Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

55results about How to "Achieve co-optimization" patented technology

Intelligent traffic light safety dynamic regulating and controlling method based on alliance block chain technology

The invention provides an intelligent traffic light safety dynamic regulating and controlling method based on the alliance block chain technology. A vehicle-mounted unit, a roadside unit, a transportagency and an ACP system are included. The vehicle-mounted unit sends real-time road condition information to the roadside unit, the information is recorded in blocks through pre-selected bookkeepingroadside unit nodes, the transport agency decodes and acquires the road condition information from block chains, an intelligent contract is triggered to be automatically executed, and the duration oftraffic lights is dynamically regulated and controlled by the ACP system through the acquired road condition information. After the traffic lights are regulated and controlled, the reputation value ofthe vehicle-mounted unit is evaluated through the transport agency, and the real-time road condition information and other services can be enjoyed by paying the reputation value. The problem of centralization of traffic light control is solved, high human intervention in the traffic light management and coordination processes is reduced, and financial resources and material resources are saved. Coordination optimization of traffic light management and control is achieved, and the safe and credible communication environment is provided for a vehicle-mounted Ad-Hoc network. Meanwhile, the confidentiality, privacy and non-repudiation of the information are guaranteed.
Owner:徐州虹智智能科技有限公司

Unbalanced control method for grid-connected inverter multi-target collaborative optimization

The invention provides an unbalanced control method for grid-connected inverter multi-target collaborative optimization and belongs to a control method for a grid-connected inverter. The unbalanced control method includes the step of analyzing the amplitude and phase of a negative-sequence current and adjusting a scaling factor k to enable the grid-connected inverter to be smoothly switched among multiple targets, the step of establishing the relation between the amplitude and the phase of the current on the basis of suppressing instantaneous active secondary power fluctuation and instantaneous reactive secondary power fluctuation according to an instantaneous power model of a network side and an instantaneous power model of a convertor side to obtain a negative-sequence directive current generated matrix T, and the step of selecting an appropriate scaling factor k with the condition of balancing three-phase alternating currents and suppressing network side instantaneous active power secondary fluctuation and network side instantaneous reactive power secondary fluctuation as a control target so that coordination control of three targets can be achieved under power grid unbalance. According to the method, the principle is simple, the structure is clear, and the expected optimal working condition of the grid-connected inverter can be obtained as long as the parameter k is adjusted.
Owner:CHINA UNIV OF MINING & TECH

Turbosupercharging through-flow matching method for internal combustion engine

The invention relates to a turbosupercharging through-flow matching method for an internal combustion engine, which is characterized by comprising the following steps: 1) clearing the characteristics of cyclic operation conditions and performance parameter target values of the internal combustion engine against the target internal combustion engine, thereby determining the required performance parameter target values of a turbine and a gas compressor in a turbosupercharger; 2) selecting geometric parameters of the gas compressor and the turbine according to the performance parameter target values which are determined in the step 1) of the gas compressor and the turbine in the turbosupercharger, combining with parameters of the internal combustion engine, and calculating performance parameter values of the internal combustion engine; and 3) judging whether the performance parameters calculated in the step 2) of the internal combustion engine reach the target values determined in the step 1) or not, and outputting the geometric parameters of the turbine and a supercharger in the turbosupercharger when achieving the target values; otherwise, adjusting the geometric parameters of the turbine and the supercharger and returning to the step 2). The method has short cycle and low cost, and can improve the all condition performances of the internal combustion engine, and be applicable to the field of design and matching of the turbosuperchargers.
Owner:TSINGHUA UNIV

Electric-thermal coupled multi-energy-flow system optimization dispatching method considering economic efficiency and energy efficiency

