Automatic take-off and landing system for vertical take-off and landing aircraft, vertical take-off and landing aircraft, and take-off and landing control method for vertical take-off and landing aircraft

The automatic take-off and landing system for vertical take-off and landing aircraft addresses wind-related landing restrictions by aligning the aircraft's heading with the relative wind direction, ensuring safe and stable landings on moving bodies.

JP7561731B2Active Publication Date: 2024-10-04MITSUBISHI HEAVY IND LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2021213299
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-12-27
Publication Date
2024-10-04
Estimated Expiration
2041-12-27

AI Technical Summary

Technical Problem

Vertical take-off and landing aircraft face restrictions on takeoff and landing due to relative wind directions and speeds, necessitating changes in ship heading, which affect navigation, when landing on moving bodies like ships.

Method used

An automatic take-off and landing system for vertical take-off and landing aircraft that includes a relative wind information acquisition unit and a control unit to adjust the aircraft's heading to match the relative wind direction, enabling safe takeoff and landing at a landing target point on a moving body.

Benefits of technology

The system relaxes restrictions due to relative wind, allowing safe and suitable landing at the target point by aligning the aircraft's heading with the wind direction, reducing the impact of wind on the landing process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007561731000001
    Figure 0007561731000001
  • Figure 0007561731000002
    Figure 0007561731000002
  • Figure 0007561731000003
    Figure 0007561731000003
Patent Text Reader

Abstract

To ease a take-off landing limit caused by relative wind and to suitably execute take-off landing to a take-off landing target point.SOLUTION: An automatic take-off landing system for a vertical take-off landing aircraft comprises: a relative wind information acquisition unit that acquires the direction of relative wind in a mobile body; and a control unit that executes take-off landing control for causing the vertical take-off landing aircraft to take-off / land at a take-off landing target point set on the mobile body. The control unit executes the take-off landing control in a state where the nose direction of the vertical take-off landing aircraft is opposed to the direction of the relative wind on the basis of the direction of the relative wind acquired by the relative wind information acquisition unit at the time of taking-off / landing of the vertical take-off landing aircraft.SELECTED DRAWING: Figure 6
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an automatic take-off and landing system for a vertical take-off and landing aircraft, a vertical take-off and landing aircraft, and a take-off and landing control method for a vertical take-off and landing aircraft. [Background technology]

[0002] Conventionally, there is known an aircraft landing support device that supports the landing of an aircraft at a predetermined landing point (for example, see Patent Document 1). This landing support device estimates the wind direction and wind speed at the landing point with high accuracy based on the shape of the surroundings of the landing point and the wind direction and wind speed above the landing point. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-045049 A Summary of the Invention [Problem to be solved by the invention]

[0004] Incidentally, when an aircraft such as a vertical take-off and landing aircraft takes off or lands at a landing site on a moving body such as a ship, the vertical take-off and landing aircraft takes off or lands at the landing site by aligning the heading of the vertical take-off and landing aircraft with the heading of the ship. At this time, the vertical take-off and landing aircraft takes off or lands at the landing site while taking into consideration the influence of the relative wind, which is the wind relative to the vertical take-off and landing aircraft. To ensure safe take-off and landing, take-off and landing restrictions based on the relative wind are set for the ship and the vertical take-off and landing aircraft. The take-off and landing restrictions based on the relative wind are the range of the wind direction (direction) and wind strength (wind speed) of the relative wind that allows safe take-off and landing, and the vertical take-off and landing aircraft takes off or lands at the landing site within this range.

[0005] However, when the aircraft is outside the range of the landing and take-off restrictions due to the relative wind, it may be necessary to temporarily change the heading of the VTOL aircraft and the heading of the ship to bring the aircraft within the landing and take-off restrictions. Changing the heading of the ship means changing the course of the ship, which affects the navigation of the ship.

[0006] Therefore, an object of the present disclosure is to provide an automatic take-off and landing system for a vertical take-off and landing aircraft, a vertical take-off and landing aircraft, and a take-off and landing control method for a vertical take-off and landing aircraft that can relax take-off and landing restrictions due to relative wind and perform take-off and landing at a target landing point preferably. [Means for solving the problem]

[0007] The automatic take-off and landing system for a vertical take-off and landing aircraft disclosed herein comprises a relative wind information acquisition unit that acquires the direction of the relative wind at a moving body, and a control unit that executes take-off and landing control to cause the vertical take-off and landing aircraft to take off and land at a landing target point provided on the moving body, and when the vertical take-off and landing aircraft takes off or lands, the control unit executes the take-off and landing control by aligning the nose direction of the vertical take-off and landing aircraft with the direction of the relative wind based on the direction of the relative wind acquired by the relative wind information acquisition unit.

[0008] The vertical take-off and landing aircraft of the present disclosure is equipped with the automatic take-off and landing system for the vertical take-off and landing aircraft described above.

[0009] The take-off and landing control method for a vertical take-off and landing aircraft disclosed herein has an automatic take-off and landing system for a vertical take-off and landing aircraft that performs take-off and landing control for causing a vertical take-off and landing aircraft to take off and land at a landing target point provided on a moving body, and executes the following steps: acquiring a relative wind direction at the moving body; orienting the nose direction of the vertical take-off and landing aircraft to face the relative wind direction based on the acquired relative wind direction; and causing the vertical take-off and landing aircraft to take off and land at the landing target point. Effect of the Invention

[0010] According to the present disclosure, restrictions due to relative winds can be alleviated, enabling landing at a target landing point to be performed favorably. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 is a schematic diagram showing an example of an automatic take-off and landing system for a vertical take-off and landing aircraft according to this embodiment. [Diagram 2] FIG. 2 is an explanatory diagram showing a state in which a vertical take-off and landing aircraft according to this embodiment heads toward a landing target point. [Diagram 3] FIG. 3 is a flowchart showing an example of a processing procedure of a take-off and landing control method for a vertical take-off and landing aircraft according to this embodiment when landing. [Figure 4] FIG. 4 is an explanatory diagram showing the landing operation of the vertical take-off and landing aircraft according to this embodiment. [Diagram 5] FIG. 5 is a flowchart showing an example of a processing procedure of a take-off and landing control method for a vertical take-off and landing aircraft according to this embodiment when landing. [Figure 6] FIG. 6 is an explanatory diagram illustrating a take-off and landing control pattern when the vertical take-off and landing aircraft according to this embodiment lands. [Figure 7] FIG. 7 is an explanatory diagram showing the takeoff operation of the vertical take-off and landing aircraft according to this embodiment. [Figure 8] FIG. 8 is a flowchart showing an example of a processing procedure of a take-off and landing control method during take-off of a vertical take-off and landing aircraft according to this embodiment. [Figure 9] FIG. 9 is an explanatory diagram illustrating a takeoff and landing control pattern during takeoff of a vertical take-off and landing aircraft according to this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, the embodiments of the present disclosure will be described in detail with reference to the drawings. Note that the present disclosure is not limited to these embodiments. In addition, the components in the following embodiments include those that are easily replaceable by those skilled in the art, or those that are substantially the same. Furthermore, the components described below can be appropriately combined, and when there are multiple embodiments, each embodiment can be combined.

