Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

806results about How to "Improve operating economy" patented technology

Large grid real-time scheduling method for accepting access of wind power

The invention relates to a large grid real-time scheduling method for accepting access of wind power, which belongs to the technical field of power system operation and control. The method comprises: according to the characteristics of wind power and load fluctuation and the control characteristics of generator sets, classifying the generator sets in the whole grid; acquiring the current plan, real-time output, connecting line plan, numerical weather prediction and other related information of each generator set; performing ultrashort period load prediction and wind power output prediction towork out the output regulation amount at next moment of real-time scheduling generator sets and construct an active real-time scheduling model with the smallest wind loss; working out the output regulation amount of the real-time scheduling generator sets including the wind power generator sets by using a simplex method; and transmitting the next output regulation amount of thermal power generator sets directly, and giving the output maximum value at next moment of the wind power generator sets. In the invention, the combined optimized scheduling of the wind power generator sets and traditional generator sets is performed to eliminate wind power generation prediction deviation and load prediction deviation in advance, so the wind power accepting capability of a power grid is improved to the maximum extent while the operation economy of the power grid is guaranteed.
Owner:TSINGHUA UNIV

Two-stage coordinated optimization and control-based running method of combined cooling heating and power supply type microgrid

The invention discloses a two-stage coordinated optimization and control-based running method of a combined cooling heating and power supply type microgrid. The running method comprises the steps of 10) performing inter-day rolling dispatching of the combined cooling heating and power supply type microgrid, in which optimal dispatching is performed by taking minimum running cost of the combined cooling heating and power supply type microgrid as an optimal target and combining forecast renewable energy generation power and load demand according to a running constraint condition of the system, and rolling output of each equipment and electricity purchase or sale quantity from a power grid are determined; and 20) building a real-time dispatching module of the combined cooling heating and power supply type microgrid, correcting an inter-day rolling dispatching result by taking dispatching fluctuation penalty-based minimum running cost of the combined cooling heating and power supply type microgrid as the optimal target and combining the renewable energy generation power and a load demand real-time value according to a real-time running constraint condition, and determining real-time output of each equipment in the combined cooling heating and power supply type microgrid and an electricity purchase or sale quantity real-time value. By the running method, the purpose of running economy and stability of the combined cooling heating and power supply type microgrid is achieved.
Owner:SOUTHEAST UNIV

Simulation platform of macrotype power station integrated automation system

The invention relates to an comprehensive automatic system imitation platform for a large power plant, comprising that an 'imitation machine' part is a power station imitation platform for simulating the power plant production process by real-time and providing an actual and effective testing and analysis platform to improve the power station automatic level; a distributed control system comprises a plurality of control points in the actual site, a work station, a display, a printer, a data server and a double-redundancy fiber optical ring-shaped communication network; the 'actual power' part is the 'actual power' part of the power station simulation platform, and comprises a site input signal collecting system, a site testing and control instrument and an execution mechanism of the output signal of the simulation platform. The invention is constructed into a comprehensive automatic system research platform of the completely interacted power plant so as to conduct the analysis and research of the operation of the entire equipment of the power plant system without being limited by each condition on site, thereby, the time and the cost of the system design, testing and optimization can be largely saved, the economy and the safety of the power plant operation can be improved.
Owner:SHANGHAI ELECTRICGROUP CORP

Direct current traction power supply system and protective method

The invention discloses a direct current traction power supply system and a protective method, and utilizes direct current protective device outlet information and a short circuit fault mark value as a criterion to judge various direct current short circuit faults. When the short fault occurs, an alternating current incoming line breaker closest to a fault element is subjected to brake separating; if the sum of the fault mark values of the element, measured and computed after the brake separating, is more than or equal to 1, permanent fault is determined, the alternating current incoming line breakers of other traction substations in the whole line are subjected to brake separating, and related direct current isolation switches are subjected to brake separating to enable the alternating current incoming line breakers of the traction substation in the whole line to be subjected to switching on, so the power supply of the system can be restored; and if the sum of the fault mark values of the element is smaller than 1, the fault is instant, and related breakers are switched on for restoring the power supply of the system. The direct current traction power supply system and the protective method are capable of omitting the direct current breakers and saving investment, convenient to implement, suitable for carrying out new line construction or old line transformation in occasions where the lines are not very long (for example in 20m and less than 10 traction substations). When the line is overlong, the traction power supply system can be subjected to partition by a small amount of direct current breakers.
Owner:SOUTHWEST JIAOTONG UNIV +1

