METHOD FOR ASSESSING PHOTOVOLTAIC ENERGY PRODUCTION AND ASSESSMENT AND CONTROL UNIT CARRYING OUT THE METHOD - Patent application

The method uses a database with historical and predicted irradiance values to accurately and rapidly evaluate photovoltaic energy production, addressing the limitations of existing forecasting methods by enabling real-time energy management in positive energy districts.

JP7564124B2Active Publication Date: 2024-10-08TOTAL RENEWABLES
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021560443
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2019-04-11
Filing Date
2020-04-10
Publication Date
2024-10-08
Estimated Expiration
2040-04-10

AI Technical Summary

Technical Problem

Existing photovoltaic energy production forecasting methods are inadequate for real-time evaluation and are computationally complex, making them unsuitable for short-term predictions and adjustments in energy supply and demand within positive energy districts.

Method used

A method for evaluating photovoltaic energy production using a database with historical or predicted irradiance values at short intervals, combined with mathematical functions, to determine solar power generation accurately and rapidly, enabling real-time adjustments in energy management.

Benefits of technology

Facilitates rapid and accurate evaluation of photovoltaic energy production, allowing for real-time management of energy supply and demand, reducing computational complexity and enabling efficient use of storage and consumption adjustments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007564124000008
    Figure 0007564124000008
  • Figure 0007564124000009
    Figure 0007564124000009
  • Figure 0007564124000010
    Figure 0007564124000010
Patent Text Reader

Abstract

The invention relates to a method for evaluating photovoltaic energy production of an energy supply facility (11) installed at a site (1), the energy supply facility (11) comprising at least one power production unit (12) having at least one photovoltaic module (14), the method comprising the steps of determining historical or predicted irradiance values ​​for the site (1) on which the energy supply facility (11) is installed, the determining being performed at a time interval of 1 second to 2 years, and evaluating the photovoltaic power generated as a function of the determined irradiance values ​​and pre-recorded values ​​in a database (30), the database (30) containing pre-recorded values ​​for determining the photovoltaic power generated as a function of irradiance for each day of the year and for different times of each day.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to the field of estimating photovoltaic energy production, more specifically to a method for estimating photovoltaic energy production and to an evaluation and management unit implementing this method.

[0002] Cutting-edge technology The rising cost of fossil fuels and the increase in pollution caused by the consumption of these fossil fuels have led to an increasing attention being paid to renewable energy sources and to energy consumption in line with sustainable development. This trend is naturally in favor of renewable energies such as solar energy. Currently, it is common to install photovoltaic panels, especially on the roofs of companies, public buildings or simply on the roofs of private homes, for self-consumption or to feed, for example, the entire production or surplus energy into the public network.

[0003] Currently, positive energy districts are being developed. The aim of these districts is to become self-sufficient in electricity by generating in a renewable manner the energy they consume. One example of this is the IssyGrid project, an experimental project that groups together private homes and offices. In this project, various locations are equipped, among other things, with photovoltaic modules in order to be able to produce electrical energy to meet the energy needs of the facilities in the district.

[0004] The various electrical equipment of these installations can, for example, be interconnected in a network and controlled in order to optimize their operation as a function of the amount of electricity instantly generated and / or stored, for example in accumulators, while of course limiting backup electricity coming from the public network to which the district is connected.

[0005] There are also various control modules that make it possible to limit the consumption of various electrical devices, in particular to control the optimized operation of air conditioning or heating (reversible heat pump) installations, household appliances (washing machines, dishwashers, water heaters) or even lighting.

[0006] The aim of the IssyGrid project is therefore to create districts capable of generating their own energy and potentially injecting surplus renewable electrical energy into the public electricity network.

[0007] In order to achieve such autonomy at least in part, it must be possible to evaluate the generated photovoltaic power in a predictive manner that makes it possible to choose, in the event of insufficient renewable electrical energy production, for example in the face of high energy demand, between, on the one hand, electrical energy backup from the public network or from electricity stored in an accumulator, and, on the other hand, simply declining some consumers, who are, for example, considered non-essential.

[0008] Indeed, if the amount of available or produced renewable energy is insufficient or in a state of oversupply, it may be necessary to implement storage solutions, to alert the public network operator or to draw from storage units to meet the energy needs of various consumers in the district or to limit certain electricity consumers.

[0009] Such situations may arise, for example, during harsh winters when renewable energy production capacity falls far short of demand, or conversely, during midday summer hours when solar power production is high but consumption is low.

[0010] In the context of the design of photovoltaic installations, several software programs are currently known that allow for the calculation of renewable electrical energy production forecasts, which are used to size photovoltaic installations for future production sites and generally take into account historical weather data.

[0011] These historical weather data include, for example, sunlight levels during different periods of the year within the geographic zone for which the facility is intended.

[0012] The software is primarily developed to calculate the return on investment, and therefore the financial viability, of such projects.

[0013] In more sophisticated versions for projects with self-consumption, some software also takes into account the consumer side and the electric energy needs of more complex installations with electric energy production units, electric energy storage units and electric energy consumption units.

[0014] However, this software is not suitable for predicting in a reliable or practical manner the photovoltaic power generated by the production unit for future periods, in particular from day to day, with sufficiently accurate sampling intervals throughout the day. Indeed, the photovoltaic power generated by the electricity production unit depends on the instantaneous weather conditions. These weather conditions may vary from day to day, or even during the same day.

[0015] Furthermore, the calculations carried out by this software are very complex and lengthy, making them unsuitable for carrying out predictive assessments that enable, for example, the energy supply or consumption of an electrical appliance to be adapted in real time.