[0013] [Embodiment] FIG. 1 is a schematic diagram showing an example of an automatic takeoff and landing system for a vertical takeoff and landing aircraft according to this embodiment, and FIG. 2 is an explanatory diagram showing a state in which the vertical takeoff and landing aircraft according to this embodiment heads toward a landing target point. The vertical takeoff and landing aircraft 1 according to this embodiment is an aircraft (for example, a helicopter, a drone, etc.) as a rotorcraft. In this embodiment, the vertical takeoff and landing aircraft 1 is an unmanned aircraft, and is an aircraft having a heading including a nose and a tail. Specifically, the vertical takeoff and landing aircraft 1 is an unmanned helicopter. Note that the vertical takeoff and landing aircraft 1 may be an aircraft capable of forward, backward, lateral, turning, and hovering, and may be a manned aircraft. In addition, when the vertical takeoff and landing aircraft 1 is an unmanned aircraft, when remote manual operation is performed during flight control of the unmanned aircraft by autopilot, flight control based on remote manual operation is prioritized. Similarly, when the vertical takeoff and landing aircraft 1 is a manned aircraft, when manual operation is performed during flight control of the manned aircraft by autopilot, flight control based on manual operation is prioritized. This vertical take-off and landing aircraft 1 is equipped with an automatic take-off and landing system 100, and flight is controlled by the automatic take-off and landing system 100, and the aircraft lands at a target landing point 2 shown in FIG.

[0014] (Landing target point) In this embodiment, the landing target point 2 is provided on the bow side of the ship 5 as shown in FIG. 2. The vertical take-off and landing aircraft 1 lands (lands) on the ship 5, which is a moving body that moves on water. However, the landing target point 2 is not limited to being provided on the bow side of the ship 5, and may be provided on the stern side of the ship 5. The landing target point 2 may also be provided on a vehicle or the like, which is a moving body that moves on the ground. Furthermore, in this embodiment, the ship 5 is a manned ship, but it may also be an unmanned ship. A marker 7 is provided on the landing target point 2 to enable the vertical take-off and landing aircraft 1 to capture the position of the landing target point 2. The marker 7 is a marker that can capture the position of the landing target point 2 by image processing.

[0015] (ship) 1, the ship 5 includes a navigation device 70, a data transmission device 80, an operation display unit 90, and a wind direction and speed meter (relative wind information acquisition unit) 95. The navigation device 70 is, for example, an inertial navigation system (INS), and acquires the attitude angles in the pitch direction and roll direction of the ship 5, the bow direction, speed, acceleration, and position coordinates in the Earth coordinate system. In this embodiment, the navigation device 70 is described as being applied to an inertial navigation system, but is not particularly limited, and any navigation device 70 may be used. In this embodiment, the navigation device 70 is an inertial navigation system including a global positioning system (GPS) as a position measurement unit in order to improve the measurement accuracy of the position. In this embodiment, the present invention is applied to an inertial navigation system including a GPS, but is not limited to a GPS, and any position measurement unit capable of measuring a position with high accuracy may be used. For example, a quasi-zenith satellite system may be used. If the position can be measured with high accuracy only by the navigation device 70, a configuration may be used in which a position measurement unit such as a GPS is omitted. The navigation device 70 may acquire at least a part of various data by a sensor. The data transmission device 80 is included in an automatic take-off and landing system 100 described later, and exchanges various signals with a data transmission device 40 mounted on the vertical take-off and landing aircraft 1 by wireless communication. The operation display unit 90 is a user interface through which an operator on board the ship 5 grasps the control status and inputs various instructions. The instructions input by the operator through the operation display unit 90 include, for example, a control mode transition instruction described later. Details of the transition instruction will be described later. The instruction input through the operation display unit 90 is transmitted from the data transmission device 80 to the data transmission device 40. The control status of the vertical take-off and landing aircraft 1 is transmitted from the data transmission device 40 to the data transmission device 80. That is, the data transmission device 40 and the data transmission device 80 are capable of two-way communication. The anemometer 95, like the data transmission device 80, is included in the automatic landing and launching system 100 described below, and measures and acquires the direction and speed of the relative wind at the ship 5. The relative wind is the relative wind flow between the ship 5 and the air.The anemometer 95 transmits the measured relative wind direction and wind speed from the data transmission device 80 to the data transmission device 40.

[0016] (Automatic Take-Off and Landing System) The automatic take-off and landing system 100 for a vertical take-off and landing aircraft 1 according to this embodiment is a system that controls the position of the vertical take-off and landing aircraft 1 in order to land the vertical take-off and landing aircraft 1 in flight at a landing target point 2. The automatic take-off and landing system 100 is mounted on the vertical take-off and landing aircraft 1 and on a ship 5. As shown in FIG. 1 , the automatic take-off and landing system 100 includes a camera 10, a navigation device 20, a control unit 30, and a data transmission device 40. Note that in this embodiment, the control unit 30 of the automatic take-off and landing system 100 uses a control unit mounted on the vertical take-off and landing aircraft 1, but a control unit mounted on the ship 5 may also be used, or the control unit of the vertical take-off and landing aircraft 1 and the control unit of the ship 5 may be made to work together.

[0017] The camera 10 is mounted on the vertical take-off and landing aircraft 1 via a gimbal (not shown). The camera 10 may be a monocular camera, a compound eye camera, an infrared camera, or the like, as long as it can photograph the marker 7. The camera 10 is provided to photograph the marker 7 provided at the landing target point 2 from the vertical take-off and landing aircraft 1. The photographing direction of the camera 10 can be adjusted via a gimbal (not shown). In this embodiment, the camera 10 is controlled by the control unit 30 so that its photographing range (angle of view) B (see FIG. 2) faces, for example, directly downward in the vertical direction. The camera 10 may also be controlled by the control unit 30 so that the photographing range B faces diagonally forward with respect to the vertical direction. The gimbal may be omitted for the camera 10, and the camera 10 may be fixed directly below the body of the vertical take-off and landing aircraft 1 so that the photographing direction faces, for example, downward in the vertical direction.

[0018] The navigation device 20 is, for example, an inertial navigation device including a GPS, like the navigation device 70. The navigation device 20 may be an inertial navigation device including a position measurement unit such as a GPS, like the navigation device 70, or may be an inertial navigation device omitting a position measurement unit such as a GPS, and is not particularly limited. The navigation device 20 including a GPS acquires the attitude angles in the pitch direction and roll direction of the vertical take-off and landing aircraft 1, the aircraft heading, the aircraft speed of the vertical take-off and landing aircraft 1, the aircraft acceleration, and the position coordinates in the Earth coordinate system. The navigation device 20 may have an attitude angle sensor that detects the attitude angle of the vertical take-off and landing aircraft 1, a speed detection sensor that detects the aircraft speed of the vertical take-off and landing aircraft 1, an acceleration detection sensor that detects the aircraft acceleration of the vertical take-off and landing aircraft 1, and a sensor that detects the aircraft heading of the vertical take-off and landing aircraft 1. The navigation device 20 outputs the acquired attitude angle, aircraft speed, aircraft acceleration, and position coordinates of the vertical take-off and landing aircraft 1 to the control unit 30.

