediction module during a period dedicated to the idle mode, since the prediction model was previously determined by the model improvement module during a period dedicated to the training mode.

3. adapted such that for any of the subset of user equipment, each state measurement value stored by the storage means or used by the state estimation module is derived from one or several base state measurements, 3. The user equipment of claim 1 or 2, wherein the model improvement module is further adapted to control the resource control module to adjust the frequency at which the baseline state measurements are obtained for each user equipment of the subset such that a value of the frequency during a period dedicated to the training mode is higher than another value of the frequency in effect during the preceding or subsequent period dedicated to the idle mode.

4. A user equipment according to any one of claims 1 to 3, wherein the state of any of the user equipment of the subset is adapted to include coordinate values ​​of a position of the user equipment of the subset.

5. 5. User equipment according to claim 3 and 4, adapted to operate using the base state measurements provided by at least one positioning system, the base state measurements for each user equipment of the subset being transmitted wirelessly between the user equipment or transmitted internally to each user equipment.

6. 6. A user equipment according to claim 1, wherein the model improvement module is adapted to switch from the training mode to the idle mode when a match criterion for the training mode is met between the state measurements and the state prediction values ​​inferred by the currently determined prediction model, or after a request to release some resources is received by the user equipment, or at a time issued by a scheduling algorithm.

7. The model improvement module satisfies the following conditions: the idle mode match criteria is no longer met between the state measurements and the state predictions issued by the prediction module; After receiving information that a certain amount of said resource is available, upon receiving information that the reliability of the condition measurement exceeds a predetermined threshold; When issued by the scheduling algorithm, 7. A user equipment according to claim 1, adapted to switch from said idle mode back to said training mode when at least one of the following occurs:

8. 8. A user equipment according to claim 1, wherein the configuration parameters selected by the resource control module based on the state estimates issued by the state estimation module, and possibly also on requirements from the state control module, are suitable to control at least one of the following: a frequency of basic state measurements, a frequency of transmission of basic state measurements, a modulation and coding scheme, and at least one transmission power implemented between the user equipments.

9. A process for exercising control over a set of user equipment, each user equipment updating its state based on state measurements and state predictions obtained for a subset of said user equipment; At least one of said user equipments performs the following steps: storing at least some of the condition measurements obtained for each user equipment of the subset or storing statistics derived from the condition measurements obtained for each user equipment of the subset; - inferring a state prediction value for any of the subset of user equipment by implementing a prediction model using pre-stored state measurements or statistics; issuing a respective state estimate for each state of the subset of user equipment by combining the state measurements and the state predictions of the subset of user equipment; selecting configuration parameters for controlling operation of resources of the user equipment based on the state estimate; updating a state of the user equipment also based on the state estimate; In the process of executing At least one of the user equipments, referred to as a model improvement user equipment, operates alternately in a training mode and an idle mode; In the training mode, the prediction model is determined from the state measurements or statistics obtained for each user equipment of the subset or from the state estimates issued for each user equipment of the subset; The process further includes updating the prediction model implemented to estimate the state forecast value according to the prediction model determined in the training mode; wherein the configuration parameters are adjusted such that the reliability of the state measurements obtained for each user equipment of the subset is at a higher level, during a period dedicated to the training mode, than another level of reliability valid during a preceding or subsequent period dedicated to the idle mode.

10. 10. The process of claim 9, wherein in the idle mode, the validity of the currently implemented predictive model is evaluated as the predictive model was previously determined during the period dedicated to the training mode.

11. for any of the subset of user equipment, each state measurement value stored or used to issue one of the state estimates is derived from one or several base state measurements; 11. The process according to claim 9 or 10, wherein the frequency with which the base state measurements are obtained for each user equipment of the subset is adjusted such that a value of the frequency during a period dedicated to the training mode is higher than another value of the frequency in effect during the preceding or subsequent period dedicated to the idle mode.

12. The process according to any one of claims 9 to 11, wherein the model improvement user equipment is a user equipment according to at least one of claims 1 to 3.

13. A process as claimed in any one of claims 9 to 12, wherein the state of any of the user equipment of the subset comprises coordinate values ​​of positions of user equipment of the subset.

14. The process of claims 11 and 13, wherein the base state measurements are provided by at least one positioning system, and the base state measurements for each user equipment of the subset are transmitted wirelessly to the model refinement user equipment or transmitted internally to the model refinement user equipment.

15. 15. The process according to any one of claims 9 to 14, wherein the model improvement user equipment switches from the training mode to the idle mode when a match criterion for the training mode is met between the state measurements and the state prediction values ​​inferred using the currently determined prediction model, or after a request to release some resources is received by the model improvement user equipment, or at a time issued by a scheduling algorithm.

16. The model improvement user equipment satisfies the following conditions: the idle mode match criteria is no longer met between the state measurements and the state predictors used to issue the state estimates; After receiving information that a certain amount of said resource is available, upon receiving information that the reliability of the condition measurement exceeds a predetermined threshold; When issued by the scheduling algorithm, The process according to any one of claims 9 to 15, wherein the process switches from the idle mode back to the training mode when at least one of the following occurs:

17. 17. The process of any one of claims 9 to 16, wherein the configuration parameters are selected based on the state estimates, and possibly also based on control requirements, to control at least one of: a frequency of base state measurements, a frequency of transmission of the base state measurements, a modulation and coding scheme, and at least one transmission power implemented between the user equipments.

18. A set of user equipment adapted to implement a control, at least one of said user equipment being according to any one of claims 1 to 8.

Citation Information

Patent Citations

  • Communication system and method for setting communication path

    JP2018016203A

  • Information processing device, flight control instruction method, program and recording medium

    JP2019101587A

  • Drone network and operating method

    JP2021119656A

  • Machine learning model scaling system with energy efficient network data transfer for power aware hardware

    US20220036123A1