Energy trading system

The power trading system addresses contract fulfillment issues by imposing higher penalties during emergencies and calculating credibility scores, ensuring reliable power trading and balance.

JP7559729B2Active Publication Date: 2024-10-02TOYOTA JIDOSHA KK
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021163488
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-10-04
Publication Date
2024-10-02
Estimated Expiration
2041-10-04

AI Technical Summary

Technical Problem

Existing power trading systems face challenges in ensuring the fulfillment of electricity contracts, leading to imbalances in power supply and demand, particularly during emergencies, without appropriate penalties for non-compliance.

Method used

A power trading system with a management device that imposes higher penalties for contract non-compliance during emergencies, calculates participant achievement levels based on transaction performance, and transitions markets between normal and emergency modes to ensure reliable contract fulfillment.

Benefits of technology

The system effectively encourages participants to fulfill their contracts by imposing higher penalties during emergencies, maintaining power supply and demand balance, and promoting reliable trading through credibility scoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007559729000001
    Figure 0007559729000001
  • Figure 0007559729000002
    Figure 0007559729000002
  • Figure 0007559729000003
    Figure 0007559729000003
Patent Text Reader

Abstract

To provide a peer-to-peer (P2P) electric power transaction system that can prompt participants to reliably implement contracts by imposing an appropriate penalty on a participant who does not implement a contract in an electric power transaction.SOLUTION: In an electric power transaction system, a P2P electric power transaction market includes a first individual market 12A and a second individual market 12B. When an electric power system is in a normal state, the first individual market implements transactions of electric power between a plurality of electric power resources. In an emergency state where electric power supply from the electric power system is stopped, the second individual market implements the transaction of electric power between a plurality of electric power resources. A management device manages the transactions of electric power among the plurality of electric power resources, and is configured to impose a penalty on a participant who does not implement a contract for a transaction of electric power in each of the first and second individual markets. The management device of a micro grid sets the penalty in the second individual market to a higher value than the penalty in the first individual market.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an energy trading system. [Background technology]

[0002] Japanese Patent Publication No. 2020-9334 (Patent Document 1) discloses an energy trading platform that allows each member to buy and sell electricity, including solar power generation electricity. In Patent Document 1, the computers owned by each member are connected on an equal basis via a computer network. The amount of sold or purchased electricity sold or purchased via the electricity network is verified and approved based on blockchain technology, then compiled into one block in a ledger supplied to all members, and managed based on blockchain technology. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-9334 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the above-mentioned power platform, each member is equipped with a solar power generation system and a storage battery, and can trade surplus electricity stored in the storage battery with other members via a computer network.

[0005] However, if the electricity transactions agreed upon between the members are not fulfilled, there is a concern that it will be difficult for the members to procure electricity according to the demand planned in advance. There is also a concern that this may affect the balance of supply and demand of electricity in the electricity network that transmits and distributes electricity. Therefore, a mechanism is needed that can encourage participants who trade electricity on the electricity platform to reliably fulfill their agreements and, in turn, to create electricity bidding plans with reliably fulfilled agreements.

[0006] The present disclosure has been made to solve the above-mentioned problems, and its purpose is to promote reliable fulfillment of contracts in a P2P energy trading system by imposing appropriate penalties on participants who do not fulfill their contracts in electricity trading. [Means for solving the problem]

[0007] An energy trading system according to an aspect of the present disclosure trades electricity in a distribution network connected to an electric power system. A plurality of electric power resources are connected to the distribution network. Each of the plurality of electric power resources is configured to be able to perform at least one of transferring electricity to and from other electric power resources through the distribution network and transferring electricity directly to and from other electric power resources through charging and discharging equipment owned by the resource. The energy trading system includes an energy trading market that performs P2P (Peer to Peer) electricity trading, and a management device that manages electricity trading in the plurality of electric power resources. The energy trading market includes a first individual market and a second individual market. The first individual market trades electricity between the plurality of electric power resources during normal operation of the electric power system. The second individual market trades electricity between the plurality of electric power resources during emergency operation in which power supply from the electric power system is stopped. The management device is configured to impose a penalty on a participant who does not fulfill a contract in electricity trading in each of the first and second individual markets. The management device sets the penalty in the second individual market to a value higher than the penalty in the first individual market.

[0008] According to the above configuration, it is possible to impose an appropriate penalty set from the viewpoint of maintaining the balance of power supply and demand in the power distribution network on participants who do not fulfill their contracts in power trading during both normal and emergency times in the power system. This makes it possible to encourage participants to reliably fulfill their contracts, thereby reducing the impact on the balance of power supply and demand in the power distribution network.

[0009] Preferably, when a power outage is detected in the power grid, the energy trading market transitions from the first individual market to the second individual market and notifies participants of a change in penalties associated with the transition to the second individual market.

[0010] This will encourage participants who are planning to trade electricity in the second individual market in the event of an emergency in the power system to ensure that their contracts are fulfilled and to create bidding plans that ensure fulfillment.

[0011] Preferably, the management device is configured to calculate a degree of achievement based on the trading performance of the participants in each of the first and second individual markets, and to increase the penalty imposed on the participants as the calculated degree of achievement decreases. The management device sets the penalty in the second individual market to a higher value than the penalty in the first individual market for the same degree of achievement.

[0012] According to this system, since the penalties are set according to the achievement level based on the trading performance of the participants, it is possible to impose appropriate penalties on the participants. Furthermore, since the penalties imposed in the event of a power grid emergency are higher than those imposed in the event of normal power grid conditions, it is possible to encourage participants to reliably fulfill their contracts.

[0013] Preferably, the management device calculates the achievement level of the participant based on the amount of energy that the participant should trade in accordance with the agreement and the amount of energy that the participant has traded.

[0014] This makes it possible to accurately evaluate the achievement level of a participant based on the actual value of the amount of energy traded by the participant, and therefore to impose an appropriate penalty on the participant.

[0015] Preferably, the management device calculates the achievement level of the participant based on the buying and selling price of the amount of electricity traded by the participant.

[0016] According to this, the buying and selling price of the traded energy reflects the urgency of the demand for the power resource, so the higher the buying and selling price of the energy, the more it is judged that the power resource is able to cope with the increase in the power demand, and the higher the achievement level of the participant is regarded as. Therefore, it is possible to accurately evaluate the achievement level of the participant.

