Method for selecting additional ventilation device, method for selecting additional ventilation device and air conditioning device, and air conditioning ventilation system

The method for selecting an additional ventilation device and air conditioner addresses the cost and thermal impact issues of upgrading ventilation systems by determining ventilation needs and optimizing air conditioning capacity, ensuring effective pathogen prevention and cost efficiency.

JP7564456B2Active Publication Date: 2024-10-09DAIKIN INDUSTRIES LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2022133766
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-08-25
Publication Date
2024-10-09
Estimated Expiration
2040-09-18

AI Technical Summary

Technical Problem

Existing ventilation systems in buildings are costly to replace and upgrade, and there is a need to increase ventilation to combat pathogen infections, but doing so can lead to increased air conditioning loads and thermal environment deterioration.

Method used

A method for selecting an additional ventilation device that supplements the existing system by determining the required ventilation volume based on indoor space size and pathogen infection needs, and selecting an air conditioner capable of handling the resulting air conditioning load, including heat exchange to minimize thermal impact.

Benefits of technology

This approach allows for effective pathogen prevention while keeping costs down by using existing equipment where possible and optimizing air conditioning capacity, reducing installation and operational costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007564456000001
    Figure 0007564456000001
  • Figure 0007564456000002
    Figure 0007564456000002
  • Figure 0007564456000003
    Figure 0007564456000003
Patent Text Reader

Abstract

One of the measures to prevent pathogen infection is to increase ventilation. [Solution] The method for selecting a second ventilation device (20) is a method for selecting a second ventilation device (20) when a different ventilation device is newly installed as the second ventilation device (20) in an indoor space (SI) where an existing first ventilation device (10) is installed. The ventilation volume per hour of the existing first ventilation device (10) is the first ventilation volume. In the first step, the second ventilation volume is calculated based on the size of the indoor space. The second ventilation volume is the ventilation volume per hour required as a countermeasure against pathogen infection. In the second step, the difference between the second ventilation volume and the first ventilation volume is calculated as the additional ventilation volume. In the third step, a ventilation device capable of ventilating the additional ventilation volume is selected as the second ventilation device (20).
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for selecting an additional ventilation device, a method for selecting an additional ventilation device and an air conditioning device, and an air conditioning and ventilation system. [Background technology]

[0002] 2. Description of the Related Art Conventionally, ventilation devices that exhaust indoor air to the outside and supply outdoor air to the room have been widely used (see, for example, Patent Document 1 (JP-A-2005-300112)). Summary of the Invention [Problem to be solved by the invention]

[0003] Many existing buildings are equipped with ventilation systems to provide some degree of ventilation.

[0004] Recently, on the other hand, there has been a demand to increase ventilation volume as one of the measures against infection by pathogens such as viruses and bacteria (hereinafter referred to as pathogen infection).

[0005] However, replacing an existing ventilation system requires high equipment and installation costs. [Means for solving the problem]

[0006] The method for selecting an additional ventilation device from a first aspect is a method for selecting an additional ventilation device when a different ventilation device is newly installed as an additional ventilation device for an indoor space in which an existing first ventilation device is installed. The existing first ventilation device has a ventilation volume per hour as a first ventilation volume. The method for selecting an additional ventilation device from a first aspect includes a first step, a second step, and a third step. In the first step, the second ventilation volume is calculated based on the size of the indoor space. The size of the indoor space can be, for example, the floor area of ​​the indoor space, the volume of the indoor space, or the number of people accommodated in the indoor space. The second ventilation volume is the ventilation volume per hour required as a measure against pathogen infection. In the second step, the difference between the second ventilation volume and the first ventilation volume is calculated as the additional ventilation volume. In the third step, a ventilation device capable of ventilating the additional ventilation volume is selected as the additional ventilation device.

[0007] Here, the additional ventilation equipment is selected based on the excellent and unconventional idea of ​​utilizing the primary ventilation volume of the existing primary ventilation equipment as is, and supplementing the insufficient ventilation volume (additional ventilation volume) with the additional ventilation equipment. This realizes the secondary ventilation volume required as a measure against pathogen infection while keeping costs down.

[0008] A second aspect of the selection method of an additional ventilation device and an air conditioning device is a selection method of an additional ventilation device and an air conditioning device, which selects an additional ventilation device by the selection method of the first aspect, and further selects an air conditioning device. The air conditioning device is a device that conditions an indoor space. The second aspect of the selection method of an additional ventilation device and an air conditioning device includes a fourth step and a fifth step in addition to the first step, the second step, and the third step. In the fourth step, the sum of the first air conditioning load, the second air conditioning load, and the third air conditioning load is calculated as a total air conditioning load. The first air conditioning load is determined based on the size of the indoor space. The second air conditioning load is an air conditioning load generated by ventilation by the existing first ventilation device. The third air conditioning load is an air conditioning load generated by ventilation by the additional ventilation device selected in the third step. In the fifth step, an air conditioning device having an air conditioning capacity capable of processing the total air conditioning load is selected from a plurality of air conditioning device candidates having different air conditioning capacities.

[0009] When an additional ventilation device is installed in an indoor space in addition to an existing first ventilation device, it is expected that the air conditioning load of the indoor space will increase due to ventilation by the additional ventilation device. If this is not taken into consideration, the thermal environment of the indoor space may deteriorate. In view of this, the selection method of the additional ventilation device and the air conditioner of the second aspect makes it possible to select an air conditioner that is capable of processing the total air conditioning load, including the air conditioning load generated by ventilation by the additional ventilation device.

[0010] A selection method for an additional ventilation device and an air conditioner according to a third aspect is the selection method according to the second aspect, in which in a third step, a ventilation device having a heat exchange unit is selected as the additional ventilation device. The heat exchange unit exchanges heat between outside air that is supplied to the indoor space and return air that is exhausted from the indoor space. In addition, in a fourth step, a third air conditioning load is calculated in consideration of the amount of heat exchanged in the heat exchange unit of the selected additional ventilation device.

[0011] Here, a ventilation device having a heat exchange section that exchanges heat between the intake air and the exhaust air is selected as the additional ventilation device. This makes it possible to minimize the deterioration of the thermal environment in the indoor space caused by ventilation by the additional ventilation device. In addition, because the third air conditioning load is calculated taking into account the amount of heat exchanged in the heat exchange section, it is possible to prevent the total air conditioning load from being overestimated. This makes it possible to correctly recognize the required air conditioning capacity of the air conditioner and select an air conditioner that is neither excessive nor insufficient.