[0016] Furthermore, known photovoltaic simulation software, originally designed for annual performance evaluation, often has calculation intervals of the order of one hour that cannot be adjusted, which is too long for same-day evaluations, which require evaluating forecasts on the order of one minute.

[0017] Thus, although this software is very efficient in modeling and ergonomics, it is not suitable or accurate for predicting short-term solar photovoltaic energy production and requires significant computation time.

[0018] Therefore, in order to meet the energy needs of the various installations in these positive energy districts, it must be possible to predict in real time the photovoltaic power that will be generated and to activate the supply or injection of electricity, possibly from the public network, to these installations, to activate storage units or to command the reduction or switching on of consumption of certain authorized consumers or electrical appliances in the district.

[0019] Especially for hybrid electric systems with thermoelectric generators such as diesel generator sets, short-term solar power forecasting makes it possible to anticipate a decrease in solar power generation, for example due to the passage of clouds, and switch on one or more generators in advance, avoiding forced drop-outs or blackouts. In return, reliable forecasts make it possible to minimize the number of operating generators, reducing fuel consumption and maintenance needs, while ensuring a reliable power supply.

[0020] One of the objects of the invention is therefore to provide a solution for enabling a real-time assessment of the photovoltaic power production of an installation without the use of complex calculations.

[0021] Another aspect relates to controlling the generated power for diagnostic purposes: in fact, by evaluating the theoretical photovoltaic energy production according to actual weather conditions in a sufficiently accurate manner for a production unit during a past time interval, and by comparing this theoretical production with the actual power production by the production unit during the same time interval, it is possible to determine the operating state of the production unit and, in case of too great a discrepancy, for example to schedule necessary maintenance operations.

[0022] In fact, if the amount of generated electrical energy is too low compared to the expected power, it can be inferred that the production unit has technical problems, such as, for example, a fault in the module chain or inverter, or the accumulation of dust or dirt.

[0023] The object of the present invention is therefore to at least partially overcome the above-mentioned problems of the prior art by proposing a simplified method for evaluating photovoltaic energy production, which allows monitoring, diagnosing or predicting the production of photovoltaic energy.

[0024] Disclosure of the Invention For this purpose, the subject of the invention is a method for estimating the photovoltaic energy production of an energy supply installation installed on a site, the energy supply installation comprising at least one power production unit having at least one photovoltaic module, Photovoltaic energy production evaluation methodology: - determining historical or predicted irradiance values ​​of the site where the energy supply installation is installed, the determination being carried out at a time interval between 1 second and 2 years; - evaluating the photovoltaic power generated as a function of the determined irradiance value and pre-recorded values ​​in a database, the database containing pre-recorded values ​​for determining the photovoltaic power generated as a function of irradiance for each day of the year and for different times of each day.

[0025] The various steps of the method are carried out automatically by an evaluation and management unit, which comprises, for example, processing means or a computer system such as a microprocessor or microcontroller. The capabilities of these processing means may be limited by the fact that they use a database, as described later in this specification. In particular, the values ​​of the generated photovoltaic power can be read by the processing means, stored and processed later.

[0026] The use of a database, for example in the form of a table, to determine the photovoltaic power generated by the power production unit by introducing irradiance limits the computational power required to determine this generated photovoltaic power.

[0027] Thus, using such a database facilitates the calculations and therefore makes it easier and faster to determine the photovoltaic power generated at any time of the day. Furthermore, using such a database makes it possible to automate the determination of the photovoltaic power generated by the power production unit.

[0028] The invention may also include one or more of the following aspects, either alone or in combination.

[0029] According to one embodiment, the pre-recorded values ​​in the database correspond to photovoltaic power values ​​generated as a function of irradiance values.

[0030] The database may, for example, include for each time point included in the database, power values ​​generated as a function of different irradiance levels, the irradiance levels being between 0 and 1300 W / m 2 in the range of 10 W / m 2 is incremented by one.

[0031] For irradiance levels not shown in the database and lying between two levels shown in the database, the value of the solar power generated can be determined by linear interpolation of the solar power values ​​shown at the two irradiance levels shown in the database.

[0032] According to another aspect, the numerical values ​​pre-recorded in the database correspond to the coefficients of a mathematical function describing the value of the power to be generated as a function of the irradiance.

[0033] The mathematical function may be a polynomial, in particular a fourth order polynomial.

[0034] The coefficients of the mathematical function are determined in particular by least squares regression of the values ​​of the generated power as a function of different irradiance values, the irradiance values ​​being, for example, between 0 and 1300 W / m 2 is in the range.

[0035] The method may include a step for correcting the solar power generated as a function of irradiance, the step taking into account predicted, historical, or measured values ​​of temperature and / or wind speed at the installation site by applying a correction factor.

[0036] The correction factor is in particular a linear correction factor.

[0037] The pre-recorded values ​​may be shown in a database with times spaced, for example, at least between sunrise and sunset for each day, and spaced apart by 5 minutes to 2 hours, particularly 1 hour.

[0038] For a time not shown in the database and falling between two times shown in the database, the pre-recorded value can be determined by linear interpolation of the pre-recorded values ​​shown at the two times shown in the database.

[0039] The evaluation of the electrical energy production is in particular carried out at a sampling interval of less than or equal to 5 minutes, in particular every second.

[0040] The invention also provides a method for forecasting photovoltaic energy production and managing electrical equipment for an on-site energy supply installation equipped with at least one power producing unit having at least one photovoltaic module (14), comprising: - executing the method for evaluating photovoltaic energy production as defined above, in which during the step of determining irradiance values, predicted irradiance values ​​are determined for the site at which the energy supply installation is installed, said determination being made for a prediction time interval between 1 second and 2 days; - adapting the operation method of at least one electrical appliance as a function of an assessment of photovoltaic energy production by the energy supply installation.