[0017] Preferably, the management device calculates the seller's achievement level based on the ratio of renewable electricity in the amount of electricity traded by the participant.

[0018] According to this, the higher the ratio of renewable electricity in the amount of electricity traded by a participant, the greater the contribution to stable energy supply and reduced environmental impact is judged to be, and the higher the participant's achievement level is deemed to be. Therefore, it is possible to accurately evaluate the participant's achievement level.

[0019] Preferably, the management device sets a penalty in trading of electricity exchanged through the power distribution network to a value higher than a penalty in trading of electricity exchanged through the charging / discharging facility in each of the first and second individual markets.

[0020] When trading electricity through the distribution grid, it is expected that non-fulfillment of contracts will have a greater impact on the electricity supply and demand balance in the distribution grid than when electricity is traded directly through charging and discharging equipment within the power resource. Therefore, by setting the penalty to a high value, participants can be encouraged to ensure that their contracts are fulfilled.

[0021] Preferably, the management device is configured to increase the penalty imposed on the seller who does not fulfill the contract as the tightness of electricity among the buyers increases in each of the first and second individual markets, and the management device sets the penalty in the second individual market to a higher value than the penalty in the first individual market for the same tightness.

[0022] According to this, when the demand for electricity in the power resource is highly urgent, the penalty can be set to a high value to request the other party in the electricity transaction to reliably fulfill the contract. Furthermore, in the event of an emergency in the power system, the power supply from the power system is stopped, and the power resource must procure the required amount of electricity exclusively from other power resources. Therefore, by setting the penalty to a higher value as the power tightness increases, it is possible to reliably procure electricity.

[0023] Preferably, the management device is configured to output a request to the energy trading market via the communication network to transition from the first individual market to the second individual market when a power outage in the power system is detected. The energy trading market is configured to disable the first individual market and enable the second individual market in response to the request from the management device. When communication with the energy trading market cannot be established, the management device opens a third individual market having the same functions as the second individual market, independent from the energy trading market, and manages electricity trading in the third individual market.

[0024] This makes it possible to avoid a situation in which, in the event of an emergency in the power system, power trading between power resources becomes impossible due to a communication abnormality between the power trading market and the management device.

[0025] Preferably, the management device includes a power conditioning resource connected to the power grid. When an amount of power supplied to the power grid becomes insufficient in an emergency of the power system, the management device controls the power conditioning resource to supply power to the power grid.

[0026] This makes it possible to prevent imbalances in the supply and demand of electricity in the power distribution network during emergencies in the power system.

[0027] Preferably, the management device is configured to calculate an index representing a creditworthiness of a participant in trading electricity in each of the first and second individual markets, and generate the participant information using the calculated index. The management device decreases the index as the penalty imposed on the participant increases.

[0028] According to this, a power resource can make a contract by referring to the creditworthiness of the power resource in addition to the bidding conditions of other power resources. Therefore, it is possible to promote power trading between highly creditworthy power resources, and as a result, it is possible to reduce contract non-fulfillment.

[0029] An energy trading system according to another aspect of the present disclosure trades electricity in a distribution network connected to an electric power system. A plurality of power resources are connected to the distribution network, and each of the plurality of power resources is configured to be able to perform at least one of transferring electricity to and from other power resources through the distribution network and transferring electricity in series with other power resources through a charging / discharging facility owned by the resource. The energy trading system includes an energy trading market that performs P2P (Peer to Peer) electricity trading, and a management device that manages electricity trading in the plurality of facilities. The management device is configured to impose a penalty on a participant who does not fulfill a contract in electricity trading in the energy trading market, and to calculate, for each participant, an index representing the creditworthiness of the participant in electricity trading based on the penalty imposed on the participant. The management device lowers the index as the penalty imposed on the participant increases.

[0030] According to the above configuration, the creditworthiness of participants in energy trading is evaluated based on the penalty imposed on participants who do not fulfill their contracts, so that a power resource can make a contract by referring to the creditworthiness of the power resource in addition to the bidding conditions of other power resources. Therefore, it is possible to promote power trading between highly creditworthy power resources, and as a result, it is possible to reduce non-fulfillment of contracts. Effect of the Invention

[0031] According to the present disclosure, in a P2P energy trading system, by imposing an appropriate penalty on a participant who does not fulfill a contract in an energy trading, it is possible to promote reliable fulfillment of the contract. [Brief description of the drawings]

[0032] [Figure 1] 1 is a diagram illustrating a schematic configuration example of a power transmission and distribution system. [Diagram 2] 1 is a diagram illustrating an outline of a configuration of an energy trading system according to an embodiment of the present invention. [Diagram 3] 1 is a diagram illustrating a schematic configuration of an energy trading system according to an embodiment of the present invention. [Figure 4] 1 is a diagram illustrating an overall configuration of an energy trading system according to an embodiment of the present invention. [Diagram 5] 13 is a flowchart showing the procedure of a process for shifting from a normal market to an emergency market. [Figure 6] 13 is a flowchart showing the procedure of a process for shifting from a normal market to an emergency market. [Figure 7] FIG. 11 is a diagram for explaining an example of a method for calculating a degree of achievement. [Figure 8] FIG. 13 is a diagram illustrating a relationship between the degree of achievement and a penalty. [Figure 9] FIG. 13 is a diagram illustrating a relationship between a buyer's power tightness and a penalty. [Figure 10] FIG. 10 is a diagram illustrating a relationship between a credit score of a power resource and a penalty. [Figure 11]FIG. 11 is a diagram showing an example of participant information. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0033] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference characters and the description thereof will not be repeated.

[0034] <Configuration of power transmission and distribution system> FIG. 1 is a diagram illustrating an example of the configuration of an electricity transmission and distribution system to which an energy trading system according to an embodiment is applied.

[0035] Referring to FIG. 1, the microgrid MG includes a power distribution network 2 connected to a power system 1, and a plurality of power resources 4 connected to the power distribution network 2. In the microgrid MG, the plurality of power resources 4 are connected to the power system as one aggregate. FIG. 1 shows an example configuration in which two microgrids MG1 and MG2 are connected to the power system 1 via a switch 3. In the following description, the microgrids MG1 and MG2 will be collectively referred to as "microgrid MG."

