Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

127 results about "Building simulation" patented technology

Wide-base truck radial tire building machine belt drum and design method

The invention provides a wide-base truck radial tire building machine belt drum and a design method.A middle section of the belt drum is designed to be of a convex curved surface structure, the contour line of the surface of the belt drum is composed of two straight line sections and an arc section located between the two straight line sections, and according to the width of a main belt layer, the radius of curvature, the diameter of a first belt layer and the elongation, the width d of the arc section, the radius R of curvature, the diameter D of the belt drum and the lengths l1 and l2 of the two straight line sections are preliminarily determined; the optimal parameter is optimally determined through a tire building simulation method by using the cord thread elongation and tread rubber material flow uniformity as judgment standards.The cord thread elongation of the belt layers is effectively controlled, the problem that belt layer stress is uneven during sizing is thoroughly solved, the abnormal phenomenon that a wide-base tire shoulder rubber material flows to the crown center in the process of sizing in a machine is eliminated, the tire endurance quality is improved, and enforceability and operability are extremely strong.
Owner:SHANDONG LINGLONG TIRE

Double-loop constant-frequency control method based on BUCK-LLC (buck-logical link control) two-level DC/DC (direct current/direct current) converter

The invention discloses a double-loop constant-frequency control method based on a BUCK-LLC (buck-logical link control) two-level DC/DC (direct current/direct current) converter. The switch frequency of an LLC resonance converter is set to two-element resonance frequency; the output voltage of the BUCK-LLC two-level DC/DC converter is collected by a differential circuit; the inductive current of a BUCK converter is collected by a current sensor to implement double-loop control. The double-loop constant-frequency control method has the advantages that the gain of the LLC resonance converter is not changed, and the output voltage of the BUCK-LLC two-level DC/DC converter is adjusted by regulating the duty cycle of a BUCK converter switch tube through the double-loop control; compared with the traditional single-loop control, the dynamic response speed of the double-loop control is higher, and the steady-state performance is better; the power density of the converter is higher; for a built simulation model of the BUCK-LLC two-level DC/DC converter, the range of input voltage is wider, the anti-load disturbance ability is stronger, and the certain engineering application value is realized.
Owner:HEFEI UNIV OF TECH

Intelligent substation process layer network modeling method based on OPNET

InactiveCN105721208AEasy and intuitive accessRealize Quantitative SimulationData switching networksData streamDevice simulation
The invention discloses an intelligent substation process layer network modeling method based on OPNET. The method comprises following steps of building simulation models of various IEDs (Intelligent Electronic Device) of an intelligent substation in an OPNET environment, wherein the step of building the simulation models comprises building a combined unit simulation model, building an intelligent terminal simulation model, building a protection device simulation model and building a measuring and control device simulation device; using random numbers satisfying a distribution rule to simulate the data streams in an intelligent substation process layer network; and according to the built IED simulation models, through adoption of link connection of 100M bandwidth, building the intelligent substation process layer network with a set topological structure. Through adoption of the intelligent substation network model built by the method as a platform, indexes such as transmission delay, jitter and a packet loss rate of various data messages can be clearly and visually inspected; whether the indexes satisfy the IEC61850 standard or not is evaluated; and new ideals are provided for the designing and maintaining work of the intelligent substation network.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER CO LTD SHAOXING POWER SUPPLY CO +2

Assistant decision-making method and system for urban rail transit network operation emergencies

The invention relates to an auxiliary decision-making method and system for urban rail transit network operation emergencies. The method comprises the steps: building simulation models through a digital twinning technology, and combining a plurality of simulation models to build a digital twinning rail transit network; according to historical passenger flow data of the urban rail transit network, data simulation and prediction are carried out, and emergency situations under possible situations are analyzed; deducing driving and passenger flow trends in the simulation model according to an emergency situation, establishing communication between the urban rail transit system and the digital twin simulation system, and realizing real-time driving analysis and interaction of passenger flow data and analogue simulation data; and analyzing the harm degree and the development condition of the received emergencies, determining the early warning level, carrying out quantitative and qualitative evaluation on the effect after the implementation of the emergency treatment measures, and providing the simulation process and the result to the scheduling personnel of the network control center in the form of images and texts to assist the scheduling personnel to carry out strategy optimization.
Owner:通控研究院(安徽)有限公司

Wind tunnel test device for simulating influence of wind on structure in mountain area

InactiveCN108168830AShorten test timeSolve the inadequacy of not being able to simulate mountainous buildingsAerodynamic testingBuilding simulationWind engineering
The invention discloses a wind tunnel test device for simulating influence of wind on a structure in a mountain area, and relates to the field of structural wind engineering. The wind tunnel test device comprises a building simulation system, a slope simulation system and a pressure measuring tube; the building simulation system is composed of a building model and a building base plate; the slopesimulation system is composed of a front slope subsystem, a building platform, a back slope subsystem and a driving subsystem, the front and back sides of the building platform are in rotatable connection with the front slope subsystem and the back slope subsystem respectively, the building model is mounted on the building platform via the building base plate, and the driving subsystem adjusts andcontrols the height of the building platform as well as the gradient of the front slope subsystem and the back slope subsystem; and the pressure measuring tube penetrates the building base plate andis laid in the building model. The wind tunnel test device can be used to overcome the disadvantage that test device at present does no research on the wind pressure characteristic of the building inthe mountain area, simulate mountain areas of different gradient and height-to-width ratio by changing the gradient of different landform simulated testers, and simulate different distribution forms of the buildings in the mountain area by changing the number and heights of building models.
Owner:CHONGQING JIAOTONG UNIVERSITY

Distribution network real model simulation platform

The invention discloses a distribution network real model simulation platform. The objective of the invention is to simulate the fault patterns of switches so as to detect the faults of switch-type devices. The whole platform can be used for teaching demonstration or actual detection and can be also used for initiatively simulating fault conditions so as to carry out device detection or teaching demonstration. In order to achieve the above objective, the distribution network real model simulation platform of the present invention comprises infrastructures installed in a work site and matched auxiliary power source supply equipment; the distribution network real model simulation platform is further provided with detected or simulated equipment; the platform is configured with a real object detection state and a fault simulation state; and the detected or simulated equipment is a switchgear. According to the platform, real distribution network equipment fault models are adopted to reproduce the typical defects of a 10kV distribution network switchgear; the built simulation platform has three-phase voltage adjustable and three-phase high-current analog load changing capabilities and can realize laboratorial reproduction of typical defects under rated voltage and rated load.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER CO LTD JINHUA POWER SUPPLY CO +1

Novel multi-factor tactical internet connection reliability simulation method

ActiveCN103745049AImprove the degree of perfectionSolve problemsData switching networksSpecial data processing applicationsTerrainInternet reliability
The invention relates to a novel multi-factor tactical internet connection reliability simulation method which solves the problem that complex movement modes and terrain environments cannot be comprehensively considered in the research process of tactical internet connection reliability. The method includes the steps: designing and building simulation network scenes in an OPNET, generating combat movement modes by the aid of a two-dimensional normal cloud model, adding the movement modes into the network scenes, adding business operation simulation, collecting simulation data in different movement modes and analyzing the simulation data to obtain a connection reliability curve; newly building same network scenes, adding real terrain data to obtain a connection reliability curve under terrain influence, and researching the influence of the real terrain environments on the network connection reliability. The method improves modeling of the movement modes and the terrain environments in network connection reliability research, solves the problem of difficulty in modeling the complex environments in networks and the movement modes, and builds a foundation for the research of complex factors of tactical internet reliability research.
Owner:BEIHANG UNIV

Energy-saving type intelligent external window optimization control method

The invention, which relates to the field of smart windows, provides an energy-saving type intelligent external window optimization control method. An EC casement window regulation strategy is determined according to different regions, different building types, and different orientations; the solar radiant heat can be utilized effectively, the natural lighting is increased, and glaring is avoided;and the optimized control problem of the multiple control targets in a photo-thermal environment is solved and the building energy consumption is reduced. According to the invention, on the basis ofarchitectural design parameters of the electrochromic casement window, control logics of the electrochromic casement window are set in an EnergyManagement System module of the EnergyPlus; with Genoptsoftware, an outdoor horizontal illumination control threshold of a control parameter of the electrochromic casement window state in the established EnergyPlus simulation model is optimized, so that the sum of the illumination energy consumption and the air conditioning energy consumption of the building simulation is minimized. Therefore, the building energy consumption is reduced effectively; and incorrect usage of the electrochromic casement window due to different regions, different orientations, different building types and different seasons is reduced effectively.
Owner:BEIJING UNIV OF TECH

Electric field simulation method and device for DC field of super/ultrahigh-voltage converter station and storage medium

The invention discloses an electric field simulation method for a DC field of a super/ultrahigh-voltage converter station. The electric field simulation method comprises the steps of determining a keypart according to a structure of the DC field of the converter station; building simulation model of the DC field, and performing simplification to obtain a DC field simplification model; constructing a plurality of geometric models according to the DC field simplification model; obtaining a plurality of air model modules of an outer boundary rule; dividing the DC field simplification model to obtain a DC field division model; determining a corresponding relative dielectric constant and electrical conductivity according to a material of each part of the DC field, and applying to each part ofthe DC field simplification model; and obtaining electric field intensity of different moments by employing a full-period transient field calculation method. According to the electric field simulationmethod for the DC field of the super/ultrahigh-voltage converter station, disclosed by the invention, the simulation model can be simplified, and the simulation calculation efficiency is improved. The invention also discloses an electric field simulation device for the DC field of the super/ultrahigh-voltage converter station and a storage medium.
Owner:ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD +1

Architectural design workbench

The invention relates to an architectural design device, and especially relates to an architectural design workbench. The technical problem to be solved is to provide the architectural design workbench. In order to solve the above technical problem, the invention provides the architectural design workbench, which comprises a double-support mechanism, a circular display mechanism, a protection projection mechanism and a double-expansion mechanism; a cover plate is arranged at the front end of a table body; and a base is arranged at the bottom end of the table body. According to the architectural design workbench provided by the invention, when in use, a drawing placement desktop can be expanded, and meanwhile, it is ensured that drawings on the two sides after expansion can be convenientlyviewed, and the illumination during viewing is ensured; the drawings on both sides can be viewed at the same time without adjusting the drawings, the observation and research of a building model can be carried out in a matched mode; and at the same time, protection and projection 3D can be achieved for coordinated research, the effect of omnibearing research is achieved, the convenience of users can be greatly improved, synchronous research comparison can be better achieved, and the error rate of building simulation assumptions is reduced.
Owner:湖南旭彦建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products