[0041] The invention also relates to a method for monitoring and diagnosing photovoltaic energy production of an energy supply installation installed on a site, the energy supply installation comprising at least one power producing unit having at least one photovoltaic module, - performing the method for estimating photovoltaic energy production as defined above, in which during the step of determining irradiance values, historical irradiance values ​​of a site at which an energy supply installation is installed are determined for a past time interval, - comparing the estimated solar photovoltaic energy production with a measured solar photovoltaic energy production during a past time interval.

[0042] According to an additional aspect, the method also includes generating an alert if a difference between the evaluated solar power energy production and the solar power production measured during the past time interval exceeds a predetermined threshold.

[0043] The invention also relates to an evaluation and management unit comprising means adapted to implement a method as defined above.

[0044] The invention further relates to a computer program product which can be loaded into the internal memory of the evaluation and management unit, comprising portions of software code for carrying out the steps of the method as defined above, when the computer program is executed by a computer.

[0045] Further characteristics and advantages of the invention will become apparent from the following description, given by way of non-limiting example with reference to the attached drawings, in which: [Brief description of the drawings]

[0046] [Figure 1] FIG. 1 is a schematic perspective view of a site equipped with renewable energy supply facilities. [Diagram 2] It is a synoptic representation of a local electrical network including electrical energy supply facilities. [Diagram 3] FIG. 3 is an example of an extract from a schematic representation of a database for evaluating the photovoltaic power generated as a function of irradiance level and time of year for the on-site energy supply equipment of FIGS. 1 and 2 . [Figure 4] 3 is an example graph showing the solar power generated as a function of irradiance for the on-site energy supply installation of FIGS. 1 and 2 for several times during the year. [Diagram 5] FIG. 3 is an example of an extract from a schematic representation of a database for estimating the photovoltaic power generated as a function of irradiance and time of year for the energy supply installations at the sites of FIGS. 1 and 2, accompanied by coefficients of polynomial functions. [Figure 6] 2 is a diagram showing the configuration of a database for evaluating photovoltaic power generated by the on-site energy supply facility of FIG. 1. FIG. [Figure 7] FIG. 1 is a flow diagram of an embodiment of a method for valuing generated solar power. [Figure 8] FIG. 1 is a flow diagram of an embodiment of a method for forecasting solar power energy production and managing electric equipment. [Figure 9] FIG. 1 is a flow diagram of one embodiment of a method for monitoring and diagnosing solar photovoltaic energy production. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0047] In all figures, elements having the same function have the same reference numbers.

[0048] The following embodiments are examples. Although the description refers to one or more embodiments, this does not necessarily mean that each reference relates to the same embodiment or that a feature applies only to one embodiment. Single features of different embodiments may be combined or exchanged to provide other embodiments.

[0049] definition In the following description, "photovoltaic module" means the most basic (DC) electrical energy production unit consisting of an assembly of photovoltaic cells connected together and fully protected from the external environment, i.e. as defined by the IEC-TS61836 standard.

[0050] In the following description, "real time" means an evaluation sampling interval of 10 minutes or less, in particular 5 minutes or less, in particular every minute.

[0051] In the following description, "irradiance" or flux density according to the ISO 80000-7 § 19 standard means the quantification of the power of electromagnetic radiation falling on a surface unit. Irradiance corresponds to the surface density of the energy flow arriving at the considered point of the surface. This surface density is expressed in watts per square meter (W / m ) for the entire solar spectrum or for a defined part of the spectrum. 2 ) The irradiance can be in particular the "global horizontal irradiance" (GHI), the irradiance in a fixed or variable defined plane such as a module plane, the diffuse irradiance and / or the normal direct irradiance, or a combination of these pieces of information.

[0052] In French, the word "temp" can be associated with a time sequence or with meteorology. In this description, the word "temp" is used only to describe the element of time, and the words meteorology or meteorological are used to describe elements associated with meteorology.

[0053] "Weather parameters" means any parameters related to meteorology that may affect the operation, and in particular the efficiency, of a photovoltaic module, such as irradiance values, temperature and / or wind speed at the installation site.

[0054] "Time interval" means the time from the beginning to the end of the evaluation or forecast period. The forecast time interval is the time from a future forecast point in time to the present time. If the forecast time interval is 36 hours, this makes it possible, for example, to have at the present time a forecast of the value of a weather parameter up to 36 hours from now.

[0055] By "sampling interval" we mean the time between two points in time within a "time interval" required to determine, for example, an irradiance value or the time between photovoltaic energy production evaluation points. Thus, for a forecast time interval of 36 hours and a sampling interval of 5 minutes, it is possible to calculate the photovoltaic energy production every 5 minutes from now until 36 hours from now, i.e. 36 x 60 / 5 + 1 = 433 future production values.

[0056] On-site 1 shows a site 1, for example a commercial site, such as a service station, in particular having a retail building 3 and a fuel distribution structure 5, for example having a roof 7 in the form of a canopy. At this site 1, various electrical appliances 10 are also installed.

[0057] The electrical appliance 10 is, for example, a heat pump, an air conditioning system, a lighting and / or display device, a fuel dispensing pump, or even a vending machine.

[0058] The site 1 is also equipped with an electrical energy supply installation 11 (see FIG. 2 ) which comprises at least one power production unit 12 having at least one, preferably several, photovoltaic modules 14 and an evaluation and management unit 16 .

[0059] Each photovoltaic module 14 of this power producing unit 12 has known characteristics of production, in particular of the power generated as a function of sunlight, more particularly as a function of irradiance and, for example, temperature. Photovoltaic modules 14 of known technology can be used, for example modules having crystalline silicon photovoltaic cells (not shown).