[0036] The power resource 4 includes distributed power sources and consumers. The distributed power sources are small-scale power generation facilities, and include power generation facilities using fossil fuels such as gas engines and gas turbines, power generation facilities using renewable energy such as solar power generation, wind power generation, and biomass power generation, power generation facilities using hydrogen such as fuel cells, and power storage devices such as storage batteries. The storage batteries can include storage batteries mounted on the mobile object 6. The mobile object 6 is equipped with a storage battery that can be charged from the outside and discharged to the outside. The mobile object is, for example, an electric vehicle, a hybrid vehicle, a plug-in hybrid vehicle, or an autonomous vehicle that can transport goods without a driver.

[0037] The power resource 4 further includes a prosumer. A prosumer is a consumer that owns a power generation facility and a power storage device that stores the power generated by the power generation facility, and is configured to store the power generated by the power generation facility in the power storage device and supply surplus power to other power resources.

[0038] In Fig. 1, charging / discharging equipment 5 is connected to the power distribution network 2, and by connecting a mobile object 6 to the charging / discharging equipment 5, the storage battery of the mobile object 6 can be charged / discharged. Furthermore, since the charging / discharging equipment 5 can also be installed in the facility of the power resource 4, the exchange of power between the mobile object 6 and the power resource 4 can be performed via the power distribution network 2 or directly via the charging / discharging equipment 5 installed in the power resource 4. Therefore, it becomes possible to use the mobile object 6 as a power resource.

[0039] The microgrid MG includes a management device 7 for adjusting the balance between power supply and demand in the microgrid MG. The management device 7 controls the output of each distributed power source so as to balance the power demand and supply. By balancing the power supply and demand, it is possible to suppress fluctuations in the voltage and frequency of the power transmitted through the power distribution network 2. In the example of FIG. 1, the management device 7 of the microgrid MG1 includes a storage battery 8 and a generator 9 such as a gas engine as distributed power sources capable of controlling the amount of power supplied to the power distribution network 2. The storage battery 8 and the generator 9 correspond to an example of a "power adjustment resource."

[0040] The microgrid MG can be connected to the power system 1 or another microgrid MG during normal operation of the power system 1. Furthermore, the microgrid MG can be operated independently of the power system 1. For example, during an emergency in which power supply from the power system 1 is stopped due to a disaster or the like, the switch 3 is opened to disconnect the microgrid MG from the power system 1. Until the power system 1 is restored, power can be continuously supplied to the load in the microgrid MG by transmitting and receiving power between the power resources through the power distribution network 2. Alternatively, as described above, power can also be continuously supplied to the load by directly transmitting and receiving power between the mobile object 6 and another power resource via the charging and discharging facility 5.

[0041] In the microgrid MG, the introduction of P2P (Peer to Peer) energy trading, in which electricity is traded directly between a plurality of power resources 4, is being considered. Fig. 2 shows a system for carrying out P2P energy trading between a plurality of power resources 4.

[0042] 2, the P2P energy trading system in the microgrid MG includes a plurality of bidding agents 15. The plurality of bidding agents 15 includes a bidding agent for the power resource 4 owned by the microgrid MG1 and a bidding agent for the power resource 4 owned by the microgrid MG2.

[0043] The multiple bidding agents 15 include a "power generation agent" that manages bidding and agreements of distributed power sources, a "consumer agent" that manages bidding and agreements of consumers, a "prosumer agent" that manages bidding and agreements of prosumers, and a "mobile agent" that manages bidding and agreements of mobile entities 6. Each bidding agent 15 is capable of exchanging information with the P2P energy trading market 10 through a communication network. Each power resource 4 makes a bid via its assigned bidding agent.

[0044] When P2P trading of electricity is performed in the microgrid MG, the market can be categorized into a "general market" and an "individual market." The "general market" is a market in which an agreement is made for the supply of electricity from an electricity seller to a buyer through the power grid 1. In the power transmission and distribution system shown in FIG. 1, it is assumed that the power resource 4 in the microgrid MG1 is the seller and the power resource 4 in the microgrid MG2 is the buyer, and electricity is traded through the power grid 1, or that the power resource 4 in the microgrid MG2 is the seller and the power resource 4 in the microgrid MG1 is the buyer, and electricity is traded through the power grid 1.

[0045] An "individual market" is a market (hereinafter also referred to as an "MG market") that settles the transactions of electricity exchanged between power resources 4 in individual microgrids MG. In FIG. 2, the P2P energy trading market 10 has an "MG1 market 12" that is an individual market that settles the transactions of electricity exchanged in microgrid MG1, and an "MG2 market 13" that is an individual market that settles the transactions of electricity exchanged in microgrid MG2.

[0046] The MG market is managed by an MG management agent. The MG management agent can be configured by, for example, a server managed by the management device 7 of the microgrid MG. The MG management agent corresponds to one embodiment of the "management device".

[0047] The MG1 market 12 is managed by an MG1 management agent 16. The MG1 management agent 16 issues identification information (market ID) for identifying the MG1 market 12 and a password for logging in to the MG1 market 12, and assigns them to the MG1 market 12. The bidding agent 15 of the power resource 4 connected to the microgrid MG1 is notified of the market ID and password of the MG1 market 12. This allows only the power resource 4 connected to the microgrid MG1 to bid on the MG1 market 12 through the bidding agent 15.

[0048] The MG2 market 13 is managed by an MG2 management agent 18. The MG2 management agent 18 issues a market ID for identifying the MG2 market 13 and a password for logging in to the MG2 market 13, and assigns them to the MG2 market 13. The bidding agent 15 of the power resource 4 connected to the microgrid MG2 is notified of the market ID and password of the MG2 market 13. This allows only the power resource 4 connected to the microgrid MG2 to bid on the MG2 market 13 through the bidding agent 15.

[0049] In the P2P energy trading system shown in FIG. 2, during normal operation of the power grid 1, each power resource 4 of the microgrid MG1 can trade electricity in the general market 11 or in the MG1 market 12 through a bidding agent 15.