[0019] As shown in FIG. 1, the automatic take-off and landing system 100 includes an altitude sensor 25 that detects the altitude of the vertical take-off and landing aircraft 1 from the ground surface or the water surface. The altitude sensor 25 is, for example, a laser altimeter, and measures the relative altitude Δh (see FIG. 2) from the vertical take-off and landing aircraft 1 to the landing target point 2. Note that the altitude sensor 25 may be a radio altimeter or a barometric altimeter, or any other altimeter. These altimeters may be appropriately combined and applied according to the usage environment, that is, to measure the altitude from the ground surface or the altitude from the sea surface. The altitude sensor 25 outputs the detected relative altitude Δh of the vertical take-off and landing aircraft 1 to the control unit 30. Note that the altitude sensor 25 measures the altitude of the vertical take-off and landing aircraft 1 and outputs it to the control unit 30, and the control unit 30 may calculate the relative altitude Δh (see FIG. 2) to the landing target point 2 based on the altitude of the vertical take-off and landing aircraft 1 in a guidance calculation unit 34 described later. In addition, the automatic take-off and landing system 100 may calculate the relative altitude Δh between the vertical take-off and landing aircraft 1 and the ship 5 by applying image processing to an image including the marker 7 captured by the camera 10 in the image processing unit 32 described later, rather than using the altitude sensor 25.

[0020] (Control unit) The control unit 30 has an image processing unit 32, a guidance calculation unit 34, and a flight control unit 36. The control unit 30 also has an imaging control unit (not shown) that controls the imaging direction of the camera 10 via a gimbal (not shown) provided in the vertical take-off and landing aircraft 1. In this embodiment, as described above, the imaging range B of the camera 10 is adjusted to face directly downward in the vertical direction.

[0021] The image processing unit 32 performs image processing on the image captured by the camera 10 to calculate the center of the marker 7, i.e., the landing target point 2. The center here is a coordinate point in a camera fixed coordinate system with the center of the image captured by the camera 10 as the origin, and can be calculated by the number of pixels from the center of the image. Note that the landing target point 2 is not limited to the center of the marker 7, and may be any of the four corners of the marker 7, or may be a position offset from the center of the marker 7.

[0022] As described above, the image processing unit 32 may calculate the relative altitude Δh between the vertical take-off and landing aircraft 1 and the ship 5 by performing image processing on the image including the marker 7 captured by the camera 10. Furthermore, the image processing unit 32 may specify the orientation of the marker 7 by performing image processing on the image including the marker 7 captured by the camera 10, and calculate the bow heading of the ship 5 by correlating it with the bow heading of the vertical take-off and landing aircraft 1 acquired by the navigation device 20. Note that a marker for calculating the bow heading may be provided separately on the ship 5.

[0023] The guidance calculation unit 34 calculates a control amount for the vertical take-off and landing aircraft 1 for guiding the vertical take-off and landing aircraft 1 to the landing target point 2. The control amount is a control amount for adjusting the aircraft speed, attitude angle, rate of change of the attitude angle, etc. of the vertical take-off and landing aircraft 1. To calculate the control amount, the guidance calculation unit 34 calculates the relative position (X, Y) between the vertical take-off and landing aircraft 1 and the landing target point 2 and the relative speed between the vertical take-off and landing aircraft 1 and the landing target point 2.

[0024] The guidance calculation unit 34 calculates the relative position (X, Y) between the vertical take-off and landing aircraft 1 and the landing target point 2 based on the center of the marker 7 calculated by the image processing unit 32, the orientation of the camera 10, i.e., the nose orientation of the vertical take-off and landing aircraft 1, and the altitude of the vertical take-off and landing aircraft 1 (relative altitude Δh with respect to the landing target point 2). In this embodiment, the orientation of the camera 10 and the nose orientation of the vertical take-off and landing aircraft 1 are made to match, but this is not particularly limited, and the orientation of the camera 10 and the nose orientation of the vertical take-off and landing aircraft 1 do not have to match. The relative position (X, Y) is the distance between the vertical take-off and landing aircraft 1 and the landing target point 2 in the horizontal direction. More specifically, the guidance calculation unit 34 converts the center of the marker 7 in the camera fixed coordinate system calculated by the image processing unit 32 into the relative position between the vertical take-off and landing aircraft 1 and the landing target point 2 in the ship inertial system based on the heading direction of the vertical take-off and landing aircraft 1 and the altitude of the vertical take-off and landing aircraft 1 (relative altitude Δh to the landing target point 2), and further converts it into the relative position (X, Y) between the vertical take-off and landing aircraft 1 and the landing target point 2 in the aircraft inertial system. At this time, the guidance calculation unit 34 may directly convert into the relative position (X, Y) between the vertical take-off and landing aircraft 1 and the landing target point 2 in the aircraft inertial system based on the heading direction of the vertical take-off and landing aircraft 1 and the altitude of the vertical take-off and landing aircraft 1 (relative altitude Δh to the landing target point 2). The ship inertial system is a coordinate system with the landing target point 2 as the origin, and the direction along the heading direction of the ship 5, the direction perpendicular to the heading direction of the ship 5 in the horizontal direction, and the vertical direction as orthogonal axes. In addition, as shown in Figure 2, the aircraft inertial system is a coordinate system with the vertical take-off and landing aircraft 1 as the origin, the direction along the heading of the vertical take-off and landing aircraft 1 as the X-axis, the direction horizontally perpendicular to the heading of the vertical take-off and landing aircraft 1 as the Y-axis, and the vertical direction as the Z-axis.

[0025] The guidance calculation unit 34 also calculates the relative speed between the vertical take-off and landing aircraft 1 and the landing target point 2. More specifically, the guidance calculation unit 34 calculates the relative speed, for example, from the difference between the aircraft speed of the vertical take-off and landing aircraft 1 acquired by the navigation devices 20, 70 and the hull speed of the ship 5. The guidance calculation unit 34 may also calculate the relative speed based on a pseudo derivative of the relative position (X, Y). The guidance calculation unit 34 also calculates the relative direction between the heading direction of the vertical take-off and landing aircraft 1 and the heading direction of the ship 5.

[0026] Furthermore, the guidance calculation unit 34 calculates the relative altitude Δh to the landing target point 2 based on the altitude of the vertical take-off and landing aircraft 1 detected by the altitude sensor 25. Note that the image processing unit 32 may calculate the relative altitude Δh between the vertical take-off and landing aircraft 1 and the ship 5 by performing image processing on the image including the marker 7 captured by the camera 10.

[0027] The guidance calculation unit 34 then calculates a control amount by feedback control (for example, PID control) based on the relative position (X, Y), the relative speed, the relative direction, and the aircraft acceleration. In this embodiment, the guidance calculation unit 34 calculates a control amount of the vertical take-off and landing aircraft 1 by feedback control so that the relative position (X, Y) becomes zero. The guidance calculation unit 34 also calculates a control amount of the vertical take-off and landing aircraft 1 by feedback control so that the relative direction becomes a predetermined direction. The predetermined direction is a range that satisfies the vertical take-off and landing aircraft 1 being in a stable flight state even when affected by the relative wind. Furthermore, the guidance calculation unit 34 calculates a control amount of the vertical take-off and landing aircraft 1 by feedback control so that the relative speed is within a predetermined speed and the aircraft acceleration is within a predetermined acceleration. The ranges within the predetermined speed and within the predetermined acceleration are ranges that satisfy the vertical take-off and landing aircraft 1 being in a stable flight state at a predetermined relative altitude Δh. For example, the predetermined speed is zero, and the predetermined acceleration is zero. The guidance calculation unit 34 outputs the calculated control amount to the flight control unit 36. In calculating such control amounts, the guidance calculation unit 34 controls the vertical take-off and landing aircraft 1 in a plurality of control modes in order to guide the vertical take-off and landing aircraft 1 to the landing target point 2 and land it. The plurality of control modes include an approach mode, a hovering mode including a high-altitude hovering mode and a low-altitude hovering mode, and a landing mode. Details of each control mode will be described later.