[0060] As can be seen in FIG. 1, the photovoltaic module 14 is mounted, for example, on the roof 7 of the fuel distribution structure 5 .

[0061] The electrical energy supply installation 11 also optionally comprises a storage unit 18 for the electrical energy generated by the power production unit 12 and / or the thermoelectric generator 20 .

[0062] This storage unit 18 can be, for example, a battery or an electrical energy accumulator.

[0063] The thermoelectric generator 20 may, for example, be formed by a diesel generator set that can be switched on to provide backup power in the event of a failure or outage of the public electricity network or when it is economically more advantageous to turn on the generator than to draw from the public network.

[0064] Clearly other embodiments are envisaged in which site 1 may be a residential and / or industrial estate including individual or collective dwellings, offices or industrial buildings.

[0065] As shown diagrammatically in FIG. 2, the electrical energy supply installation 12 and the electrical appliances 10 are interconnected in a local electrical network 22 which is controlled, for example, by an evaluation and management unit 16 .

[0066] As will be explained in more detail below, the evaluation and management unit 16 is configured to analyze the production of electrical energy by the power production unit 12, to analyze the electrical requirements of the electrical equipment 10, and to control, for example, the storage unit 18 and / or one or more thermoelectric generators 20 and the flow of electricity between various units of a local electrical network 22. This local electrical network 22 is also connected to a public electricity network 24 that can receive surplus electricity generated by the energy supply facility 12 or that allows to back up the supply or possibly replace the power production unit 12 completely or partially.

[0067] For this purpose, the evaluation and management unit 16 is configured, for example, to enable / disable / control switches, relays and / or converters (not shown) arranged in this local network 22 and to manage the various electrical flows.

[0068] Thus, the electrical energy generated by the power production unit 12 can be consumed directly by the electrical equipment 10, stored by the storage unit 18 or supplied to the public network 24, depending for example on which is most economically advantageous for the operator of the site 1.

[0069] The electrical energy stored by the storage unit 18 can be supplied to the electrical equipment 10, for example, especially when the electrical energy generated by the production unit 12 is insufficient.

[0070] Electrical energy from the public network 24 can be supplied to the electrical equipment 10, for example, when the electrical energy generated by the production unit 12 and / or the thermoelectric generator 20 is insufficient, or when the available electrical energy in the storage unit 18 is insufficient.

[0071] Finally, electrical energy can be supplied to the electrical equipment 10, produced by a local thermoelectric generator 20, such as, for example, a diesel generator set, which can be switched on to ensure backup power in case of a failure or outage of the public network 24.

[0072] For the evaluation and management unit 16 to be able to make these choices, it is therefore necessary to predict in real time the production of photovoltaic energy achieved by the power production unit 12, which depends heavily on the weather conditions at the site 1, and to take into account not only the power requirements of the various power-consuming equipment 10, but also the conditions for buying back or selling power through the public network 24.

[0073] In a more advanced variant, the evaluation and management unit 16 is configured to more finely control the energy consumption of at least some of the electrical appliances 10, for example to limit the consumption of some of the electrical appliances 10 over a given period of time. In particular, this increases the energy self-sufficiency of the site 1 by limiting the consumption in the public network 24 and thus optimizing the energy bill of the site 1. For example, in the case of an air conditioning system, the evaluation and management unit 16 can be configured to increase the setpoint temperature by, for example, one degree, in order to limit the consumption.

[0074] A predictive aspect may also be necessary to alert the operator of the public network 24 so that certain power can be allowed to be drawn from or injected into the public network 24 without penalty, or simply so that the thermoelectric generator 20 can be switched on in time.

[0075] For this purpose, the evaluation and management unit 16 is connected by electrical communication means 26 to a meteorological evaluation system 28 configured in particular to communicate to the evaluation and management unit 16 forecast or historical meteorological parameters, such as irradiance values, wind speed or temperature, of the site 1 where the power production unit 12 is installed. The meteorological evaluation system 28 is located remotely and comprises, for example, a remote server.

[0076] The evaluation and management unit 16 is for example a computer with a memory and one or more processors or microcontrollers and communication means arranged to communicate with and control the energy supply installations 11 and the electrical appliances 10, to communicate with the weather evaluation system 28 and also with an operator of for example the public network 24. This evaluation and management unit 16 can be installed at the site 1 or remotely.

[0077] The evaluation and management unit 16 is configured to implement a method for evaluating the photovoltaic energy production of the energy supply installation 11, in particular the power production unit 12, by using a database 30 containing pre-recorded numerical values ​​making it possible to determine the photovoltaic power generated as a function of the irradiance for each day of the year and for different times of each day.

[0078] For this purpose, the evaluation and management unit 16 is configured to access a database 30 which can be recorded in a memory of the evaluation and management unit 16 (as shown diagrammatically in FIG. 2) or which can be located on a remote server.

[0079] According to a first embodiment, the pre-recorded numerical values ​​correspond to the photovoltaic power values ​​generated by the power producing unit 12 as a function of irradiance.

[0080] An example of the representation and contents of this database 30 is shown in table form in FIG.

[0081] This database 30 contains photovoltaic power values ​​generated as a function of irradiance for each day of the year and for different times of each day.

[0082] More precisely, the database 30 is organized into a number of columns on the y-axis 32, e.g., 10 W / m 2 In this embodiment, the irradiance values ​​range from 0 to 1300 W / m 2 In this example, the range is 0 to 1100 W / m 2 In general, the irradiance on a surface perpendicular to the sun's rays is up to 1000 W / m 2 Since it is around this level range, it is considered sufficient.