[0050] Specifically, in the general market 11, bids are received from an unspecified number of power resources 4 through the respective bidding agents 15, and a contract is made for those where the bidding conditions of the seller and the buyer match. In detail, for each unit time slot, multiple buyers and sellers bid a pair of price and amount of power. A "unit time slot" refers to one of multiple time slots obtained by dividing the time during which electricity is traded into a predetermined length of time set in the P2P electricity trading market. Currently, in Japan, 24 hours are divided into 48 segments, so the length of one unit time slot is 30 minutes. Electricity trading is carried out for each amount of power transmitted within a unit time slot (power x length of unit time slot).

[0051] In the individual market, one MG market is formed for multiple power resources 4 connected to one microgrid MG. In the MG1 market 12, one power resource 4 in the microgrid MG1 makes a bid to buy or sell for each unit time period, and other power resources 4 in the microgrid MG1 make bids to buy or sell for each unit time period, and the bid that matches the conditions is contracted. Note that power transactions between power resources 4 in the microgrid MG1 are realized by at least one of transferring power through the power distribution network 2 and transferring power directly through charging / discharging facilities in the power resources 4.

[0052] In contrast, in an emergency in which power supply from the power grid 1 is stopped, power cannot be traded in the general market 11, and power is traded only in the MG1 market 12. In the microgrid MG1, since it is disconnected from the power grid 1, consumers need to procure power from other power resources 4, such as distributed power sources or mobile objects. Therefore, consumers submit buy bids to the MG1 market 12. The MG1 market 12 accepts buy bids from distributed power sources or mobile objects, and contracts are made for bids that meet the conditions.

[0053] In order to balance the supply and demand of electricity in the microgrid MG during an emergency in the power system 1, it is necessary to ensure that the agreed-upon electricity transactions are carried out. If the seller cannot procure electricity from the contracted consumer, the consumer's demand cannot be met, and the balance of electricity supply and demand may be lost. The loss of balance of electricity supply and demand may cause the system frequency to fluctuate, leading to the shutdown of power generation facilities.

[0054] Thus, in an emergency in the power system 1, reliable fulfillment of contracts in power trading is required even more than in normal times in the power system 1 in order to maintain the balance between power supply and demand. This embodiment provides a mechanism for encouraging participants trading power in the MG market to ensure reliable fulfillment of contracts, and in turn to create bidding plans with high fulfillment reliability. A "participant" is someone who is qualified to trade power in the MG market, and corresponds to a plurality of power resources 4 connected to the microgrid MG.

[0055] Specifically, as shown in FIG. 2, each of the MG markets 12 and 13 is provided with a "normal market" and an "emergency market." In the MG1 market 12, the normal market 12A is a market that settles the trading of electricity in the microgrid MG1 during normal times of the power system 1. The emergency market 12B is a market that settles the trading of electricity in the microgrid MG1 during an emergency of the power system 1. The emergency market 12B can be assigned a market ID and a password different from those of the normal market 12A. The normal market 12A corresponds to an embodiment of the "first individual market," and the emergency market 12B corresponds to an embodiment of the "second individual market."

[0056] The P2P energy trading market 10 enables the normal market 12A and disables the emergency market 12B when the power system 1 is in a normal state. On the other hand, the P2P energy trading market 10 disables the normal market 12A and enables the emergency market 12B when the power system 1 is in an emergency. The transition from the normal market 12A to the emergency market 12B is performed in response to a request from the MG management agent 16, as described below.

[0057] Fig. 2 shows the P2P energy trading market 10 in normal times of the power system 1. In normal times of the power system 1, a general market 11 and normal markets 12A, 13A in the MG markets 12, 13 are valid. In contrast, Fig. 3 shows the P2P energy trading market 10 in an emergency of the power system 1. In an emergency of the power system 1, emergency markets 12B, 13B in the MG markets 12, 13 are valid.

[0058] In the event of an emergency in the power system 1, the P2P energy trading market 10 is configured to accept and contract only bids to the emergency market 12B for the multiple power resources 4 connected to the microgrid MG1, and not accept bids to markets other than the emergency market 12B, and / or not contract bids to markets other than the emergency market 12B. Similarly, in the event of an emergency in the power system 1, the P2P energy trading market 10 is configured to accept and contract only bids to the emergency market 13B for the multiple power resources 4 connected to the microgrid MG2, and not accept bids to markets other than the emergency market 13B, and / or not contract bids to markets other than the emergency market 13B. The P2P energy trading market 10 can limit the emergency markets in which each power resource 4 can make bids and contracts, based on information on which microgrid MG each power resource 4 is connected to.

[0059] In the MG1 market 12, the normal use market 12A and the emergency use market 12B have different rules for P2P trading of electricity. The main difference between the two markets is the penalty imposed on participants who do not fulfill their contracts. In the emergency use market 12B, the penalty imposed on participants who do not fulfill their contracts is set to a higher value compared to the normal use market 12A. In the event of an emergency in the power system 1, participants are required to fulfill their contracts reliably by imposing higher penalties. Furthermore, participants are required to create bidding plans that allow them to make bids with certainty of fulfillment.

[0060] <Electricity trading system configuration> FIG. 4 is a diagram illustrating a schematic overall configuration of an energy trading system according to the present embodiment. As illustrated in FIG. 4, the energy trading system includes a P2P energy trading market 10, a plurality of bidding agents 15, and an MG1 management agent 16. The P2P energy trading market 10, the plurality of bidding agents 15, and the MG1 management agent 16 are communicatively connected via a communication network NW. The plurality of bidding agents 15 illustrated in FIG. 4 each manages bidding and contracting of a plurality of power resources 4 in the microgrid MG1. In FIG. 4, the power resources 4, the bidding agent 15, and the MG2 management agent 18 in the microgrid MG2 are omitted from illustration.

[0061] The P2P energy trading market 10 is an information processing device that executes P2P trading of electricity. The P2P energy trading market 10 has a processor 20, a memory 22, and a communication interface (I / F) 24. The processor 20 is, for example, a CPU (Central Processing Unit) and is configured to execute a predetermined arithmetic process described in a program. This arithmetic process includes the acceptance and contract of bids by the bidding agent 15. The memory 22 includes a ROM (Read Only Memory) and a RAM (Random Access Memory). The ROM stores the program executed by the processor 20. The RAM temporarily stores data generated by the execution of the program in the processor and data input via the communication I / F 24. The RAM also functions as a temporary data memory used as a working area.