The invention provides an electric-thermal coupled multi-energy-flow system optimization dispatching method considering economic efficiency and energy efficiency, and belongs to the technical fields of operation and control of the power grid comprising multiple kinds of energy forms. According to the method, equality and inequality constraints of steady state safety operation of a power grid and aheat supply network in the electric-thermal coupled multi-energy-flow system are set firstly; an economic efficiency target function and an energy efficiency target function of optimization and dispatching of the electric-thermal coupled multi-energy-flow system are established separately; a dispatching scheme taking economic efficiency as the target and a dispatching scheme taking energy efficiency as the target are solved separately; the two schemes are substituted into corresponding target functions to perform interaction calculation, and an electric-thermal coupled multi-energy-flow system optimization dispatching model considering economic efficiency and energy efficiency is established according to the calculation result; and the model is solved, and finally an electric-thermal coupled multi-energy-flow system optimization dispatching scheme is obtained. By taking tight coupling and mutual influence of the electric-thermal system into consideration, the electric-thermal coupledmulti-energy-flow system optimization dispatching considering economic efficiency and energy efficiency is realized.
Owner:TSINGHUA UNIV

Low-voltage distribution network line loss and reactive compensation collaborative optimization method

The invention provides a low-voltage distribution network line loss and reactive compensation collaborative optimization method. The method comprises the following steps: S1, acquiring accurate measurement data by utilizing user voltage and current data provided by an intelligent electric meter on the low-voltage side of a transformer area and considering the influence of grid connection of a distributed power supply; S2, correcting locally by adopting a Newton method, a sensitivity method and a loop method by taking a forward-backward sweep algorithm as a main body, and establishing an accurate three-phase load flow calculation model; S3, performing accurate analysis and calculation on theoretical line loss by utilizing the data and line parameters after load flow calculation; and S4, establishing a reactive power compensation optimization model of the power distribution network by taking the minimum line loss as an optimization purpose and taking the economy of reactive power compensation as a constraint condition, thereby realizing collaborative optimization of the line loss and the reactive power compensation. Intelligent management and economic and reliable operation of a power distribution area are realized. The method is suitable for being used as a line loss and reactive compensation collaborative optimization method based on multi-dimensional data fusion.
Owner:HULUDAO POWER SUPPLY COMPANY OF STATE GRID LIAONING ELECTRIC POWER +2

Ultra-short-term prediction-based smooth new energy power generation control method for energy storage system

The invention provides an ultra-short-term prediction-based smooth new energy power generation control method for an energy storage system. The method comprises the following steps: reading related operation data of new energy and the energy storage system; building a target function on the basis of an ultra-short-term prediction power and a charged state of the energy storage system; optimizing six control variables in a control strategy by an adaptive chaotic particle swarm optimization algorithm according to the target function; obtaining a power command value of the energy storage system on the basis of the optimal solution of the control variables and carrying out power limitation on the power command value of the energy storage system; updating the control variables in a rolling manner according to the characteristic that ultra-short-term prediction forecasts once every 15 minutes; and outputting the power command value of the energy storage system to an energy storage control system to execute control on the energy storage system, and achieving a smoothing function of new energy output. By the ultra-short-term prediction-based smooth new energy power generation control method for the energy storage system, the charged state of the energy storage system is kept in an appropriate level; the continuous charging and discharging capabilities of the energy storage system are improved; and cooperative optimization of the smoothing capability and the performance index of the energy storage system is achieved.
Owner:CHINA ELECTRIC POWER RES INST +2

Chip based HEVC (high efficiency video coding) multi-module optimization method and system

InactiveCN103313058AAchieve co-optimizationReduce Motion Search Complicated SchedulingTelevision systemsMotion vectorMotion prediction
The invention discloses chip based HEVC (high efficiency video coding) multi-module optimization method and system. The chip based HEVC (high efficiency video coding) multi-module optimization method includes integer pixel motion estimation, fractional pixel motion estimation, mode selection, coding rate control and video noise reduction. Video pre-analysis in the code rate control, motion prediction in the video noise reduction and the integer pixel motion estimation are in collaborative optimization; video pre-analysis in the code rate control, the fractional pixel motion estimation and the mode selection are combined to be optimized. By the method and system, on the basis of hardware, goodness evaluation and multi-modules collaborative optimization are realized and an HEVC pipeline algorithm basic framework is determined; motion vectors are utilized to the utmost extent and scheduling complexity of separate motion search of multiple modules is reduced; since the video pre-analysis in the code rate control, the factional pixel motion estimation (FME) and the mode selection are combined organically and a layering convergence mode-selection algorithm framework is provided, the computing bottleneck problems caused by a great quantity of HEVC modes are reduced greatly.
Owner:CHINA JILIANG UNIV