Supercritical boiler fire coal heat value self-balance control loop distributed control system implementation method

The invention discloses a supercritical boiler fire coal heat value self-balance control loop distributed control system implementation method. The method comprises the steps of outputting a final coal feeder rotation speed command after PID adjustment is carried out on a received coal feed quantity command and a total coal quantity command with a heat value corrected, wherein the total coal quantity command with the heat value corrected is a total coal quantity command output by multiplying a dynamically-measured total coal feed quantity by a heat value balance correction coefficient, and the heat value balance correction coefficient is a delayed heat value balance correction coefficient. According to the method, soft measurement of a fire coal heat value can be achieved based on a unit DCS platform, additional investment is not needed, and a soft measurement signal of the fire coal heat value makes it convenient for operating personnel to monitor the quality of fired coal in real time and guides boiler combustion adjustment. A fire coal heat value self-balance control loop is designed, and therefore a unit coordinated control system has the ability to adapt to various types of coal, and the operation stability and the economy of a unit are improved.
Owner:ANHUI XINLT POWER TECH CONSULTING +3

Transmission and distribution coordinated dispatching target cascaded analysis method of high-proportion renewable energy source power system

The invention discloses a transmission and distribution coordinated dispatching target cascaded analysis method of a high-proportion renewable energy source power system. The transmission and distribution coordinated dispatching target cascaded analysis method of the high-proportion renewable energy source power system comprises a local scheduling layer which is a scheduling unit for performing joint output optimization on a distributed renewable energy source in the interior of one power distribution network; a power transmission network and a power distribution network which separately serves as autonomous main bodies for decoupling through border frequency and optimizing resources in zones separately and cooperating with each other to schedule a power transmission plan, wherein a powertransmission network scheduling layer is to perform uncertainty modeling on the renewable energy source based on the improved interval optimization method to construct an energy and standby coordinative optimization model, and the power distribution network scheduling layer is a local scheduling layer set for the distributed renewable energy sources and performs joint output optimization by utilizing a scene method and combining with an energy storage system, thereby constructing the distribution network layer sub-problems into a dynamic economic scheduling model with optimal economical efficiency and with a target of absorbing the distributed renewable energy source joint output in the local scheduling layer.
Owner:SHANDONG UNIV +2

Digital electric-hydraulic synchronous control system

InactiveCN101571155AThrottle control responds quicklyIntelligentFluid-pressure actuator componentsHydraulic pumpFuel tank
The invention discloses a digital electric-hydraulic synchronous control system, which comprises a hydraulic actuating mechanism, a digital synchronous control mechanism for performing synchronous control on the hydraulic actuating mechanism, an electric-hydraulic power source for providing power oil for the hydraulic actuating mechanism and the digital synchronous control mechanism, and an electric-hydraulic control system for controlling the power source and the synchronous control mechanism. The hydraulic actuating mechanism is a hydrocylinder; the electric-hydraulic power source comprises an oil storage tank, a double-acting hydraulic oil pump and a driving motor; the electric-hydraulic control system comprises a detector for detecting the oil pressure of the hydraulic oil pump and the rotating speed of the motor respectively and a variable frequency speed regulator and a controller for controlling the motor; and the digital synchronous control mechanism comprises a digital synchronization valve, a digital synchronization controller and a displacement transducer for detecting the displacement of an output shaft of the hydrocylinder. The digital electric-hydraulic synchronous control system has the advantages of simple structure, simple and convenient use and operation, good use effect, energy conservation and no oil leakage, and can achieve the aims of stepless speed regulation and high-precision synchronization according to operating characteristic requirements of different types of controlled objects.
Owner:薛国光