[0083] The x-axis 34 indicates a point in time in a year, for example referenced by date and time. In this embodiment, this table in the database 30 has each day of the year (January 1 (01 / 01) to December 31 (12 / 31)) and for each day, different points in time, for example 24 points in time, with one-hour intervals in the range 00:00 to 23:00, are shown.

[0084] Obviously, database table 30 can be modified without departing from the scope of the present invention. Thus, the time intervals between the various time points can be longer or shorter than one hour, and a day can have more (or fewer) than 24 time points. Also, nighttime hours, when irradiance values ​​are zero or negligible, can be implicitly ignored by listing in this table 30 of this database only time points between sunrise and sunset, which can be easily determined by astronomical calculations.

[0085] Thus, the database 30 of FIG. 3 shows photovoltaic power values ​​36 generated as a function of irradiance 32 at times throughout the day, preferably at regular intervals of between 30 minutes and 2 hours, in particular 1 hour, at least between sunrise and sunset each day.

[0086] More specifically, each day of the year can be divided into hours, or 8760 common hour intervals.

[0087] 0~1100W / m 2 in the range of 10W / m 2 For each irradiance level contained in the database 30 and for each time point in the year, a power value 36 corresponding to the photovoltaic power generated by the power producing unit 12 is pre-recorded, incremented by 100 .mu.m.

[0088] As a result, for example, 470W / m at 12:00 on 01 / 01 2 At 16:00, this same irradiance produces 2,325,012 kW of photovoltaic power.

[0089] It is therefore apparent that the photovoltaic power generated by the power producing unit 12 can be very easily assessed based on irradiance values, which may be predicted or historical values.

[0090] This database 30 therefore takes into account the angle formed between the direct sunlight and the surface of the photovoltaic module 14, which for astronomical reasons varies as a function of the season and the time of day, according to the date and a given geographical zone.

[0091] If the irradiance value 32 determined by the weather assessment system 28 is not exactly one of the pre-recorded irradiance levels in the database 30, a linear correction can be made, for example, to approximate, for example by interpolation, the solar power 36 that would be generated in these particular conditions.

[0092] For example, at a given time of day, such as 10:00 on July 20, 468 W / m 2 For example, let's look at the predicted irradiance of 32. In this case, we can calculate the following:

number

[0093] During the ceremony, -P1 corresponds to the solar power 36 generated for the predicted irradiance 32 at a given time T; and -E e corresponds to a predicted irradiance value of 32.

[0094] According to the data in Figure 3, at 10:00 on July 20th,

number

[0095] For example, a prediction of irradiance 32 may be made at 10:15 on July 20. In such a case, the following calculations can be made for a given time interval to predict the solar power 36 to be generated at exactly that time on July 20:

number

[0096] During the ceremony, -P2 corresponds to the photovoltaic power generated at a particular time of day for a given irradiance.

[0097] According to the data in Figure 3, on July 20th, it was 468 W / m 2 In contrast, At 10:00:

number

number

number

[0098] The correction is linear in this case, so it can be done first at the irradiance level and then at the time point within the interval, or in the reverse order.

[0099] According to a second embodiment which allows to further reduce the size of the database 30, the pre-recorded values ​​are, for example, between 0 and 1300 W / m 2 These correspond to the coefficients of a mathematical function, for example a polynomial function of order 4, which describes the value of the power generated as a function of the irradiance within a range of irradiance values.

[0100] For example, if the value of solar generated power 36 as a function of irradiance level 32 is plotted for different times of the year, the graph shown in FIG. 4 is obtained.

[0101] Thus, curve 41 (triangle), curve 43 (diamond), curve 45 (square), and curve 47 (circle) show values ​​of solar generated power 36 as a function of irradiance level 32 at 12:00 on 01 / 01, 16:00 on 01 / 01, 10:00 on 07 / 20, and 11:00 on 07 / 20, respectively.

[0102] For example, by using interpolation with a fourth order polynomial function as a mathematical function by least squares regression, it is possible to determine coefficients that are pre-recorded as numerical values ​​in the database 30 to calculate the photovoltaic power generated by the power producing unit 12 as a function of irradiance.

[0103] More specifically, from modeling calculations shown graphically in Figure 4 and described in the following paragraphs, the relationship between power 36 and irradiance 32 can be modeled by a fourth order polynomial by least squares regression. This polynomial can be written as follows: P(Ee)=AxEe 4 +BxEe 3 +CxEe 2 +DxEe+E

[0104] From this regression it is possible to estimate five coefficients A, B, C, D and E that will be recorded in the database 30 for a defined point in time of a year, as shown in FIG. 5, which shows an example of the representation and content of this database 30 in the form of a table with the different coefficients.

[0105] Also for this embodiment, this database 30 includes a set of coefficients, e.g. A, B, C, D, E, that allow to calculate by mathematical functions the photovoltaic power values ​​generated as a function of irradiance for each day of the year and for different times of each day.

[0106] To estimate the photovoltaic power of the power producing unit 12 for a measured or predicted irradiance 32, all that is required is to retrieve the coefficients A through E corresponding to the time of evaluation in the database 30 and use these coefficients to calculate the power 36 using a polynomial. For example, to determine the power 36 at 10:00 on July 20, the coefficients A through E for that time of the year that are extracted from the database are -4.6074×10 -6 , 3.1851×10 -3 , 3.427×10 0 , 4.7805×10 3 , 0×10 0 468W / m 2 The ratio of solar power generation to GHI of 36 is P(468) = -4.6074 x 10 -6 ×468 4 +3.1851×10 -3 ×468 3 +3.4227×10 0 ×468 2 +4.7805×10 3 ×468+0×10 0 =3,092,387kW Compared to the first embodiment, this method does not require irradiance interpolation calculations to process accurate irradiance levels. On the contrary, as mentioned above, it is always necessary to perform an interpolation to evaluate the power at the time point between two time intervals in the database. In the above example, 468 W / m 2 To evaluate the power at 10:15 in GHI, P2(10:00)=3,092,387kW P2(11:00)=3,048,581kW

number

[0107] This second embodiment of the database 30 describing the performance of the power producing unit 12 as a function of irradiance and time is shown in Fig. 1 as a function of irradiance from 0 to 1100 W / m 2 at 10 W / m 2 It is more compact, with only five prerecorded numbers per time interval, instead of the 111 given in the base case with increments of 1, i.e., about 22 times smaller storage requirements.