Optimal dispatching method of flexible medium-power direct-current distribution center containing multiple micro-grids

The invention discloses an optimal dispatching method of a flexible medium-power direct-current distribution center containing multiple micro-grids. The optimal dispatching method comprises the stepsthat upper controllers of all sub-systems control optimal dispatching in the sub-systems; the medium-power direct-current upper controllers collect the transmission power of DC-AC and DC-DC interconnecting devices in real time, and communicate with an alternating current distribution management system and upper controllers of all the alternating-current and direct-current micro-grids; the upper controllers of all the alternating-current and direct-current micro-grids issues power instructions to DC-AC and DC-DC according to the optimal dispatching goals of the alternating-current and direct-current micro-grids, and control the intercommunication power of the alternating-current and direct-current micro-grids and the medium-power direct-current distribution center, and coordinated control over regions is achieved. The technical problems are solved that in the prior art, optimal dispatching is not conducted in the sub-systems of the micro-grids, coordinated control is not conducted between the sub-systems, so that the whole system is poor in stability, and the safe operation of the system is affected.
Owner:GUIZHOU POWER GRID CO LTD

Active power distribution network double-layer planning method considering source-load interaction response

The invention relates to an active power distribution network double-layer planning method considering source-load interaction response. The method comprises the following steps: S1, establishing an active power distribution network upper-layer planning model considering the source-load interaction response; S2, establishing an active power distribution network lower-layer planning model considering the source-load interaction response; S3, solving the upper-layer model to obtain a planning scheme and transmitting a result to the lower layer; s4, solving the lower-layer model to obtain an operation scheme, and returning a result to the upper layer; and S5, repeatedly iterating to finally obtain an optimal result. According to the active power distribution network double-layer planning method considering the source-load interaction response, the defect of unreasonable configuration of the active power distribution network is overcome; the coordination between the source side and the user side is enhanced, the collaborative optimization of the two sides of the source load is realized, the interactive response process is considered in the planning stage, a distributed power supply double-layer planning model considering the source load interactive response is established and is solved and analyzed, and deep guidance opinions are provided for the planning and construction of the active power distribution network.
Owner:GUANGDONG POWER GRID CO LTD +1

Multi-voltage-level maintenance plan optimization method and device based on risk overlapping degree

The invention provides a multi-voltage-level maintenance plan optimization method and device based on risk overlapping degree, which comprises the following steps of: defining and constructing a riskoverlapping degree index, and constructing an objective function of maintenance plan optimization according to the risk overlapping degree, maintenance-caused power failure loss load capacity and daily maintenance workload; and utilizing constraint conditions, solving the minimum value of the objective function through an artificial fish swarm algorithm. The invention further provides a multi-voltage-level maintenance plan optimization device based on the risk overlapping degree. In the compilation of the maintenance plans, the risk superposition caused to the same object when multiple power-off work is carried out at the same time is considered, so that the compilation of the maintenance plans realizes the minimization of the risk overlapping degree, and the collaborative optimization ofthe maintenance plans with multiple voltage levels is realized. The invention also defines a risk overlapping degree concept, and designs a risk overlapping index capable of quantifying the risk overlapping level in the maintenance plan.
Owner:STATE GRID SHANDONG ELECTRIC POWER +1

Preparation method for thermoelectric composite material of polyaniline in-situ polymerization clad PEDOT modified nano-carbon

The invention provides a preparation method for thermoelectric composite material of polyaniline in-situ polymerization clad PEDOT modified nano-carbon, belongs to the field of thermoelectric polymers, and aims at solving the problem of low thermoelectric performance of existing polyaniline thermoelectric polymer material. The preparation method comprises the steps that firstly, an organic solvent and nano-carbon material are added in a PEDOT:PSS solution, and acid is added and stirring is performed so that suspending liquid is obtained; secondly, aniline is added to the PEDOT modified nano-carbon material suspending liquid, and ultrasonic stirring reaction is performed under temperature of 0-30 DEG C so that the PEDOT modified nano-carbon material suspending liquid having aniline is obtained; and thirdly, a proton acid solution having an oxidizing agent is dropped in the suspending liquid, and compression molding is performed after stirring reaction so that the thermoelectric composite material is obtained. Preparation time of the thermoelectric composite material of polyaniline in-situ polymerization clad PEDOT modified nano-carbon is short, the PEDOT:PSS content is low, the percolation threshold of the nano-carbon particles in the base is low and the thermoelectric performance is great.
Owner:HARBIN INST OF TECH