Isolated micro-grid hybrid energy storage optimal configuration method

ActiveCN105226691AComply with hybrid energy storage configuration planning requirementsIncrease profitAc network load balancingDecompositionGenetic algorithm
The invention provides an isolated micro-grid hybrid energy storage optimal configuration method. Micro-grid power supply load unbalanced power and total loads in a micro-grid are integrally considered, influences of factors that intermittent energy and load conditions fluctuates with time in the system on isolated micro-grid hybrid energy storage capacity configuration are comprehensively considered, and the isolated micro-grid hybrid energy storage capacity optimal configuration is established; in addition, a genetic algorithm is utilized for solves isolated micro-grid hybrid energy storage capacity optimal configuration models corresponding to different splitting and decomposition modes of the power supply load unbalanced power, and an isolated micro-grid hybrid energy storage optimal scheme more according with reality is determined by selection, so that the practical isolated micro-grid hybrid energy storage configuration programming requirements are better met, the utilization rate and the service lifetime of the isolated micro-grid hybrid energy storage capacity configuration are improved, the operation economy is enhanced, the comprehensive utilization cost of the isolated micro-grid is lowered, and the isolated micro-grid hybrid energy storage optimal configuration method can be widely applied to hybrid energy storage capacity optimal configuration of the isolated micro-grids.
Owner:CHONGQING UNIV

Method and device for robust interval wind power scheduling based on consideration on wind power field current collecting line fault

The invention relates to a method and a device for robust interval wind power scheduling based on consideration on wind power field current collecting line fault. The method includes, from the points of power system dynamic response capacity and section safety, building a worst scene model with consideration on system running safety on the circumstance of wind power field current collecting line m faults; according to the worst scene model, taking the minimum wind curtailment demand as the target to optimize the model and taking the system running safety requirement on the circumstance of the worst wind power output as a constraint condition to build a robust dual-layer wind power mixed integer interval optimization model; according to a variable equivalent substitution method and a strong dual principle of linear programming, transforming the robust dual-layer wind power mixed integer interval optimization model into the problem about single-layer secondary programming, and utilizing an interior point method to solve the optimal thermal power output planned value and the maximum wind power planned interval; and finally performing wind power scheduling according to the optimal thermal power output planned value and the maximum wind power planned interval so as to achieve the robust interval wind power scheduling.
Owner:STATE GRID CORP OF CHINA +1

Power-system economic dispatching method considering power grid topology optimization

The invention discloses a power-system economic dispatching method considering power grid topology optimization. A power-system dispatching model using active power of conventional generator sets and output component states of the power grid as decision making factors is provided by incorporating the power grid topology optimization into a power-system economic dispatching model and considering the power grid topology connectivity conditions. Topological connectivity is constrained based on the minimum cutset concept in graph theory so as to judge system topological connectivity. The provided model is solved by combination of genetic algorithm and linear programming primal-dual path following interior algorithm. Conventional generator sets and power grid topology can be preset, economical efficiency of power grid operation is improved on the premise of guaranteeing safety of power grid operation, balance capacity of load power of system generation is improved, renewable energy power generation can be accepted within a larger range, abandonment of renewable energy power generation or load shedding is effectively alleviated, and technical support is provided for intelligent development for power system dispatching.
Owner:STATE GRID CORP OF CHINA +1

Multi-target synergic planning method considering charging station and distributed power supply for power distribution network