[0028] The flight control unit 36 ​​controls each component of the vertical take-off and landing aircraft 1 according to the control amount calculated by the guidance calculation unit 34 described later, to fly the vertical take-off and landing aircraft 1. The flight control unit 36 ​​controls the blade pitch angle, rotation speed, etc. of each rotor according to the control amount, and adjusts the aircraft speed, attitude angle, and rate of change of the attitude angle, etc. of the vertical take-off and landing aircraft 1. As a result, the vertical take-off and landing aircraft 1 is guided to the landing target point 2. Note that in this embodiment, the image processing unit 32 and the guidance calculation unit 34 are described as functional units separate from the flight control unit 36, but the flight control unit 36, the image processing unit 32, and the guidance calculation unit 34 may be an integrated functional unit. That is, the processing of the image processing unit 32 and the guidance calculation unit 34 may be performed in the flight control unit 36.

[0029] (Method of controlling take-off and landing of vertical take-off and landing aircraft) Next, a procedure for guiding the vertical take-off and landing aircraft 1 to the landing target point 2 and landing by the control unit 30 will be described as a take-off and landing control method for the vertical take-off and landing aircraft according to this embodiment. FIG. 3 is a flowchart showing an example of a processing procedure of the take-off and landing control method for landing of the vertical take-off and landing aircraft according to this embodiment. FIG. 4 is an explanatory diagram showing the landing operation of the vertical take-off and landing aircraft according to this embodiment. FIG. 5 is a flowchart showing an example of a processing procedure of the take-off and landing control method for landing of the vertical take-off and landing aircraft according to this embodiment. FIG. 6 is an explanatory diagram showing an example of a take-off and landing control pattern for landing of the vertical take-off and landing aircraft according to this embodiment.

[0030] First, the landing operation of the vertical take-off and landing aircraft 1 will be described with reference to Figures 3 and 4. The vertical take-off and landing aircraft 1 executes a plurality of control modes in a series of landing operations from a flight state to landing (docking) on ​​the ship 5. Specifically, the vertical take-off and landing aircraft 1 performs a series of landing operations by sequentially performing step S1 of executing the return mode, step S2 of executing the approach mode and the high-altitude hovering mode, step S3 of executing the low-altitude hovering mode, and step S4 of executing the landing mode.

[0031] As shown in FIG. 4, the return mode is a mode in which the vertical take-off and landing aircraft 1 is moved toward the ship 5 in response to a command from the ship 5, and is also moved to a return position P (see FIG. 6) near the ship 5 (S1). The approach mode is a mode in which the vertical take-off and landing aircraft 1 approaches the deck of the ship 5 from the return position P (S2). The return position P is an arbitrary position, and may be a position in which the aircraft approaches from the side of the ship 5 (in the width direction). The high-altitude hovering mode is a mode to which the vertical take-off and landing aircraft 1 transitions when the camera 10 captures a marker 7 on the deck during execution of the approach mode, and is a mode in which the aircraft hovers so that the landing target point 2 is at the center of the shooting range (angle of view) B of the camera 10 (S2). The low-altitude hovering mode is a mode in which the vertical take-off and landing aircraft 1 descends and hovers at a lower altitude than in the high-altitude hovering mode (S3). The landing mode is a mode in which the vertical take-off and landing aircraft 1 lands on the landing target point 2 (S4).

[0032] In such a series of controls related to the landing operation, the automatic take-off and landing system 100 executes the take-off and landing control shown in Fig. 5. The take-off and landing control shown in Fig. 5 is a control for orienting the nose of the vertical take-off and landing aircraft 1 to face the direction of the relative wind during the landing operation. The take-off and landing control shown in Fig. 5 is executed during the return mode or after the return mode is completed, and immediately before the transition to the approach mode. Note that the take-off and landing control shown in Fig. 5 is not particularly limited to the above timing, and may be executed at any timing before landing at the landing target point 2.

[0033] In the automatic take-off and landing system 100, the ship 5 measures and acquires the direction and speed of the relative wind using the anemometer 95, and the control unit 30 of the vertical take-off and landing aircraft 1 acquires the direction and speed of the relative wind acquired by the ship 5 (step S11). Note that in step S11, the control unit 30 acquires the direction of the relative wind measured by the anemometer 95, but the control unit 30 may acquire the direction of the relative wind by input from the operator piloting the vertical take-off and landing aircraft 1. Next, the control unit 30 of the vertical take-off and landing aircraft 1 acquires the heading direction of the vertical take-off and landing aircraft 1 from the navigation device 20 (step S12). Based on the acquired direction of the relative wind and heading direction, the control unit 30 controls the flight of the vertical take-off and landing aircraft 1 so that the direction of the relative wind and the heading direction are opposite to each other (step S13). Specifically, in step S13, the direction of the relative wind (relative wind angle) coming from the front of the bow heading of the ship 5 is set as the reference (0 deg). Then, in step S13, when the relative wind is in a predetermined direction, the flight of the vertical take-off and landing aircraft 1 is controlled so that the heading coincides with the heading obtained by adding the direction of the relative wind to the heading. Note that, in step S13, the control unit 30 controls the flight of the vertical take-off and landing aircraft 1, but the flight of the vertical take-off and landing aircraft 1 may also be controlled by an operator who pilots the vertical take-off and landing aircraft 1. In other words, when the flight control of the vertical take-off and landing aircraft 1 is performed by an operator, the operator may check the direction of the relative wind in step S11, and in step S13, the operator may control the flight so that the heading of the vertical take-off and landing aircraft 1 coincides with the heading obtained by adding the direction of the relative wind to the heading.

[0034] After executing step S13, the control unit 30 judges whether the relative wind direction and the aircraft heading are opposite to each other, that is, whether the aircraft heading is the same as the heading obtained by adding the relative wind direction to the ship heading (step S14). If the control unit 30 judges in step S14 that the relative wind direction and the aircraft heading are opposite to each other (step S14: Yes), the control unit 30 is ready to transition to the approach mode. On the other hand, if the control unit 30 judges in step S14 that the relative wind direction and the aircraft heading are not opposite to each other (step S14: No), the control unit 30 again proceeds to step S13 and executes flight control until the relative wind direction and the aircraft heading are opposite to each other. After transitioning to the approach mode, the control unit 30 executes a series of controls related to the landing operation shown in FIG. 4 to land the vertical take-off and landing aircraft 1 at the landing target point 2 (step S4).