Optimized scheduling method based on multi-energy complementary micro-grid and active power distribution network

The invention discloses an optimal scheduling method based on a multi-energy complementary micro-grid and an active power distribution network. The method comprises the following steps: respectively establishing an optimal scheduling target model of the multi-energy complementary micro-grid and an optimal scheduling target model of the active power distribution network; establishing an optimization scheduling constraint condition; establishing a double-layer optimization model by taking the optimization scheduling target model of the multi-energy complementary micro-grid and the optimization scheduling target model of the active power distribution network as optimization targets and the optimization scheduling constraint conditions as constraint conditions; and solving the double-layer optimization model, and carrying out optimization scheduling operation based on a solving result. According to the method, coordinated optimization of the multi-energy complementary micro-grid and the active power distribution network is realized, various energy requirements in the micro-grid can be met, gradient utilization of different energy sources is realized, the operation state of the active power distribution network can be considered, support is provided for safe operation of the power distribution network, and the energy benefit of a user-side comprehensive energy system can be improved.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO LTD MARKETING SERVICE CENT +1

Collaborative optimization method based on logistics supply chain

The invention provides a collaborative optimization method based on a logistics supply chain. The method comprises the steps of setting labels of various logistics resources in a supply logistics chain, creating a label database, and acquiring mapping logistics information of various logistics resources; based on a label-based database, making logistics label analysis on the mapped logistics information; based on a logistics attribute library, acquiring logistics attributes on mapped logistics information, adopting a target optimization algorithm to perform dynamic tracking monitoring on eachkind of moving logistics resources, and finally, subjecting a logistics label analysis result, a logistics attribute result and a dynamic tracking monitoring result to cooperative processing to realize cooperative optimization of the logistics chain. A three-in-one optimization mode of logistics labels, logistics attributes and dynamic tracking is utilized to achieve collaborative optimization oflogistics supply chains, matching performance among storage, distribution and transfer is achieved based on a target optimization algorithm, and precise monitoring of mobile logistics resources and optimal transportation of the logistics resources are achieved.
Owner:深圳市快金数据技术服务有限公司

Mechanical arm control precision collaborative optimization method

The invention belongs to the technical field of mechanical and control system simulation and particularly relates to a mechanical arm control precision collaborative optimization method. The method comprises the steps that firstly, configuration analysis and forward kinematics analysis of a mechanical arm are performed; secondly, inverse kinematics analysis of the mechanical arm is performed; thirdly, the track of the tail end of the mechanical arm is planned; fourthly, the space track of joints of the mechanical arm is planned; fifthly, topological optimization of a mechanical arm rod is performed; sixthly, control parameter collaborative optimization is performed; and seventhly, comparison validation is performed. The mechanical arm control precision collaborative optimization method isused for a series connection six-degree-of-freedom light mechanical arm which is independently researched and developed, on the basis that the configuration and kinematics of the mechanical arm of thetype are analyzed, an inverse kinematics analytical algorithm of the mechanical arm of the type is put forward, and all the joints of the mechanical arm are subjected to working track planning by means of the inverse kinematics calculation method.
Owner:BEIJING RES INST OF PRECISE MECHATRONICS CONTROLS

Multi-scene power transmission network planning method considering load and wind power randomness under network source coordination

