Construction plan management system, construction plan management method, and construction plan management program

The construction plan management system addresses the challenge of managing complex relationships between tasks and companies at construction sites by using hierarchical templates, enhancing task organization and information sharing.

JP2025136235AActive Publication Date: 2025-09-19RVSTA INC +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2024034552
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2024-03-07
Publication Date
2025-09-19
Estimated Expiration
2044-03-07

AI Technical Summary

Technical Problem

Existing construction plan management systems struggle to effectively manage complex relationships between multiple tasks and cooperating companies at construction sites, making it difficult to organize and share information efficiently.

Method used

A construction plan management system utilizing a hierarchical template structure that allows users to select, customize, and share construction plans, enabling efficient management and visualization of tasks with complex relationships, and supporting template reuse and classification.

Benefits of technology

Enables easy and effective management of construction plans with complex relationships, allowing for task organization, visualization, and information sharing among users, improving user convenience and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2025136235000001_ABST
    Figure 2025136235000001_ABST
Patent Text Reader

Abstract

To relate to a construction plan management system, a construction plan management method, and a construction plan management program.SOLUTION: A construction plan management system 1 includes a storage unit, a receiving unit, and a selection unit. The storage unit stores construction work including attribute or construction type in a construction site, and hierarchical templates including a plurality of tasks related to the construction work, in association with each other. The receiving unit receives construction work desired by a user in a construction plan. The selection unit selects a specific template, based on a selection request input by the user, from among the templates corresponding to the construction work received from the user, associates the specific template with the user, and stores in the storage unit as a construction plan to be shared with a plurality of users related to the construction work.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present invention relates to a construction plan management system, a construction plan management method, and a construction plan management program. [Background technology]

[0002] Management systems have been developed for managing construction plans and work execution at construction sites. Recently, various efforts have been made to share information on these construction plans and work results.

[0003] For example, Patent Document 1 discloses a plant deliverable management system that uses templates to create plant deliverables during plant construction. This plant deliverable management system makes it possible to use templates for inspection reports and other items created based on past experience for new construction projects. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Special Publication No. 2013-514597 Summary of the Invention [Problem to be solved by the invention]

[0005] The technology of Patent Document 1 utilizes templates to report deliverables after work is completed. That is, a user can enter deliverables using a pre-prepared template, which simplifies the reporting of deliverables for each work.

[0006] However, at actual construction sites, multiple cooperating companies work under complex relationships, and multiple tasks and processes are also intricately related, so the technology of Patent Document 1, which simply uses templates, makes it difficult to properly manage the construction plans for these various tasks.

[0007] The present invention has been made in consideration of the problems of the above-mentioned conventional technology, and its purpose is to provide a construction plan management system that can simply and effectively manage construction plans for each task that has complex correspondence relationships at a construction site. [Means for solving the problem]

[0008] In order to solve the above problems, the present invention provides a construction plan management system for managing construction plans at a construction site, The construction plan management system includes a storage unit, a reception unit, and a selection unit, The storage unit stores a construction work including attributes and / or work types at the construction site in association with a template having a hierarchical structure including a plurality of tasks related to the construction work, The reception unit receives the construction work desired by the user in the construction plan, The selection unit selects and processes a specific template from among multiple templates corresponding to the construction work received from the user based on a selection request input from the user, associates the specific template with the user, and stores it in the memory unit as a construction plan that can be shared by multiple users related to the construction work.

[0009] The present invention also provides a construction plan management method executed by a construction plan management system that manages construction plans for a construction site, The construction plan management system includes a storage unit, a reception unit, and a selection unit, The storage unit stores a construction work including attributes and / or work types at the construction site in association with a template having a hierarchical structure including a plurality of tasks related to the construction work; The receiving unit receives the construction work desired by the user in the construction plan; The method includes a step in which the selection unit selects and processes a specific template from among a plurality of templates corresponding to the construction work received from the user based on a selection request input from the user, associates the specific template with the user, and stores the result in the memory unit as a construction plan that can be shared by a plurality of users related to the construction work.

[0010] The present invention also provides a construction plan management program for managing a construction plan for a construction site, causing a computer to function as a storage unit, a reception unit, and a selection unit; The storage unit stores a construction work including attributes and / or work types at the construction site in association with a template having a hierarchical structure including a plurality of tasks related to the construction work, The reception unit receives the construction work desired by the user in the construction plan, The selection unit selects and processes a specific template from among multiple templates corresponding to the construction work received from the user based on a selection request input from the user, associates the specific template with the user, and stores it in the memory unit as a construction plan that can be shared by multiple users related to the construction work.

[0011] This configuration makes it possible to easily and effectively manage construction plans for each task that has a complex relationship at the construction site. In this invention, by using a template with a hierarchical structure, each task that has a complex relationship can be organized and visualized, thereby realizing appropriate management.

[0012] In a preferred embodiment of the present invention, the construction plan management system further includes a creation processing unit, The creation processing unit creates a dedicated template including the tasks desired by the user based on the specific template and input of a change request from the user, and associates the results of the creation process with the user and stores them in the memory unit as the construction plan.

[0013] By configuring it in this way, the format can be customized according to the user's wishes. For example, a template with a hierarchical structure containing multiple tasks can be used as a base, and tasks included in the template can be added, changed, or deleted according to the user's wishes.