[0012] The selection method of an additional ventilation device and an air conditioner of a fourth aspect is the selection method of the second or third aspect, and further includes a sixth step and a seventh step. In the sixth step, it is determined whether the air volume at maximum ventilation volume of the additional ventilation device selected in the third step is 30% or less of the rated air volume of the air conditioner selected in the fifth step. In the seventh step, if it is determined in the sixth step that the air volume at maximum ventilation volume of the additional ventilation device exceeds 30% of the rated air volume of the air conditioner, the selection of the additional ventilation device and the air conditioner is reviewed.

[0013] If the air volume at the maximum ventilation volume of the additional ventilation device exceeds 30% of the rated air volume of the air conditioner, even if the total air conditioning load can be handled by the air conditioning capacity of the air conditioner, the operating efficiency of the air conditioner may deteriorate and the running costs may become high. In view of this, the selection method of the additional ventilation device and the air conditioner of the fourth aspect further includes the sixth and seventh steps, and the selection of the additional ventilation device and the air conditioner is reviewed. This makes it possible, for example, to select an air conditioner with a higher rated air volume or air conditioning capacity, thereby reducing the running costs of the air conditioning and ventilation.

[0014] A fifth aspect of the method for selecting an additional ventilation device and an air conditioning device is the selection method according to any one of the second aspect to the fourth aspect, in which in the third step, an additional ventilation device is selected from a plurality of ventilation device candidates having different maximum ventilation volumes. Also, the number of the plurality of air conditioning device candidates in the fifth step is greater than the number of the plurality of ventilation device candidates in the third step.

[0015] Here, by preparing many candidate air conditioners, it becomes possible to select a more appropriate air conditioner according to the selected additional ventilation device, thereby making it possible to reduce the cost of the device and the cost of installing the device.

[0016] The sixth aspect of the ventilation system is a 70m2 air conditioner. 2 More than 95m 2 An air conditioning and ventilation system to be installed in an indoor space where an existing first ventilation device with a ventilation volume per hour of 12.5 kW or less is installed, and the air conditioning device has a cooling rated capacity of about 12.5 kW and a maximum ventilation volume of 250 m 3 / h ventilation system.

[0017] If this air conditioning and ventilation system is installed in an indoor space within an existing building, with the above-mentioned floor area where the first ventilation volume is secured, it will be possible to obtain the ventilation volume necessary to prevent pathogen infection, and the total air conditioning load of the indoor space, including the air conditioning load due to the increased ventilation volume, will be handled by the air conditioner.

[0018] The seventh aspect of the ventilation system is a 40m2 air conditioner. 2 More than 60m 2 An air conditioning and ventilation system to be installed in an indoor space where an existing first ventilation device with a ventilation volume per hour of 150 m or less is installed, and an air conditioning device with a cooling rated capacity of about 7.1 kW and a maximum ventilation volume of 150 m 3 / h ventilation system.

[0019] If this air conditioning and ventilation system is installed in an indoor space within an existing building, with the above-mentioned floor area where the first ventilation volume is secured, it will be possible to obtain the ventilation volume necessary to prevent pathogen infection, and the total air conditioning load of the indoor space, including the air conditioning load due to the increased ventilation volume, will be handled by the air conditioner.

[0020] An air conditioning and ventilation system of an eighth aspect is the air conditioning and ventilation system of the sixth or seventh aspect, wherein the air conditioner has an air intake port. The air intake port receives supply air from outside the indoor space. The ventilation device has an air intake fan. The air intake fan is a fan for sending outside air to the air conditioner as supply air. The air conditioning and ventilation system of the eighth aspect further comprises an air intake path forming member. The air intake path forming member is connected to the ventilation device and the air conditioner to form an air intake path. The air intake path is an air flow path that guides the supply air from the ventilation device to the air intake port of the air conditioner.

[0021] This air conditioning ventilation system includes a ventilation device, an air conditioner, and air supply path forming components all packaged together, so the introduction costs, including the cost of installation work, are lower than when connecting the ventilation device and the air conditioner using ducts and other parts procured locally. Also, because the air supply from the ventilation device is received by the air conditioner, it is possible to change the temperature of the supply air in the air conditioner before supplying it to the indoor space.

[0022] An air conditioning and ventilation system of a ninth aspect is the air conditioning and ventilation system of the eighth aspect, wherein the ventilation device further includes a casing, an exhaust fan, and a heat exchanger. The casing houses the intake fan and the exhaust fan. The exhaust fan is a fan for sending air in the indoor space to the outside of the indoor space as exhaust air. The heat exchanger exchanges heat between the outside air and the exhaust air. The casing is formed with a first opening, a second opening, a third opening, and a fourth opening. The third opening is an opening for taking in the outside air. An air supply path forming member is connected to the fourth opening. The first opening is an opening for taking in air in the indoor space as return air. The second opening is an opening for sending the return air to the outside of the indoor space as exhaust air. The air conditioning and ventilation system of the ninth aspect further includes a pressure adjustment unit. The pressure adjustment unit adjusts the air pressure so that the difference between the pressure of the return air flowing from the first opening to the second opening in the ventilation device and the pressure of the outside air flowing from the third opening to the fourth opening in the ventilation device is small.

[0023] Here, when the exhaust fan operates, air from the indoor space is taken into the casing through the first opening as return air, and is sent out of the indoor space through the second opening as exhaust air. When the supply air fan operates, outside air is taken into the casing through the third opening, flows from the third opening to the fourth opening, and supply air is sent from the fourth opening through the air supply passage to the air conditioner. The return air taken into the casing through the first opening and the outside air taken into the casing through the third opening are heat exchanged in the heat exchanger. This makes it possible to suppress an increase in the air conditioning load in the indoor space due to ventilation.

[0024] In addition, in the air conditioning and ventilation system of the ninth aspect, a pressure adjustment unit is provided so that the difference between the pressure of the outside air and the pressure of the return air that are exchanged with each other is reduced. This prevents problems such as the outside air and the return air mixing in a heat exchanger or the like.

