Patents
Literature
Eureka-AI is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Eureka AI

4388 results about "Wind power generator" patented technology

Multifunctional automatic climbing device

The invention relates to a multifunctional automatic climbing device, particularly to an automatic climbing device which is suitable for a variable diameter fan tower barrel and can carry various working equipment. The multifunctional automatic climbing device is composed of a guide rail, an upper clamp, a lower clamp, a connecting platform and a power hydraulic cylinder. The lower clamp is fixedly connected to the bottom of the guide rail; the upper clamp is slidingly mounted on the upper part of the guide rail and can be vertically moved along the guide rail by effect of the power hydraulic cylinder; the connecting platform for connecting other working equipment is mounted on the top of the guide rail; the upper and lower clamps have two-layer structures; each layer is equipped with four fingers; and the upper clamp is installed with a control box and a hydraulic box. The multifunctional automatic climbing device can be connected with other working equipment to realize repairing and detection of a wind power generator, for example, the multifunctional automatic climbing device is connected with a lifting device to finish lifting and repairing of parts in a cabin and is connected with an annular platform to realize repairing and maintenance of outer surfaces of the tower barrel and blades. The multifunctional automatic climbing device has the characteristics of no height and region limitation, high automation level, ground remote control, and the like.
Owner:SHENYANG JIANZHU UNIVERSITY

Model prediction control method and model prediction control system for all working conditions of wind generating set

Disclosed are a model prediction control method and a model prediction control system for all working conditions of a wind generating set. The system comprises an MPC (model prediction control) device, a feedback information measurer, a wind wheel, a driving chain, a tower, a generating unit, a variable propeller driver and a converter. The feedback information measurer is used for detecting status variables of the wind wheel, the driving chain, the tower and the generating unit and transmitting detecting results to the MPC device, the MPC device is used for computing targets of the blade pitch angle and the generator torque, and the variable propeller driver and the converter are used for adjusting the blade pitch angle and the wind generator torque. The method is used for computing control increment by means of a variable propeller control prediction model and a torque control prediction model, takes the status variables including driving chain torsional displacement, driving chain torsional speed, blade plane external first-order flap displacement, blade plane external first-order flap speed, tower front-back first-order swing displacement, tower front-back first-order swing speed, mechanical loads of the unit and the like, and two prediction models can be automatically switched in different working conditions, so that the wind generating set can be operated in all working conditions.
Owner:SHENYANG HUAREN WIND POWER TECH

Active and reactive coordination control method for permanent-magnet direct-driven wind turbines in low-voltage ride-through process

Enclosed is an active and reactive coordination control method for permanent-magnet direct-driven wind turbines in the low-voltage ride-through process. Two different control strategies are employed for a grid side converter according to amplitude change of power grid voltage: when the power grid voltage is in a normal state, the grid side converter is in an active-priority maximum power tracing control mode so that the wind turbines capture wind energy to the maximum extent; when the power grid voltage is beyond the normal range, the grid side converter is in an active priority control mode so that the dynamic reactive current which is injected into an electricity system meets the requirements of grid combining. An engine side converter is in a direct-current voltage control mode based on rotor energy storage, power unbalance of the direct-current side of the engine side converter is relieved and the direct-current voltage is stabilized by utilizing the self rotating speed of the permanent-magnet direct-driven wind turbines and the change of the kinetic energy. The active and reactive coordination control for the wind turbines before or after the sudden change of the power grid voltage is realized according to the amplitude change of the power grid voltage, the fluctuation of the direct-current bus voltage is restrained by releasing or storing the rotor kinetic energy, so that the low-voltage ride-through capability of the permanent-magnet direct-driven wind turbines is improved, reactive power support is rapidly and accurately provided for the power grid, and certain support is given to restoration of the power grid voltage.
Owner:NORTH CHINA ELECTRIC POWER UNIV (BAODING)