[0062] The communication I / F 24 is configured to be capable of bidirectional communication with external devices (such as the bidding agent 15 and the MG management agents 16 and 18) of the P2P energy trading market 10 via the communication network NW. The P2P energy trading market 10 may be configured using a computer device provided by the operator of the P2P energy trading market 10, or may be configured using cloud computing.

[0063] The bidding agent 15 is an information processing device that manages bidding and agreements for the corresponding power resource 4. The bidding agent 15 includes a processor 30, a memory 32, and a communication I / F 34. The processor 30 is, for example, a CPU, and is configured to execute a predetermined arithmetic process described in a program. This arithmetic process includes bidding for power trading in the P2P power trading market. The memory 32 includes a ROM and a RAM. The ROM stores the program executed by the processor 30. The RAM temporarily stores data generated by the execution of the program in the processor 30 and data input via the communication I / F 34. The RAM also functions as a temporary data memory used as a working area.

[0064] The communication I / F 34 is configured to enable bidirectional communication with external devices (such as the P2P energy trading market 10 and the MG management agent 16) of the bidding agent 15 via the communication network NW. The bidding agent 15 may be configured using a computer device provided in the power resource, or may be configured using cloud computing.

[0065] The MG1 management agent 16 is an information processing device that manages electricity trading in the MG1 market 12. The MG1 management agent 16 includes a processing device 40 and a communication I / F 46. The processing device 40 includes a processor 42 and a memory 44. The processor 42 is, for example, a CPU, and is configured to execute a predetermined arithmetic process described in a program. This arithmetic process includes a request for switching to the emergency market 12B to the P2P energy trading market 10.

[0066] The memory 44 includes a ROM and a RAM. The ROM stores the programs executed by the processor 42. The RAM temporarily stores data generated by the execution of the programs in the processor 42 and data input via the communication I / F 46. The RAM also functions as a temporary data memory used as a working area.

[0067] The communication I / F 46 is configured to enable two-way communication with external devices (such as the P2P power trading market 10 and the bidding agent 15, etc.) of the MG1 management agent 16 via the communication network NW. The MG1 management agent 16 may be configured using a computer device provided in the management device 7 of the microgrid MG1, or may be configured using cloud computing.

[0068] <Migration process in the MG market> Next, with reference to FIGS. 5 and 6, the procedure of the process of migrating from the normal market 12A to the emergency market 12B in the MG1 market 12 will be described.

[0069] FIG. 5 is a flowchart showing the procedure of the process of migrating from the normal market 12A to the emergency market 12B. In the figure, the processes executed by the processing device 40 of the MG1 management agent 16 are shown on the left side, the processes executed by the processor 20 of the P2P power trading market 10 are shown in the center, and the processes executed by the processor 30 of the bidding agent 15 are shown on the right side. Each step is realized by software processing by the processing device 40 or the processors 30, 42, but may also be realized by hardware such as LSI (Large Scale Integration) mounted on the processing device 40 or the processors 30, 42.

[0070] The MG1 management agent 16 first determines in step (hereinafter simply referred to as step S) 01 whether a power outage of the power grid 1 has occurred. In S01, for example, the voltage of the power grid 1 is detected in the management device 7 of the microgrid MG1, and when the detected value is less than a predetermined threshold value, a power outage of the power grid 1 can be detected.

[0071] When a power outage of the power grid 1 is detected (when the determination in S01 is YES), the MG1 management agent 16 outputs a request for migration from the normal market 12A to the emergency market 12B in the MG1 market 12 to the P2P power trading market 10 via the communication network NW in S02.

[0072] In the P2P energy trading market 10, during normal times when no power outage occurs in the power grid 1, the normal market 12A is enabled in the MG1 market 12 and the emergency market 12B is disabled in S11. The P2P energy trading market 10 determines whether or not a request to switch to the emergency market 12B has been received from the MG1 management agent 16 in S12. If no request has been received, the process returns to S11 and the normal market 12A continues to be enabled.

[0073] When a request is received from the MG1 management agent 16 (YES in S12), the P2P energy trading market 10 proceeds to S13, where it transitions the MG1 market 12 from the normal market 12A to the emergency market 12B by disabling the normal market 12A and enabling the emergency market 12B in the MG1 market 12.

[0074] Furthermore, the P2P energy trading market 10 transmits information about the energy trading in the emergency market 12B to the bidding agent 15 that can bid in the MG1 market 12 via the communication network NW at S14. The information about the energy trading includes the market ID and password of the emergency market 12B, and the rules for the energy trading in the emergency market 12B. The information about the energy trading includes information about penalties.

[0075] After the MG1 market 12 transitions to the emergency market 12B, the P2P energy trading market 10 accepts and executes bids for only the power resources 4 connected to the microgrid MG1 in the emergency market 12B. That is, the P2P energy trading market 10 is configured not to accept and / or execute bids for the power resources 4 connected to other microgrids MG in the emergency market 12B.

[0076] During normal times in the power system 1, the bidding agent 15 submits a bid to sell or buy electricity to the general market 11 or the normal use market 12A of the MG1 market 12 by S21 (see FIG. 2). As described above, the bidding agent 15 submits a bid to buy or sell electricity for each unit time period. In each of the general market 11 and the normal use market 12A, a bid that meets the conditions is concluded.

[0077] In S22, the bidding agent 15 determines whether or not information regarding electricity trading in the emergency market 12B has been received from the P2P electricity trading market 10. If the information has not been received (NO in S22), the process returns to S21 and the bidding agent 15 submits a bid to the general market 11 or the normal market 12A.

[0078] On the other hand, when information on electricity trading in the emergency market 12B is received (NO in S22), the bidding agent 15 logs into the emergency market 12B using the market ID and password included in the received information. Then, in the emergency market 12B, the bidding agent 15 makes a bid to buy or sell for each unit time slot, and a bid that meets the conditions is contracted.

[0079] According to the flowchart shown in Fig. 5, when a power outage occurs in the power grid 1, the MG1 market 12 in the P2P energy trading market 10 transitions from a normal market 12A to an emergency market 12B. The bidding agents 15 of the power resources 4 connected to the microgrid MG1 make bids and enter into contracts in the emergency market 12B in accordance with the rules of energy trading in the emergency market 12B.