[0025] An air conditioning and ventilation system according to a tenth aspect is the air conditioning and ventilation system according to any one of the sixth aspect to the ninth aspect, further comprising a remote controller that controls the air conditioner and the ventilation device.

[0026] Here, for example, it is possible to use a remote controller to link the operation and stopping of the air conditioning system and the ventilation system, and to control the ventilation system so that it does not ventilate when the air conditioning system is not operating. [Brief description of the drawings]

[0027] [Figure 1A] FIG. 1 is a state diagram of a building in which a first ventilation device and an air conditioning ventilation system are installed. [Figure 1B] FIG. 1 shows the state of the building before the second ventilation device was added. [Diagram 2] 2 is an oblique view of an air conditioning indoor unit, an air supply intake member attached to the air conditioning indoor unit, and an air supply duct for assembly. FIG. [Diagram 3] FIG. 2 is a control block diagram of the air conditioning and ventilation system. [Figure 4A]FIG. 11 is a diagram showing the state of ventilation in a room by a first ventilation device before a second ventilation device is installed. [Figure 4B] FIG. 11 is a diagram showing the state of ventilation in a room when a second ventilation device is not installed and the ventilation volume is increased by opening a window. [Figure 4C] FIG. 13 is a diagram showing the ventilation state in a room when a second ventilation device is additionally installed. [Diagram 5] 13 is a table showing various numerical values ​​for combinations of candidates for second ventilation devices and candidates for air conditioning indoor units. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0028] (1) Overall configuration of the first ventilation device and the air conditioning ventilation system 1A shows an installation state of a first ventilation device 10 and an air conditioning ventilation system 100 in a building H. The first ventilation device 10 and the air conditioning ventilation system 100 are installed for one predetermined indoor space SI in the building H. The air conditioning ventilation system 100 mainly comprises a second ventilation device 20, an air conditioning indoor unit 30, ducts 21-24, and a remote control 90.

[0029] The first ventilation device 10 is a ventilation device that was already installed in the indoor space SI before the second ventilation device 20 was installed.

[0030] The air conditioning indoor unit 30 of the air conditioning ventilation system 100 is also equipment that had already been installed in the indoor space SI before the second ventilator 20 was installed.

[0031] FIG. 1B shows the state of the building H before the second ventilation device 20 is installed.

[0032] The second ventilation device 20 and the ducts 21 to 24 of the air conditioning ventilation system 100 are installed later as an additional component in the indoor space SI in which the first ventilation device 10 and the air conditioning indoor unit 30 are already installed.

[0033] In this embodiment, it is assumed that the first ventilation device 10 and the air conditioning indoor unit 30 shown in Figs. 1A and 1B have already been installed, and the second ventilation device 20 and ducts 21-24 shown in Fig. 1A are in the design consideration stage for installation.

[0034] (2) Details of the first ventilation device The first ventilation device 10 is a ventilation fan having a propeller fan or a ventilation device having a sirocco fan. The first ventilation device 10 shown in Figs. 1A and 1B draws in indoor air from an indoor space SI and exhausts it to the outside of a building H (outdoor space SO). An intake port of the first ventilation device 10 is connected to a first return air vent 16 provided on the ceiling of the indoor space SI. An air outlet of the first ventilation device 10 is connected to a first exhaust vent 18 opened in the outer wall of the building H. The first ventilation device 10 has a range of, for example, 500m 3 / h ventilation volume.

[0035] (3) Details of air conditioning indoor units The air conditioning indoor unit 30 is a device that constitutes an air conditioner together with an air conditioning outdoor unit (not shown) installed on the rooftop or outside of the building H. The air conditioner is a device that cools or heats an indoor space SI by a vapor compression refrigeration cycle. As shown in FIG. 1A or FIG. 1B, the air conditioning indoor unit 30 has a heat exchanger 37 that constitutes a refrigeration cycle, an indoor fan 35 for sending indoor air to the heat exchanger 37 and returning it to the indoor space SI, and the like. The casing of the air conditioning indoor unit 30 is rectangular in plan view, with an intake port 31 formed in the center of the bottom surface, and an outlet port 32 formed along each of the four sides of the bottom surface. Indoor air is sucked in from the intake port 31 (see arrow Ain in FIG. 1A), and conditioned air is returned to the indoor space SI from the outlet port 32 (see arrow Aout in FIG. 1A).

[0036] 1A is equipped with an air intake member 30a shown in FIG. 2 as an optional device. The air intake member 30a is a member that forms a flow path through which air flows. Air that enters through an inlet 33 of the air intake member 30a flows out near an inlet 31 of a casing of the air conditioning indoor unit 30.

[0037] (4) Details of the second ventilation device and duct that, together with the air conditioning indoor unit, constitute the air conditioning ventilation system The second ventilation device 20 is disposed in the space SC above the ceiling of the indoor space SI of the building H, and ventilates the indoor space SI while exchanging heat between the outside air OA, which serves as supply air SA, and the return air RA, which serves as exhaust air EA.

[0038] The ducts 21 to 24 are a return air duct 21, an exhaust air duct 22, an outside air introduction duct 23, and an intake air duct 24.

[0039] The second ventilation device 20 has a casing 50, an intake fan 26, an exhaust fan 28, a heat exchange element 40 having a substantially rectangular prism shape, and a ventilation control unit 70.

[0040] The casing 50 accommodates therein the heat exchange element 40, the intake fan 26, the exhaust fan 28, etc. The casing 50 also has a first opening 51 to which the return air duct 21 is connected, a second opening 52 to which the exhaust duct 22 is connected, a third opening 53 to which the outside air introduction duct 23 is connected, and a fourth opening 54 to which the intake air duct 24 is connected.

[0041] Inside the casing 50, there are a first space 51a between the first opening 51 and the heat exchange element 40, a second space 52a between the second opening 52 and the heat exchange element 40, a third space 53a between the third opening 53 and the heat exchange element 40, and a fourth space 54a between the fourth opening 54 and the heat exchange element 40.

[0042] The supply air fan 26 is disposed in the fourth space 54a and has an supply air fan motor 26m. The exhaust fan 28 is disposed in the second space 52a and has an exhaust fan motor 28m.

[0043] The return air duct 21 connects the first opening 51 of the second ventilation device 20 and a second return air port 81 provided in the ceiling of the indoor space SI, and forms a return air passage 21a through which the return air RA flows.