Microgrid multi-energy joint optimal scheduling method

The invention relates to a microgrid multi-energy joint optimal scheduling method. The method includes: step 1, on the basis of force application conditions of energy supply equipment and operating states of energy storage equipment in different scenes, constructing a physical model of a multi-energy system; step 2, establishing unit mathematical models, including a wind power generator model, a photovoltaic power generation model, a micro-gas turbine model, a fuel cell model and an energy storage model, of the microgrid multi-energy system; step 3, in order to realize lowest comprehensive cost in system operation, constructing a microgrid multi-energy optimal scheduling model by taking DG operation constraints, system safety constraints and multi-energy coupling characteristics into comprehensive consideration; step 4, on the basis of reversed order dynamic planning, solving the microgrid multi-energy optimal scheduling model to obtain a microgrid multi-energy joint optimal operatingstrategy. By the microgrid multi-energy joint optimal scheduling method, operating demands in different scenes can be met, electricity-thermal coordinated optimal scheduling schemes are provided for operating of a comprehensive energy microgrid in different scenes, and high integral operating efficiency and high economic benefits are realized.
Owner:NANJING UNIV OF POSTS & TELECOMM

Simulation modeling method for equivalent simulation of doubly-fed wind-power generator set

The invention provides a simulation modeling method for equivalent simulation of a doubly-fed wind-power generator set. A frequency converter of the doubly-fed wind-power generator set is simulated by controlled source. The simulation modeling method includes the following steps of (1), building a model of a circuit of the doubly-fed wind-power generator set; (2) building an equivalent model of the doubly-fed wind-power generator set; (3) building a grid-integration testing system of the doubly-fed wind-power generator set; and (4) setting up a testing system for multiple wind-power generator sets, wherein in the step (2), the equivalent model of the doubly-fed wind-power generator set is built on the basis of characteristics of a controlled voltage source of an alternating-current side and a controlled current source of a direct-current side of the frequency converter of the doubly-fed wind-power generator set. By the aid of the simulation modeling method, transient-state characteristics of the doubly-fed wind-power generator set can be simulated accurately, and different characteristics and mutual affection among multiple wind-power generator sets can be computed. High-frequency on and off of fully-controlled devices cannot be taken into consideration, and simulation efficiency is improved greatly. The more the wind-power generator sets are simulated, the more evidently the efficiency is improved, simulation step-length can be increased on the premise of guaranteeing accuracy, and simulation efficiency is improved greatly.
Owner:WIND POWER TECH CENT OF GANSU ELECTRIC POWER +1

Automated, self-contained, home sewage treatment system

A small and cost effective sewage treatment system intended for unattended use in individual homes, small industries or businesses in locations where a central sewage treatment plant is not available. The sewage treatment system comprises a conventional septic tank which drains into a smaller aerated holding tank, a pump to transfer effluent from the holding tank into a disinfecting chamber, a regenerative heat exchanger used to raise the temperature of the effluent while being aerated in the holding tank, means for pumping the effluent at a controlled rate through a microwave field, and a conventional drain field used to release the disinfected water into the surrounding soil. Operation of this system is fully regulated by a micro-controller, thereby eliminating the need for human intervention during normal use. This invention also incorporates electronic means for detecting various fault conditions which may impede effective disinfection, means for diagnosing what part of the system is at fault, means for reporting the fault and diagnose to a central municipal location via a telephone or transponder system, an emergency battery backup system, and means for reverting system operation to that of a conventional septic tank and drain field system is case of a total power failure (both A/C and DIC) or water pump failure. Conventional household alternating current or a battery recharged via a wind generator or solar cells may power the sewage treatment system.
Owner:BARRERAS SR FRANCISCO J +1

Wind turbine set gearbox remote online state monitoring and life assessment method

The invention provides a wind turbine set gearbox remote online state monitoring and life assessment method. The method comprises the following steps: (1) a remote center computer collects a real-time operation parameter, temperature data and vibration data of each wind turbine through SCADA; (2) through analyzing the characteristic values of signal time domain and frequency domain, whether a vibration sensor has a fault or not is diagnosed; (3) the data is subjected to normalization process, a difference between data is reduced, and the diagnosis precision is raised; (4) when the fault of a wind generator set gearbox is diagnosed, different filtering modes are employed for different algorithms to extract the corresponding characteristic; (5) the collected data is subjected to characteristic extraction; (6) the fault diagnosis is carried out to provide the fact that whether the fault exists or not and the degree of the fault; (7) the residual life of the failed gearbox is estimated through a gray theory model, and an autoregression model is established for the residual error of the predication result to raise the predication precision. According to the method, the real-time estimation of the residual life is realized, and a basis is provided for the planned maintenance of the wind turbine set.
Owner:BEIHANG UNIV +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products