The invention relates to a multi-target synergic planning method considering a charging station and a distributed power supply for a power distribution network. The method comprises the steps of considering uncertainty of the distributed power supply, analyzing a wind light power generation output rule, and building a multi-scene distributed power supply and load model according to season and timesequence characteristic; building an electric vehicle road traffic network model, considering traffic flow distribution and traffic network layout, calculating traffic economic benefit according to traffic flow captured by an electric vehicle charging station and average waiting time of a user, and allowing the power distribution network to be coupled to the traffic network; and comprehensively considering the distributed power supply and electric vehicle charging site selection and sizing, and building a multi-target synergic planning model by planning lowest total cost and optimal network node voltage mass as an upper-layer target and minimum distributed power supply removal quantity expected value as a lower-layer target. By the method, the running economy and the electric energy quality of a power grid are improved, moreover, the traffic congestion caused by construction of the charging station is prevented, and the stability of the power system is improved.
Owner:STATE GRID CORP OF CHINA +3

Quick start method and system of combined cycle unit

The invention relates to a quick start method and system of a combined cycle unit, which mainly detect and control the PH value of the condensed water by controlling the dissolved oxygen in the water and steam of a thermodynamic system and controlling the dissolved oxygen corrosion according to the relationship among temperature, pressure and content of dissolved oxygen of water and steam, by setting the content of dissolved oxygen in the condensed water to be less than or equal to 50microgram / L and by setting the content of dissolved oxygen in the water feed to be less than or equal to 15microgram / L, and adopts the combined deoxygenization manners of condenser vacuum deoxygenization and chemical dosing deoxygenization, and optimized operation mode and maintenance mode to ensure that the oxygen content in the condensed water in the combined cycle unit reaches the standard so as to avoid oxide etch of the metal due to that the oxygen content in the condensed water of the unit is excessive. The quick start system used for the combined cycle unit comprises a condenser; the water outlet of the condenser is connected with the input end of a condensed water flow meter through a condensed water pump and a shaft-sealing cooler; one loop of the outlet end of the condensed water flow meter is communicated with a boiler of the combined cycle unit through a condensed water cut-off valve, and the other loop is connected with a water return port of the condenser through a recycle cut-off valve and a recycle control valve; and a steam outlet of the condenser is connected with a vacuum pump through an air valve. The quick start method and system have the advantages that the overall structure of the thermodynamic system is simplified and the reliability and the economical efficiency of the system are improved.
Owner:SHENZHEN GUANGQIAN ELECTRIC POWER

Circulating fluidized bed garbage incineration boiler and pollution control system with same

The invention discloses a circulating fluidized bed garbage incineration boiler and a pollution control system with the same, which relate to a garbage incineration boiler and a pollution control system with the same, and aim to solve the problems that the conventional circulating fluidized bed garbage incineration furnace difficultly discharges slag and is required to be stopped regularly to remove the slag and the economy of a garbage incineration plant is influenced. According to the scheme I, a circulating fluidized bed and double V-shaped wind distributing plates are arranged in a boiler body, the boiler body, a separator, a flue gas cooling chamber and a tail flue are communicated in sequence, an upper level low-temperature superheater, a lower level low-temperature superheater, a primary wind air preheater, a secondary wind air preheater, an upper level primary wind economizer, a lower level primary wind economizer, an upper level secondary wind economizer and a lower level secondary wind economizer are arranged in the tail flue, and the separator is communicated with the boiler body by a U-shaped valve; different from the scheme I, the scheme III is characterized in that: double inverted V-shaped wind distributing plates are adopted; different from the scheme III, the scheme V is characterized in that: an inverted V-shaped wind distributing plate is adopted; and according to the scheme II, the scheme IV and the scheme VI, a semidry reaction tower, a bag-type dust collector, an induced draft fan, a chimney, a fly ash cabin, a lime slurry preparation system, a rotary atomizer and an active carbon injecting device are added on the basis of the scheme I, the scheme III and the scheme V. The circulating fluidized bed garbage incineration boiler and the pollution control system with the same are used for incinerating garbage, and pollutant emission can be controlled.
Owner:无锡光核新能源建设有限公司

