STORAGE SYSTEM AND CONTROL METHOD - Patent application
The storage system addresses the challenge of container availability by synchronizing volumes across sites and using associated volumes to ensure redundancy and automated failover, maintaining continuous IO operations and optimal performance.
Patent Information
- Application Number
- JP2022118839
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-07-26
- Publication Date
- 2024-09-18
- Estimated Expiration
- 2042-07-26
AI Technical Summary
Existing storage systems face challenges in increasing the availability of containers due to limitations in relocating volumes and managing storage devices across multiple sites, leading to potential data loss and performance issues during failures.
A storage system that manages clusters with compute nodes and storage devices across multiple sites, synchronizes volumes, and uses associated volumes to ensure redundancy, allowing seamless relocation and prioritization of connections based on site identification labels to maintain high availability and performance.
The system enhances storage system availability by ensuring continuous IO operations even during failures, preventing data loss and maintaining optimal performance through automated volume management and site-based prioritization.
Smart Images

Figure 0007552969000001 
Figure 0007552969000006 
Figure 0007552969000014
Abstract
Description
[Technical field]
[0001] The present invention generally relates to a technique for increasing the availability of a storage system. [Background technology]
[0002] In a storage system that uses containers, one method of increasing availability is to distribute the server devices that make up a cluster across multiple sites. If a cluster has multiple sites, it is necessary to allocate a storage device to each site and increase the availability of the storage device.
[0003] The availability of the storage device itself can be improved by allocating a storage device to each site and synchronizing the volumes created from each storage device to ensure redundancy. Regarding containers, a container provision support system that can shorten the time it takes to provide containers has been disclosed (see Patent Document 1).
[0004] In the container provision support system described in Patent Document 1, a first volume at a first site, a container image required to start a container at a second site, and a second volume used by an application program (hereinafter, APP) executed on the container are linked by management information. Therefore, the container image and volume required to start a container at the second site can be easily identified, and the container can be started at the second site in a short time. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Patent No. 6759317 Summary of the Invention [Problem to be solved by the invention]
[0006] The technology described in Patent Document 1 above makes it possible to switch to a standby site in a short time if a failure occurs at an active site, but it is difficult to increase the availability of containers because containers cannot be moved freely between the active and standby sites.
[0007] Here, in container management software (hereinafter, container management software), one volume is stored as one piece of data in the storage area of the container management software. For example, even if a user performs synchronization settings for multiple volumes, the container management software continues to recognize each volume as an individual volume. In other words, since a container launched by the container management software is connected to one volume, if a failure occurs in the storage device that provides the volume that does not involve relocation of the container, for example, IO will be disconnected and the user will be unable to continue work.
[0008] The present invention has been made in consideration of the above points, and aims to propose a storage system etc. with high availability. [Means for solving the problem]
[0009] In order to solve such problems, the present invention provides a storage system that manages a cluster including compute nodes, which are nodes provided at each of a plurality of sites and are capable of running containers, and a storage device that provides a volume that can be used by a container is provided at each of the plurality of sites, and the storage system includes a generation unit that generates information of an associated volume that associates each of the volumes based on information of each volume created in each of a plurality of storage devices specified by two or more sites, and an instruction unit that instructs each storage device in which each volume was created to connect each volume associated with the associated volume to the compute node that runs the container based on a request to start a container specified by the associated volume information generated by the generation unit.
[0010] In the above configuration, since the two volumes associated with the associated volume are connected to the compute node that runs the container, for example, when the two volumes are synchronized and one storage device becomes unavailable due to a failure, the container can use the volume of the other storage device. With the above configuration, the user can continue work without IO being interrupted. Effect of the Invention
[0011] According to the present invention, it is possible to increase the availability of a storage system. Problems, configurations, and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]
[0012] [Figure 1] FIG. 1 illustrates an example of a configuration of a storage system according to a first embodiment. [Diagram 2] FIG. 1 illustrates an example of a network configuration according to a first embodiment. [Diagram 3]FIG. 2 is a diagram illustrating an example of an associated volume according to the first embodiment. [Figure 4] FIG. 4 is a diagram illustrating an example of a node management table according to the first embodiment. [Diagram 5] FIG. 4 illustrates an example of a storage management table according to the first embodiment. [Figure 6] FIG. 4 is a diagram showing an example of a volume management table according to the first embodiment. [Figure 7] FIG. 11 is a diagram illustrating an example of a connection volume management table according to the first embodiment. [Figure 8] FIG. 11 is a diagram showing an example of a processing flow illustrating a storage information input process according to the first embodiment. [Figure 9] FIG. 11 is a diagram showing an example of a processing flow illustrating volume creation related processing according to the first embodiment. [Figure 10] FIG. 11 is a diagram illustrating an example of a process flow showing a container startup process according to the first embodiment. [Figure 11] FIG. 11 illustrates an example of a volume creation process according to the first embodiment; [Figure 12] FIG. 11 illustrates an example of a connection process according to the first embodiment. [Figure 13] FIG. 11 is a diagram illustrating an example of a connection release process according to the first embodiment. [Figure 14] FIG. 11 illustrates an example of a storage failure detection process according to the first embodiment; [Figure 15] FIG. 11 illustrates an example of node failure related processing according to the first embodiment; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] (I) First embodiment An embodiment of the present invention will be described in detail below, however, the present invention is not limited to the embodiment.
[0014] (A) In conventional technology, container management software recognizes multiple synchronized volumes individually (independently).
[0015] (A-1) If IO (Input / Output) is performed on each of the individually recognized volumes simultaneously from separate applications, there is a risk of data corruption. In this regard, in this embodiment, the risk of data corruption as described above can be eliminated by treating a plurality of synchronized volumes as a single volume. For example, multiple synchronized volumes are recognized by the container management software as a single volume (associated volume) virtually. This allows the container management software to recognize multiple synchronized volumes as a single volume, preventing the volume from being connected to simultaneously by multiple different apps.
[0016] (A-2) If you try to use different volumes that are recognized individually depending on the site where the container is located, you will need to manually switch the volume to be connected every time a container is relocated. However, because container relocation may occur automatically, it is not desirable to involve manual operations. In this regard, in this embodiment, by using an associated volume, manual switching becomes unnecessary. For example, a container continues to reference the volume originally associated with it even if it is relocated to another site. In other words, by linking the associated volumes, no manual volume switching is required regardless of which site the container is located at.
[0017] (B) In conventional technology, when there are multiple connections between a volume and a container (compute node), the OS (Operating System) controls the IO path to be used.