The invention discloses a multi-scene power transmission network planning method considering load and wind power randomness under network source coordination. According to the planning method, load prediction and wind power output randomness are comprehensively considered, andthe multi-scene power transmission network planning method under the network source coordination drive is put forward. Themethod comprises the steps that S1, a load and wind speed probability density random model considering randomness is established, then historical data is counted, load and wind speed model parametersare obtained according to data change conditions, and then a load curve and a wind power output curve are fitted through a model Carlo; S2, an annual operation scene is obtained through multi-scene random simulation on the basis of the load curve and the wind power output curve, and a plurality of typical operation scenes are obtained through scene clustering; and S3, a planning model taking the optimal safety and economy as a target is established, and the safety and economy under different planning schemes are calculated and compared through a plurality of typical scenes to obtain an optimalwind power grid-connected point and power transmission network planning scheme.
Owner:STATE GRID JILIN ELECTRIC POWER COMPANY LIMITED +1

Park comprehensive energy optimization method and device based on ADMM alternating direction multiplier method

The invention discloses a park comprehensive energy optimization method and device based on an ADMM alternating direction multiplier method, and the method comprises the steps: obtaining the declaration information of a participant, and displaying the real-time demands and output information on a public interface; and according to the declaration information, adopting an ADMM alternating directionmultiplier method to carry out pre-optimization processing, decomposing the electric power and energy system into two optimization sub-problems of the electric power system and the natural gas system, and generating optimization parameters and an optimization result by taking the minimum operating cost of the energy system of the whole park as a target, sending the optimization parameters and theoptimization result to each enterprise in the park; performing safety check according to the optimization parameters; and if the emergency situation occurs, sending an emergency announcement according to the emergency situation, and carrying out emergency optimization processing. According to the invention, the problems of non-transparent information, complex model and the like in the centralizedand unified optimization method of the energy system can be solved, and the collaborative optimization of the comprehensive energy system in the park is realized through the interaction of a small amount of information between the power system and the natural gas system.
Owner:南方电网能源发展研究院有限责任公司

Optimization method and device for oilfield development scheme

The invention provides an optimization method and device for an oilfield development scheme, which relate to the technical field of petroleum exploration and development. The method comprises the following steps: coding optimization indexes of the oilfield development scheme respectively and combining the codes obtained to obtain individual codes of the oilfield development scheme; calculating thefitness of individual coding according to the fitness function; carrying out cross and mutation according to that target population in turn to generate the N generation population, wherein N is greater than or equal to 2; judging whether the Nth generation population satisfies the constraint condition, and if not, regenerating the Nth generation population; if yes, judging whether the N generation population satisfies the termination condition; if the termination condition is not satisfied, generating the N+1 generation population; if the termination condition is satisfied, selecting and decoding the optimal individual coding to obtain the optimal oilfield development plan. The invention realizes the collaborative optimization of multi-index oilfield development scheme, and can be flexibly expanded to obtain more optimized oilfield development scheme.
Owner:CHINA PETROLEUM & CHEM CORP +1

Power system information physical double-layer strategy optimization method considering network attack influence

The invention discloses a power system information physical double-layer strategy optimization method considering network attack influence, and belongs to the technical field of power generation, power transformation or power distribution. The method comprises the following steps: modeling an electric power information physical system based on an incidence matrix method; forming a mathematical vector by using a known network attack mechanism, and analyzing attack influence based on a power information physical system association model; on the basis of the influence of attacks on the physical side and the information side of a power system, an existing control strategy is judged firstly for the safety and stability control service of the power system, and if the judgment result is feasible,execution is performed; if the method is not feasible, optimizing a load reduction optimization strategy of a physical side according to the attack influence; and optimizing the strategy transmissionpath on the basis of upper-layer optimization, and finally obtaining an information physical coordination optimal control strategy of the network attack scene. According to the invention, an information physical cooperative control strategy under a network attack can be formed, and a better control effect is realized.
Owner:SOUTHEAST UNIV +1