[0035] Meanwhile, the control unit 30 executes the following control based on the wind speed of the relative wind acquired by the anemometer 95 during the landing operation of the vertical take-off and landing aircraft 1. When the control unit 30 acquires the wind speed of the relative wind in step S11 of FIG. 5, it judges whether the wind speed of the relative wind is equal to or higher than a first wind speed, or whether it is smaller than the first wind speed and equal to or higher than a second wind speed. The first wind speed and the second wind speed are wind speeds when the wind speed of the relative wind is high, and the first wind speed is higher than the second wind speed. For example, the first wind speed is set as a wind speed at which safe take-off and landing are difficult and it is not desirable to perform take-off and landing control. The second wind speed is a wind speed at which take-off and landing control is possible but the influence of a turbulent area formed by the structure of the ship 5 described later becomes large, and it is set as a wind speed at which it is desirable to perform turbulence avoidance control at the time of take-off and landing. Specifically, the first wind speed is 35 kt, and the second wind speed is 20 kt. The first wind speed and the second wind speed are not particularly limited to the above values. Furthermore, when the wind speed of the acquired relative wind is smaller than the second wind speed, the control unit 30 executes step S12 and subsequent steps.

[0036] When the wind speed of the acquired relative wind is equal to or greater than the first wind speed, the control unit 30 does not execute takeoff and landing control of the vertical takeoff and landing aircraft 1, and outputs a movement instruction to the ship 5 and the vertical takeoff and landing aircraft 1 to an area where the wind speed is smaller than the first wind speed. Specifically, the control unit 30 prompts the operator (operator) to move the ship 5 by displaying information on the operation display unit 90 of the ship 5 that the ship 5 will move to an area where the wind speed is smaller than the first wind speed. Similarly, the control unit 30 prompts the operator of the vertical takeoff and landing aircraft 1 to move the vertical takeoff and landing aircraft 1 by notifying the operator of information that the ship 5 will move to an area where the wind speed is smaller than the first wind speed. Note that when the vertical takeoff and landing aircraft 1 and the ship 5 are unmanned aircraft, the control unit 30 executes flight control of the vertical takeoff and landing aircraft 1 and movement control of the ship 5. In addition, in this embodiment, the control unit 30 outputs an instruction to move to an area where the wind speed is smaller than the first wind speed, but the operator of the ship 5 (e.g., the captain) may check the relative wind speed and direction and move the ship 5 to an area where the wind speed is smaller than the first wind speed.

[0037] When the wind speed of the acquired relative wind is smaller than the first wind speed and equal to or greater than the second wind speed, the control unit 30 executes turbulence avoidance control to avoid a turbulent area generated at the landing target point 2 by the relative wind. That is, the control unit 30 controls the movement of the ship 5 so that the vertical take-off and landing aircraft 1 can enter the ship 5 while avoiding the turbulent area formed by the structure of the ship 5 described later, thereby controlling the position of the turbulent area to be formed. As the turbulence avoidance control, for example, the movement of the ship 5 is controlled so that the bow heading is ±120 deg or less with respect to the relative wind direction. Note that ±120 deg or less refers to a range from -120 deg to +120 deg via 0 deg. In addition, ±120 deg or less is the case when the landing target point 2 is provided on the bow side of the ship 5. On the other hand, when the landing target point 2 is provided on the stern side of the ship 5, the control unit 30 controls the movement of the ship 5 as the turbulence avoidance control so that the bow heading is ±30 deg or more with respect to the relative wind direction. Incidentally, ±30 degrees or more refers to a range from -30 degrees via 180 degrees to +30 degrees. Incidentally, when the wind speed of the acquired relative wind is smaller than the first wind speed and equal to or greater than the second wind speed, the control unit 30 may notify the operator of the ship 5 of information for making the wind speed smaller than the second wind speed on the operation display unit 90 of the ship 5, instead of the above-mentioned movement control of the ship 5 (turbulence avoidance control).

[0038] Here, referring to Fig. 6, an example of a take-off and landing control pattern when the vertical take-off and landing aircraft 1 lands will be described. As described above, in step S13, when the relative wind is in a predetermined direction, the flight of the vertical take-off and landing aircraft 1 is controlled so that the heading of the aircraft coincides with the heading obtained by adding the heading of the relative wind. From the left side of Fig. 6, the relative wind directions are 0deg, 30deg, 60deg, 90deg, 120deg, 150deg, and 180deg. Also, in Fig. 6, the vertical take-off and landing aircraft 1 is located at the return position P.

[0039] When the relative wind direction is 0 deg, the control unit 30 of the vertical take-off and landing aircraft 1 executes flight control so that the heading of the aircraft coincides with the heading of the ship. Therefore, the vertical take-off and landing aircraft 1 approaches the ship 5 in a state where the heading of the aircraft coincides with the heading of the ship.

[0040] When the relative wind direction is 30 degrees, the control unit 30 of the vertical take-off and landing aircraft 1 derives a direction obtained by adding 30 degrees to the bow direction (bow direction +30 degrees) and executes flight control so that the bow direction coincides with the bow direction +30 degrees. Therefore, the vertical take-off and landing aircraft 1 approaches the ship 5 with the bow direction tilted by 30 degrees with respect to the bow direction.

[0041] Similarly, when the relative wind direction is 60 degrees or 90 degrees, the control unit 30 of the vertical take-off and landing aircraft 1 derives a direction by adding 60 degrees or 90 degrees to the bow heading (bow heading +60 degrees, bow heading +90 degrees) and performs flight control so that the bow heading coincides with bow heading +60 degrees or bow heading +90 degrees. Therefore, the vertical take-off and landing aircraft 1 approaches the ship 5 with the bow heading tilted by 60 degrees or 90 degrees with respect to the bow heading.

[0042] Furthermore, when the relative wind direction is 120 deg, 150 deg, or 180 deg, the control unit 30 of the vertical take-off and landing aircraft 1 derives a direction obtained by adding 120 deg, 150 deg, or 180 deg to the heading (heading +120 deg, heading +150 deg, heading +180 deg). Here, if there is a structure such as a bridge or a container aft of the landing target point 2, the relative wind will be blowing from the rear side, and the relative wind will be disturbed by the structure, forming a turbulent area E on the bow side. Even in this case, the control unit 30 performs flight control so that the heading coincides with heading +120 deg, heading +150 deg, or heading +180 deg. For this reason, the vertical take-off and landing aircraft 1 approaches the ship 5 with its nose tilted by 120 degrees, 150 degrees, or 180 degrees with respect to the ship's bow direction. This allows the vertical take-off and landing aircraft 1 to land at the landing target point 2 with a nose direction that is less affected by the turbulent area E.

[0043] Next, a procedure for causing the control unit 30 to make the vertical take-off and landing aircraft 1 take off from the landing target point 2 will be described as a take-off and landing control method for the vertical take-off and landing aircraft according to this embodiment. Fig. 7 is an explanatory diagram showing the take-off operation of the vertical take-off and landing aircraft according to this embodiment. Fig. 8 is a flowchart showing an example of the processing procedure of the take-off and landing control method for the vertical take-off and landing aircraft during take-off according to this embodiment. Fig. 9 is an explanatory diagram illustrating an example of a take-off and landing control pattern for the vertical take-off and landing aircraft during take-off according to this embodiment.