Dynamic reconstruction method considering distributed power supply and soft switch access for power distribution network

A dynamic reconstruction method considering distributed power supply and soft switch access for a power distribution network comprises the steps of building a source-load stochastic model, and performing stochastic power flow analysis on the power distribution network, wherein source-load stochastic model comprises a wind power generation system stochastic model, a solar photovoltaic power generation system stochastic model and a load stochastic model, and the stochastic power flow analysis of the power distribution network is based on a cumulant method; building an intelligent soft switch running model and a dynamic network reconstruction model, wherein the intelligent soft switch running model is expressed by capacity constraint of an intelligent soft switch converter, and the dynamic network reconstruction mathematical model comprises a target function and a constraint condition; and solving the built models by employing a genetic algorithm. The network reconstruction problem of thepower distribution network containing a distributed power supply and an intelligent soft switch is solved, a load among feeders of the power distribution network is balanced, the integral power flowdistribution of the system is improved, the overload is eliminated, the voltage level is improved, the electric energy quality and the power supply reliability are improved, the network loss is effectively reduced, and the running economy of the power distribution network is improved.
Owner:国网宁夏电力有限公司经济技术研究院

Stratified combustion on-line optimization control system of boiler coal dust and optimization method thereof

The invention discloses a stratified combustion on-line optimization control system of boiler coal dust, comprising a gas sampling system and a data processing system, wherein the gas sampling system comprises a fume sampling probe and a fume component continuous monitoring system. The invention is characterized in that the fume sampling probe comprises a first fume sampling probe arranged at an opening of an A air preheater, a second fume sampling probe arranged at an opening of a B air preheater and a third fume sampling probe arranged in a boiler chamber; the data processing system comprises an industrial computer connected with the fume component continuous monitoring system and provided with a stratified combustion on-line optimization computation module; and DCS data of the industrial computer and a generator set are connected by a data collector. The invention utilizes a support vector machine theory by the method and the method to establish an on-line optimization model to carry out automatic training and optimization so as to obtain combustion optimization condition parameters to guide operation, thereby keeping high operation safety of the boiler, improving operation economical efficiency and reducing the emission concentration and totals of pollutants.
Owner:JIANGSU FRONTIER ELECTRIC TECH +1

Electric automobile charging station charging/discharging scheduling method capable of accelerating absorption of renewable energy sources

The invention discloses an electric automobile charging station charging/discharging scheduling method capable of accelerating the absorption of renewable energy sources. The electric automobile charging station charging/discharging scheduling method comprises the following steps: (1) absorbing the renewable energy sources at maximum the day before based on power generation output of the renewable energy sources, load demanding, power demanding of an electric automobile charging station andresidual electric quantity predication informationnext day, and minimizing the power generation cost of an adjustable set to be an optimized target; determining a charging/discharging plan of the electric automobile charging station the day before and an output plan of the adjustable set the day before; and (2) aiming at the renewable energy sources, load, electric automobile demanding and a short-period predicated result of the residual electric quantity at a remaining period in the day, and taking maximized absorption of the renewable energy sources at the remaining period of the current moment as a target, rolling to revise a charging/discharging plan of the electric automobile charging station in the day before. With the adoption of the method, the renewable energy sources can be absorbed to a certain extent and regulation and control pressure of an active power distribution network is alleviated; and the total operation cost of a system is reduced and economic and efficient comprehensive utilization of resources in the active power distribution network is realized.
Owner:SOUTHEAST UNIV

High-elevation correction method for lead critical coronal voltage of 750kV transmission line

The invention discloses a high-elevation correction method for the lead critical coronal voltage of a 750kV transmission line, comprising the following steps of: (1) obtaining a test critical coronal voltage U test according to a corona loss measurement curve; (2) establishing a correction model for the critical coronal voltage of the 750kV transmission line; and (3) substituting the test critical coronal voltage U test in the step (1) to the correction model for the critical coronal voltage in the step (2) to obtain elevation correction voltage. The elevation correction method for the critical coronal voltage of the 750kV transmission line as stated in the claim 1 is characterized in that the elevation correction model for the critical coronal voltage of the 750kV transmission line is shown as follows: Ucorrection=Utest *eAH or Ucorrection=Utest / 1-BH, wherein Ucorrection is correction voltages at the same elevation; Utest is the test critical coronal voltage; H is the elevation height km of a test site; and A and B are elevation correction parameters. The elevation correction mode can be used for the elevation correction of the lead critical coronal voltage of the 750kV transmission line, thereby achieving the goals of optimizing the lead structure and the circuit design and improving the running economy of the 750kV transmission line.
Owner:NORTHWEST CHINA GRID +1

Multi-objective optimization system and multi-objective optimization method containing composite energy storage micro grid

The invention discloses a multi-objective optimization system and a multi-objective optimization method containing a composite energy storage micro grid. The multi-objective optimization system containing a composite energy storage micro grid is composed of a micro grid central controller, an energy storage controller, a photovoltaic controller, a load controller, and a communication network. According to the multi-objective optimization method containing a composite energy storage micro grid, a multi-objective optimization model is established for a grid-connected composite energy storage micro grid including photovoltaic batteries, flow batteries, lithium batteries and other energy storage devices, with the purpose of minimizing micro grid electricity purchasing cost and tie line power fluctuation. The weighting coefficient is determined based on a two-person zero-sum game method, and the model is converted into a single-objective optimization problem and solved using a linear weighted method. By adopting the multi-objective optimization system containing a composite energy storage micro grid, the utilization rate of renewable energy of the micro grid can be maximized effectively, tie line power fluctuation and distributed power supply grid-connected operation shock can be reduced, and the economical efficiency of micro grid operation can be improved.
Owner:SOUTH CHINA UNIV OF TECH

Preheating catalytic-oxidation device with burner starting for coal mine ventilation air methane

The invention provides a preheating catalytic-oxidation device with burner starting for coal mine ventilation air methane, and belongs to the technical field of ultralow-concentration methane oxidation; the device comprises a ventilation air methane gas supply system, a preheater and a reaction chamber disposed in a housing, a burner heating starting system, a gas intake system, a heat extractionsystem, and a measuring and controlling system, wherein a uniform-temperature uniform-flow bed layer and a catalytic-oxidation bed layer are orderly disposed in the reaction chamber along the gas flow direction, and hot gas generated by the burner heating starting system is delivered into the gas intake system. After the starting of heating in the reaction chamber, the ventilation air methane is fed into the preheater to be heated to a high temperature, and is oxidized into carbon dioxide and water in the catalytic-oxidation bed layer; a part of the oxidized hot gas is allowed to enter the heat extraction system for heat extraction and utilization, and the other part is allowed to enter the preheater for transferring heat to fresh ventilation air methane entering the preheater and for cooling, and then is discharged into atmosphere through a exhaust gas outlet. The invention has the advantages of compact structure, low power dissipation, simple operation, high reliability, flexible fuels, and the like.
Owner:SHANDONG UNIV OF TECH

Flue gas composite phase change dust removal and desulfurization technology and device

The invention discloses a flue gas composite phase change dust removal and desulfurization device. The device comprises a desulfurizing tower (10). The lower portion of the side wall of the desulfurizing tower (10) is connected with an inlet flue (11). The upper portion of the side wall of the desulfurizing tower (10) is connected with an outlet flue (12). A vortex phase changer (13) is arranged on the inlet flue (11) of the desulfurizing tower (10) and comprises a plurality of sets of atomization nozzles (18). The atomization nozzles (18) are symmetrically arranged on the side wall of the inlet flue (11). Openings of the atomization nozzles (18) face the interior of the inlet flue (11) and are eccentrically arranged relative to the inlet flue (11). Spraying water sprayed by the atomization nozzles (18) in the vortex phase changer (13) can enable flue gas in the inlet flue (11) to generate rotational flow. The invention further discloses a flue gas composite phase change dust removal and desulfurization technology. The composite phase change condensation principle is utilized for enabling supersaturated water vapor to be condensed on the surfaces of fine particles, and the fine particle collection efficiency of the desulfurizing tower is improved.
Owner:BEIJING CPCEP ENERGY CONSERVATION & ENVIRONMENTAL PROTECTION TECH CO LTD