[0014] In a preferred embodiment of the present invention, the reception unit receives the construction work from the user, The selection unit selects and processes the dedicated template so that it can be reused based on a reuse request input from the user, associates the dedicated template with the user, and stores it in the storage unit as the construction plan.

[0015] This configuration allows users to reuse dedicated templates they created at previous construction sites at similar construction sites. For example, users can further customize the dedicated templates they reuse.

[0016] In a preferred embodiment of the present invention, the receiving unit receives implementation statuses of the tasks from a plurality of users with different user attributes, and associates the implementation statuses with the construction plan.

[0017] This configuration allows different users to share information. For example, the worker who actually performed the work can input the implementation status into a construction plan, and the manager or other workers related to the construction plan can view it.

[0018] In a preferred embodiment of the present invention, the construction plan management system further includes a setting unit, the receiving unit receives a classification instruction for classifying the task from the user; The setting unit sets classification labels for classifying tasks corresponding to the hierarchical structure based on the classification instruction received from the user.

[0019] This configuration allows classification labels to be set for multiple tasks based on predetermined conditions. For example, even if tasks are for work at a construction site that has complex correspondence relationships, the user can easily and quickly search for the task they require (the classification they need from among multiple classifications of tasks).

[0020] In a preferred embodiment of the present invention, the construction plan management system further includes a display processing unit, The hierarchical structure includes an item and one or more sub-items that subdivide the item, The display processing unit associates the items in the template with one or more details, performs display processing, and transmits the results of the display processing to a terminal used by a user.

[0021] By configuring in this way, it is possible to display a construction plan (specific template) with a hierarchical structure, such as major items, medium items, minor items, etc. By displaying the construction plan with this hierarchical structure, the user can check the construction plan in an organized and easy-to-view format.

[0022] In a preferred embodiment of the present invention, the display processing unit further displays a part of the content of the particular item included in the particular item, and transmits the display processing result to a terminal used by the user.

[0023] This configuration allows the user to check some of the details of the medium and small items on the terminal screen, so that the user can select the required task from the multiple tasks displayed on the terminal screen and check the detailed content.

[0024] In a preferred embodiment of the present invention, the construction plan management system further includes a display processing unit, The display processing unit processes display of a distinguishable classification mark according to the classification of the task, and transmits the result of the display processing to the terminal used by the user.

[0025] This configuration allows tasks classified in a construction plan to be displayed, allowing the user to easily understand the tasks for each classification.

[0026] In a preferred embodiment of the present invention, the construction plan management system further includes a display processing unit, The display processing unit processes and displays a list of a plurality of construction plans (specific templates), and transmits the results of the display processing to the terminal used by the user.

[0027] This configuration allows users to check the necessary templates (such as construction plans and tasks related to individual work) according to their attributes and authority. For example, a user can check a list of construction plans related to the work they are responsible for.

[0028] In a preferred embodiment of the present invention, the receiving unit receives a specific classification label from the user, The display processing unit displays a list of multiple construction plans and / or the tasks based on the specific classification label accepted by the accepting unit, and transmits the results of the display processing to the terminal used by the user.

[0029] With this configuration, it is possible to display a list of multiple construction plans created by the user from a template while sorting and rearranging them based on the classification labels. For example, the display processing allows the display processing unit (or selection unit) to select a specific classification label based on input from the user, thereby bringing only specific tasks to the top, and also to display them in order of the closest date or deadline.

[0030] In a preferred embodiment of the present invention, the construction plan management system further includes a setting unit and a display processing unit, the receiving unit receives an implementation status of the task; The setting unit sets a status based on the progress of the implementation status, and stores the set status in the storage unit in association with the construction plan and / or task; The display processing unit processes the status to be displayed in a distinguishable manner according to the progress, and transmits the result of the display processing to a terminal used by the user.

[0031] By configuring it this way, you can set a progress status for each task (not started, in progress, completed, etc.) and display it clearly according to its progress. You can also set a status for each item (major item) and each subitem (medium item and minor item). [Effects of the Invention]

[0032] According to the present invention, a new technique for a construction plan management system can be provided by executing predetermined processing using a template having a hierarchical structure. [Brief explanation of the drawings]

[0033] [Figure 1] 1 shows a block diagram of a system configuration according to an embodiment of the present invention. [Figure 2] 1A and 1B are schematic diagrams illustrating an example of the hardware configuration of an information processing device and a terminal according to an embodiment of the present invention. [Figure 3] 2 shows a flowchart of a processing procedure of a construction plan management system according to an embodiment of the present invention. [Figure 4] 2 shows an example of each piece of information used in a construction plan management system according to one embodiment of the present invention. [Figure 5] 2 shows an example of each piece of information used in a construction plan management system according to one embodiment of the present invention. [Figure 6] 10 shows a flowchart of a flow when a dedicated template is reused in a construction plan management system according to an embodiment of the present invention. [Figure 7] 10 shows an example of a display processing result (registration screen) on the terminal according to one embodiment of the present invention. [Figure 8] 10 shows an example of a display processing result (construction plan) on the terminal according to one embodiment of the present invention. [Figure 9]1 shows an example of an initial screen (portal screen) for each construction site displayed on a terminal according to an embodiment of the present invention. [Figure 10] 10 shows an example of a display processing result of detailed content of a task displayed on a terminal according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE INVENTION

[0034] The present invention will now be described more fully with reference to the accompanying drawings, in which preferred embodiments are shown, but which may be embodied in many different forms and are not limited to the embodiments set forth herein.