[0044] The takeoff operation of the vertical take-off and landing aircraft 1 will be described with reference to Figures 7 and 8. The vertical take-off and landing aircraft 1 executes a take-off mode in a series of take-off operations for taking off (leaving a ship) from the ship 5. Specifically, the vertical take-off and landing aircraft 1 executes take-off and landing control shown in Figure 8 before executing the take-off mode. Here, as shown in Figure 7, the ship 5 is provided with a nose orientation changing unit 98 that changes the nose orientation of the vertical take-off and landing aircraft 1 that has landed on the landing target point 2. The nose orientation changing unit 98 is, for example, a rotating table, and is controlled on the ship 5 side.

[0045] In the automatic take-off and landing system 100, the ship 5 measures and acquires the relative wind direction and wind speed using the anemometer 95, and the control unit 30 of the vertical take-off and landing aircraft 1 acquires the relative wind direction and wind speed acquired by the ship 5 (step S21). Next, the control unit 30 of the vertical take-off and landing aircraft 1 acquires the heading of the vertical take-off and landing aircraft 1 from the navigation device 20 (step S22). Next, the ship 5 acquires the heading acquired by the vertical take-off and landing aircraft 1, and controls the heading change unit 98 so that the acquired relative wind direction and the heading are opposite to each other (step S23). Note that in step S23, similar to step S13, the heading change unit 98 changes the heading so that the heading and the heading obtained by adding the relative wind direction to the heading are consistent with each other. Thereafter, the control unit 30 judges whether the relative wind direction and the aircraft heading are opposite to each other, that is, whether the aircraft heading is the same as the heading obtained by adding the relative wind direction to the heading (step S24). If the control unit 30 judges in step S24 that the relative wind direction and the aircraft heading are opposite to each other (step S24: Yes), the control unit 30 transitions to a takeoff mode (step S25). On the other hand, if the control unit 30 judges in step S24 that the relative wind direction and the aircraft heading are not opposite to each other (step S24: No), the control unit 30 again proceeds to step S23, and the aircraft heading of the vertical take-off and landing aircraft 1 is changed by the aircraft heading change unit 98 until the relative wind direction and the aircraft heading are opposite to each other. When the control unit 30 transitions to the take-off mode in step S25, the control unit 30 causes the vertical take-off and landing aircraft 1 to take off from the landing target point 2. It should be noted that the control based on the relative wind speed is the same during the takeoff operation of the vertical take-off and landing aircraft 1 as it is during the landing operation of the vertical take-off and landing aircraft 1.

[0046] Here, a takeoff and landing control pattern during takeoff of the vertical take-off and landing aircraft 1 will be illustrated and described with reference to Fig. 9. As described above, in step S23, when the relative wind is in a predetermined direction, the aircraft heading is changed by the aircraft heading change unit 98 so that the aircraft heading coincides with the heading obtained by adding the relative wind direction to the bow heading. From the left in Fig. 9, the relative wind directions are 0deg, 30deg, 60deg, 90deg, 120deg, 150deg, and 180deg.

[0047] When the relative wind direction is 0 deg, the vessel 5 executes heading change control by the heading change unit 98 so that the heading of the vessel coincides with the heading of the bow. As a result, the heading of the vertical take-off and landing aircraft 1 coincides with the heading of the bow.

[0048] When the relative wind direction is 30 degrees, the control unit 30 of the vertical take-off and landing aircraft 1 derives a direction obtained by adding 30 degrees to the bow direction (bow direction +30 degrees). The ship 5 executes direction change control by the bow direction changing unit 98 so that the bow direction coincides with the bow direction +30 degrees. As a result, the vertical take-off and landing aircraft 1 is in a state in which the bow direction is tilted by 30 degrees with respect to the bow direction.

[0049] Similarly, when the relative wind direction is 60 degrees or 90 degrees, the control unit 30 of the vertical take-off and landing aircraft 1 derives a direction obtained by adding 60 degrees or 90 degrees to the bow heading (bow heading +60 degrees, bow heading +90 degrees). The ship 5 executes heading change control by the bow heading change unit 98 so that the bow heading coincides with bow heading +60 degrees or bow heading +90 degrees. As a result, the vertical take-off and landing aircraft 1 is in a state in which the bow heading is tilted by 60 degrees or 90 degrees with respect to the bow heading.

[0050] Furthermore, when the relative wind direction is 120 deg, 150 deg, or 180 deg, the control unit 30 of the vertical take-off and landing aircraft 1 derives a direction obtained by adding 120 deg, 150 deg, or 180 deg to the bow heading (bow heading +120 deg, bow heading +150 deg, bow heading +180 deg). During take-off, as during landing, a turbulent area E is formed on the bow side. In this case, too, the vessel 5 executes heading change control by the bow heading change unit 98 so that the bow heading coincides with bow heading +120 deg, bow heading +150 deg, or bow heading +180 deg. As a result, the vertical take-off and landing aircraft 1 is in a state in which the bow heading is tilted by 120 deg, 150 deg, or 180 deg with respect to the bow heading. Therefore, the vertical take-off and landing aircraft 1 can take off from the landing target point 2 with a heading that is less affected by the turbulent area E.

[0051] In this embodiment, the vertical take-off and landing aircraft 1 is controlled so that the heading coincides with the direction of the relative wind. However, the heading error angle, which is the error angle between the heading and the direction of the relative wind, may be included. Here, the angle at which the heading and the direction of the relative wind face each other and coincide is set as a reference angle of 0 deg. The control unit 30 may cause the heading to face the direction of the relative wind within a range where the heading error angle is ±30 deg with respect to the reference angle of 0 deg. In other words, the heading of the vertical take-off and landing aircraft 1 does not have to coincide with the direction of the relative wind, and may be ±30 deg with respect to the direction of the relative wind. For example, as shown in FIG. 6, when the direction of the relative wind is 90 deg, if the reference angle is 0 deg, the heading direction of the vertical take-off and landing aircraft 1 is 90 deg with respect to the heading direction of the ship 5. Therefore, by setting the heading error angle to, for example, −30 degrees, the heading of the vertical take-off and landing aircraft 1 may be set to 60 degrees with respect to the heading of the ship 5.

[0052] Furthermore, in this embodiment, the automatic take-off and landing system 100 is mounted on the vertical take-off and landing aircraft 1 and the ship 5, but it may be mounted only on the vertical take-off and landing aircraft 1. In this case, it is necessary to acquire the relative wind direction and wind speed on the ship 5, and the relative wind direction and wind speed on the ship 5 can be derived from the speed of the ship 5 and the true wind in the ground coordinate system. Therefore, when the automatic take-off and landing system 100 is mounted only on the vertical take-off and landing aircraft 1, this can be realized by acquiring the speed of the ship 5 and the true wind direction and wind speed in the ground coordinate system.

[0053] Furthermore, in this embodiment, the aircraft heading changing unit 98 is controlled by the ship 5, but it may be controlled by the control unit 30 of the vertical take-off and landing aircraft 1.

[0054] As described above, the automatic take-off and landing system for a vertical take-off and landing aircraft, the vertical take-off and landing aircraft, and the take-off and landing control method for a vertical take-off and landing aircraft described in the present embodiment can be understood, for example, as follows.