Regional multi-type rail transit transport capacity resource allocation method

The invention discloses a regional multi-type rail transit transport capacity resource allocation method, which comprises the following steps of: establishing a regional multi-type rail transit transport capacity resource collaborative allocation model considering influence of interactive passenger flow among different rail transit modes; acquiring a time period in which transport capacity resource distribution is not matched according to current transport capacity resource allocation situations of arterial rail transit and urban rail transit, and determining a time period in which a train needs to be called out and a time period in which the train can be called in for the arterial rail transit according to a time distribution situation of urban rail transit transport capacity resources; determining and adjusting the transfer-in and transfer-out time of the train based on the arrival balance of the main line rail transit according to the adjustment requirement of the time period so asto realize the allocation of the transport capacity resources of the main line rail transit; after the main line rail transit transport capacity resources are adjusted, optimizing the time table of the urban rail transit train with the minimum transfer time of the interactive passenger flow as the target, so that adjustment of the urban rail transit transport capacity resources is achieved, and cooperative allocation of the regional multi-type rail transit transport capacity resources is completed.
Owner:SOUTHWEST JIAOTONG UNIV

Method and system for multi-module optimization of hevc video encoding implemented on chips

InactiveCN103313058BAchieve co-optimizationReduce Motion Search Complicated SchedulingDigital video signal modificationMotion vectorMotion prediction
The invention discloses chip based HEVC (high efficiency video coding) multi-module optimization method and system. The chip based HEVC (high efficiency video coding) multi-module optimization method includes integer pixel motion estimation, fractional pixel motion estimation, mode selection, coding rate control and video noise reduction. Video pre-analysis in the code rate control, motion prediction in the video noise reduction and the integer pixel motion estimation are in collaborative optimization; video pre-analysis in the code rate control, the fractional pixel motion estimation and the mode selection are combined to be optimized. By the method and system, on the basis of hardware, goodness evaluation and multi-modules collaborative optimization are realized and an HEVC pipeline algorithm basic framework is determined; motion vectors are utilized to the utmost extent and scheduling complexity of separate motion search of multiple modules is reduced; since the video pre-analysis in the code rate control, the factional pixel motion estimation (FME) and the mode selection are combined organically and a layering convergence mode-selection algorithm framework is provided, the computing bottleneck problems caused by a great quantity of HEVC modes are reduced greatly.
Owner:CHINA JILIANG UNIV

Equipment design/maintenance scheme intelligent decision-making method based on digital twinning

PendingCN113627032ASolve the problem that the level of intelligence is still lowOvercome the difficulty of coordinating decision-making across geographiesDesign optimisation/simulationSpecial data processing applicationsStructure analysisIndustrial engineering
The invention discloses an equipment design / maintenance scheme intelligent decision-making method based on digital twinning, and belongs to the technical field of advanced manufacturing and automation. The method comprises the following steps: 1, carrying out structure analysis and function analysis on key equipment, and carrying out mechanism model construction and data model construction to obtain a digital twin modeling module of the key equipment; 2, carding data and information required by design / maintenance service according to the digital twin modeling module of the key equipment obtained in the step 1, formulating an evaluation criterion of a design / maintenance optimal scheme, and obtaining a decision scheme alternative set; 3, according to the decision scheme alternative set obtained in the step 2, performing multi-attribute multi-scheme decision of a complex group to obtain an alternative scheme sequence under a design / maintenance service task; and 4, when the alternative schemes are reasonably ranked, outputting the alternative schemes as optimal schemes. According to the method, the problem that the intelligent level of industry design, production, management and service is still low at present is solved.
Owner:XIAN UNIV OF SCI & TECH +1

Longitudinal section line layout method and system, terminal and readable storage medium

The invention discloses a longitudinal section line layout method and system, a terminal and a readable storage medium, and the method comprises the steps of obtaining the line information of a to-be-laid line, and constructing a longitudinal section line optimization model; obtaining a feasible region of station apron elevation search and a feasible region of line longitudinal section slope change point search based on the constraint conditions, and generating an initial layout result of a line longitudinal section, wherein the initial layout result is an initial value of a design variable; and based on the longitudinal section line optimization model, the feasible region of station apron elevation search, the feasible region of line longitudinal section slope change point search and the initial layout result of the line longitudinal section, optimizing by adopting an optimization algorithm to obtain a longitudinal section line layout result. According to the invention, the distribution of the gradient change points of the longitudinal section of the subway line and the collaborative optimization of the elevation of the station level are realized, and the coupling relation and dynamic characteristics of the gradient change points of the longitudinal section of the line and the elevation of the station level are considered, so that the scheme is more reasonable.
Owner:CENT SOUTH UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products