Method and device for robust interval wind power scheduling based on consideration on wind power field current collecting line fault
A technology for wind farms and collecting lines, applied in the field of robust interval wind power dispatching, can solve problems such as the influence of system safety, the lack of fault tripping of the collecting lines of wind farms, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0109] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0110] The working principle of this technical solution is: in the case of large-scale wind power centralized access, the operation safety of the power system caused by the uncertainty of the multi-fault of the wind turbine collector line, a wind power system based on the minimum wind curtailment is established. A two-layer mixed-integer interval optimal scheduling model for rods. The double-level mixed integer programming problem is further transformed into a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com