[0055] The automatic take-off and landing system 100 for a vertical take-off and landing aircraft 1 in the first embodiment comprises a relative wind information acquisition unit (wind vane and anemometer 95) that acquires the direction of the relative wind at a moving body (ship 5), and a control unit 30 that executes take-off and landing control to cause the vertical take-off and landing aircraft 1 to take off and land at a landing target point 2 provided on the moving body, and when the vertical take-off and landing aircraft takes off or lands, the control unit 30 executes the take-off and landing control by aligning the nose direction of the vertical take-off and landing aircraft 1 with the direction of the relative wind based on the direction of the relative wind acquired by the relative wind information acquisition unit.

[0056] According to this configuration, the vertical take-off and landing aircraft 1 can take off and land with the heading of the vertical take-off and landing aircraft 1 facing the direction of the relative wind. Therefore, the vertical take-off and landing aircraft 1 can be made less susceptible to the effects of the relative wind, so the vertical take-off and landing aircraft 1 can take off and land regardless of the direction of the relative wind. This alleviates take-off and landing restrictions due to the relative wind, and the vertical take-off and landing aircraft 1 can be suitably taken off and landed at the landing target point 2.

[0057] In a second aspect, the relative wind information acquisition unit acquires the wind speed of the relative wind, and the control unit performs control based on the wind speed of the relative wind acquired by the relative wind information acquisition unit when the vertical take-off and landing aircraft 1 takes off or lands, and when the wind speed of the relative wind becomes equal to or greater than a second wind speed, performs turbulence avoidance control to avoid a turbulent area generated at the landing target point due to the relative wind.

[0058] According to this configuration, when the relative wind speed is a strong wind equal to or greater than the second wind speed, turbulence avoidance control can be executed to avoid the turbulent area occurring at the landing target point, making it possible to make the aircraft less susceptible to the effects of the relative wind.

[0059] As a third aspect, when the wind speed of the relative wind is equal to or greater than a first wind speed that is greater than a second wind speed, the control unit 30 does not perform takeoff and landing control of the vertical take-off and landing aircraft 1, but instructs the moving body and the vertical take-off and landing aircraft 1 to move to an area where the wind speed is smaller than the first wind speed.

[0060] According to this configuration, when there is a strong wind in which the relative wind speed is equal to or greater than the first wind speed, the moving body and vertical take-off and landing aircraft 1 can be urged to move to an area where the relative wind speed is weak, enabling the vertical take-off and landing aircraft 1 to take off and land safely at the landing target point 2.

[0061] As a fourth aspect, when the wind speed of the relative wind becomes equal to or greater than the second wind speed, the control unit 30 notifies the operator operating the moving object of information to make the wind speed smaller than the second wind speed.

[0062] According to this configuration, when the relative wind speed is a strong wind equal to or greater than the second wind speed, the moving body can be caused to move in order to weaken the relative wind speed, thereby enabling the vertical take-off and landing aircraft 1 to take off and land safely at the landing target point 2.

[0063] As a fifth aspect, when the wind speed of the relative wind becomes equal to or greater than a first wind speed that is greater than the second wind speed, the control unit 30 notifies the operator operating the moving object of information to make the wind speed smaller than the first wind speed.

[0064] According to this configuration, when the relative wind speed is a strong wind equal to or greater than the first wind speed, the moving body can be caused to move in order to weaken the relative wind speed, thereby enabling the vertical take-off and landing aircraft 1 to take off and land safely at the landing target point 2.

[0065] In a sixth aspect, the error angle between the heading direction and the relative wind direction is defined as a heading error angle, and the angle at which the heading direction and the relative wind direction are opposite and coincident is defined as a reference angle of 0 deg., and the control unit 30 causes the heading to face the relative wind direction within a range where the heading error angle is 0±30 deg with respect to the reference angle of 0 deg.

[0066] According to this configuration, even when the direction of the relative wind and the nose direction of the vertical take-off and landing aircraft 1 are made to face each other, there is no need to make the direction of the relative wind and the nose direction of the vertical take-off and landing aircraft 1 coincident (at 0 deg). This allows priority to be given to safe take-off and landing of the vertical take-off and landing aircraft 1 at the landing target point 2.

[0067] In a seventh aspect, the moving body is a ship 5, and the landing target point 2 is provided on the bow side of the ship 5.

[0068] According to this configuration, by providing the landing target point 2 on the bow side, it is possible to make it less susceptible to the effects of turbulence generated by structures on the stern side.

[0069] As an eighth aspect, the apparatus further includes a nose direction changing unit 98 that changes the nose direction of the vertical take-off and landing aircraft 1 that has landed on the landing target point 2, and when the nose direction of the vertical take-off and landing aircraft 1 changed by the nose direction changing unit 98 and the direction of the relative wind acquired by the relative wind information acquisition unit become opposite to each other when the vertical take-off and landing aircraft 1 takes off, the control unit 30 causes the vertical take-off and landing aircraft 1 to take off from the landing target point 2.

[0070] According to this configuration, the heading of the vertical take-off and landing aircraft 1 at the landing target point 2 can be changed by the heading change unit 98, allowing the vertical take-off and landing aircraft 1 to take off while facing the direction of the relative wind.

[0071] The vertical take-off and landing aircraft 1 according to the ninth aspect includes the automatic take-off and landing system 100 for the vertical take-off and landing aircraft 1 described above.

[0072] According to this configuration, if the speed of the ship 5 and the true wind direction and wind speed in the ground coordinate system can be obtained, a configuration in which the automatic take-off and landing system 100 is mounted only on the vertical take-off and landing aircraft 1 can be realized.

[0073] A take-off and landing control method for a vertical take-off and landing aircraft in accordance with a tenth aspect has an automatic take-off and landing system 100 for a vertical take-off and landing aircraft 1, which performs take-off and landing control for causing the vertical take-off and landing aircraft 1 to take off and land at a landing target point 2 provided on a moving body (ship 5), execute steps S11 and S21 of acquiring a relative wind direction at the moving body, steps S13 and S23 of orienting the nose direction of the vertical take-off and landing aircraft to face the relative wind direction based on the acquired relative wind direction, and steps S4 and S25 of causing the vertical take-off and landing aircraft 1 to take off and land at the landing target point 2.

[0074] According to this configuration, the vertical take-off and landing aircraft 1 can take off and land with the heading of the vertical take-off and landing aircraft 1 facing the direction of the relative wind. Therefore, the vertical take-off and landing aircraft 1 can be made less susceptible to the effects of the relative wind, so the vertical take-off and landing aircraft 1 can take off and land regardless of the direction of the relative wind. This alleviates take-off and landing restrictions due to the relative wind, and the vertical take-off and landing aircraft 1 can be suitably taken off and landed at the landing target point 2. [Explanation of symbols]

[0075] 1. Vertical take-off and landing aircraft 2. Landing target point 5 Ships 7. Markers 10. Camera 20,70 Navigation equipment 30 Control section 32 Image processing section 34 Guidance calculation section 36 Flight Control Unit 40,80 Data transmission equipment 95 Anemometer 98 Heading change section 100 Automatic take-off and landing system

Claims

1. A relative wind information acquisition unit that acquires a direction of a relative wind in the moving object; a control unit that executes take-off and landing control to cause a vertical take-off and landing aircraft to take off and land at a landing target point provided on the moving body, The control unit is An automatic take-off and landing system for a vertical take-off and landing aircraft that performs take-off and landing control while a return mode is being executed in which the vertical take-off and landing aircraft is moved to a return position, or after completion of the return mode, by aligning the nose direction of the vertical take-off and landing aircraft with the direction of the relative wind based on the direction of the relative wind acquired by the relative wind information acquisition unit.

2. A heading change unit that changes the heading of the vertical take-off and landing aircraft that has landed on the landing target point, The control unit is 2. An automatic take-off and landing system for a vertical take-off and landing aircraft as described in claim 1, wherein, when the vertical take-off and landing aircraft takes off, if the nose direction of the vertical take-off and landing aircraft changed by the nose direction changing unit and the direction of the relative wind acquired by the relative wind information acquisition unit become opposite to each other, the vertical take-off and landing aircraft is caused to take off from the landing target point.

3. A relative wind information acquisition unit that acquires a direction of a relative wind in the moving object; a control unit that executes takeoff and landing control for causing a vertical takeoff and landing aircraft to take off and land at a landing target point provided on the moving body; a heading changing unit that changes a heading of the vertical take-off and landing aircraft that has landed on the landing target point, The control unit is When the vertical take-off and landing aircraft takes off or lands, the take-off and landing control is executed in a state where the heading of the vertical take-off and landing aircraft is oriented toward the direction of the relative wind based on the direction of the relative wind acquired by the relative wind information acquisition unit, An automatic take-off and landing system for a vertical take-off and landing aircraft that, when the nose direction of the vertical take-off and landing aircraft changed by the nose direction changing unit and the direction of the relative wind acquired by the relative wind information acquisition unit become opposite to each other during take-off of the vertical take-off and landing aircraft, causes the vertical take-off and landing aircraft to take off from the landing target point.

4. The relative wind information acquisition unit acquires a wind speed of the relative wind, The control unit is When the vertical take-off and landing aircraft takes off or lands, control is performed based on the wind speed of the relative wind acquired by the relative wind information acquisition unit, 4. An automatic take-off and landing system for a vertical take-off and landing aircraft as described in any one of claims 1 to 3, wherein, when the wind speed of the relative wind becomes equal to or greater than a second wind speed, turbulence avoidance control is executed to avoid a turbulent area generated at the landing target point by the relative wind.

5. A relative wind information acquisition unit that acquires a relative wind direction and a wind speed at the moving object; a control unit that executes take-off and landing control to cause a vertical take-off and landing aircraft to take off and land at a landing target point provided on the moving body, The control unit is When the vertical take-off and landing aircraft takes off or lands, the take-off and landing control is executed in a state where a heading of the vertical take-off and landing aircraft is oriented to face a direction of the relative wind based on a direction of the relative wind acquired by the relative wind information acquisition unit, and An automatic take-off and landing system for a vertical take-off and landing aircraft that, when the wind speed of the relative wind acquired by the relative wind information acquisition unit becomes equal to or greater than a second wind speed based on the wind speed of the relative wind acquired by the relative wind information acquisition unit, executes turbulence avoidance control to avoid a turbulent area generated at the landing target point due to the relative wind.

6. The control unit is An automatic take-off and landing system for a vertical take-off and landing aircraft as described in any one of claims 1 to 5, wherein when the wind speed of the relative wind becomes equal to or greater than a first wind speed that is greater than a second wind speed, take-off and landing control of the vertical take-off and landing aircraft is not performed, and the moving body and the vertical take-off and landing aircraft are instructed to move to an area where the wind speed is smaller than the first wind speed.

7. The control unit is 6. An automatic take-off and landing system for a vertical take-off and landing aircraft as described in claim 4 or 5, which, when the wind speed of the relative wind becomes equal to or greater than the second wind speed, notifies an operator operating the moving body of information for making the wind speed smaller than the second wind speed.

8. The control unit is 7. The automatic take-off and landing system for a vertical take-off and landing aircraft as described in claim 6, wherein, when the wind speed of the relative wind becomes equal to or greater than a first wind speed that is greater than the second wind speed, an operator operating the moving body is notified of information for making the wind speed smaller than the first wind speed.

9. The error angle between the heading and the relative wind direction is defined as a heading error angle, If the angle at which the heading direction and the relative wind direction are opposite and coincident is defined as a reference angle 0 deg, 9. The automatic take-off and landing system for a vertical take-off and landing aircraft according to claim 1, wherein the control unit adjusts the heading to face the direction of the relative wind within a range in which the heading error angle is ±30 degrees with respect to the reference angle of 0 degrees.

10. The moving object is a ship, 10. The automatic take-off and landing system for a vertical take-off and landing aircraft according to claim 1, wherein the landing target point is provided on the bow side of the ship.

11. A vertical take-off and landing aircraft comprising the automatic take-off and landing system for vertical take-off and landing aircraft according to any one of claims 1 to 10.

12. An automatic take-off and landing system for a vertical take-off and landing aircraft that performs take-off and landing control to make the vertical take-off and landing aircraft take off and land at a landing target point provided on a moving body, Obtaining a relative wind direction at the moving body; a step of orienting a heading of the vertical take-off and landing aircraft to face the direction of the relative wind based on the acquired direction of the relative wind; and causing the vertical take-off and landing aircraft to take off and land at the landing target point, A method for controlling take-off and landing of a vertical take-off and landing aircraft, in which the step of acquiring the relative wind direction and the step of facing the relative wind direction are performed during execution of a return mode in which the vertical take-off and landing aircraft is moved to a return position, or after completion of the return mode.

13. An automatic take-off and landing system for a vertical take-off and landing aircraft that performs take-off and landing control to make the vertical take-off and landing aircraft take off and land at a landing target point provided on a moving body, Obtaining a relative wind direction at the moving body; a step of orienting a heading of the vertical take-off and landing aircraft to face the direction of the relative wind based on the acquired direction of the relative wind; and causing the vertical take-off and landing aircraft to take off and land at the landing target point, A take-off and landing control method for a vertical take-off and landing aircraft, which causes the vertical take-off and landing aircraft to take off from the landing target point when the heading of the vertical take-off and landing aircraft whose heading has been changed becomes opposite to the acquired relative wind direction during take-off.

14. An automatic take-off and landing system for a vertical take-off and landing aircraft that performs take-off and landing control to make the vertical take-off and landing aircraft take off and land at a landing target point provided on a moving body, acquiring a relative wind direction and a wind speed at the moving object; a step of orienting a heading of the vertical take-off and landing aircraft to face the direction of the relative wind based on the acquired direction of the relative wind; and causing the vertical take-off and landing aircraft to take off and land at the landing target point, An automatic take-off and landing system for a vertical take-off and landing aircraft that, when the wind speed of the relative wind becomes equal to or greater than a second wind speed based on the acquired wind speed of the relative wind during take-off and landing of the vertical take-off and landing aircraft, performs turbulence avoidance control to avoid a turbulent area generated at the landing target point due to the relative wind.

Citation Information

Patent Citations

  • Landing support device for aircraft, landing support method for aircraft, and landing support program for aircraft

    JP2020045049A

  • Automatic landing system for vertical takeoff / landing aircraft, vertical takeoff / landing aircraft, and control method for landing of vertical takeoff / landing aircraft

    JP2021062719A

  • Method and apparatus for constructing an artificial island

    US4648749A