Power grid electric power and electric quantity balancing method
A technology for power balance and power grid, which is applied in the direction of instruments, character and pattern recognition, data processing applications, etc., and can solve problems such as few balance strategies, insufficient power supply, and damage to power balance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0220] Load balance during peak summer and winter
[0221] According to the actual situation of the region, the typical summer and winter days of the Chongqing power grid system are selected for scenario application analysis. For the entire Chongqing power grid system, the period of the balance plan for special periods is set to 1d, and the calculation period of relevant variables is set to 15 minutes. The power dispatching measures adopted include increasing purchased electricity and interruptible loads. The cost coefficients for the measures are shown in Table 1. .
[0222] Table 1 Measure Adjustment Cost Factors
[0223]
[0224] First, select the typical summer and winter load curves of Chongqing power grid, such as image 3 As shown, from the perspective of the curve shape, the typical summer load curve presents a more obvious feature of "two peaks and one valley"; while the change fluctuations in typical winter days are relatively slow, roughly showing a "~" type tr...
Embodiment 2
[0230] Floods in the Wujiang and Jialing Rivers were completely stopped and balanced
[0231] In view of the importance of Wujiang River and Jialing River hydropower in Chongqing, and their inter-annual and intra-annual runoff distributions have a good identity. Therefore, on this basis, the power balance of the Wujiang River and the Jialing River when the floods are completely stopped is studied, so as to analyze its impact on the power balance of the entire power grid system. Considering the comparability, the same typical day of the classic "peaking summer" is taken as the simulation object. In the same way, the joint optimal dispatch of various power sources is firstly integrated. For the time period when the system has a tight power supply, the balance of the power gap is oriented. The goal of minimizing benefit loss should be adjusted. To sum up, the simulation calculation shows that the power adjustment scheme when the Wujiang River and the Jialing River are completely...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com