[0044] The exhaust duct 22 connects the second opening 52 of the second ventilation device 20 and a second exhaust port 82 opened in the outer wall of the building H, and forms an exhaust path 22a through which the exhaust air EA flows.

[0045] The outside air introduction duct 23 connects the third opening 53 of the second ventilation device 20 and an outside air introduction port 83 opened in the outer wall of the building H, and forms an outside air introduction path 23a through which the outside air OA flows.

[0046] The supply air duct 24 connects the fourth opening 54 of the second ventilation device 20 and the inlet 33 of the supply air intake member 30a that is additionally installed in the air conditioning indoor unit 30, and forms an air supply path 24a through which the supply air SA flows. The supply air duct 24 branches into two and is connected to the two inlets 33. By branching into two, the air passage area can be increased and the pressure loss in the supply air duct can be reduced.

[0047] As shown in FIG. 3, the ventilation control unit 70 is connected to the supply fan motor 26m, the exhaust fan motor 28m, a remote control 90, and the like. The ventilation control unit 70 is realized by a computer. The ventilation control unit 70 includes a control arithmetic device and a storage device. The control arithmetic device can be a processor such as a CPU or a GPU. The control arithmetic device reads out a program stored in the storage device and performs predetermined image processing and arithmetic processing according to the program. Furthermore, the control arithmetic device can write the calculation result to the storage device and read out information stored in the storage device according to the program. In response to a command from the remote control 90, which will be described later, the ventilation control unit 70 turns the supply fan 26 and the exhaust fan 28 on and off.

[0048] Although not shown or described here, an outside air temperature sensor and an indoor temperature sensor can be connected to the ventilation control unit 70 and the sensor values ​​can be used for control.

[0049] (5) Remote control details The remote control 90 is used by a user in the indoor space SI to operate various settings for the air conditioning indoor unit 30 and the second ventilation device 20. Like the ventilation control unit 70, the remote control 90 is also realized by a computer.

[0050] The remote control 90, the ventilation control unit 70, and a control unit (not shown) of the air conditioning indoor unit 30 are connected via communication lines.

[0051] (6) Details of ventilation by air conditioning and ventilation system The remote control 90 operates the second ventilation device 20 when the indoor fan 35 of the air conditioner indoor unit 30 is operating. In other words, when it is necessary to operate the second ventilation device 20, the remote control 90 also operates the air conditioner indoor unit 30. When the supply air fan 26 and the exhaust fan 28 of the second ventilation device 20 are operated, the outside air OA of the outdoor space SO reaches the heat exchange element 40 from the outside air introduction path 23a, and the air that has passed through the heat exchange element 40 passes through the supply air fan 26 and is supplied to the indoor space SI as fresh supply air SA. The indoor air of the indoor space SI reaches the heat exchange element 40 as return air RA through the return air path 21a, and the air that has passed through the heat exchange element 40 passes through the exhaust fan 28 and is discharged to the outdoor space SO as exhaust air EA.

[0052] In the heat exchange element 40, heat exchange takes place between the outside air OA and the return air RA, suppressing an increase in the air conditioning load associated with ventilation by the second ventilator 20.

[0053] (7) A method for selecting a second ventilation device to be installed additionally to increase the amount of ventilation in an indoor space, and a method for selecting an air conditioning indoor unit Assume that it is required to increase the ventilation volume for an indoor space SI of a building H, in which a first ventilation device 10 and an air conditioning indoor unit 30 are already installed, as shown in FIG. 1B, as one of the measures against infection by pathogens such as viruses and bacteria. For example, if the ventilation volume is designed to be 20 m per person, 3 / h, the ventilation volume of the first ventilation device 10 was determined, but 3 / h, 30m in total 3 / h is required. In other words, the current ventilation volume is required to be increased by 1.5 times. In this case, the second ventilation device 20 to be additionally installed is selected by the following steps.

[0054] (7-1) Selection method for the second ventilation device First, in the first step, a second ventilation volume required for the second ventilation device 20 to be additionally installed is calculated based on the size of the indoor space SI. In this embodiment, the first step includes a step of calculating the maximum number of people who can enter the indoor space SI, and a step of calculating the ventilation volume required for the indoor space SI from the maximum number of people. Specifically, the ventilation volume required for the indoor space SI is calculated based on the floor area (m 2 ) is the exclusive area per person (m2) determined by the use of the indoor space SI (room) (general store, office, etc.) 2 ) is the ventilation volume required per person per hour (m 3 / h) is multiplied by the indoor space SI use per person (m 2 ) can be, for example, 3m depending on the application. 2 , 5m 2 The required ventilation volume is determined by the volume of the indoor space SI (m 3 ) or the required ventilation rate for the room.

[0055] First ventilation volume (m 3 / h) is the ventilation required for the indoor space SI based on, for example, human carbon dioxide emissions. 3 The second ventilation volume (m / h) is the ventilation volume per hour required for the indoor space SI as a measure against pathogen infection. Pathogens that are the subject of infection control measures include viruses and bacteria, such as influenza viruses, noroviruses, coronaviruses, and tuberculosis bacteria. 3 / h) is the first ventilation volume (m 3 / h).

[0056] Next, in the second step, the difference between the second ventilation rate and the first ventilation rate is called the additional ventilation rate (m 3 / h) First ventilation volume (m 3 / h) is the ventilation volume of the first ventilation device 10 already installed in the indoor space SI.

[0057] Next, in a third step, a ventilation device capable of providing the additional ventilation volume is selected as an additional second ventilation device 20. In the third step, the second ventilation device 20 is selected from among candidate ventilation devices V1 to V6 shown in the following (7-2).

[0058] (7-2) Ventilation device candidates V1 to V6 Candidates for ventilation equipment are: Ventilation volume 150m 3 / h, Ventilator V1, Ventilation volume 250m 3 / h, ventilation system V2, Ventilation volume 350m 3 / h, Ventilator V3, Ventilation volume 500m 3 / h, Ventilator V4, Ventilation volume: 650m 3 / h, ventilation system V5, and Ventilation volume: 800m 3 / h, Ventilator V6, It is.