[0108] Mathematical models other than a fourth order polynomial can be used to describe the performance of power 36 as a function of irradiance 32, by using other mathematical functions or other regressions, or other methods for determining coefficients. The method selected will affect the size of the database and the computing power requirements.

[0109] Thus, the solar power production of the power producing unit 12 can be accurately assessed at each time of the year and for all irradiance conditions.

[0110] In order to make this assessment as accurate as possible, particular care has been taken in the calculation and construction of database 30, as will be explained in detail below.

[0111] Creating and Using Databases 30 6 is a simplified schematic representation of the operational blocks making it possible to form the database 30. Block B1 represents the above-mentioned modeling of the energy supply installation 11, in particular the power production unit 12, as a whole, and block 2 represents well-known sizing or simulation programs of the prior art, such as the commercial products PVSYST, PVSOL, or the academic work SAM or the collaborative work LADYBUG. Such modeling takes into account a large number of parameters, in particular the characteristics of the photovoltaic modules 14, their installation / orientation / tilt at the site 1, and their number and efficiency.

[0112] The modelling also includes a description of the combined wiring of the different photovoltaic modules 14, or for example a description of the power conversion devices (inverters, controllers, transformers, etc.) used.

[0113] Also, environmental factors such as distant or near shading, and self-shading can be taken into account.

[0114] Once this modeling is completed, it is possible to obtain, for every given point in time of the year (represented by block B3), at time intervals defined by the user or by the software, and in the tables of the database 30 of FIG. 3 or FIG. 5 described above, in particular the range of 0 to 1100 W / m 2 in the range of 10W / m 2 For each incremented irradiance value, e.g., GHI (embodiment shown in FIG. 3), or for the coefficients of the mathematical function represented by block B4 (embodiment of FIG. 5), numerical values ​​are calculated and recorded in the database 30 to determine the photovoltaic power generated by the power producing unit 12 so modeled.

[0115] This calculation is therefore performed using well known sizing and modelling software for photovoltaic power installations, in particular by taking into account the specific configuration of the power production units 12 at the site 1 .

[0116] These calculations, which are relatively exhaustive in terms of computing power and dedicated software, are carried out only once to create the database 30. As mentioned above, subsequent evaluations are performed by simple reading or interpolation calculations of the values ​​in the database 30. Furthermore, the creation of such a database 30 is facilitated by the fact that the modelling of the energy supply installation 11 is often carried out at least once before its deployment and assembly at the site 1, especially in the context of cost-benefit studies.

[0117] One advantage of using such a database 30 lies in the fact that the predicted or historical irradiance values ​​directly take into account some meteorological phenomena, such as for example cloud layers.

[0118] Methods for assessing photovoltaic energy production FIG. 7 illustrates an embodiment of a method for evaluating photovoltaic energy production of an energy supply installation 11 installed at a site 1 .

[0119] According to step E1, historical or forecast irradiance values ​​are determined for a time point of a day spaced apart by a time interval of 1 second to 2 days, or even 2 years, for the site 1 on which the energy supply installation 11 is installed. This step E1 is in particular carried out by the meteorological evaluation system 28 providing the irradiance values ​​to the evaluation and management unit 16, thanks to the electrical communication means 26.

[0120] In the context of forecast evaluation, the determination of irradiance and other meteorological parameters is carried out with a forecast time interval of 1 second to 2 days, in particular less than 5 minutes. Obviously, the shorter the forecasted time interval, the more reliable the forecast of irradiance values. The interval between two forecasts of irradiance values ​​can then be selected according to the requirements, as will be explained below, for example one forecast every 10 seconds in the case of the management of the local network 22.

[0121] In the context of historical evaluation, the collected weather parameters may cover a past interval of minutes to days.

[0122] The determination (forecast or collection) of meteorological parameters over a given predicted time interval is specified over a time interval that is shorter than or equal to the given predicted time interval, typically from one second to several hours.

[0123] Then, during step E2, an evaluation of the generated photovoltaic power as a function of the determined irradiance value, the time of this evaluation during the year and the pre-recorded generated power value 36 in the database 30 is performed by simple reading or, if necessary, by linear interpolation on the irradiance 32 or the time of the year 34, by calculation using the mathematical functions and coefficients described above for the two embodiments.

[0124] According to an optional step E3, a step of correcting the pre-recorded values ​​36 in the database 30 of the generated photovoltaic power is performed by applying a correction factor, in particular a linear correction factor, taking into account past or measured predicted values ​​of the temperature (in particular the temperature of the modules 14 or the ambient temperature at the site 1) and / or the wind speed at the installation site 1.

[0125] In fact, photovoltaic modules 14, and in particular the cells that compose them, are components whose photovoltaic conversion efficiency is quasi-linearly linked to the operating temperature of the cells. Secondarily, the ambient temperature can limit the conversion efficiency of energy converters such as inverters.

[0126] The temperature can then be determined, for example, by a temperature sensor fixed to the module 14 and connected to the evaluation and management unit 16, or it can be the result of a weather forecast calculation transmitted by the weather evaluation system 28.