[0080] However, if communication cannot be established between the MG1 management agent 16 and the P2P energy trading market 10, the MG1 management agent 16 cannot transmit a request for transition to the emergency market 12B to the P2P energy trading market 10. Fig. 6 shows a procedure for transitioning from the normal market 12A to the emergency market 12B when communication cannot be established between the MG1 management agent 16 and the P2P energy trading market 10. The flowchart shown in Fig. 6 is obtained by adding processes S03 to S05 to the flowchart shown in Fig. 5.

[0081] The MG1 management agent 16 first determines whether a power outage has occurred in the power grid 1 in the same manner as in S01 of Fig. 5. When a power outage in the power grid 1 is detected (YES in S01), the MG1 management agent 16 determines whether communication between the MG1 management agent 16 and the P2P energy trading market 10 has been established in S03. In S03, for example, when the MG1 management agent 16 transmits a request to start communication to the P2P energy trading market 10 and receives a response to the request from the P2P energy trading market 10, it can determine that communication has been established.

[0082] When it is determined in S03 that communication between the MG1 management agent 16 and the P2P energy trading market 10 has been established (YES in S03), the MG1 management agent 16 outputs a request for transition from the normal market 12A to the emergency market 12B in the MG1 market 12 to the P2P energy trading market 10 via the communication network NW in S02, the same as in Fig. 5. The P2P energy trading market 10 that receives the request executes the same processes from S12 to S14 as in Fig. 5.

[0083] On the other hand, if it is determined in S03 that communication between the MG1 management agent 16 and the P2P energy trading market 10 has not been established (NO in S03), the MG1 management agent 16 opens an emergency market independent of the P2P energy trading market 10 in S04. This emergency market has the same functions as the emergency market 12B in the P2P energy trading market 10. The MG1 management agent 16 can open the emergency market in a server that it manages. This makes it possible to avoid a situation in which, in an emergency in the power system 1, a communication abnormality between the P2P energy trading market 10 and the MG1 management agent 16 causes the power trading between the power resources 4 to become impossible.

[0084] In S05, the MG1 management agent 16 transmits information about the electricity trading in the emergency market 12B to the bidding agent 15 that can place a bid in the MG1 market 12, via the communication network NW. The information about the electricity trading includes the market ID and password of the emergency market 12B, and rules (such as penalty information) for the electricity trading in the emergency market 12B.

[0085] During normal times in the power system 1, the bidding agent 15 submits a bid to sell or buy electricity to the general market 11 or the normal use market 12A in the same S21 as in Fig. 5. In S22, the bidding agent 15 determines whether or not it has received information about electricity trading in the emergency use market 12B from the P2P energy trading market 10 or the MG1 management agent 16. If it has not received the information (NO in S22), it returns to S21 and submits a bid to the general market 11 or the normal use market 12A.

[0086] On the other hand, when information on electricity trading in the emergency market 12B is received (NO in S22), the bidding agent 15 logs into the emergency market 12B using the market ID and password included in the information. Then, in the emergency market 12B, the bidding agent makes a bid to buy or sell for each unit time slot, and a bid that meets the conditions is contracted.

[0087] <Penalties in the MG Market> Next, penalties imposed on participants who do not fulfill agreements in the MG market will be explained.

[0088] As described below, the penalty can be set according to any one, or a combination of two or more, of (1) the achievement level of participants in power trading, (2) the degree of power shortage on the buyer side in power trading, and (3) the path of power trading.

[0089] (1) The achievement level of participants in power trading Specifically, the penalty can be set according to the achievement level of the participant. The "achievement level of the participant" indicates the degree to which the participant has achieved the power trading expected of the participant. The MG management agent can calculate the achievement level for each participant based on their trading performance.

[0090] Figure 7 is a diagram for explaining an example of a method for calculating the achievement level. As shown in Figure 7, the achievement level can be calculated based on at least one of the actual value of the amount of power traded by the participant in the MG market, the buying and selling price per unit time of the amount of power traded by the participant, and the ratio of renewable power in the amount of power traded by the participant.

[0091] Specifically, the achievement level can be calculated based on the amount of power that the participant should trade according to the agreement in the MG market and the amount of power that the participant actually traded (actual value). For example, the ratio of the amount of power actually traded to the amount of power that the participant should trade according to the agreement is calculated. When this ratio becomes 1 (i.e., when the amount of power to be traded is equal to the amount of power actually traded), the achievement level is set to the maximum value. And as the ratio decreases from 1, the achievement level is calculated to decrease from the maximum value. According to this, when power trading is fulfilled according to the agreement, the achievement level becomes the maximum value, while when the agreement is not fulfilled, the achievement level decreases as the ratio of the actual value of the amount of power to the agreed amount of power decreases.

[0092] Alternatively, the degree of achievement can be calculated based on the buying and selling prices per unit time period of the amount of power traded by participants in the MG market. In the microgrid MG, as the power demand in the power resource 4 increases, the purchase price at which the power resource 4 bids in the MG market is expected to be set higher in order to procure more power through the MG market. The purchase price of the amount of power is the buying and selling price at which the power resource 4 buys power from another power resource 4. The higher the buying and selling price of the traded amount of power, the more it is determined that the power resource 4 is able to cope with the increase in the power demand, and therefore the higher the degree of achievement.

[0093] Alternatively, the degree of achievement can be calculated based on the ratio of renewable electricity to the amount of electricity traded. Renewable electricity is electricity generated by renewable energy. Renewable energy is energy that is always present in nature, such as part of the earth's resources such as solar and wind power, and has the characteristics of never being depleted, being present anywhere, and not emitting CO2. Therefore, in microgrid MG, it is expected that the buying and selling of renewable electricity will be promoted from the viewpoint of stable energy supply and reduction of environmental load. Therefore, the higher the ratio of renewable electricity to the amount of electricity traded, the higher the degree of achievement will be, as it is judged that expectations are being met.

[0094] 7 shows a configuration for calculating the achievement level based on the actual value of the amount of electricity traded by the participants in the MG market, the buying and selling price per unit time of the amount of electricity traded by the participants, and the ratio of renewable electricity in the amount of electricity traded by the participants. However, it is also possible to calculate the achievement level based on at least one of these three parameters.

[0095] The MG management agent sets the penalty to be imposed on the participant according to the calculated achievement level of the participant. FIG. 8 is a diagram showing a schematic diagram of the relationship between the achievement level and the penalty. The horizontal axis of FIG. 8 shows the achievement level, and the vertical axis shows the penalty. Line L1 in the diagram shows the relationship between the achievement level and the penalty in the normal market. Line L2 in the diagram shows the relationship between the achievement level and the penalty in the emergency market.

[0096] As shown in Fig. 8, the lower the achievement level of a participant, the higher the penalty imposed on the participant. Note that in Fig. 8, the relationship between the achievement level and the penalty is shown as a straight line, but the relationship between the achievement level and the penalty can be set appropriately by the MG management agent.

[0097] According to FIG. 8, the penalty in the emergency market for the same achievement level is set to a higher value than the penalty in the normal market. In other words, participants in the emergency market are subject to relatively higher penalties than those in the normal market. Therefore, in the event of an emergency in the power system, it is possible to encourage participants trading electricity in the MG market to reliably fulfill their contracts. Furthermore, it is possible to encourage participants to create bidding plans with reliably fulfilled contracts.

[0098] (2) Power tightness on the buyer's side in electricity trading The penalty imposed on participants can be set according to the degree of electricity tightness on the buyer side in the electricity trading.

[0099] The power tightness is an index showing the urgency of the demand for electricity on the buyer side. The power tightness indicates the degree to which the amount of electricity demand per unit time exceeds the maximum amount (reference value) of the amount of electricity procured from the power grid set in advance by the consumer. Note that information on the maximum amount of electricity procured from the power grid by the consumer may be obtained in advance from the consumer, or may be estimated from past trading records in the market.

[0100] When the consumer's electricity demand increases and the amount of electricity procured from the power grid approaches the planned maximum amount (reference value) or is in danger of exceeding the maximum amount, the consumer will attempt to procure electricity by trading with other electricity resources in the MG market as a peak-cutting measure in order to reduce the amount of electricity procured from the power grid. In this case, since the consumer's demand is highly urgent, the penalty is set to a high value to request the other party in the electricity transaction to reliably fulfill the contract.

[0101] FIG. 9 is a diagram showing the relationship between the power tightness of buyers and the penalty. The horizontal axis of FIG. 9 shows the power tightness of buyers, and the vertical axis shows the penalty. Line L3 in the diagram shows the relationship between the power tightness and the penalty in the normal market. Line L4 in the diagram shows the relationship between the power tightness and the penalty in the emergency market.

[0102] As shown in Fig. 9, the higher the power tightness of the buyer, the higher the penalty imposed on the participant. Note that in Fig. 9, the relationship between the power tightness and the penalty is shown as a straight line, but the relationship between the power tightness and the penalty can be set appropriately by the MG management agent.

[0103] According to FIG. 9, the penalty in the emergency market for the same power tightness is set to a higher value than the penalty in the normal market. That is, in the emergency market, participants are imposed with a relatively higher penalty than in the normal market. In the event of a power system emergency, power supply from the power system is stopped, so that consumers procure the required amount of power exclusively from other power resources 4 of the microgrid MG. By setting the penalty to a higher value as the power tightness of the consumer increases, it is possible to reliably procure power in the event of a power system emergency.

[0104] (3) Electricity trading channels The penalty imposed on the participants can be set according to the transmission path of the power from the seller's power resource to the buyer's power resource.

[0105] As described above, power trading between power resources 4 in the microgrid MG is realized by at least one of transferring power through the distribution network 2 and transferring power directly through charging / discharging equipment 5 within the power resource 4.

[0106] When trading electricity through the electricity distribution network 2, electricity is transmitted through the electricity distribution network 2, so it is expected that non-fulfillment of contracts will have a greater impact on the electricity supply and demand balance in the microgrid MG compared to when electricity is traded directly through the charging / discharging equipment 5 in the power resource 4. Therefore, when trading electricity through the electricity distribution network 2, participants are required to reliably fulfill contracts compared to when electricity is traded directly through the charging / discharging equipment 5 in the power resource 4.

[0107] Therefore, when trading electricity through the power distribution network 2, the penalty is set to a higher value compared to when trading electricity directly through the charging / discharging equipment 5 in the power resource 4. Furthermore, when the electricity transmission route between the power resources 4 is the same, the penalty in the emergency market is set to a higher value than the penalty in the normal market. This is because, in an emergency in the power system 1, it is expected that the impact on the electricity supply and demand balance in the microgrid MG will be greater when a contract is not fulfilled compared to when the power system is normal.

[0108] <Participant information> As explained above, a penalty is imposed on a participant who does not fulfill a contract in the MG market. Since the penalty is based on the participant's trading performance, it can be an indicator of the participant's creditworthiness in energy trading.

[0109] Therefore, the MG management agent calculates an index (hereinafter also referred to as a "credit score") representing the creditworthiness of participants in electricity trading based on the penalties in each of the normal market and the emergency market, and makes the calculated credit score public in the MG market as information about the participants.

[0110] Fig. 10 is a diagram showing a relationship between the credit score of a power resource and the penalty. The horizontal axis of Fig. 10 shows the penalty, and the vertical axis shows the credit score. Line L5 in the figure shows the relationship between the credit score of a power resource and the penalty.

[0111] As shown in Fig. 10, as the penalty imposed on the power resource 4 increases, the credit score decreases. Note that in Fig. 10, the relationship between the credit score and the penalty is represented by a straight line, but the relationship between the credit score and the penalty can be set appropriately by the MG management agent.

[0112] Fig. 11 is a diagram showing an example of participant information disclosed in the MG market. As shown in Fig. 11, the participant information (credit score) can be included in, for example, a bidding condition for the power resource 4 to trade power in the MG market.

[0113] The bidding conditions include "time slots during which electricity (of the power resource) can be traded", "amount of electricity per unit time slot during that time slot", and "buying and selling price per unit time slot". "Time slots during which electricity can be traded" corresponds to time slots during which electricity can be exchanged in the power resource 4. In FIG. 10, whether electricity can be exchanged is shown for each unit time slot. Specifically, "◯" indicates that electricity can be exchanged in the power resource 4, and "-" indicates that electricity cannot be exchanged in the power resource 4. "Amount of electricity per unit time slot" is the amount of electricity that the power resource can exchange in the unit time slot. In a unit time slot during which electricity can be supplied from the power resource, the power resource 4 can make a selling bid in the MG market. On the other hand, in a unit time slot during which the power resource 4 can receive electricity, the power resource can make a buying bid in the MG market. "Buying and selling price per unit time slot" is the price at which electricity amount per unit time slot is sold or purchased.

[0114] 11, the bidding agent 15 can make an agreement by referring to the credit score of the power resource 4 in addition to the bidding conditions of other power resources 4. This can promote power trading between power resources with high credit scores and reduce non-fulfillment of agreements.

[0115] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present disclosure is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0116] 1 Power system, 2 Distribution network, 3 Switchgear, 4 Power resource, 5 Charging / discharging equipment, 6 Mobile object, 7 Management device, 8 Storage battery, 9 Generator, 10 P2P power trading market, 11 General market, 12 MG1 market, 13 MG2 market, 12A, 13A Normal use market, 12B, 13B Emergency use market, 15 Bidding agent, 16 MG1 management agent, 18 MG2 management agent, 20, 30, 42 Processor, 22, 32, 44 Memory, 24, 34, 46 Communication I / F, 40 Processing device, MG1, MG2 Microgrid, NW Communication network.

Claims

1. An electricity trading system for trading electricity in a distribution network connected to an electric power system, comprising: A plurality of power resources are connected to the power distribution network, and each of the plurality of power resources is configured to be able to execute at least one of: transferring power to and from the other power resources through the power distribution network; and transferring power directly to and from the other power resources through charging / discharging equipment owned by the each of the plurality of power resources; An electricity trading market that conducts Peer to Peer (P2P) electricity trading; a management device for managing power transactions in the plurality of power resources; The electricity trading market is a first individual market that trades electricity between the plurality of power resources during normal operation of the power system; a second individual market that trades electricity between the plurality of power resources in an emergency when the power supply from the power grid is stopped; the management device is configured to impose a penalty on a participant who does not fulfill a contract in an electricity transaction in each of the first and second individual markets; The management device sets the penalty in the second individual market to a value higher than the penalty in the first individual market.

2. 2. The energy trading system according to claim 1, wherein, when a power outage is detected in the power grid, the energy trading market shifts from the first individual market to the second individual market, and notifies the participants of a change in the penalty associated with the shift to the second individual market.

3. 3. The energy trading system according to claim 2, wherein the energy trading market is configured, when a power outage in the power system is detected, not to accept a bid from the participant in a market other than the second individual market established for the power distribution network to which the participant is connected, or not to allow the bid to be executed.

4. the management device is configured to calculate a degree of achievement based on trading performance of the participants in each of the first and second individual markets, and to increase the penalty imposed on the participants as the calculated degree of achievement becomes lower; 4. The energy trading system according to claim 1, wherein the management device sets the penalty in the second individual market to a higher value than the penalty in the first individual market for the same level of achievement.

5. 5. The energy trading system according to claim 4, wherein the management device calculates the achievement level of the participant based on an amount of energy that the participant should trade in accordance with the agreement and an amount of energy that the participant has traded.

6. The energy trading system according to claim 4 , wherein the management device calculates the achievement level of the participant based on a buying and selling price of the amount of energy traded by the participant.

7. 5. The energy trading system according to claim 4, wherein the management device calculates the achievement level of the participant based on a ratio of renewable electricity in the amount of electricity traded by the participant.

8. 8. The energy trading system according to claim 1, wherein the management device sets, in each of the first and second individual markets, the penalty in trading of electricity exchanged through the electricity distribution network to a value higher than the penalty in trading of electricity exchanged through the charging / discharging facility.

9. the management device is configured to increase the penalty imposed on a seller who does not fulfill the contract as the tightness of electricity among buyers increases in each of the first and second individual markets; 4. The energy trading system according to claim 1, wherein the management device sets the penalty in the second individual market to a higher value than the penalty in the first individual market for the same tightness.

10. the management device is configured to, when a power outage is detected in the power grid, output, via a communication network, to the energy trading market, a request for transition from the first individual market to the second individual market; the energy trading market is configured to disable the first individual market and enable the second individual market in response to the request from the management device; 3. The energy trading system according to claim 2, wherein, when the management device cannot establish communication with the energy trading market, the management device opens a third individual market having the same functions as the second individual market, independent of the energy trading market, and manages electricity trading in the third individual market.

11. The management device has a power regulation resource connected to the power distribution network, 11. The energy trading system according to claim 1, wherein, when an amount of power supplied to the power grid becomes insufficient during an emergency in the power system, the management device controls the power regulating resource to supply power to the power grid.

12. the management device is configured to calculate an index representing a creditworthiness of the participant in electricity trading in each of the first and second individual markets, and generate participant information using the calculated index; The energy trading system according to claim 1 , wherein the management device decreases the index as the penalty imposed on the participant increases.

13. An electricity trading system for trading electricity in a distribution network connected to an electric power system, comprising: A plurality of power resources are connected to the power distribution network, and each of the plurality of power resources is configured to be able to execute at least one of: transferring power to and from the other power resources through the power distribution network; and transferring power to and from the other power resources in series through charging / discharging equipment owned by the each of the plurality of power resources; an electricity trading market for P2P electricity trading; a management device for managing power transactions in the plurality of power resources; the management device is configured to impose a penalty on a participant who does not fulfill an agreement in an electricity transaction in the electricity trading market, and to calculate, for each participant, an index representing the creditworthiness of the participant in an electricity transaction based on the penalty imposed on the participant; The management device reduces the index as the penalty imposed on the participant increases.

Citation Information

Patent Citations

  • Power demand / response management device, power demand / response management method, power demand / response management system, and power demand management device

    JP2017127085A

  • Communication method, central control device, and individual control device

    JP2018068017A

  • Power generation system

    JP2019075889A

  • Electric power system monitoring system, electric power system monitoring method, and program

    JP2019216534A

  • Electric power transaction platform

    JP2020009334A