[0059] (7-3) Selection method for air conditioning indoor units After the selection of the second ventilation device 20 in the third step is completed, the process proceeds to the fourth step. In the fourth step, the sum of the first air conditioning load, the second air conditioning load, and the third air conditioning load is calculated as the total air conditioning load. The first air conditioning load is an air conditioning load determined based on the size of the indoor space SI, and is calculated by summing the heat load of the people and equipment in the room, the solar heat entering through the windows and walls, the heat load based on the temperature difference between inside and outside, and the like. The air conditioning load (first air conditioning load) for cooling and heating per unit floor area is known according to the purpose (general store, office, etc.) of the indoor space SI (room) of the building H. The second air conditioning load is an air conditioning load generated by ventilation by the existing first ventilation device 10. When ventilation is performed, outside air is taken into the indoor space SI through ducts and gaps in the doors, and a load is generated to keep the outside air at the temperature and humidity inside the room. This outside air load is the second air conditioning load generated by ventilation. The third air conditioning load is the air conditioning load caused by the ventilation of the second ventilation device 20 selected in the third step.

[0060] In the fourth step, the third air conditioning load is calculated taking into consideration the amount of heat exchanged between the outdoor air OA and the return air RA in the heat exchange element 40 of the second ventilation device 20. The heat exchange element 40 is provided to recover all the heat (sensible heat and latent heat) of the air conditioning energy lost by ventilation, and in the fourth step, the amount of heat recovered is taken into consideration.

[0061] In the fifth step, an air conditioning indoor unit 30 having an air conditioning capacity capable of processing the total air conditioning load is selected from a plurality of air conditioning indoor unit candidates with different air conditioning capacities. Here, the air conditioning indoor unit 30 is selected from the air conditioning indoor unit candidates A1 to A9 shown in (7-4) below.

[0062] (7-4) Air conditioner indoor unit candidates A1 to A9 The candidates for indoor air conditioning units for the indoor space SI used for general stores are: 22-25m 2 A1, a 1.5 horsepower (3.6 kW) air conditioning indoor unit suitable for floor space of 25-28m 2A2, a 1.8 horsepower (4.0 kW) air conditioning indoor unit suitable for floor space of 28-31m 2 A3, a 2 horsepower (4.5 kW) air conditioning indoor unit suitable for floor space of 31-35m 2 A4 air conditioning indoor unit with 2.3 horsepower (5.0 kW), suitable for floor space of 35-39m 2 A5 air conditioning indoor unit with 2.5 horsepower (5.6 kW), suitable for floor space of 44-50m 2 A6 air conditioning indoor unit with 3 horsepower (7.1 kW), suitable for floor space of 62-70m 2 A7 air conditioning indoor unit with 4 horsepower (10.0 kW) suitable for floor space of 100,000 m². 78-88m 2 A8 air conditioning indoor unit with 5 horsepower (12.5 kW), suitable for floor space of 100m², and 89-100m 2 A9 6 horsepower (14.0 kW) air conditioning indoor unit, suitable for floor space of The number of these air conditioning indoor unit candidates A1 to A9 is greater than the number of the above-mentioned ventilator candidates V1 to V6.

[0063] (7-5) Review of the selection of the second ventilation device and the air conditioning indoor unit In the sixth step, it is determined whether the air volume at maximum ventilation volume of the second ventilation device 20 selected in the third step is 30% or less of the rated air volume of the air conditioning indoor unit 30 selected in the fifth step.

[0064] Next, in the seventh step, if it is determined in the sixth step that the air volume at the maximum ventilation volume of the second ventilation device 20 exceeds 30% of the rated air volume of the air conditioning indoor unit 30, the selection of the second ventilation device and the air conditioning indoor unit is reviewed. In reviewing the selection, a new air conditioning indoor unit 30 is selected from candidate air conditioning indoor units with a larger rated air volume, or a new second ventilation device 20 is selected from candidate ventilation devices with a smaller maximum ventilation volume.

[0065] (7-6) Specific examples of selection Next, with reference to Figures 4A to 4C, a specific example of selection of the second ventilation device 20 when additionally installing a second ventilation device 20 to increase the ventilation volume in an indoor space SI of a building H where a first ventilation device 10 is already installed will be described.

[0066] As shown in FIG. 4A, for example, an indoor space SI of a store is equipped with an air conditioning indoor unit 30 with a 5 horsepower (5 HP) and a ventilation volume of 500 m 3 / h of the first ventilation device 10 is installed. The exclusive area per person (m2) determined by the use of the indoor space SI is 2 ) is 3m for general stores. 2 The floor area of ​​the indoor space SI is 75 m 2 In the past, a store with an indoor space SI capacity of 25 people had a ventilation design of 20 m per person. 3 / h, the ventilation volume is 500m 3 / h first ventilation device 10 is installed. In a general store, the air conditioning capacity of the 5 horsepower air conditioning indoor unit 30 is 12.5 kW, and the floor area is 83 m 3 On the other hand, the current ventilation volume is 500 m 3 / h, the floor space of a general store is 75 m 2 The required air conditioning capacity for the indoor space SI is 11.3kW. Therefore, the current indoor space SI has a floor area of ​​75m 2 In contrast, the 5 horsepower air conditioning indoor unit 30 has a spare capacity of approximately 10%.

[0067] This store has set the current ventilation rate (20 m per person) as a measure to prevent pathogen infection. 3 / h), totaling 30m 3 When trying to ensure a ventilation volume of 100 / h (per person) for an indoor space SI, opening the windows for ventilation is a simple method.

[0068] When ventilation is performed by opening windows, open the windows and place them at a distance of 250m as shown in Figure 4B. 3It is necessary to take in an additional 1.5 kW of outside air per hour into the indoor space SI. However, opening the windows will cause problems such as increased noise, insects entering the indoor space SI, and uneven temperatures in the indoor space SI, which will hinder the comfort of store customers. In addition, the increase in air conditioning load due to the introduction of outside air will be, for example, when the outside temperature is 35°C and the indoor temperature is 27°C, the outside air load will increase by 1.5 kW, and the floor area of ​​the indoor space SI will increase by 75 m. 2 Therefore, an air conditioning capacity of 12.8 kW (= 11.3 kW + 1.5 kW) is required. However, the air conditioning capacity (12.5 kW) of the existing 5 horsepower air conditioning indoor unit 30 is insufficient, so stores that ventilate by opening the windows will have to remove the 5 horsepower air conditioning indoor unit 30 and install a new 6 horsepower (14.0 kW) air conditioning indoor unit.