[0127] Thus, steps E1 and E2, or E1 to E3, performed in a loop with a sampling interval of 5 minutes or less, in particular every second, allows for an accurate and rapid photovoltaic energy production assessment.

[0128] If the sampling interval of the received irradiance, temperature or wind speed values ​​exceeds the sampling interval of the assessment calculation (if the interval between two irradiance value determinations is longer than the interval between two assessments of power production), the calculation can also be refined using first-order linear interpolation.

[0129] For example, the use of a database 30 in the form of a table makes it possible to strictly limit to a minimum the computational power required to determine the past or future theoretical photovoltaic power 36 generated by the power production unit 12 by a simple determination (prediction or historical collection) of the irradiance. The use of such a database 30 therefore facilitates the calculations and therefore makes it possible to more easily and quickly determine the photovoltaic power 36 generated by the energy supply installation 11 at any time and period. The use of this database 30 allows an almost instantaneous assessment of the generated power, which is not possible with the known sizing programs of the prior art.

[0130] Furthermore, the use of such a database 30 allows the automation of determining the photovoltaic power theoretically generated by the energy supply installation 11 at fine sampling intervals of less than 5 minutes, in particular every minute.

[0131] The valuation calculations can also be performed on a physical machine or a virtual machine on cloud computing, which is not always possible with, for example, commercial solar sizing software.

[0132] These assessments can be used, for example, to manage the local electrical network 22 or to perform operational tests on the power producing units 12 .

[0133] Management of local electricity networks 22 FIG. 8 shows an embodiment of a method for forecasting photovoltaic energy production and managing electrical appliances, implemented by the evaluation and management unit 16, for example for managing the local electricity network 22. According to step F1, which is similar to step E1 of Fig. 7, predicted weather parameters are collected for the site 1 where the energy supply installation 11 is installed (e.g. irradiance values, temperature at the site 1 and wind speed at the site 1). Values ​​of the predicted weather parameters are provided, for example, by a weather evaluation system 28. Steps E2 and E3 then follow as described above with respect to Fig. 5 (E3 is optional). Finally, during a step F4, the evaluation and management unit 16 is configured to control the local electricity network 22 as a function of the forecast of the photovoltaic energy production of the energy supply installation 11.

[0134] This control of the local electrical network may include, for example, one or more of the following non-exhaustive list of actions: - adapting the consumption of one or more electrical devices 10, - storing electrical energy in and / or from a storage unit 18; - starting or stopping one or more thermoelectric generators 20; - Drawing electricity from or putting electricity into the public network 24.

[0135] Method for monitoring and diagnosing energy production - Patents.com The agility, speed and low power consumption of the computational power also allow the evaluation method to be used in the context of a method for monitoring and diagnosing the photovoltaic energy production of an energy supply installation 11 installed at a site 1, as shown diagrammatically according to an embodiment of FIG. 9. The speed and computational simplicity of the method allow frequent monitoring of a large number of sites using limited computing resources. According to step G1, which is similar to step E1 of FIG. 7, historical meteorological parameters are collected for the site 1 where the energy supply installation 11 is installed (e.g. irradiance values, temperature at the site 1 and wind speed at the site 1). The values ​​of the historical meteorological parameters are provided, for example, by a meteorological evaluation system 28 operating on the basis of satellite images. According to a variant not shown, these historical values ​​are provided by sensors present at the site 1 and can be recorded, for example, in a memory of the evaluation and management unit 16. Steps E2 and E3 then follow as described above with respect to figure 7 (E3 being optional). These steps E2 and E3 therefore make it possible for the energy supply installation 11 to provide reference values ​​which it would have generated as a function of the irradiance and possibly also of the temperature. Then, during step G4, the evaluation and management unit 16 is configured to compare the estimated photovoltaic energy production based on historical weather values ​​with the actual photovoltaic energy production measured during a past time interval.

[0136] Finally, according to step G5, the evaluation and management unit 16 is configured to generate an alert if the difference between the evaluated photovoltaic energy production and the photovoltaic power production measured during a past time interval exceeds a predefined threshold.

[0137] In practice, if the measured value is significantly lower than the theoretical value (e.g. 10%), it can be assumed that the energy supply equipment 11 is exposed to a fault requiring maintenance intervention, such as the presence of dust or dirt on the photovoltaic modules 14 or a string failure of the modules 14.

[0138] Historical weather parameters can be collected with great accuracy and / or large data volumes, so that finer estimates of theoretical power over time, or even over longer time intervals, are possible using the same computational power.

[0139] Obviously, therefore, one of the determining factors of the present invention is the use of a database 30 and the choice of how to configure this database 30, in order to use pre-recorded values ​​that make it possible to determine the specific photovoltaic power of the installation 11 at the site 1 and to evaluate the production of power based on several variables, for example the point of the year (date + time, which makes it possible to take into account astronomical and geometrical aspects) and the irradiance (which makes it possible to take into account meteorological and astronomical aspects) or the coefficients as explained above.

[0140] Furthermore, with regard to the repetition frequency of the method for predicting solar photovoltaic energy production, even short adverse weather conditions, such as the passage of clouds, which would reduce the irradiance on the solar photovoltaic modules 14 of the power production unit 12, can be used to predict the solar photovoltaic power generated by the energy supply facility 11.

[0141] Similarly, short adverse weather conditions have less impact on the assessment of the theoretical power, thanks to the short calculation times and provided that the readings of the weather parameters are sufficiently frequent and close together during the time interval in question.

[0142] For this reason, the evaluation calculations can be performed on a physical machine or on a virtual machine on cloud computing.

[0143] The above-described embodiments are given as non-limiting examples.

Claims

1. A computer-implemented method for estimating photovoltaic energy production of an energy supply installation (11) installed at a site (1), the energy supply installation (11) comprising at least one electricity producing unit (12) having at least one photovoltaic module (14), the method for estimating photovoltaic energy production comprising: - determining (E1, F1, G1) historical or predicted irradiance values ​​of the site (1) on which the energy supply installation (11) is installed, said determining being carried out at a time interval between 1 second and 2 years; a step (E2) of evaluating the photovoltaic power generated as a function of the determined irradiance values ​​and of prerecorded values ​​in a database (30), the database (30) containing prerecorded values ​​for determining the photovoltaic power generated as a function of irradiance for each day of the year and for the different times of each day, 13. A method for estimating solar photovoltaic energy production, characterized in that for irradiance levels not represented in the database (30) and lying between two levels represented in the database (30), the value of the solar photovoltaic power is determined by linear interpolation of the values ​​of the solar photovoltaic power represented at irradiance levels lying between the two levels represented in the database (30).

2. 2. The method for estimating photovoltaic energy production as recited in claim 1, wherein said numerical values ​​pre-recorded in said database (30) correspond to values ​​of photovoltaic power generated as a function of irradiance values.

3. The database (30) includes, for each time point contained in the database (30), power values ​​generated as a function of different irradiance levels, the irradiance levels being between 0 and 1300 W / m 2 In the range of 10 W / m 2 3. The method for estimating photovoltaic energy production according to claim 1 or 2, characterized in that the time is incremented by 100 ms.

4. 2. The method for estimating photovoltaic energy production according to claim 1, characterized in that the numerical values ​​prerecorded in the database (30) correspond to coefficients of a mathematical function describing the value of the generated power as a function of irradiance.

5. 5. The method for estimating photovoltaic energy production according to claim 4, characterized in that the mathematical function is a polynomial, in particular a fourth order polynomial.

6. The coefficients of the mathematical function are determined in particular by least squares regression of the values ​​of the generated power as a function of different irradiance values, the irradiance values ​​being in the range of 0 to 1300 W / m 2 6. The method for evaluating photovoltaic energy production according to claim 5, characterized in that the photovoltaic energy production is in the range of

7. 7. The method for evaluating photovoltaic energy production according to any one of claims 1 to 6, characterized in that it comprises a step for correcting the photovoltaic power generated as a function of irradiance, said step of correcting taking into account predicted, past or measured values ​​of temperature and / or wind speed at the installation location (1) by applying a correction factor.

8. 8. The method for estimating photovoltaic energy production according to claim 7, characterized in that the correction factor is linear.

9. A method for assessing photovoltaic energy production according to any one of claims 1 to 8, characterized in that the pre-recorded values ​​are shown in the database (30) with time intervals between 5 minutes and 2 hours at least between sunrise and sunset for each day.

10. 10. The method for estimating photovoltaic energy production according to claim 9, characterized in that for a time not shown in the database (30) and lying between two times shown in the database (30), the pre-recorded value is determined by linear interpolation of the pre-recorded values ​​shown at the two times shown in the database (30).

11. 11. A method for assessing photovoltaic energy production according to any one of claims 1 to 10, characterized in that the assessment of photovoltaic energy production is performed at sampling intervals of less than 5 minutes and more than every second.

12. A method for forecasting photovoltaic energy production and for managing electrical equipment for an energy supply installation (11) installed on a site (1) equipped with at least one electrical equipment (10), said energy supply installation (11) comprising at least one power production unit (12) having at least one photovoltaic module (14), - executing a method for evaluating photovoltaic energy production according to any one of claims 1 to 11, in which during the step of determining irradiance values, predicted irradiance values ​​are determined (F1) for a site (1) on which the energy supply installation (11) is installed, said determination being made for a prediction time interval between 1 second and 2 days; - adapting the method of operation of at least one electrical appliance (10) as a function of an evaluation of the photovoltaic energy production by the energy supply installation (11), Methods for forecasting photovoltaic energy production and managing electrical equipment.

13. A method for monitoring and diagnosing photovoltaic energy production of an energy supply installation (11) installed at a site (1), said energy supply installation (11) comprising at least one power production unit (12) having at least one photovoltaic module (14), - executing a method for evaluating photovoltaic energy production according to any one of claims 1 to 11, during which, during the step of determining irradiance values, historical irradiance values ​​of a site (1) on which the energy supply installation (11) is installed are determined (G1) for past time intervals, - comparing (G4) said evaluated photovoltaic energy production with said photovoltaic energy production measured during said past time interval.

14. 14. The method for monitoring and diagnosing solar photovoltaic energy production according to claim 13, further comprising the step of generating an alert (G5) if a difference between the evaluated solar photovoltaic energy production and the solar photovoltaic energy production measured during the past time interval exceeds a predetermined threshold.

15. An evaluation and management unit (16) comprising means adapted to carry out the method according to any one of the preceding claims.

16. A computer program product that can be loaded into an internal memory of an evaluation and management unit (16), comprising portions of software code for carrying out the steps of the method according to any one of claims 1 to 14, when said computer program is executed by a computer.

Citation Information

Patent Citations

  • Energy management apparatus, energy management method, and energy management program

    JP2011259656A

  • Power generation amount prediction device, power generation amount prediction system, power generation amount prediction method, and power generation amount prediction program

    JP2012010508A

  • Solar radiation amount prediction method, photovoltaic power generation output prediction method and system

    JP2013164286A

  • Power generation amount prediction method and device in photovoltaic power generation

    JP2013258853A

  • Photovoltaic power output prediction device considering residual snow

    JP2018148743A