Flue gas desulfurization control system of large coal-fired power plant

The invention provides a flue gas desulfuration control system for large coal-fired power plant and comprises an imaginary machine part which is a flue gas desulfuration simulation platform, a DCS control system which comprises control points arranged at in-site in a scattered way as well as working stations, monitors, printers, data servers and dual redundant optical fiber circular communication networks used for interconnection of the components; a real electricity part which is a real electricity part for flue gas desulfurization simulation platform and comprises an in-site input signal collection system, an in-site measurement and control instrument and an executing mechanism for simulation platform output signal. In addition, the real electricity part collects simulation signal and state of device coherent with in-site signal and sends into the flue gas desulfuration simulation platform through the DCS control system for performance check and control operation, and then outputted signal gets into the executing mechanism through the DCS control system and control of real device is realized. The invention is good for research and development of process, new technology and electrically controlled device of large desulfuration device, and then effectively controls carbon dioxide pollution of atmosphere and protects environment.
Owner:SHANGHAI ELECTRICGROUP CORP

Comprehensive energy station equipment type selection and capacity planning method considering various energy storage devices

The invention discloses a comprehensive energy station equipment type selection and capacity planning method considering various energy storage devices. The method comprises the following steps: inputting energy conversion and energy storage equipment parameters according to the type and energy form of to-be-selected equipment of a comprehensive energy system in a park; establishing a comprehensive energy station equipment type selection and capacity planning model considering various energy storage equipment according to the input parameters; solving by adopting a mixed integer linear programming method based on historical data of electricity, heat and cold loads, illumination intensity and wind speed in the park according to a comprehensive energy station equipment model selection and capacity planning model; and outputting a solving result which comprises an equipment type selection and capacity planning scheme, the annual comprehensive cost of the system and the annual consumptionof electricity/gas. According to the planning scheme, the requirements of multiple loads of cooling, heating and power can be met at the same time, the system operation economy is remarkably improved,the annual comprehensive cost of the comprehensive energy system can be remarkably reduced, multi-energy complementation is achieved, and the energy utilization efficiency is improved.
Owner:TIANJIN UNIV

Microgrid cluster concentrated-distributed type coordinated optimization scheduling method

The invention discloses a microgrid cluster concentrated-distributed type coordinated optimization scheduling method. The method includes the steps that a microgrid cluster two-layer optimization scheduling model is built, and the microgrid cluster global goal and local goals of microgrids are all taken into consideration, wherein a microgrid cluster scheduling center is arranged on the upper layer, and a microgrid scheduling center is arranged on the lower layer; the cluster scheduling center on the upper layer calculates generating capacity of all micro power sources according to optimization of the global goal and sends the generating capacity to the microgrid scheduling center on the lower layer, wherein the generating capacity serves as decision variables; the microgrid scheduling center corrects the generating capacity of the micro power sources according to the local goals of the microgrids; the corrected generating capacity is sent to the cluster scheduling center on the upper layer, and correction and iteration are repeated until a coordination solution with which both the upper layer and the lower layer are satisfied is achieved. According to the microgrid cluster coordinated optimization scheduling method, inconsistency of the goal of the upper layer and the goals of the lower layer is taken into consideration, and through iterative optimization and interacted correction of the cluster scheduling center and the microgrid scheduling center, the global goal and the local goals can be coordinated. The method adapts to the distributed characteristic of a microgrid cluster, and coordinated operation between the microgrids can be achieved.
Owner:SOUTHEAST UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products