[0069] In contrast, a total of 30m 3 By adopting the selection methods shown in (7-1) to (7-5) above as a method for ensuring a ventilation volume of 100 sq. m / h for the indoor space SI, it is possible to ensure the ventilation volume of the indoor space SI and handle the air conditioning load while keeping initial costs and running costs down.

[0070] Using the above selection method, in step 1, the size of the indoor space SI (floor area 75 m 2 Based on the indoor air temperature (air temperature, 20°C, and 25 people), we calculate the secondary ventilation volume required for the indoor space SI as a measure against pathogen infection. 3 / h, the second ventilation volume is 750 m 3 / h(25×30m 3 / h).

[0071] Next, in the second step, the difference between the second ventilation volume and the first ventilation volume is called the additional ventilation volume (m 3 / h) The additional ventilation volume is calculated as 250 m 3 / h (secondary ventilation volume 750m 3 / h-First ventilation volume of the first ventilation device 10: 500 m 3 / h).

[0072] Next, in the third step, a ventilation device capable of providing additional ventilation is selected from the above-mentioned ventilation device candidates V1 to V6, and selected as the second ventilation device 20. 3 / h ventilation device V2 is selected as the second ventilation device 20.

[0073] Next, in the fourth step, the sum of the first air conditioning load, the second air conditioning load, and the third air conditioning load is calculated as the total air conditioning load. As described above, the second air conditioning load is the air conditioning load caused by ventilation by the existing first ventilation device 10. 3 / h) and the first air conditioning load are the same for a general store with a floor area of ​​75 m 2 In the case of an indoor space SI of 11.3 kW, the third air conditioning load is an additional air conditioning load caused by the additional installation of the second ventilation device 20 and accompanying the ventilation operation of the second ventilation device 20. The additional air conditioning load (third air conditioning load) is calculated based on the ventilation volume of 250 m3 of the ventilation device selected as the second ventilation device 20. 3 In the case of the 1.3kW / h ventilation device V2, the load is 0.6kW when the outside temperature is 35°C and the room temperature is 27°C. In the case of the above-mentioned open window ventilation, the load is 1.5kW under the same conditions, but when the second ventilation device 20 is used, the additional air conditioning load is 0.6kW because total heat exchange is performed in the heat exchange element 40. Therefore, the total air conditioning load is 11.9kW (11.3kW + 0.6kW).

[0074] For reference, the additional air conditioning load and other numerical values ​​for each combination of candidates for the second ventilation device 20 and candidates for the air conditioning indoor unit 30 are shown in FIG.

[0075] Next, in the fifth step, an air conditioning indoor unit 30 having an air conditioning capacity capable of processing the total air conditioning load is selected from the above air conditioning indoor unit candidates A1 to A9. Here, the 5 horsepower (12.5 kW) air conditioning indoor unit A8, which has already been installed in the indoor space SI, is selected as the air conditioning indoor unit 30. This is because 5 horsepower (12.5 kW) can process the total air conditioning load (11.9 kW).

[0076] Next, in the sixth step, it is determined whether the air volume at the maximum ventilation volume of the second ventilation device 20 selected in the third step is 30% or less of the rated air volume of the air conditioning indoor unit 30 selected in the fifth step. Here, the air volume at the maximum ventilation volume of the second ventilation device 20 is 30% or less of the rated air volume of the air conditioning indoor unit 30. For this reason, the selection of the second ventilation device and the air conditioning indoor unit in the seventh step is not reviewed.

[0077] Thus, here, as shown in FIG. 4C, a second ventilation device 20 having a heat exchange element 40 for performing total heat exchange is additionally installed, and the air conditioning ventilation system 100 is formed by the second ventilation device 20 and the existing 5 horsepower air conditioning indoor unit 30.

[0078] As mentioned above, when adopting open window ventilation as a measure to prevent pathogen infection, the 5 horsepower air conditioning indoor unit 30 must be removed and a new 6 horsepower (14.0 kW) air conditioning indoor unit must be installed; however, when additionally installing a second ventilator 20 having a heat exchange element 40 for performing total heat exchange, the existing 5 horsepower air conditioning indoor unit 30 can continue to be used as is.

[0079] (8) Characteristics of the selection method for the second ventilation device (8-1) According to the method for selecting the second ventilation device described in (7) above, the second ventilation device 20 is selected in accordance with the unprecedented and excellent idea of ​​utilizing the first ventilation volume of the existing first ventilation device 10 as is and supplementing the insufficient additional ventilation volume with the second ventilation device 20. This realizes ventilation of the second ventilation volume required as a measure against pathogen infection while suppressing costs.

[0080] (8-2) When an additional second ventilation device 20 is installed in the indoor space SI in addition to the existing first ventilation device 10, it is expected that the air conditioning load of the indoor space SI will increase due to ventilation by the second ventilation device 20. If this is not taken into consideration, the thermal environment of the indoor space SI may deteriorate. In view of this, in the above-mentioned method for selecting the second ventilation device 20 and the air conditioning indoor unit 30, an air conditioning indoor unit 30 that can handle the total air conditioning load including the air conditioning load generated by ventilation is selected. This makes it possible to determine whether the air conditioning indoor unit 30 already installed in the indoor space SI can be used as is, or whether it is necessary to replace it with a new air conditioning indoor unit 30 with a higher air conditioning capacity.

[0081] (8-3) In the method for selecting the second ventilation device described in (7) above, the second ventilation device 20 having a heat exchange element 40 that performs heat exchange between the supply air SA and the exhaust air EA is selected as the additional ventilation device. This makes it possible to minimize the deterioration of the thermal environment of the indoor space SI due to ventilation by the second ventilation device 20. Furthermore, since the third air conditioning load (air conditioning load associated with additional ventilation) is calculated taking into account the amount of heat exchanged in the heat exchange element 40, the total air conditioning load is not overcalculated. This allows the required air conditioning capacity to be correctly recognized, and an air conditioning indoor unit 30 that is neither excessive nor insufficient can be selected.