[0035] For example, in this embodiment, the configuration, operation, etc. of the construction plan management system will be described, but similar effects can be achieved by the executed method (steps), device, computer program, etc. The program in this embodiment may be provided as a non-transitory computer-readable recording medium, or may be provided so as to be downloadable from an external server.

[0036] Furthermore, in this embodiment, the term "unit" may include, for example, a combination of hardware resources implemented by circuits in a broad sense and software information processing that can be specifically realized by these hardware resources.

[0037] In this embodiment, "information" is represented by, for example, the physical value of a signal representing voltage or current, the high or low value of a signal as a binary bit set consisting of 0 or 1, or quantum superposition (so-called quantum bits), and communication and calculations can be performed on a circuit in a broad sense.

[0038] A circuit in the broad sense is a circuit realized by appropriately combining a circuit, circuitry, processor, memory, etc. That is, it includes a CPU (Central Processing Unit), a GPU (Graphics Processing Unit), an LSI (Large Scale Integration), an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), etc.

[0039] <System configuration> Fig. 1 is a block diagram showing a system configuration according to one embodiment of the present invention. As shown in Fig. 1, the construction plan management system 1 includes an information processing device 10 and a database DB. The construction plan management system 1 is configured to be able to communicate with a plurality of management terminals 2 (reference numerals 2(a) to 2(c) in Fig. 1) and work terminals 3 (reference numerals 3(a) to 3(c)) via a network NW. In this embodiment, managers, workers, etc. are collectively referred to as users, and the management terminal 2 and work terminal 3 are sometimes collectively referred to as user terminals.

[0040] The information processing device 10 operates as a server, the management terminal 2 is a terminal used by the prime contractor at the construction site to register the construction plan and each task described below, and the work terminal 3 is a terminal used by the cooperating companies and workers to input the work status for each task.

[0041] In this embodiment, the network NW is an IP (Internet Protocol) network, but there is no limitation on the type of communication protocol, and there is also no limitation on the type and scale of the network.

[0042] It should be noted that a general-purpose server computer, a personal computer, or the like can be used as the information processing device 10. It is also possible to configure the construction plan management system 1 by implementing the functional components described below on multiple computers.

[0043] The management terminal 2 is a terminal used by the prime contractor (the prime contractor's manager or person in charge), etc. A smartphone, tablet terminal, personal computer, wearable device, etc. can be used as the management terminal 2. The management terminal 2 stores a construction plan management application program for management, and this application program is configured with functions that allow the user to register construction plan templates and tasks, or to view construction plans, etc.

[0044] The work terminal 3 is a terminal used by cooperating companies, workers, etc. Smartphones, tablet terminals, personal computers, wearable devices, etc. can be used as the work terminal 2. The work terminal 3 stores a construction plan management application program for work, and is configured with functions for inputting and viewing the progress status of each task, etc.

[0045] The management terminal 2 and the work terminal 3 may be configured not to have their own construction plan management application programs. In this case, the management terminal 2 and the work terminal 3 can use a web browser or the like to view and transmit each piece of information.

[0046] <Hardware configuration> 2(a) is a diagram showing an example of the hardware configuration of the information processing device 10. The information processing device 10 includes a control unit 11, a storage unit 12, and a communication unit 13 as the hardware configuration.

[0047] The control unit 11 includes one or more processors such as a CPU, and controls the overall operation and processing of the information processing device 10 by executing the construction plan management program according to the present invention, an OS, and other applications.

[0048] The storage unit 12 is an HDD, SSD, ROM, RAM, etc., and stores the construction plan management program according to the present invention and data used when the control unit 11 executes processing based on the program. The control unit 11 executes processing based on the construction plan management program stored in the storage unit 12, thereby realizing the functional configuration described below.

[0049] The communication unit 13 controls communication with the network NW, and performs inputs required to operate the information processing device 10 and outputs related to the operation results.

[0050] 2(b) is a diagram showing an example of the hardware configuration of a terminal 90 (the management terminal 2 and the operation terminal 3 in FIG. 1). The terminal 90 includes, as its hardware configuration, a control unit 91, a storage unit 92, a communication unit 93, an input unit 94, and an output unit 95.

[0051] The control unit 91 of the terminal 90 includes one or more processors such as a CPU, and controls the overall operation and processing of the terminal 90. The storage unit 92 of the terminal 90 is an HDD, SSD, ROM, RAM, etc., and stores the above-mentioned construction plan management application program, as well as data and the like used when the control unit 91 executes processing based on the program.

[0052] A communication unit 93 of the terminal 90 controls communication with the network. An input unit 94 of the terminal 90 is a touch panel, a mouse, a keyboard, or the like, and inputs operation requests from the user to the control unit 91. An output unit 95 of the terminal 90 is a display, or the like, and displays the results of processing by the control unit 91, etc.

[0053] <Functional configuration> 2(a), the information processing device 10 includes, as its functional configuration, a reception unit 101, a transmission unit 102, a selection unit 103, a creation processing unit 104, a setting unit 105, and a display processing unit 106. These are information processing performed by software (stored in the storage unit 12) that is specifically realized by hardware (such as the control unit 11).

