Resource optimization method and device, computer equipment and storage medium

PendingCN121880739AAchieve coordinated optimizationImprove operational efficiencyResource assignmentFeature data
The invention discloses a resource optimization method and apparatus, a computer device and a storage medium. The method comprises the steps of obtaining a to-be-managed crowd and current crowd feature data and historical crowd feature data of the to-be-managed crowd; providing the current crowd feature data and the historical crowd feature data to a preset prediction model, so that the prediction model outputs a resource operation state index of the crowd; determining a resource scheduling priority of the to-be-managed crowd based on the resource operation state index; determining a target resource optimization strategy of the to-be-managed crowd based on a mapping relationship between the resource scheduling priority and a resource optimization strategy; and performing resource optimization processing on the to-be-managed crowd based on the target resource optimization strategy. Resource allocation such as computing power, bandwidth and task execution rhythm can be adaptively adjusted under different service loads and crowd scale changes, and coordinated optimization of multi-dimensional system resources and improvement of overall operation efficiency are achieved.
Owner:SHENZHEN YISHIHUOLALA TECH CO LTD

A method for dynamic coordination optimization of urban arterial multi-path signal timing and guided vehicle speed considering overlapping phases

ActiveCN120526575BImprove utilization efficiencyOvercoming signal optimization issues
The application provides a kind of urban trunk multi-path signal timing and guiding vehicle speed dynamic coordination optimization method considering lap phase, comprising: collecting road network geometry data and traffic flow data;Current cycle length and current control time length are increased by 1s, update traffic flow data;If the current cycle length has reached the cycle length, the intersection level signal control optimization model is constructed with the minimum intersection delay value as the target, and the optimal signal timing is obtained;If the current control time length has reached the control time length, the trunk level signal control and guiding vehicle speed optimization model is constructed with the maximum weighted green wave bandwidth of all key paths as the target, the optimal signal cycle and the maximum green wave bandwidth are obtained, and the optimized key path phase difference and guiding vehicle speed are output.The signal timing and guiding vehicle speed coordination optimization scheme generated by the application can ensure that vehicles can still smoothly pass through multiple intersections under fluctuation, realize the coordination optimization of traffic signal and vehicle speed control, improve the operation efficiency of traffic flow, and reduce waiting time and parking times.
Owner:SOUTHEAST UNIV

A power distribution network source-network-load-storage collaborative scheduling method for new energy access

PendingCN122600220AImprove drawing accuracyAvoid under-response
The application discloses a power distribution network source-network-load-storage collaborative scheduling method for new energy access, relates to the technical field of power distribution network operation control, and specifically comprises the following steps: a coupling model taking node safety margin and response reliability as state variables is established by collecting power distribution network, energy storage and flexible load response data; the reliability is updated according to response deviation, online state and user constraints, and effective response capacity with a confidence boundary is formed; power flow checking is performed in each scheduling period, safety pressure values are generated by combining voltage out-of-limit, equipment load rate and reverse power flow risk, and safety and economic coordination weights are adaptively determined; a flexible load calling strategy of safety priority or economic priority is selected according to the safety pressure, and a collaborative scheduling model is solved with the minimum weighted sum of economic cost and safety risk conversion cost as the target, and source-network-load-storage joint scheduling instructions are outputted; and the method can improve the safety risk inhibition capability and economic scheduling level of the power distribution network under the new energy access scenario.
Owner:广州弘一信息科技有限公司

Aircraft overall scheme generative design method based on PILO-GAN

PendingCN121997454AAchieve coordinated optimizationHave engineering credibilityGeometric CADSustainable transportationStructured systems analysis and design methodAlgorithm
The invention relates to the technical field of aircraft design, in particular to an aircraft overall scheme generative design method based on PILO-GAN, and the method comprises the steps: converting an unstructured natural language demand into structured design parameters; then constructing a PILO-GAN network, generating initial design parameters by taking structured parameters as conditional input and combining with random noise, embedding aircraft design empirical criterion constraints, and driving physical optimization based on multidisciplinary performance evaluation; performing multidisciplinary physical performance verification on the initial design parameters to obtain quantitative performance indexes; constructing a gradient propagation path by adopting a REINFORCE algorithm, and feeding back a performance index gradient to the generator to realize parameter updating; and finally, dynamically adjusting the weight of the loss item of the constraint and physical optimization, and carrying out iterative optimization until a preset requirement is met. Through a physical closed-loop optimization mechanism, end-to-end intelligent generation of feasible schemes from demands to engineering is realized, and the physical consistency and engineering credibility of the design scheme are remarkably improved.
Owner:NORTHWESTERN POLYTECHNICAL UNIV

A multi-mode motor torque distribution method and system

This invention relates to the field of motor technology, specifically to a multi-mode motor torque distribution method and system. The method includes: a drive system based on dual front axle motors and a single rear axle motor; constructing an economy control module and a power control module based on a hierarchical control architecture; calculating the driver's driving intention based on the accelerator pedal opening; if the driving intention is within the standard range of the economy control module, obtaining the optimal torque distribution coefficient by minimizing instantaneous energy consumption power, and obtaining the reference torque for the rear axle and front axle motors; if the driving intention is within the standard range of the power control module, calculating the compensation torque for the front axle and rear axle motors based on a preset fuzzy control algorithm according to vehicle speed and accelerator pedal opening change rate, and superimposing the compensation torque onto the reference torque for the front axle and rear axle motors respectively to obtain the final drive torque command; this invention solves the balance problem between economy and dynamics in four-wheel drive multi-motor electric vehicles.
Owner:SHENZHEN XISITE NEW ENERGY TECH CO LTD

Remote node dormant state machine control method and system based on message time sequence analysis

ActiveCN121984796AImprove characterization accuracyStrong forward-lookingSubstation remote connection/disconnectionHigh level techniquesSleep stateTimestamp
The invention discloses a remote node dormant state machine control method and system based on message time sequence analysis, and relates to the field of node power consumption management control, and the method comprises the steps: obtaining an arrival timestamp and a message identifier of an inbound message, and carrying out the classified storage of the arrival timestamp and the message identifier according to service types; extracting statistical characteristics based on the adjacent arrival time interval sequence of each category of messages, constructing a message arrival probability distribution model and calculating an arrival risk degree function; carrying out weighted fusion by combining service priorities to obtain a system-level comprehensive risk degree function, and predicting that a next message arrives at an expected moment; and calculating a safety margin in combination with the current energy state of the node, and selecting a target dormant state in the multi-stage dormant state machine. Therefore, dynamic control over the sleep depth and the wake-up time is achieved, and the adaptivity and response coordination of low-power-consumption management of the far-end node are improved.
Owner:SUZHOU AIXIONGSI COMM TECH CO LTD