[0082] (8-4) When the air volume at the maximum ventilation volume of the second ventilation device 20 added as a measure against pathogen infection exceeds 30% of the rated air volume of the air conditioner indoor unit 30, even if the total air conditioning load can be handled by the air conditioning capacity of the air conditioner indoor unit 30, the operating efficiency of the air conditioner may deteriorate and the running costs may become high. In view of this, in the method for selecting the second ventilation device and the air conditioner indoor unit of this embodiment, the sixth and seventh steps are performed to review the selection of the second ventilation device and the air conditioner indoor unit. This makes it possible to select an air conditioner indoor unit with a higher rated air volume or air conditioning capacity, for example, and thereby reduce the running costs of air conditioning and ventilation.

[0083] (8-5) In the above embodiment, by preparing many candidates for the air conditioning indoor unit as shown in (7-4) above, it becomes possible to select a more appropriate air conditioning indoor unit 30 according to the selected second ventilation device 20. This makes it possible to reduce the running costs and installation costs of the air conditioning ventilation system 100.

[0084] (9) Variations and features of air conditioning and ventilation systems (9-1) In the air conditioning ventilation system 100 of (1) to (6) above, the air conditioning indoor unit 30 has already been installed, but the second ventilation device 20, the air conditioning indoor unit 30, and the ducts 21 to 24 such as the supply air duct 24 that form the flow path of the supply air SA may be packaged as the air conditioning ventilation system 100. The ducts 21 to 24 connected to the second ventilation device and the supply air intake member 30a described later are configured to have a certain flow path resistance so that the air volume supplied to the room becomes the target ventilation air volume when the fan of the second ventilation device 20 is operated at a predetermined rotation speed. Being packaged means that the system can supply the target ventilation air volume without having to calculate the flow path resistance on site as a desired flow path resistance is generated simply by connecting the ducts 21 to 24 and the supply air intake member 30 having flow path resistance to the air conditioning indoor unit 30 and the second ventilation device 20. By adopting the packaged air conditioning and ventilation system 100, the introduction costs, including the cost of installation work, can be reduced compared to when connecting the ventilation equipment and the indoor unit of the air conditioner using parts such as ducts procured locally.

[0085] (9-2) Furthermore, in the air conditioning ventilation system 100, the supply air SA from the second ventilator 20 enters the air conditioning indoor unit 30, so the temperature of the supply air SA can be adjusted or the humidity adjusted by the air conditioning indoor unit 30 before being supplied to the indoor space SI.

[0086] (9-3) The air conditioning ventilation system 100 includes a remote control 90 that controls the air conditioning indoor unit 30 and the second ventilation device 20. This makes it possible to link the operation / stop of the air conditioning indoor unit 30 and the second ventilation device 20, and to control the second ventilation device 20 so that ventilation is not performed when the air conditioning indoor unit 30 is not operating.

[0087] In the air conditioning ventilation system 100, if ventilation is performed by the second ventilation device 20 when the air conditioning indoor unit 30 is not operating, a problem may occur in which dust attached to the suction filter of the air conditioning indoor unit 30 falls into the indoor space SI. This problem can be prevented by installing the remote control 90 and controlling the air conditioning indoor unit 30 and the second ventilation device 20 in conjunction with each other.

[0088] (10) Examples of air conditioning and ventilation systems (10-1) In the specific example of the selection of the second ventilation system in (7-6) above, the indoor space SI (floor area 75 m) of a certain store is 2 ) with 30 5 horsepower (5HP) air conditioning indoor units and a ventilation volume of 500 m 3 Assuming that the first ventilation system 10 with a capacity of 20 m3 / h is installed, the current ventilation volume (20 m3 / person) is used as a measure against pathogen infection. 3 / h), a total of 30m per person 3 This explains the case where a ventilation volume of 100 / h is required for the indoor space SI.

[0089] If we use the same approach as in this example to select a floor space of 70 m 2 More than 95m 2 The air conditioning and ventilation system to be installed in the indoor space below is an air conditioning indoor unit with a cooling rated capacity of approximately 12.5 kW and a maximum ventilation volume of 250 m 3 and a second ventilation device having a capacity of 100 s / h.

[0090] If this air conditioning and ventilation system is installed in an indoor space within an existing building, in an indoor space of the above-mentioned floor area where the first ventilation volume (for example, twice the maximum ventilation volume of the second ventilation device) is secured, it will be possible to obtain the ventilation volume necessary to prevent pathogen infection, and the total air conditioning load of the indoor space, including the air conditioning load due to the increased ventilation volume, will be handled by the air conditioner.

[0091] (10-2) In the specific example of the selection of the second ventilation system in (7-6) above, the indoor space SI (floor area 75 m) of a certain store is 2 ) with 30 5 horsepower (5HP) air conditioning indoor units and a ventilation volume of 500 m 3 Assuming that the first ventilation system 10 with a capacity of 20 m3 / h is installed, the current ventilation volume (20 m3 / person) is used as a measure against pathogen infection. 3 / h), a total of 30m per person 3 This explains the case where a ventilation volume of 100 / h is required for the indoor space SI.

[0092] If we use the same approach as in this example to select a floor space of 40 m 2 More than 60m 2 The air conditioning and ventilation system to be installed in the indoor space below is an air conditioning indoor unit with a cooling rated capacity of approximately 7.1 kW and a maximum ventilation volume of 150 m 3 and a second ventilation device having a capacity of 100 s / h.

[0093] If this air conditioning and ventilation system is installed in an indoor space within an existing building, in an indoor space of the above-mentioned floor area where the first ventilation volume (for example, twice the maximum ventilation volume of the second ventilation device) is secured, it will be possible to obtain the ventilation volume necessary to prevent pathogen infection, and the total air conditioning load of the indoor space, including the air conditioning load due to the increased ventilation volume, will be handled by the air conditioner.

[0094] (11) Variations (11-1) In the air conditioning ventilation system 100 of the above embodiment, the indoor air of the indoor space SI reaches the heat exchange element 40 as return air RA through the return air passage 21a, and the air that has passed through the heat exchange element 40 passes through the exhaust fan 28 and is discharged to the outdoor space SO as exhaust air EA. On the other hand, the outside air OA of the outdoor space SO reaches the heat exchange element 40 through the outside air introduction passage 23a, and the air that has passed through the heat exchange element 40 passes through the supply air fan 26 and is supplied to the indoor space SI as fresh supply air SA. However, the supply air SA needs a certain degree of static pressure to pass through a narrow flow path in the air conditioning indoor unit 30 to which the supply air intake member 30a is attached. For this reason, there is a risk of a pressure difference occurring between the flow paths of the return air RA and exhaust air EA, which have low flow path resistance, and the flow paths of the outside air OA and supply air SA, which have high flow path resistance.