[0054] The reception unit 101 receives various types of information from a user terminal. The reception unit 101 also receives various types of information for registering a template having a hierarchical structure. In this embodiment, the reception unit 101 receives construction work related to a construction plan that the user plans to manage. The reception unit 101 receives selection requests, template change requests, reuse requests, and the like from the user.

[0055] Furthermore, the receiving unit 101 receives the implementation status of the task from a plurality of users (e.g., actual workers) with different user attributes, and associates the implementation status with a specific template (a construction plan created from a template selected by the user). The receiving unit 101 receives a classification instruction for classifying the task from the user.

[0056] The transmitting unit 102 transmits various information to the user terminal. In this embodiment, the transmitting unit 102 transmits a plurality of templates corresponding to construction work to the user terminal based on a request from the user. Furthermore, based on various input requests from the user, such as a request to change or reuse a template, the transmitting unit 102 transmits information corresponding to each request to the user terminal.

[0057] The selection unit 103 selects information necessary for managing a construction plan based on a request from a user. The selection unit 103 in this embodiment selects a specific template from among multiple templates corresponding to construction work received from the user based on a selection request input from the user, and stores this specific template and the user in association with each other as a construction plan in the storage unit 12.

[0058] Furthermore, the selection unit 103 selects a dedicated template so that it can be reused based on a reuse request input from a user, associates the dedicated template with the user, and stores the result in the storage unit as a construction plan.

[0059] The creation processing unit 104 creates a template that can be used at the construction site. In this embodiment, the creation processing unit 104 creates a dedicated template including tasks desired by the user based on a specific template and input of a change request from the user, and stores the result of the creation processing in the storage unit 12 as a construction plan in association with the user.

[0060] The setting unit 105 sets a label or the like for each task. In this embodiment, the setting unit 105 sets a classification label for classifying a task corresponding to a hierarchical structure based on a classification instruction received from a user. The setting unit 105 sets a status based on the progress of the implementation situation.

[0061] The display processing unit 106 performs display processing on the display screens of the management terminal 2 and the work terminal 3. In this embodiment, the display processing unit 106 performs display processing on items (e.g., major items) in the template in association with one or more subitems (e.g., medium items or minor items), and transmits the results of this display processing to the terminal used by the user. The display processing unit 106 can further perform display processing on part of the content of the subitems included in the subitems, and transmit the results of this display processing to the terminal used by the user.

[0062] The display processing unit 106 can display a classification mark that can be identified according to the classification of the task, or can display a list of multiple construction plans (specific templates). Furthermore, the display processing unit 106 can display a list of multiple construction plans and / or tasks based on a specific classification label accepted by the accepting unit 101, and transmit the results of this display processing to the terminal used by the user. The display processing unit 106 displays the status in an identifiable manner according to the progress, and transmits the results of this display processing to the user terminal.

[0063] <Database> 1 stores user information on users such as workers and managers, company information on prime contractors and cooperating companies, construction site information on the construction site, work information on the construction work, construction system information on the construction system at the construction site, information on tasks and items, template information, construction plan information (usage information), dedicated template information, reuse template information, and other information necessary for managing construction plans. Some or all of this information may be stored in the memory unit 12 or the like, or some of this information may be stored in another database or the like.

[0064] The construction plan management system 1 and the processing contents of each functional component will be described below with reference to FIGS.

[0065] <Overview of the construction plan management system> The construction plan management system 1 according to this embodiment is a system for simply and appropriately managing construction plans at a construction site. The construction plan management system 1 according to the present invention prepares in advance a plurality of templates each having a hierarchical structure including a plurality of tasks, and allows the user to selectively use (or customize according to the user's wishes) these distinctive templates, thereby making it possible to appropriately manage construction plans and work at a construction site that have complex correspondence relationships.

[0066] Furthermore, the construction plans managed by the construction plan management system 1 are themselves new information that has not been available before. For example, in the past, a person in charge of a prime contractor who was assigned to a certain site would create a final construction plan for on-site workers to carry out while checking the know-how and key points based on the person in charge's on-site experience with their superior, but the construction plan management system 1 makes it possible to appropriately manage and share information such as know-how that was previously difficult to share. The processing flow in the construction plan management system 1 will be explained in detail below.

[0067] In this specification, in order to clearly explain which template (described later) the construction plan was created from, the created construction plan (construction plan information) may be expressed by the name of the template (specific template, dedicated template, etc.) from which the construction plan was created. Furthermore, the construction plan in this specification means data for managing information necessary to advance on-site work, such as work tasks and processes at the construction site (exceptionally, the construction plan may also be expressed simply as a plan for future construction at the construction site).

[0068] In this specification, the term "task" does not necessarily mean work that must be done, and includes, for example, information for informing people about the work content, even if it is not a task performed by a worker. Also, a hierarchical structure refers to a structure in which multiple corresponding tasks are connected in a tree structure consisting of a parent-child relationship (for example, a construction method (higher concept) and its specific method (lower concept)).

[0069] <Registering various information> 3 shows a flowchart of the processing steps in a construction plan management system according to one embodiment of the present invention. In S201, users such as prime contractors and cooperating companies (and individuals belonging to these companies) register their user information in advance. The reception unit 101 of the information processing device 10 registers various information used in managing construction plans. Note that users in this embodiment include not only prime contractors (prime contractors) and cooperating companies (contractors), but also on-site personnel at prime contractors and workers at cooperating companies (people involved in construction work).

[0070] As shown in Figure 4(a), user information is managed by user ID and includes the user's name, contact information, job information, information about qualifications held, facial image, user identification information, registration date, information about the company to which the user belongs (prime contractor or subcontractor) (company ID, which will be described later), etc. Note that users include not only site supervisors and site managers, but also, for example, people in charge of managing the site situation (people in charge at the headquarters of the prime contractor) who do not actually visit the construction site.

[0071] In the construction plan management system 1 of this embodiment, in addition to user information, company information regarding the prime contractor company and cooperating companies to which the user belongs, construction site information regarding each construction site, construction work information regarding work at the construction site, and construction organization information are also registered in advance.

[0072] As shown in Figure 4(b), company information is managed by company ID and includes the company name (e.g., A-Kumi or B-Kenchitsu), company contact information, company address, order type indicating whether the company is a prime contractor or a subcontractor, available duties, etc. This company information can also include information about sole proprietors, for example.

[0073] Furthermore, as shown in Figure 4(c), construction site information is managed by construction site ID, including the site name such as construction site a or construction site b, the building name such as SK Park or J Bridge, the construction site attributes such as large-scale entertainment facilities or high-rise buildings, the site address, the construction period, etc.

[0074] Furthermore, as shown in Fig. 4(d), construction work information is managed by a work ID, including the type of work, such as "underground (foundation) framework work / RC sequential pouring" or "architectural work," and the type of work, such as reinforcing steel or concrete. In this specification, the term "construction work" refers to the type of work and the attributes of the construction site (as well as the type of work for a certain attribute, reinforcing steel work in a high-rise building, etc.).

[0075] 4(e), the construction organization information is managed by a construction organization ID, and includes a site ID, a work ID, a company ID, a user ID, a subordinate relationship, information indicating a parent company (company ID), information related to a job, etc. In this embodiment, the subordinate relationships between companies included in the construction organization information can be used to manage construction plans.

[0076] <Registering a new template> 3, the reception unit 101 of the information processing device 10 receives a request to create a new template from a person in charge of the prime contractor via the management terminal 2, and registers the new template (S203). In this embodiment, only persons in charge (and managers, etc.) belonging to the prime contractor can register templates, but the system may be configured so that actual workers at the construction site can register new templates via the work terminal 3. By configuring the system so that workers can register templates in this way, better templates can be created (registered) based on their experience with actual input work.

[0077] The receiving unit 101 receives information about a construction plan template from the management terminal 2, and stores a plurality of templates based on this information in the storage unit 12. This template is configured to include a plurality of tasks having a hierarchical structure.

[0078] For example, the template has a hierarchical structure in which each task is related to the work and process, such as major items (construction methods and prerequisites), medium items (safety of construction methods - confirmation of preliminary plans), and minor items (confirmation of overall preliminary plans) (see Figure 8 below). These templates are linked to the type of work (rebar or concrete) and attributes (attributes depending on the characteristics of the construction site, such as a high-rise building or hospital). As will be explained in more detail later, users can select an appropriate template to easily create a construction plan based on the type of work and attributes (and the construction site).

[0079] As shown in Fig. 4(f), task information includes a major item ID, a medium item ID, a small item ID, and the like, and is managed by a task ID. In this embodiment, each of the major item ID, medium item ID, and small item ID is expressed as a task. The task ID is included in a template; that is, a template having a hierarchical structure is configured by the task IDs (combinations of each item).

[0080] In this embodiment, one template (construction plan) can have multiple major items, each of which can have multiple medium-sized items, and each of which can have multiple small items (Figure 4(f) is an image for explaining task information).

[0081] For example, as shown in Figure 4(g) as an example of the contents of a sub-item, the information includes the sub-item name (the name of each item or sub-item), detailed content, completion deadline, status, save destination and comments (where comments are saved), and is managed by the sub-item ID.

[0082] In this embodiment, comments can be entered by the person in charge or the worker and saved, but these comments can be managed by item, or they can be managed as a group (both comments for major items and comments for minor items can be managed together in a single table as comment information).

[0083] In this specification, a major item is referred to as an "item," and multiple medium items and small items that subdivide the major item are sometimes referred to as "minor items." In this embodiment, detailed tasks related to the major item are referred to as medium items, and even more detailed tasks related to the medium items are referred to as small items. For example, if the major item is a "construction method," the medium item can be "installing wall boards" and the small item can be "installing wall boards on the second floor of the building to be constructed."

[0084] In this embodiment, templates are registered in advance for each type of work and site attribute to facilitate management of construction plans. These templates can be created taking into consideration, for example, the user's past experience and versatility.

[0085] As shown in Figure 5(a), template information is managed by template ID, including information such as template name, site ID, task ID, construction organization ID, etc. With this configuration, construction plans can be managed appropriately at sites with complex subordinate relationships by using the construction organization information.

[0086] In this embodiment, the template information includes a construction team ID, but the template information may not include a construction team ID. In this case, the user can specify (select) the required template based on the attributes of the construction site (site ID) and the type of work (task ID).

[0087] <Creating a construction plan> 3, the reception unit 101 receives information about construction work related to the construction plan from the management terminal 2 used by the user. For example, the reception unit 101 receives information about the type of work, such as reinforcing steel or concrete, and information about the attributes of the construction site from the person in charge of the prime contractor. These attributes are classified according to the work and rules specific to construction sites such as large-scale entertainment facilities and medium-sized bridges.

[0088] For example, at large-scale entertainment facilities, inspections are required for each section, whereas at medium-sized bridge sites, such inspections are not necessary (other inspections are required, etc.). It is expected that the work content and characteristics will differ depending on the type of site, and the attributes at a construction site are a classification of these different characteristics.

[0089] The attributes in this embodiment are classifications of different characteristics for each site, such as rules and exceptions regarding work at heights in high-rise buildings, and the need to measure noise from medical equipment (or shield noise, etc.) in hospitals. The reception unit 101 can also receive information combining a work type and an attribute, such as reinforcing bar work at a high-rise building construction site (attribute), from the management terminal 2. For example, when creating a construction plan for a specific construction site, the reception unit 101 can receive, from the management terminal 2, attributes corresponding to the construction site and the work type for which the user plans to create a construction plan.

[0090] In S205, the transmitting unit 102 of the information processing device 10 presents a plurality of hierarchically structured templates to the user. The user selects a template to be used to create a construction plan from the plurality of templates. Specifically, in S206, the receiving unit 101 receives a selection request from the user from the user terminal. The selecting unit 103 selects a specific template based on the selection request received from the user in S206, associates the specific template with the user, and stores the selected template in the storage unit 12 as a construction plan.

[0091] This construction plan is managed as construction plan information. As shown in Figure 5(b), the construction plan information includes the template ID, template name, manager, worker, company, task ID, completion deadline, status, etc., and is managed by usage ID.

[0092] <Template changes (customization)> Next, the flow of the customization function for the template selected by the user (construction plan created by the user) will be described. In S207 of Fig. 3, the reception unit 101 confirms a template change request from the user.

[0093] When the receiving unit 101 receives a change request from a user (S208), the creation processing unit 104 creates a dedicated template including tasks desired by the user based on the change request (S209), that is, creates a dedicated template by changing or adding tasks included in the original template, and registers (stores) this created dedicated template (the result of the creation processing) as a construction plan in the storage unit 12 (S210). The user can use this customized dedicated template as a construction plan.

[0094] This dedicated template is managed separately from the templates mentioned above. As shown in Figure 5(c), the dedicated template information includes multiple tasks such as a usage ID, template name (construction plan name), major item ID, medium item ID, and minor item ID, and is managed by a dedicated ID.

[0095] In this embodiment, if the receiving unit 101 does not receive a change request from the user in S208, the template selected by the user in S206 will be used as is as the construction plan. The transmitting unit 102 in this embodiment can also transmit a comment to the user (user terminal) prompting the user to request a change to the template when the template selection process is completed. <Label settings>

[0096] Next, in S211, classification labels are set in the dedicated template (or the template itself selected by the user). The reception unit 101 receives a classification instruction for classifying tasks from the user, and the setting unit 105 sets classification labels for classifying multiple tasks for each hierarchical structure based on the classification instruction received from the user.

[0097] In this embodiment, the classification labels can be set to "Discuss with partner companies," "Decidation by prime contractor," "Confirm with blueprints," etc. For example, the classification labels can be displayed in a way that is visible to the user, such as by color-coding the labels (also called classification marks).

[0098] 3, labels and the like are set, but it is not necessary to set labels and the like in the construction plan, and the user can select them as appropriate. Also, the user can set labels and the like at the same time as accepting the template selection request in S206.

[0099] <Status setting> The setting unit 105 can also set a status. Based on input from the user, the setting unit 105 can set a status such as not started, in progress, or completed for each task. Then, in S212, after all settings have been completed, the creation of the construction plan is completed. The construction plan with the labels, statuses, etc. set is stored in the memory unit 12.

[0100] It is not necessary to set the status either, and it is preferable that the user can select it as appropriate. In this embodiment, the status can be displayed by the display processing unit in a manner that allows the user to see it, for example, by color coding or highlighting according to the status, in the same way as the classification labels.

[0101] In this embodiment, the setting unit 105 can set information such as the worker and the company to which the worker belongs in addition to the person in charge (user) in the dedicated template. This linked worker can edit the dedicated template (construction plan). For example, the actual worker can input the work status after the work is completed or during the work into this dedicated template. Furthermore, the set worker can exchange comments with the person in charge of the prime contractor company in the dedicated template.

[0102] <Reusing dedicated templates> Next, the reuse of a dedicated template will be explained. Fig. 6 shows a flowchart of the process for reusing a dedicated template in this embodiment.

[0103] In S301, the reception unit 101 receives a request from the management terminal 2 to reuse a previously created dedicated template (FIG. 5(c)), and presents multiple dedicated templates (S302). Then, in S303, the reception unit 101 receives a request to select a dedicated template to be reused. In this manner, in this embodiment, a dedicated template created (customized) by a user according to the characteristics of a construction site can be reused at other construction sites with similar characteristics. As a result, user convenience can be further improved.

[0104] For example, if a dedicated template for rebar work at a large hospital has been created in the past, this dedicated template can be reused for the construction site of the large hospital where work is scheduled to take place in the future. As a result, even at unique construction sites where existing templates are difficult to use, it is possible to easily create (and manage) construction plans for each task with complex correspondence relationships by using a dedicated template with a unique hierarchical structure (accumulating past experience as a dedicated template).

[0105] As shown in Figure 6, when the receiving unit 101 receives a request to select a dedicated template to be reused, the creation of a construction plan using the dedicated template is completed in the same manner as described in Figure 3, i.e., through a series of steps from S304 to S310.

[0106] In this embodiment, a template consisting of a hierarchical structure containing multiple tasks is prepared in advance, and by going through a series of steps, construction plans and work at construction sites that have complex correspondence relationships can be properly managed.

[0107] <Display processing> Fig. 7 shows an example of a display processing result on a terminal according to an embodiment of the present invention. Fig. 7 is an example of a setting screen for registering a template having a hierarchical structure including multiple tasks. Fig. 7 is displayed so that it can be scrolled left and right, up and down (the display on display screen W10 is a part of the setting screen).

[0108] In Figure 7, a construction plan template is registered as a priority item. This priority item indicates the work content that is particularly frequently used or that is already scheduled to be used at a specific construction site. Priority items may be set as needed, and are not necessarily required to implement the present invention.

[0109] As shown in the figure, the display screen W10 displays a screen for registering the type of work, template name, template description, etc. In addition, a screen for registering the planning period, construction date, etc. is also displayed. As shown in Figure 7, the user can select the type of work and template name as appropriate from a predetermined list of options by scrolling. In Figure 7, the terminal's display screen W10 displays major items W12 such as "Construction method and assumptions" and "Specific plan / draft," and medium items W14 such as "Safety - preliminary plan confirmation," and minor items W16 such as "Overall preliminary plan confirmation."

[0110] 7, a plurality of major items are displayed, a plurality of intermediate items linked to the major items are displayed, and a plurality of minor items linked to each intermediate item are displayed. For example, the display processing unit 106 can display the major items by arranging them from left to right in chronological order of the work.

[0111] FIG. 8 shows an example of the display processing result of a construction plan (specific template or dedicated template) according to this embodiment. FIG. 8 is displayed so that it can be scrolled left and right, up and down (as in FIG. 7, the display on the display screen W10 is part of the construction plan). As shown in the figure, multiple tasks are displayed in a hierarchical structure such as a major item W12, a medium item W14, and a minor item W16. The hierarchical structure includes an item and one or more subitems that subdivide the item.

[0112] The display processing unit 106 associates items in a template with one or more subitems, performs display processing, and transmits the results of the display processing to the terminal used by the user. For example, in this embodiment, it is possible to display a part of the contents (subitem contents) included in the minor items and medium items so that the user can view them, and transmit the results of the display processing to the terminal used by the user.

[0113] 8, the display processing unit 106 can also display the number of days remaining until the construction deadline and the number of days remaining until the start date of construction, along with a plurality of tasks having a hierarchical structure. Furthermore, the display processing unit 106 can display the progress of each task as a status such as "completed" or "in progress." As described above, the display processing unit 106 can also display classification marks for classifying tasks so that the user can distinguish between each label, and can also display the number of unread comments for each task.

[0114] 9 shows an example of an initial screen (portal screen) for each construction site displayed on the display screen W10 of the user terminal. As shown in the figure, the display screen W10 displays information organized by type of work.

[0115] For example, for rebar in Figure 8, it can be seen that there are 14 unread comments, 16 unstarted tasks, 13 ongoing tasks, and 1 completed task. Also, for concrete, it can be seen that there are 4 unread comments, 10 unstarted tasks, 7 ongoing tasks, and 23 completed tasks. In other words, in this embodiment, by checking the portal screen for each construction site, the user can easily and accurately grasp the overall situation at that construction site.

[0116] 10 shows an example of the display processing result of the detailed content (subitem content) of a task displayed on the display screen W10 of the user terminal. For example, when a task of a subitem W16 as illustrated in FIGS. 7 and 8 is selected by a user's selection operation (such as a touch operation), the detailed content of the subitem W16 is displayed. The display processing unit 106 displays the subitem content based on a task selection request from the user.

[0117] For example, as shown in Figure 10, the details include the name of the task, the type of work (e.g., rebar), a major item such as "Construction policy and assumptions" that is at the top of the task in the hierarchical structure, and a medium item such as "Safety - Confirmation of preliminary plan" that is at a higher level of the task. The detailed content also includes the status (e.g., in progress), the construction deadline (and the number of days until the deadline), the start date (and the number of days until the start date), the person in charge, the update date and time, etc.

[0118] Furthermore, the details also display points and cautions to be aware of when creating a construction plan, which was previously difficult to share at the construction site. Furthermore, users can also leave and display notes from the person in charge along with comments for sharing information, allowing for close information sharing between the person in charge and their superiors. In this embodiment, information that was previously difficult to share, such as know-how, can be properly managed and made sharable.

[0119] As described above, the construction plan management system 1 according to the present invention can execute predetermined processing using a template consisting of a hierarchical structure containing multiple tasks, thereby enabling simple and effective management of construction plans for each task at a construction site that have complex correspondence relationships.

[0120] Furthermore, in this embodiment, the management of construction plans at construction sites has been described, but the same effects as those of the present invention can be obtained when the construction plan management system 1 is used in fields other than construction sites. [Explanation of symbols]

[0121] 1 Construction plan management system 2 Management terminal 3 Work terminal 10. Information processing equipment 11 Control section 12 Storage section 13 Communications Department 90 terminals (management terminal 2, work terminal 3) 91 Control Unit 92 Memory section 93 Communications Department 94 Input section 95 Output section 101 Reception 102 Transmitter 103 Selection section 104 Creation processing unit 105 Settings 106 Display processing unit NW Network W10 display screen W12 Major item W14 Medium item W16 Small item

Claims

1. A construction plan management system for managing construction plans at a construction site, The construction plan management system includes a storage unit, a reception unit, and a selection unit, The storage unit stores a construction work including attributes and / or work types at the construction site in association with a template having a hierarchical structure including a plurality of tasks related to the construction work, The reception unit receives the construction work desired by the user in the construction plan, The selection unit selects a specific template from among a plurality of templates corresponding to the construction work received from the user based on a selection request input from the user, associates the specific template with the user, and stores the result in the storage unit as a construction plan that can be shared by a plurality of users related to the construction work. Construction plan management system.

2. The construction plan management system further includes a creation processing unit, The creation processing unit creates a dedicated template including tasks desired by the user based on the specific template and an input of a change request from the user, and stores the result of the creation processing in the storage unit as the construction plan in association with the user. The construction plan management system according to claim 1 .

3. The reception unit receives the construction work from the user, The selection unit selects and processes the dedicated template so that it can be reused based on the input of a reuse request from the user, and stores the dedicated template and the user in association with each other as the construction plan in the storage unit. The construction plan management system according to claim 2 .

4. the receiving unit receives implementation statuses of the tasks from a plurality of users having different user attributes, and associates the implementation statuses with the construction plan. The construction plan management system according to claim 1 .

5. The construction plan management system further includes a setting unit, the receiving unit receives a classification instruction for classifying the task from the user; the setting unit sets a classification label for classifying the task corresponding to the hierarchical structure based on the classification instruction received from the user. The construction plan management system according to claim 1 .

6. The construction plan management system further includes a display processing unit, the hierarchical structure includes an item and one or more sub-items that subdivide the item; the display processing unit associates the items in the template with one or more details, performs a display process, and transmits the display process result to a terminal used by a user. The construction plan management system according to claim 1 .

7. The display processing unit further displays a part of the content of the particulars included in the particulars, and transmits the display processing result to a terminal used by the user. The construction plan management system according to claim 6.

8. The construction plan management system further includes a display processing unit, the display processing unit performs a display process of a classification mark that can be identified according to the classification of the task, and transmits a result of the display process to a terminal used by the user. The construction plan management system according to claim 5 .

9. The construction plan management system further includes a display processing unit, The display processing unit displays a list of a plurality of construction plans and transmits the display processing result to the terminal used by the user. The construction plan management system according to claim 1 .

10. the receiving unit receives a specific classification label from the user; The display processing unit displays a list of the construction plans and / or the tasks based on the specific classification label received by the receiving unit, and transmits the display processing result to the terminal used by the user. The construction plan management system according to claim 5 or 8.

11. The construction plan management system further includes a setting unit and a display processing unit, the receiving unit receives an implementation status of the task; The setting unit sets a status based on the progress of the implementation status, and stores the set status in the storage unit in association with the construction plan and / or task; the display processing unit performs a process of displaying the status in a distinguishable manner according to the progress, and transmits a result of the display process to a terminal used by the user. The construction plan management system according to claim 1 .

12. A construction plan management method executed by a construction plan management system that manages construction plans for a construction site, The construction plan management system includes a storage unit, a reception unit, and a selection unit, The storage unit stores a construction work including attributes and / or work types at the construction site in association with a template having a hierarchical structure including a plurality of tasks related to the construction work; The receiving unit receives the construction work desired by the user in the construction plan; the selection unit selects and processes a specific template from among a plurality of templates corresponding to the construction work received from the user based on an input of a selection request from the user, associates the specific template with the user, and stores the association in the storage unit as a construction plan that can be shared by a plurality of users related to the construction work, Construction planning management methods.

13. A construction plan management program for managing construction plans at a construction site, causing a computer to function as a storage unit, a reception unit, and a selection unit; The storage unit stores a construction work including attributes and / or work types at the construction site in association with a template having a hierarchical structure including a plurality of tasks related to the construction work, The reception unit receives the construction work desired by the user in the construction plan, The selection unit selects a specific template from among a plurality of templates corresponding to the construction work received from the user based on a selection request input from the user, associates the specific template with the user, and stores the result in the storage unit as a construction plan that can be shared by a plurality of users related to the construction work. Construction planning management program.

Citation Information

Patent Citations

  • Job navigation system and its method

    JP2004355526A

  • System, method and program for supporting preparation of civil engineering work construction plan

    JP2011022723A

  • Process design method, process design support system, and process design support device

    JP2013045386A

  • Information sharing system and information processing server

    JP2017059033A

  • Display control method

    JP2023049318A