[0018] (B-1) When multiple synchronized volumes are connected to a container, both a connection path to a storage device at the same site as the container or a connection path to a storage device at a site different from the container can be used, but there is a possibility that the connection path to a storage device at a site different from the container will be used (IO performance is worse than the former). In this regard, in this embodiment, by assigning a site identification label in advance to both the compute node and the storage device, it is possible to increase the priority of connecting to a storage device that matches the site of the node on which the container is attempting to start up. This allows communications with matching site identification labels (within the same site) to be prioritized, preventing degradation of IO performance.
[0019] (C) In conventional technology, container management software does not detect failures in storage devices, and therefore containers are not relocated when a failure occurs in the storage device.
[0020] (C-1) If a failure occurs in the storage device at the site where the container is located, the container's IO will stop or its performance will be degraded. Here, when there are multiple synchronized volumes, it is possible to use a connection to a storage device that is not experiencing a failure; however, if the site where the storage device that is not experiencing a failure is located is different from the site where the container is located, IO performance will be degraded. In this embodiment, a plug-in running on a node monitors the state of a connected volume and checks whether IO is possible for a volume with a higher connection priority (a volume with a connection priority setting). If there is a volume with which IO cannot be performed (for example, a storage device with which communication is not possible), the plug-in determines that a failure has occurred in a storage device at the same site as the node, and prompts the container management software to relocate the container. By using container management software to relocate containers, it is possible to avoid situations where IO performance deteriorates.
[0021] Next, an embodiment of the present invention will be described based on the drawings. The following description and drawings are examples for explaining the present invention, and are omitted and simplified as appropriate for clarity of explanation. The present invention can be implemented in various other forms. Unless otherwise specified, each component may be singular or plural.
[0022] In the following description, the same elements in the drawings are given the same numbers, and the description is omitted as appropriate. When describing elements of the same type without distinction, the common part (part excluding the branch number) of the reference sign including the branch number is used, and when describing elements of the same type with distinction, the reference sign including the branch number may be used. For example, when describing a site without distinction, it may be written as "site 101", and when describing individual sites with distinction, it may be written as "site A 101-1", "site B 101-2", etc.
[0023] The designations "first," "second," "third," and the like in this specification are given to identify components and do not necessarily limit the number or order. Furthermore, numbers for identifying components are used in each context, and a number used in one context does not necessarily indicate the same configuration in another context. Furthermore, a component identified by a certain number is not prevented from also having the function of a component identified by another number.
[0024] In FIG. 1, 100 indicates a storage system according to a first embodiment as a whole.
[0025] The storage system 100 is provided with a plurality of sites 101 and clusters 102. The sites 101 are data centers or the like that handle data related to user business, and are configured to include one or more compute nodes 110 and one or more storage devices 120. In this embodiment, the sites 101 are described by taking a first site 101 (site A 101-1) and a second site 101 (site B 101-2) as examples, but other sites 101 such as a third site 101 may also be provided.
[0026] Moreover, the storage system 100 is configured to include a controller node 130 (control plane) for managing the cluster 102, and a user terminal 140 for user operation. The storage system 100 may or may not include the user terminal 140. The cluster 102 may or may not include the user terminal 140.
[0027] Here, a "node" corresponds to hardware that executes software, a virtual machine, a container, etc., and typically corresponds to an operating unit of an OS. In the following, when there is no need to distinguish between the compute node 110 and the controller node 130, they may be referred to as nodes.
[0028] The compute node 110 is configured to include a connection volume management table 111, a container 112 (user APP), a plug-in (compute) 113, container management software (compute) 114, and an OS 115. The compute node 110 may be a physical device, for example, a server device, and includes an interface unit, a storage unit, a processor unit connected thereto, and the like.
[0029] The functions of the compute node 110 (container 112, plug-in (compute) 113, container management software (compute) 114, OS 115, etc.) may be realized, for example, by a processor unit reading a program into a storage unit and executing it (software), or may be realized by hardware such as a dedicated circuit, or may be realized by a combination of software and hardware. Note that one function of the compute node 110 may be divided into multiple functions, or multiple functions may be integrated into one function. For example, the plug-in (compute) 113 may be divided into a management unit, a detection unit, and an output unit, which will be described later. Also, some of the functions of the compute node 110 may be provided as separate functions, or may be included in other functions. Also, some of the functions of the compute node 110 may be realized by other nodes that can communicate with the compute node 110, computers (not shown), etc.
[0030] The storage device 120 is configured to include a volume 121 that can be used by the container 112, and a site identification label 122 that can identify the site 101 in which the storage device 120 is located. The storage device 120 includes a PDEV unit, a storage controller connected to the PDEV unit, and the like.
[0031] The controller node 130 is configured to include a node management table 131, a storage management table 132, a volume management table 133, a plug-in (controller) 134, a container management software (controller) 135, and an OS 136. The controller node 130 may be a physical device, for example, a server device, and includes an interface unit, a storage unit, a processor unit connected thereto, and the like.
[0032] The functions of the controller node 130 (such as the plug-in (controller) 134, the container management software (controller) 135, and the OS 136) may be realized, for example, by a processor unit reading a program into a storage unit and executing it (software), or may be realized by hardware such as a dedicated circuit, or may be realized by a combination of software and hardware. Note that one function of the controller node 130 may be divided into multiple functions, or multiple functions may be integrated into one function. For example, the plug-in (controller) 134 may be divided into a generating unit, an instruction unit, and a setting unit, which will be described later. Also, for example, the container management software (controller) 135 may be divided into a detecting unit and a receiving unit, which will be described later. Also, some of the functions of the controller node 130 may be provided as separate functions, or may be included in other functions. Also, some of the functions of the controller node 130 may be realized by a compute node capable of communicating with the controller node 130, a computer (not shown), or the like.
[0033] In the following, for ease of explanation, the plug-in (compute) 113 may be referred to as the site side plug-in 113, the plug-in (controller) 134 may be referred to as the plug-in 134, the container management software (compute) 114 may be referred to as the site side container management software 114, and the container management software (controller) 135 may be referred to as the container management software 135.
[0034] FIG. 2 is a diagram showing an example of a network configuration related to the storage system 100. As shown in FIG.
[0035] The first network 201 (network A 201-1) is, for example, a local area network (LAN), and is a network for communication between the compute nodes 110 and the controller node 130 that configure the cluster 102. The compute nodes 110, the controller node 130, and the user terminal 140 are communicatively connected via the first network 201. For example, the controller node 130 issues an instruction to each compute node 110 via the first network 201 in response to a request from the user terminal 140.
[0036] The second network 201 (network B 201-2) is a FC (Fibre Channel) network, a SCSI (Small Computer System Interface) network, or the like, and is a communication network for the compute node 110 to perform data I / O to the volume 121 of the storage device 120. The compute node 110 and the storage device 120 are communicatively connected via the second network 201. For communication, a SCSI communication standard called FC or iSCSI is used. Any of the compute nodes 110 can access all of the storage devices 120.
[0037] The third network 201 (network C201-3) is, for example, a LAN, and is a communication network for using a REST API (Representational State Transfer Application Programming Interface). The controller node 130 and the storage devices 120 are communicatively connected via the third network 201. For example, the plug-in 134 of the controller node 130 issues a command (an instruction to perform an operation on each storage device 120) to the storage devices 120 via the third network 201.
[0038] The fourth network 201 (network D201-4) is, for example, an FC network, which is a network that connects the storage devices 120 to each other. The storage devices 120 are communicatively connected to each other via the fourth network 201. For example, each storage device 120 synchronizes data via the fourth network 201.
[0039] The above-described network configuration is an example, and other network configurations may be adopted.
[0040] Fig. 3 is a diagram showing an example of an associated volume 121. In Fig. 3, when the volume 121 recognized by the site-side container management software 114 is an associated volume 121, it is shown that a plurality of volumes 121 are actually associated.
[0041] In the storage system 100, the volumes 121 in a synchronized state are associated as associated volumes 121 by the volume management table 133. For example, the site-side container management software 114 recognizes the volumes A 121-A1 and A 121-A2 in a synchronized state as associated volumes 121-A, and recognizes the volumes B 121-B1 and B 121-B2 in a synchronized state as associated volumes 121-B.
[0042] Furthermore, in this embodiment, an example will be described in which there are two volumes 121 in a synchronized state, but there may be three or more volumes 121 in a synchronized state.
[0043] FIG. 4 is a diagram showing an example of the node management table 131. As shown in FIG.
[0044] The node management table 131 is a table managed by the container management software 135, and is a table for managing (accumulating) information on each node that constitutes the cluster 102. The node information includes information on both the compute node 110 and the controller node 130.
[0045] More specifically, the node management table 131 stores records in which information on a node identification ID 401, a site identification label 402, a role 403, and a node status 404 is associated with each other.
[0046] The node identification ID 401 is an ID (unique character string) for identifying a node. The site identification label 402 is label information (unique character string) indicating which site 101 the node belongs to. The role 403 is information (character string) indicating the role that the node has. Whether or not a node is a compute node 110 can be determined by the information in this role 403. For example, if the role 403 is "none", this indicates that the node is a compute node 110. The node status 404 is information indicating whether or not a node is available. For example, for a node in which a failure has occurred, the node status 404 is "unavailable".
[0047] FIG. 5 is a diagram showing an example of the storage management table 132. As shown in FIG.
[0048] The storage management table 132 is a table managed by the container management software 135, and is a table for managing information about the storage device 120 used when creating the volume 121. The information about the storage device 120 is stored in the storage management table 132 by a user via the user terminal 140, for example.
[0049] More specifically, the storage management table 132 stores records in which information such as a storage identification ID 501, a storage serial number 502, storage authentication information 503, and a storage URL 504 are associated with each other. Note that, in the conventional technology, information on one storage device 120 is stored in one record, but in this embodiment, this is expanded so that information on a plurality of storage devices 120 related to a plurality of volumes 121 to be synchronized is stored in one record.
[0050] In other words, depending on the number of storage devices 120 that provide each of the multiple volumes 121 to be synchronized, the information of the storage serial 502, the storage authentication information 503, and the storage URL 504 is associated with the storage identification ID 501. For example, when the volume 121-1 provided by the storage device 120-1 of the site A 101-1 and the volume 121-2 provided by the storage device 120-2 of the site B 101-2 are to be synchronized, the storage management table 132 stores a record in which the information of the storage identification ID 501, the storage A serial 502-1, the storage A authentication information 503-1, the storage A URL 504-1, the storage B serial 502-2, the storage B authentication information 503-2, and the storage B URL 504-2 are associated with each other.
[0051] The storage identification ID 501 is an ID for identifying each storage device 120 providing a plurality of volumes 121 to be synchronized as one storage device 120. This ID (character string) may be determined when the user registers information on the storage device 120 in the storage management table 132. When creating a volume 121, the user specifies the storage identification ID 501 via the user terminal 140 and transmits a request to the container management software 135. The storage serial 502 is the serial number of the storage device 120. The storage authentication information 503 is authentication information for the storage device 120 (ID, password, etc. used for authentication). The storage URL 504 is a URL (Uniform Resource Locator) of the storage device 120 indicating the location of the storage device 120. The information stored in the storage management table 132 is generated by the process of S802 described later.
[0052] FIG. 6 is a diagram showing an example of the volume management table 133. As shown in FIG.
[0053] The volume management table 133 is a table managed by the container management software 135 and is a table for managing information on the volumes 121 created in the storage device 120 .
[0054] More specifically, the volume management table 133 stores records in which information on a volume identification ID 601, a storage identification ID 602, an NAA (Network Address Authority) 603, a storage serial number 604, and a storage volume ID 605 are associated with each other.
[0055] In the conventional technology, information on one volume 121 is stored in one record, but in this embodiment, the present invention is expanded so that information on a plurality of volumes 121 set to be synchronized is stored in one record. In other words, information on the storage serial number 604 and the storage volume ID 605 is associated with the volume identification ID 601 according to the number of volumes 121 set to be synchronized. For example, when the volume 121-1 of the site A 101-1 and the volume 121-2 of the site B 101-2 are set to be synchronized, the volume management table 133 stores a record in which information on the volume identification ID 601, the storage identification ID 602, the NAA 603, the storage A serial number 604-1, the storage A volume ID 605-1, the storage B serial number 604-2, and the storage B volume ID 605-2 are associated with each other.
[0056] The volume identification ID 601 is an ID (unique character string) for identifying the volume 121. This character string is generated by the container management software 135, for example, when the volume 121 is created, and is used thereafter as a unique ID for identifying the volume 121. Note that the site-side container management software 114 cannot determine whether the volume 121 identified by the volume identification ID 601 is an associated volume 121. In addition, although not shown in the figure, the volume management table 133 may store information on volumes 121 that are not set for synchronization.
[0057] The storage identification ID 602 is an ID (storage identification ID 501 in the storage management table 132) for identifying the storage device 120 used to create the volume 121. The NAA 603 is identification information of the volume 121 used when the OS 115 recognizes the volume 121 of the storage device 120 as a device. The storage serial 604 is the serial number of the storage device 120 associated with the storage identification ID 602 (storage identification ID 501). The storage volume ID 605 is the ID of the volume 121 created within the storage device 120. The information stored in the volume management table 133 is generated by the processing of S904 described later.
[0058] FIG. 7 is a diagram showing an example of the connection volume management table 111. As shown in FIG.
[0059] The connected volume management table 111 is provided independently for each compute node 110. The connected volume management table 111 is a table managed by the site side plug-in 113, and is a table for managing information on the volume 121 connected to the compute node 110. When the plug-in 134 performs a process of connecting the volume 121 to the compute node 110 on which the container 112 is about to be started, information on the volume 121 is written to the connected volume management table 111 on the compute node 110.
[0060] More specifically, the connected volume management table 111 stores records in which information on an NAA 701, a storage volume ID 702, a storage serial 703, and whether or not priority setting is set 704 is associated with each other.
[0061] The NAA 701 is identification information of the volume 121 used when the OS 115 of the compute node 110 in which the connected volume management table 111 is provided recognizes the volume 121 of the storage device 120 as a device. The storage volume ID 702 is the ID of the volume 121 created inside the storage device 120. The storage serial 703 is the serial number of the storage device 120. The priority setting presence / absence 704 is the presence / absence of priority setting for the connection between the volume 121 and the compute node 110. The information stored in the connected volume management table 111 is generated by the processing of S1004 described later. In addition, in the conventional technology, the connected volume management table 111 is not provided.
[0062] 8 is a diagram showing an example of a processing flow showing processing (storage information input processing) for inputting information on the storage device 120 related to synchronization. Note that the storage information input processing is a pre-processing of the volume creation related processing described later.
[0063] In S801, the user terminal 140 inputs information about the storage device 120 involved in synchronization. The information is configured to include information required for a record to be registered in the storage management table 132, and includes, for example, information about the storage serial 502, storage authentication information 503, and storage URL 504 of each storage device 120 that provides multiple volumes 121 to be synchronized.
[0064] In S 802 , the container management software 135 stores the information about the storage device 120 input via the user terminal 140 in the storage management table 132 .
[0065] FIG. 9 is a diagram showing an example of a processing flow showing processing (volume creation related processing) when creating a volume 121 to be synchronized.
[0066] In S901, the user terminal 140 requests the creation of the volume 121. More specifically, the user terminal 140, in response to an operation by a user, requests the container management software 135 to create the volume 121 by specifying information required for creating the volume 121 (for example, the volume capacity) and one record in the storage management table 132 (for example, the storage identification ID 501).
[0067] In S902, the container management software 135 acquires the specified record (information on the storage device 120 related to synchronization) from the storage management table 132.
[0068] In S903, the container management software 135 instructs the plug-in 134 to create the volume 121. Note that in S903, the information on the storage device 120 acquired in S902 is passed to the plug-in 134.
[0069] In S904, the plug-in 134 performs a volume creation process. In the volume creation process, the plug-in 134 instructs the storage device 120 related to synchronization to create a volume 121, synchronizes the created volume 121, and adds information obtained at that time to the volume management table 133 as information on the associated volume 121. Details of the volume creation process will be described later with reference to FIG. 11.
[0070] In S905, the container management software 135 transmits (responses) to the user terminal 140 information indicating that the creation of the volume 121 has been completed.
[0071] FIG. 10 is a diagram showing an example of a process flow showing a process (container startup process) performed when starting up the container 112.
[0072] In S1001, the user terminal 140 requests the start of the container 112 (user APP). For example, the user inputs a command via the user terminal 140 by specifying the volume 121 (for example, the volume identification ID 601).
[0073] In S 1002 , the container management software 135 obtains information on the specified volume 121 from the volume management table 133 , and obtains information on the storage device 120 that provides the volume 121 from the storage management table 132 .
[0074] In S1003, the container management software 135 determines the compute node 110 on which the container 112 is to be placed (activated), and instructs the plug-in 134 to connect the volume 121 to be set in the container 112 to the compute node 110. Note that in S1003, the information on the volume 121 and the storage device 120 acquired in S1002, and the identifier of the compute node 110 on which the container 112 is to be placed (container placement destination node) are passed to the plug-in 134.
[0075] In S1004, the plug-in 134 executes a connection process. In the connection process, the volume 121 and the container destination node are connected, and information related to the connection is added to the connection volume management table 111. Details of the connection process will be described later with reference to FIG.
[0076] In S1005, the container management software 135 starts up the container 112. The container management software 135 sets a volume identification ID in the container 112 at an appropriate timing.
[0077] FIG. 11 is a diagram illustrating an example of a volume creation process.
[0078] In S1101, the plug-in 134 receives an instruction to create the volume 121 from the container management software 135. This instruction includes, for example, the capacity of the volume 121, information on the storage device 120 related to synchronization, and so on.
[0079] Next, the plug-in 134 executes the processes of S1102 and S1103 for each storage device 120 involved in the synchronization.
[0080] In S1102, the plug-in 134 instructs the processing target storage device 120 to create a volume 121.
[0081] In S1103, the plug-in 134 receives a notification from the processing target storage device 120 indicating that creation of the volume 121 has been completed, and the ID of the created volume 121 (storage volume ID).
[0082] In S1104, the plug-in 134 instructs the storage device 120 involved in the synchronization to perform synchronization processing of the volume 121 created in S1103.
[0083] In S1105, the plug-in 134 associates the information of the volume 121 synchronized in S1104 and stores it in the volume management table 133. For example, the plug-in 134 generates an NAA, and stores the generated NAA, the storage identification ID and storage serial received in S1101, and the multiple storage volume IDs received in S1103 as one record in the volume management table 133. The NAA may be generated at an appropriate timing. The NAA may also be generated by another component.
[0084] In S1106, the plug-in 134 notifies (responds to) the container management software 135 of information indicating that the creation of the volume 121 has been completed.
[0085] In conventional container management software, when a volume is created, one volume is created and stored as one record in the volume management table. In this regard, in this embodiment, multiple volumes 121 are created, synchronization is set, and information on the multiple volumes 121 is stored as one record in the volume management table 133.
[0086] FIG. 12 is a diagram illustrating an example of the connection process.
[0087] In S1201, the plug-in 134 receives an instruction (connection instruction) to connect the volume 121 to the compute node 110 on which the container 112 that uses the volume 121 is placed, from the container management software 135. For example, the connection instruction includes a volume identification ID, information on the multiple volumes 121 linked to the volume identification ID, and an identifier of the node on which the container is placed (for example, a node identification ID). Based on the connection instruction, the plug-in 134 identifies (designates) the synchronously set volume 121 and the storage device 120 that provides the volume 121.
[0088] In addition, the user does not generally specify which site 101 the container 112 should be started at. The container management software 135 determines which site 101 the container 112 should be started at, and the information (the identifier of the node where the container is to be placed) is passed to the plug-in 134 when a connection instruction is issued.
[0089] Next, the plug-in 134 executes the process of S1202 for each storage device 120 and volume 121 identified in S1201.
[0090] In S1202, the plug-in 134 records whether communication with the processing target storage device 120 is possible. For example, the plug-in 134 calls (invokes) an API for confirming communication with the processing target storage device 120, determines whether communication with the processing target storage device 120 is possible, and if it is determined that communication is possible, records the storage device 120 and volume 121 as being communicable (counts the number of possible communications).
[0091] In S1203, the plug-in 134 determines whether the number of possible communications is "0 (zero)". If the plug-in 134 determines that the number of possible communications is "0", the process proceeds to S1204, and if the plug-in 134 determines that the number of possible communications is not "0" (determines that the number of possible communications is "1" or more), the process proceeds to S1205.
[0092] In S1204, the plug-in 134 notifies the container management software 135 of a processing failure, and ends the connection processing.
[0093] In S1205, the plug-in 134 acquires the site identification label of the container destination node from the node management table 131 using the identifier of the container destination node.
[0094] Next, the plug-in 134 executes the processes of S1206 to S1208 for each storage device 120 and volume 121 with which it can communicate.
[0095] In S1206, the plug-in 134 instructs the storage device 120 to connect the volume 121 to the container destination node. For example, the plug-in 134 calls an API for connecting the volume 121 to the container destination node. As a result, the volume 121 and the container destination node are connected to each other.
[0096] In this embodiment, when the volume 121 of the storage device 120 is connected to the compute node 110, it is automatically recognized as a device file by the OS 115. In addition, in order to use the volume 121, the connected volume 121 is identified from the device files recognized by the OS 115, and the identified volume 121 is mounted in a file system of the OS 115. The volume 121 is identified using an NAA (an identifier for the OS 115 to identify the volume 121 of the storage device 120) which is passed in this order from the plug-in 134, the container management software 135, and the site side plug-in 113.
[0097] More specifically, when a volume 121 of the storage device 120 is connected to the compute node 110, it is automatically recognized and is recognized as a device file by the OS 115. The same number of device files as the number of paths between the compute node 110 and the storage device 120 are created. For example, if the connected volume 121 is an associated volume 121, a minimum of two device files will be recognized by the compute node 110 for one volume 121. In other words, if the connection between the storage device 120 and the compute node 110 is made redundant, the number of device files recognized will increase accordingly.
[0098] Furthermore, the recognized multiple device files are bundled into one multipath device file by a function called multipath that the OS 115 has. When the volume 121 is used from the container 112 (user APP) on the OS 115, this multipath device file is mounted. Since there is only one mount for the container 112 (since only one multipath device file is mounted at one mount point), the volume 121 can be used without being aware of the physical path to the volume 121.
[0099] In S1207, the plug-in 134 instructs the storage device 120 to set a priority for connection based on the site identification label. For example, the plug-in 134 queries the storage device 120 to be processed about the site identification label and determines whether it matches the site identification label of the container placement destination node. If it determines that they match, the plug-in 134 instructs the storage device 120 to set a priority for connection (calls an API for setting a priority for connection).
[0100] In this embodiment, ALUA (Asymmetric Logical Unit Access), which allows for priority setting of the connection between the storage device 120 and the compute node 110, is adopted as an example of a protocol for identifying an optimized path between the storage device 120 and the compute node 110, and in S1207, the priority setting of ALUA is updated to "preferred."
[0101] When performing IO from the container 112 (user APP) to the volume 121, the multipath function of the OS 115 automatically selects the IO path. Here, since the multipath function supports ALUA, if there is a path with ALUA priority setting among multiple paths bundled by the multipath device file, this is detected and the path with the highest priority is selected as the IO path. In other words, by setting ALUA priority on the storage device 120 side, the OS 115 side automatically detects this, and as a result, the IO path with the highest priority is used. In addition, the plug-in 134 can increase the priority of the path by setting ALUA priority.
[0102] In S1208, the plug-in 134 writes information about the connected volume 121 and storage device 120 (NAA, storage volume ID, storage serial, and whether or not priority is set) in the connected volume management table 111 via the site side plug-in 113. The site side plug-in 113 stores the information notified by the plug-in 134 in the connected volume management table 111.
[0103] In S1209, the plug-in 134 notifies the container management software 135 of the success of the processing, and ends the connection processing.
[0104] For example, assume that there are synchronized volumes A and B. In conventional technology, volumes A and B are recognized independently by the container management software. If you want to use a volume from a container, you specify the volume you want to use when you create the container. The parameters specified when you create the container remain as settings until the container is deleted. Therefore, even if a container created by specifying volume A is moved from site A to site B, the container continues to use volume A as is. If you want to change the volume that the container is trying to reference, the user needs to manually reconfigure the container and restart the container once. Since container relocation is performed automatically, it is not desirable for the user to need to do it manually.
[0105] It is possible to specify both Volume A and Volume B from the beginning when starting the container, but the container management software will recognize them as independent volumes, and the container (user application) will also recognize them as separate volumes, so the benefits of redundancy will not be realized.
[0106] In this embodiment, by introducing and using associated volume 121, both volume A and volume B are connected to the container from the beginning, eliminating the need for manual work by the user when relocating the container.
[0107] 13 is a diagram showing an example of a process for releasing a connection (disconnection process). In the connection release process, for example, information stored in the connected volume management table 111 is deleted. The connection release process is executed at an appropriate timing, such as when a failure occurs in the compute node 110, when the container 112 is rearranged, or when the volume 121 has finished being used.
[0108] In S1301, the plug-in 134 receives an instruction to disconnect the volume 121 from the compute node 110 from the container management software 135. For example, the disconnection instruction includes a volume identification ID and information on the multiple volumes 121 linked to the volume identification ID. Based on the disconnection instruction, the plug-in 134 identifies (designates) the synchronized volume 121 and the storage device 120 that provides the volume 121.
[0109] Next, the plug-in 134 executes the process of S1302 for each storage device 120 and volume 121 identified in S1301.
[0110] In S1302, the plug-in 134 records whether communication with the storage device 120 to be processed is possible. For example, when the plug-in 134 determines that communication is possible, it records the storage device 120 and the volume 121 as being communicable (counts the number of communicable volumes). Note that the method of determining whether communication is possible may be the same as that of S1202, and the description thereof will be omitted.
[0111] In S1303, the plug-in 134 determines whether the number of possible communications is “0.” If the plug-in 134 determines that the number of possible communications is “0,” the process proceeds to S1304. If the plug-in 134 determines that the number of possible communications is not “0,” the process proceeds to S1306.
[0112] In S1304, the plug-in 134 deletes, via the site-side plug-in 113, the information about the volume 121 for which the disconnection has been instructed from the connected volume management table 111.
[0113] In S1305, the plug-in 134 notifies the container management software 135 of a processing failure, and ends the connection release processing.
[0114] Furthermore, if the plug-in 134 determines that the number of communicable volumes is not "0", it executes the process of S1306 for each communicable storage device 120 and volume 121.
[0115] In S1306, the plug-in 134 instructs the storage device 120 to be processed to disconnect the volume 121 to be processed from the compute node 110 (container-placed node) in which the container 112 using the volume 121 is placed. For example, the plug-in 134 calls an API for disconnecting the volume 121 from the container-placed node. As a result, the volume 121 and the container-placed node are disconnected.
[0116] In S1307, the plug-in 134 deletes, via the site-side plug-in 113, the information about the volume 121 for which the instruction to disconnect has been given from the connected volume management table 111.
[0117] In S1308, the plug-in 134 notifies the container management software 135 of the success of the process, and ends the connection release process.
[0118] 14 is a diagram showing an example of a process (storage failure detection process) relating to detection of a failure in the storage device 120. The storage failure detection process is performed periodically and independently in each compute node 110.
[0119] In S1401, the site-side plug-in 113 acquires information on all nodes from the node management table 131 via the plug-in .
[0120] In S1402, the site-side plug-in 113 determines whether there is an available compute node 110 having a site identification label different from that of the local compute node 110. If the site-side plug-in 113 determines that there is an available compute node 110, it proceeds to S1403, and if it determines that there is no available compute node 110, it ends the storage failure detection process.
[0121] If the site-side plug-in 113 determines that there is an available compute node 110, it executes the processes of S1403 to S1407 for each volume 121 recognized by the OS 115.
[0122] In S1403, the site side plug-in 113 uses a SCSI command (for example, an INQUIRY command) to check whether there is a response from the storage device 120 that provides the volume 121 to be processed. If the volume 121 to be processed is an associated volume 121, the site side plug-in 113 issues a SCSI command not only to the storage device 120 of its own site 101, but also to the storage device 120 of the other site 101 that provides the volume 121 associated by the associated volume 121.
[0123] In S1404, the site side plug-in 113 judges whether or not there has been a response. If the site side plug-in 113 judges that there has been a response (no failure has occurred in the storage device 120), it sets the processing target to the next volume 121 and moves the processing to S1403, and if it judges that there has been no response (a failure has occurred in the storage device 120), it moves the processing to S1405.
[0124] In S1405, the site side plug-in 113 checks whether or not a priority setting is made for the volume 121 provided by the unresponsive storage device 120, from the connected volume management table 111. For example, the site side plug-in 113 determines whether or not a record corresponding to the volume 121 provided by the unresponsive storage device 120 is included in the connected volume management table 111 and whether or not the priority setting presence / absence 704 of that record is "present."
[0125] In S1406, if the site side plug-in 113 determines that there is a priority setting, it moves the process to S1407, and if it determines that there is no priority setting, it sets the processing target to the next volume 121 and moves the process to S1403.
[0126] In S1407, the site-side plug-in 113 instructs the container management software 135 to relocate the container 112 running on its own compute node 110 that uses the volume 121 to be processed, and then exits the loop to terminate the storage failure detection process.
[0127] In the storage failure detection process, the site side plug-in 113 determines that a failure has occurred in a storage device 120 (volume 121) that does not respond to a SCSI command, and determines whether the volume 121 in question is prioritized (i.e., whether the volume 121 is in the same site 101 as the compute node 110) based on the presence or absence of a priority setting in the connected volume management table 111. If the site side plug-in 113 determines that a failure has occurred in the storage device 120 that provides the volume 121 in the same site 101, it notifies the container management software 135 of information indicating that the container 112 that uses the volume 121 in question is to be relocated to another site 101.
[0128] FIG. 15 is a diagram showing an example of processing (node failure related processing) when a failure occurs in the compute node 110.
[0129] In S1501, the container management software 135 detects a failure in the compute node 110 belonging to the cluster 102.
[0130] In S1502, the container management software 135 instructs the plug-in 134 to disconnect the volumes 121 from the failed compute node 110 for all containers 112 running on the failed compute node 110. The plug-in 134 executes the above-mentioned disconnection process based on the instruction.
[0131] In S1503, the container management software 135 assigns another normally operating compute node 110 to all the containers 112 operating on the failed compute node 110, and instructs the plug-in 134 to connect the volumes 121 to the assigned compute nodes 110. The plug-in 134 executes the above-mentioned connection process based on the instruction.
[0132] According to this connection process, for each volume 121 associated with an associated volume 121 specified in a container 112 to be relocated from a failed compute node 110 to another compute node that is operating normally, it is determined whether the storage device 120 in which the volume 121 was created and the other compute node 110 are located at the same site 101, and settings are made to give priority to the use of the volume 121 created in the storage device 120 determined to be located at the same site 101.
[0133] According to this embodiment, the availability of the storage system can be increased.
[0134] (II) Supplementary Note The above-described embodiment includes, for example, the following contents.
[0135] In the above embodiment, the present invention is described as being applied to a storage system, but the present invention is not limited to this and can be widely applied to various other systems, devices, methods, and programs.
[0136] In the above-described embodiment, the "interface unit" may be one or more interfaces. The one or more interfaces may be one or more homogeneous communication interface devices (e.g., one or more NICs (Network Interface Cards)) or two or more heterogeneous communication interface devices (e.g., a NIC and an HBA (Host Bus Adapter)).
[0137] In the above-described embodiments, the "storage unit" is at least one of a memory unit and a PDEV unit (typically at least a memory unit).
[0138] In the above-described embodiment, the "memory unit" refers to one or more memories, typically a primary storage device. At least one memory in the memory unit may be a volatile memory or a non-volatile memory.
[0139] Furthermore, in the above-described embodiment, a "PDEV unit" refers to one or more PDEVs, and may typically be an auxiliary storage device. "PDEV" refers to a physical storage device, and is typically a non-volatile storage device, such as an HDD (Hard Disk Drive) or SSD (Solid State Drive).
[0140] In the above-described embodiment, the "processor unit" refers to one or more processors. The at least one processor is typically a microprocessor such as a CPU (Central Processing Unit), but may be another type of processor such as a GPU (Graphics Processing Unit). The at least one processor may be a single-core or multi-core. The at least one processor may be a processor in the broad sense, such as a hardware circuit (e.g., an FPGA (Field-Programmable Gate Array) or an ASIC (Application Specific Integrated Circuit)) that performs part or all of the processing.
[0141] Furthermore, in the above-described embodiments, the processing may be described with a "program" as the subject, but the program is executed by the processor unit to perform a defined processing step by appropriately using a storage unit (e.g., a memory) and / or an interface unit (e.g., a communication port), and so the subject of the processing may be the processor. Processing described with a program as the subject may be processing performed by a processor unit or a device having the processor unit. The processor unit may also include a hardware circuit (e.g., a field-programmable gate array (FPGA) or an application specific integrated circuit (ASIC)) that performs part or all of the processing.
[0142] In the above-described embodiment, a part or all of the programs may be installed from a program source into a device such as a computer that realizes a node. The program source may be, for example, a program distribution server connected via a network or a computer-readable recording medium (for example, a non-transitory recording medium). In the above description, two or more programs may be realized as one program, or one program may be realized as two or more programs.
[0143] Furthermore, in the above-described embodiments, the configuration of each table is an example, and one table may be divided into two or more tables, or all or part of two or more tables may be one table.
[0144] In the above embodiment, for convenience of explanation, the information related to the storage system is explained using a table, but the data structure is not limited to a table. The information related to the storage system may be expressed by a data structure other than a table, such as XML (Extensible Markup Language), YAML (YAML Ain't a Markup Language), a hash table, a tree structure, etc.
[0145] In addition, in the above description, information such as programs, tables, files, etc. that realize each function can be placed in a storage device such as a memory, a hard disk, or an SSD (Solid State Drive), or in a recording medium such as an IC card, an SD card, or a DVD.
[0146] The above-described embodiment has the following characteristic configurations, for example.
[0147] (1) A storage system (e.g., storage system 100) that manages a cluster (e.g., cluster 102) including compute nodes (e.g., compute node 110), which are nodes provided at each of a plurality of sites (e.g., site 101) and capable of running a container (e.g., container 112), and in which a storage device (e.g., storage device 120) that provides a volume (e.g., volume 121) available to the container is provided at each of the plurality of sites, includes: a generating unit (e.g., controller node 130, plug-in 134, circuit, etc.) that generates information of an associated volume (e.g., a record of a volume management table 133) that associates each of the volumes based on information of each volume created in each of a plurality of storage devices designated by two or more sites; and an instruction unit (e.g., controller node 130, plug-in 134, circuit, etc.) that instructs each storage device in which each volume has been created to connect each volume associated with the associated volume to a compute node that runs the container, based on a request to start a container designated by the associated volume information generated by the generating unit.
[0148] In the above configuration, since the two volumes associated with the associated volume are connected to the compute node that runs the container, for example, when the two volumes are synchronized and one storage device becomes unavailable due to a failure, the container can use the volume of the other storage device. With the above configuration, the user can continue work without IO being interrupted.
[0149] (2) When a container is moved from a first site to a second site, if the volume used by the container remains the volume of the first site, there is a risk that IO performance will deteriorate.
[0150] In this regard, the storage system includes a setting unit (e.g., controller node 130, plug-in 134, circuit, etc.) that, based on a request to start a container specified by information on the associated volume generated by the generation unit, determines for each volume associated with the associated volume whether the storage device in which the volume was created and the compute node running the container are located at the same site, and performs settings so that the volume created in the storage device determined to be located at the same site is used preferentially.
[0151] In the above configuration, for example, each time a container is started, settings are made so that the container can use a volume created in a storage device located at the same site as the site where the compute node running the container is located, among the multiple synchronized volumes. According to the above configuration, even if the container is moved from the first site to the second site, the volume used by the container is assigned to the volume at the second site when the container is started, so that it is possible to avoid a situation in which the volume used by the container remains the volume at the first site, and thus to avoid deterioration of IO performance.
[0152] (3) When a failure occurs in the compute node at the first site, the container is automatically moved to the second site by the container management software. For the container that has been moved to the second site, manual operation by the user is required to switch the connected volume to the volume of the storage device at the second site. The container is moved automatically by the container management software, and it is expected that the storage device will also be switched automatically.
[0153] In this regard, the storage system is equipped with a detection unit (e.g., controller node 130, container management software 135, circuitry, etc.) that detects a failure in a compute node, and when the detection unit detects a failure in a compute node, the setting unit determines, for each volume associated with an associated volume specified in a container to be relocated from the compute node to another compute node, whether the storage device in which the volume was created and the other compute node are located at the same site, and performs settings so that the volume created in the storage device determined to be located at the same site is used preferentially (e.g., see Figures 15 and 12).
[0154] In the above configuration, for example, when a failure occurs in a compute node at a first site where a running container is located and the container management software detects that the container has been relocated to a compute node at a second site, a volume at the same site as the site of the relocated container is set to be used. According to the above configuration, since a volume at the same site as the relocated container is used, it is possible to avoid degradation of IO performance without the user having to manually switch volumes in accordance with the relocation of the container in response to the failure of the compute node.
[0155] (4) When a failure occurs in a storage device at a first site where a container is running, if the connection is switched to a volume on a storage device at a second site that is not failed among the multiple synchronized volumes used by the running container, there is a risk of degradation in IO performance because the container is located at the first site.
[0156] In this regard, the compute node includes a management unit (e.g., the compute node 110, the site side plug-in 113, a circuit, etc.) that manages information, a detection unit (e.g., the compute node 110, the site side plug-in 113, a circuit, etc.) that detects a failure in a storage device connected to the compute node, and an output unit (e.g., the compute node 110, the site side plug-in 113, a circuit, etc.) that outputs information based on the information managed by the management unit and the results detected by the detection unit. When the setting unit performs a setting so that a volume created in a storage device determined to be provided at the same site is used preferentially, the setting unit outputs information about the volume (e.g., NAA) and information about the storage device (e.g., storage volume ID, storage The management unit of the compute node notifies the node of management information (for example, information to be stored in the connected volume management table 111) in which a storage serial number (used for the storage device) is associated with information indicating that a setting has been made for the volume to be used with priority (for example, presence or absence of priority setting) (for example, S1208), and the management unit of the compute node manages the management information notified by the setting unit, and when a failure of the storage device is detected by the detection unit, the output unit of the compute node determines based on the management information managed by the management unit whether or not there is a volume in the compute node that has been set to be used with priority, and when it determines that there is a volume that has been set to be used with priority, outputs information to prompt a relocation of a container that uses the volume running on the compute node (for example, S1407).
[0157] According to the above configuration, for example, when a failure occurs in the storage device at the first site where the container is running, if the connection target is switched to a volume of a storage device where the failure does not occur, information that prompts the movement of the container is output. The container management software moves the container in accordance with such information, thereby making it possible to avoid a situation in which IO performance is degraded.
[0158] (5) When a first volume in a storage device at a first site and a second volume in a storage device at a second site are managed separately, the first volume can be referred to as a first container, the second volume as a second container, etc. However, when the first volume and the second volume are synchronized, if they are simultaneously connected from different containers, data will be destroyed.
[0159] In this regard, the storage system includes a reception unit (e.g., controller node 130, container management software 135, circuitry, etc.) that receives input of information on a plurality of storage devices designated from two or more sites and receives a request for creating a volume designated by the plurality of storage devices, and when the reception unit receives a request for creating a volume designated by the plurality of storage devices from two or more sites, the instruction unit instructs each of the plurality of storage devices to create a volume, receives information on the created volume from each of the plurality of storage devices, and instructs each of the plurality of storage devices to perform synchronization processing for the created volume (e.g., see FIG. 11).
[0160] In the above configuration, multiple volumes are created in multiple storage devices, the created volumes are synchronized, and an associated volume in which the synchronized multiple volumes are associated is assigned to a container. With the above configuration, for example, synchronized volumes are not simultaneously accessed from different containers, and it is possible to avoid a situation in which data is destroyed.
[0161] Furthermore, the above-described configurations may be modified, rearranged, combined, or omitted as appropriate without departing from the spirit and scope of the present invention.
[0162] It should be understood that items listed in the format "at least one of A, B, and C" can mean (A), (B), (C), (A and B), (A and C), (B and C), or (A, B, and C). Similarly, items listed in the format "at least one of A, B, or C" can mean (A), (B), (C), (A and B), (A and C), (B and C), or (A, B, and C). [Explanation of symbols]
[0163] 100...storage system, 110...compute node, 120...storage device, 130...controller node.
Claims
1. A storage system for managing a cluster including compute nodes, the compute nodes being nodes capable of operating containers and provided at each of a plurality of sites, wherein a storage device providing a volume available to the container is provided at each of the plurality of sites, a generating unit that generates associated volume information in which each volume is virtually associated as one volume based on information of each volume that is created and synchronized in each of a plurality of storage devices designated by two or more sites, and stores the information of each synchronized volume and the information of the associated volume as one record in a volume management table; an instruction unit that instructs each storage device in which each volume has been created to connect each volume associated with the associated volume to a compute node that runs the container, based on a request to start a container in which information about the associated volume created by the creation unit is specified; A storage system comprising:
2. a setting unit which, based on a request to start a container for which information on an associated volume generated by the generating unit is specified, determines whether or not a storage device in which the volume has been created and a compute node that runs the container are provided at the same site for each volume associated with the associated volume, and performs setting so that the volume created in the storage device determined to be provided at the same site is used preferentially; The storage system according to claim 1 .
3. A detection unit for detecting a failure of a compute node, When a failure is detected in a compute node by the detection unit, the setting unit determines, for each volume associated with an associated volume specified in a container to be relocated from the compute node to another compute node, whether a storage device in which the volume was created and the other compute node are located at the same site, and performs setting so that a volume created in a storage device determined to be located at the same site is used preferentially. The storage system according to claim 2.
4. The compute node is A management department that manages information; a detection unit that detects a failure in a storage device connected to the compute node; an output unit that outputs information based on the information managed by the management unit and the result detected by the detection unit; Equipped with when the setting unit has performed a setting for preferentially using a volume created in a storage device determined to be located at the same site, the setting unit notifies a compute node at the site of management information in which information about the volume, information about the storage device, and information indicating that a setting for preferentially using the volume have been performed are associated with each other; A management unit of the compute node manages the management information notified by the setting unit, When the detection unit detects a failure in a storage device, the output unit of the compute node checks whether or not information can be input and / or output to the volume by determining whether or not there is a volume that is set to be used preferentially in the compute node based on the management information managed by the management unit, and when it is determined that there is a volume that is set to be used preferentially, it determines that a failure has occurred in a storage device at the same site as the computer node, and outputs information instructing the relocation of a container that uses the volume running on the compute node. The storage system according to claim 2.
5. a reception unit that receives input of information on a plurality of storage devices designated from two or more sites, and receives a request for creating a volume designated by the plurality of storage devices; the instruction unit, when a request for creating a volume designated by a plurality of storage devices designated from two or more sites is accepted by the acceptance unit, instructs each of the plurality of storage devices to create a volume, receives information on the created volume from each of the plurality of storage devices, and instructs each of the plurality of storage devices to perform synchronization processing for the created volume. The storage system according to claim 1 .
6. A control method for a storage system that manages a cluster including compute nodes that are nodes provided at each of a plurality of sites and that are capable of operating containers, in which a storage device that provides a volume that the containers can use is provided at each of the plurality of sites, comprising: a generating unit generates associated volume information that virtually associates each of the volumes as one volume based on information of each of the volumes that is created and synchronized in each of the multiple storage devices designated by two or more sites, and stores the information of each of the synchronized volumes and the information of the associated volume as one record in a volume management table; an instruction unit instructs each storage device in which each volume has been created to connect each volume associated with the associated volume to a compute node that runs the container, based on a request to start a container in which information about the associated volume generated by the generation unit is specified; A control method comprising:
Citation Information
Patent Citations
System management methods and computer systems
JP2015531091A
Information processing system and path management method
JP2019185328A
Container providing support system and container providing support method
JP2020095547A
Container provision support system and container provision support method
JP6759317B2
I / O path reservation with out of band management