[0095] For this reason, if the pressure loss of the supply air SA becomes significantly large, it is preferable to additionally provide a pressure adjustment unit in the air conditioning ventilation system 100.

[0096] For example, a pressure reducing member 58 such as a baffle plate or a damper is provided in the first space 51a of the second ventilation device 20 in Fig. 1A as a pressure adjusting section to increase the flow resistance of the return air RA and the exhaust air EA. This reduces the pressure difference, and the problem of the outside air and the return air mixing in the heat exchange element 40 almost never occurs.

[0097] (11-2) Although the embodiments of the present disclosure have been described above, it will be understood that various changes in form and details can be made without departing from the spirit and scope of the present disclosure described in the claims. [Explanation of symbols]

[0098] 10. First Ventilator 20 Secondary ventilation system (ventilation system, additional ventilation system) 24 Air supply passage forming member 24a Air supply path 26 Intake fan 28 Exhaust fan 30 Air conditioning indoor unit (air conditioning equipment) 30a Air intake member 33 Air intake inlet (air intake) 40 Heat exchange element 51 First opening 52 Second Opening 53 Third Opening 54 4th Aperture 58 Pressure reducing member (pressure adjusting part) 90 Remote Control (Controller) 100 Air conditioning and ventilation system EA Exhaust OA Outdoor air RA return air SA Air Supply SI interior space SO Outdoor space (outside indoor space) [Prior art documents] [Patent documents]

[0099] [Patent Document 1] JP 2005-300112 A

Claims

1. A method for selecting an additional ventilation device and an air conditioning device, when a different ventilation device is newly installed as an additional ventilation device (20) for an indoor space (SI) in which an existing first ventilation device (10) having a first ventilation volume per hour is installed, comprising the steps of selecting an additional ventilation device (20) by a method for selecting an additional ventilation device and further selecting an air conditioning device (30) for air-conditioning the indoor space, A first step of calculating a second ventilation volume, which is a ventilation volume per hour required as a measure against pathogen infection, based on the size of the indoor space (SI); A second step of determining a difference between the second ventilation volume and the first ventilation volume as an additional ventilation volume; a third step of selecting a ventilation device capable of ventilating the additional ventilation volume as an additional ventilation device (20); A fourth step of calculating a total air conditioning load by adding together a first air conditioning load determined based on the size of the indoor space (SI), a second air conditioning load generated by ventilation using the existing first ventilation device, and a third air conditioning load generated by ventilation using the additional ventilation device selected in the third step; and a fifth step of selecting an air conditioner (30) having an air conditioning capacity capable of processing the total air conditioning load from among a plurality of candidate air conditioners having different air conditioning capacities; A method for selecting an additional ventilation device and an air conditioning device, comprising:

2. In the third step, a ventilation device having a heat exchange section (40) that performs heat exchange between outside air (OA) that is supplied air (SA) to the indoor space and return air (RA) that is exhaust air (EA) from the indoor space is selected as an additional ventilation device (20); In the fourth step, the third air conditioning load is calculated in consideration of a heat exchange amount in the heat exchange section (40) of the selected additional ventilation device. A method for selecting a supplementary ventilation device and an air-conditioning device according to claim 1.

3. In the third step, an additional ventilation device is selected from among a plurality of candidate ventilation devices having different maximum ventilation volumes; the number of the plurality of air conditioning device candidates in the fifth step is greater than the number of the plurality of ventilator candidates in the third step; A method for selecting a supplementary ventilation device and an air-conditioning device according to claim 1 or 2.

4. Floor area is 70m 2 More than 95m 2 An air conditioning ventilation system to be installed in an indoor space in which an existing first ventilation device having a first ventilation volume per hour is provided, The additional ventilation device and the air conditioning device are selected by the selection method of the additional ventilation device and the air conditioning device according to any one of claims 1 to 3, The air conditioner has a cooling rated capacity of about 12.5 kW; Maximum ventilation volume is 250m 3 / h, and An air conditioning and ventilation system.

5. Floor area is 40m 2 More than 60m 2 An air conditioning ventilation system to be installed in an indoor space in which an existing first ventilation device having a first ventilation volume per hour is provided, The additional ventilation device and the air conditioning device are selected by the selection method of the additional ventilation device and the air conditioning device according to any one of claims 1 to 3, The air conditioner has a cooling rated capacity of about 7.1 kW; Maximum ventilation volume is 150m 3 / h, and An air conditioning and ventilation system.

6. The air conditioning device has an air supply port (33) that receives supply air (SA) from outside the indoor space, The ventilation device has a supply air fan (26) for sending outside air (OA) to the air conditioning device as the supply air (SA), an air supply path forming member (24) connected to the ventilation device and the air conditioning device and forming an air supply path (24a) for guiding the supply air (SA) from the ventilation device to the air supply port of the air conditioning device; The air conditioning and ventilation system according to claim 4 or 5, further comprising:

7. The ventilation device (20) further includes a casing (50) that houses the supply air fan (26), an exhaust fan (28) that is housed in the casing and sends air in the indoor space (SI) to the outside (SO) of the indoor space as exhaust air (EA), and a heat exchanger (40) that exchanges heat between return air (RA) that becomes the exhaust air (EA) and the outside air (OA), The casing is formed with a first opening (51) for taking in air from the indoor space as the return air (RA), a second opening (52) for sending the return air (RA) to the outside of the indoor space as the exhaust air (EA), a third opening (53) for taking in the outside air (OA), and a fourth opening (54) to which the air supply path forming member is connected, a pressure adjusting unit (58) that adjusts the pressure of air so that a difference between a pressure of return air (RA) flowing from the first opening (51) to the second opening (52) in the ventilation device and a pressure of outside air (OA) flowing from the third opening (53) to the fourth opening (54) in the ventilation device becomes small; The air conditioning and ventilation system of claim 6 , further comprising:

8. A remote controller (90) for controlling the air conditioning device and the ventilation device; The air conditioning and ventilation system according to claim 4 , further comprising: